Hearing
S.No. | Schedule | Description | Status | Attachments |
---|---|---|---|---|
1 | Wed 19/03/2025 10:30:00 AM |
e-Public Hearing
Hearing on Suo-Motu Draft Order on Renewable Energy Tariff for FY 2025-26
1 of 2025
|
Scheduled | |
2 | Wed 19/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Rajuri steel and TMT Bars Pvt. Ltd. seeking early
hearing in Case No. 41/MP/2025.
(Petition of Rajuri steel and TMT Bars Pvt. Ltd. under Section 94 read with
Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the
MERC (Transaction of Business and Fees and Charges) Regulations 2022
seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 33 of 2025 in Case No. 41 of 2025
|
Scheduled | |
3 | Wed 19/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Rathi Steel and Metal Private Limited seeking early
hearing in Case No. 39/MP/2025.
(Petition of Rathi Steel and Metal Private Limited under Section 94 read with
Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the
MERC (Transaction of Business and Fees and Charges) Regulations 2022
seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 34 of 2025 in Case No. 39 of 2025
|
Scheduled | |
4 | Wed 19/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Geetai Steels Private Limited seeking early hearing
in Case No. 42/MP/2025.
(Petition of Geetai Steels Private Limited under Section 94 read with Section 142
and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking
implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 35 of 2025 in Case No. 42 of 2025
|
Scheduled | |
5 | Wed 19/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Gajkesari Steels & Alloys Pvt Ltd. seeking early
hearing in Case No. 40/MP/2025.
(Petition of Gajkesari Steels & Alloys Pvt Ltd. under Section 94 read with
Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the
MERC (Transaction of Business and Fees and Charges) Regulations 2022
seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 36 of 2025 in Case No. 40 of 2025
|
Scheduled | |
6 | Wed 19/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brookhill Co-Op Housing Society Limited, Harmony Sky Suites Co-
Op Housing Society Limited and Royce Co-Op Housing Society Limited seeking directions to MSEDCL for enabling Virtual Net Metering Arrangement.
222 of 2024
|
Scheduled | |
7 | Tue 18/03/2025 10:30:00 AM |
e-Public Hearing
Hearing on Suo-Motu Draft Order on Renewable Energy Tariff for FY 2025-26
1 of 2025
|
Rescheduled on Wed 19/March/2025 10:30 AM | |
8 | Tue 11/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brookhill Co-Op Housing Society Limited, Harmony Sky Suites CoOp Housing Society Limited and Royce Co-Op Housing Society Limited seeking
directions to MSEDCL for enabling Virtual Net Metering Arrangement.
222 of 2024
|
Scheduled | |
9 | Tue 11/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Rajuri steel and TMT Bars Pvt. Ltd. (Formerly
Saptshrungi steels alloys Pvt Ltd. seeking early hearing in Case No. 32/MP/2025.
(Petition of Rajuri steel and TMT Bars Pvt. Ltd. (Formerly Saptshrungi steels
alloys Pvt Ltd.) under Section 94 read with Section 142 and 146 of the Electricity
Act 2003 read with Regulation 41 of the MERC (Transaction of Business and
Fees and Charges) Regulations 2022 seeking implementation and enforcement of
S. 40 and 42 Electricity Act, 2003.)
IA. No. 31 of 2025 in Case No 32 of 2025
|
Scheduled | |
10 | Tue 11/03/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of KSB Limited seeking urgent and early listing in Case No. 197/MP/2024.
(Petition of KSB Limited seeking directions forthwith for allowing Net Metering Arrangement).
IA. No. 32 of 2025 in Case No. 197 of 2024
|
Scheduled | |
11 | Tue 04/03/2025 10:30:00 AM |
e-Public Hearing at Nagpur
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024. (Place/Venue of e-Facilitation Centre: District Planning Committee, Behind Sadar Police Station, Nagpur)
217 of 2024
|
Completed | |
12 | Mon 03/03/2025 10:30:00 AM |
e-Public Hearing at Amravati
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024. (Place/Venue of e-Facilitation Centre: DPDC Hall, Amravati, District - Amravati).
217 of 2024
|
Completed | |
13 | Sat 01/03/2025 10:30:00 AM |
e-Public Hearing at Chhatrapati Sambhaji Nagar
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Place/Venue of e-Facilitation Centre: ASCDL HQ OCC Hall Aurangabad Smart City Development Corporation Limited, Chhatrapati Sambhaji Nagar.)
217 of 2024
|
Completed | |
14 | Fri 28/02/2025 10:30:00 AM |
e-Public Hearing at Nashik
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024, (Place/Venue of e-Facilitation Centre: Niyojan Bhavan, Collector Office Campus, Old Agra Road, Nasik).
217 of 2024
|
Completed | |
15 | Thu 27/02/2025 10:30:00 AM |
e-Public Hearing at Pune
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024. (Place/Venue of e-Facilitation Centre: Auditorium, Government College of Engineering, Shivaji Nagar, Pune).
217 of 2024
|
Completed | |
16 | Tue 25/02/2025 10:30:00 AM |
e-Public Hearing at Navi Mumbai
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024.
(Place/Venue of e-Facilitation Centre: Conference Hall, 7th Floor, CIDCO Bhavan, CBD, Belapur, Navi Mumbai).
217 of 2024
|
Completed | |
17 | Tue 18/02/2025 12:30:00 PM |
e-Public Hearing
Inviting Suggestions/Objections on Multi Year Tariff Petition of The Tata Power Company Limited - Distribution Business for Truing up for FY 2023-24, Provisional Truing up for
FY 2024-25 and Approval of ARR projections and Tariff for MYT Control Period from FY 2025-26 to FY 2029-30
(Case No. 210 of 2024)
210 of 2024
|
Completed | |
18 | Tue 18/02/2025 12:30:00 PM |
e-Hearing through Video Conferencing
Interlocutory Application of Mindspace Business Parks Private Limited & Ors.
seeking early hearing in Case No. 26/MP/2025.
(Petition of Mindspace Business Parks Private Limited & Ors. under Section 142,
146 and 149 of the Electricity Act, 2003 and Regulation 32 of the MERC
(Transaction of Business and Fees and Charges) for non-compliance of the Order
dated 27.09.2023 passed by this Hon’ble Commission in MERC Case No.162 of
2022.)
IA. No. 27 of 2025 in Case No. 26 of 2025
|
Completed | |
19 | Tue 18/02/2025 12:30:00 PM |
e-Hearing through Video Conferencing
Interlocutory Application of Geetai Steels Private Limited seeking early hearing
in Case No. 27/MP/2025.
(Petition of Geetai Steels Private Limited under Section 94 read with Section 142
and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking
implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 28 of 2025 in Case No. 27 of 2025
|
Completed | |
20 | Tue 18/02/2025 12:30:00 PM |
e-Hearing through Video Conferencing
Interlocutory Application of Gajkesari Steels & Alloys Private Limited seeking
early hearing in Case No. 28/MP/2025.
(Petition of Gajkesari Steels & Alloys Private Limited under Section 94 read with
Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the
MERC (Transaction of Business and Fees and Charges) Regulations 2022
seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 29 of 2025 in Case No. 28 of 2025
|
Completed | |
21 | Tue 18/02/2025 12:30:00 PM |
e-Hearing through Video Conferencing
Interlocutory Application of Bhagwati Steel Cast Pvt. Ltd. seeking early hearing
in Case No. 29/MP/2025.
(Petition of Bhagwati Steel Cast Pvt. Ltd. under Section 94 read with Section 142
and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking
implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 30 of 2025 in Case No. 29 of 2025
|
Completed | |
22 | Tue 18/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Adani Electricity Mumbai Limited - Distribution Business Multi-Year Tariff (MYT) Petition for Truing Up of FY 2022-23 and FY 2023-24, Provisional Truing Up for FY 2024-25 and approval of ARR and Tariff for FY 2025-26 to FY 2029-30 [Case No. 211 of 2024]
211 of 2024
|
Completed | |
23 | Tue 18/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Adani Power Ltd (APL) for Truing Up of FY 2022-23 and FY 2023-24, Provisional True Up for FY 2024-25 and approval of ARR projections for MYT control period from FY 2025-26 to FY 2029-30 of Adani Dahanu Thermal Power Station. [Case No. 188 of 2024]
188 of 2024
|
Completed | |
24 | Mon 17/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Multi Year Tariff Petition of The Brihanmumbai Electric Supply & Transport Undertaking for Truing up for FY 2022-23 and FY 2023-24, Provisional Truing up for FY 2024-25 and Approval of ARR projections and Tariff for MYT Control Period from FY 2025-26 to FY 2029-30
(Case No. 207 of 2024)
207 of 2024
|
Completed | |
25 | Mon 17/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Maharashtra Airport Development Company Limited (MADC) Multi-Year Tariff (MYT) Petition for approval of Truing up of FY 2020-21 to FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024
(Case No. 229 of 2024)
229 of 2024
|
Completed | |
26 | Mon 17/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on MITL-SIA
Petition for Approval of Multi-Year Tariff Petition for FY 2025-26 to FY 2029-30 including Aggregate Revenue Requirement for FY 2025-26 to FY 2029-30 and category wise tariff for FY 2025-26 under MERC (Multi Year Tariff) Regulations, 2024.
(Case No. 239 of 2024)
239 of 2024
|
Completed | |
27 | Mon 17/02/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on MITL-BIA
Petition for Approval of Multi-Year Tariff Petition for FY 2025-26 to FY 2029-30 including Aggregate Revenue Requirement for FY 2025-26 to FY 2029-30 and category wise tariff for FY 2025-26 under MERC (Multi Year Tariff) Regulations, 2024.
(Case No. 241 of 2024)
241 of 2024
|
Completed | |
28 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent hearing in Case No. 17/MP/2025.
(Petition of MSEDCL for seeking approval to bidding documents for medium term procurement of 1000 MW Power through Competitive Bidding Process in the State of Maharashtra read with Regulation 21 of the MERC (Multi Year Tariff) Regulations, 2019.)
IA. No. 19 of 2025 in Case No. 17 of 2025
|
Completed | |
29 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Avaada Energy Private Limited seeking urgent hearing in Case No. 88/AP/2024.
(Petition of MSEDCL seeking approval for adoption of tariff for long term procurement of 400 MW power from Intra-State grid connected solar power project under Section 63 of the Electricity Act 2003.)
IA. No. 20 of 2025 in Case No. 88 of 2024
|
Completed | |
30 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of MITC Rolling Mills Private Limited seeking early hearing in Case No. 18/MP/2025.
(Petition of MITC Rolling Mills Private Limited under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 21 of 2025 in Case No. 18 of 2025
|
Completed | |
31 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Shiv Krupa Steel & Alloys Private Limited seeking early hearing in Case No. 19/MP/2025.
(Petition of Shiv Krupa Steel & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.)
IA. No. 22 of 2025 in Case No. 19 of 2025
|
Completed | |
32 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Jalna Siddhivinayak Alloys Private Limited seeking early hearing in Case No. 21/MP/2025.
(Petition of Jalna Siddhivinayak Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.)
IA. No. 23 of 2025 in Case No. 21 of 2025
|
Completed | |
33 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Rajuri steel and TMT Bars Pvt. Ltd. seeking early hearing in Case No. 24/MP/2025.
(Petition of Rajuri steel and TMT Bars Pvt. Ltd. under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 24 of 2025 in Case No. 24 of 2025
|
Completed | |
34 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brookhill Co-Op Housing Society Limited, Harmony Sky Suites Co-Op Housing Society Limited and Royce Co-Op Housing Society Limited seeking directions to MSEDCL for enabling Virtual Net Metering Arrangement.
222 of 2024
|
Completed | |
35 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Non compliance of the Commission’s Order dated 27 December 2024 in Case No. 12 of 2024 by Maharashtra State Electricity Distribution Company Ltd. (MSEDCL).
(Petition of MSEDCL seeking review of Order dated 08th January 2024 passed in Case No. 181 of 2023 in the matter of non-compliance of regulation 22.14 & 25.2 of the MERC (supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 regarding installation of power quality meters and mechanism for automatic compensation.)
12 of 2024
|
Completed | |
36 | Tue 11/02/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking permission to bring on record the subsequent developments and additional document in Case No. 17/MP/2025.
(Petition of MSEDCL for seeking approval to bidding documents for medium term procurement of 1000 MW Power through Competitive Bidding Process in the State of Maharashtra read with Regulation 21 of the MERC (Multi Year Tariff) Regulations, 2019.)
IA. No. 25 of 2025 in Case No. 17 of 2025
|
Completed | |
37 | Tue 21/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Jawaharlal Nehru Port Authority (JNPA) Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 206 of 2024).
206 of 2024
|
Completed | |
38 | Tue 21/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on AEML SEEPZ Limited (ASL) Multi-Year Tariff Petition for approval of Truing up of FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 215 of 2024).
215 of 2024
|
Completed | |
39 | Tue 21/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on M/s. SEZ Bio-Tech Services Private Limited -Manjari
Multi-Year Tariff Petition for approval of Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 204 of 2024).
204 of 2024
|
Completed | |
40 | Tue 21/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on M/s. SEZ Bio-Tech Services Private Limited - Hadapsar
Multi-Year Tariff Petition for approval of Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 205 of 2024).
205 of 2024
|
Completed | |
41 | Tue 21/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Laxmipati Balaji Supply Chain Management Limited (LBSCML)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 218 of 2024)
218 of 2024
|
Completed | |
42 | Tue 21/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Bhagwati Ferro Metal Private Limited seeking early hearing in Case No. 9/MP/2025.
(Petition of Bhagwati Ferro Metal Private Limited seeking refund of the cost incurred on setting up of the infrastructures at EHV levels.)
IA. No. 13 of 2025 in Case No. 9 of 2025
|
Completed | |
43 | Tue 21/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Surya Ferrous Alloys Pvt. Ltd. seeking early hearing in Case No. 10/MP/2025.
Petition of Surya Ferrous Alloys Pvt. Ltd. seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.
IA. No. 14 of 2025 in Case No. 10 of 2025
|
Completed | |
44 | Tue 21/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Guardian Castings Pvt. Ltd. seeking early hearing in Case No. 11/MP/2025.
(Petition of Guardian Castings Pvt. Ltd. seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 15 of 2025 in Case No. 11 of 2025
|
Completed | |
45 | Tue 21/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Diwanka Energy Private Limited seeking early hearing in Case No. 12/MP/2025.
Petition of Diwanka Energy Private Limited seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
IA. No. 16 of 2025 in Case No. 12 of 2025
|
Completed | |
46 | Tue 21/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Jaideep Mettalics and Alloys Pvt. Ltd. seeking early hearing in Case No. 13/MP/2025.
(Petition of Jaideep Mettalics and Alloys Pvt. Ltd. seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.)
IA. No. 17 of 2025 in Case No. 13 of 2025
|
Completed | |
47 | Mon 20/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on EON Kharadi Infrastructure Private Limited's (EON SEZ Phase I)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accor- dance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 213 of 2024)
213 of 2024
|
Completed | |
48 | Mon 20/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on EON Kharadi Infrastructure Private Limited's
(EON SEZ Phase II)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accor- dance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 214 of 2024)
214 of 2024
|
Completed | |
49 | Mon 20/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on KRC Infrastructure and Projects Private Limited (KRCIPPL)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024
(Case No. 209 of 2024)
209 of 2024
|
Completed | |
50 | Mon 20/01/2025 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Mindspace Business Parks Private Limited (MBPPL)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 (Case No. 216 of 2024)
216 of 2024
|
Completed | |
51 | Mon 20/01/2025 10:20:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Gigaplex Estate Private Limited (GEPL)
Multi-Year Tariff Petition for approval of Truing up of FY 2022-23 and FY 2023-24, Provisional Truing up of FY 2024-25 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2025-26 to FY 2029-30 for its Distribution Business in accordance with the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024
(Case No. 212 of 2024)
212 of 2024
|
Completed | |
52 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking urgent hearing in Case No. 198/AP/2024.
(Petition of MSEDCL for seeking approval for adoption of tariff for long term procurement of 885 MW grid connected solar photovoltaic power projects to be set up on lands of Water Resource Department of Maharashtra and 20 MW from solar projects to be installed on the private lands of private LIS consumers for lift irrigation schemes in the state of Maharashtra under Section 63 of the Electricity Act 2003 for meeting the solar renewable purchase obligations.)
IA. No. 84 of 2024 in Case No. 198 of 2024
|
Completed | |
53 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking urgent hearing in Case No. 173/AP/2024.
(Petition of MSEDCL for seeking approval on adoption of tariff for procurement of storage capacity from 250 MW/ 500 MWH with additional green shoe capacity upto 500 MW/1000 MWH standalone battery energy storage system under competitive bidding process to be installed in MSEDCL sub-stations through competitive bidding under Section 63 of the Electricity Act 2003 for meeting Renewable Purchase Obligations.)
IA. No. 85 of 2024 in Case No. 173 of 2024
|
Completed | |
54 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Load Despatch Centre (MSLDC) for seeking urgent listing in Case No. 103/MP/2024.
(Petition of Maharashtra State Load Despatch Centre (MSLDC) seeking appropriate Orders for removal of difficulties, granting of relaxation and issuance of appropriate directions under Clause No (18), (19), (20) and (21) of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019)
IA. No. 1 of 2025 in Case No. 103 of 2024
|
Completed | |
55 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of AEML SEEPZ Limited for seeking urgent listing in Case No. 168/AP/2024.
(Petition of AEML SEEPZ Limited for seeking adoption of tariff discovered under Competitive Bidding Process conducted vide RFS No. SECI/C&P/IPP/11/0009/22-23 dated 31.03.2023 issued by SECI for procurement of 50 MW ISTS connected Solar Power under ISTS-Tranche-XI scheme to meet it demand and RPO.
IA. No. 2 of 2025 in Case No. 168 of 2024
|
Completed | |
56 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited - (Distribution Business) (AEML-D) for seeking urgent listing in Case No. 166/AP/2024.
(Petition of AEML-D for seeking adoption of tariff discovered under Competitive Bidding Process conducted vide RFS No. SECI/C&P/IPP/11/0009/22-23 Dated 31.03.2023 issued by SECI for procurement of 50 MW ISTS connected Solar Power under ISTS - Tranche - XI scheme to meet demand and RPO.
IA. No. 3 of 2025 in Case No. 166 of 2024
|
Completed | |
57 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Load Despatch Centre (MSLDC)
for seeking urgent listing in Case No. 3/MP/2025.
(Petition of MSLDC seeking appropriate orders for removal of difficulties,
granting of relaxation and issuance of appropriate directions under the Clause No
(18), (19), (20) and (21) of MERC (Deviation Settlement Mechanism And
Related Matters) Regulations, 2019 and under Section 86 (1) of the Electricity
Act, 2003 for recovery of Legacy Charges.)
IA No. 4 of 2025 in Case No. 3 of 2025
|
Completed | |
58 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s Laxmipati Balaji Supply Chain Management Limited (LBSCML) for grant of early hearing in Case No. 4/AT/2025.
(Petition of M/s Laxmipati Balaji Supply Chain Management Limited (LBSCML)
under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2025 to January 31, 2026 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.)
IA No. 5 of 2025 in Case No. 4 of 2025
|
Completed | |
59 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited seeking urgent listing in Case No. 5/MP/2025
(Petition of Adani Electricity Mumbai Limited under Section 86 (1) (e ) of the Electricity Act, 2003 read with all other relevant provisions of the Electricity Act, 2003, for seeking clarification with respect to the ‘cost of enforcement’ in terms of the Order dated 16.08.2006 passed in Case No. 6 of 2006, towards any shortfall in supply of Committed Wind Energy by the wind generator (presently under IBC proceeding)).
IA No. 6 of 2025 in Case No. 5 of 2025
|
Completed | |
60 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (KVTL) for urgent listing in Case No. 44/AD/2024.
(Petition of Kharghar Vikhroli Transmission Limited (KVTL) seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure events and appropriate relief for Change in Law events.)
IA No. 7 of 2025 in Case No. 44 of 2025
|
Completed | |
61 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Nidar Utilities Panvel LLP (NUPLLP) seeking urgent and early hearing in Case No. 6/AP/2025.
(Petition of M/s. Nidar Utilities Panvel LLP (NUPLLP) for Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 for 3 MW Electricity supply on Medium-Term Basis for the period starting from 1 February 2025 to 31 January 2029 (i.e. 4 years) Procurement of Power by Distribution Licensees through ‘Tariff Based Bidding Process’ issued by Ministry of Power, Government of India.)
IA No. 8 of 2025 in Case No. 6 of 2025
|
Completed | |
62 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Viraj Profile Limited for urgent hearing in Case No. 140/MP/2021.
(Petition of M/s. Viraj Profile Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 29.08.2018 passed by the CGRF in Grievance No. K/E/1426/1677/ of 2017-2018.)
IA No. 9 of 2025 in Case No. 140 of 2021
|
Scheduled | |
63 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company
Limited (MSEDCL) seeking urgent hearing in Case No. 7/AP/2025.
(Petition of MSEDCL seeking approval for adoption of tariff discovered for long
term procurement of 5008 MW through competitive bidding under the
Mukhyamantri Saur Krushi Vahini Yojana 2.0 scheme launched for
implementation of feeder level solarisation under component c of PM-Kusum
scheme connected to the distribution network under Section 63 read with Section
86 of the Electricity act 2003 for meeting the Solar Renewable Purchase
Obligations.)
IA No. 10 of 2025 in Case No. 7 of 2025
|
Scheduled | |
64 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Urjankur Shree Datta Power Company Limited
(USDPCL) seeking urgent hearing in Case No. 2/MP/2025.
(Petition of Urjankur Shree Datta Power Company Limited (USDPCL) under
Section 142 read with 146 of the Electricity Act, 2003 read with Regulations 14
and 39 of the Maharashtra Electricity Regulation (Transaction of Business and
Fees and Charges) Regulations, 2022 having been aggrieved by the deliberate
non-compliance of the directions issued by this Hon’ble Commission vide its
Order dated 19.09.2024 in Case No. 202/AD/2023.)
IA No. 12 of 2025 in Case No. 2 of 2025
|
Scheduled | |
65 | Tue 14/01/2025 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company
Limited (MSEDCL) seeking urgent hearing in Case No. 224/AP/2024.
(Petition of MSEDCL for seeking approval for Adoption of Tariff for Long Term
Procurement of 150 MW Power from Inter/Intra-State Grid Connected Solar
Power Project under Section 63 of the Electricity Act 2003 for Meeting the Solar
Renewable Purchase Obligations.)
IA No. 11 of 2025 in 224 of 2024
|
Scheduled | |
66 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Tata Power Company Limited- Transmission Petition for approval of Truing-up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing-up of ARR for FY 2024-25 as per MYT Regulations, 2019 and ARR Projections for the 5th Control Period from FY 2025-26 to FY 2029-30 as per MERC MYT Regulations , 2024
185 of 2024
|
Completed | |
67 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Tata Power Company Limited- Generation Petition for approval of Truing-up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing-up of ARR for FY 2024-25 as per MYT Regulations, 2019 and ARR Projections for the 5th Control Period from FY 2025-26 to FY 2029-30 as per MERC MYT Regulations , 2024
189 of 2024
|
Completed | |
68 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Adani Electricity Mumbai Limited’s (Transmission Business) Petition for Approval of Truing Up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulations, 2019 and Approval of Aggregate Revenue Requirement (ARR) for 5th Control Period from FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
184 of 2024
|
Completed | |
69 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Power Generation
Company Limited's Petition for Approval of Truing Up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulations, 2019 and Approval of Aggregate Revenue Requirement (ARR) for 5th Control Period from FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
187 of 2024
|
Completed | |
70 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Transmission Utility's (STU) Petition for Approval of Truing-up of Intra-State Transmission System Tariff (InSTS) for FY 2022-23 and FY 2023-24 as per MERC MYT Regulations, 2019 and determination of Multi Year Tariff for Intra-State Transmission System for the 5" control period from FY 2025-26 to FY 2029-30 as per the MERC MYT Regulations, 2024
208 of 2024
|
Completed | |
71 | Wed 08/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited Transmission (VIPL-T) Business's Petition for True-up of Annual Revenue Requirement for FY 2022-23 & FY 2023-24; Provisional True-up of ARR for FY 2024-25 and Projection of Aggregate Revenue Requirement for FY 2025-26 to FY 2029-30
220 of 2024
|
Completed | |
72 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing-up of ARR for FY 2024-25 as per MYT Regulations, 2019 and ARR Projections for the 5th Control Period from FY 2025-26 to FY 2029-30 as per MERC MYT Regulations , 2024
178 of 2024
|
Completed | |
73 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for Approval of Truing up of Annual Fixed Charges (AFC) for FY 2022-23 and FY 2023-24, provisional Truing up of AFC for FY 2024-25 as per MERC MYT Regulations, 2019 and determination of AFC and Fees and Charges for the 5th Control Period from FY 2025-26 to FY 2029-30 as per the MERC MYT Regulations, 2024.
186 of 2024
|
Completed | |
74 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for Approval of True-Up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulations, 2019 and Projection of ARR for FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
179 of 2024
|
Completed | |
75 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Jaigad Power Transco Limited's Petition for Approval of True-Up of ARF FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulatio 2019 and ARR Projection for FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
180 of 2024
|
Completed | |
76 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for Approval of True-Up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulations, 2019 and ARR Projection for FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
181 of 2024
|
Completed | |
77 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Co. Ltd.'s Petition for Approval of True-Up of ARR for FY 2022-23 and FY 2023-24, Provisional Truing Up of ARR for FY 2024-25 as per MERC MYT Regulations, 2019 and ARR Projection for FY 2025-26 to FY 2029-30 as per MERC MYT Regulations, 2024
182 of 2024
|
Completed | |
78 | Tue 07/01/2025 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Transmission Utility's (STU) Multi Year Tariff Petition for Approval of the STU Fees & Charges for the 5th control period of FY 2025-26 to FY 2029-30 as per the MERC MYT Regulations, 2024
183 of 2024
|
Completed | |
79 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shrisai Medicare Services Pvt. Ltd. seeking compliance of the Order of Electricity Ombudsman, Mumbai, dated 27 April 2020.
6 of 2024
|
Scheduled | |
80 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Co. Ltd. (MSETCL) seeking transfer and handover the partly constructed 220kV transmission line from Babhaleshwar substation to the proposed Adwadi substation and partly constructed 220kV/33kV Adwadi substation to MSETCL without any cost.
61 of 2024
|
Scheduled | |
81 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Varun Beverages Limited seeking directions to process Net Billing Applications and clarifications for allowing the Eligible Consumers to avail the Net Billing and Open Access in line with the MERC DOA Second Amendment Regulations 2023.
129 of 2024
|
Scheduled | |
82 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. India Steel Works Ltd., under section 142 and 146 of the Electricity Act, 2003 for non-compliance of the Order dated 15.09.2022 passed by the Hon’ble Members of the Consumer Grievance Redressal Forum, Kalyan Zone by the Licensee.
145 of 2024
|
Scheduled | |
83 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. India Steel Works Ltd., under section 142 and 146 of the Electricity Act, 2003 for non-compliance of the Order dated 15.09.2022 passed by the Hon’ble Members of the Consumer Grievance Redressal Forum, Kalyan Zone by the Licensee i.e., the Respondent.
146 of 2024
|
Scheduled | |
84 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-D under Section 86 (1)(e) read with MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019 and its amendment ,RE Tariff Regulations, 2019 and (Distribution Open Access) (Second Amendment) Regulations, 2023 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval of Proposed Methodology for the Settlement of Surplus Renewable Energy available with infirm open access consumers amongst other Tata Power-D Consumers.
147 of 2024
|
Scheduled | |
85 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for re-calculating the base TCR afresh for Control period FY 2020-21 to FY 2024-25 pursuant to the Order dated 05.07.2024 in Appeal No. 95 of 2024 passed by the Hon'ble Tribunal.
151 of 2024
|
Scheduled | |
86 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Eden Agencies against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 20 November 2023 passed by Appellate Authority in Appeal No. 234 of 2016.
157 of 2024
|
Scheduled | |
87 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 63 of Electricity Act, 2003 for adoption of tariff for procurement of 250 MW Power from Grid-Connected Wind Power Projects in India under Tariff-based Competitive Bidding on long term basis through competitive bidding process to meet Demand and the Renewable Purchase Obligation.
160 of 2024
|
Heard on 19.11.2024 | |
88 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Baramati Agro Limited seeking directions against M.S.E.D.C.L. to perform and adhere to its contractual obligations under the Energy Purchase Agreement (EPA) dated 25/10/2013 executed with the Petitioner.
161 of 2024
|
Scheduled | |
89 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Someshwar SSK Limited seeking directions against MSEDCL to perform and adhere to its contractual obligations under the Energy Purchase Agreement dated 09.03.2010 executed with the Petitioner.
175 of 2024
|
Scheduled | |
90 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Purna Sahakari Sakhar Karkhana seeking directions against M.S.E.D.C.L. to perform and adhere to its contractual obligations under the Energy Purchase Agreement dated 09.05.2011executed with the Petitioner.
196 of 2024
|
Scheduled | |
91 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Renewable Energy Fifty Five Limited under Section 86(1)(f) read with Section 86(1)(b) of the Electricity Act, 2003 read with Article 11 of the Power Purchase Agreement dated 29.10.2024 executed between Adani Renewable Energy Fifty-Five Ltd. and Maharashtra State Electricity Distribution Company Ltd. for procurement of power on long-term basis through competitive bidding process (followed by reverse e-auction) from 5000 MW Grid Connected Solar Photovoltaic Power Project.
192 of 2024
|
Scheduled | |
92 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited- Distribution under Section 63 of the Electricity Act, 2003 seeking approval for Medium Term Procurement of 200 MW Power from FY 2025-26 to FY 2026-27 and for approval of deviations in the MoP’s Model Bidding Documents for Medium Term Procurement through competitive bidding process.
194 of 2024
|
Scheduled | |
93 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Nidar Utilities Panvel LLP seeking urgent and early hearing in Case No. 228/AP/2024.
(Petition of Nidar Utilities Panvel LLP Petition for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Short Term Competitive Bidding Guidelines issued by Ministry of Power as per Section 63 of the Electricity Act, 2003 for the procurement of 1 MW Round the Clock (RTC) power for the period 1 January 2025 to 31 March 2025 and 2 MW RTC power for the period 1 April 2025 to 31 October 2025.)
