1 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
2 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
|
Scheduled | |
3 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
4 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
|
Scheduled | |
5 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
|
Scheduled | |
6 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
|
Scheduled | |
7 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
8 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in 84 of 2022
|
Scheduled | |
9 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
|
Scheduled | |
10 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
153 of 2023
|
Rescheduled on Tue 29/August/2023 10:30 AM | |
11 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
|
Scheduled | |
12 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
|
Rescheduled on Friday 29/September/2023 10:30 AM | |
13 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
|
Scheduled | |
14 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
|
Scheduled | |
15 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited.
151 of 2023
|
Scheduled | |
16 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
|
Scheduled | |
17 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
|
Scheduled | |
18 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
|
Scheduled | |
19 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
|
Scheduled | |
20 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
|
Scheduled | |
21 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
22 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
|
Scheduled | |
23 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
24 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
25 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
26 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
27 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
28 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
29 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
30 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
31 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 76.55 MW wind power from the wind Generators whose EPAs with MSEDCL have expired.
119 of 2023
|
Scheduled | |
32 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited for seeking approval for adoption of tariff rate of Rs 2.97/KWH under ‘Mukhyamantri Saur Krishi Vaahini Yojana’ to meet MSEDCL's Solar Renewable Purchase Obligations under Section 63 of Electricity Act, 2003 and for seeking approval to the Deviations Sought in the Draft PSA & PPA with respect to the Standard Bidding Guidelines, issued by MNRE/MoP, for Procurement of Power through Competitive Bidding Process as per directions in MERC Order dated 19.10.2018 in Case No. 172 of 2017.
120 of 2023
|
Scheduled | |
33 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 Review of Commission Order dated 15th February, 2023 in Case 116 of 2022.
123 of 2023
|
Scheduled | |
34 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bhimashankar Sahakari Sakhar Karkhana Limited requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 8.02 of the Energy Purchase Agreement dated 21.06.2004 and subsequent amendment EPA dated 12.12.2012 entered between the Petitioner and the Respondent.
124 of 2023
|
Scheduled | |
35 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for Regulatory Framework for sharing of Expenses Amongst all Discoms in the State in respect of procurement of Power from waste to Energy Projects, bagasse, biomass and small/mini/micro Hydro Projects as per directives of Hon’ble Commission vide Order dated 22.03.2021 in Case No. 162 of 2019 and Order dated 26.03.2021 in Case No. 208 of 2020.
115 of 2023
|
Scheduled | |
36 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15.3 of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner’s assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Hedge Banks) in respect of the Petitioner’s Transmission Project.
116 of 2023
|
Scheduled | |
37 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Haldirams Food International Pvt Ltd. under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of distribution licensees including power quality) Regulations, 2021 challenging the “debit bill adjustment” amounting to Rs. 2,79,19,643.09 included by MSEDCL in the petitioner’s monthly energy bill dated 07.01.2023 and under Section 142, 146 and 149 of the EA, 2003 against MSEDCL seeking initaition of appropriate proceedings for violation of provisions of Regulations framed by this Hon’ble Commission including but not limited to violation of provisions of EA, 2003 and petition in the matter of MSEDCL’s commercial circular bearing no. 266 dated 30.07.2016 read with MSEDCL’s commercial circular bearing no. 289 dated 06.06.2017 adopting the government of Maharashtra resolution bearing no. 238/urja/-5 dated 29.06.2016 alongwith the modified government of Maharashtra resolution bearing no. 238/urja/-5 dated 24.03.2017 and thereby providing incentives to Marathwada, north Maharashtra and d & d+ areas and providing the applicable incentive to the petitioner for the period september-2019 to march-2022
117 of 2023
|
Scheduled | |
38 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Niwas Spinning Mills Ltd. regarding Revision in contract demand.
118 of 2023
|
Scheduled | |
39 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
|
Scheduled | |
40 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
|
Scheduled | |
41 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
|
Scheduled | |
42 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
|
Scheduled | |
43 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
|
Scheduled | |
44 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
|
Scheduled | |
45 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
|
Scheduled | |
46 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
|
Scheduled | |
47 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
|
Scheduled | |
48 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
|
Scheduled | |
49 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
|
Scheduled | |
50 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
|
Scheduled | |
51 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
|
Scheduled | |
52 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
|
Scheduled | |
53 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
|
Scheduled | |
54 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
|
Scheduled | |
55 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
|
Scheduled | |
56 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
|
Scheduled | |
57 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
|
Rescheduled on Friday 11/August/2023 10:30 AM | |
58 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
|
Scheduled | |
59 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nitin Ramling Ghule for Non-Compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur, Nagpur in Case No. 50 of 2022.
103 of 2023
|
Scheduled | |
60 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
|
Scheduled | |
61 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
|
Scheduled | |
62 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
|
Scheduled | |
63 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
|
Scheduled | |
64 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
|
Scheduled | |
65 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
|
Scheduled | |
66 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
|
Scheduled | |
67 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
|
Scheduled | |
68 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
|
Scheduled | |
69 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
|
Scheduled | |
70 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
|
Scheduled | |
71 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
|
Scheduled | |
72 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
|
Scheduled | |
73 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
|
Scheduled | |
74 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
|
Scheduled | |
75 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Rahul R. Maroti in the matter of non-compliance of CGRF Order in complaint No: 102 of 2022 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
85 of 2023
|
Scheduled | |
76 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
|
Scheduled | |
77 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals against MSEDCL seeking compliance of the CGRF, Nagpur Order dated 23 November 2020.
15 of 2023
|
Scheduled | |
78 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 9 September 2022.
46 of 2023
|
Scheduled | |
79 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya, Station Road Ravi, Arvi, Wardha against MSEDCL seeking compliance of the CGRF, Nagpur’s Order dated 20 February, 2018 in complaint No: 114 of 2017.
48 of 2023
|
Scheduled | |
80 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aspa Bansons Auto Pvt Ltd. against MSEDCL seeking compliance of the CGRF, Akola’s Order dated 23 November 2022 in complaint No: 141 of 2022.
49 of 2023
|
Scheduled | |
81 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Scheduled | |
82 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 24 February 2023 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 108 of 2022.
169 of 2023
|
Scheduled | |
83 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sanfoods & Cold Storage Pvt Ltd. under Section 142 & 146 for Non-compliance Hon’ble Electricity Ombudsman (Mumbai) has issued order and instructed to charge the bill as Industrial tariff category only from 28/07/2020 till January 2021, by withdrawing interest and DPC levied, if any. In their order no 1/2023/793 dt. 09.03.2023.
170 of 2023
|
Scheduled | |
84 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Swastika Infra-Logic (India) Pvt. Ltd. for directing MSEDCL to Comply Hon. CGRF order in respect of consumer M/s. Swastika Infra-Logic (India) Pvt. Ltd. Consumer No. 128019008040 Under Jalgaon Circle, MSEDCL Jalgaon.
183 of 2023
|
Scheduled | |
85 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ms. Sujata Prasanna Soparkar against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 27 June 2022 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 42 of 2022 and Order dated 17 October 2022 passed by the Ld. Appellate Authority, Chembur in Appeal No. 4 of 2019.
185 of 2023
|
Scheduled | |
86 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. The Grand Jalsa for non-compliance of Order passed by Hon’ble Electricity Ombudsman, MSEDCL, Akola Zone, Akola in Case No. 04 of 2023.
188 of 2023
|
Scheduled | |
87 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
|
Scheduled | |
88 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of CGRF Amaravati Order dated 27 May, 2022.
223 of 2022
|
Scheduled | |
89 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Mahagaon Yawatmal Highways Private Limited seeking compliance of CGRF Amaravati Order dated 27 May, 2022 and Order dated 18 August, 2022.
243 of 2022
|
Scheduled | |
90 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
And
Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
91 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
And
Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
And
Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
92 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
93 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
94 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa& Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
95 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
96 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
97 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
98 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Navi Mumbai Cold Storage Owners Welfare Association seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
98 of 2023
|
Scheduled | |
99 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maha Coldstorage Association C/o Ecofresh Cold Storage & Warehousing Pvt Ltd. seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
99 of 2023
|
Scheduled | |
100 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31st March 2023 in Case No. 226 of 2022 in the matter of final True-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional True Up of ARR of FY 2022-23 and Revised Tarff and Projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
|
Scheduled | |
101 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Association of Plant Tissue Culture Industries for proper Tariff Categorization of the Plant Tissue Culture Units, which are the integral part of the Agriculture Category alike Nursery and Horticulture (in LT/HT Agricultural Category). In order to stop improper LT-IV C and HTV B Tariff Application, and with reference to the Hon’ble Commission latest concerned Orders in Case No. 226 of 2022.
121 of 2023
|
Scheduled | |
102 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Ltd. seeking Review of Order dated 31st March 2023 in Case No. 227 of 2022 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional truing-up of ARR of FY 2022-23 and revised tariff for FY 2023-24 and FY 2024-25 and provisional tariff for Bhusawal Unit No. 6
132 of 2023
|
Scheduled | |
103 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section
94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking review
of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY
2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and
Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for
Generation Business of Tata Power.
93 of 2023
|
Scheduled | |
104 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of
the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of
Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY
2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of
ARR for FY 2023-24 and FY 2024-25.
94 of 2023
|
Scheduled | |
105 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order in Case No. 239 of 2022 dated 31st March, 2023 for Truing-up of Intra-State Transmission System Tariff (InSTS) for FY 2020-21 and FY 2021-22 and determination of revised InSTS Tariff for FY 2023-24 and FY 2024-25.
95 of 2023
|
Scheduled | |
106 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Jaigad Powertransco Limited (JPTL) seeking review of the Order in Case No. 213 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
96 of 2023
|
Scheduled | |
107 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Adani Transmission (India) Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 238 of 2022.
100 of 2023
|
Scheduled | |
108 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 and Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 237 of 2022.
101 of 2023
|
Scheduled | |
109 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. in respect of Order dated 31st March, 2023 notified by Hon’ble Commission in Case No. 232 of 2022 in the matter of Petition of MSETCL for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20 to FY 2021-22, Provisional Truing-up of Aggregate Revenue Requirement for FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25.
137 of 2023
|
Scheduled | |
110 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35.
and
Application of The Tata Power Company Limited (Distribution) seeking urgent listing.
39 of 2023 & I.A. No. 56 of 2023
|
Scheduled | |
111 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section
94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra
Electricity Regulatory Commission (Transaction of Business and Fees and
Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case
No. 225 of 2022.
76 of 2023
|
Scheduled | |
112 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under
Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking review
of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY
2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and
Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for
Transmission Business of Tata Power.
91 of 2023
|
Scheduled | |
113 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
|
Rescheduled on Friday 06/October/2023 10:30 AM | |
114 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
|
Rescheduled on Friday 06/October/2023 10:30 AM | |
115 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
|
Rescheduled on Tuesday 10/October/2023 10:30 AM | |
116 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
|
Rescheduled on Tuesday 10/October/2023 10:30 AM | |
117 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
|
Postponed till further notice | |
118 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
|
Postponed till further notice | |
119 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
|
Postponed till further notice | |
120 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
|
Postponed till further notice | |
121 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
And
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023.