IA. No. 80 of 2024 in Case No. 228 of 2024
|
Scheduled | |
94 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 232/MP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for clarification by Hon’ble MERC (vide the Powers of Hon’ble MERC to issue Orders and Practice Directions and/or Remove Difficulties) on (i) Regulation 3.3, Fifth Proviso, (ii) Regulation 3.3, Sixth Proviso read-with Regulation 20.5, Proviso and (iii) Regulation 3.4, Proviso, amended by the MERC (Distribution Open Access) (Second Amendment) Regulations, 2023.
IA. No. 81 of 2024 in Case No. 232 of 2024
|
Scheduled | |
95 | Tue 17/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 233/AD/2024.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking ad-interim stay on the alleged invoices raised by JSW / Respondent.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for quashing and setting aside of the invoices/supplementary bills/bills dated 23.09.2024, 01.10.2024 and 02.11.2024 as well as subsequent such invoices/supplementary bills/bills raised by JSW Energy Limited (JSW) on Maharashtra State Electricity Distribution Company Limited (MSEDCL), which are disputed and denied by MSEDCL)
IA. No. 82 & 83 of 2024 in Case No. 233 of 2024
|
Scheduled | |
96 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shrisai Medicare Services Pvt. Ltd. seeking compliance of the Order of Electricity Ombudsman, Mumbai, dated 27 April 2020.
6 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
97 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Co. Ltd. (MSETCL) seeking transfer and handover the partly constructed 220kV transmission line from Babhaleshwar substation to the proposed Adwadi substation and partly constructed 220kV/33kV Adwadi substation to MSETCL without any cost.
61 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
98 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Varun Beverages Limited seeking directions to process Net Billing Applications and clarifications for allowing the Eligible Consumers to avail the Net Billing and Open Access in line with the MERC DOA Second Amendment Regulations 2023.
129 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
99 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. India Steel Works Ltd., under section 142 and 146 of the Electricity Act, 2003 for non-compliance of the Order dated 15.09.2022 passed by the Hon’ble Members of the Consumer Grievance Redressal Forum, Kalyan Zone by the Licensee.
145 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
100 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. India Steel Works Ltd., under section 142 and 146 of the Electricity Act, 2003 for non-compliance of the Order dated 15.09.2022 passed by the Hon’ble Members of the Consumer Grievance Redressal Forum, Kalyan Zone by the Licensee i.e., the Respondent.
146 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
101 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-D under Section 86 (1)(e) read with MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019 and its amendment ,RE Tariff Regulations, 2019 and (Distribution Open Access) (Second Amendment) Regulations, 2023 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval of Proposed Methodology for the Settlement of Surplus Renewable Energy available with infirm open access consumers amongst other Tata Power-D Consumers.
147 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
102 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for re-calculating the base TCR afresh for Control period FY 2020-21 to FY 2024-25 pursuant to the Order dated 05.07.2024 in Appeal No. 95 of 2024 passed by the Hon'ble Tribunal.
151 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
103 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Eden Agencies against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 20 November 2023 passed by Appellate Authority in Appeal No. 234 of 2016.
157 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
104 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 63 of Electricity Act, 2003 for adoption of tariff for procurement of 250 MW Power from Grid-Connected Wind Power Projects in India under Tariff-based Competitive Bidding on long term basis through competitive bidding process to meet Demand and the Renewable Purchase Obligation.
160 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
105 | Fri 13/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Baramati Agro Limited seeking directions against M.S.E.D.C.L. to perform and adhere to its contractual obligations under the Energy Purchase Agreement (EPA) dated 25/10/2013 executed with the Petitioner.
161 of 2024
|
Postponed and Rescheduled on Tue 17/December/2024 10:30 AM | |
106 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Co. Ltd. seeking
direction to M/s GMR Warora Energy Ltd. to handover the land to MSETCL for
construction of 400/220 kV switchyard for evacuation of MSEDCL’s 200 MW
power from 2x300 MW thermal power plant.
233 of 2023
|
Scheduled | |
107 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gimatex Industries Pvt Ltd. and Ors. seeking compliance of CGRF
Nagpur’s Orders.
242 of 2023
|
Scheduled | |
108 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. (SIIPL) under Sections 42(3),
42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the
Maharashtra Electricity Regulatory Commission (Distribution Open Access)
Regulations, 2016 and the Practice Directions dated 08.03.2017 issued
thereunder, for refund of excess wheeling and transmission charges levied &
collected by the Respondent for the period September-21 up till May 2023 with
interest.
131 of 2024
|
Scheduled | |
109 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute under the Power Purchase Agreements entered between Adani Power Limited and Maharashtra State Electricity Distribution Company Limited qua levy of Forest Tax in the state of Chhattisgarh as a Change in Law event.
132 of 2024
|
Scheduled | |
110 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited under Section 86 of the Electricity Act, 2003 read with Article 13 (‘Change in Law’) of Power Purchase Agreement dated 08.09.2008 and Article 10 (‘Change in Law’) of Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Limited (erstwhile Adani Power Maharashtra Limited) for seeking appropriate adjustment of tariff owing to ‘Change in Law’ event arising due to Notification No. F-09/2015/Seven-1 dated 04.09.2019.
133 of 2024
|
Scheduled | |
111 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEZ Bio-Tech Services Pvt Ltd -Manjari SEZ and SEZ Bio-Tech services Pvt Ltd -Hadapsar SEZ for obtaining the Hon'ble Commission’s approval for power purchase plan & for undertaking combined power purchase and for procuring Round the Clock (RTC) power on long-term basis for the period from FY 2025-26 to FY 2044-45.
137 of 2024
|
Scheduled | |
112 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for review of Order dated 1st August 2024 passed by Hon’ble Commission in Case No.174/MP/2023.
139 of 2024
|
Scheduled | |
113 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking approval of deviations under Long-Term procurement of power 1500 MW (750 MW + additional 750 MW under Green Shoe Option) from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
140 of 2024
|
Scheduled | |
114 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of UltraTech Cement Limited under Section 86 of the Electricity Act, 2003 read with Transmission Open Access Regulations, 2016 seeking clarification / directions from this Hon’ble Commission qua granting connectivity to hybrid projects.
143 of 2024
|
Scheduled | |
115 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Rakesh S. Shetty, C/o Raj Palace Hotel for non-compliance of CGRF Kalyan Order dated 20/03/2024 in Case No. 108 of 2023.
144 of 2024
|
Scheduled | |
116 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited Refund of excess Wheeling and Transmission charges along with applicable interest to the Petitioner Company by the Respondent Distribution Licensee.
150 of 2024
|
Scheduled | |
117 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Omsairam Steels and Alloys Pvt Limited seeking urgent and early Listing in Case No. 223/MP/2024.
(Petition of Omsairam Steels and Alloys Pvt Limited under MERC (Distribution Open Access) Regulations 2016 and its subsequent amendments regarding incorrect monthly billing methodology followed by MSEDCL for captive open access consumer.)
IA. No. 78 of 2024 in Case No. 223 of 2024
|
Scheduled | |
118 | Tue 10/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Brookhill Co-Op Housing Society Limited, Harmony Sky Suites Co-Op Housing Society Limited and Royce Co-Op Housing Society Limited seeking urgent and early listing in Case No. 222/MP/2024.
(Petition of Brookhill Co-Op Housing Society Limited, Harmony Sky Suites Co-Op Housing Society Limited and Royce Co-Op Housing Society Limited under Section 86(1)(E) of the Electricity Act 2003, and MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 and its subsequent amendments, seeking directions on allowance of Virtual Net Metering Arrangement.)
IA. No. 79 of 2024 in Case No. 222 of 2024
|
Scheduled | |
119 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.
And
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.
And
Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.
Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble
APTEL’s Judgement dated 31st May, 2024.
IN
Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to
the Commission therein.]
323, 324 & 372 of 2018 (Re-opened Case)
|
Postponed till further notice | |
120 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Garware Technical Fibres Ltd. to implead the Applicant as a party in the present Petitions in Case No. 372 of 2018 for FY 2017-18.
110 of 2024
|
Postponed till further notice | |
121 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Ltd. to implead the Applicant as a party in the Petition in Case No. 323 of 2018 for FY 2015-16.
111 of 2024
|
Postponed till further notice | |
122 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Ltd. to implead the Applicant as a party in the Petition in Case No. 324 of 2018 for FY 2016-17.
112 of 2024
|
Postponed till further notice | |
123 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Ltd. to implead the Applicant as a party in the Petition in Case No. 372 of 2018 for FY 2017-18.
113 of 2024
|
Postponed till further notice | |
124 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Balkrishna Industries Limited (BIL) seeking Impleadment as a party Respondent to Case No. 324 of 2018 (FY 2016-17).
124 of 2024
|
Postponed till further notice | |
125 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Balkrishna Industries Ltd. to implead the Applicant as a party in the Petition in Case No. 372 of 2018 for FY 2017-18.
125 of 2024
|
Postponed till further notice | |
126 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. RattanIndia Power Ltd challenging the recovery of subsidy amounts by Maharashtra State Electricity Distribution Company Ltd.
45 of 2024
|
Postponed till further notice | |
127 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Sunil Vilas Pawar seeking action against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Consumer Grievance Redressal Forum (CGRF) Kalyan’s Order dated 19 July, 2023.
65 of 2024
|
Postponed till further notice | |
128 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under Section 45 and Section 62 (4) of the Electricity Act, 2003 seeking pass through of losses on account of uncontrollable factors for the period from April 2023 to October 2023.
74 of 2024
|
Postponed till further notice | |
129 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lokmangal Mauli Industries Limited requesting The Hon’ble Commission to issue necessary directions to MSEDCL to Honor the terms and conditions of Article 8.03 of the Energy Purchase Agreement dated 18.10.2013 entered between the Petitioner and the Respondent.
114 of 2024
|
Postponed till further notice | |
130 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lokmangal Sugar Ethanol & Co-Generation Industries Limited
requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 8.03 of the Energy Purchase Agreement dated 17.11.2011 (15 MW) and article 7 of amendment Energy Purchase Agreement dated 09.04.2012 (16.5 MW) as well as article 7.3 of the Energy Purchase Agreement dated 13.12.2023 (15 MW) entered between the Petitioner and the Respondent.
115 of 2024
|
Postponed till further notice | |
131 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Tapadia Diagnostic Center under Sections 142 & 146 of the Electricity Act 2003 for non compliance of CGRF Order dt. 20.02.2023 passed by Hon’ble CGRF, Aurangabad in Case No. 1088/2022.
119 of 2024
|
Postponed till further notice | |
132 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking Approval on Adoption of Tariff for Long Term Procurement of 480 MW Wind-Solar Hybrid Power from grid connected Renewable Energy Power Projects under development mode selected by NTPC under Section 63 of the Electricity Act 2003 for meeting the wind and other renewable purchase obligations.
123 of 2024
|
Postponed till further notice | |
133 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) seeking action against MSEDCL for alleged non-compliance of the Commission’s Order in Case No. 196 of 2022 dated 13 February 2023.
37 of 2024 (Re-opened Case)
|
Postponed till further notice | |
134 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Suzlon Global Services Limited seeking Impleadment in Case No. 37/AD/2024.
(Petition of Shah Promoters and Developers (SPD) seeking action against MSEDCL for alleged non-compliance of the Commission’s Order in Case No. 196 of 2022 dated 13 February 2023.)
IA. No. 64 of 2024 in Case No. 37 of 2024 (Re-opened Case)
|
Postponed till further notice | |
135 | Fri 06/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Transition Sustainable Energy Services One Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 seeking an order declaring/ clarifying that the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and its amendments thereof & the Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 and its amendments thereof are applicable to inter-state open access transactions.
128 of 2024
|
Postponed till further notice | |
136 | Tue 03/12/2024 10:30:00 AM |
e-Public Hearing
Inviting comments in proceeding for verification of Renewable Purchase Obligation compliance targets for FY 2014-15 to FY 2019-20 by CPP Users.
1/SM/2024
|
Scheduled | |
137 | Tue 03/12/2024 10:30:00 AM |
e-Public Hearing
Inviting comments in proceeding for verification of Renewable Purchase Obligation compliance targets for FY 2014-15 to FY 2019-20 by Open Access Consumers.
2/SM/2024
|
Scheduled | |
138 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking amendments in existing Regulations for establishing and operating wind-solar-thermal hybrid power plant in line with the National Wind-Solar Hybrid Scheme, 2018 and the MoP scheme for Flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power.
246 of 2023
|
Scheduled | |
139 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rishabh Enterprises seeking compliance of CGRF (Nashik) Order dated 24 March 2023.
22 of 2024
|
Scheduled | |
140 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. ACME Heergarh Powertech Private Limited for approval of ‘Change in Law’ on account of imposition of Basic Customs Duty on import of Solar Modules along with levy of cess, social welfare surcharge and IGST.
23 of 2024
|
Scheduled | |
141 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of A A Energy Ltd. for charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016, 195 of 2017 & 322 of 2019 and getting refund of excess amount paid along with interest.
60 of 2024
|
Scheduled | |
142 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Co. Ltd. seeking approval of change in law claims related to coal tolling arrangements carried out under Case - IV, Phase - III.
62 of 2024
|
Scheduled | |
143 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Dilip Buildcon Ltd. against Maharashtra State Electricity Distribution Co. Ltd. seeking compliance of the CGRF Kolhapur Order dated 30 October 2023 in Representation No. 14/2023 for refund of security deposit amounting Rs 39,12,500/- along with the interest at 4.65% with effect from 31 January 2023 till the date of refund.
63 of 2024
|
Scheduled | |
144 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Dilip Buildcon Ltd. against Maharashtra State Electricity Distribution Co. Ltd. seeking compliance of the CGRF Kolhapur Order dated 20 February 2023 in Representation No. 102 of 2022 in view of the Commission's Order dated 03 October 2023 in Case No. 45 of 2023.
64 of 2024
|
Scheduled | |
145 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Basant Ago Tech against Maharashtra State Electricity Distribution Co. Ltd. under section 142 and 146 of the Electricity Act, 2003 and as per MERC CGRF and EO Regulations 2020, for non-compliance of CGRF Akola Order in complaint No: 21 of 2023.
71 of 2024
|
Scheduled | |
146 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) seeking pass-through/ adjustment of the payment made to Adani Hybrid Energy Jaisalmer Four Ltd. in view of the change in law in terms of the PPA dated 7 July 2020, as approved in Case No. 154 of 2023.
152 of 2024
|
Scheduled | |
147 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - (Distribution Business) seeking approval of the Power Purchase Agreement duly agreed between Adani Electricity Mumbai Ltd. and Adani Power Ltd. for procurement of power from 2 X 250 MW Dahanu Thermal Power Station.
154 of 2024
|
Scheduled | |
148 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pimpri Chinchwad Municipal Corporation for Non-compliance with the MERC (Distribution Open Access) (Second Amendment) Regulations, 2023 by the Respondent, MSEDCL.
158 of 2024
|
Scheduled | |
149 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited (SWPGPL) under Section 94 (1) (f) of the Electricity Act, 2003, read with regulation 28 of MERC (Transaction of Business and fees and charges) Regulations, 2022, seeking Review of Order dated 01.07.2024 in Case No. 73 of 2023.
130 of 2024
|
Scheduled | |
150 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Renewable Energy Fifty Five Limited under Section 86(1)(f) read with Section 86(1)(b) of the Electricity Act, 2003 read with Article 11 of the Power Purchase Agreement dated 29.10.2024 executed between Adani Renewable Energy Fifty-Five Ltd. and Maharashtra State Electricity Distribution Company Ltd. for procurement of power on long-term basis through competitive bidding process (followed by reverse e-auction) from 5000 MW Grid Connected Solar Photovoltaic Power Project.
192 of 2024
|
Scheduled | |
151 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited seeking waiver of fixed demand charges, reduction of Contract Demand and relaxation under MERC (Distribution Open Access) Regulations, 2016 on the banking issue due to Force Majeure situation prevailing in Maharashtra State due to COVID-19 outbreak and lockdown situation.
93 of 2020 (Re-opened Case)
|
Scheduled | |
152 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of KSB Limited seeking urgent and early listing in Case No. 197/MP/2024.
(Petition of KSB Limited under Section 86(1)(e) of the Electricity Act 2003, MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) (First Amendment) Regulations, 2019 and Its subsequent Amendments, And MERC (Distribution Open Access) (Principle) Regulations 2016 and Its subsequent Amendments, seeking directions on forthwith allowance of Net Metering Arrangement.)
IA. No. 75 of 2024 in Case No. 197 of 2024
|
Scheduled | |
153 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of The Tata Power Company Limited- Distribution seeking urgent listing and hearing in Case No. 194/MP/2024.
(Petition of The Tata Power Company Limited- Distribution under Section 63 of the Electricity Act, 2003 seeking approval for Medium Term Procurement of Power of 200 MW and for approval of deviations sought in the Model Bidding Documents as notified by the Ministry of Power, Government of India, for Medium Term Procurement through competitive bidding process for meeting the demand of Tata Power-D from FY 2025-26 to FY 2026-27.)
IA. No. 76 of 2024 in Case No. 194 of 2024
|
Scheduled | |
154 | Tue 03/12/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent hearing in Case No. 199/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on adoption of tariff for procurement of 13 MW of wind-solar hybrid power through green shoe in respect of MSEDCL’s tender for procurement of 2000 MW wind-solar hybrid power with greenshoe option of additional capacity upto 2000 MW through competitive bidding under Section 63 of the Electricity Act 2003 for meeting the wind and other renewable purchase obligations.)
IA. No. 77 of 2024 in Case No. 199 of 2024
|
Scheduled | |
155 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar, seeking relaxation of monthly Banking provisions and requirement of 15 minute time block metering for its Hydro Electric Projects under Regulation 39 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019.
And
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar seeking review of the Commission’s Order dated 13 September 2022 in Case No. 88 of 2022
88 of 2022 & 199 of 2022
|
Postponed till further notice | |
156 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under the Energy Banking Agreement dated 29 June 2022 executed between MSEDCL and Saranyu Power Trading Pvt. Ltd for banking of energy.
122 of 2023
|
Completed | |
157 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Budhay for dropping of ‘Grid Support Charges’ applicable to Solar Rooftop Systems after installation base in Maharashtra reaches 2000 MW.
176 of 2023
|
Completed | |
158 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. seeking directions against MSEDCL for correctly applying open Access permission for Captive use.
198 of 2023
|
Completed | |
159 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited seeking in-principle declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 04.07.2023.
215 of 2023
|
Completed | |
160 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of National Highway Authority of India (NHAI) seeking action against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking compliance of the Consumer Grievance Redressal Forum (CGRF), Nashik’s Order dated 6 March 2023.
229 of 2023
|
Completed | |
161 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Pushkaraj Ispat (India) LLP seeking action against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Non-compliance of Consumer Grievance Redressal Forum (CGRF) Nasik’s Order dated 18 July 2023.
230 of 2023
|
Withdrawn | |
162 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay seeking clarifications on certain provisions in MERC (Grid interactive rooftop renewable energy generating systems) (First Amendment) Regulations, 2023 and MERC (Distribution Open Access) (Second Amendment) Regulations, 2023.
231 of 2023
|
Completed | |
163 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that the Power Purchase Agreement dated 14.01.2022 between M/s TP Saurya Limited and MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) and to return the Performance Bank guarantee.
66 of 2023
|
Completed | |
164 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
And
Interlocutory Application of Tata Power Company Limited-Distribution seeking Impleadment in Case No. 1/MP/2024 and consequential reliefs.
1 of 2024 & IA. No. 41 of 2024
|
Completed | |
165 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. seeking compliance of Order dated 27 December 2023 in Case No. 151 of 2023 (Batch) and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited.
And
Petition of Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. seeking compliance of Order dated 27 December 2023 in Case No. 151 of 2023 (Batch) and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited.
29 of 2024 & 30 of 2024
|
Completed | |
166 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Services Pvt. Ltd. against MSEDCL seeking dues for sale of wind energy from 1 April 2015 to 31 May 2015.
31 of 2024
|
Completed | |
167 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited-Distribution under Section 86 of the Electricity Act, 2003 for declaration that the standby arrangement between Tata Power Company Limited – Distribution and Maharashtra State Electricity Distribution Company Limited stood revoked/extinguished with effect from 01.04.2023.
And
Interlocutory Application of Tata Power Company Limited-Distribution for urgent listing in Case No. 136/AD/2024.
136 of 2024 & IA. No. 40 of 2024
|
Completed | |
168 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited Seeking Urgent Listing in Case No. 140/MP/2024.
And
Interlocutory Application of Adani Electricity Mumbai Limited seeking amendment of the petition in Case No. 140/MP/2024.
(Petition of Adani Electricity Mumbai Limited seeking approval of deviations under Long-Term procurement of power 1500 MW (750 MW + additional 750 MW under Green Shoe Option) from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.)
IA. No. 70 & 71 of 2024 in Case No. 140 of 2024
|
Completed | |
169 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited-(Distribution Business) Seeking urgent Listing in Case No. 160/AP/2024.
(Petition of Adani Electricity Mumbai Limited-(Distribution Business) for adoption of tariff for procurement of 250 MW Power from Grid-Connected Wind Power Projects in India under Tariff-based Competitive Bidding on long term basis through competitive bidding process to meet Demand and the Renewable Purchase Obligation.)
IA. No. 72 of 2024 in Case No. 160 of 2024
|
Completed | |
170 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Ratnagiri Wind Power Projects Private Limited
seeking Urgent Listing and interim reliefs in Case No. 169/AD/2024.
(Petition of Ratnagiri Wind Power Projects Private Limited for adjudication of
disputes between M/s. Ratnagiri Wind Power Projects Pvt. Ltd. and MSEDCL).
IA No 73 and 65 of 2024 in Case No 169 of 2024
|
Completed | |
171 | Tue 19/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Khare and Tarkunde Green Energy Private Limited
(KTGEPL) seeking urgent Listing in Case No. 193/MP/2024.
(Petition of Khare and Tarkunde Green Energy Private Limited (KTGEPL) under
Section 142 of the Electricity Act, 2003 seeking compliance of the Order dated
20.09.2024 in Case No. 59 of 2024 by M/s. Maharashtra State Electricity
Distribution Company Limited in respect of execution of EPA with the Petitioner/
Applicant for procurement of 4 MW hydro power from the HEP at Isapur.)
IA No 74 of 2024 in Case No 193 of 2024
|
Completed | |
172 | Tue 12/11/2024 10:30:00 AM |
e-Public Hearing
Petition of M/s. Shreehari Associates Pvt. Ltd. for determination of Project Specific Tariff for supply of power from Mukane Hydro Electric Project with the installed capacity of 1.45 MW.
57 of 2023
|
Completed | |
173 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Suo-Motu Hearing on Review of status of compliances of various directions issued by the Commission in its order dated 31 March 2023 in Case No.226 of 2022.
Case No. 04/SM/2024.
04/SM/2024
|
Completed | |
174 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited (Erstwhile Adani Power Maharashtra Ltd.) for consequent Orders to be passed pursuant to the Order of the Hon’ble Appellate Tribunal dated 17.10.2023 in Appeal No. 130 of 2018.
15 of 2024
|
Completed | |
175 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Liberty Oil Mills seeking implementation of MERC Order dated 26 May 2021 in Case No. 25 of 2021 in the matter of “allowing revision in contract demand up to 2 occasions to HT Industrial and HT Commercial consumers and up to 1 occasion to LT Industrial and LT Commercial consumers in a billing cycle up to 31 March 2022.”
18 of 2024
|
Completed | |
176 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company seeking adjudication on interpretation being adopted by both the parties on the implementation of the operative direction No. 2 of order dated 28 November 2020 in Case No. 132 of 2020.
26 of 2024
|
Completed | |
177 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited seeking directions to MSEDCL for payment of late payment surcharge in terms of Energy Purchase Agreement dated 30 April, 2013 and 31 March 2016 respectively.
34 of 2024
|
Completed | |
178 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited seeking directions to MSEDCL for payment of late payment surcharge in terms of Energy Purchase Agreement dated 30 April, 2013 and 31 March 2016 respectively.
35 of 2024
|
Completed | |
179 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s N.R.C. Limited against Maharashtra State Electricity Distribution Co. Ltd., seeking compliance of the CGRF, Kalyan Order dated 8 November 2023.
43 of 2024
|
Completed | |
180 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (KVTL) seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure events and appropriate relief for Change in Law events.
44 of 2024
|
Completed | |
181 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. and M/s ReNew Sun Renewables Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd. on M/s. Saarloha Advanced Materials Pvt. Ltd.
120 of 2024
|
Completed | |
182 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited & Ors. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd. on M/s CIE Automotive India Ltd. (formerly known as Mahindra CIE Automotive Limited)
121 of 2024
|
Completed | |
183 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Mahindra and Mahindra Limited under Section 86(1)(b) and (c) of Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations, 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on M/s Mahindra and Mahindra Ltd.
153 of 2024
|
Completed | |
184 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Renewable Energy Fifty Five Limited seeking urgent Hearing in Case No. 192/AD/2024.
(Petition of Adani Renewable Energy Fifty Five Limited under Section 86(1)(f) read with Section 86(1)(b) of the Electricity Act, 2003 read with Article 11 of the Power Purchase Agreement dated 29.10.2024 executed between Adani Renewable Energy Fifty-Five Ltd. and Maharashtra State Electricity Distribution Company Ltd. for procurement of power on long-term basis through competitive bidding process (followed by reverse e-auction) from 5000 MW Grid Connected Solar Photovoltaic Power Project.)
IA. No. 68 of 2024 in Case No. 192 of 2024
|
Completed | |
185 | Tue 12/11/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Nidar Utilities Panvel LLP seeking urgent and early hearing in Case No. 174/AP/2024.
(Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 7.00 MW Round the Clock (RTC) power for a period of 7 months i.e. from 1 December 2024 to 30 June 2025.)
IA. No. 69 of 2024 in Case No. 174 of 2024
|
Completed | |
186 | Tue 29/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Despatch Centre (MSLDC) seeking appropriate orders for removal of difficulties, granting of relaxation and issuance of appropriate directions under the Clause No (18), (19), (20) and (21) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 and under Section 86 (1) of the Electricity Act, 2003.
103 of 2024
|
Preponed and Rescheduled on Fri 18/October/2024 10:30 AM | |
187 | Tue 29/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited under Section 86 of the EA, 2003 read with Article 13 (“Change in Law”) of the PPA dated 08.09.2008 for 1320 MW and Article 10 (“Change in Law”) of the PPAs dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between Adani Power Limited and MSEDCL, in respect of levy of User Fee by MCL in the state of Orissa.
104 of 2024
|
Preponed and Rescheduled on Fri 18/October/2024 10:30 | |
188 | Tue 29/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Apollo Hospitals Enterprise Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period July-21 up till May 2023 with interest.
105 of 2024
|
Preponed and Rescheduled on Tue 22/October/2024 10:30 | |
189 | Tue 29/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aditya Birla Renewable Energy Limited (ABREL) under Section 86(1)(C), (E), (K) and Section 181 of EA, 2003 read with Regulation 39 of the MERC (Transaction Of Business And Fees And Charges) Regulations, 2022 read with Regulations 32, 33 of MERC (Transmission Open Access) Regulations 2016 and Amendments Thereof read with Regulation 100 of Maharashtra Electricity Grid Code 2020 read with Regulations 36, 37 of MERC (Distribution Open Access) Regulations 2016 and Amendments thereof read with other applicable Regulations.
106 of 2024
|
Preponed and Rescheduled on Fri 25/October/2024 10:30 | |
190 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking Review of Order dated 31st March, 2024 in Case No. 146 of 2023 in the matter of Petition by Persistent System Ltd. seeking refund of Improper Wheeling and Transmission Charges allegedly Recovered on Over-Injected Units and Payment of Eligible Unutilized Banked Units for the Period FY 2015-16 and FY 2019-20 to FY 2022-23.
97 of 2024
|
Completed | |
191 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avaada MH Sustainable Private Limited under Section 86 of Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 10.08.2021 between Avaada MH Sustainable Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited seeking declaration that change in Goods and Services Tax from 5% to 12% and 13.8%, respectively w.e.f. 01.10.2021 by way of GST Amendment Notifications dated 30.09.2021 and 14.10.2021, qualifies as a ‘Change in Law’ event under Article 9 of the PPA and consequently, directions to MSEDCL to compensate the Petitioner towards additional expenditure incurred on account of the ‘Change in Law’ event along with carrying cost.
99 of 2024
|
Completed | |
192 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Meera Enterprise for non-Compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola Zone, Akola in Case No. 120 of 2023.
101 of 2024
|
Completed | |
193 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Rajendra Pundlik Ingole for non-Compliance of CGRF Order in Grievance No. 32 of 2022 passed by Hon’ble CGRF, on date 21/11/2023, MSEDCL, Pune Zone, Pune.
102 of 2024
|
Completed | |
194 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aditya Birla Renewable Energy Limited (ABREL) under Section 86(1)(C), (E), (K) and Section 181 of EA, 2003 read with Regulation 39 of the MERC (Transaction Of Business And Fees And Charges) Regulations, 2022 read with Regulations 32, 33 of MERC (Transmission Open Access) Regulations 2016 and Amendments Thereof read with Regulation 100 of Maharashtra Electricity Grid Code 2020 read with Regulations 36, 37 of MERC (Distribution Open Access) Regulations 2016 and Amendments thereof read with other applicable Regulations.
106 of 2024
|
Completed | |
195 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 400 MW power from intra-state grid connected solar power project under Section 63 of the Electricity Act 2003.
88 of 2024
|
Completed | |
196 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act 2003.
89 of 2024
|
Completed | |
197 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited under Section 86 of the EA, 2003 read with Article 13 (“Change in Law”) of the PPA dated 08.09.2008 for 1320 MW and Article 10 (“Change in Law”) of the PPAs dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between Adani Power Limited and MSEDCL, in respect of levy of User Fee by MCL in the state of Orissa.
104 of 2024
|
Completed | |
198 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Nidar Utilities Panvel LLP (NUPLLP) seeking urgent and early Hearing of Case No. 170/MP/2024.
(Petition of Nidar Utilities Panvel LLP (NUPLLP) for the approval of the Power Procurement Plan for FY 2025-26 to FY 2033-34 as per Maharashtra Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2024 along with the Tender documents for procuring power through Renewable Energy Sources such as Bagasse, Hydro or Firm Desptachable Renewable Energy (FDRE) on Medium / Long Term basis.)
IA. No. 63 of 2024 in Case No. 170 of 2024
|
Completed | |
199 | Fri 25/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent hearing of Case No. 171/MP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for procurement of additional 500 MW from the successful bidder of tariff discovered through the competitive bidding process held for procurement of 2000 MW (2000 MW under Green Shoe Option) Energy Storage Capacity (for 8 hours discharge with maximum 5 hours continuous discharge) for 40 years from INSTS connected pumped Hydro Storage Plant/s under Section 63 read with Regulation 21 of the MERC (MYT) Regulations, 2024.)
IA. No. 66 of 2024 in Case No. 171 of 2024
|
Completed | |
200 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Renewable Energy (RJ) Limited under Section 86 of the Electricity Act, 2003, seeking direction upon the Respondent, Maharashtra State Electricity Distribution Company Limited to pay Late Payment Surcharge, compounded on monthly rest, on the delayed payments, in terms of the PPA dated 27.07.2018.
90 of 2024
|
Completed | |
201 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Renew Solar Power Private Limited (RSPPL) under section 86 of the Electricity Act 2003 before the Maharashtra Electricity Regulatory Commission for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of imposition of Safeguard Duty (SGD) on solar cells/modules in terms of Article 9 of Power Purchase Agreement dated 27.07.2018 between M/s ReNew Solar Power Private Limited and Maharashtra State Electricity Distribution Limited.
91 of 2024
|
Completed | |
202 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Wind Energy Kutchh Six Limited (Formerly known as Adani Renewable Energy (GJ) Limited) under Section 86 of the Electricity Act, 2003, seeking direction upon the Respondent, Maharashtra State Electricity Distribution Company Limited to pay Late Payment Surcharge, compounded on monthly rest, on the delayed payments, in terms of the PPA dated 17.07.2018.
93 of 2024
|
Completed | |
203 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hardoli Paper Mills Ltd. for complying the order of CGRF issued in case No. 161/2023 DT. 5/3/2024 for refund the excess demand charges for the month of October 2023 till 22/11/2023 along with interest and issue corrected energy bills.
95 of 2024
|
Completed | |
204 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Apollo Hospitals Enterprise Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period July-21 up till May 2023 with interest.
105 of 2024
|
Completed | |
205 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited (SWPGPL) under Section 94 (1) (f) of the Electricity Act, 2003, read with regulation 28 of MERC (Transaction of Business and fees and charges) Regulations, 2022, seeking Review of Order dated 01.07.2024 in Case No. 73 of 2023.
130 of 2024
|
Completed | |
206 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (a) read with Section 86 (1) (k) of the Electricity Act, 2003 seeking appropriate directions of this Hon’ble Commission to relax Regulation 36.4 of the MERC (MYT) Regulations 2015 and Regulation 37.4 of the MERC (MYT) Regulations 2019 by invoking inherent power under Regulation 92 and 94 of MERC (Conduct of Business Regulations), 2004 read with Regulation 105 of the MERC (MYT) Regulations 2019 thereby permitting the Petitioner herein to treat the levy of LPS on disputed invoices raised by the Generators having long term PPA as an expenses for the same being a pass-through, wherein MSEDCL has been diligently pursuing such dispute over Change in Law claims during the period of which these LPS levy had continued to accumulate.
85 of 2024
|
Completed | |
207 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Despatch Centre (MSLDC) seeking appropriate orders for removal of difficulties, granting of relaxation and issuance of appropriate directions under the Clause No (18), (19), (20) and (21) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 and under Section 86 (1) of the Electricity Act, 2003.
103 of 2024
|
Completed | |
208 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Load Despatch Centre (MSLDC) for Amendment petition in Case No. 103/MP/2024.
(Petition of Maharashtra State Load Despatch Centre (MSLDC) seeking appropriate orders for removal of difficulties, granting of relaxation and issuance of appropriate directions under the Clause No (18), (19), (20) and (21) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 and under Section 86 (1) of the Electricity Act, 2003.)
IA. No. 62 of 2024 in Case No. 103 of 2024
|
Completed | |
209 | Tue 22/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited & Ors. seeking urgent listing in Case No. 121/AD/2024.
Petition of CIE Automotive India Limited & Ors. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd. on M/s CIE Automotive India Ltd. (formerly known as Mahindra CIE Automotive Limited)
IA. No. 61 of 2024 in Case No. 121 of 2024
|
Completed | |
210 | Fri 18/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (a) read with Section 86 (1) (k) of the Electricity Act, 2003 seeking appropriate directions of this Hon’ble Commission to relax Regulation 36.4 of the MERC (MYT) Regulations 2015 and Regulation 37.4 of the MERC (MYT) Regulations 2019 by invoking inherent power under Regulation 92 and 94 of MERC (Conduct of Business Regulations), 2004 read with Regulation 105 of the MERC (MYT) Regulations 2019 thereby permitting the Petitioner herein to treat the levy of LPS on disputed invoices raised by the Generators having long term PPA as an expenses for the same being a pass-through, wherein MSEDCL has been diligently pursuing such dispute over Change in Law claims during the period of which these LPS levy had continued to accumulate.
85 of 2024
|
Postponed and Rescheduled on Tue 22/October/2024 10:30 AM | |
211 | Fri 18/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 400 MW power from intra-state grid connected solar power project under Section 63 of the Electricity Act 2003.
88 of 2024
|
Postponed and Rescheduled on Fri 25/October/2024 10:30 AM | |
212 | Fri 18/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act 2003.
89 of 2024
|
Postponed and Rescheduled on Fri 25/October/2024 10:30 AM | |
213 | Fri 18/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Despatch Centre (MSLDC) seeking appropriate orders for removal of difficulties, granting of relaxation and issuance of appropriate directions under the Clause No (18), (19), (20) and (21) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 and under Section 86 (1) of the Electricity Act, 2003.
103 of 2024
|
Postponed and Rescheduled on Tue 22/October/2024 10:30 AM | |
214 | Fri 18/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited under Section 86 of the EA, 2003 read with Article 13 (“Change in Law”) of the PPA dated 08.09.2008 for 1320 MW and Article 10 (“Change in Law”) of the PPAs dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between Adani Power Limited and MSEDCL, in respect of levy of User Fee by MCL in the state of Orissa.
104 of 2024
|
Postponed and Rescheduled on Fri 25/October/2024 10:30 AM | |
215 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on adoption of tariff for long term procurement of 1475 MW solar power from NHPC Ltd under section 63 of the Electricity Act 2003 for meeting the solar renewable purchase obligations.
81 of 2024
|
Completed | |
216 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sharad S. Chaughule for Non-Compliance of Order dated 30.04.2021 passed by Hon’ble, CGRF Kalyan in Case No. 172 of 2021.
83 of 2024
|
Completed | |
217 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for Quashing/Revising the weekly VSE (Virtual State Entity) bills raised by Maharashtra State Load Despatch Centre (MSLDC) to Koyana HPS for reasons not attributable to Koyana HPS operation as VSE and modifying the DSM price vector for regulated Hydro Generators Operated as VSE.
84 of 2024
|
Completed | |
218 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of TP Solapur Saurya Ltd & Ors. under section 86(1)(e) & (f) of the Electricity Act, 2003 for Incorrect levy of Wheeling Charges and Losses for energy generated from the Solar Power Plants of the Petitioners.
100 of 2024
|
Competed | |
219 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 341 of 2018 read with Order dated 01.06.2021 in Case No. 34 of 2021 and Order dated 20.01.2023 in Case No. 189 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Distribution License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
46 of 2024
|
Completed | |
220 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - T under Section 17(3) of the Electricity Act, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 311 of 2018 readwith Order dated 01.06.2021 in Case No. 35 of 2021 and Order dated 20.01.2023 in Case No. 183 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Transmission License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
47 of 2024
|
Completed | |
221 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Amravati Power Transmission Company Limited (APTCL) under section 17(3) of the Electricity Act, 2003 for bringing on record the changes in the group of lenders of Amravati Power Transmission Company Limited (transmission licensee) and approval for change of encumbrance created on its assets in favour of L&T infrastructure finance co. ltd. with Kotak Infrastructure Debt Fund Limited (KIDF) by the transmission licensee.
58 of 2024
|
Competed | |
222 | Tue 15/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. V. Agro Products for non-compliance of CGRF Order in complaint No: 75 of 2023 passed by CGRF, MSEDCL, Akola Zone, Akola.
69 of 2024
|
Completed | |
223 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Regulation 10 of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019 read with Section 45 and Section 62(4) of the Electricity Act, 2003 seeking pass through of losses on account of uncontrollable factors for the period from April 2023 to October 2023.
74 of 2024
|
Completed | |
224 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunil Baliram Patil against the order dated: 28 November 2022 passed by the consumer grievance redressal forum MSEDCL Bhandup (the Forum).
78 of 2024
|
Completed | |
225 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of the Common Order dated 27.12.2023 passed by Hon’ble Maharashtra Electricity Regulatory Commission (MERC) in Case Nos. 151, 177, 186, 187 and 196 of 2023, under inter alia Section 94 (1) (f) of the Electricity Act, 2003 (EA, 2003).
And
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for condonation of delay.
79 of 2024 & IA. No. 22 of 2024
|
Completed | |
226 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of the Common Order dated 01.02.2024 passed by Hon’ble Maharashtra Electricity Regulatory Commission (MERC) in Case Nos. 162, 163 and 166 of 2023, under inter alia Section 94 (1) (f) of the Electricity Act, 2003 (EA, 2003).
And
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for condonation of delay.
80 of 2024 & IA. No. 23 of 2024
|
Completed | |
227 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Adani Electricity Mumbai Limited - G under Section 86 (1)(a), 86(1)(b) read with Section 86(1)(k) of the Electricity Act, 2003 and Regulation 106 of MERC (MYT) Regulations, 2019 seeking a direction to be issued to the Maharashtra State Load Despatch Centre for the formulation of guidelines for the Ramp rate Performance Evaluation Methodology for intra-state generating stations in the State of Maharashtra, in accordance with the MERC (MYT) Regulations, 2019.
49 of 2024
|
Completed | |
228 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of A A Energy Ltd. for charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016, 195 of 2017 & 322 of 2019 and getting refund of excess amount paid along with interest.
60 of 2024
|
Completed | |
229 | Fri 11/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 162/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.04.2025 to 31.05.2025 and approval for ceiling rate for short term power purchase for FY 2025-26.)
IA. No. 60 of 2024 in Case No. 162 of 2024
|
Completed | |
230 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Basant Ago Tech for non-compliance of CGRF Order in complaint No: 21 of 2023 passed by CGRF, MSEDCL, Akola Zone, Akola.
71 of 2024
|
Completed | |
231 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vetal Baba Stone Crusher for non-compliance of CGRF Order in complaint No: 76 of 2023 passed by CGRF, MSEDCL, Akola Zone, Akola.
72 of 2024
|
Completed | |
232 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sumatinath Enterprises under Section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the Respondent / MSEDCL to pay to petitioner outstanding sum of Rs.11,48,694/- (Rupees Eleven Lakhs, Forty-Eight Thousand, Six Hundred, Ninety-Four only) alongwith late payment surcharge & interest.
73 of 2024
|
Completed | |
233 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RPL) under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 32 of MERC (Conduct of Business) Regulations, 2004 challenging the recovery of subsidy amounts by Maharashtra State Electricity Distribution Company Ltd. from RattanIndia Power Ltd.
45 of 2024
|
Completed | |
234 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Raghunath Keru Bagul against MSEDCL seeking compliance of the Order of CGRF, Kalyan Zone Case No. 66 of 2023.
48 of 2024
|
Completed | |
235 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Sunil Vilas Pawar for non-compliance of CGRF Kalyan Order dated 19/07/2023 in Case No. 18 of 2022-23.
65 of 2024
|
Completed | |
236 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. V. Agro Products for non-compliance of CGRF Order in complaint No: 75 of 2023 passed by CGRF, MSEDCL, Akola Zone, Akola.
69 of 2024
|
Completed | |
237 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Limited–Distribution under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 06.03.2024 in Case No. 237 of 2023.
67 of 2024
|
Completed | |
238 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited (APL) (erstwhile Adani Power Maharashtra Limited) under Section 86 of the Electricity Act, 2003 read with Article 13 (“Change in Law”) of the Power Purchase Agreement dated 08.09.2008 for 1320 MW and Article 10 (“Change in Law”) of the Power Purchase Agreements dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between Adani Power Limited (erstwhile Adani Power Maharashtra Limited) and Maharashtra State Electricity Distribution Company Limited, in respect of revision of Transit Fee (Forest Tax) by SECL in the state of Madhya Pradesh.
68 of 2024
|
Completed | |
239 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking urgent hearing in Case No. 148/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval on adoption of tariff for procurement of 1601 MW of Wind-Solar Hybrid Power in respect of MSEDCL’s tender for procurement of 2000 MW Wind-Solar Hybrid Power with greenshoe option of additional capacity upto 2000 MW through competitive bidding under Section 63 of the Electricity Act 2003 for meeting the wind and other Renewable Purchase Obligations.)
IA. No. 58 of 2024 in Case No. 148 of 2024
|
Completed | |
240 | Tue 08/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking urgent hearing in Case No. 149/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval on adoption of tariff for procurement of 1000 MW of Wind-Solar Hybrid Power in respect of MSEDCL’s tender for procurement of 1650 MW Wind-Solar Hybrid Power with greenshoe option of additional capacity upto 1650 MW through competitive bidding under section 63 of the Electricity Act 2003 for meeting the wind and other Renewable Purchase Obligations.)
IA. No. 59 of 2024 in Case No. 149 of 2024
|
Completed | |
241 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Sunil Vilas Pawar for non-compliance of CGRF Kalyan Order dated 19/07/2023 in Case No. 18 of 2022-23.
65 of 2024
|
postponed and rescheduled on Tue 8/October/2024 10:30 AM | |
242 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Limited–Distribution under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 06.03.2024 in Case No. 237 of 2023.
67 of 2024
|
postponed and rescheduled on Tue 8/October/2024 10:30 AM | |
243 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited (APL) (erstwhile Adani Power Maharashtra Limited) under Section 86 of the Electricity Act, 2003 read with Article 13 (“Change in Law”) of the Power Purchase Agreement dated 08.09.2008 for 1320 MW and Article 10 (“Change in Law”) of the Power Purchase Agreements dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between Adani Power Limited (erstwhile Adani Power Maharashtra Limited) and Maharashtra State Electricity Distribution Company Limited, in respect of revision of Transit Fee (Forest Tax) by SECL in the state of Madhya Pradesh.
68 of 2024
|
postponed and rescheduled on Tue 8/October/2024 10:30 AM | |
244 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. V. Agro Products for non-compliance of CGRF Order in complaint No: 75 of 2023 passed by CGRF, MSEDCL, Akola Zone, Akola.
69 of 2024
|
postponed and rescheduled on Tue 8/October/2024 10:30 AM | |
245 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 341 of 2018 read with Order dated 01.06.2021 in Case No. 34 of 2021 and Order dated 20.01.2023 in Case No. 189 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Distribution License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
46 of 2024
|
postponed and rescheduled on Tue 15/October/2024 10:30 AM | |
246 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - T under Section 17(3) of the Electricity Act, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 311 of 2018 readwith Order dated 01.06.2021 in Case No. 35 of 2021 and Order dated 20.01.2023 in Case No. 183 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Transmission License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
47 of 2024
|
postponed and rescheduled on Tue 15/October/2024 10:30 AM | |
247 | Fri 04/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Amravati Power Transmission Company Limited (APTCL) under section 17(3) of the Electricity Act, 2003 for bringing on record the changes in the group of lenders of Amravati Power Transmission Company Limited (transmission licensee) and approval for change of encumbrance created on its assets in favour of L&T infrastructure finance co. ltd. with Kotak Infrastructure Debt Fund Limited (KIDF) by the transmission licensee.
58 of 2024
|
postponed and rescheduled on Tue 15/October/2024 10:30 AM | |
248 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) under Sections 30, 40, 61(b),(c),(d) and 86(1)(c), (f) & (k) of the EA, 2003 read with Regulations 14 & 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 24 of the MERC (Approval of Capital Investment Schemes) Regulations, 2022, and Regulation 106 of the MERC (Multi Year Tariff) Regulations, 2019, seeking appropriate directions against M/s Suzlon Global Services Limited to transfer and handover the partly constructed 220kV double circuit transmission line from Babhaleshwar substation to the proposed Adwadi substation and partly constructed 220kV/33kV Adwadi substation to the Maharashtra State Electricity Transmission Company Limited without any cost.
61 of 2024
|
Completed | |
249 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited seeking approval of change in law claims related to coal tolling arrangements carried out under case-iv, phase III.
62 of 2024
|
Completed | |
250 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Dilip Buildcon Ltd. seeking compliance with the Order dated 30.10.2023 passed by CGRF, Kolhapur in Representation No. 14/2023 (Id No. 2023030013) Directing MSEDCL Refund of security deposit amounting Inr. 39,12,500/- along with the interest @4.65% with effect from 31.01.2023 till refund is made.
63 of 2024
|
Completed | |
251 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Dilip Buildcon Ltd. seeking compliance with the Order dated 20.02.2023 passed by CGRF, Kolhapur in Representation No. 102 of 2022 in Light of the Order dated 03.10.2023 passed by the Hon’ble MERC in Case No. 45 of 2023.
64 of 2024
|
Completed | |
252 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Rishabh Enterprises for non-compliance of CGRF Order in Complaint No. 66 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
22 of 2024
|
Completed | |
253 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under Section 86 of the EA 2003 before the MERC for (i) an in-principle approval of “Change in Law” and (ii) seeking an appropriate mechanism for appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events in terms of Article 12 of the PPA dated 21.08.2019 between Petitioner and Respondent along with carrying cost and interest on carrying cost.
23 of 2024
|
Completed | |
254 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking amendments in existing Regulations for establishing and operating wind-solar-thermal hybrid power plant in line with the National Wind-Solar Hybrid Scheme, 2018 and the MoP scheme for Flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power.
246 of 2023
|
Completed | |
255 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking under Sections 86(1)(b) of the Electricity Act, 2003, read with Regulations 18, 19, 20 & 21 of the MERC (Multi Year Tariff) Regulations, 2019, and Regulations 14 & 39 of the MERC (Transaction of business and fees and charges) Regulations, 2022, seeking approval to revoke the agreement signed between BEST and TPCG for Unit 5 Thermal.
134 of 2024
|
Completed | |
256 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86 of the Electricity Act, 2003 including Section 86(1)(b) read with Regulation 10.10 of the MERC (Multi-Year Tariff Regulations), 2019 seeking pass-through/ adjustment of the payment made to Adani Hybrid Energy Jaisalmer Four Limited in view of the change in law in terms of the PPA dated 07.07.2020, as approved by this Hon’ble Commission vide the order dated 22.05.2024 passed in Case No. 154 of 2023.
152 of 2024
|
Completed | |
257 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86(1)(b) of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024, seeking approval of the Power Purchase Agreement duly agreed between Adani Electricity Mumbai Limited and Adani Power Limited for procurement of power from 2 X 250 MW Dahanu Thermal Power Station.
154 of 2024
|
Completed | |
258 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Pimpri Chinchwad Municipal Corporation for urgent listing in Case No. 158/AD/2024.
(Petition of Pimpri Chinchwad Municipal Corporation for Non-compliance with the MERC (Distribution Open Access) (Second Amendment) Regulations, 2023 by the Respondent, MSEDCL.)
IA. No. 51 of 2024 in Case No. 158 of 2024
|
Completed | |
259 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Pimpri Chinchwad Municipal Corporation seeking issuance of interim relief in Case No. 158/AD/2024.
(Petition of Pimpri Chinchwad Municipal Corporation for Non-compliance with the MERC (Distribution Open Access) (Second Amendment) Regulations, 2023 by the Respondent, MSEDCL.)
IA. No. 52 of 2024 in Case No. 158 of 2024
|
Completed | |
260 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Rathi Steel Ltd. and Metal Pvt. Lt. seeking early hearing in Case No. 117/MP/2024.
Petition of Rathi Steel and Metal Private Limited under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.
IA. No.53 of 2024 In Case No. 117 of 2024
|
Completed | |
261 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application seeking early hearing in Case No.116/MP/2024.
Petition of Gajkesari Steeks & Alloys Pvt Ltd. under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.
IA. No.54 of 2024 In Case No. 116 of 2024
|
Completed | |
262 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application seeking early hearing in Case No. 118/MP/2024.
Petition of Geetai Steels Private Limited under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.
IA. No.55 of 2024 In Case No. 118 of 2024
|
Completed | |
263 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application seeking early hearing in Case No. 126/MP/2024.
Petition of Rajuri steel and TMT Bars Pvt. Ltd. (RajuriSteels) under Section 94 read with Section 142 and 146 of the Electricity Act 2003 read with Regulation 41 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking implementation and enforcement of S. 40 and 42 Electricity Act, 2003.
IA. No.56 of 2024 In Case No. 126 of 2024
|
Completed | |
264 | Tue 01/10/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Sai Wardha Power Generation Private Limited (SWPGPL) for urgent listing in Case No. 130/RC/2024.
(Petition of Sai Wardha Power Generation Private Limited seeking Review of Order dated 01.07.2024 in Case No. 73 of 2023)
IA. No. 57 of 2024 in Case No. 130 of 2024
|
Completed | |
265 | Fri 27/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Adani Electricity Mumbai Limited - G under Section 86 (1)(a), 86(1)(b) read with Section 86(1)(k) of the Electricity Act, 2003 and Regulation 106 of MERC (MYT) Regulations, 2019 seeking a direction to be issued to the Maharashtra State Load Despatch Centre for the formulation of guidelines for the Ramp rate Performance Evaluation Methodology for intra-state generating stations in the State of Maharashtra, in accordance with the MERC (MYT) Regulations, 2019.
49 of 2024
|
Rescheduled on Fri 11/October/2024 10:30 AM | |
266 | Fri 27/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Amravati Power Transmission Company Limited (APTCL) under section 17(3) of the Electricity Act, 2003 for bringing on record the changes in the group of lenders of Amravati Power Transmission Company Limited (transmission licensee) and approval for change of encumbrance created on its assets in favour of L&T infrastructure finance co. ltd. with Kotak Infrastructure Debt Fund Limited (KIDF) by the transmission licensee.
58 of 2024
|
Rescheduled on Fri 04/October/2024 10:30 AM | |
267 | Fri 27/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of A A Energy Ltd. for charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016, 195 of 2017 & 322 of 2019 and getting refund of excess amount paid along with interest.
60 of 2024
|
Rescheduled on Fri 11/October/2024 10:30 AM | |
268 | Tue 24/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RPL) under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 32 of MERC (Conduct of Business) Regulations, 2004 challenging the recovery of subsidy amounts by Maharashtra State Electricity Distribution Company Ltd. from RattanIndia Power Ltd.
45 of 2024
|
Rescheduled on Tue 08/October/2024 10:30 AM | |
269 | Tue 24/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 341 of 2018 read with Order dated 01.06.2021 in Case No. 34 of 2021 and Order dated 20.01.2023 in Case No. 189 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Distribution License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
46 of 2024
|
Rescheduled on Fri 04/October/2024 10:30 AM | |
270 | Tue 24/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - T under Section 17(3) of the Electricity Act, 2003 and in terms of Order dated 02.01.2019 passed by the Hon’ble Commission in Case No. 311 of 2018 readwith Order dated 01.06.2021 in Case No. 35 of 2021 and Order dated 20.01.2023 in Case No. 183 of 2022 passed by the Hon’ble Commission (wherein the Hon’ble Commission has already permitted assignment of the Transmission License of Adani Electricity Mumbai Limited in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of Adani Electricity Mumbai Limited) for bringing on record and approve the changes/ addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
47 of 2024
|
Rescheduled on Fri 04/October/2024 10:30 AM | |
271 | Tue 24/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Raghunath Keru Bagul against MSEDCL seeking compliance of the Order of CGRF, Kalyan Zone Case No. 66 of 2023.
48 of 2024
|
Rescheduled on Tue 08/October/2024 10:30 AM | |
272 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shrisai Medicare Services Pvt. Ltd. seeking compliance of the Order of Electricity Ombudsman, Mumbai, dated 27 April 2020.
6 of 2024
|
Completed | |
273 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dhuri Industrial Complex Premises Co-operative Industrial Society Limited, Vasai, seeking compliance of the CGRF, Kalyan Order dated 10 August 2020 and CGRF, Vasai Order dated 28 December 2022.
7 of 2024
|
Completed | |
274 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited for approval of change in law on account of increase in rate of Goods and Service Tax (GST) from 5% to 12% for its 10 MW solar power project located at village Katgaon, Tehsil Tuljapur, District Osmanabad, Maharashtra.
8 of 2024
|
Completed | |
275 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited for approval of change in law and on account of increase in rate of Goods and Service Tax (GST) from 5% to 12% for its 5 MW solar power project located at village Vadgaon, Tehsil Kalamb, District Osmanabad, Maharashtra.
9 of 2024
|
Completed | |
276 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited for approval of change in law on account of increase in rate of Goods and Service Tax (GST) from 5% to 12% for its 10 MW solar power project located at village Navindagi and Goudgaon Budruk Tehsil Akkalkot, District Solapur, Maharashtra.
10 of 2024
|
Completed | |
277 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 8 January 2024 in Case No. 181 of 2023 in the matter of non-compliance of Regulation 22.14 and 25.2 of the MERC (Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 regarding installation of power quality meters and Mechanism for Automatic Compensation.
12 of 2024
|
Completed | |
278 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between MSEDCL and Indian Railways qua non payment of Cross Subsidy Surcharge (CSS) and Additional Surcharge (ASC) as directed under the MERC order dated 21.12.2018 and 05.09.2019 passed in Case No. 149 of 2017 and Case No. 154 of 2019 respectively.
24 of 2024
|
Completed | |
279 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited–Distribution under Section 86 of the EA, 2003 for adjudication of dispute between TPC-D and Indian Railways for non-payment of outstanding dues including fixed charges as well as cross subsidy surcharge in terms of the Order dated 05.09.2019 passed in Case No. 154 of 2019.
70 of 2024
|
Completed | |
280 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited-(Distribution Business) for urgent listing and hearing of Case No. 152/MP/2024.
(Petition of Adani Electricity Mumbai Limited-(Distribution Business) seeking pass-through/ adjustment of the payment made to Adani Hybrid Energy Jaisalmer Four Limited in view of the change in law in terms of the PPA dated 07.07.2020, as approved by this Hon’ble Commission vide the order dated 22.05.2024 passed in Case No. 154 of 2023.)
I.A. No. 46 of 2024 in Case No. 152 of 2024
|
Completed | |
281 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Adani Electricity Mumbai Limited-(Distribution
Business) for urgent listing in Case No. 154/AP/2024.
(Petition of Adani Electricity Mumbai Limited-(Distribution Business) under
Section 86(1)(b) of the Electricity Act, 2003 and Maharashtra Electricity
Regulatory Commission (Multi Year Tariff) Regulations, 2024, seeking
approval of the Power Purchase Agreement duly agreed between Adani
Electricity Mumbai Limited and Adani Power Limited for procurement of
power from 2 X 250 MW Dahanu Thermal Power Station.)
IA No. 47 of 2024 & Case No. 154 of 2024
|
Completed | |
282 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution
Company Limited (MSEDCL) for urgent listing in Case No. 155/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) seeking approval for adoption of weighted average Tariff
discovered in composite bids through the Competitive Bidding Process held for Long Term Procurement of 1600 MW Thermal Power and 5000 MW Solar
Power under Section 63 of the Electricity Act, 2003 read with Regulation 21 of
the MERC (Multi Year Tariff) Regulations, 2019.)
IA No. 48 of 2024 & Case No 155 of 2024
|
Completed | |
283 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Varun Beverages Limited under Section 86(1)(e) and Regulation 16,
Regulation 17, and Regulation 19 of Maharashtra Electricity Regulatory
Commission (Grid Interactive Rooftop Renewable Energy Generating Systems)
(Principle) Regulations, 2019, Regulation 2 and Regulation 7 of Maharashtra
Electricity Regulatory Commission (Grid Interactive Rooftop Renewable
Energy Generating Systems) (First Amendment) Regulations, 2023, Regulation
35, Regulation 37 of the Maharashtra Electricity Regulatory Commission
(Distribution Open Access) (Principle) Regulations 2016, and Regulation 4 of
the Maharashtra Electricity Regulatory Commission (Distribution Open Access)
(Second Amendment) Regulations 2023, seeking directions on allowance of Net
Billing arrangement along with Open Access.
129 of 2024
|
Completed | |
284 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 156/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of tariff discovered through the competitive bidding process held for procurement of 3000 MW (2000 MW under green shoe option) energy storage capacity (for 8 hours discharge with maximum 5 hours continuous discharge) for 40 years from InSTS connected pumped hydro storage plant/s under Section 63 read with regulation 21 of the MERC (Multi Year Tariff) Regulations, 2019.)
IA No. 49 of 2024 & Case No. 156 of 2024
|
Completed | |
285 | Fri 20/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of SJVN Limited for urgent listing in Case No. 82/AP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval to long term procurement of 1468 MW Firm and Dispatchable Renewable Energy (FDRE) Power from grid connected Renewable Energy power projects with Energy Storage systems.)
IA No. 50 of 2024 & Case No. 82 of 2024
|
Completed | |
286 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 8 January 2024 in Case No. 181 of 2023 in the matter of non-compliance of Regulation 22.14 and 25.2 of the MERC (Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 regarding installation of power quality meters and Mechanism for Automatic Compensation.
12 of 2024
|
Rescheduled on Fri 20/September/2024 10:30 AM | |
287 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Rishabh Enterprises for non-compliance of CGRF Order in Complaint No. 66 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
22 of 2024
|
Rescheduled on Tue 01/October/2024 10:30 AM | |
288 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under Section 86 of the EA 2003 before the MERC for (i) an in-principle approval of “Change in Law” and (ii) seeking an appropriate mechanism for appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events in terms of Article 12 of the PPA dated 21.08.2019 between Petitioner and Respondent along with carrying cost and interest on carrying cost.