148 of 2023 & I.A. No. 52 of 2023
|
Postponed till further notice | |
122 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
And
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
179 of 2023 & I.A. No. 53 of 2023
|
Postponed till further notice | |
123 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
And
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
180 of 2023 &I.A. No. 54 of 2023
|
Postponed till further notice | |
124 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
|
Postponed till further notice | |
125 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanshtha Ltd. in the matter of (i) Breach of Distribution Open Access Regulations 2016. (ii) Breach of Practice Directions dated 8 March 2017. (iii) Excess levy and recovery of Wheeling Charges & Transmission Charges. (iv) Breach of A.T.E.’s order dated 06-10-2022 in Appeal No. 20 of 2019.
72 of 2023
|
Completed | |
126 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(b) read with Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 and under various Power Purchase Agreements, as enumerated below, seeking compensation on account of occurrence of Change in Law events.
73 of 2023
|
Completed | |
127 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SJVN LTD under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
|
Completed | |
128 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86 (1) (e) and Section 86 (1) (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 22.07.2022 (signed on 03.08.2022), seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change in Law event.
75 of 2023
|
Completed | |
129 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
|
Completed | |
130 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
|
Completed | |
131 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing and interim directions in Case No. 187/AD/2023.
I.A. No. 57 of 2023 in Case No. 187 of 2023
|
Completed | |
132 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. seeking urgent listing and interim directions in Case No. 186/AD/2023.
I.A. No. 58 of 2023 in Case No. 186 of 2023
|
Completed | |
133 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing in Case No. 56/AD/2023.
I.A. No. 59 of 2023 in Case No. 56 of 2023
|
Completed | |
134 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Completed | |
135 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
|
Completed | |
136 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Regulation 20 of the MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
68 of 2023
|
Completed | |
137 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Vayunandana Power Limited requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 15.02 of the energy purchase agreement dated 22.09.2008 entered between the petitioner and the respondent.
69 of 2023
|
Completed | |
138 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Greta Energy Limited under regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
70 of 2023
|
Completed | |
139 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
71 of 2023
|
Completed | |
140 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Infosys Limited (SEZ) seeking interim directions and urgent listing in Case No. 177/AD/2023. (Petition of M/s. Infosys Limited (SEZ) challenging the levy of wheeling charges and losses by MSEDCL on M/s. Infosys Ltd. (SEZ).
I.A. No. 55 of 2023 in Case No. 177 of 2023
|
Completed | |
141 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing in Case No. 39/MP/2023. (Petition of TPC-D directions of the Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Commission seeking approval of the Power Procurement Plan of TPC-D for FY 2024-25 to FY 2034-35.)
I.A. No. 56 of 2023 in Case No. 39 of 2023
|
Completed | |
142 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited for clarification of Order dated
27.05.2023 passed in Case No. 174 of 2022.
And
Interlocutory Application of Juniper Green Field Private Limited seeking urgent
listing of Case No. 175/MP/2023.
175 of 2023 & I.A. No. 50 of 2023
|
Completed | |
143 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Postponed till further notice | |
144 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
|
Postponed till further notice | |
145 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
|
Postponed till further notice | |
146 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
|
Postponed till further notice | |
147 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Hamid Stone Crusher for Non-compliance of CGRF order in complaint No: 39 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
50 of 2023
|
Completed | |
148 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Smt. Sheela Rajeshwar Niwal for Non-compliance of CGRF order in complaint No: 64/2022 passed by CGRF, MSEDCL, Amravati Zone, Amravati.
51 of 2023
|
Completed | |
149 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Manjusha Amit Mundada for Non-compliance of CGRF order in complaint No: 104 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
52 of 2023
|
Completed | |
150 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rajaram Subarao Patil under Section 142 & 146 of the Electricity Act, 2003 seeking compliance of the order dated 02.05.2022 passed by CGRF, Kolhapur in Case No.10/2022, whereby MSEDCL was ordered to release the Electricity connection to the agriculture pump of the petitioner within 3 months from the date of CGRF Order and to compensate the petitioner with twice the amount paid by petitioner against service charge connection.
61 of 2023
|
Completed | |
151 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises for Non-compliance of CGRF order in complaint No: 71 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
46 of 2023
|
Completed | |
152 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Usha Packaging for non-compliance of CGRF order in complaint No: 121 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
47 of 2023
|
Completed | |
153 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya for non-compliance of CGRF order in complaint No: 114 of 2017 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
48 of 2023
|
Completed | |
154 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. ASPA BANSONS Auto Pvt Ltd. for non-compliance of CGRF order in complaint No: 141 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
49 of 2023
|
Completed | |
155 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirements including calibration and testing thereof as stipulated by the Statutory Regulations.
And
Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No. 181/MP/2023.
181 of 2023 & I.A No. 51 of 2023
|
Completed | |
156 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Juniper Green Field Private Limited seeking urgent listing of Case No. 175/MP/2023. (Petition filed by Juniper Green Field Private Limited for clarification of Order dated 27.05.2023 passed in Case No. 174 of 2022.)
I.A. No.50 of 2023 in Case No. 175 of 2023
|
Completed | |
157 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023. (Petition filed by MSPGCL seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.)
I.A. No. 52 of 2023 in Case No. 148 of 2023
|
Completed | |
158 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
(Petition filed by M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 53 of 2023 in Case No. 179 of 2023
|
Completed | |
159 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
(Petition filed by M/s. SEZ Bio-Tech Services Private Limited. for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 54 of 2023 in Case No. 180 of 2023
|
Completed | |
160 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur Zone, Order in Case No 17/2020 dated 23.11.2020 related to the revision of energy bills according to contract demand 100 KVA instead of 155 KVA from February 2020.
15 of 2023
|
Completed | |
161 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - (Distribution Business) under Section 86, including Sections 86 (1) (b) & (e) of the Electricity Act, 2003 and in compliance of the directions issued by this Hon’ble Commission vide Order dated 28.10.2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project being developed by M/s Adani Hybrid Energy Power Jaisalmer Four Ltd., on account of occurrence of Force Majeure Events falling under Article 11 of Power Purchase Agreement dated 07.07.2020.
33 of 2023
|
Completed | |
162 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Green Energy Limited seeking Change in Law compensation in terms of the Power Purchase Agreements (“PPA”) dated 04.12.2020 executed between Tata Power Green Energy Limited (“TPGEL”) and The Tata Power Company Limited (“Tata Power”), on account of increase in costs due to increase in rate of Goods & Services Tax (“GST”), amounting to Change in Law.
34 of 2023
|
Completed | |
163 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
|
Postponed till further notice | |
164 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shakila Bano Nijamuddin Shaikh under Electricity Act 2003 for noncompliance of final order of the Electricity Ombudsman, Mumbai by the Respondent.
38 of 2023
|
Withdrawn | |
165 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
|
Completed | |
166 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
|
Completed | |
167 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sanyo Special Steel Manufacturing India Private Limited (SSSMIPL) for non-compliance of provisions of Electricity Act, 2003 particularly Section 62(6) read with Section 42 and 86 of the Electricity Act, 2003 read with Regulations 4.5 and 32 of the MERC (Distribution Open Access) Regulations, 2016 for payment of interest on amounts refunded on account of adoption of incorrect monthly billing methodology for FY 2016-17, 2017-18 and FY 2018-19 by Maharashtra State Electricity Distribution Company Limited read with the relevant provisions of Electricity Act, 2003.
29 of 2023
|
Completed | |
168 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility as per Regulation 99 of MEGC, 2020.
31 of 2023
|
Completed | |
169 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Border Check Post Network Limited under Section 86(1)(k) read with Sections 61 & 62 of the Electricity Act, 2003 challenging Maharashtra Electricity Distribution Company Limited’s act of arbitrarily changing tariff category of the Border Check Posts from ‘Public Service – Others’ to ‘Commercial’ and retrospectively recovering differential tariff.
32 of 2023
|
Completed | |
170 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre (MSLDC) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking to prepare procedure for operationalization of spinning reserve in the State of Maharashtra, by MSLDC as per Order in Case No. 85 of 2022.
142 of 2023
|
Completed | |
171 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
|
Completed | |
172 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
|
Completed | |
173 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited under Section 86(1)(b), (e.) and (f) of the Electricity Act, 2003 read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 seeking extension of Scheduled Commercial Operation Date (“SCOD”) of the 225 MW Wind Solar Hybrid Power Project, located in village Noorsar, Taluka – Bikaner, Rajasthan and the State of Maharashtra (“Hybrid Project”).
14 of 2023
|
Completed | |
174 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AEML SEEPZ Ltd. under Section 86 read with Section 43 of the Electricity Act, 2003 for implementation of the orders of this Hon’ble Commission dated 15.10.2009 passed in Case No. 50 of 2009 and 12.06.2017 passed in Case Nos. 182 of 2014 and 40 of 2015, thereby making AEML SEEPZ Ltd. a part of the changeover and switchover protocol as framed in the aforesaid orders existing amongst the parallel distribution licensee in common area of supply.
21 of 2023
|
Completed | |
175 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Airport Development Company Limited (MADC) for determination and approval of “Schedule of Charges” to be recovered by the distribution licensee from the existing / prospective consumers for the various services provided to them.
25 of 2023
|
Notice Withdrawn and will be rescheduled | |
176 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
And
Interlocutory Application of M/s. Jawaharlal Nehru Port Authority (JNPA) for urgent listing in Case No. 153/AP/2023.
153 of 2023 & IA No 46 of 2023
|
Completed | |
177 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Power Procurement plan as per the direction of the Hon’ble Commission in Order dated 24.05.2023 in IA No. 25 of 2023 in Case No. 40 of 2023 and under Regulation 5.1 of MERC (Multi Year Tariff) Regulation, 2019.
And
Interlocutory Application of AEML SEEPZ Limited (ASL) for urgent listing in Case No. 171/MP/2023.
171 of 2023 & IA No 48 of 2023
|
Completed | |
178 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
|
Rescheduled on Tuesday 29/August/2023 10:30 AM | |
179 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
|
Rescheduled on Tuesday 29/August/2023 10:30 AM | |
180 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
|
Rescheduled on Tuesday 01/September/2023 10:30 AM | |
181 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
|
Rescheduled on Tuesday 01/September/2023 10:30 AM | |
182 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jalna Siddhi Vinayak Alloys Pvt Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
4 of 2023
|
Completed | |
183 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Energy Development Agency (MEDA) under Section 86(1)(e) for appropriate directions to Distribution Licensees to meet 50% of total Renewable Purchase Obligation (RPO) requirement by purchase of energy from Renewable Sources within the State as per amendment dated 30 June 2022 in Renewable Energy Generation Policy 2020 issued by Government of Maharashtra.
6 of 2023
|
Completed | |
184 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandelwal Jinning and Pressing for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 9/2022.
209 of 2022
|
Withdrawn | |
185 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 and invoking regulation 92 of MERC (Conduct of Business) Regulations 2004 to seek relaxation of regulations 8.2 of the MERC (Forecasting Scheduling and Deviation Settlement for solar and wind 2018 in the compliance of the Order of the Hon’ble APTEL in the Appeal No. 31 of 2022 dated 11.10.2022.