23 of 2024
|
Rescheduled on Tue 01/October/2024 10:30 AM | |
289 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between MSEDCL and Indian Railways qua non payment of Cross Subsidy Surcharge (CSS) and Additional Surcharge (ASC) as directed under the MERC order dated 21.12.2018 and 05.09.2019 passed in Case No. 149 of 2017 and Case No. 154 of 2019 respectively.
24 of 2024
|
Rescheduled on Fri 20/September/2024 10:30 AM | |
290 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited–Distribution under Section 86 of the EA, 2003 for adjudication of dispute between TPC-D and Indian Railways for non-payment of outstanding dues including fixed charges as well as cross subsidy surcharge in terms of the Order dated 05.09.2019 passed in Case No. 154 of 2019.
70 of 2024
|
Rescheduled on Fri 20/September/2024 10:30 AM | |
291 | Fri 13/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking amendments in existing Regulations for establishing and operating wind-solar-thermal hybrid power plant in line with the National Wind-Solar Hybrid Scheme, 2018 and the MoP scheme for Flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power.
246 of 2023
|
Rescheduled on Tue 01/October/2024 10:30 AM | |
292 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16. And Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17. And Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18. Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 31st May, 2024. IN Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
|
Completed | |
293 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Garware Technical Fibres Limited (GTFL) Intervention Application in Case No. 372 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.)
110 of 2024
|
Completed | |
294 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 323 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.)
111 of 2024
|
Completed | |
295 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 324 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.)
112 of 2024
|
Completed | |
296 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 372 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.)
113 of 2024
|
Completed | |
297 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
And
Interlocutory Application Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking amendments of pleadings in the petition filed by the petitioner seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
233 of 2023 & IA. No. 1 of 2024
|
Completed | |
298 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for determination and approval of provisional Tariff for Bhusawal Unit 6 (1 X 660 MW) for FY 2023-24 and FY 2024-25.
236 of 2023
|
Completed | |
299 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
|
Preponed and Rescheduled on Tue 13/August/2024 10:30 AM | |
300 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Pravin D. Thakkar for non-compliance of Electricity Ombudsman (Mumbai) Order dated 18 October, 2023.
241 of 2023
|
Completed | |
301 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
242 of 2023
|
Completed | |
302 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Balkrishna Industries Limited (BIL) seeking Impleadment as a party Respondent to Case No. 324 of 2018 (FY 2016-17).
124 of 2024
|
Completed | |
303 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Balkrishna Industries Limited (BIL) seeking Impleadment as a party Respondent to Case No. 372 of 2018 (FY 2017-18).
125 of 2024
|
Completed | |
304 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Varun Beverages Limited seeking urgent and early hearing of Case No. 129 of 2024.
(Petition of Varun Beverages Limited seeking directions on allowance of Net Billing arrangement along with Open Access.)
IA. No. 44 of 2024 in Case No. 129 of 2024
|
Completed | |
305 | Tue 10/09/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Jawaharlal Nehru Port Authority (JNPA) seeking urgent and early hearing of Case No. 138/AP/2024.
(Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase Agreement and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.8 MW for a period of one year Round the clock from 1 September, 2024 to 31 August, 2025.)
IA. No. 45 of 2024 in Case No. 138 of 2024
|
Completed | |
306 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
|
Completed | |
307 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Supercraft Foundry Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
51 of 2024
|
Completed | |
308 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Supercraft Foundry Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
52 of 2024
|
Completed | |
309 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jupiter Lifeline Hospitals Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
53 of 2024
|
Completed | |
310 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jupiter Lifeline Hospitals Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
54 of 2024
|
Completed | |
311 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jathar Textiles Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
55 of 2024
|
Completed | |
312 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
56 of 2024
|
Completed | |
313 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
57 of 2024
|
Completed | |
314 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ascent Hotels Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
75 of 2024
|
Completed | |
315 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Mahabal Foundries Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
76 of 2024
|
Completed | |
316 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Mahabal Metals Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
77 of 2024
|
Completed | |
317 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period October 2020 up till May 2023 with interest.
232 of 2023
|
Completed | |
318 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
|
Completed | |
319 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
|
Completed | |
320 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Brihanmumbai Electric Supply and Transport
Undertaking seeking urgent hearing in Case No. 134/MP/2024.
(Petition of Brihanmumbai Electric Supply and Transport Undertaking seeking
approval to revoke the agreement signed between BEST and TPCG for Unit 5
Thermal.)
IA. No. 42 of 2024 in Case No. 134 of 2024
|
Completed | |
321 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Brihanmumbai Electric Supply and Transport
Undertaking seeking urgent hearing in Case No. 135/AP/2024.
(Petition of Brihanmumbai Electric Supply and Transport Undertaking seeking
approval of agreement for procurement of power and adoption of tariff
discovered through competitive bidding for medium term procurement of 350
MW of round the clock power.)
IA. No. 43 of 2024 in Case No. 135 of 2024
|
Completed | |
322 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval to float tenders for additional procurement of 5991 MW Solar Power under MSKVY 2.0.
127 of 2024
|
Completed | |
323 | Fri 23/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking Approval for Long Term Procurement of 1052 MW grid connected Solar Photovoltaic Power Projects to be set up on lands of Water Resource Department of Maharashtra for lift irrigation schemes in the State of Maharashtra.
122 of 2024
|
Completed | |
324 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
And
Petition of Mr. Sudhir Sukharup Budhay for interim Order for “Grid Support Charges” (GSC) Solar Generators above 10 KW & Below 1 MW.
176 of 2023 & IA. No. 26 of 2024
|
Completed | |
325 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 seeking declaration of Change in Law in respect of revision in the Fees for Consent to Operate notified vide Notification dated 25.08.2011 issued by the MPCB, GoM and levy of Add-on charges by WCL for supply of coal.
224 of 2023
|
Completed | |
326 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of National Highway Authority of India Through its Project Director Bhausaheb S Salunke for Non-compliance of the Order dated 06.03.2023 passed by Consumer Grievance Redressal Forum, Nashik in Complaint No.2481/ 2022.
229 of 2023
|
Completed | |
327 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Pushkaraj Ispat (India) LLP for Non-compliance of CGRF Nasik Order dated 18/07/2023 in Case No. 06 of 2022-23.
230 of 2023
|
Completed | |
328 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for Clarifications on “Grid Interactive Roof Top Amendment 2023” and “DOA (Second Amendment) 2023”
231 of 2023
|
Completed | |
329 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
|
Postponed till further notice | |
330 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for procurement of 1052 MW from grid connected Solar PV projects to be set up on lands of Water Resource Department of Maharashtra for Lift Irrigation Schemes (LIS).
122 of 2024
|
Completed | |
331 | Tue 20/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval to float tenders for additional procurement of 5991 MW Solar Power under MSKVY 2.0.
127 of 2024
|
Completed | |
332 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MEGC, 2020.
5 of 2024
|
Completed | |
333 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
|
Completed | |
334 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited seeking in-principle declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 04.07.2023.
215 of 2023
|
Completed | |
335 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kasturi Electricals & Engineering for approval of ‘Change in Law’ on account of increase in the rate of GST from 5% to 12 % as per Ministry of Finance, Government of India notification dated 30 September 2021.
222 of 2023
|
Completed | |
336 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
And
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & IA. No. 23 of 2021
|
Completed | |
337 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
|
Completed | |
338 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
|
Completed | |
339 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution
Company Limited (MSEDCL) for urgent listing in Case No. 122/MP/2024.
(Petition of MSEDCL for seeking Approval for Long Term Procurement of
1052 MW grid connected Solar Photovoltaic Power Projects to be set up on
lands of Water Resource Department of Maharashtra for lift irrigation schemes in the State of Maharashtra.)
IA No 38 of 2024 in Case No. 122 of 2024
|
Completed | |
340 | Tue 13/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution
Company Limited (MSEDCL) for urgent listing in Case No. 127/MP/2024.
(Petition of MSEDCL for seeking approval to float tenders for additional LongTerm Procurement of 5991 MW Solar Power for meeting the Solar Renewable
Purchase Obligations under Section 19 of MERC (Renewable Purchase
Obligation, its compliance and implementation of Renewable Energy Certificate Framework) Regulations, 2019 and to supply day time power to the farmers of the State of Maharashtra.)
IA No. 39 of 2024 in Case No. 127 of 2024
|
Completed | |
341 | Fri 09/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
|
Rescheduled on Tue 20/August/2024 10:30 AM | |
342 | Fri 09/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
|
Rescheduled on Fri 23/August/2024 10:30 AM | |
343 | Fri 09/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
|
Rescheduled on Tue 10/September/2024 10:30 AM | |
344 | Fri 09/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 8 January 2024 in Case No. 181 of 2023 in the matter of non-compliance of Regulation 22.14 and 25.2 of the MERC (Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 regarding installation of power quality meters and Mechanism for Automatic Compensation.
12 of 2024
|
Rescheduled on Fri 13/September/2024 10:30 AM | |
345 | Fri 09/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the
Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
|
Rescheduled on Tue 13/August/2024 10:30 AM | |
346 | Fri 02/08/2024 10:30:00 AM |
e-Public Hearing
Inviting Comments on Application of the Tata Power Company Ltd.-Transmission for amendment of Transmission licence under section 18 of the electricity Act, 2003.
13 of 2024
|
Completed | |
347 | Fri 02/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under the Energy Banking Agreement dated 29 June 2022 executed between MSEDCL and Saranyu Power Trading Pvt. Ltd for banking of energy.
122 of 2023
|
Completed | |
348 | Fri 02/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Ltd. against MSEDCL under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12%.
And
Interlocutory Application of Energy Efficiency Services Limited (EESL) for Amendment of Petition in Case No. 150/AD/2023.
150 of 2023 & IA. No. 6 of 2024
|
Completed | |
349 | Fri 02/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
|
Completed | |
350 | Fri 02/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Kreate Energy (I) Pvt. Ltd. under Section 94 (1) f of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 for review of the Order dated 27.09.2023 passed by the Hon’ble Commission in Case No. 162/AD/2022 seeking compensation from Kreate Energy India Pvt. Ltd. (KEIPL) (Petitioner herein) for the alleged additional power purchase cost incurred in the months from April, 2022 to June, 2022.
221 of 2023
|
Completed | |
351 | Fri 02/08/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 50/AP/2024. (Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 63.75 MW wind power from the wind generators whose EPAs with MSEDCL have expired.)
IA. No. 37 of 2024 in Case No. 50 of 2024
|
Completed | |
352 | Fri 26/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers against MSEDCL seeking appropriate relief to stop levying wheeling charges, transmission charges, export unit charges and other operating charges upon the Petitioner for being a power Generator and wheeling power to 220 kV EHV pooling substation through the 33 kV common evacuation line under Open Access.
194 of 2023
|
Completed | |
353 | Fri 26/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. seeking directions against MSEDCL for correctly applying open Access permission for Captive use.
198 of 2023
|
Completed | |
354 | Fri 26/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on Adoption of Tariff for Long Term Procurement of 1468 MW Firm and Dispatchable Renewable Energy Power from Grid Connected Renewable Energy Power Projects (FDRE) with Energy Storage Systems Selected by SJVN under Section 63 of the Electricity Act 2003 for Meeting the other Renewable Purchase Obligations.
82 of 2024
|
Completed | |
355 | Fri 26/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.
And
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.
And
Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.
Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble
APTEL’s Judgement dated 31st May, 2024.
IN
Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to
the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
|
Rescheduled on Tue 10/September/2024 10:30 AM | |
356 | Tue 23/07/2024 11:00:00 AM |
e-Public Hearing
Petition of Khare and Tarkunde Green Energy Private Limited (KTGEPL) for determination of Project Specific Tariff for Isapur Hydro Electric Project of capacity 4 MW (2 x 2 MW) located on Right Bank Canal of Isapur Dam at village Kadapdev, Tal Kalamnuri, Dist Hingoli."
59 of 2024
|
Completed | |
357 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kukreja Enterprises for dispute resolution filed under Section
86 (1) (f) of the Electricity Act 2003, read with Regulations 92, 93 and 94 of the
MERC Regulations 2004 petition seeking Order for payment of Principal / LPS
Sum
40 of 2024
|
Completed | |
358 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 11 of
the Electricity Act, 2003 read with Section 86(1)(h) and 86(1)(k) of the
Electricity Act, 2003 along with Regulation 101 and 102 of the Maharashtra
Electricity Regulatory Commission (State Grid Code) Regulations 2020
including amendments thereto and all enabling powers in this regard including
the inherent powers and expansive regulatory authority vested unto the Hon'ble
Commission, thereby seeking this Hon’ble Commission to consider relaxation/
amendment/ modification in Maharashtra Electricity Regulatory Commission
(State Grid Code) Regulations 2020 for enabling power sale by generator.
41 of 2024
|
Rescheduled on Fri 17/May/2024 10:30 AM | |
359 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited for seeking
relaxation through Amendment/Modifications to Regulation 50 (Provisions
related to GCV of Coal in Computation of Energy Charge Rate), Regulation
47.2 (O&M Charges for New Stations) and Regulation 32 (Interest on Working
Capital) of MERC (Multi Year Tariff) Regulations 2019.
42 of 2024
|
Completed | |
360 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. N.R.C. Limited for non-compliance of CGRF Kalyan Order
dated 08/11/2023 in Case No. K/E/081 of 2022 of M/s. N.R.C. Ltd, Kalyan in
the matter of billing dispute
43 of 2024
|
Completed | |
361 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusawal, Chandrapur, Khaparkheda and Nashik.
And
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking impleadment of MSEDCL as Respondent and early hearing of Case No. 167/MP/2023.
167 of 2023 & I.A No. 21 of 2024
|
Completed | |
362 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Services Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act, 2003, MERC (Distribution Open Access) Regulations, 2016 and MERC (Conduct of Business) Regulations, 2004 seeking adjudication of disputes between Petitioner and Respondent in relation to payment of outstanding dues to the Petitioner for sale of wind energy to the Respondent during the period 01.04.2015 to 31.05.2015.
31 of 2024
|
Completed | |
363 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 96 of 2024 wherein only deviation sought was for combining of Thermal and Solar bids in procurement of 1600 MW Thermal Power and 5000 MW Solar power through tariff based competitive bidding for long term in the state of Maharashtra.
108 of 2024
|
Completed | |
364 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 108 of 2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 96 of 2024 wherein only deviation sought was for combining of Thermal and Solar bids in procurement of 1600 MW Thermal Power and 5000 MW Solar power through tariff based competitive bidding for long term in the state of Maharashtra.)
IA. No. 35 of 2024 in Case No. 108 of 2024
|
Completed | |
365 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 98 of 2024 seeking approval for procurement of additional green shoe capacity.
109 of 2024
|
Completed | |
366 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 109/MP/2024.
(Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 98 of 2024 seeking approval for procurement of additional green shoe capacity.)
IA. No. 36 of 2024 in Case No. 109 of 2024
|
Completed | |
367 | Tue 23/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Nidar Utilities Panvel LLP for early hearing in Petition No. 107/AP/2024.
(Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 7.00 MW Round the Clock (RTC) power for a period of 4 months i.e. from 1 August 2024 to 30 November 2024.)
IA. No. 34 of 2024 in Case No. 107 of 2024
|
Completed | |
368 | Fri 19/07/2024 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Shreehari Associates Private Limited Petition for determination of Project Specific Tariff for Mukane Hydro Electric Project(MHEP) (1*1.45MW) under Regulation 9.1 & 10.2 of MERC(Term and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019 and Section 62(1) (a) & 86 (1) (e) of the Electricity Act, 2003.
57 of 2023
|
Completed | |
369 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 seeking Consideration/Adjudication with respect to the interpretation being so adopted by both the parties herein on the implementation of the operative direction no. 2 of Order dated 28.11.2020 in Case No. 132 of 2020.
26 of 2024
|
Completed | |
370 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Pravin Dalpatbhai Thakkar seeking action against MSEDCL for non-compliance of Electricity Act-2003 (36 of 2003), Section No.42/5 and MEER Regulation No.8.15, 37 of 21.09.2020.
33 of 2024
|
Completed | |
371 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 8.03 of the Energy Purchase Agreement dated 30.04.2013entered between the Petitioner and the Respondent.
34 of 2024
|
Completed | |
372 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for under Regulation 21 of the MERC (terms and conditions for determination of re tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
35 of 2024
|
Completed | |
373 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S.F.M. for non-compliance of Order in complaint No: 209 of 2021 passed by Chief Electrical Inspector, Govt of Maharashtra, Mumbai.
36 of 2024
|
Withdrawn | |
374 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 86 (1) (k), 94 (1) (g) of the EA, 2003 read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, and Regulation 105 of MERC (MYT) Regulations, 2019 seeking certain clarification in respect of the Letter dated 06.10.2022 issued by this Hon’ble Commission.
39 of 2024
|
Completed | |
375 | Fri 19/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Diwanka Energy Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
86 of 2024
|
Completed | |
376 | Tue 16/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 seeking Consideration/Adjudication with respect to the interpretation being so adopted by both the parties herein on the implementation of the operative direction no. 2 of Order dated 28.11.2020 in Case No. 132 of 2020.
26 of 2024
|
Rescheduled on Fri 19/July/2024 10:30 AM | |
377 | Tue 16/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Services Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act, 2003, MERC (Distribution Open Access) Regulations, 2016 and MERC (Conduct of Business) Regulations, 2004 seeking adjudication of disputes between Petitioner and Respondent in relation to payment of outstanding dues to the Petitioner for sale of wind energy to the Respondent during the period 01.04.2015 to 31.05.2015.
31 of 2024
|
Rescheduled on Tue 23/July/2024 10:30 AM | |
378 | Tue 16/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Pravin Dalpatbhai Thakkar seeking action against MSEDCL for non-compliance of Electricity Act-2003 (36 of 2003), Section No.42/5 and MEER Regulation No.8.15, 37 of 21.09.2020.
33 of 2024
|
Rescheduled on Fri 19/July/2024 10:30 AM | |
379 | Tue 16/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 8.03 of the Energy Purchase Agreement dated 30.04.2013entered between the Petitioner and the Respondent.
34 of 2024
|
Rescheduled on Fri 19/July/2024 10:30 AM | |
380 | Tue 16/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Diwanka Energy Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
86 of 2024
|
Rescheduled on Fri 19/July/2024 10:30 AM | |
381 | Fri 12/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
|
Rescheduled on Friday 14/June/2024 10:30 AM | |
382 | Fri 12/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Rishabh Enterprises for non-compliance of CGRF Order in Complaint No. 66 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
22 of 2024
|
Postponed till further notice | |
383 | Fri 12/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under Section 86 of the EA 2003 before the MERC for (i) an in-principle approval of “Change in Law” and (ii) seeking an appropriate mechanism for appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events in terms of Article 12 of the PPA dated 21.08.2019 between Petitioner and Respondent along with carrying cost and interest on carrying cost.
23 of 2024
|
Postponed till further notice | |
384 | Fri 12/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between MSEDCL and Indian Railways qua non payment of Cross Subsidy Surcharge (CSS) and Additional Surcharge (ASC) as directed under the MERC order dated 21.12.2018 and 05.09.2019 passed in Case No. 149 of 2017 and Case No. 154 of 2019 respectively.
24 of 2024
|
Postponed till further notice | |
385 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited under Section 86 of the Electricity Act, 2003 read with clause 5.7.2 of the competitive bidding guidelines, 2017 and article 9 of Power Purchase Agreement dated 03.01.2020, seeking in-principle declaration of issuance of working group report, 2022 issued by Central Electricity Authority as a change in law event.
16 of 2024
|
Completed | |
386 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited under Section 86 of the Electricity Act, 2003 read with clause 5.7.2 of the competitive bidding guidelines, 2017 and article 9 of Power Purchase Agreement dated 27.07.2018, seeking in-principle declaration of issuance of working group report, 2022 issued by Central Electricity Authority as a change in law event.
17 of 2024
|
Completed | |
387 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
|
Completed | |
388 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Liberty Oil Mills for Non-Compliance of MERC Order dated 26/05/2021 in Case No. 25 of 2021 in the matter of “allowing revision in contract demand up to 2 occasions to HT Industrial and HT Commercial consumers and up to 1 occasion to LT industrial and LT commercial consumers in a billing cycle up to 31 March, 2022.
18 of 2024
|
Completed | |
389 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Yutika Engineering for non-compliance of CGRF Order in Complaint No. 65 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
21 of 2024
|
Completed | |
390 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited (Erstwhile Adani Power Maharashtra Ltd.) for consequent Orders to be passed pursuant to the Order of the Hon’ble Appellate Tribunal dated 17.10.2023 in Appeal No. 130 of 2018.
15 of 2024
|
Completed | |
391 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
SUO- MOTU HEARING ON REVIEW OF STATUS OF COMPLIANCES OF VARIOUS DIRECTIONS ISSUED BY THE COMMISSION IN ITS ORDER DATED 31 MARCH 2023 IN CASE NO.226 OF 2022
4/SM/2024
|
Completed | |
392 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
|
Completed | |
393 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. seeking compliance of CGRF, MSEDCL Pune Order dated 11 September 2023.
244 of 2023
|
Completed | |
394 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (KVTL) seeking ex-parte ad-interim relief under Section 94(2) of the EA, 2003 read with Regulation 33 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 in Case No. 44/AD/2024 (Petition of KVTL seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.)
I.A No. 33 of 2024 in Case No. 44 of 2024
|
Completed | |
395 | Tue 09/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (KVTL) under Section 86 (1) (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Articles 11 and 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.
44 of 2024
|
Completed | |
396 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification No.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification No.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification No.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Navindagi and Goudgaon Budruk, Taluka Akkalkot, District Solapur, Maharashtra.
10 of 2024
|
Rescheduled on Tue 02/July/2024 10:30 AM | |
397 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 08th January 2024 passed in Case No. 181 of 2023 in the matter of non-compliance of regulation 22.14 & 25.2 of the MERC (supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 regarding installation of power quality meters and mechanism for automatic compensation.
12 of 2024
|
Rescheduled on Tue 14/May/2024 10:30 AM | |
398 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Limited (Erstwhile Adani Power Maharashtra Ltd.) for consequent Orders to be passed pursuant to the Order of the Hon’ble Appellate Tribunal dated 17.10.2023 in Appeal No. 130 of 2018.
15 of 2024
|
Rescheduled on Tue 09/July/2024 10:30 AM | |
399 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
SUO- MOTU HEARING ON REVIEW OF STATUS OF COMPLIANCES OF VARIOUS DIRECTIONS ISSUED BY THE COMMISSION IN ITS ORDER DATED 31 MARCH 2023 IN CASE NO.226 OF 2022
4/SM/2024
|
Rescheduled on Tue 09/July/2024 10:30 AM | |
400 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
|
Rescheduled on Tue 09/July/2024 10:30 AM | |
401 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. seeking compliance of CGRF, MSEDCL Pune Order dated 11 September 2023.
244 of 2023
|
Rescheduled on Tue 09/July/2024 10:30 AM | |
402 | Fri 05/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (KVTL) seeking ex-parte ad-interim relief under Section 94(2) of the EA, 2003 read with Regulation 33 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 in Case No. 44/AD/2024
(Petition of KVTL seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.)
I.A No. 33 of 2024 in Case No. 44 of 2024
|
Rescheduled on Tue 09/July/2024 10:30 AM | |
403 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shrisai Medicare Services Pvt. Ltd. non-compliance of Electricity Ombudsman Mumbai Order dated 27/04/2020 in Rep. No. 06/2020 of M/s. Shrisai Medicare Services Pvt Ltd, Pune in the matter of billing dispute.
6 of 2024
|
Completed | |
404 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dhuri Ind. Complex Premises Co-operative Industrial Society Limited against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 10 August 2020 passed by the Ld. CGRF, Kalyan in Grievance No. K/E/1657/2013 OF 2019-20 AND Order dated 28 December 2022 passed by the Ld. CGRF, Vasai in Case No. 077 of 2022.
7 of 2024
|
Completed | |
405 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification no.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification no.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification no.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Katgaon, Taluka Tuljapur, District Osmanabad, Maharashtra.
8 of 2024
|
Completed | |
406 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification no.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification no.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification no.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 5 MW solar power project located at village Vadgaon, Taluka Kallam, District Osmanabad, Maharashtra.
9 of 2024
|
Completed | |
407 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification No.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification No.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification No.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Navindagi and Goudgaon Budruk, Taluka Akkalkot, District Solapur, Maharashtra.
10 of 2024
|
Completed | |
408 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Diwanka Energy Private Limited for urgent listing in Case No. 86/MP/2024.
(Petition of Diwanka Energy Private Limited seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.)
I.A No. 30 of 2024 in Case No. 86 of 2024
|
Completed | |
409 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for deviations in standard bidding documents for long term procurement of 1600 MW thermal power and 5000 MW solar power in the state of Maharashtra.
96 of 2024
|
Completed | |
410 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for bidding documents for procurement of 1,000 MW (up to 2000MW under green shoe option) energy storage capacity for 40 years from ISTS/InSTS connected pumped Hydro Storage Plant/s through competitive bidding.
98 of 2024
|
Completed | |
411 | Tue 02/07/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Urjankur Shree Datta Power Company Limited challenging arbitrary reduction of the tenure of the Energy Purchase Agreement dated 21 June 2013 by MSEDCL.
202 of 2023
|
Completed | |
412 | Fri 28/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
|
Postponed till further notice | |
413 | Fri 28/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
|
Postponed till further notice | |
414 | Fri 28/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
|
Postponed till further notice | |
415 | Fri 28/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MEGC, 2020.
5 of 2024
|
Postponed till further notice | |
416 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. for non-compliance of CGRF Pune Order dated 11/09/2023 in Case No. 77/2022.
244 of 2023
|
Completed | |
417 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balaji International for non-compliance of Electricity Ombudsman Order dated 15/09/2021 in Rep. No. 57 of 2021.
245 of 2023
|
Completed | |
418 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking in line with the national wind-solar hybrid scheme, 2018 and the ‘scheme for flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power, 2022 seeking appropriate direction(s) and/or direction(s) from this Hon’ble Commission for framing appropriate regulations/amendments in existing regulations for establishing, operating, scheduling and commercial settlement of wind-solar-thermal hybrid power plant to be setup for utilisation under open access by the consumer in the state of Maharashtra and in the interim, issue appropriate direction to MSEDCL and MSETCL to allow connectivity to the members of captive power producer association with their system for operating wind-solar-thermal hybrid power plant in the state of Maharashtra.
246 of 2023
|
Completed | |
419 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
|
Rescheduled on Friday 14/June/2024 10:30 AM | |
420 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Industrial Township Limited (MITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement.
214 of 2023
|
Completed | |
421 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.
And
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.
And
Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.
Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble
APTEL’s Judgement dated 31st May, 2024.
IN
Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
|
Completed | |
422 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application for urgent listing of the Petition No. 202/AD/2023
I.A. No. 25 of 2024 in Case No. 202 of 2023
|
Completed | |
423 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for Condonation of Delay and early hearing in Case No. 94/AP/2024.
I.A. No. 27 of 2024 in Case No. 94 of 2024
|
Completed | |
424 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 96/MP/2024.
I.A. No. 28 of 2024 in Case No. 96 of 2024
|
Completed | |
425 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 98/MP/2024.
I.A. No. 29 of 2024 in Case No. 98 of 2024
|
Completed | |
426 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of SEZ Bio-Tech Services Pvt Ltd – Manjari SEZ and SEZ Bio-tech Services Pvt Ltd – Hadapsar SEZ for urgent listing in Case No. 66/AP/2024.
IA No 31 of 2024 in Case No 66 of 2024
|
Scheduled | |
427 | Tue 25/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Pvt. Ltd. – Manjari SEZ and M/s SEZ Bio-Tech Services Pvt. Ltd. - Hadapsar SEZ. for urgent listing in Case No. 92/AP/2024.
IA No 32 of 2024 in Case No 92 of 2024
|
Scheduled | |
428 | Fri 21/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
And
Interlocutory Application Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking amendments of pleadings in the petition filed by the petitioner seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
233 of 2023 & IA. No. 1 of 2024
|
Postponed till further notice | |
429 | Fri 21/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for determination and approval of provisional Tariff for Bhusawal Unit 6 (1 X 660 MW) for FY 2023-24 and FY 2024-25.
236 of 2023
|
Postponed till further notice | |
430 | Fri 21/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Pravin D. Thakkar seeking non compliance of Electricity Ombudsman (Mumbai) Order dated 18 October, 2023.
241 of 2023
|
Postponed till further notice | |
431 | Fri 21/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
242 of 2023
|
Postponed till further notice | |
432 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of National Highway Authority of India Through its Project Director Bhausaheb S Salunke for Non-compliance of the Order dated 06.03.2023 passed by Consumer Grievance Redressal Forum, Nashik in Complaint No.2481/ 2022.
229 of 2023
|
Postponed till further notice | |
433 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Pushkaraj Ispat (India) LLP for Non-compliance of CGRF Nasik Order dated 18/07/2023 in Case No. 06 of 2022-23.
230 of 2023
|
Postponed till further notice | |
434 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for Clarifications on “Grid Interactive Roof Top Amendment 2023” and “DOA (Second Amendment) 2023”
231 of 2023
|
Postponed till further notice | |
435 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period October 2020 up till May 2023 with interest.
232 of 2023
|
Postponed till further notice | |
436 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
|
Postponed till further notice | |
437 | Fri 14/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
|
Postponed till further notice | |
438 | Fri 14/06/2024 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Shreehari Associates Private Limited Petition for determination of Project Specific Tariff for Mukane Hydro Electric Project(MHEP) (1*1.45MW) under Regulation 9.1 & 10.2 of MERC(Term and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019 and Section 62(1) (a) & 86 (1) (e) of the Electricity Act, 2003.