245 of 2022
|
Completed | |
186 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
|
Completed | |
187 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 12-14/2022 & 18-24/2022 directing MSEDCL to reclassify category of Tariff.
223 of 2022
|
Completed | |
188 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. T.P. Saurya Ltd. under Section 86(1)(f) of the Electricity Act, 2003, read with Article 9.2.1 and 9.2.2 of the Power Purchase Agreement dated 22.07.2022 seeking rise in the rate of Goods and Service Tax as a Change in Law relief.
241 of 2022
|
Completed | |
189 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 15-17/2022 and Order dated 18.08.2022 passed by CGRF, Amravati in Representation No. 70-92/2022 whereby MSEDCL was ordered to reclassify the category of tariff.
243 of 2022
|
Completed | |
190 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. T. P. Kirnali Limited seeking compensation on account of increase in costs on account of increase in rate of Goods & Services Tax (“GST”) and change in Basic Custom Duty (“BCD”) amounting to Change in Law in terms of the Power Purchase Agreements (“PPA”) dated 16.09.2020, as amended on 25.10.2021, executed between T. P. Kirnali Limited (“TPKL”) and Maharashtra State Electricity Distribution Company Limited (“MSEDCL”).
244 of 2022
|
Completed | |
191 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
|
Completed | |
192 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
I.A. No. 45 of 2023 in 151 of 2023
|
Completed | |
193 | Tue 08/08/2023 10:30:00 AM |
Admissibility and Maintainability e-Hearing through Video Conferencing
Petition of Mr. Amin Fakir Mohammad Shaikh for safeguarding the rights of the consumers, in reference to the rights given to consumers under Section 55 of EA, 2003, to choose, Purchase and install the electricity meters of his own choice. & Violating Regulation No 4 of CEA (Installation and Operation of Meters) (Amendments) Regulations, 2019 related to replacement of existing meter only in smart meter and Violating Regulation 15.1.1 of MERC (Electricity supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 related to replacement of existing meter only in smart meter.
203 of 2022
|
Completed | |
194 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited for Review of the Suo-Moto Order dated 02.08.2022 passed in the matter of Commercial implementation of the MERC (Deviation Settlement Mechanism and related matters) Regulations, 2019, post expiry of stabilization period and related issues thereof limited to the issues and grounds as raised herein.
204 of 2022
|
Completed | |
195 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Laxminarayn Bhutada Foundation for Education for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola Zone Order in Case No. 106/2022 dated 30.08.2022 related to wrong multiplying factor grievance (Billing Dispute).
207 of 2022
|
Completed | |
196 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 39/2022.
208 of 2022
|
Completed | |
197 | Fri 04/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants
And
Application of Captive Power Producers Association seeking Impleadment as a party/Respondent
And
Applications of Respondents for striking off their names from the list of Respondents
And
Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
|
Completed | |
198 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
|
Completed | |
199 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination
And
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I.A. No. 30 of 2023
|
Completed | |
200 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent
And
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
201 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Completed | |
202 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021.
And
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Completed | |
203 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking
appropriate directions from the Commission in compliance with Order dated 24
January, 2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009
of 2023 (Ultratech Cement Limited & Anr vs. MSEDCL), Order dated
16.03.2023 in Civil Writ Petition No. 2511 of 2023 (Vaibhav Deshmukh Infra
Pvt Ltd. vs. Union of India & Anr.), Civil Writ Petition No. 2516 of 2023 (RNP
Concrete (India) Pvt Ltd. v. UOI and Ors.) and Civil Writ Petition No. 2587 of
2023 (M/s. L T Patil and Sons vs MSEDCL)
45 of 2023
|
Completed | |
204 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Completed | |
205 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021
And
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Completed | |
206 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Completed | |
207 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Completed | |
208 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Completed | |
209 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Completed | |
210 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
|
Postponed till further notice | |
211 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22
September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017 (Re-opened Case.)
|
Postponed till further notice | |
212 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking appropriate directions from MERC in compliance with Order dated 24.01.2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516 of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
|
Completed | |
213 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL
And
Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition
And
Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I. A. No.7 of 2023, I. A. No.8 of 2023
|
Completed | |
214 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project
And
Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project
And
Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I. A. No.9 of 2023, I. A. No.10 of 2023
|
Completed | |
215 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014
And
Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014
And
Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I. A. No.13 of 2023, I. A. No.14 of 2023
|
Completed | |
216 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
And
Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
And
Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I. A. No.17 of 2023, I. A. No.18 of 2023
|
Completed | |
217 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
And
Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
And
Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I. A. No.15 of 2023, I. A. No.19 of 2023
|
Completed | |
218 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under
Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation
14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees
and Charges) Regulations, 2022, read with the various provisions of the Wind
Energy Purchase Agreements entered into between M/s NSL Wind Power
Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of
Impugned Notice dated 09.01.2023
And
Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking
interim protection against the Respondent to take any action(s) pursuant to the
Impugned Notice dated 09.01.2023
And
Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking
urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I. A. No.16 of 2023, I. A. No.20 of 2023
|
Completed | |
219 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
|
Completed | |
220 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects
And
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
And
Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
And
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I. A. No. 23, 36 & 38 of 2021
|
Completed | |
221 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for seeking approval for Deviation in Standard Bidding document for
Long Term Procurement of 7,000 MW Solar Power and for Meeting the Solar
Renewable Purchase Obligations under Section 19 of MERC (Renewable Purchase
Obligation, Its Compliance and Implementation of Renewable Energy Certificate
Framework) Regulations, 2019 and to Supply day time Power to the Farmers of
the State of Maharashtra.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company
Limited (MSEDCL) seeking urgent hearing in Case No. 164/MP/2023.
164 of 2023 & IA No. 41 of 2023
|
Completed | |
222 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pimpri Chinchwad Municipal Corporation & Anr. seeking adoption of
the Electricity (Promoting Renewable Energy Through Green Energy Open
Access) Rules, 2022 as promulgated by the Government of India in June 2022. and
Promotion of generation and procurement of power generated through municipal
solid waste under the concept of Waste to Energy. and Pimpri Chinchwad
Municipal Corporation’s 14 MW Waste to Energy plant at Moshi, Pune.
And
Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for
Interim Reliefs in Case No. 165/AD/2023.
And
Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for
urgent listing in Case No. 165/AD/2023.
165 of 2023 & IA No. 42 of 2023, 43 of 2023
|
Completed | |
223 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Section 86 (1)(b) of the EA, 2003 read with Regulation 20 of the MERC (MYT) Regulations, 2019 and directions of the Hon'ble Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35
And
Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing of the captioned Petition.
39 of 2023 & I. A. No.39 of 2023
|
Completed | |
224 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86(1)(f) of the EA, 2003 read with Regulation 27 & 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022
And
Petition of M/s. TP Saurya Limited under Section 94(2) of the Electricity Act, 2003 read with Regulation 33 of the MERC Regulations, 2022 seeking interim relief(s)/directions on behalf of TP Saurya Limited.
66 of 2023 & I.A. No.32 of 2023
|
Completed | |
225 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) under Section 86 (1)(f) & 11(2) of the Electricity Act, 2003 for payment of Fixed Charges and Revision of Energy Charges during Subsistence of S. 11 Direction
And
Application of JSW Energy Limited (JSWEL) seeking urgent listing of the Petition filed under section 86 (1)(f) & Section 11(2) of the Electricity Act, 2003.
211 of 2022 & I.A. No.33 of 2023
|
Completed | |
226 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act,
2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated
29.06.2022 executed between Maharashtra State Electricity Distribution
Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under
Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022
And
Application of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for urgent listing in Case No. 122/MP/2023.
122 of 2023 & I.A No.38 of 2023
|
Postponed till further notice | |
227 | Tue 16/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
228 | Tue 16/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
229 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Rescheduled till further notice | |
230 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Rescheduled till further notice | |
231 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the
Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
232 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003
to penalized MSEDCL for non compliance of CGRF Order and issue directions
to comply the Order.
200 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
233 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled till further notice | |
234 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants
And
Application of Captive Power Producers Association seeking Impleadment as a party/Respondent
And
Applications of Respondents for striking off their names from the list of Respondents
And
Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 247, 242, 256, 262, 266, 267 of 2022 & I.A. No. 25, 29, 31, 34, 40 & 45 of 2022
|
Rescheduled till further notice | |
235 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
236 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Completed | |
237 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
|
Completed | |
238 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Completed | |
239 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Section 86 (1) (e) read with 86 (1) (b), (k) of
the Electricity Act, 2003 Read with Article 5 & 21.8 of Energy Purchase
Agreement dated 19.09.2017 executed between Petitioner AA Energy Limited and
Respondent Maharashtra State Electricity Distribution Company Ltd for supply of
10 MW Energy, from its Biomass Plant Located at Wadsa, Desaiganj, District
Gadchiroli.
60 of 2023
|
Completed | |
240 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of AA Energy Limited for seeking urgent listing and
issuance of interim directions in Case No. 60/AP/2023.
IA No. 31 of 2023 in Case No. 60 of 2023
|
Completed | |
241 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 15 read with Article 10.05 of the Wind Energy Purchase Agreements dated 08.08.2017, 24.03.2017 and 24.03.2017 for adjudication of dispute in relation to timely payment of Energy Bills raised by the Petitioner.
27 of 2023
|
Completed | |
242 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -D under Section 86 (1)(b) read with
and Regulation 39 of the Maharashtra Electricity Regulatory Commission
(Transaction of Business and Fees and Charges) Regulations, 2022 and all the
enabling powers in this regard including the inherent powers and expansive
regulatory authority vested unto the Hon'ble Commission seeking approval for
Short Term Power Purchase for Tata Power -D for April 2023 to June 2023
And
Interlocutory Application of The Tata Power Company Limited - Distribution for
seeking urgent listing and hearing of the captioned petition in Case No.
53/AP/2023.
53 of 2023 & I. A. No.28 of 2023
|
Completed | |
243 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination
And
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I. A. No. 30 of 2023
|
Completed | |
244 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Joint Petition of 1) Maharashtra State Electricity Distribution Company Ltd. and 2) Dodson-Lindblom Hydro Power Private Limited Section 86 (1) (e) of the Electricity Act, 2003 for amendment to the PPA which is a ministerial act in the present Case for updating the record of the transaction between the Parties
And
Joint Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. and Dodson-Lindblom Hydro Power Private Limited for seeking urgent listing and hearing Case No. 58/MP/2023.
58 of 2023 & I. A. No. 29 of 2023
|
Completed | |
245 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. for change in the approved Load Shedding Protocol of AG Load Management Scheme in Gadchiroli District.