57 of 2023
|
Rescheduled on Fri 19/July/2024 10:30 AM | |
439 | Tue 11/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Kreate Energy (I) Pvt. Ltd. under Section 94 (1) f of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 for review of the Order dated 27.09.2023 passed by the Hon’ble Commission in Case No. 162/AD/2022 seeking compensation from Kreate Energy India Pvt. Ltd. (KEIPL) (Petitioner herein) for the alleged additional power purchase cost incurred in the months from April, 2022 to June, 2022.
221 of 2023
|
Postponed till further notice | |
440 | Tue 11/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kasturi Electricals & Engineering under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
222 of 2023
|
Completed | |
441 | Tue 11/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) under Section 86 of the Electricity Act, 2003 read with Article 13 (“Change in Law”) of the Power Purchase Agreement dated 08.09.2008 for 1320MW and Article 10 (“Change in Law”) of the Power Purchase Agreements dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between APML and MSEDCL in respect of revision in the Fees for Consent to Operate notified vide Notification dated 25.08.2011 by the Maharashtra Pollution Control Board, Government of Maharashtra and levy of Add-on charges by Western Coalfields Limited for supply of coal.
224 of 2023
|
Completed | |
442 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
|
Completed | |
443 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Chetan Purushottam Patel under provisions of Electricity Act, 2003 more particularly section 86(1)(e) and section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
212 of 2023
|
Completed | |
444 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Jignesh Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
216 of 2023
|
Completed | |
445 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jayesh Purushottam Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
217 of 2023
|
Completed | |
446 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Purushottam Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
218 of 2023
|
Completed | |
447 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Vallabhbhai Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vallabhbhai Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
219 of 2023
|
Completed | |
448 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Vipul Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vipul Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
220 of 2023
|
Completed | |
449 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Satyen Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Satyen Vallabh Patel and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
223 of 2023
|
Completed | |
450 | Tue 04/06/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ultratech Cement Limited under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of the Commission’s common Order dated 27 December 2023 in Case No. 151 of 2023 & Others, by Maharashtra State Electricity Distribution Company Limited.
19 of 2024
|
Completed | |
451 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27 December 2023 passed by the Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against MSEDCL.
11 of 2024
|
Completed | |
452 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
|
Completed | |
453 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited Petition seeking Review of Order dated 31 March 2023 in Case No. 226 of 2022 in the matter of final true-up of aggregate revenue requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional true up of ARR of FY 2022-23 and revised tariff and projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
|
Completed | |
454 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra.
And
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023.
And
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
And
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023
|
Completed | |
455 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shivam Oil Industries for non-compliance of CGRF order in complaint No: 79 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
210 of 2023
|
Completed | |
456 | Fri 31/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 04.07.2023, seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change In Law event.
215 of 2023
|
Completed | |
457 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SJVN Limited seeking directions to MSEDCL for payment of outstanding amounts in terms of energy purchase agreements executed between the parties and seeking action against MSEDCL under Section 142,146 & 149 of the Electricity Act, 2003.
74 of 2023
|
Completed | |
458 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking in-Principle Declaration of issuance of
Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 22 July, 2022 which was signed on 3 August, 2022.
75 of 2023
|
Completed | |
459 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the
Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
|
Completed | |
460 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
|
Rescheduled till further notice | |
461 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for deferment of interest on security deposit to be paid to the consumers of the Petitioner.
209 of 2023
|
Completed | |
462 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Industrial Township Limited (MITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement.
214 of 2023
|
Completed | |
463 | Tue 28/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
|
Completed | |
464 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the
switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Completed | |
465 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Completed | |
466 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Morries Energy Ltd. regarding non-adjustment of Open Access units for September 2021.
12 of 2023
|
Completed | |
467 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking directions under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement (EBA) dated 29 June 2022 executed between MSEDCL and SPTPL for banking of Energy.
122 of 2023
|
Completed | |
468 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Schreiber Dynamics Dairies Pvt. Ltd. for not allowing Power Factor Incentive on Open Access charges by the Respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under Section 142, 146 & 149 of Electricity Act, 2003.
178 of 2023
|
Completed | |
469 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Harshad Sheth seeking for an appropriate orders and directions regarding validity of T.O. Circular No. C.E. (Dist.)/D-III/NSC/30011 dated 20 December 2018 issued by MSEDCL and subsequent modifications made thereto.
182 of 2023
|
Completed | |
470 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
|
Withdrawn | |
471 | Tue 21/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
|
Completed | |
472 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
And
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
473 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
176 of 2023
|
Completed | |
474 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) against MSEDCL seeking compliance of the CGRF, Bhandup Orders in Case No. 42 dated 28/06/2021.
And
Interlocutory Application of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) for urgent hearing in Case No. 192/MP/2023.
192 of 2023 & I.A. No. 64 of 2023
|
Completed | |
475 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Application by Serum Institute of India Pvt. Ltd before the Commission to get the matter listed on the basis of the Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 passed in Appeal No. 46 of 2019.
210 of 2022
|
Completed | |
476 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017. Case No. 173 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 22.09.2022. IN Appeal No. 46 of 2019 directions to the Commission therein.)]
173 of 2017 (Re-opened Case)
|
Completed | |
477 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 11 of
the Electricity Act, 2003 read with Section 86(1)(h) and 86(1)(k) of the
Electricity Act, 2003 along with Regulation 101 and 102 of the Maharashtra
Electricity Regulatory Commission (State Grid Code) Regulations 2020
including amendments thereto and all enabling powers in this regard including
the inherent powers and expansive regulatory authority vested unto the Hon'ble
Commission, thereby seeking this Hon’ble Commission to consider relaxation/
amendment/ modification in Maharashtra Electricity Regulatory Commission
(State Grid Code) Regulations 2020 for enabling power sale by generator.
41 of 2024
|
Completed | |
478 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MW ac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under ‘Mukhyamantri Saur Krushi Vahini Yojana’ as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.
148 of 2023
|
Completed | |
479 | Fri 17/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Limited seeking an Order directing MSEDCL to pay Rs. 2,73,63,784 together with interest, due and payable in view of supply of electricity by it, along with such other and further reliefs as may be necessary.
155 of 2023
|
Completed | |
480 | Tue 14/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL)
seeking review of Order dated 08th January 2024 passed in Case No. 181 of
2023 in the matter of non-compliance of regulation 22.14 & 25.2 of the MERC
(supply code and standards of performance of distribution licensees including
power quality) Regulations, 2021 regarding installation of power quality meters
and mechanism for automatic compensation.
12 of 2024
|
Completed | |
481 | Tue 14/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants. And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent. And Applications of Respondents for striking off their names from the list of Respondents. And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition. And Application of M/s. Asian Colour Coated Ispat Ltd. for change in the name of Respondent No. 97/ Applicant, M/s. Asian Colour Coated Ispat Ltd. to JSW Steel Coated Products Ltd. And Application of Tata Steel Limited Global Wires India Division for deletion of name from the main petition filed by Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking amendment to the Petition in respect of 100% CPP Unit Owners and urgent listing in Case No. 158/MP/2022.
158 of 2022 & Diary Nos. 242, 247, 256, 262, 266, 267 of 2022 and IA. Nos. 25, 29, 31, 34, 40, 45 of 2022 & IA. Nos. 47, 49, 72 of 2023 in Case No. 158 of 2022
|
Completed | |
482 | Fri 10/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MW ac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under ‘Mukhyamantri Saur Krushi Vahini Yojana’ as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.
148 of 2023
|
Rescheduled on Fri 17/May/2024 10:30 AM | |
483 | Fri 10/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Limited seeking an Order directing MSEDCL to pay Rs. 2,73,63,784 together with interest, due and payable in view of supply of electricity by it, along with such other and further reliefs as may be necessary.
155 of 2023
|
Rescheduled on Fri 17/May/2024 10:30 AM | |
484 | Fri 10/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
|
Rescheduled on Tuesday 21/May/2024 10:30 AM | |
485 | Fri 10/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
|
Rescheduled on Tuesday 21/May/2024 10:30 AM | |
486 | Fri 10/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
|
Rescheduled on Tuesday 28/May/2024 10:30 AM | |
487 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd, under Section 86 of the Electricity Act, 2003 and PPA dated 21.08.2019, seeking injunction against Maharashtra Electricity Distribution Company Ltd, from levying any penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
|
Completed | |
488 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Limited seeking relief for additional cost of transportation pursuant to the APTEL Judgment dated 21 October, 2022 in Appeal No. 148 of 2019.
84 of 2023
|
Completed | |
489 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Azure Power Thirty-Four Private Limited under Section 86 of the Electricity Act 2003 seeking an appropriate compensation for the Change in Law event, on account of Hon’ble the Supreme Court of India’s Order dated 19 April 2021 in Writ Petition (Civil) No. 838 of 2019, in terms of Article 9 of the Power Purchase Agreement dated 30 July 2018.
149 of 2023
|
Completed | |
490 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Ltd. against MSEDCL under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12%.
And
Interlocutory Application of Energy Efficiency Services Limited (EESL) for Amendment of Petition in Case No. 150/AD/2023.
150 of 2023 & IA. No. 6 of 2024
|
Completed | |
491 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusaval, Chandrapur, Khaperkheda and Nashik.
167 of 2023
|
Completed | |
492 | Tue 07/05/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) under Section 86 (1) (b) of the Electricity Act, 2003 for approval of combined short term wind power procurement for the period 01.08.2023 to 31.07.2024.
168 of 2023
|
Completed | |
493 | Tue 02/04/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Chetan Purushottam Patel under provisions of Electricity Act, 2003 more particularly section 86(1)(e) and section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
212 of 2023
|
Postponed till further notice | |
494 | Tue 02/04/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Jignesh Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
216 of 2023
|
Postponed till further notice | |
495 | Tue 02/04/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jayesh Purushottam Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
217 of 2023
|
Postponed till further notice | |
496 | Tue 02/04/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Purushottam Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
218 of 2023
|
Postponed till further notice | |
497 | Tue 02/04/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Vallabhbhai Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vallabhbhai Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
219 of 2023
|
Postponed till further notice | |
498 | Tue 26/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for deferment of interest on security deposit to be paid to the consumers of the Petitioner.
209 of 2023
|
Postponed till further notice | |
499 | Tue 26/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shivam Oil Industries for non-compliance of CGRF order in complaint No: 79 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
210 of 2023
|
Postponed till further notice | |
500 | Tue 26/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
|
Rescheduled on Tuesday 23/January/2024 10:30 AM | |
501 | Tue 26/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 04.07.2023, seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change In Law event.
215 of 2023
|
Postponed till further notice | |
502 | Tue 26/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as
Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the
Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise
commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
|
Rescheduled on Fri 12/January/2024 10:30 AM | |
503 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. ICC Realty India Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
206 of 2023
|
Completed | |
504 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Eon Hinjewadi Infrastructure Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
207 of 2023
|
Completed | |
505 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Panchshil Infrastructure Holdings Pvt Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
208 of 2023
|
Completed | |
506 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Panchshil Corporate Park Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
211 of 2023
|
Completed | |
507 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
|
Completed | |
508 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
|
Completed | |
509 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sunil Shantilal Agrawal for non-compliance of CGRF Order in complaint No: 20 of 2021 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
193 of 2023
|
Completed | |
510 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Gimatex Industries Pvt Ltd., & Ors. for early hearing in Case No. 242/MP/2023.
Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
IA. No. 18 of 2024 in Case No. 242 of 2023
|
Completed | |
511 | Fri 22/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of The Tata Power Company Limited – Generation for Urgent Hearing in Case No. 41/MP/2024. (Petition of The Tata Power Company Limited – Generation under Section 11 of the EA, 2003 read with Section 86(1)(h) and 86(1)(k) of the EA, 2003 along with Regulation 101 and 102 of the MERC (State Grid Code) Regulations 2020 including amendments thereto and all enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission, thereby seeking this Hon’ble Commission to consider relaxation/ amendment/ modification in MERC (State Grid Code) Regulations 2020 for enabling
IA. No. 19 of 2024 in Case No. 41 of 2024
|
Completed | |
512 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Mayur Naik against Unethical Billing Recovery and ASD Billed Amount for Consumer No – 160250946560 (BU 4637).
201 of 2023
|
Completed | |
513 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Urjankur Shree Datta Power Company Limited under Section 86 (1)(f) of the Electricity Act 2003 read with Regulations 14 and 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 having been aggrieved by the high handed and unilateral actions on part of the Respondent No.1, MSEDCL, in arbitrarily reducing the tenure of the Energy Purchase Agreement dated 21.06.2013 (hereinafter referred to as the EPA) and for seeking issuance of appropriate directions to the Respondent No.1 to abide by the provisions of the EPA in letter and spirit. A copy of the EPA dated 21.06.2013.
202 of 2023
|
Completed | |
514 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kumar Plasto Pack Industries for non-compliance of CGRF Kalyan Order dated 31/01/2022 in Case No. K/E/1813/2254 of 2021-22.
203 of 2023
|
Withdrawn | |
515 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Dinesh Manohar Sharma for Non-compliance of CGRF order in complaint No:19 OF 2021passed by CGRF, MSEDCL, Nashik Zone, Nashik.
204 of 2023
|
Completed | |
516 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the
Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c),
86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed
thereunder, seeking appropriate relief against Maharashtra State Electricity
Distribution Company Limited.
194 of 2023
|
Completed | |
517 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
|
Completed | |
518 | Tue 19/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of EON Kharadi Infrastructure Private Limited (EON SEZ Phase I) and EON Kharadi Infrastructure Private Limited (EON SEZ Phase II) for early hearing in Case No. 38/MP/2024.
(Petition of EON Kharadi Infrastructure Private Limited (EON SEZ Phase I) and EON Kharadi Infrastructure Private Limited (EON SEZ Phase II) for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase and for procuring Round the Clock (RTC) Renewable Energy (RE) power on long-term basis for the period from FY 2025-26 to FY 2045-46.)
IA. No. 17 of 2024 in Case No. 38 of 2024
|
Completed | |
519 | Fri 15/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed thereunder, seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
194 of 2023
|
Rescheduled on Tuesday 19/March/2024 10:30 AM | |
520 | Fri 15/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
|
Rescheduled on Tuesday 19/March/2024 10:30 AM | |
521 | Fri 15/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
|
Rescheduled on Friday 22/March/2024 10:30 AM | |
522 | Fri 15/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
|
Rescheduled on Friday 22/March/2024 10:30 AM | |
523 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Vivek Laxman Pawar (Marathi Asmita samajik Sanstha) against MSEDCL seeking compliance of the CGRF, Bhandup Orders dated 28/06/2023.
191 of 2023
|
Completed | |
524 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) against MSEDCL seeking compliance of the CGRF, Bhandup Orders in Case No. 42 dated 28/06/2021.
And
Interlocutory Application of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) for urgent hearing in Case No. 192/MP/2023.
192 of 2023 & I.A. No. 64 of 2023
|
Completed | |
525 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sunil Shantilal Agrawal for non-compliance of CGRF Order in complaint No: 20 of 2021 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
193 of 2023
|
Completed | |
526 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of The Tata Power Company Limited (Distribution) for Urgent Listing and Hearing in Case No. 27/AP/2024.
(Petition of The Tata Power Company Limited (Distribution) under Section 86 (1)(b) read with and Regulation 39 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for Short Term Power Purchase for Tata Power -D for April 2024 to June 2024.)
AI. No. 10 of 2024 in Case No. 27 of 2024
|
Completed | |
527 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Shah Promoters and Developers (SPD) for Urgent Listing in Case No. 37/AD/2024.
(Petition of Shah Promoters and Developers (SPD) under Section 86 read with Section 94 read with Section 142 of the Electricity Act, 2003 read with Regulation 96 of The MERC (Conduct of Business) Regulations, 2004 against non-compliance of the Order dated February 13, 2023 of the Hon’ble Commission in Case No. 196 of 2022 by MSEDCL read with the relevant provisions of Electricity Act, 2003.)
IA. No. 14 of 2024 in Case No. 37 of 2024
|
Completed | |
528 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Jubilant Ingrevia Limited for Urgent Listing and Hearing in Case No. 29/AD/2024.
Petition of Jubilant Ingrevia Limited under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited.
IA. No. 15 of 2024 in Case No. 29 of 2024
|
Completed | |
529 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Saarloha Advanced Materials Private Limited & Renew Bhanu Shakti Pvt. Ltd. for Urgent Listing and Hearing in Case No. 30/AD/2024.
(Petition of M/s. Saarloha Advanced Materials Private Limited & Renew Bhanu Shakti Pvt. Ltd. under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) by MSEDCL).
IA. No. 16 of 2024 in Case No. 30 of 2024
|
Completed | |
530 | Tue 12/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due
to the increase in Goods and Service Tax rates on Renewable Energy Devices
and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
|
Completed | |
531 | Tue 05/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
176 of 2023
|
Rescheduled till further notice | |
532 | Tue 05/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Schreiber Dynamics Dairies Pvt. Ltd. for not allowing Power Factor Incentive on Open Access charges by the Respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under Section 142, 146 & 149 of Electricity Act, 2003.
178 of 2023
|
Rescheduled till further notice | |
533 | Tue 05/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Harshad Sheth seeking for an appropriate orders and directions regarding validity of T.O. Circular No. C.E. (Dist.)/D-III/NSC/30011 dated 20 December 2018 issued by MSEDCL and subsequent modifications made thereto.
182 of 2023
|
Rescheduled till further notice | |
534 | Tue 05/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
|
Rescheduled till further notice | |
535 | Mon 04/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking approval for deviation in standard bidding document for long term procurement of solar power and for meeting the solar renewable purchase obligations under section 19 of MERC (Renewable Purchase Obligation, its compliance and implementation of renewable energy certificate framework) Regulations, 2019 and to supply day time power to the farmers of the state of Maharashtra under the Mukhyamantri Saur Krushi Vahini yojana 2.0 through competitive bidding process.
28 of 2024
|
Completed | |
536 | Mon 04/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 7783 MW through competitive bidding under the Mukhyamantri Saur Krushi Vahini Yojana 2.0 Scheme launched for implementation of feeder level solarisation under component C of PM-Kusum scheme connected to the distribution network under Section 63 read with Section 86 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
32 of 2024
|
Completed | |
537 | Mon 04/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking urgent hearing in Case No. 28/MP/2024 (Petition of MSEDCL for seeking approval for deviation in standard bidding document for long term procurement of solar power and for meeting the solar RPO under section 19 of MERC (Renewable Purchase Obligation, its compliance and implementation of renewable energy certificate framework) Regulations, 2019 and to supply day time power to the farmers of the state of Maharashtra under the Mukhyamantri Saur Krushi Vahini yojana 2.0 through
IA. No. 11 of 2024 in Case No. 28 of 2024
|
Completed | |
538 | Mon 04/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) f or seeking urgent hearing in Case No. 32/AP/2024. (Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 7783 MW through competitive bidding under the Mukhyamantri Saur Krushi Vahini Yojana 2.0 Scheme launched for implementation of feeder level solarisation under component C of PM-Kusum scheme connected to the
distribution network under Section 63 read with Section 86 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
IA. No. 12 of 2024 in Case No. 32 of 2024
|
Completed | |
539 | Fri 01/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL)
seeking special allowance as additional O&M expense for its thermal power plant
at Bhusaval, Chandrapur, Khaperkheda and Nashik.
167 of 2023
|
Rescheduled till further notice | |
540 | Fri 01/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) under Section 86 (1) (b) of the Electricity Act, 2003 for approval of combined short term wind power procurement for the period 01.08.2023 to 31.07.2024.
168 of 2023
|
Rescheduled till further notice | |
541 | Fri 01/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
|
Rescheduled till further notice | |
542 | Fri 01/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
|
Rescheduled till further notice | |
543 | Fri 01/03/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
|
Rescheduled till further notice | |
544 | Tue 27/02/2024 11:00:00 AM |
e-Public Hearing
Hearing on Suo-Motu draft Order on Renewable Energy Tariff for FY 2024-25
3 of 2024
|
Completed | |
545 | Tue 27/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
|
Rescheduled on Tuesday 20/February/2024 10:30 AM | |
546 | Tue 27/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
|
Rescheduled on Tuesday 20/February/2024 10:30 AM | |
547 | Tue 27/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra.
And
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023.
And
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
And
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
|
Rescheduled on Tuesday 20/February/2024 10:30 AM | |
548 | Tue 27/02/2024 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited- Distribution's Tariff Petition for Truing up of FY 2022-23, Provisional Truing up for FY 2023-24 and approval of Revised ARR and Tariff for FY 2024-25 [Case No. 237 of 2023]
237 of 2023
|
Completed | |
549 | Tue 27/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking guidance and directions for further course of action to be taken for procurement of solar power under the Mukhyamantri Saur Krushi Vahini Yojana 2.0.
20 of 2024
|
Completed | |
550 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. for Non-compliance of CGRF Nashik Order dated 15 February 2019 in Case No. 58/2018-19 by MSEDCL.
127 of 2023
|
Completed | |
551 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 57/2018 by MSEDCL.
128 of 2023
|
Completed | |
552 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 63/2018-19 by MSEDCL.
129 of 2023
|
Completed | |
553 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 67/2018-19 by MSEDCL.
130 of 2023
|
Completed | |
554 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February2019 in Case No. 71/2018-19 by MSEDCL.
133 of 2023
|
Completed | |
555 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 72/2018-19 by MSEDCL.
134 of 2023
|
Completed | |
556 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 73/2018-19 by MSEDCL.
135 of 2023
|
Completed | |
557 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 74/2018-19 by MSEDCL.
136 of 2023
|
Completed | |
558 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
|
Completed | |
559 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
|
Completed | |
560 | Fri 23/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking guidance and directions for further course of action to be taken for procurement of solar power under the Mukhyamantri Saur Krushi Vahini Yojana 2.0.
20 of 2024
|
Completed | |
561 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners.
And
Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
562 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners.
And
Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
563 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
564 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ajay Mansukhlal Shah against MSEDCL seeking compliance of Order passed by The Electricity Ombudsman dated 06 January 2023.
158 of 2023
|
Completed | |
565 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
|
Completed | |
566 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
|
Completed | |
567 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra.
And
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023.
And
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
And
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
|
Completed | |
568 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited in relation thereto.
11 of 2024
|
Completed | |
569 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
|
Completed | |
570 | Tue 20/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Ultratech Cement Limited for Urgent Listing in Case No. 19/AD/2024. (Petition of Ultratech Cement Limited under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) by Maharashtra State Electricity Distribution Company Limited.)
IA No. 8 of 2024 in Case No. 19 of 2024
|
Completed | |
571 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 27 October 2022.
62 of 2023
|
Completed | |
572 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Executive Engineer, Maharashtra State Road Development Corporation (MSRDC) through user M/s. Regent Bhairavi Corporation seeking compliance of the Order dated 24 August 2022 passed by CGRF, Kalyan zone in Case No. K/E/048 of 2022-23.
64 of 2023
|
Completed | |
573 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. seeking compliance of CGRF, Vasai Order dated 24 February, 2023.
169 of 2023
|
Completed | |
574 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
|
Completed | |
575 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement
dated 5th January, 2024.
IN
Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
|
Completed | |
576 | Fri 16/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution
Company Ltd. (MSEDCL) for Urgent Listing in Case No. 20/MP/2024.
IA No. 09 of 2024 in Case No 20 of 2024
|
Completed | |
577 | Tue 13/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Pvt. Ltd. under Section 86(1) (b) read with Section 86(1) (f) and other applicable provisions of the Electricity Act, 2003 and under various power purchase agreements seeking compensation on account of occurrence of Change in Law event.
73 of 2023
|
Completed | |
578 | Tue 13/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SJVN Ltd. under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
|
Completed | |
579 | Tue 13/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking in-Principle Declaration of issuance of
Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 22 July, 2022 which was signed on 3 August, 2022.
75 of 2023
|
Completed | |
580 | Tue 13/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31 March 2023 in Case No. 226 of 2022 in the matter of final true-up of aggregate revenue requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional true up of ARR of FY 2022-23 and revised tariff and projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
|
Completed | |
581 | Tue 13/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company
Limited (MSPGCL) seeking urgent hearing of Case No. 14/MP/2024. (Petition
of MSPGCL seeking approval of M/s. Ideal Energy Projects Limited as
successful single bidder and allow MSPGCL to enter into Power Purchase
Agreement and Tri-Partite agreement pursuant to Case IV, Phase 4 bidding
undertaken by MSPGCL as per Case IV Guidelines issued by Ministry of
Power, Government of India.)
IA No 07 of 2024 in Case No 14 of 2024
|
Completed | |
582 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra Border Check Post Network Limited seeking applicability of appropriate tariff to the Border Check Post Nakas and seeking recovery of differential amount.
32 of 2023
|
Completed | |
583 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Adani Electricity Mumbai Limited- Distribution (AEML-D) under Section 86 of the Electricity Act, 2003 in compliance of the directions in Order dated 28 October 2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project on account of occurrence of Force Majeure Events.
33 of 2023
|
Completed | |
584 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
|
Completed | |
585 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the
Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
|
Completed | |
586 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
|
Rescheduled on Tuesday 06/February/2024 10:30 AM | |
587 | Fri 09/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
|
Rescheduled on Tuesday 06/February/2024 10:30 AM | |
588 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. Seeking clarification/modification/removal of difficulties/issuance of Practice Directions under MERC Supply Code Regulations, 2021.
11 of 2023
|
Completed | |
589 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Morries Energy Ltd. regarding non-adjustment of Open Access units for September 2021.
12 of 2023
|
Completed | |
590 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jalna Siddhivinayak Alloys Pvt. Ltd. seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as per the Commission’s Clarificatory Order dated 30 April, 2020.
4 of 2023
|
Completed | |
591 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
|
Completed | |
592 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
|
Completed | |
593 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Shah Promoters and Developers (SPD) for urgent listing in Case No. 194/AD/2023 (Petition of Shah Promoters and Developers (SPD) seeking appropriate relief against MSEDCL).
I.A. 4 of 2024 in Case No. 194 of 2023
|
Completed | |
594 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. for Urgent Listing in Case No. 11/AD/2024. (Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. seeking compliance of Order dated 27.12.2023 passed by Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the EA, 2003 against MSEDCL in relation thereto.)
I.A. 5 of 2024 in Case No. 11 of 2024
|
Completed | |
595 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
|
Completed | |
596 | Tue 06/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
|
Completed | |
597 | Fri 02/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants.
And
Application of Captive Power Producers Association seeking Impleadment as a party/Respondent.
And
Applications of Respondents for striking off their names from the list of Respondents.
And
Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
|
Rescheduled till further notice | |
598 | Fri 02/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the
switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal
and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of
2014 and 40 of 2015 read with the Supply Code and Standard of Performance
Regulations
82 of 2021
|
Completed | |
599 | Fri 02/02/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against
Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12
June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015,
while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Completed | |
600 | Tue 30/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking inter alia quashing of the Notice dated 05 January 2023 issued by MSEDCL to Petitioner for alleged contravention of PPA dated 20 August 2014.
And
Interlocutory Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
And
Interlocutory Application pof M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13, 14 of 2023
|
Completed | |
601 | Tue 30/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated 29.06.2022 executed between Maharashtra State Electricity Distribution Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022.
122 of 2023
|
Completed | |
602 | Tue 30/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with Section 40, 43 and 46 of the EA 2003 and directions pertaining to the applicable wheeling charges as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No. 322 of 2019.
54 of 2023
|
Completed | |
603 | Tue 30/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2024 to 31 January 2025.
213 of 2023
|
Completed | |
604 | Tue 30/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
|
Completed | |
605 | Tue 30/01/2024 10:30:00 AM |
e-Public Hearing
Suggestions/ Objections on Mira-Bhaindar Municipal Corporation's Petition for determination of Project Specific Tariff for supply of electricity generated from waste-to-energy project of cumulative capacity 575 kVA (3 x 125 kVA and 4 x 50 kVA) located in the area of Mira Bhaindar Municipal Corporation.
28 of 2023
|
Completed | |
606 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
|
Postponed till further notice | |
607 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
|
Postponed till further notice | |
608 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
|
Postponed till further notice | |
609 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
|
Postponed till further notice | |
610 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
|
Postponed till further notice | |
611 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
|
Postponed till further notice | |
612 | Tue 23/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
|
Postponed till further notice | |
613 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2021- 22 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17.
And
Interlocutory Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as Shri Tradco India Pvt. Ltd. Vs. MSEDCL.
19 of 2023 & I.A. No. 40 of 2023
|
Completed | |
614 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2020-21 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17 and FY 2017-18.
And
Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
And
Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
|
Completed | |
615 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
80 of 2023
|
Completed | |
616 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tejas Sizers for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2017-18 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
81 of 2023
|
Completed | |
617 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
88 of 2023
|
Completed | |
618 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
89 of 2023
|
Completed | |
619 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s B.S.Channabasappa & Sons and Others for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
90 of 2023
|
Completed | |
620 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Verroc Engineering Ltd. for payment for purchase of surplus units / over-injected units with 15 % interest per annum for the period from July 2014 to June 2016 under the applicable MERC Distribution Open Access Regulations.
144 of 2023
|
Completed | |
621 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -Distribution under Section 63 of the Electricity Act, 2003 seeking adoption of tariff discovered for procurement of 225 MW grid connected Wind- Solar Hybrid capacity on long term basis plus additional 150 MW under Greenshoe Option through Competitive Bidding Process (Followed by E-Reverse Auction) to meet the future demand and Renewable Purchase Obligation as per Regulation 7 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff), 2019.
195 of 2023
|
Completed | |
622 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for
Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse
Based Co-Generation Projects.
Case No. 70 of 2021 And
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and
Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in
Case No 70 of 2021
MA No. 23 of 2021 in Case No. 70 of 2021 And
Application of Cogeneration Association of India (CAI) seeking Impleadment of
the Applicant as a Party Respondent in Case No 70 of 2021
IA No. 36 of 2021 in Case No. 70 of 2021 And
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended
Petition in Case No. 70 of 2021.
IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
|
Completed | |
623 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled till further notice | |
624 | Fri 19/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra Industrial Township Limited (MITL)
Erstwhile Aurangabad Industrial Township Limited (AITL) seeking urgent
listing and hearing in Case No. 214/AP/2023.
IA No. 3 of 2024 in Case No. 214 of 2023
|
Completed | |
625 | Tue 16/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
|
Rescheduled on Tue 30/January/2024 10:30 AM | |
626 | Tue 16/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for
Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse
Based Co-Generation Projects.