59 of 2023
|
Completed | |
246 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Shreehari Associates Private Limited for seeking urgent reliefs in Case No. 57/DT/2023
I.A. in 27 of 2023 in Case No. 57 of 2023
|
Completed | |
247 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
|
Completed | |
248 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL
seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in
Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Scheduled | |
249 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 61 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
178 of 2022
|
Rescheduled till further notice | |
250 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 62 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
179 of 2022
|
Rescheduled till further notice | |
251 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events
And
Application of M/s. Avaada MH Sustainable Pvt. Ltd. seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No. 44 of 2022
|
Scheduled | |
252 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021 and Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Rescheduled till further notice | |
253 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
|
Scheduled | |
254 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
|
Scheduled | |
255 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent
and
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled on Friday, 12/May/2023 10:30 AM | |
256 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Rescheduled till Further Notice | |
257 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021
and
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Rescheduled on Thursday, 02/May/2023 10:30 AM | |
258 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22 September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017
|
Rescheduled till further notice | |
259 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
|
Rescheduled till further notice | |
260 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for non-compliance dated 05.02.2023 filed by the petitioner in view of daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking action against MSEDCL for wilful violation of directions contained in daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission.
7 of 2023 & I.A. No. 4 of 2023, I.A. No. 5 of 2023, I.A. No. 11 of 2023, I.A. No. 12 of 2023, I.A. No. 21 of 2023, I.A. No. 22 of 2023
|
Completed | |
261 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Rescheduled till further notice | |
262 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Rescheduled till further notice | |
263 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for
Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse
Based Co-Generation Projects And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I.A. 23, 36 & 38 of 2021
|
Completed | |
264 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
265 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
266 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
267 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023
and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023
and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
268 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
|
Completed | |
269 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
|
Completed | |
270 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
|
Completed | |
271 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
|
Completed | |
272 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
|
Completed | |
273 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
|
Completed | |
274 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f)
of the Electricity Act, 2003 for adjudication of dispute between NuPower
Renewables Private Limited and Maharashtra State Electricity Distribution
Company Limited (MSEDCL) in respect of disconnection from grid by
MSEDCL for non-installation of meters at the Petitioner’s Wind Project.
And
Application for seeking interim directions under regulation 81 read with
regulation 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 on behalf of the petitioner.
IA No. 26 of 2023 in Case No. 18 of 2023
|
Completed | |
275 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition seeking appropriate directions from Maharashtra Electricity Regulatory
Commission in compliance with Order dated 24.01.2023 passed by Hon’ble
Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement
Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order
dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav
Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516
of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ
Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
|
Completed | |
276 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under section 63 of the Electricity Act 2003.
41 of 2023
|
Completed | |
277 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 117.5 MW solar power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (PM-KUSUM) under component-c from solar projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
42 of 2023
|
Completed | |
278 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff discovered for long term procurement of 150 MW solar power under ‘Mukhyamantri Sour Krishi Vahini Yojana’ from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
43 of 2023
|
Completed | |
279 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Review Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) for the Order dated 31.03.2023 in Case No. 37 of 2023 issued by Hon’ble Commission in the matter of petition filed by BEST Undertaking for approval of tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April, 2023 to March, 2024.
44 of 2023
|
Completed | |
280 | Tue 11/04/2023 10:30:00 AM |
e-Public Hearing
Hearing on SUO- MOTU draft ORDER ON Renewable
Energy Tariff for FY 2023-24
01/SM/2023
|
Completed | |
281 | Tue 11/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
282 | Tue 11/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
283 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of TP Saurya Limited under Section 86 (1) (b) of the Electricity Act,
2003 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for sale of non-solar (wind) power under short term arrangement. And Interlocutory Application of TP Saurya Limited seeking urgent listing and hearing of the captioned Petition in Case No. 30/AP/2023.
30 of 2023 & IA. No. 23 of 2023
|
Completed | |
284 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking
(of the Municipal Corporation of Greater Mumbai) Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April 2023 to March 2024. And Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) seeking urgent hearing of Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April’2023 to March’2024.
37 of 2023 & IA. No. 24 of 2023
|
Completed | |
285 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Aggregate Revenue
Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24
and FY 2024-25 in accordance with Regulation 5.1 (b) of the Maharashtra
Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019.
And Interlocutory Application of AEML SEEPZ Limited (ASL) under Section 86,
including Section 86(1)(a) and Section 94(2) of the Electricity Act, 2003 seeking for urgent listing of the captioned petition and for seeking certain interim directions.
40 of 2023 & IA. No. 25 of 2023
|
Completed | |
286 | Thu 23/03/2023 11:00:00 AM |
e-Public Hearing
Inviting Comments on Application of Adani Electricity Mumbai Limited -Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
127 of 2022
|
Completed | |
287 | Thu 23/03/2023 10:30:00 AM |
e-Public Hearing
Inviting Comments on Application of The Tata Power Company Ltd.-Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
89 of 2022
|
Completed | |
288 | Fri 03/03/2023 10:30:00 AM |
e-Public Hearing at Nagpur
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Vanamati Auditorium, V.I.P. Road, Dharampeth, Nagpur, District-Nagpur)
226 of 2022
|
Completed | |
289 | Thu 02/03/2023 10:30:00 AM |
e-Public Hearing at Amravati
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Niyojan Bhavan (DPDC Hall), Collector Office Premises, Camp, Amravati, District-Amravati)
226 of 2022
|
Completed | |
290 | Mon 27/02/2023 10:30:00 AM |
e-Public Hearing at Nashik
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Niyojan Bhavan, Collector Office Campus, Old Agra Road, Nasik)
226 of 2022
|
Completed | |
291 | Sat 25/02/2023 10:30:00 AM |
e-Public Hearing at Aurangabad
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Meeting Hall, Office of the Divisional Commissioner, Aurangabad, District-Aurangabad)
226 of 2022
|
Completed | |
292 | Thu 23/02/2023 10:30:00 AM |
e-Public Hearing at Pune
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
(Place/Venue of e-Facilitation Centre: Auditorium, Government College of Engineering, Shivaji Nagar, Pune)
226 of 2022
|
Completed | |
293 | Tue 21/02/2023 10:30:00 AM |
e-Public Hearing at Navi Mumbai
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25 (Place/Venue of e-Facilitation Centre: Agri-Koli Sanskruti Bhavan, Pam Beach Road, Sector-24, Nerul West, Navi Mumbai-400706)
226 of 2022
|
Completed | |
294 | Mon 20/02/2023 10:30:00 AM |
e-Public Hearing
Suggestions and Objections on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Mid Term Review (MTR) Tariff Petition for Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
212 of 2022
|
Completed | |
295 | Fri 17/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited - Distribution's Mid-Term-Review Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
225 of 2022
|
Completed | |
296 | Thu 16/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Adani Electricity Mumbai Limited – Distribution Business Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
231 of 2022
|
Completed | |
297 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Corporation Limited (MSEDCL) and Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT) for Approval of Power Purchase Agreement (PPA) between MSEDCL and MAHAPREIT and Tariff for Solar Power Plant, Sangli of 125 MW capacity under Section 86(1)(A), 86(1)(B), 86(1)(E) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
5 of 2023
|
Completed | |
298 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission
7 of 2023 & IA. No. 4 of 2023, 5 of 2023, 11 of 2023, 12 of 2023
|
Completed | |
299 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 3.00 MW Round the Clock (RTC) power for a period of 12 months i.e. from 1 July 2023 to 30 June 2024.
9 of 2023
|
Completed | |
300 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval to tariff and procurement of 500 MW Solar Power through MAHAPREIT’s Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY).
222 of 2022
|
Completed | |
301 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under Section 63 of the Electricity Act 2003.
242 of 2022
|
Completed | |
302 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) seeking approval for Adoption of Tariff discovered for Long Term
Procurement of 8.7 MW Solar Power Under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component A from 0.5
to 2 MW Capacity Projects Connected to Distribution Network under Section 63
of the Electricity Act 2003 for Meeting the Solar Renewable Purchase
Obligations.
26 of 2023
|
Completed | |
303 | Thu 09/02/2023 12:00:00 PM |
e-Public Hearing
Inviting Suggestions and Objections on State Transmission Utility’s (STU) Mid Term Review Petition for Truing up of FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and determination of Intra-State Transmission Tariff for the MYT Control Period from FY 2023-24 to FY 2024-25.
284 of 2022
|
Completed | |
304 | Thu 09/02/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Laxmipati Balaji Supply Chain Management Limited (LBSCML)’s Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
220 of 2022
|
Completed | |
305 | Thu 09/02/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on EON Kharadi Infrastructure Private Limited's (EON SEZ Phase II) Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
236 of 2022
|
Completed | |
306 | Thu 09/02/2023 10:30:00 AM |
e-Public Hearing
Suggestions and Objections on EON Kharadi Infrastructure Private Limited (EON SEZ Phase I)'s Multi-Year Tariff Petition and for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
235 of 2022
|
Completed | |
307 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & IA. No. 9 of 2023, 10 of 2023
|
Completed | |
308 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & IA. No. 13 of 2023, 14 of 2023
|
Completed | |
309 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & IA. No.7 of 2023, 8 of 2023
|
Completed | |
310 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
22 of 2023 & IA. No. 17 of 2023
|
Completed | |
311 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
23 of 2023 & IA. No. 15 of 2023
|
Completed | |
312 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023.
24 of 2023 & IA. No. 16 of 2023
|
Completed | |
313 | Tue 07/02/2023 12:00:00 PM |
e-Public Hearing
Suggestions and Objections on JAWAHARLAL NEHRU PORT TRUST's Multi Year Tariff Petition for Truing-up of FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023- 24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the MERC (Multi Year Tariff) Regulations, 2019
219 of 2022
|
Completed | |
314 | Tue 07/02/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on KRC Infrastructure and Projects Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
214 of 2022
|
Completed | |
315 | Tue 07/02/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Gigaplex Estate Private Limited’s
Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
215 of 2022
|
Completed | |
316 | Tue 07/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Mind space Business Parks Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
216 of 2022
|
Completed | |
317 | Tue 31/01/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final True-up for FY 2019-20, FY 2020-21 and FY 2021-22, Annual Performance Review and provisional True- up for FY 2022-23 and Revised Aggregate Revenue Requirement and Tariff for FY 2023-24 and FY 2024-25 & provisional tariff for upcoming Bhusawal Unit 6
227 of 2022
|
Completed | |
318 | Tue 31/01/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions / Objections on Mid-Term Review Petition of The Tata Power Company Limited - Generation Business for Truing up for FY 2019-20, FY 2020-21 & FY 2021-22, Provisional Truing up for FY 2022-23 and Approval of Revised ARR forecast for the period from FY 2023-24 to FY 2024-25.
221 of 2022
|
Completed | |
319 | Wed 25/01/2023 12:30:00 PM |
e-Public Hearing
Suggestions / Objections on Mid Term Review Petition of The Tata Power Company Limited - Transmission for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up of FY 2022-23 and Revised Projections of Aggregate Revenue Requirement for the period from FY 2023-24 to FY 2024-25
217 of 2022
|
Completed | |
320 | Wed 25/01/2023 12:00:00 PM |
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Generation Business for Truing up for FY 2019-20, FY 2020-21 and
FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR), Revised Fixed Charges and Variable
Charges for FY 2023-24 and FY 2024-25.
229 of 2022
|
Completed | |
321 | Wed 25/01/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Transmission Business for Truing up for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR) for fourth (FY 2023-24) and fifth (FY 2024-25) year of Fourth Control Period.
230 of 2022
|
Completed | |
322 | Wed 25/01/2023 11:00:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
237 of 2022
|
Completed | |
323 | Wed 25/01/2023 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019.
238 of 2022
|
Completed | |
324 | Tue 24/01/2023 12:30:00 PM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23 and Revised Estimate of ARR for FY 2023-24 and FY 2024-25.
232 of 2022
|
Completed | |
325 | Tue 24/01/2023 12:00:00 PM |
e-Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited- Transmission Business’s Petition for approval of Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23, and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25
224 of 2022
|
Completed | |
326 | Tue 24/01/2023 11:30:00 AM |
e-Public Hearing
Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for Approval of Truing-Up of ARR for FY 2019-20 as per MERC MYT Regulations, 2015, Truing up of ARR for FY 2020-21 and FY 2021-22 and Provisional Truing-up of ARR for FY 2022-23 and Determination of ARR for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
234 of 2022
|
Completed | |
327 | Tue 24/01/2023 11:00:00 AM |
e-Public Hearing
Suggestions/Objections on Jaigad PowerTransco Limited's Petition for approval of True up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing up of ARR for FY 2022-23 and ARR Projection for FY 2023- 24 to FY 2024-25 as per MYT Regulation 2019
213 of 2022
|
Completed | |
328 | Tue 24/01/2023 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Truing-up of Annual Fixed Charges (AFC) for FY 2019- 20 to FY 2021-22, Provisional Truing-up of AFC for FY 2022-23 and Determination of AFC and Fees and Charges for FY 2023-24 and FY 2024-25
233 of 2022
|
Completed | |
329 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
|
Completed | |
330 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Rescheduled till Further Notice | |
331 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
|
Completed | |
332 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Rescheduled till Further Notice | |
333 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Rescheduled till Further Notice | |
334 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Rescheduled till Further Notice | |
335 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply & Transport Undertaking of Municipal Corporation of Greater Mumbai (BEST) for under Regulations 20.1 of the MERC (Multi-Year Tariff) Regulations, 2019 (‘MYT Regulations’) in the matter of approval of power procurement plan for 7 (Seven) years period from FY 2023-24 to FY 2029-30 covering next control period.
240 of 2022
|
Completed | |
336 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023. And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023.
And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023.
7 of 2023 & IA. No. 4 of 2023 & IA. No. 5 of 2023
|
Completed | |
337 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Laxmipati Balaji Supply Chain Management Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2023 to January 31, 2024 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
8 of 2023
|
Completed | |
338 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Completed | |
339 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax (GST) rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
|
Completed | |
340 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. seeking execution/ implementation/ compliance of the Order dated 17.02.2022 passed in Case No. 61 of 2020.
178 of 2022
|
Completed | |
341 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd seeking execution/ implementation/compliance of the Order dated 17.02.2022 passed in Case No. 62 of 2020.
179 of 2022
|
Completed | |
342 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events.
187 of 2022
|
Completed | |
343 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
344 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
194 of 2022
|
Completed | |
345 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rathi Steel and Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
195 of 2022
|
Completed | |
346 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of City Corporation Ltd. seeking relief under the Distribution Franchisee Agreement dated 16 October 2010 and subsequent renewals thereafter read with the Commission’s Order dated 24 May 2010 in Case No. 62 of 2007 and dated 1 June 2010 in Case No. 75 of 2007.
198 of 2022
|
Completed | |
347 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators. And Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022 & Diary No. 254 of 2022, IA No. 41 of 2022 & IA No. 42 of 2022
|
Completed | |
348 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
|
Completed | |
349 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd and Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
84 of 2016 and Diary No. 257 of 2022
|
Completed | |
350 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Asian Infrastructure Development Pvt. Ltd. seeking refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Company Ltd.
103 of 2022
|
Completed | |
351 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
352 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014. And Miscellaneous Application of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021 and 167 of 2020
|
Completed | |
353 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Completed | |
354 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021. And Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing on the Petition filed under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and Respondent.
162 of 2022 & I.A No. 23 of 2022
|
Rescheduled till Further Notice | |
355 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for power procurement plan along with Tender documents for procuring power through Renewable Energy Sources with Energy Storage facility on Long Term Basis for 15 years. And Interlocutory Application for early hearing in Case No. 185/MP/2022 filed by M/s. Eon Kharadi Infrastructure Pvt. Ltd. SEZ Phase-I.
185 of 2022 & Diary No. 264 of 2022
|
Completed | |
356 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects
and
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 202
and
Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
and
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects).
70 of 2021 & 23 of 2021, IA 36 & 38 of 2021
|
Rescheduled till Further Notice | |
357 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017.
173 of 2017
|
Completed | |
358 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators.
And
Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022.
And
Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
And
Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022, Diary No.254 of 2022 & IA No.41 of 2022, IA No.42 of 2022
|
Completed | |
359 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
|
Completed | |
360 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the PPA based on the tariff determined under Competitive Bidding process u/s. 63 of the EA, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the MoP, GoI, dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2023 to 31 January 2024.
218 of 2022
|
Completed | |
361 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval to tariff and procurement of 500 MW Solar Power through Mahatma Phule Renewable Energy and Infrastructure Technology Limited’s (MAHAPREIT) Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) as per Section 86(1)(A), 86(1)(B) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
222 of 2022
|
Completed | |
362 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for change in the approved Load Shedding Protocol of AG Load
Management Scheme in five Districts of Vidharbha Viz. Nagpur, Chandrapur,
Bhandara, Gondia and Gadchiroli Districts.
228 of 2022
|
Completed | |
363 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the Order dated 13.09.2022 passed by the Hon’ble Commission in Case No. 88 of 2022 and Interlocutory Application of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar seeking urgent listing and hearing in Case No. 199/RC(MP)/2022.
199 of 2022
|
Rescheduled on Fri 29/November/2022 10:30 AM | |
364 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd. Case No. 84 of 2016 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 18.10.2022. IN Appeal No. 263 of 2018 directions to the Commission therein.)
84 of 2016
|
Completed | |
365 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sridevi Trading Company regarding breach of Distribution Open Access Regulations 2016, Practice Directions dated 8 March 2017 and Excess levy and recovery of Wheeling Charges. Case No. 206 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 06.10.2022. IN Appeal No. 20 of 2019 directions to the Commission therein.)
206 of 2017
|
Completed | |
366 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Rescheduled till Further Notice | |
367 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Sunil Madhusudan Joshi under Section 142 of Electricity Act 2003 in the matter of Contempt, Non-compliance and Continuance of Contravene of the Order of CGRF dated 28-10-2022.
201 of 2022
|
Completed | |
368 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for adoption of the tariff discovered through the Competitive Bidding Process held for long term procurement of 18.36 MW wind power from the wind generators whose EPAs with MSEDCL have expired.
202 of 2022
|
Completed | |
369 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
Diary No. 257 of 2022
|
Completed | |
370 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aurangabad Industrial Township Limited for approval of Short Term Power Purchase plan by Aurangabad Industrial Township Limited for one year period starting from 01.04.2023 to 31.03.2024 under Section 86 of the Electricity Act, 2003 (EA) read with Competitive Bidding Guidelines issued by the Ministry of Power (MoP) Government of India (GoI) dated 30 March, 2016 and amendments thereof.
206 of 2022
|
Completed | |
371 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86(1)(e), (f) and (k) of the EA, 2003 read with article 8 of the PPA dated 10.08.2021 executed between M/s Avaada MH Sustainable Private Limited and MSEDCL for supply of 250 MW solar power from its solar PV power plant in the state of Maharashtra, seeking inter alia extension of the scheduled commercial operation date on account of certain force majeure events affecting the project implementation and pass appropriate order(s) /direction(s) in relation to certain other incidental issues under the PPA, to the extent prayed by the petitioner herein.
187 of 2022
|
Completed | |
372 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avaada Sunce Energy Private Limited under Section 86(1)(f) of the EA, 2003 and Article 9 of the PPA dated 26.06.2019 seeking declaration that the imposition of Safeguard Duty on import of Solar Cells/ modules on account of promulgation of Ministry of Finance Notification dated 29.07.2020 bearing No. 02/2020-Customs (SG) and enhancement of GST Rates on Solar Energy Devices and Parts on account of promulgation of Ministry of Finance Notification dated 30.09.2021 bearing No. 8/2021-Central Tax (Rate) are ‘Change in Law’ events under Article 9.1 of the said PPA and to further direct the Respondent to pay compensation along with carrying cost to the Petitioner as the relief under Article 9.2.1 of the said PPA as to offset the financial impact of the said Change in Law events and to ensure that the Petitioner is placed in the same financial position as it would have been had it not been for the occurrence of the said Change in Law events.
192 of 2022
|
Completed | |
373 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Private Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated August 29, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
374 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
194 of 2022
|
Completed | |
375 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rathi Steel And Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
195 of 2022
|
Completed | |
376 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of City Corporation Limited (CCL) seeking appropriate relief on provided under the distribution franchisee agreements dated October 16, 2010 and subsequent renewals thereafter read with Order of the Hon’ble Commission dated May 24, 2010 in Case No. 62 of 2007 and June 1, 2010 in Case No. 75 of 2007.
198 of 2022
|
Completed | |
377 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86 read with Section 94 (2) of the Electricity Act, 2003 along with provisions of MERC Conduct of Business Regulations 2004, seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No.44 of 2022 in 187 of 2022
|
Completed | |
378 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for Power Procurement Plan through Renewable Energy Sources with Energy Storage facility on Long Term Basis For 15 years starting from 1st November 2023 to 31st October 2038 and Approval of Tender Documents for its IT and ITES SEZ at Survey no. 77, MIDC Knowledge Park, Kharadi, District Pune (EON SEZ Phase- I) and Survey No. 72, Village Kharadi, District Pune (EON SEZ Phase-II).
185 of 2022
|
Rescheduled on Fri 25/November/2022 10:30 AM | |
379 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Transmission-T) under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 311 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 35 of 2021 (wherein the Commission has already permitted assignment of the Transmission License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of AEML and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
183 of 2022
|
Completed | |
380 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 against the Respondent/ Maharashtra State Electricity Distribution Company Limited for wilful disobedience of this Hon’ble Commission’s final order dated 18.07.2022 passed in Case No. 26 of 2022, since disposed and Interlocutory Application filed by Mahanagar Gas Limited under Section 94(2) of the Electricity Act, 2003 seeking urgent hearing in Case No. 186/MP/2022.
186 of 2022 & IA. No.35 of 2022 in 186 of 2022
|
Completed | |
381 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 341 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 34 of 2021 (wherein the Commission has already permitted assignment of the Distribution License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
189 of 2022
|
Completed | |
382 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.43/2018, Dt. of order: 14/12/2018.
190 of 2022
|
Completed | |
383 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 44/2018, Dt. of order: 14/12/2018.
191 of 2022
|
Completed | |
384 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020
159 of 2021
|
Completed | |
385 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014
167 of 2020
|
Completed | |
386 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Manoj Panjabrao Updhye for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola zone in the matter of Manoj Panjabrao Upadhye Complaint No 52 of 2022 Order dated 31.05.2022 realted to refund of infrastructure cost spent under commitment of refund by agriculture consumer having no arrears.
176 of 2022
|
Completed | |
387 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 61 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
178 of 2022
|
Completed | |
388 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 62 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
179 of 2022
|
Completed | |
389 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Jaykumar Maniklal Vishwakarma & Anr. for obtaining Electric meter from the Power Supplier M/s. Adani Electricity Generation and Supply Ltd. formerly Reliance Electric Generation and Supply Ltd. Application under Section 43 of Electricity Act 2003.