Case No. 70 of 2021 and
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and
Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in
Case No 70 of 2021. and
MA No. 23 of 2021 in Case No. 70 of 2021
Application of Cogeneration Association of India (CAI) seeking Impleadment of
the Applicant as a Party Respondent in Case No 70 of 2021.
IA No. 36 of 2021 in Case No. 70 of 2021 and
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended
Petition in Case No. 70 of 2021.
IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
|
Rescheduled on Fri 19/January/2024 10:30 AM | |
627 | Tue 16/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
And
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled on Fri 19/January/2024 10:30 AM | |
628 | Tue 16/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
|
Rescheduled on Tue 23/January/2024 10:30 AM | |
629 | Tue 16/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
|
Rescheduled on Tue 23/January/2024 10:30 AM | |
630 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
|
Completed | |
631 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the
switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Completed | |
632 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Completed | |
633 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017 And
Case No. 173 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement
dated 22.09.2022.
IN
Appeal No. 46 of 2019 directions to the Commission therein.)
173 of 2017 (Re-opened Case)
|
Completed | |
634 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
|
Completed | |
635 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Completed | |
636 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Protostar Technologies Private Limited under Section 86(1)(e) and Regulation 16 and Regulation 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 to allow facility of Group Net Metering for multiple electricity service connections of different Consumers within the same premises having single building or buildings with same tariff category.
226 of 2023
|
Completed | |
637 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
|
Completed | |
638 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of
Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021-
22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and
Tariff for FY 2023-24 and FY 2024-25.
Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement
dated 5
th January, 2024.
IN
Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
|
Completed | |
639 | Fri 12/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for Urgent Listing in Case No. 4/AP/2024.
IA. No. 2 of 2024 in Case No. 4 of 2024
|
Completed | |
640 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
|
Withdrawn | |
641 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
|
Completed | |
642 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
|
Completed | |
643 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
|
Completed | |
644 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited (MSPGCL) seeking approval for adoption of Tariff of Rs 2.97/kWh and deviations from competitive bidding guidelines under ‘Mukhyamantri Saur Krishi Vaahini Yojana’.
120 of 2023
|
Completed | |
645 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
|
Completed | |
646 | Tue 09/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
|
Completed | |
647 | Fri 05/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
|
Rescheduled on Tuesday 09/January/2024 10:30 AM | |
648 | Fri 05/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
|
Rescheduled on Tuesday 09/January/2024 10:30 AM | |
649 | Fri 05/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
|
Rescheduled on Tuesday 09/January/2024 10:30 AM | |
650 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
|
Completed | |
651 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
|
Completed | |
652 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
|
Completed | |
653 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
|
Completed | |
654 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
|
Completed | |
655 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
|
Completed | |
656 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
|
Completed | |
657 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
|
Completed | |
658 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
227 of 2023
|
Completed | |
659 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for Impleadment of Respondent in Diary No. 309 of 2023 and Diary No. 315 of 2023 in the matter of the Petition filed for obtaining the Hon'ble Commission’s approval for consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
228 of 2023
|
Completed | |
660 | Tue 02/01/2024 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (Formerly
known as Kharghar Vikhroli Transmission Private Limited) seeking urgent
listing of the Case No. 205/AD/2023.
IA No 73 of 2023 in Case No. 205 of 2023
|
Completed | |
661 | Fri 22/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
|
Rescheduled on Tuesday 09/January/2024 10:30 AM | |
662 | Fri 22/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
|
Rescheduled on Friday 12/January/2024 10:30 AM | |
663 | Fri 22/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
|
Rescheduled on Tuesday 16/January/2024 10:30 AM | |
664 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
|
Completed | |
665 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
|
Rescheduled on Friday 03/November/2023 10:30 AM | |
666 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
|
Rescheduled on Friday 03/November/2023 10:30 AM | |
667 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
|
Completed | |
668 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
|
Completed | |
669 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
|
Completed | |
670 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
|
Completed | |
671 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Laxmipati Balaji Supply Chain Management
Limited seeking early hearing of the Diary No. 309/2023.
Diary No. 315 of 2023
|
Completed | |
672 | Tue 19/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Protostar Technologies Private Limited seeking
urgent and early hearing of the Case No. 226/MP/2023.
IA No. 71 of 2023 in Case No. 226 of 2023
|
Completed | |
673 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
|
Postponed till further notice | |
674 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
|
Postponed till further notice | |
675 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
|
Postponed till further notice | |
676 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
|
Postponed till further notice | |
677 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
|
Rescheduled on Friday 05/January/2024 10:30 AM | |
678 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
|
Rescheduled on Friday 05/January/2024 10:30 AM | |
679 | Fri 15/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
|
Rescheduled on Friday 05/January/2024 10:30 AM | |
680 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
|
Completed | |
681 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
|
Completed | |
682 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
|
Completed | |
683 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
|
Completed | |
684 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
|
Completed | |
685 | Tue 12/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
|
Completed | |
686 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
|
Completed | |
687 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
|
Completed | |
688 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
|
Completed | |
689 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
|
Completed | |
690 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
|
Completed | |
691 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
|
Rescheduled on Tuesday 02/January/2024 10:30 AM | |
692 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
|
Rescheduled on Tuesday 02/January/2024 10:30 AM | |
693 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
|
Rescheduled on Tuesday 02/January/2024 10:30 AM | |
694 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
|
Rescheduled on Tuesday 02/January/2024 10:30 AM | |
695 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
|
Rescheduled on Tuesday 02/January/2024 10:30 AM | |
696 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) and Section 86 (1) (f) read with Section 142 of Electricity Act, 2003 for non-compliance and willful defiance of the order dated 15.03.2023 passed by this Hon’ble Commission in case no. 240 of 2022 by the Tata Power Co Ltd- G.
189 of 2023
|
Completed | |
697 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
And
Interlocutory Application of M/s FPEL MH 1 Private Limited seeking urgent listing of the Petition (Diary No. 300 of 2023) and interim directions on behalf of M/s FPEL MH 1 Private Limited.
225 of 2023 & I.A. No. 70 of 2023
|
Completed | |
698 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 122/MP/2023.
I.A. No. 68 of 2023 in Case No. 122 of 2023
|
Completed | |
699 | Fri 08/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited for urgent listing in Case No. 166/AD/2023.
I. A. No. 69 of 2023 in Case No. 166 of 2023
|
Completed | |
700 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
701 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
702 | Tue 05/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
703 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
704 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
705 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
706 | Fri 01/12/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
707 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in 84 of 2022
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
708 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
709 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
153 of 2023
|
Rescheduled on Tue 29/August/2023 10:30 AM | |
710 | Tue 28/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
|
Rescheduled on Friday 15/December/2023 10:30 AM | |
711 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
|
Rescheduled on Friday 29/September/2023 10:30 AM | |
712 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
|
Rescheduled on Tuesday 12/December/2023 10:30 AM | |
713 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
|
Rescheduled on Tuesday 12/December/2023 10:30 AM | |
714 | Fri 24/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited.
151 of 2023
|
Rescheduled on Tuesday 17/October/2023 10:30 AM | |
715 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
|
Rescheduled on Tuesday 12/December/2023 10:30 AM | |
716 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
|
Rescheduled on Tuesday 12/December/2023 10:30 AM | |
717 | Tue 21/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
|
Rescheduled on Tuesday 12/December/2023 10:30 AM | |
718 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
|
Rescheduled on Friday 22/December/2023 10:30 AM | |
719 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
|
Rescheduled on Friday 22/December/2023 10:30 AM | |
720 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
721 | Fri 17/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
|
Rescheduled on Friday 22/December/2023 10:30 AM | |
722 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
723 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
724 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
725 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
726 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
|
Completed | |
727 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
|
Completed | |
728 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
|
Completed | |
729 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
|
Completed | |
730 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
731 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
732 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
733 | Fri 10/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
|
Rescheduled on Tuesday 19/December/2023 10:30 AM | |
734 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
735 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
736 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
737 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
|
Rescheduled on Friday 20/October/2023 10:30 AM | |
738 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
|
Completed | |
739 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
|
Completed | |
740 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
|
Completed | |
741 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
|
Completed | |
742 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
|
Completed | |
743 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114/MP/2023. (Petition of MSEDCL for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.)
I.A. No. 61 of 2023 in 114 of 2023
|
Completed | |
744 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
I.A. No. 66 of 2023 in 114 of 2023
|
Completed | |
745 | Tue 07/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
I.A. No. 67 of 2023 in 114 of 2023
|
Completed | |
746 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 76.55 MW wind power from the wind Generators whose EPAs with MSEDCL have expired.
119 of 2023
|
Completed | |
747 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited for seeking approval for adoption of tariff rate of Rs 2.97/KWH under ‘Mukhyamantri Saur Krishi Vaahini Yojana’ to meet MSEDCL's Solar Renewable Purchase Obligations under Section 63 of Electricity Act, 2003 and for seeking approval to the Deviations Sought in the Draft PSA & PPA with respect to the Standard Bidding Guidelines, issued by MNRE/MoP, for Procurement of Power through Competitive Bidding Process as per directions in MERC Order dated 19.10.2018 in Case No. 172 of 2017.
120 of 2023
|
Completed | |
748 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 Review of Commission Order dated 15th February, 2023 in Case 116 of 2022.
123 of 2023
|
Completed | |
749 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bhimashankar Sahakari Sakhar Karkhana Limited requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 8.02 of the Energy Purchase Agreement dated 21.06.2004 and subsequent amendment EPA dated 12.12.2012 entered between the Petitioner and the Respondent.
124 of 2023
|
Completed | |
750 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
|
Completed | |
751 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
|
Completed | |
752 | Fri 03/11/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (BEST) for urgent Listing in Case No. 189/AD/2023.
I.A. No. 65 of 2023 in Case No. 189 of 2023
|
Completed | |
753 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for Regulatory Framework for sharing of Expenses Amongst all Discoms in the State in respect of procurement of Power from waste to Energy Projects, bagasse, biomass and small/mini/micro Hydro Projects as per directives of Hon’ble Commission vide Order dated 22.03.2021 in Case No. 162 of 2019 and Order dated 26.03.2021 in Case No. 208 of 2020.
115 of 2023
|
Completed | |
754 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15.3 of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner’s assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Hedge Banks) in respect of the Petitioner’s Transmission Project.
116 of 2023
|
Completed | |
755 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Haldirams Food International Pvt Ltd. under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of distribution licensees including power quality) Regulations, 2021 challenging the “debit bill adjustment” amounting to Rs. 2,79,19,643.09 included by MSEDCL in the petitioner’s monthly energy bill dated 07.01.2023 and under Section 142, 146 and 149 of the EA, 2003 against MSEDCL seeking initaition of appropriate proceedings for violation of provisions of Regulations framed by this Hon’ble Commission including but not limited to violation of provisions of EA, 2003 and petition in the matter of MSEDCL’s commercial circular bearing no. 266 dated 30.07.2016 read with MSEDCL’s commercial circular bearing no. 289 dated 06.06.2017 adopting the government of Maharashtra resolution bearing no. 238/urja/-5 dated 29.06.2016 alongwith the modified government of Maharashtra resolution bearing no. 238/urja/-5 dated 24.03.2017 and thereby providing incentives to Marathwada, north Maharashtra and d & d+ areas and providing the applicable incentive to the petitioner for the period september-2019 to march-2022
117 of 2023
|
Completed | |
756 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Niwas Spinning Mills Ltd. regarding Revision in contract demand.
118 of 2023
|
Completed | |
757 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
|
Completed | |
758 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
|
Completed | |
759 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
|
Completed | |
760 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
|
Completed | |
761 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
|
Completed | |
762 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
|
Completed | |
763 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
|
Completed | |
764 | Tue 31/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
|
Completed | |
765 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
|
Postponed till further notice | |
766 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
|
Postponed till further notice | |
767 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
|
Postponed till further notice | |
768 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
|
Postponed till further notice | |
769 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
|
Postponed till further notice | |
770 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
|
Postponed till further notice | |
771 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
|
Postponed till further notice | |
772 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
|
Postponed till further notice | |
773 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
|
Postponed till further notice | |
774 | Fri 27/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
|
Postponed till further notice | |
775 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
|
Rescheduled on Friday 11/August/2023 10:30 AM | |
776 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
|
Rescheduled on Tuesday 07/November/2023 10:30 AM | |
777 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nitin Ramling Ghule for Non-Compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur, Nagpur in Case No. 50 of 2022.
103 of 2023
|
Completed | |
778 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
|
Rescheduled on Tuesday 07/November/2023 10:30 AM | |
779 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
|
Completed | |
780 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
|
Completed | |
781 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
|
Completed | |
782 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
|
Completed | |
783 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
|
Completed | |
784 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
|
Completed | |
785 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
|
Completed | |
786 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
|
Completed | |
787 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
|
Completed | |
788 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
|
Completed | |
789 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
|
Completed | |
790 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
|
Completed | |
791 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
|
Completed | |
792 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. Seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination.
56 of 2023
|
Completed | |
793 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirementsincluding calibration and testing thereof as stipulated by the Statutory Regulations.
And
Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No.
181/MP/2023
181 of 2023 & IA No. 51 of 2023
|
Completed | |
794 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
I.A. No. 63 of 2023 in 162 of 2023
|
Completed | |
795 | Fri 20/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
I.A. No. 62 of 2023 in 163 of 2023
|
Completed | |
796 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
|
Rescheduled on Tuesday 07/November/2023 10:30 AM | |
797 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
|
Rescheduled on Tuesday 07/November/2023 10:30 AM | |
798 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Rahul R. Maroti in the matter of non-compliance of CGRF Order in complaint No: 102 of 2022 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
85 of 2023
|
Completed | |
799 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
|
Rescheduled on Tuesday 07/November/2023 10:30 AM | |
800 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals against MSEDCL seeking compliance of the CGRF, Nagpur Order dated 23 November 2020.
15 of 2023
|
Completed | |
801 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 9 September 2022.
46 of 2023
|
Completed | |
802 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya, Station Road Ravi, Arvi, Wardha against MSEDCL seeking compliance of the CGRF, Nagpur’s Order dated 20 February, 2018 in complaint No: 114 of 2017.
48 of 2023
|
Completed | |
803 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aspa Bansons Auto Pvt Ltd. against MSEDCL seeking compliance of the CGRF, Akola’s Order dated 23 November 2022 in complaint No: 141 of 2022.
49 of 2023
|
Completed | |
804 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Completed | |
805 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 24 February 2023 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 108 of 2022.
169 of 2023
|
Completed | |
806 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sanfoods & Cold Storage Pvt Ltd. under Section 142 & 146 for Non-compliance Hon’ble Electricity Ombudsman (Mumbai) has issued order and instructed to charge the bill as Industrial tariff category only from 28/07/2020 till January 2021, by withdrawing interest and DPC levied, if any. In their order no 1/2023/793 dt. 09.03.2023.
170 of 2023
|
Completed | |
807 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Swastika Infra-Logic (India) Pvt. Ltd. for directing MSEDCL to Comply Hon. CGRF order in respect of consumer M/s. Swastika Infra-Logic (India) Pvt. Ltd. Consumer No. 128019008040 Under Jalgaon Circle, MSEDCL Jalgaon.
183 of 2023
|
Completed | |
808 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ms. Sujata Prasanna Soparkar against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 27 June 2022 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 42 of 2022 and Order dated 17 October 2022 passed by the Ld. Appellate Authority, Chembur in Appeal No. 4 of 2019.
185 of 2023
|
Completed | |
809 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. The Grand Jalsa for non-compliance of Order passed by Hon’ble Electricity Ombudsman, MSEDCL, Akola Zone, Akola in Case No. 04 of 2023.
188 of 2023
|
Completed | |
810 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
|
Completed | |
811 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of CGRF Amaravati Order dated 27 May, 2022.
223 of 2022
|
Completed | |
812 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Mahagaon Yawatmal Highways Private Limited seeking compliance of CGRF Amaravati Order dated 27 May, 2022 and Order dated 18 August, 2022.
243 of 2022
|
Completed | |
813 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited.
And
Interlocutory Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
151 of 2023 & I.A. No. 45 of 2023
|
Completed | |
814 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Infosys Limited (SEZ) under Section 86(1)(c) of the Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on M/s. Infosys Ltd. (SEZ).
And
Interlocutory Application of M/s Infosys Ltd. (SEZ) seeking urgent listing of Petition and interim directions in Case No. 177/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
177 of 2023 & I.A. No. 55 of 2023
|
Completed | |
815 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on Ultra Tech Cement Ltd.
And
Interlocutory Application of Ultra Tech Cement Ltd. and ReNew Surya Spark Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 186 of 2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
186 of 2023 & I.A. No. 58 of 2023
|
Completed | |
816 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and wheeling losses by Maharashtra State Electricity Distribution Company Ltd. on M/s Saarloha Advanced Materials Pvt. Ltd.
And
Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. and Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 187/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
187 of 2023 & I.A. No. 57 of 2023
|
Completed | |
817 | Tue 17/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & M/s Huoban Energy 1
Private Limited under Section 86(1)(c) of the Electricity Act, 2003 read with
Regulation 32 of MERC (Distribution Open Access) Regulations 2016
challenging the levy of wheeling charges and wheeling losses by Maharashtra
State Electricity Distribution Company Ltd on M/s Saarloha Advanced Materials
Pvt. Ltd.
196 of 2023
|
Completed | |
818 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
And
Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
819 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
And
Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
And
Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
820 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
821 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
822 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa& Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
823 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
824 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
825 | Fri 13/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
|
Rescheduled on Tuesday 31/October/2023 10:30 AM | |
826 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Navi Mumbai Cold Storage Owners Welfare Association seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
98 of 2023
|
Completed | |
827 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maha Coldstorage Association C/o Ecofresh Cold Storage & Warehousing Pvt Ltd. seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
99 of 2023
|
Completed | |
828 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31st March 2023 in Case No. 226 of 2022 in the matter of final True-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional True Up of ARR of FY 2022-23 and Revised Tarff and Projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
|
Completed | |
829 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Association of Plant Tissue Culture Industries for proper Tariff Categorization of the Plant Tissue Culture Units, which are the integral part of the Agriculture Category alike Nursery and Horticulture (in LT/HT Agricultural Category). In order to stop improper LT-IV C and HTV B Tariff Application, and with reference to the Hon’ble Commission latest concerned Orders in Case No. 226 of 2022.
121 of 2023
|
Completed | |
830 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Ltd. seeking Review of Order dated 31st March 2023 in Case No. 227 of 2022 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional truing-up of ARR of FY 2022-23 and revised tariff for FY 2023-24 and FY 2024-25 and provisional tariff for Bhusawal Unit No. 6
132 of 2023
|
Completed | |
831 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section
94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking review
of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY
2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and
Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for
Generation Business of Tata Power.
93 of 2023
|
Completed | |
832 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of
the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of
Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY
2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of
ARR for FY 2023-24 and FY 2024-25.
94 of 2023
|
Completed | |
833 | Tue 10/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
|
Completed | |
834 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order in Case No. 239 of 2022 dated 31st March, 2023 for Truing-up of Intra-State Transmission System Tariff (InSTS) for FY 2020-21 and FY 2021-22 and determination of revised InSTS Tariff for FY 2023-24 and FY 2024-25.
95 of 2023
|
Completed | |
835 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Jaigad Powertransco Limited (JPTL) seeking review of the Order in Case No. 213 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
96 of 2023
|
Completed | |
836 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Adani Transmission (India) Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 238 of 2022.
100 of 2023
|
Completed | |
837 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 and Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 237 of 2022.
101 of 2023
|
Completed | |
838 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. in respect of Order dated 31st March, 2023 notified by Hon’ble Commission in Case No. 232 of 2022 in the matter of Petition of MSETCL for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20 to FY 2021-22, Provisional Truing-up of Aggregate Revenue Requirement for FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25.
137 of 2023
|
Completed | |
839 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35.
and
Application of The Tata Power Company Limited (Distribution) seeking urgent listing.
39 of 2023 & I.A. No. 56 of 2023
|
Completed | |
840 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section
94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra
Electricity Regulatory Commission (Transaction of Business and Fees and
Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case
No. 225 of 2022.
76 of 2023
|
Completed | |
841 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under
Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC
(Transaction of Business and Fees and Charges) Regulations 2022 seeking review
of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY
2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and
Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for
Transmission Business of Tata Power.
91 of 2023
|
Completed | |
842 | Fri 06/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
I.A. No. 60 of 2023 in Case No. 190 of 2023
|
Completed | |
843 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
|
Rescheduled on Friday 06/October/2023 10:30 AM | |
844 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
|
Rescheduled on Friday 06/October/2023 10:30 AM | |
845 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
|
Rescheduled on Tuesday 10/October/2023 10:30 AM | |
846 | Tue 03/10/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
|
Rescheduled on Tuesday 10/October/2023 10:30 AM | |
847 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
|
Postponed till further notice | |
848 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
|
Postponed till further notice | |
849 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
|
Postponed till further notice | |
850 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
|
Postponed till further notice | |
851 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
And
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023.
148 of 2023 & I.A. No. 52 of 2023
|
Postponed till further notice | |
852 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
And
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
179 of 2023 & I.A. No. 53 of 2023
|
Postponed till further notice | |
853 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
And
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
180 of 2023 &I.A. No. 54 of 2023
|
Postponed till further notice | |
854 | Fri 29/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
|
Postponed till further notice | |
855 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanshtha Ltd. in the matter of (i) Breach of Distribution Open Access Regulations 2016. (ii) Breach of Practice Directions dated 8 March 2017. (iii) Excess levy and recovery of Wheeling Charges & Transmission Charges. (iv) Breach of A.T.E.’s order dated 06-10-2022 in Appeal No. 20 of 2019.
72 of 2023
|
Completed | |
856 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(b) read with Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 and under various Power Purchase Agreements, as enumerated below, seeking compensation on account of occurrence of Change in Law events.
73 of 2023
|
Completed | |
857 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SJVN LTD under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
|
Completed | |
858 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86 (1) (e) and Section 86 (1) (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 22.07.2022 (signed on 03.08.2022), seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change in Law event.
75 of 2023
|
Completed | |
859 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
|
Completed | |
860 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
|
Completed | |
861 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing and interim directions in Case No. 187/AD/2023.
I.A. No. 57 of 2023 in Case No. 187 of 2023
|
Completed | |
862 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. seeking urgent listing and interim directions in Case No. 186/AD/2023.
I.A. No. 58 of 2023 in Case No. 186 of 2023
|
Completed | |
863 | Tue 26/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing in Case No. 56/AD/2023.
I.A. No. 59 of 2023 in Case No. 56 of 2023
|
Completed | |
864 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Completed | |
865 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
|
Completed | |
866 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Regulation 20 of the MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
68 of 2023
|
Completed | |
867 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Vayunandana Power Limited requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 15.02 of the energy purchase agreement dated 22.09.2008 entered between the petitioner and the respondent.
69 of 2023
|
Completed | |
868 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Greta Energy Limited under regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
70 of 2023
|
Completed | |
869 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
71 of 2023
|
Completed | |
870 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Infosys Limited (SEZ) seeking interim directions and urgent listing in Case No. 177/AD/2023. (Petition of M/s. Infosys Limited (SEZ) challenging the levy of wheeling charges and losses by MSEDCL on M/s. Infosys Ltd. (SEZ).
I.A. No. 55 of 2023 in Case No. 177 of 2023
|
Completed | |
871 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing in Case No. 39/MP/2023. (Petition of TPC-D directions of the Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Commission seeking approval of the Power Procurement Plan of TPC-D for FY 2024-25 to FY 2034-35.)
I.A. No. 56 of 2023 in Case No. 39 of 2023
|
Completed | |
872 | Fri 22/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited for clarification of Order dated
27.05.2023 passed in Case No. 174 of 2022.
And
Interlocutory Application of Juniper Green Field Private Limited seeking urgent
listing of Case No. 175/MP/2023.
175 of 2023 & I.A. No. 50 of 2023
|
Completed | |
873 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
|
Postponed till further notice | |
874 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
|
Postponed till further notice | |
875 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
|
Postponed till further notice | |
876 | Fri 15/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
|
Postponed till further notice | |
877 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Hamid Stone Crusher for Non-compliance of CGRF order in complaint No: 39 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
50 of 2023
|
Completed | |
878 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Smt. Sheela Rajeshwar Niwal for Non-compliance of CGRF order in complaint No: 64/2022 passed by CGRF, MSEDCL, Amravati Zone, Amravati.
51 of 2023
|
Completed | |
879 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Manjusha Amit Mundada for Non-compliance of CGRF order in complaint No: 104 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
52 of 2023
|
Completed | |
880 | Tue 12/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rajaram Subarao Patil under Section 142 & 146 of the Electricity Act, 2003 seeking compliance of the order dated 02.05.2022 passed by CGRF, Kolhapur in Case No.10/2022, whereby MSEDCL was ordered to release the Electricity connection to the agriculture pump of the petitioner within 3 months from the date of CGRF Order and to compensate the petitioner with twice the amount paid by petitioner against service charge connection.
61 of 2023
|
Completed | |
881 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises for Non-compliance of CGRF order in complaint No: 71 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
46 of 2023
|
Completed | |
882 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Usha Packaging for non-compliance of CGRF order in complaint No: 121 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
47 of 2023
|
Completed | |
883 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya for non-compliance of CGRF order in complaint No: 114 of 2017 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
48 of 2023
|
Completed | |
884 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. ASPA BANSONS Auto Pvt Ltd. for non-compliance of CGRF order in complaint No: 141 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
49 of 2023
|
Completed | |
885 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirements including calibration and testing thereof as stipulated by the Statutory Regulations.
And
Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No. 181/MP/2023.
181 of 2023 & I.A No. 51 of 2023
|
Completed | |
886 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Juniper Green Field Private Limited seeking urgent listing of Case No. 175/MP/2023. (Petition filed by Juniper Green Field Private Limited for clarification of Order dated 27.05.2023 passed in Case No. 174 of 2022.)
I.A. No.50 of 2023 in Case No. 175 of 2023
|
Completed | |
887 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023. (Petition filed by MSPGCL seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.)
I.A. No. 52 of 2023 in Case No. 148 of 2023
|
Completed | |
888 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
(Petition filed by M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 53 of 2023 in Case No. 179 of 2023
|
Completed | |
889 | Fri 08/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
(Petition filed by M/s. SEZ Bio-Tech Services Private Limited. for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 54 of 2023 in Case No. 180 of 2023
|
Completed | |
890 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur Zone, Order in Case No 17/2020 dated 23.11.2020 related to the revision of energy bills according to contract demand 100 KVA instead of 155 KVA from February 2020.
15 of 2023
|
Completed | |
891 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - (Distribution Business) under Section 86, including Sections 86 (1) (b) & (e) of the Electricity Act, 2003 and in compliance of the directions issued by this Hon’ble Commission vide Order dated 28.10.2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project being developed by M/s Adani Hybrid Energy Power Jaisalmer Four Ltd., on account of occurrence of Force Majeure Events falling under Article 11 of Power Purchase Agreement dated 07.07.2020.
33 of 2023
|
Completed | |
892 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Green Energy Limited seeking Change in Law compensation in terms of the Power Purchase Agreements (“PPA”) dated 04.12.2020 executed between Tata Power Green Energy Limited (“TPGEL”) and The Tata Power Company Limited (“Tata Power”), on account of increase in costs due to increase in rate of Goods & Services Tax (“GST”), amounting to Change in Law.
34 of 2023
|
Completed | |
893 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
|
Postponed till further notice | |
894 | Tue 05/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shakila Bano Nijamuddin Shaikh under Electricity Act 2003 for noncompliance of final order of the Electricity Ombudsman, Mumbai by the Respondent.
38 of 2023
|
Withdrawn | |
895 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
|
Completed | |
896 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
|
Completed | |
897 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sanyo Special Steel Manufacturing India Private Limited (SSSMIPL) for non-compliance of provisions of Electricity Act, 2003 particularly Section 62(6) read with Section 42 and 86 of the Electricity Act, 2003 read with Regulations 4.5 and 32 of the MERC (Distribution Open Access) Regulations, 2016 for payment of interest on amounts refunded on account of adoption of incorrect monthly billing methodology for FY 2016-17, 2017-18 and FY 2018-19 by Maharashtra State Electricity Distribution Company Limited read with the relevant provisions of Electricity Act, 2003.
29 of 2023
|
Completed | |
898 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility as per Regulation 99 of MEGC, 2020.
31 of 2023
|
Completed | |
899 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Border Check Post Network Limited under Section 86(1)(k) read with Sections 61 & 62 of the Electricity Act, 2003 challenging Maharashtra Electricity Distribution Company Limited’s act of arbitrarily changing tariff category of the Border Check Posts from ‘Public Service – Others’ to ‘Commercial’ and retrospectively recovering differential tariff.
32 of 2023
|
Completed | |
900 | Fri 01/09/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre (MSLDC) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking to prepare procedure for operationalization of spinning reserve in the State of Maharashtra, by MSLDC as per Order in Case No. 85 of 2022.
142 of 2023
|
Completed | |
901 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
|
Completed | |
902 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
|
Completed | |
903 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited under Section 86(1)(b), (e.) and (f) of the Electricity Act, 2003 read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 seeking extension of Scheduled Commercial Operation Date (“SCOD”) of the 225 MW Wind Solar Hybrid Power Project, located in village Noorsar, Taluka – Bikaner, Rajasthan and the State of Maharashtra (“Hybrid Project”).
14 of 2023
|
Completed | |
904 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AEML SEEPZ Ltd. under Section 86 read with Section 43 of the Electricity Act, 2003 for implementation of the orders of this Hon’ble Commission dated 15.10.2009 passed in Case No. 50 of 2009 and 12.06.2017 passed in Case Nos. 182 of 2014 and 40 of 2015, thereby making AEML SEEPZ Ltd. a part of the changeover and switchover protocol as framed in the aforesaid orders existing amongst the parallel distribution licensee in common area of supply.
21 of 2023
|
Completed | |
905 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Airport Development Company Limited (MADC) for determination and approval of “Schedule of Charges” to be recovered by the distribution licensee from the existing / prospective consumers for the various services provided to them.
25 of 2023
|
Notice Withdrawn and will be rescheduled | |
906 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
And
Interlocutory Application of M/s. Jawaharlal Nehru Port Authority (JNPA) for urgent listing in Case No. 153/AP/2023.