180 of 2022
|
Completed | |
390 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Greta Energy Ltd. & Anr. under Regulation 85 of Maharashtra Electricity Regulatory Commission conduct of Business Regulations 2004 for Review of Order of Commission issued in Case No. 1/SM/2022 dt. 29/7/2022 for Generic renewable energy Tariff for FY 2022-22 under MERC (Renewable Energy Tariff) Regulations, 2019.
181 of 2022
|
Completed | |
391 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
|
Completed | |
392 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ideal Energy Projects Limited (IEPL) under Section 86(1)(a) and 86(1)(f) seeking directions against Maharashtra State Electricity Distribution Company Limited to apply HT-I Industrial Tariff category to the start-up power consumed by the Petitioner and accordingly issue appropriate refund / credit towards excess amount collected from the Petitioner for the period 27.12.2012 till 31.05.2015 under HT-II Commercial Tariff category along with applicable interest.
168 of 2022
|
Completed | |
393 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Viraj Profiles Private Limited against MSEDCL to (i) waive the demand made by MSEDCL for additional security deposit to VPL, pending refund of additional surcharge by MSEDCL to VPL under the Judgement dated 10.12.2021 passed in Civil Appeal Nos. 5074-5075 of 2019 (MSEDCL V/s. M/s. JSW Steel Limited & Ors.) and the Order dated 15.03.2022 passed in Contempt Petition (Civil) Nos. 112-113 of 2022 in Civil Appeal Nos. 5074-5075 of 2019 (M/s. JSW Steel Coated Products Limited V/s. Vijay Singhal & Ors.), of Supreme Court of India, and (ii) alternatively and without prejudice, exempt VPL from payment of additional security deposit under regulation 13.1. and 13.2 of MERC (ESC & SOP) Regulations, 2020 by ordering MSEDCL to revise the billing cycle for VPL to twice a month (i.e., for 15 days) instead of existing billing of once every month, under regulation 16.1.1 of MERC (ESC & SOP) Regulations, 2020.
169 of 2022
|
Completed | |
394 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra State Power Generation Company Limited under Section 61 of Electricity Act, 2003 read with Regulation 28 and 29 of MERC (Multi Year Tariff) Regulations, 2015 and MERC (Multi Year Tariff) Regulations, 2019 respectively, seeking modification/reconsideration of the Lease Rent from FY 2019-20 onwards, as approved by the Hon’ble Commission in its Order dated 27.10.2008 in Case No. 17 of 2007.
172 of 2022
|
Completed | |
395 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited (JGFPL) under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2020 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking compensation on account of Change in Law Events.
174 of 2022
|
Completed | |
396 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
|
Completed | |
397 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No.23 of 2021 in 119 of 2021
|
Completed | |
398 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
|
Completed | |
399 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
|
Completed | |
400 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
|
Completed | |
401 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
|
Completed | |
402 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
|
Completed | |
403 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
|
Completed | |
404 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
|
Completed | |
405 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
|
Completed | |
406 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition filed by M/s. WAACOX Energy Private Limited under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, and principles analogous Order XLVII of Code of Civil Procedure, 1908, for review of Order dated 07.07.2022 passed in Case No. 104 of 2021 filed by M/s. WAACOX Energy Private Ltd. against Maharashtra State Power Generation Co. Ltd. and Maharashtra State Electricity Distribution Co. Ltd. for issuance of appropriate directions to comply with the Power Purchase Agreements dated 14.06.2018 pertaining to Solar Power Projects at Ralegansiddhi and Manjarda
167 of 2022
|
Completed | |
407 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindustan Petroleum Corporation Limited under Sections 142 & 146 of the Electricity Act, 2003 for non-compliance by of the Commission’s Order dated 17 January 2019 in Case No. 223 of 2018.
66 of 2022
|
Completed | |
408 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Completed | |
409 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
|
Completed | |
410 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
411 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of R. L. Steels & Energy Limited under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
163 of 2022 & I.A No.18 of 2022, I.A No.19 of 2022, I.A No.36 of 2022, I.A No.37 of 2022, I.A No.38 of 2022 in 163 of 2022
|
Completed | |
412 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
164 of 2022 & I.A No.20 of 2022, I.A No.21 of 2022, in 164 of 2022
|
Completed | |
413 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited for in principle approval under the Change in Law provision of the PPA in respect of installation of additional systems in compliance with the Environment (Protection) Amendment Rules, 2015.
84 of 2022
|
Completed | |
414 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
|
Completed | |
415 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
|
Completed | |
416 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s. Maharashtra State Electricity Distribution Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 and of Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, for review of Order dated 06.04.2022 passed by Hon’ble MERC in Case No. 96 of 2021.
170 of 2022
|
Completed | |
417 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking direction against Respondents to comply with order of this Hon’ble Commission. And Interlocutory Application filed by Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking urgent hearing in Case No. 184/AD/2022.
184 of 2022 & I.A No.33 of 2022 in 184 of 2022
|
Completed | |
418 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Imagicaa World Entertainment Ltd. seeking refund of wheeling and transmission charges levied for over-injected units for FY 2020-21 along with applicable interest and excess refund penalty of wheeling charges.
116 of 2022
|
Completed | |
419 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Completed | |
420 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Pvt. Ltd. seeking relief on account of Change in law due to the increase in Goods and Service Tax rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
|
Completed | |
421 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and PPA dated 04 April 2022 seeking amendment in Effective Date of the PPA.
128 of 2022
|
Completed | |
422 | Tue 15/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants.
158 of 2022
|
Completed | |
423 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and the Respondent arising out of the PPA dated 27.05.2021.
162 of 2022
|
Completed | |
424 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Case No. 103 of 2021 dated 07.12.2021
161 of 2022
|
Completed | |
425 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
159 of 2022
|
Completed | |
426 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ultratech Cement Ltd. under Section 142 of Electricity Act 2003 against wrong recovery of incremental consumption rebate given in monthly energy bills from period April 2021 to March 2022 violating Commissions tariff order issued in Case No. 322 of 2019.
155 of 2022
|
Completed | |
427 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
|
Completed | |
428 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
|
Completed | |
429 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sunflag Iron & Steel Company Ltd. & Others under Regulation 29, 30, 31 & 32 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 for removing difficulty in depositing 2 months Security Deposit with Distribution licensee.
154 of 2022
|
Completed | |
430 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the order dated 16.03.2022 passed by the learned commission in case no. 170 of 2018 and seeking appropriate reliefs towards compliance of the order and for refund of amounts by the respondent to the petitioner.
152 of 2022
|
Completed | |
431 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited seeking approval for Change in Law due to increase in approved variable cost of thermal generating stations due to mandated use of imported coal as per directions issued by ministry of power, Government of India and prompt recovery of imported coal cost impact by adjustment in variable cost of respective station and billing mechanism.
144 of 2022
|
Completed | |
432 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited (PIEL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pertinent Infra and Energy Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 125 of 2020.
136 of 2022
|
Completed | |
433 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited (PIL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pristine Industries Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 124 of 2020.
135 of 2022
|
Completed | |
434 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited (PPL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Priyadarshini Polysacks Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against noncompliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 126 of 2020.
134 of 2022
|
Completed | |
435 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
|
Scheduled | |
436 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited under 142, 144 & 146 of the Electricity Act 2003 seeking non compliance of the Electricity Ombudsman at Nagpur, in representation number 08/2021 dated 04.06.2021.
141 of 2022
|
Scheduled | |
437 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Distribution) under Section 86(1)(b) of the Electricity Act, 2003 and under Regulation 22 of MERC (Multi Year Tariff) Regulations 2019, in respect of additional power procurement.
137 of 2022
|
Scheduled | |
438 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mphasis Limited under Section 142 of the Electricity Act, 2003 for non-compliance of MERC Order dated 30.03.2020 in Case No. 322 of 2019 by the Distribution Licensee (MSEDCL) of Mumbai.
143 of 2022
|
Scheduled | |
439 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited under section 86 of the Electricity Act 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in rate of basic customs duty on import of inverters and increase in GST rates.
124 of 2022
|
Completed | |
440 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 21 of the (Deviation Settlement Mechanism and Related Matters) Regulation, 2019. And Application of The Tata Power Company Limited-Distribution seeking stay of the Mechanism Devised by Maharashtra State Load Despatch Centre for calculating and raising the DSM bills/invoices on the Petitioner. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
130 of 2022 & I.A No.8 of 2022 & I.A No.9 of 2022 in 130 of 2022
|
Withdrawn | |
441 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution for seeking approval for the Bidding Documents, for long term power procurement (25 years) of 225 MW from grid connected Wind-Solar Hybrid Power Projects through competitive bidding process to meet demand of consumers for optimization of power purchase cost.
129 of 2022
|
Completed | |
442 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking amendment of Effective Date of the Power Purchase Agreement and grant of approval of the Amended PPA by this Hon’ble Commission.
128 of 2022
|
Completed | |
443 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
|
Completed | |
444 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
|
Completed | |
445 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
|
Completed | |
446 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Suggestions/Objections on M/s. Sanjay B. Patil's Petition for determination of Project Specific Tariff for Jambre Hydro Electric Project(JHEP)(1 x 2MW) under Regulation 9.1& 10.2of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019and Section 62 (1) (a) & 86 (1) (e) of the Electricity Act,2003.
22 of 2022
|
Completed | |
447 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
|
Completed | |
448 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
|
Completed | |
449 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
|
Completed | |
450 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking for seeking approval for procurement of 300 MW Solar Power from Solar Energy Corporation of India Limited (SECI) for meeting the Solar and Non-solar RPO of BEST under Section 86(1)(b) of Electricity Act 2003 and Regulation 21.1 of MERC (Multi Year Tariff) Regulations, 2019.
120 of 2022
|
Completed | |
451 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Ltd. seeking direction in respect to quash and set aside the alleged notice dated 27th Jan 2022 and 11th Mar 2022 issued by Maharashtra State Electricity Distribution Company Limited upon the Sarla Performance Fibers Limited hereby imposing penalty of Rs 1,14,00,000/- for FY 2019-2020 and 2020-2021 and also seeking direction to amend the Power Purchase Agreement dated 22nd Nov 2018 to the extend of reducing the capacity of the wind power project capacity from 6MW to 4MW with the effect from 20/7/2020.
119 of 2022
|
Completed | |
452 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Himadri Speciality Chemical Limited (Formerly known as Himadri Chemicals & Industries Limited) under the provisions of Section 86 (1) (E) of The Electricity Act, 2003 read with Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking directions from The Hon’ble Commission to MSEDCL for payment of delayed payment charges in Terms of Energy Purchase Agreement Dated 26.05.2006 and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the energy purchase agreement dated 26.05.2006 entered between the Petitioner and the Respondent.
118 of 2022
|
Completed | |
453 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Steel Manufacturers Association of Maharashtra under Regulation 29-32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 seeking amendment/relaxation/removal of difficulties in depositing 2 months security deposit with distribution licensees.