153 of 2023 & IA No 46 of 2023
|
Completed | |
907 | Tue 29/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Power Procurement plan as per the direction of the Hon’ble Commission in Order dated 24.05.2023 in IA No. 25 of 2023 in Case No. 40 of 2023 and under Regulation 5.1 of MERC (Multi Year Tariff) Regulation, 2019.
And
Interlocutory Application of AEML SEEPZ Limited (ASL) for urgent listing in Case No. 171/MP/2023.
171 of 2023 & IA No 48 of 2023
|
Completed | |
908 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
|
Rescheduled on Tuesday 29/August/2023 10:30 AM | |
909 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
|
Rescheduled on Tuesday 29/August/2023 10:30 AM | |
910 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
|
Rescheduled on Tuesday 01/September/2023 10:30 AM | |
911 | Tue 22/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
|
Rescheduled on Tuesday 01/September/2023 10:30 AM | |
912 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jalna Siddhi Vinayak Alloys Pvt Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
4 of 2023
|
Completed | |
913 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Energy Development Agency (MEDA) under Section 86(1)(e) for appropriate directions to Distribution Licensees to meet 50% of total Renewable Purchase Obligation (RPO) requirement by purchase of energy from Renewable Sources within the State as per amendment dated 30 June 2022 in Renewable Energy Generation Policy 2020 issued by Government of Maharashtra.
6 of 2023
|
Completed | |
914 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandelwal Jinning and Pressing for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 9/2022.
209 of 2022
|
Withdrawn | |
915 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 and invoking regulation 92 of MERC (Conduct of Business) Regulations 2004 to seek relaxation of regulations 8.2 of the MERC (Forecasting Scheduling and Deviation Settlement for solar and wind 2018 in the compliance of the Order of the Hon’ble APTEL in the Appeal No. 31 of 2022 dated 11.10.2022.
245 of 2022
|
Completed | |
916 | Fri 18/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
|
Completed | |
917 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 12-14/2022 & 18-24/2022 directing MSEDCL to reclassify category of Tariff.
223 of 2022
|
Completed | |
918 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. T.P. Saurya Ltd. under Section 86(1)(f) of the Electricity Act, 2003, read with Article 9.2.1 and 9.2.2 of the Power Purchase Agreement dated 22.07.2022 seeking rise in the rate of Goods and Service Tax as a Change in Law relief.
241 of 2022
|
Completed | |
919 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 15-17/2022 and Order dated 18.08.2022 passed by CGRF, Amravati in Representation No. 70-92/2022 whereby MSEDCL was ordered to reclassify the category of tariff.
243 of 2022
|
Completed | |
920 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. T. P. Kirnali Limited seeking compensation on account of increase in costs on account of increase in rate of Goods & Services Tax (“GST”) and change in Basic Custom Duty (“BCD”) amounting to Change in Law in terms of the Power Purchase Agreements (“PPA”) dated 16.09.2020, as amended on 25.10.2021, executed between T. P. Kirnali Limited (“TPKL”) and Maharashtra State Electricity Distribution Company Limited (“MSEDCL”).
244 of 2022
|
Completed | |
921 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
|
Completed | |
922 | Fri 11/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
I.A. No. 45 of 2023 in 151 of 2023
|
Completed | |
923 | Tue 08/08/2023 10:30:00 AM |
Admissibility and Maintainability e-Hearing through Video Conferencing
Petition of Mr. Amin Fakir Mohammad Shaikh for safeguarding the rights of the consumers, in reference to the rights given to consumers under Section 55 of EA, 2003, to choose, Purchase and install the electricity meters of his own choice. & Violating Regulation No 4 of CEA (Installation and Operation of Meters) (Amendments) Regulations, 2019 related to replacement of existing meter only in smart meter and Violating Regulation 15.1.1 of MERC (Electricity supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 related to replacement of existing meter only in smart meter.
203 of 2022
|
Completed | |
924 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited for Review of the Suo-Moto Order dated 02.08.2022 passed in the matter of Commercial implementation of the MERC (Deviation Settlement Mechanism and related matters) Regulations, 2019, post expiry of stabilization period and related issues thereof limited to the issues and grounds as raised herein.
204 of 2022
|
Completed | |
925 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Laxminarayn Bhutada Foundation for Education for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola Zone Order in Case No. 106/2022 dated 30.08.2022 related to wrong multiplying factor grievance (Billing Dispute).
207 of 2022
|
Completed | |
926 | Tue 08/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 39/2022.
208 of 2022
|
Completed | |
927 | Fri 04/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants
And
Application of Captive Power Producers Association seeking Impleadment as a party/Respondent
And
Applications of Respondents for striking off their names from the list of Respondents
And
Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
|
Completed | |
928 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
|
Completed | |
929 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination
And
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I.A. No. 30 of 2023
|
Completed | |
930 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent
And
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
931 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Completed | |
932 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021.
And
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Completed | |
933 | Tue 01/08/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking
appropriate directions from the Commission in compliance with Order dated 24
January, 2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009
of 2023 (Ultratech Cement Limited & Anr vs. MSEDCL), Order dated
16.03.2023 in Civil Writ Petition No. 2511 of 2023 (Vaibhav Deshmukh Infra
Pvt Ltd. vs. Union of India & Anr.), Civil Writ Petition No. 2516 of 2023 (RNP
Concrete (India) Pvt Ltd. v. UOI and Ors.) and Civil Writ Petition No. 2587 of
2023 (M/s. L T Patil and Sons vs MSEDCL)
45 of 2023
|
Completed | |
934 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Completed | |
935 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021
And
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Completed | |
936 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Completed | |
937 | Fri 28/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Completed | |
938 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Completed | |
939 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Completed | |
940 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
|
Postponed till further notice | |
941 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22
September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017 (Re-opened Case.)
|
Postponed till further notice | |
942 | Tue 25/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking appropriate directions from MERC in compliance with Order dated 24.01.2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516 of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
|
Completed | |
943 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL
And
Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition
And
Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I. A. No.7 of 2023, I. A. No.8 of 2023
|
Completed | |
944 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project
And
Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project
And
Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I. A. No.9 of 2023, I. A. No.10 of 2023
|
Completed | |
945 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014
And
Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014
And
Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I. A. No.13 of 2023, I. A. No.14 of 2023
|
Completed | |
946 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
And
Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
And
Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I. A. No.17 of 2023, I. A. No.18 of 2023
|
Completed | |
947 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
And
Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
And
Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I. A. No.15 of 2023, I. A. No.19 of 2023
|
Completed | |
948 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under
Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation
14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees
and Charges) Regulations, 2022, read with the various provisions of the Wind
Energy Purchase Agreements entered into between M/s NSL Wind Power
Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of
Impugned Notice dated 09.01.2023
And
Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking
interim protection against the Respondent to take any action(s) pursuant to the
Impugned Notice dated 09.01.2023
And
Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking
urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I. A. No.16 of 2023, I. A. No.20 of 2023
|
Completed | |
949 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
|
Completed | |
950 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects
And
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
And
Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
And
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I. A. No. 23, 36 & 38 of 2021
|
Completed | |
951 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for seeking approval for Deviation in Standard Bidding document for
Long Term Procurement of 7,000 MW Solar Power and for Meeting the Solar
Renewable Purchase Obligations under Section 19 of MERC (Renewable Purchase
Obligation, Its Compliance and Implementation of Renewable Energy Certificate
Framework) Regulations, 2019 and to Supply day time Power to the Farmers of
the State of Maharashtra.
And
Interlocutory Application of Maharashtra State Electricity Distribution Company
Limited (MSEDCL) seeking urgent hearing in Case No. 164/MP/2023.
164 of 2023 & IA No. 41 of 2023
|
Completed | |
952 | Fri 21/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pimpri Chinchwad Municipal Corporation & Anr. seeking adoption of
the Electricity (Promoting Renewable Energy Through Green Energy Open
Access) Rules, 2022 as promulgated by the Government of India in June 2022. and
Promotion of generation and procurement of power generated through municipal
solid waste under the concept of Waste to Energy. and Pimpri Chinchwad
Municipal Corporation’s 14 MW Waste to Energy plant at Moshi, Pune.
And
Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for
Interim Reliefs in Case No. 165/AD/2023.
And
Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for
urgent listing in Case No. 165/AD/2023.
165 of 2023 & IA No. 42 of 2023, 43 of 2023
|
Completed | |
953 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Section 86 (1)(b) of the EA, 2003 read with Regulation 20 of the MERC (MYT) Regulations, 2019 and directions of the Hon'ble Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35
And
Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing of the captioned Petition.
39 of 2023 & I. A. No.39 of 2023
|
Completed | |
954 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86(1)(f) of the EA, 2003 read with Regulation 27 & 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022
And
Petition of M/s. TP Saurya Limited under Section 94(2) of the Electricity Act, 2003 read with Regulation 33 of the MERC Regulations, 2022 seeking interim relief(s)/directions on behalf of TP Saurya Limited.
66 of 2023 & I.A. No.32 of 2023
|
Completed | |
955 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) under Section 86 (1)(f) & 11(2) of the Electricity Act, 2003 for payment of Fixed Charges and Revision of Energy Charges during Subsistence of S. 11 Direction
And
Application of JSW Energy Limited (JSWEL) seeking urgent listing of the Petition filed under section 86 (1)(f) & Section 11(2) of the Electricity Act, 2003.
211 of 2022 & I.A. No.33 of 2023
|
Completed | |
956 | Tue 18/07/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act,
2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated
29.06.2022 executed between Maharashtra State Electricity Distribution
Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under
Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022
And
Application of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for urgent listing in Case No. 122/MP/2023.
122 of 2023 & I.A No.38 of 2023
|
Postponed till further notice | |
957 | Tue 16/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
958 | Tue 16/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
959 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Rescheduled till further notice | |
960 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Rescheduled till further notice | |
961 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the
Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
962 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003
to penalized MSEDCL for non compliance of CGRF Order and issue directions
to comply the Order.
200 of 2022
|
Rescheduled on Tuesday 09/May/2023 10:30 AM | |
963 | Fri 12/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled till further notice | |
964 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants
And
Application of Captive Power Producers Association seeking Impleadment as a party/Respondent
And
Applications of Respondents for striking off their names from the list of Respondents
And
Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 247, 242, 256, 262, 266, 267 of 2022 & I.A. No. 25, 29, 31, 34, 40 & 45 of 2022
|
Rescheduled till further notice | |
965 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
966 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Completed | |
967 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
|
Completed | |
968 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Completed | |
969 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Section 86 (1) (e) read with 86 (1) (b), (k) of
the Electricity Act, 2003 Read with Article 5 & 21.8 of Energy Purchase
Agreement dated 19.09.2017 executed between Petitioner AA Energy Limited and
Respondent Maharashtra State Electricity Distribution Company Ltd for supply of
10 MW Energy, from its Biomass Plant Located at Wadsa, Desaiganj, District
Gadchiroli.
60 of 2023
|
Completed | |
970 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of AA Energy Limited for seeking urgent listing and
issuance of interim directions in Case No. 60/AP/2023.
IA No. 31 of 2023 in Case No. 60 of 2023
|
Completed | |
971 | Tue 09/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 15 read with Article 10.05 of the Wind Energy Purchase Agreements dated 08.08.2017, 24.03.2017 and 24.03.2017 for adjudication of dispute in relation to timely payment of Energy Bills raised by the Petitioner.
27 of 2023
|
Completed | |
972 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -D under Section 86 (1)(b) read with
and Regulation 39 of the Maharashtra Electricity Regulatory Commission
(Transaction of Business and Fees and Charges) Regulations, 2022 and all the
enabling powers in this regard including the inherent powers and expansive
regulatory authority vested unto the Hon'ble Commission seeking approval for
Short Term Power Purchase for Tata Power -D for April 2023 to June 2023
And
Interlocutory Application of The Tata Power Company Limited - Distribution for
seeking urgent listing and hearing of the captioned petition in Case No.
53/AP/2023.
53 of 2023 & I. A. No.28 of 2023
|
Completed | |
973 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination
And
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I. A. No. 30 of 2023
|
Completed | |
974 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Joint Petition of 1) Maharashtra State Electricity Distribution Company Ltd. and 2) Dodson-Lindblom Hydro Power Private Limited Section 86 (1) (e) of the Electricity Act, 2003 for amendment to the PPA which is a ministerial act in the present Case for updating the record of the transaction between the Parties
And
Joint Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. and Dodson-Lindblom Hydro Power Private Limited for seeking urgent listing and hearing Case No. 58/MP/2023.
58 of 2023 & I. A. No. 29 of 2023
|
Completed | |
975 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. for change in the approved Load Shedding Protocol of AG Load Management Scheme in Gadchiroli District.
59 of 2023
|
Completed | |
976 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Interlocutory Application of Shreehari Associates Private Limited for seeking urgent reliefs in Case No. 57/DT/2023
I.A. in 27 of 2023 in Case No. 57 of 2023
|
Completed | |
977 | Mon 08/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
|
Completed | |
978 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL
seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in
Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Scheduled | |
979 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 61 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
178 of 2022
|
Rescheduled till further notice | |
980 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 62 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
179 of 2022
|
Rescheduled till further notice | |
981 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events
And
Application of M/s. Avaada MH Sustainable Pvt. Ltd. seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No. 44 of 2022
|
Scheduled | |
982 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021 and Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Rescheduled till further notice | |
983 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
|
Scheduled | |
984 | Tue 02/05/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
|
Scheduled | |
985 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent
and
Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Rescheduled on Friday, 12/May/2023 10:30 AM | |
986 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Rescheduled till Further Notice | |
987 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021
and
Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
|
Rescheduled on Thursday, 02/May/2023 10:30 AM | |
988 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22 September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017
|
Rescheduled till further notice | |
989 | Fri 28/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
|
Rescheduled till further notice | |
990 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for non-compliance dated 05.02.2023 filed by the petitioner in view of daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission
and
Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking action against MSEDCL for wilful violation of directions contained in daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission.
7 of 2023 & I.A. No. 4 of 2023, I.A. No. 5 of 2023, I.A. No. 11 of 2023, I.A. No. 12 of 2023, I.A. No. 21 of 2023, I.A. No. 22 of 2023
|
Completed | |
991 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
|
Rescheduled till further notice | |
992 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
|
Rescheduled till further notice | |
993 | Tue 25/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for
Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse
Based Co-Generation Projects And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I.A. 23, 36 & 38 of 2021
|
Completed | |
994 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
995 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
996 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023
and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023
and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
997 | Fri 21/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023
and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023
and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
998 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
|
Completed | |
999 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
|
Completed | |
1000 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
|
Completed | |
1001 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
|
Completed | |
1002 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
|
Completed | |
1003 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
|
Completed | |
1004 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f)
of the Electricity Act, 2003 for adjudication of dispute between NuPower
Renewables Private Limited and Maharashtra State Electricity Distribution
Company Limited (MSEDCL) in respect of disconnection from grid by
MSEDCL for non-installation of meters at the Petitioner’s Wind Project.
And
Application for seeking interim directions under regulation 81 read with
regulation 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 on behalf of the petitioner.
IA No. 26 of 2023 in Case No. 18 of 2023
|
Completed | |
1005 | Thu 20/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition seeking appropriate directions from Maharashtra Electricity Regulatory
Commission in compliance with Order dated 24.01.2023 passed by Hon’ble
Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement
Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order
dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav
Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516
of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ
Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
|
Completed | |
1006 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under section 63 of the Electricity Act 2003.
41 of 2023
|
Completed | |
1007 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 117.5 MW solar power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (PM-KUSUM) under component-c from solar projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
42 of 2023
|
Completed | |
1008 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff discovered for long term procurement of 150 MW solar power under ‘Mukhyamantri Sour Krishi Vahini Yojana’ from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
43 of 2023
|
Completed | |
1009 | Tue 11/04/2023 11:00:00 AM |
e-Hearing through Video Conferencing
Review Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) for the Order dated 31.03.2023 in Case No. 37 of 2023 issued by Hon’ble Commission in the matter of petition filed by BEST Undertaking for approval of tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April, 2023 to March, 2024.
44 of 2023
|
Completed | |
1010 | Tue 11/04/2023 10:30:00 AM |
e-Public Hearing
Hearing on SUO- MOTU draft ORDER ON Renewable
Energy Tariff for FY 2023-24
01/SM/2023
|
Completed | |
1011 | Tue 11/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
1012 | Tue 11/04/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
|
Rescheduled on Thursday 20/April/2023 10:30 AM | |
1013 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of TP Saurya Limited under Section 86 (1) (b) of the Electricity Act,
2003 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for sale of non-solar (wind) power under short term arrangement. And Interlocutory Application of TP Saurya Limited seeking urgent listing and hearing of the captioned Petition in Case No. 30/AP/2023.
30 of 2023 & IA. No. 23 of 2023
|
Completed | |
1014 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking
(of the Municipal Corporation of Greater Mumbai) Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April 2023 to March 2024. And Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) seeking urgent hearing of Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April’2023 to March’2024.
37 of 2023 & IA. No. 24 of 2023
|
Completed | |
1015 | Thu 23/03/2023 11:30:00 AM |
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Aggregate Revenue
Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24
and FY 2024-25 in accordance with Regulation 5.1 (b) of the Maharashtra
Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019.
And Interlocutory Application of AEML SEEPZ Limited (ASL) under Section 86,
including Section 86(1)(a) and Section 94(2) of the Electricity Act, 2003 seeking for urgent listing of the captioned petition and for seeking certain interim directions.
40 of 2023 & IA. No. 25 of 2023
|
Completed | |
1016 | Thu 23/03/2023 11:00:00 AM |
e-Public Hearing
Inviting Comments on Application of Adani Electricity Mumbai Limited -Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
127 of 2022
|
Completed | |
1017 | Thu 23/03/2023 10:30:00 AM |
e-Public Hearing
Inviting Comments on Application of The Tata Power Company Ltd.-Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
89 of 2022
|
Completed | |
1018 | Fri 03/03/2023 10:30:00 AM |
e-Public Hearing at Nagpur
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Vanamati Auditorium, V.I.P. Road, Dharampeth, Nagpur, District-Nagpur)
226 of 2022
|
Completed | |
1019 | Thu 02/03/2023 10:30:00 AM |
e-Public Hearing at Amravati
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Niyojan Bhavan (DPDC Hall), Collector Office Premises, Camp, Amravati, District-Amravati)
226 of 2022
|
Completed | |
1020 | Mon 27/02/2023 10:30:00 AM |
e-Public Hearing at Nashik
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Niyojan Bhavan, Collector Office Campus, Old Agra Road, Nasik)
226 of 2022
|
Completed | |
1021 | Sat 25/02/2023 10:30:00 AM |
e-Public Hearing at Aurangabad
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25.
(Place/Venue of e-Facilitation Centre: Meeting Hall, Office of the Divisional Commissioner, Aurangabad, District-Aurangabad)
226 of 2022
|
Completed | |
1022 | Thu 23/02/2023 10:30:00 AM |
e-Public Hearing at Pune
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
(Place/Venue of e-Facilitation Centre: Auditorium, Government College of Engineering, Shivaji Nagar, Pune)
226 of 2022
|
Completed | |
1023 | Tue 21/02/2023 10:30:00 AM |
e-Public Hearing at Navi Mumbai
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25 (Place/Venue of e-Facilitation Centre: Agri-Koli Sanskruti Bhavan, Pam Beach Road, Sector-24, Nerul West, Navi Mumbai-400706)
226 of 2022
|
Completed | |
1024 | Mon 20/02/2023 10:30:00 AM |
e-Public Hearing
Suggestions and Objections on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Mid Term Review (MTR) Tariff Petition for Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
212 of 2022
|
Completed | |
1025 | Fri 17/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited - Distribution's Mid-Term-Review Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
225 of 2022
|
Completed | |
1026 | Thu 16/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Adani Electricity Mumbai Limited – Distribution Business Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
231 of 2022
|
Completed | |
1027 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Corporation Limited (MSEDCL) and Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT) for Approval of Power Purchase Agreement (PPA) between MSEDCL and MAHAPREIT and Tariff for Solar Power Plant, Sangli of 125 MW capacity under Section 86(1)(A), 86(1)(B), 86(1)(E) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
5 of 2023
|
Completed | |
1028 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission
7 of 2023 & IA. No. 4 of 2023, 5 of 2023, 11 of 2023, 12 of 2023
|
Completed | |
1029 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 3.00 MW Round the Clock (RTC) power for a period of 12 months i.e. from 1 July 2023 to 30 June 2024.
9 of 2023
|
Completed | |
1030 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval to tariff and procurement of 500 MW Solar Power through MAHAPREIT’s Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY).
222 of 2022
|
Completed | |
1031 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under Section 63 of the Electricity Act 2003.
242 of 2022
|
Completed | |
1032 | Tue 14/02/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) seeking approval for Adoption of Tariff discovered for Long Term
Procurement of 8.7 MW Solar Power Under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component A from 0.5
to 2 MW Capacity Projects Connected to Distribution Network under Section 63
of the Electricity Act 2003 for Meeting the Solar Renewable Purchase
Obligations.
26 of 2023
|
Completed | |
1033 | Thu 09/02/2023 12:00:00 PM |
e-Public Hearing
Inviting Suggestions and Objections on State Transmission Utility’s (STU) Mid Term Review Petition for Truing up of FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and determination of Intra-State Transmission Tariff for the MYT Control Period from FY 2023-24 to FY 2024-25.
284 of 2022
|
Completed | |
1034 | Thu 09/02/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Laxmipati Balaji Supply Chain Management Limited (LBSCML)’s Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
220 of 2022
|
Completed | |
1035 | Thu 09/02/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on EON Kharadi Infrastructure Private Limited's (EON SEZ Phase II) Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
236 of 2022
|
Completed | |
1036 | Thu 09/02/2023 10:30:00 AM |
e-Public Hearing
Suggestions and Objections on EON Kharadi Infrastructure Private Limited (EON SEZ Phase I)'s Multi-Year Tariff Petition and for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
235 of 2022
|
Completed | |
1037 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & IA. No. 9 of 2023, 10 of 2023
|
Completed | |
1038 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & IA. No. 13 of 2023, 14 of 2023
|
Completed | |
1039 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & IA. No.7 of 2023, 8 of 2023
|
Completed | |
1040 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
22 of 2023 & IA. No. 17 of 2023
|
Completed | |
1041 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
23 of 2023 & IA. No. 15 of 2023
|
Completed | |
1042 | Tue 07/02/2023 12:30:00 PM |
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023.
24 of 2023 & IA. No. 16 of 2023
|
Completed | |
1043 | Tue 07/02/2023 12:00:00 PM |
e-Public Hearing
Suggestions and Objections on JAWAHARLAL NEHRU PORT TRUST's Multi Year Tariff Petition for Truing-up of FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023- 24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the MERC (Multi Year Tariff) Regulations, 2019
219 of 2022
|
Completed | |
1044 | Tue 07/02/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on KRC Infrastructure and Projects Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
214 of 2022
|
Completed | |
1045 | Tue 07/02/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Gigaplex Estate Private Limited’s
Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
215 of 2022
|
Completed | |
1046 | Tue 07/02/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Mind space Business Parks Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
216 of 2022
|
Completed | |
1047 | Tue 31/01/2023 11:00:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final True-up for FY 2019-20, FY 2020-21 and FY 2021-22, Annual Performance Review and provisional True- up for FY 2022-23 and Revised Aggregate Revenue Requirement and Tariff for FY 2023-24 and FY 2024-25 & provisional tariff for upcoming Bhusawal Unit 6
227 of 2022
|
Completed | |
1048 | Tue 31/01/2023 10:30:00 AM |
e-Public Hearing
Inviting Suggestions / Objections on Mid-Term Review Petition of The Tata Power Company Limited - Generation Business for Truing up for FY 2019-20, FY 2020-21 & FY 2021-22, Provisional Truing up for FY 2022-23 and Approval of Revised ARR forecast for the period from FY 2023-24 to FY 2024-25.
221 of 2022
|
Completed | |
1049 | Wed 25/01/2023 12:30:00 PM |
e-Public Hearing
Suggestions / Objections on Mid Term Review Petition of The Tata Power Company Limited - Transmission for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up of FY 2022-23 and Revised Projections of Aggregate Revenue Requirement for the period from FY 2023-24 to FY 2024-25
217 of 2022
|
Completed | |
1050 | Wed 25/01/2023 12:00:00 PM |
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Generation Business for Truing up for FY 2019-20, FY 2020-21 and
FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR), Revised Fixed Charges and Variable
Charges for FY 2023-24 and FY 2024-25.
229 of 2022
|
Completed | |
1051 | Wed 25/01/2023 11:30:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Transmission Business for Truing up for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR) for fourth (FY 2023-24) and fifth (FY 2024-25) year of Fourth Control Period.
230 of 2022
|
Completed | |
1052 | Wed 25/01/2023 11:00:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
237 of 2022
|
Completed | |
1053 | Wed 25/01/2023 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019.
238 of 2022
|
Completed | |
1054 | Tue 24/01/2023 12:30:00 PM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23 and Revised Estimate of ARR for FY 2023-24 and FY 2024-25.
232 of 2022
|
Completed | |
1055 | Tue 24/01/2023 12:00:00 PM |
e-Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited- Transmission Business’s Petition for approval of Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23, and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25
224 of 2022
|
Completed | |
1056 | Tue 24/01/2023 11:30:00 AM |
e-Public Hearing
Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for Approval of Truing-Up of ARR for FY 2019-20 as per MERC MYT Regulations, 2015, Truing up of ARR for FY 2020-21 and FY 2021-22 and Provisional Truing-up of ARR for FY 2022-23 and Determination of ARR for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
234 of 2022
|
Completed | |
1057 | Tue 24/01/2023 11:00:00 AM |
e-Public Hearing
Suggestions/Objections on Jaigad PowerTransco Limited's Petition for approval of True up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing up of ARR for FY 2022-23 and ARR Projection for FY 2023- 24 to FY 2024-25 as per MYT Regulation 2019
213 of 2022
|
Completed | |
1058 | Tue 24/01/2023 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Truing-up of Annual Fixed Charges (AFC) for FY 2019- 20 to FY 2021-22, Provisional Truing-up of AFC for FY 2022-23 and Determination of AFC and Fees and Charges for FY 2023-24 and FY 2024-25
233 of 2022
|
Completed | |
1059 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
|
Completed | |
1060 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
|
Rescheduled till Further Notice | |
1061 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
|
Completed | |
1062 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
|
Rescheduled till Further Notice | |
1063 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
|
Rescheduled till Further Notice | |
1064 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Rescheduled till Further Notice | |
1065 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply & Transport Undertaking of Municipal Corporation of Greater Mumbai (BEST) for under Regulations 20.1 of the MERC (Multi-Year Tariff) Regulations, 2019 (‘MYT Regulations’) in the matter of approval of power procurement plan for 7 (Seven) years period from FY 2023-24 to FY 2029-30 covering next control period.
240 of 2022
|
Completed | |
1066 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023. And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023.
And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023.
7 of 2023 & IA. No. 4 of 2023 & IA. No. 5 of 2023
|
Completed | |
1067 | Tue 17/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Laxmipati Balaji Supply Chain Management Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2023 to January 31, 2024 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
8 of 2023
|
Completed | |
1068 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Completed | |
1069 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax (GST) rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
|
Completed | |
1070 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. seeking execution/ implementation/ compliance of the Order dated 17.02.2022 passed in Case No. 61 of 2020.
178 of 2022
|
Completed | |
1071 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd seeking execution/ implementation/compliance of the Order dated 17.02.2022 passed in Case No. 62 of 2020.
179 of 2022
|
Completed | |
1072 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events.
187 of 2022
|
Completed | |
1073 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
1074 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
194 of 2022
|
Completed | |
1075 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rathi Steel and Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
195 of 2022
|
Completed | |
1076 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of City Corporation Ltd. seeking relief under the Distribution Franchisee Agreement dated 16 October 2010 and subsequent renewals thereafter read with the Commission’s Order dated 24 May 2010 in Case No. 62 of 2007 and dated 1 June 2010 in Case No. 75 of 2007.
198 of 2022
|
Completed | |
1077 | Tue 10/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators. And Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022 & Diary No. 254 of 2022, IA No. 41 of 2022 & IA No. 42 of 2022
|
Completed | |
1078 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
|
Completed | |
1079 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd and Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
84 of 2016 and Diary No. 257 of 2022
|
Completed | |
1080 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Asian Infrastructure Development Pvt. Ltd. seeking refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Company Ltd.
103 of 2022
|
Completed | |
1081 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
1082 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014. And Miscellaneous Application of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021 and 167 of 2020
|
Completed | |
1083 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
|
Completed | |
1084 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021. And Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing on the Petition filed under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and Respondent.
162 of 2022 & I.A No. 23 of 2022
|
Rescheduled till Further Notice | |
1085 | Tue 03/01/2023 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for power procurement plan along with Tender documents for procuring power through Renewable Energy Sources with Energy Storage facility on Long Term Basis for 15 years. And Interlocutory Application for early hearing in Case No. 185/MP/2022 filed by M/s. Eon Kharadi Infrastructure Pvt. Ltd. SEZ Phase-I.
185 of 2022 & Diary No. 264 of 2022
|
Completed | |
1086 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects
and
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 202
and
Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
and
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects).
70 of 2021 & 23 of 2021, IA 36 & 38 of 2021
|
Rescheduled till Further Notice | |
1087 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017.
173 of 2017
|
Completed | |
1088 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators.
And
Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022.
And
Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
And
Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022, Diary No.254 of 2022 & IA No.41 of 2022, IA No.42 of 2022
|
Completed | |
1089 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
|
Completed | |
1090 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the PPA based on the tariff determined under Competitive Bidding process u/s. 63 of the EA, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the MoP, GoI, dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2023 to 31 January 2024.
218 of 2022
|
Completed | |
1091 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval to tariff and procurement of 500 MW Solar Power through Mahatma Phule Renewable Energy and Infrastructure Technology Limited’s (MAHAPREIT) Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) as per Section 86(1)(A), 86(1)(B) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
222 of 2022
|
Completed | |
1092 | Tue 27/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for change in the approved Load Shedding Protocol of AG Load
Management Scheme in five Districts of Vidharbha Viz. Nagpur, Chandrapur,
Bhandara, Gondia and Gadchiroli Districts.