131 of 2022
|
Completed | |
454 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) for refund of improperly levied wheeling and transmission charges and excess demand penalty under regulation 3.2, 14.6(a), 32 & 37 of MERC DOA Regulations, 2016 and amendment thereof.
116 of 2022
|
Completed | |
455 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon’ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
|
Completed | |
456 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Rescheduled till Further Notice | |
457 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Little Earth Sampada Realities Pvt. Ltd. (Mr. Sanjay Lalaji More) against MSEDCL under 142, 146 & 147 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Pune Zone Case No. 56 of 2021/46 Dated 16/02/2022 / Case No 57 of 2021/48 Dated 16/02/2022.
117 of 2022
|
Completed | |
458 | Fri 07/10/2022 10:30:00 AM |
e-Public Hearing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process And Application of Adani Electricity Mumbai Limited under Section 94(2) of the Electricity Act, 2003 for urgent listing and ad-interim relief in Case No. 159/MP/2022.
159 of 2022 & IA No. 32 of 2022 in 159 of 2022
|
Completed | |
459 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
|
Completed | |
460 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A No.23 of 2021
|
Completed | |
461 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
|
Completed | |
462 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022.
110 of 2022
|
Completed | |
463 | Tue 04/10/2022 10:30:00 AM |
e-Public Hearing
Petition of Viraj Profiles Private Limited seeking clarification of the Order dated March 19, 2018 in Case No. 159 of 2016 read with Order dated November 26, 2021 in Appeal Nos. 106 of 2018 and batch matters in respect of treatment of certain units held as unscheduled and its treatment by MSEDCL which is not in accordance with applicable laws. And Application of Viraj Profiles Private Limited for urgent listing and ad-interim relief in Case No. 171/AD/2022.
171 of 2022 & IA No. 24 of 2022
|
Completed | |
464 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units.
109 of 2022
|
Completed | |
465 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahindra CIE Automotive Limited (MCIE) under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022, in Case No. 116 of 2018. And Application of Mahindra CIE Automotive Limited for bringing on record additional facts and documents, grant of urgent interim relief and initiation contempt proceedings against Respondent No. 1 under section 142, 146 and 149 of the Electricity Act, 2003 for deliberate and willful non-compliance of the order of this Hon’ble Commission.
95 of 2022 & I.A No. 17 of 2022
|
Completed | |
466 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Bekaert Industries Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated March 16, 2022, in Case No. 170 of 2018.
94 of 2022
|
Completed | |
467 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
|
Completed | |
468 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited seeking compliance of the Order dated May 28, 2019 in Case No. 168 of 2014 of the Hon’ble Commission read with relevant provisions of the Electricity Act, 2003 and works of Licensees Rules, 2006.
167 of 2020
|
Completed | |
469 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
470 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
|
Completed | |
471 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
|
Completed | |
472 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
473 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
102 of 2022
|
Completed | |
474 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief.
99 of 2022
|
Completed | |
475 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
|
Completed | |
476 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 17 May, 2022 in Case No 12 of 2022.
157 of 2022
|
Completed | |
477 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Vidharbha Private Limited (MHPVPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 26 May, 2022 in Case No 13 of 2022.
145 of 2022
|
Completed | |
478 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 168 of 2021.
133 of 2022
|
Completed | |
479 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 169 of 2021.
132 of 2022
|
Completed | |
480 | Tue 13/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86 (1)(b) read with and Regulations 92 & 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for Short term Power Purchase for Tata Power -D for October 2022. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
165 of 2022 & I.A No.22 of 2022 in 165 of 2022
|
Completed | |
481 | Tue 13/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (‘DOA Regulations’), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2022 & Appeal No.122 of 2019 in 218 of 2018
|
Completed | |
482 | Tue 13/09/2022 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Petition of Adani Electricity Mumbai Ltd.-Distribution seeking transfer of assets within the SEEPZ SEZ area located in Andheri East, Mumbai to AEML SEEPZ Ltd. (Case No. 3 of 2022)
3 of 2022
|
Completed | |
483 | Tue 06/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
|
Completed | |
484 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
|
Completed | |
485 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
|
Completed | |
486 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003 .
66 of 2022
|
Completed | |
487 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) seeking approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
|
Completed | |
488 | Thu 25/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the Electricity Act, 2003 seeking Review of Order dated 2 November 2021 passed by the Maharashtra Electricity Regulatory Commission in Case No. 91 of 2021 filed by Atnu Solar Power Pvt. Ltd. seeking extension in the SCOD of the Project to the actual date of commissioning.
17 of 2022
|
Completed | |
489 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 07.09.2021 passed by the Hon’ble Commission in Case No. 51 of 2021.
4 of 2022
|
Completed | |
490 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. Case No. 148/AT/2022
148 of 2022
|
Completed | |
491 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
|
Completed | |
492 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon’ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
|
Completed | |
493 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
|
Completed | |
494 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
|
Completed | |
495 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
|
Completed | |
496 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Generation under Sections 86 (1)(k) of the Electricity Act, 2003 read with this Hon’ble Commission’s Guidelines for In-principle Clearance of Proposed Investment Schemes.
29 of 2022
|
Completed | |
497 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 63 of Electricity Act, 2003 for adoption of tariff for procurement of 800 MW Round the Clock (“RTC”) power on Medium-term basis for the period starting from 01.09.2022 to 14.10.2024 through Tariff Based Competitive Bidding Guidelines issued by the Ministry of Power (MoP), Government of India (GOI).
149 of 2022 and IA No. 15 of 2022 in 149 of 2022
|
Completed | |
498 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
|
Completed | |
499 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
|
Completed | |
500 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon’ble Commission in Case Nos. 182 of 2014 and 40 of 2015
163 of 2021 and IA No. 2 of 2022 in 163 of 2021
|
Completed | |
501 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Interim Application of Inox Wind Limited to bring subsequent developments on record & addition of prayer in light of these developments in Case No 120/AD/2021.
IA No. 16 of 2022 in 120 of 2021
|
Completed | |
502 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner
120 of 2021 & IA No. 25 of 2021 in 120 of 2021
|
Completed | |
503 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 and IA No. 23 of 2021 in 119 of 2021
|
Completed | |
504 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2022 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking extension of Scheduled Commercial Operation Date due to Force Majeure events.
96 of 2022 and IA No. 7 of 2022 in 96 of 2022
|
Completed | |
505 | Fri 05/08/2022 10:30:00 AM |
Admissibility Hearing
Petition filed by Paranjape Auto Cast Private Limited under sections 86 (1)(k), 94(1)(g), read with Regulations 92 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking certain clarifications in respect of meaning and scope of the term “premises” as used in the Electricity Act, 2003 and various regulations and orders issued by this Hon?ble Commission from time to time. And Application of Paranjape Auto Cast Private Limited for interim relief.
153 of 2022 and IA No. 14 of 2022 in 153 of 2022
|
Completed | |
506 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
|
Completed | |
507 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in 139/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022.
139 of 2022 and IA No. 13 of 2022 in 139 of 2022
|
Completed | |
508 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in Case No. 138/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place.
138 of 2022 and IA No. 12 of 2022 in Case No.138 of 2022
|
Completed | |
509 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. R. L. Steels and Energy Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Aurangabad Case No. 875/2021 Order dated 26.04.2022. Case No.(111 of 2022)
111 of 2022
|
Completed | |
510 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022. Case No.(110 of 2022)
110 of 2022
|
Completed | |
511 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
|
Completed | |
512 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
513 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units. Case No.(109 of 2022)
109 of 2022
|
Completed | |
514 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the Order dated 02.02.2022 passed by the learned Commission in Case No. 116 of 2018 and seeking appropriate reliefs towards compliance of the Order and refund amounts by the Respondent to the Petitioner. Case No.(108 of 2022)
108 of 2022
|
Completed | |
515 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
31 of 2022
|
Completed | |
516 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra CIE Automotive Limited seeking action against MSEDCL seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
37 of 2022
|
Completed | |
517 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Hon’ble Commission in Case No. 103/2021.
38 of 2022
|
Completed | |
518 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
148 of 2022
|
Completed | |
519 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
|
Rescheduled | |
520 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003. Case No.(103 of 2022)
103 of 2022
|
Completed | |
521 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Gulab Shaha Chand Shaha against MSEDCL under 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 87 of 2021 Order No. EE/CGRF/AKZ/Akola/50 dated 27.01.2022. Case No.(104 of 2022)
104 of 2022
|
Completed | |
522 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking, (BEST) under Section 62 of Electricity Act 2003 read with Section 86 (1) (b) of the Electricity Act 2003 in the matter of submission of the proposal for Extension of PPA. Case No.(107 of 2022)
107 of 2022
|
Completed | |
523 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility’s for implementation of Electricity (Late Payment Surcharge) Rules 2021 notified by Ministry of Power (MoP) on dtd.22.02.2021. (Case No. 97 of 2022)
97 of 2022
|
Completed | |
524 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief. (Case No. 99 of 2022)
99 of 2022
|
Completed | |
525 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by D’ Décor Home Fabrics Private Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 32 of the MERC (Distribution Open Access) Regulations 2016 against Maharashtra State Electricity Distribution Company Limited for non-compliance / non-implementation of this Hon’ble Commission’s Order dated 07.12.2021 in Case No. 103 of 2021 read with the Hon’ble Appellate Tribunal’s Judgment dated 12.08.2021 in Appeal No. 70/2019 (Case no. 101 of 2022)
101 of 2022
|
Completed | |
526 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. (Case no. 102 of 2022)
102 of 2022
|
Completed | |
527 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
|
Completed | |
528 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s P-One Techpark Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner M/s P-One Techpark Private Limited for the IT/ITeS SEZ at Rajiv Gandhi Infotech Park, MIDC, Hinjewadi Phase III, Pune and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing P-One Techpark Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the ‘ceiling tariff’ in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
91 of 2022
|
Completed | |
529 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
530 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. New Parth Developers under Section 142 and 146 of the Electricity Act 2003 for Non-Compliance of Order of CGRF Bhandup Dated 19/04/2021 in Case No.83 of 2021.
93 of 2022
|
Completed | |
531 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for procurement of flexible and schedulable power from Renewable Energy sources with energy storage facility on long term basis for 25 Years from Renewable Sources and approval of tender documents.
86 of 2022
|
Schedule | |
532 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MERC, 2020.
85 of 2022
|
Schedule | |
533 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
|
Schedule | |
534 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) to Revise the Common Order passed on dated 30/08/2019 by Sub Divisional Magistrate (SDM), Pachora, Dist.- Jalgaon in Case No. SDM-2/ KV/ MSETCL Tower/ 317/ 2019. - Case No. 343 of 2019
343 of 2019
|
Completed | |
535 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
|
Schedule | |
536 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon'ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
|
Schedule | |
537 | Fri 08/07/2022 10:30:00 AM |
Admissibility Hearing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for approval of Final Truing up of FY 2018-19, FY 2019-20 and FY 2020-21 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period from FY 2021-22 to FY 2024-25.
19 of 2022
|
Completed | |
538 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
|
Completed | |
539 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
|
Completed | |
540 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
|
Completed | |
541 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
|
Schedule | |
542 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pee Vee Textiles Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking Grant of Power Factor Incentive on Open Access Consumption for the period June 2015 to July 2016. & Petition seeking Implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
74 of 2022
|
Schedule | |
543 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Fiat India Automobiles Pvt. Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking grant of Power Factor Incentive on open access consumption for the period May 2015 to July 2019. & Petition seeking implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
73 of 2022
|
Schedule | |
544 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Gimatex Industries Pvt. Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 07.12.2021 passed by this Hon'ble Commission in Case No. 103/2021 and petition seeking implementation of The Judgment dated 12.08.2021 passed by The Hon'ble APTEL in Appeal No. 70/2019 in the matter of "Jindal Poly Films Limited Vs. MERC & Anr" on the issue of applicability of Power Factor Incetive on Open Access consumption in MSEDCL Distribution License Area.
49 of 2022
|
Schedule | |
545 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
|
Completed | |
546 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited & Anr. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 against MSEDCL for adjudication of dispute arising under Open Access and for payment of interest on the amount illegally recovered under the Open Access Regulations and petition under Section 62 (6) of the Electricity Act, 2003 for payment of interest on the amount illegally recovered by MSEDCL.
77 of 2022
|
Schedule | |
547 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Schedule | |
548 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mayura Steels Pvt. Ltd. seeking implementation of Regulation 3, 7, 9 and 10 of the MERC (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2010 W.R.T following the procedures envisaged therein and pay for the power which has already been Accouted towards RPO and under Section 86 (1) (e) of the Electricity Act, 2003 seeking directions to MSEDCL for payment of power w.e.f 25.03.2012 till 06.06.2018 since the power injected by the petitioner was injected on the basis of assuance of a long-term EPA.
71 of 2022
|
Schedule | |
549 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ambuja Intermediates Pvt. Ltd. (Formerly known as Sinewave Biomass Power (P) Limited) under Regulation 20 of the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date and petition under the provisions of Section 86 (1) (e) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of late payment surchagre in terms of Energy Purchase Agreement dated 05.02.2011 entered in accordance with the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010.
70 of 2022
|
Schedule | |
550 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
|
Scheduled | |
551 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon'ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003.
66 of 2022
|
Schedule | |
552 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kalika Steel Alloys Pvt Ltd. & Ors. under Section under Section 57, 61, 86 and 181 of the Electricity Act 2003 seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand.
65 of 2022
|
Schedule | |
553 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
|
Schedule | |
554 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
|
Schedule | |
555 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
|
Schedule | |
556 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited seeking clarification of Obseravtions under Para 13.4 of Order dated 06.08.2021 passed in Case No. 67 of 2021 by this Hon'ble Commission and petition as per the Judgment dated 10.12.2021 passed by the Hon'ble Supreme Court in Civil Appeal Nos. 5074-5075/2018 â"MSEDCL Versus M/s. JSW Steel Limited & Orsâ"
61 of 2022
|
Schedule | |
557 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
|
Schedule | |
558 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
|
Reschedule | |
559 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon'ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
|
Schedule | |
560 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited under the provisions of Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case No. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and direction to revise incorrect monthly billing methodology followed by Maharashtra State Electricity Distribution Company Limited for FY 2018-19.
57 of 2022
|
Schedule | |
561 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
|
Schedule | |
562 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahindra Sanyo Special Steel Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
81 of 2022
|
Schedule | |
563 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Inox Air Products Private Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
75 of 2022
|
Schedule | |
564 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Asahi India Glass Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
55 of 2022
|
Schedule | |
565 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
|
Schedule | |
566 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Section 86 (1) (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Articles 3, 4 and 11 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, extension of Scheduled Commercial Operation Date due to Force Majeure events.
53 of 2022
|
Schedule | |
567 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to
directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval
of claims related to flexible utilization of coal (coal tolling) arrangement carried out
as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under
Case IV Phase II.
128 of 2021
|
Schedule | |
568 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Tata Power-Distribution) under Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 92 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for part commissioning of 225 MW Long Term Hybrid project and procurement of Non-solar (Wind) power to meet the Renewable Purchase Obligation of Tata Power-Distribution.
52 of 2022
|
Schedule | |
569 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Dhariwal Infrastructure Limited (DIL) in the matter of Section 94 (1) (g) read with Regulation 32, 35 to 39, 92 and 94 of the MERC (Conduct of Business) Regulations, 2004; and In the matter of Methodology for use of coal by State in Private Generating Stations (IPPS) namely, Case - 4: Flexibility in utilization of coal in IPP Stations, dated 20.02.2017 evolved by Government of India through a mode of competitive bidding along with the amendments to it, issued till date; and under Regulation 33 (Principles of Merit Order Despatch for Operation of INSG connected to INSGS) of MERC (State Grid Code) Regulations, 2020; and in the matter of order dated 30.11.2021 passed by this Hon'ble Commission in the Case No. 128 of 2021.
48 of 2022
|
Schedule | |
570 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85(a) of the MERC (Conduct of Business) Regulations, 2004, seeking review and modification of Order dated 17.08.2021 passed by this Hon'ble Commission in Case No. 27 of 2021.
47 of 2022
|
Schedule | |
571 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
|
Schedule | |
572 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
|
Reschedule | |
573 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Anil Yashawantrao Jadhav under Sections 143, 146 of the Electricity Act, 2003, seeking compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 February, 2021 in Case No. 21 of 2020.
42 of 2022
|
Completed | |
574 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner The Tata Power Company Limited- Distribution (TPC-D) seeking review and recall of the Order dated 09.12.2020 in Case No. 58 of 2020 in terms of the liberty granted by the Hon'ble Tribunal in its Order dated 31.08.2021 in Appeal No. 5 of 2021 - TPC-D v. MERC & Ors.
166 of 2021
|
Completed | |
575 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & IA No. 25 of 2021
|
Completed | |
576 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs.
and
Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021
|
Reschedule with further notice | |
577 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Govindrao Prithviraj Potdar for execution of the Order dated 28.01.2019 of Consumer Grievance Redressal Forum, Kolhapur in Case No. 42/2018-19/20 and Order dated 22.08.2019 of MERC in Case No. 144 of 2019.
25 of 2022
|
Completed | |
578 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Gro Solar Energy Private Limited under section 86(1)(f) of the Electricity Act 2003 for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules and increase in rate of basic customs duty on import of solar inverters in terms of Article 8 of the Power Purchase Agreement dated 31.10.2019 entered between M/s Gro Solar Energy Private Limited and Maharashtra State Power Generation Co. Ltd. for development of solar energy based power plant of 07 MW capacity at Village Degaon, Taluka Sindakhede, District. Dhule, Maharashtra.
28 of 2022
|
Completed | |
579 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Nareshkumar Motilal Ahuja under Non - Revenue Grievance - Others Type Category (Removal & Shifting of Meter Cabin) of the Indian Electricity Act, 2003 (IEA) under Section 42 & 46 for not passing transparent Order / Judgment as prayed for in the Complaint / Grievance / Representation filed by the Petitioner instead of declaring / issuing Judgment / Order (Dated : 22/09/2021 in Representation No. 54 of 2021) against the Codes & Standards + MERC norms by Mr. Deepak Lad (Chairman & Coram : Hon'ble Electricity Ombudsman (Mumbai) [EO(M)]).
20 of 2022
|
Completed | |
580 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Ltd. for directions on behalf of the Petitioner / Applicant pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 118 of 2021. And
Case of Adani Power Maharashtra Limited pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 40 of 2022.
MA No .76 of 2022 in 227 of 2018 And 124 of 2018
|
Completed | |
581 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar (STKWSNNSL) seeking appropriate dispensation or relaxation from applicability of amended Regulation 20.3 under Regulation 39 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019, particularly applicability of monthly Banking provisions thereunder for its Four (4) of the Hydro Electric Projects.
88 of 2022
|
Completed | |
582 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Wind World (India) Limited for determination of the Average Power Procurement Cost of the MSEDCL each year from FY 2016-17 to FY 2019-20 in order to comply with the provisions of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.01.2010 and for seeking directions to MSEDCL for releasing payments towards purchase of unutilized banked energy for FY 2016-17 to FY 2020-21 in terms of the MERC (Distribution Open Access) Regulations, 2016 and amendment thereof.
14 of 2022
|
Completed | |
583 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Morries Energy Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills and delayed payment charges in terms of energy purchase agreement dated 26.02.2009.
171 of 2021
|
Completed | |
584 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Hercules Hoists Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding amounts in terms of energy purchase agreement's executed between the parties from time to time.
170 of 2021
|
Completed | |
585 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
|
Completed | |
586 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Trust (JNPT) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and 'Guidelines for Shortterm (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process' issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1 MW for a period of one year from 1 July, 2022 to 30 June, 2023.
90 of 2022
|
Completed | |
587 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
|
Completed | |
588 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
|
Reschedule with further notice | |
589 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. TP Kirnali Limited & M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 read with Regulation 92 of the MERC (Conduct of Business) Regulations 2004 seeking extension of the Scheduled Commercial Operation Date of the proposed 100 MW project to 21.08.2022 ("SCOD").
167 of 2021
|
Completed | |
590 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
|
Reschedule with further notice | |
591 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
|
Completed | |
592 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
163 of 2021 And IA No. 02 of 2022 in 163 of 2021
|
Completed | |
593 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ACME Heergarh Powertech Private Limited (AHPPL) seeking extension of the scheduled commercial operation date from 28 December 2021 to 14 September 2022, account of certain Force Majeure events including second surge of Covid-19 in India and disruption in import of modules from China impacting the development of the project.
7 of 2022
|
Completed | |
594 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
|
Completed | |
595 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited for approval of the Power Procurement Plan for both its SEZ's combinedly in its capacity as a Distribution Licensee & approve the deviations in medium term power procurement Guidelines for "Procurement of Electricity for Medium Term from Power Stations set upon Finance, Own and Operate (FOO) basis" dated 30.01.2019 issued by the Ministry of Power, Government of India, considering operational expediencies, for the period of 3 years starting from 1st November 2022 to 31st October 2025 for both its IT and ITES SEZ at Survey No.72, Village Kharadi, Pune (EON SEZ Phase-I) and survey no. 77, MIDC Knowledge Park, Kharadi, District Pune,(EON SEZ Phase-II) in the State of Maharashtra.
82 of 2022 & IA No. 05 of 2022 in 82 of 2022
|
Completed | |
596 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Essel Mining & Industries Limited under Sections 86(1)(e), 86(1)(f) and 86(1)(K) of the Electricity Act, 2003 seeking appropriate relief for adjudication of disputes between the petitioner and MSEDCL under provisions of Power Purchase Agreement dated November 22, 2018 and quashing of notice dated January 27, 2022 issued by the MSEDCL.
79 of 2022 And IA No. 04 of 2022 in 79 of 2022
|
Completed | |
597 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
598 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Roha Dyechem Pvt. Ltd. for directions to Maharashtra State Electricity Distribution Company Ltd. with regard to the terms of Open Access permissions.
119 of 2018 And 19 of 2019 And 118 of 2019 And 119 of 2019
|
Completed | |
599 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 15.85 MW wind power from the wind generators whose EPAS with MSEDCL have expired.
67 of 2022
|