228 of 2022
|
Completed | |
1093 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the Order dated 13.09.2022 passed by the Hon’ble Commission in Case No. 88 of 2022 and Interlocutory Application of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar seeking urgent listing and hearing in Case No. 199/RC(MP)/2022.
199 of 2022
|
Rescheduled on Fri 29/November/2022 10:30 AM | |
1094 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd. Case No. 84 of 2016 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 18.10.2022. IN Appeal No. 263 of 2018 directions to the Commission therein.)
84 of 2016
|
Completed | |
1095 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sridevi Trading Company regarding breach of Distribution Open Access Regulations 2016, Practice Directions dated 8 March 2017 and Excess levy and recovery of Wheeling Charges. Case No. 206 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 06.10.2022. IN Appeal No. 20 of 2019 directions to the Commission therein.)
206 of 2017
|
Completed | |
1096 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
|
Rescheduled till Further Notice | |
1097 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Sunil Madhusudan Joshi under Section 142 of Electricity Act 2003 in the matter of Contempt, Non-compliance and Continuance of Contravene of the Order of CGRF dated 28-10-2022.
201 of 2022
|
Completed | |
1098 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for adoption of the tariff discovered through the Competitive Bidding Process held for long term procurement of 18.36 MW wind power from the wind generators whose EPAs with MSEDCL have expired.
202 of 2022
|
Completed | |
1099 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
Diary No. 257 of 2022
|
Completed | |
1100 | Fri 16/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aurangabad Industrial Township Limited for approval of Short Term Power Purchase plan by Aurangabad Industrial Township Limited for one year period starting from 01.04.2023 to 31.03.2024 under Section 86 of the Electricity Act, 2003 (EA) read with Competitive Bidding Guidelines issued by the Ministry of Power (MoP) Government of India (GoI) dated 30 March, 2016 and amendments thereof.
206 of 2022
|
Completed | |
1101 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86(1)(e), (f) and (k) of the EA, 2003 read with article 8 of the PPA dated 10.08.2021 executed between M/s Avaada MH Sustainable Private Limited and MSEDCL for supply of 250 MW solar power from its solar PV power plant in the state of Maharashtra, seeking inter alia extension of the scheduled commercial operation date on account of certain force majeure events affecting the project implementation and pass appropriate order(s) /direction(s) in relation to certain other incidental issues under the PPA, to the extent prayed by the petitioner herein.
187 of 2022
|
Completed | |
1102 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avaada Sunce Energy Private Limited under Section 86(1)(f) of the EA, 2003 and Article 9 of the PPA dated 26.06.2019 seeking declaration that the imposition of Safeguard Duty on import of Solar Cells/ modules on account of promulgation of Ministry of Finance Notification dated 29.07.2020 bearing No. 02/2020-Customs (SG) and enhancement of GST Rates on Solar Energy Devices and Parts on account of promulgation of Ministry of Finance Notification dated 30.09.2021 bearing No. 8/2021-Central Tax (Rate) are ‘Change in Law’ events under Article 9.1 of the said PPA and to further direct the Respondent to pay compensation along with carrying cost to the Petitioner as the relief under Article 9.2.1 of the said PPA as to offset the financial impact of the said Change in Law events and to ensure that the Petitioner is placed in the same financial position as it would have been had it not been for the occurrence of the said Change in Law events.
192 of 2022
|
Completed | |
1103 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Private Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated August 29, 2022 in Case No. 61 of 2022.
193 of 2022
|
Completed | |
1104 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
194 of 2022
|
Completed | |
1105 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rathi Steel And Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
195 of 2022
|
Completed | |
1106 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of City Corporation Limited (CCL) seeking appropriate relief on provided under the distribution franchisee agreements dated October 16, 2010 and subsequent renewals thereafter read with Order of the Hon’ble Commission dated May 24, 2010 in Case No. 62 of 2007 and June 1, 2010 in Case No. 75 of 2007.
198 of 2022
|
Completed | |
1107 | Tue 13/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86 read with Section 94 (2) of the Electricity Act, 2003 along with provisions of MERC Conduct of Business Regulations 2004, seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No.44 of 2022 in 187 of 2022
|
Completed | |
1108 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for Power Procurement Plan through Renewable Energy Sources with Energy Storage facility on Long Term Basis For 15 years starting from 1st November 2023 to 31st October 2038 and Approval of Tender Documents for its IT and ITES SEZ at Survey no. 77, MIDC Knowledge Park, Kharadi, District Pune (EON SEZ Phase- I) and Survey No. 72, Village Kharadi, District Pune (EON SEZ Phase-II).
185 of 2022
|
Rescheduled on Fri 25/November/2022 10:30 AM | |
1109 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Transmission-T) under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 311 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 35 of 2021 (wherein the Commission has already permitted assignment of the Transmission License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of AEML and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
183 of 2022
|
Completed | |
1110 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 against the Respondent/ Maharashtra State Electricity Distribution Company Limited for wilful disobedience of this Hon’ble Commission’s final order dated 18.07.2022 passed in Case No. 26 of 2022, since disposed and Interlocutory Application filed by Mahanagar Gas Limited under Section 94(2) of the Electricity Act, 2003 seeking urgent hearing in Case No. 186/MP/2022.
186 of 2022 & IA. No.35 of 2022 in 186 of 2022
|
Completed | |
1111 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 341 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 34 of 2021 (wherein the Commission has already permitted assignment of the Distribution License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
189 of 2022
|
Completed | |
1112 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.43/2018, Dt. of order: 14/12/2018.
190 of 2022
|
Completed | |
1113 | Fri 09/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 44/2018, Dt. of order: 14/12/2018.
191 of 2022
|
Completed | |
1114 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020
159 of 2021
|
Completed | |
1115 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014
167 of 2020
|
Completed | |
1116 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Manoj Panjabrao Updhye for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola zone in the matter of Manoj Panjabrao Upadhye Complaint No 52 of 2022 Order dated 31.05.2022 realted to refund of infrastructure cost spent under commitment of refund by agriculture consumer having no arrears.
176 of 2022
|
Completed | |
1117 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 61 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
178 of 2022
|
Completed | |
1118 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 62 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
179 of 2022
|
Completed | |
1119 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Jaykumar Maniklal Vishwakarma & Anr. for obtaining Electric meter from the Power Supplier M/s. Adani Electricity Generation and Supply Ltd. formerly Reliance Electric Generation and Supply Ltd. Application under Section 43 of Electricity Act 2003.
180 of 2022
|
Completed | |
1120 | Tue 06/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Greta Energy Ltd. & Anr. under Regulation 85 of Maharashtra Electricity Regulatory Commission conduct of Business Regulations 2004 for Review of Order of Commission issued in Case No. 1/SM/2022 dt. 29/7/2022 for Generic renewable energy Tariff for FY 2022-22 under MERC (Renewable Energy Tariff) Regulations, 2019.
181 of 2022
|
Completed | |
1121 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
|
Completed | |
1122 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ideal Energy Projects Limited (IEPL) under Section 86(1)(a) and 86(1)(f) seeking directions against Maharashtra State Electricity Distribution Company Limited to apply HT-I Industrial Tariff category to the start-up power consumed by the Petitioner and accordingly issue appropriate refund / credit towards excess amount collected from the Petitioner for the period 27.12.2012 till 31.05.2015 under HT-II Commercial Tariff category along with applicable interest.
168 of 2022
|
Completed | |
1123 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Viraj Profiles Private Limited against MSEDCL to (i) waive the demand made by MSEDCL for additional security deposit to VPL, pending refund of additional surcharge by MSEDCL to VPL under the Judgement dated 10.12.2021 passed in Civil Appeal Nos. 5074-5075 of 2019 (MSEDCL V/s. M/s. JSW Steel Limited & Ors.) and the Order dated 15.03.2022 passed in Contempt Petition (Civil) Nos. 112-113 of 2022 in Civil Appeal Nos. 5074-5075 of 2019 (M/s. JSW Steel Coated Products Limited V/s. Vijay Singhal & Ors.), of Supreme Court of India, and (ii) alternatively and without prejudice, exempt VPL from payment of additional security deposit under regulation 13.1. and 13.2 of MERC (ESC & SOP) Regulations, 2020 by ordering MSEDCL to revise the billing cycle for VPL to twice a month (i.e., for 15 days) instead of existing billing of once every month, under regulation 16.1.1 of MERC (ESC & SOP) Regulations, 2020.
169 of 2022
|
Completed | |
1124 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra State Power Generation Company Limited under Section 61 of Electricity Act, 2003 read with Regulation 28 and 29 of MERC (Multi Year Tariff) Regulations, 2015 and MERC (Multi Year Tariff) Regulations, 2019 respectively, seeking modification/reconsideration of the Lease Rent from FY 2019-20 onwards, as approved by the Hon’ble Commission in its Order dated 27.10.2008 in Case No. 17 of 2007.
172 of 2022
|
Completed | |
1125 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited (JGFPL) under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2020 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking compensation on account of Change in Law Events.
174 of 2022
|
Completed | |
1126 | Fri 02/12/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
|
Completed | |
1127 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No.23 of 2021 in 119 of 2021
|
Completed | |
1128 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
|
Completed | |
1129 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
|
Completed | |
1130 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
|
Completed | |
1131 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
|
Completed | |
1132 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
|
Completed | |
1133 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
|
Completed | |
1134 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
|
Completed | |
1135 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
|
Completed | |
1136 | Tue 29/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition filed by M/s. WAACOX Energy Private Limited under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, and principles analogous Order XLVII of Code of Civil Procedure, 1908, for review of Order dated 07.07.2022 passed in Case No. 104 of 2021 filed by M/s. WAACOX Energy Private Ltd. against Maharashtra State Power Generation Co. Ltd. and Maharashtra State Electricity Distribution Co. Ltd. for issuance of appropriate directions to comply with the Power Purchase Agreements dated 14.06.2018 pertaining to Solar Power Projects at Ralegansiddhi and Manjarda
167 of 2022
|
Completed | |
1137 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindustan Petroleum Corporation Limited under Sections 142 & 146 of the Electricity Act, 2003 for non-compliance by of the Commission’s Order dated 17 January 2019 in Case No. 223 of 2018.
66 of 2022
|
Completed | |
1138 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Completed | |
1139 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
|
Completed | |
1140 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
1141 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of R. L. Steels & Energy Limited under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
163 of 2022 & I.A No.18 of 2022, I.A No.19 of 2022, I.A No.36 of 2022, I.A No.37 of 2022, I.A No.38 of 2022 in 163 of 2022
|
Completed | |
1142 | Fri 25/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
164 of 2022 & I.A No.20 of 2022, I.A No.21 of 2022, in 164 of 2022
|
Completed | |
1143 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited for in principle approval under the Change in Law provision of the PPA in respect of installation of additional systems in compliance with the Environment (Protection) Amendment Rules, 2015.
84 of 2022
|
Completed | |
1144 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
|
Completed | |
1145 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
|
Completed | |
1146 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s. Maharashtra State Electricity Distribution Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 and of Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, for review of Order dated 06.04.2022 passed by Hon’ble MERC in Case No. 96 of 2021.
170 of 2022
|
Completed | |
1147 | Tue 22/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking direction against Respondents to comply with order of this Hon’ble Commission. And Interlocutory Application filed by Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking urgent hearing in Case No. 184/AD/2022.
184 of 2022 & I.A No.33 of 2022 in 184 of 2022
|
Completed | |
1148 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Imagicaa World Entertainment Ltd. seeking refund of wheeling and transmission charges levied for over-injected units for FY 2020-21 along with applicable interest and excess refund penalty of wheeling charges.
116 of 2022
|
Completed | |
1149 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
|
Completed | |
1150 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Pvt. Ltd. seeking relief on account of Change in law due to the increase in Goods and Service Tax rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
|
Completed | |
1151 | Fri 18/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and PPA dated 04 April 2022 seeking amendment in Effective Date of the PPA.
128 of 2022
|
Completed | |
1152 | Tue 15/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants.
158 of 2022
|
Completed | |
1153 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and the Respondent arising out of the PPA dated 27.05.2021.
162 of 2022
|
Completed | |
1154 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Case No. 103 of 2021 dated 07.12.2021
161 of 2022
|
Completed | |
1155 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
159 of 2022
|
Completed | |
1156 | Fri 11/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ultratech Cement Ltd. under Section 142 of Electricity Act 2003 against wrong recovery of incremental consumption rebate given in monthly energy bills from period April 2021 to March 2022 violating Commissions tariff order issued in Case No. 322 of 2019.
155 of 2022
|
Completed | |
1157 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
|
Completed | |
1158 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
|
Completed | |
1159 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sunflag Iron & Steel Company Ltd. & Others under Regulation 29, 30, 31 & 32 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 for removing difficulty in depositing 2 months Security Deposit with Distribution licensee.
154 of 2022
|
Completed | |
1160 | Fri 04/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the order dated 16.03.2022 passed by the learned commission in case no. 170 of 2018 and seeking appropriate reliefs towards compliance of the order and for refund of amounts by the respondent to the petitioner.
152 of 2022
|
Completed | |
1161 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited seeking approval for Change in Law due to increase in approved variable cost of thermal generating stations due to mandated use of imported coal as per directions issued by ministry of power, Government of India and prompt recovery of imported coal cost impact by adjustment in variable cost of respective station and billing mechanism.
144 of 2022
|
Completed | |
1162 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited (PIEL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pertinent Infra and Energy Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 125 of 2020.
136 of 2022
|
Completed | |
1163 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited (PIL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pristine Industries Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 124 of 2020.
135 of 2022
|
Completed | |
1164 | Tue 01/11/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited (PPL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Priyadarshini Polysacks Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against noncompliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 126 of 2020.
134 of 2022
|
Completed | |
1165 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
|
Scheduled | |
1166 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited under 142, 144 & 146 of the Electricity Act 2003 seeking non compliance of the Electricity Ombudsman at Nagpur, in representation number 08/2021 dated 04.06.2021.
141 of 2022
|
Scheduled | |
1167 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Distribution) under Section 86(1)(b) of the Electricity Act, 2003 and under Regulation 22 of MERC (Multi Year Tariff) Regulations 2019, in respect of additional power procurement.
137 of 2022
|
Scheduled | |
1168 | Fri 21/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mphasis Limited under Section 142 of the Electricity Act, 2003 for non-compliance of MERC Order dated 30.03.2020 in Case No. 322 of 2019 by the Distribution Licensee (MSEDCL) of Mumbai.
143 of 2022
|
Scheduled | |
1169 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited under section 86 of the Electricity Act 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in rate of basic customs duty on import of inverters and increase in GST rates.
124 of 2022
|
Completed | |
1170 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 21 of the (Deviation Settlement Mechanism and Related Matters) Regulation, 2019. And Application of The Tata Power Company Limited-Distribution seeking stay of the Mechanism Devised by Maharashtra State Load Despatch Centre for calculating and raising the DSM bills/invoices on the Petitioner. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
130 of 2022 & I.A No.8 of 2022 & I.A No.9 of 2022 in 130 of 2022
|
Withdrawn | |
1171 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution for seeking approval for the Bidding Documents, for long term power procurement (25 years) of 225 MW from grid connected Wind-Solar Hybrid Power Projects through competitive bidding process to meet demand of consumers for optimization of power purchase cost.
129 of 2022
|
Completed | |
1172 | Tue 18/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking amendment of Effective Date of the Power Purchase Agreement and grant of approval of the Amended PPA by this Hon’ble Commission.
128 of 2022
|
Completed | |
1173 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
|
Completed | |
1174 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
|
Completed | |
1175 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
|
Completed | |
1176 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Suggestions/Objections on M/s. Sanjay B. Patil's Petition for determination of Project Specific Tariff for Jambre Hydro Electric Project(JHEP)(1 x 2MW) under Regulation 9.1& 10.2of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019and Section 62 (1) (a) & 86 (1) (e) of the Electricity Act,2003.
22 of 2022
|
Completed | |
1177 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
|
Completed | |
1178 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
|
Completed | |
1179 | Fri 14/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
|
Completed | |
1180 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking for seeking approval for procurement of 300 MW Solar Power from Solar Energy Corporation of India Limited (SECI) for meeting the Solar and Non-solar RPO of BEST under Section 86(1)(b) of Electricity Act 2003 and Regulation 21.1 of MERC (Multi Year Tariff) Regulations, 2019.
120 of 2022
|
Completed | |
1181 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Ltd. seeking direction in respect to quash and set aside the alleged notice dated 27th Jan 2022 and 11th Mar 2022 issued by Maharashtra State Electricity Distribution Company Limited upon the Sarla Performance Fibers Limited hereby imposing penalty of Rs 1,14,00,000/- for FY 2019-2020 and 2020-2021 and also seeking direction to amend the Power Purchase Agreement dated 22nd Nov 2018 to the extend of reducing the capacity of the wind power project capacity from 6MW to 4MW with the effect from 20/7/2020.
119 of 2022
|
Completed | |
1182 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Himadri Speciality Chemical Limited (Formerly known as Himadri Chemicals & Industries Limited) under the provisions of Section 86 (1) (E) of The Electricity Act, 2003 read with Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking directions from The Hon’ble Commission to MSEDCL for payment of delayed payment charges in Terms of Energy Purchase Agreement Dated 26.05.2006 and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the energy purchase agreement dated 26.05.2006 entered between the Petitioner and the Respondent.
118 of 2022
|
Completed | |
1183 | Tue 11/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Steel Manufacturers Association of Maharashtra under Regulation 29-32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 seeking amendment/relaxation/removal of difficulties in depositing 2 months security deposit with distribution licensees.
131 of 2022
|
Completed | |
1184 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) for refund of improperly levied wheeling and transmission charges and excess demand penalty under regulation 3.2, 14.6(a), 32 & 37 of MERC DOA Regulations, 2016 and amendment thereof.
116 of 2022
|
Completed | |
1185 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon’ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
|
Completed | |
1186 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Rescheduled till Further Notice | |
1187 | Fri 07/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Little Earth Sampada Realities Pvt. Ltd. (Mr. Sanjay Lalaji More) against MSEDCL under 142, 146 & 147 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Pune Zone Case No. 56 of 2021/46 Dated 16/02/2022 / Case No 57 of 2021/48 Dated 16/02/2022.
117 of 2022
|
Completed | |
1188 | Fri 07/10/2022 10:30:00 AM |
e-Public Hearing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process And Application of Adani Electricity Mumbai Limited under Section 94(2) of the Electricity Act, 2003 for urgent listing and ad-interim relief in Case No. 159/MP/2022.
159 of 2022 & IA No. 32 of 2022 in 159 of 2022
|
Completed | |
1189 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
|
Completed | |
1190 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A No.23 of 2021
|
Completed | |
1191 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
|
Completed | |
1192 | Tue 04/10/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022.
110 of 2022
|
Completed | |
1193 | Tue 04/10/2022 10:30:00 AM |
e-Public Hearing
Petition of Viraj Profiles Private Limited seeking clarification of the Order dated March 19, 2018 in Case No. 159 of 2016 read with Order dated November 26, 2021 in Appeal Nos. 106 of 2018 and batch matters in respect of treatment of certain units held as unscheduled and its treatment by MSEDCL which is not in accordance with applicable laws. And Application of Viraj Profiles Private Limited for urgent listing and ad-interim relief in Case No. 171/AD/2022.
171 of 2022 & IA No. 24 of 2022
|
Completed | |
1194 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units.
109 of 2022
|
Completed | |
1195 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahindra CIE Automotive Limited (MCIE) under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022, in Case No. 116 of 2018. And Application of Mahindra CIE Automotive Limited for bringing on record additional facts and documents, grant of urgent interim relief and initiation contempt proceedings against Respondent No. 1 under section 142, 146 and 149 of the Electricity Act, 2003 for deliberate and willful non-compliance of the order of this Hon’ble Commission.
95 of 2022 & I.A No. 17 of 2022
|
Completed | |
1196 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Bekaert Industries Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated March 16, 2022, in Case No. 170 of 2018.
94 of 2022
|
Completed | |
1197 | Fri 30/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
|
Completed | |
1198 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited seeking compliance of the Order dated May 28, 2019 in Case No. 168 of 2014 of the Hon’ble Commission read with relevant provisions of the Electricity Act, 2003 and works of Licensees Rules, 2006.
167 of 2020
|
Completed | |
1199 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1200 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
|
Completed | |
1201 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
|
Completed | |
1202 | Tue 27/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
1203 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
102 of 2022
|
Completed | |
1204 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief.
99 of 2022
|
Completed | |
1205 | Fri 23/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
|
Completed | |
1206 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 17 May, 2022 in Case No 12 of 2022.
157 of 2022
|
Completed | |
1207 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Vidharbha Private Limited (MHPVPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 26 May, 2022 in Case No 13 of 2022.
145 of 2022
|
Completed | |
1208 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 168 of 2021.
133 of 2022
|
Completed | |
1209 | Tue 20/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 169 of 2021.
132 of 2022
|
Completed | |
1210 | Tue 13/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86 (1)(b) read with and Regulations 92 & 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for Short term Power Purchase for Tata Power -D for October 2022. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
165 of 2022 & I.A No.22 of 2022 in 165 of 2022
|
Completed | |
1211 | Tue 13/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (‘DOA Regulations’), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2022 & Appeal No.122 of 2019 in 218 of 2018
|
Completed | |
1212 | Tue 13/09/2022 10:30:00 AM |
e-Public Hearing
Suggestions/Objections on Petition of Adani Electricity Mumbai Ltd.-Distribution seeking transfer of assets within the SEEPZ SEZ area located in Andheri East, Mumbai to AEML SEEPZ Ltd. (Case No. 3 of 2022)
3 of 2022
|
Completed | |
1213 | Tue 06/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
|
Completed | |
1214 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
|
Completed | |
1215 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
|
Completed | |
1216 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003 .
66 of 2022
|
Completed | |
1217 | Fri 02/09/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) seeking approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
|
Completed | |
1218 | Thu 25/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the Electricity Act, 2003 seeking Review of Order dated 2 November 2021 passed by the Maharashtra Electricity Regulatory Commission in Case No. 91 of 2021 filed by Atnu Solar Power Pvt. Ltd. seeking extension in the SCOD of the Project to the actual date of commissioning.
17 of 2022
|
Completed | |
1219 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 07.09.2021 passed by the Hon’ble Commission in Case No. 51 of 2021.
4 of 2022
|
Completed | |
1220 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. Case No. 148/AT/2022
148 of 2022
|
Completed | |
1221 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
|
Completed | |
1222 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon’ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
|
Completed | |
1223 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
|
Completed | |
1224 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
|
Completed | |
1225 | Tue 23/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
|
Completed | |
1226 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Generation under Sections 86 (1)(k) of the Electricity Act, 2003 read with this Hon’ble Commission’s Guidelines for In-principle Clearance of Proposed Investment Schemes.
29 of 2022
|
Completed | |
1227 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 63 of Electricity Act, 2003 for adoption of tariff for procurement of 800 MW Round the Clock (“RTC”) power on Medium-term basis for the period starting from 01.09.2022 to 14.10.2024 through Tariff Based Competitive Bidding Guidelines issued by the Ministry of Power (MoP), Government of India (GOI).
149 of 2022 and IA No. 15 of 2022 in 149 of 2022
|
Completed | |
1228 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
|
Completed | |
1229 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
|
Completed | |
1230 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon’ble Commission in Case Nos. 182 of 2014 and 40 of 2015
163 of 2021 and IA No. 2 of 2022 in 163 of 2021
|
Completed | |
1231 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Interim Application of Inox Wind Limited to bring subsequent developments on record & addition of prayer in light of these developments in Case No 120/AD/2021.
IA No. 16 of 2022 in 120 of 2021
|
Completed | |
1232 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner
120 of 2021 & IA No. 25 of 2021 in 120 of 2021
|
Completed | |
1233 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 and IA No. 23 of 2021 in 119 of 2021
|
Completed | |
1234 | Fri 12/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2022 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking extension of Scheduled Commercial Operation Date due to Force Majeure events.
96 of 2022 and IA No. 7 of 2022 in 96 of 2022
|
Completed | |
1235 | Fri 05/08/2022 10:30:00 AM |
Admissibility Hearing
Petition filed by Paranjape Auto Cast Private Limited under sections 86 (1)(k), 94(1)(g), read with Regulations 92 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking certain clarifications in respect of meaning and scope of the term “premises” as used in the Electricity Act, 2003 and various regulations and orders issued by this Hon?ble Commission from time to time. And Application of Paranjape Auto Cast Private Limited for interim relief.
153 of 2022 and IA No. 14 of 2022 in 153 of 2022
|
Completed | |
1236 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
|
Completed | |
1237 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in 139/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022.
139 of 2022 and IA No. 13 of 2022 in 139 of 2022
|
Completed | |
1238 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in Case No. 138/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place.
138 of 2022 and IA No. 12 of 2022 in Case No.138 of 2022
|
Completed | |
1239 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. R. L. Steels and Energy Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Aurangabad Case No. 875/2021 Order dated 26.04.2022. Case No.(111 of 2022)
111 of 2022
|
Completed | |
1240 | Fri 05/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022. Case No.(110 of 2022)
110 of 2022
|
Completed | |
1241 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
|
Completed | |
1242 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1243 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units. Case No.(109 of 2022)
109 of 2022
|
Completed | |
1244 | Tue 02/08/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the Order dated 02.02.2022 passed by the learned Commission in Case No. 116 of 2018 and seeking appropriate reliefs towards compliance of the Order and refund amounts by the Respondent to the Petitioner. Case No.(108 of 2022)
108 of 2022
|
Completed | |
1245 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
31 of 2022
|
Completed | |
1246 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra CIE Automotive Limited seeking action against MSEDCL seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
37 of 2022
|
Completed | |
1247 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Hon’ble Commission in Case No. 103/2021.
38 of 2022
|
Completed | |
1248 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
148 of 2022
|
Completed | |
1249 | Fri 29/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
|
Rescheduled | |
1250 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003. Case No.(103 of 2022)
103 of 2022
|
Completed | |
1251 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Gulab Shaha Chand Shaha against MSEDCL under 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 87 of 2021 Order No. EE/CGRF/AKZ/Akola/50 dated 27.01.2022. Case No.(104 of 2022)
104 of 2022
|
Completed | |
1252 | Tue 26/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking, (BEST) under Section 62 of Electricity Act 2003 read with Section 86 (1) (b) of the Electricity Act 2003 in the matter of submission of the proposal for Extension of PPA. Case No.(107 of 2022)
107 of 2022
|
Completed | |
1253 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility’s for implementation of Electricity (Late Payment Surcharge) Rules 2021 notified by Ministry of Power (MoP) on dtd.22.02.2021. (Case No. 97 of 2022)
97 of 2022
|
Completed | |
1254 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief. (Case No. 99 of 2022)
99 of 2022
|
Completed | |
1255 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by D’ Décor Home Fabrics Private Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 32 of the MERC (Distribution Open Access) Regulations 2016 against Maharashtra State Electricity Distribution Company Limited for non-compliance / non-implementation of this Hon’ble Commission’s Order dated 07.12.2021 in Case No. 103 of 2021 read with the Hon’ble Appellate Tribunal’s Judgment dated 12.08.2021 in Appeal No. 70/2019 (Case no. 101 of 2022)
101 of 2022
|
Completed | |
1256 | Tue 19/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. (Case no. 102 of 2022)
102 of 2022
|
Completed | |
1257 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
|
Completed | |
1258 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s P-One Techpark Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner M/s P-One Techpark Private Limited for the IT/ITeS SEZ at Rajiv Gandhi Infotech Park, MIDC, Hinjewadi Phase III, Pune and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing P-One Techpark Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the ‘ceiling tariff’ in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
91 of 2022
|
Completed | |
1259 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
|
Completed | |
1260 | Fri 15/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. New Parth Developers under Section 142 and 146 of the Electricity Act 2003 for Non-Compliance of Order of CGRF Bhandup Dated 19/04/2021 in Case No.83 of 2021.
93 of 2022
|
Completed | |
1261 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for procurement of flexible and schedulable power from Renewable Energy sources with energy storage facility on long term basis for 25 Years from Renewable Sources and approval of tender documents.
86 of 2022
|
Schedule | |
1262 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MERC, 2020.
85 of 2022
|
Schedule | |
1263 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
|
Schedule | |
1264 | Tue 12/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) to Revise the Common Order passed on dated 30/08/2019 by Sub Divisional Magistrate (SDM), Pachora, Dist.- Jalgaon in Case No. SDM-2/ KV/ MSETCL Tower/ 317/ 2019. - Case No. 343 of 2019
343 of 2019
|
Completed | |
1265 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
|
Schedule | |
1266 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon'ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
|
Schedule | |
1267 | Fri 08/07/2022 10:30:00 AM |
Admissibility Hearing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for approval of Final Truing up of FY 2018-19, FY 2019-20 and FY 2020-21 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period from FY 2021-22 to FY 2024-25.
19 of 2022
|
Completed | |
1268 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
|
Completed | |
1269 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
|
Completed | |
1270 | Fri 08/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
|
Completed | |
1271 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
|
Schedule | |
1272 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pee Vee Textiles Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking Grant of Power Factor Incentive on Open Access Consumption for the period June 2015 to July 2016. & Petition seeking Implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
74 of 2022
|
Schedule | |
1273 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Fiat India Automobiles Pvt. Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking grant of Power Factor Incentive on open access consumption for the period May 2015 to July 2019. & Petition seeking implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
73 of 2022
|
Schedule | |
1274 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Gimatex Industries Pvt. Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 07.12.2021 passed by this Hon'ble Commission in Case No. 103/2021 and petition seeking implementation of The Judgment dated 12.08.2021 passed by The Hon'ble APTEL in Appeal No. 70/2019 in the matter of "Jindal Poly Films Limited Vs. MERC & Anr" on the issue of applicability of Power Factor Incetive on Open Access consumption in MSEDCL Distribution License Area.
49 of 2022
|
Schedule | |
1275 | Fri 01/07/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
|
Completed | |
1276 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited & Anr. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 against MSEDCL for adjudication of dispute arising under Open Access and for payment of interest on the amount illegally recovered under the Open Access Regulations and petition under Section 62 (6) of the Electricity Act, 2003 for payment of interest on the amount illegally recovered by MSEDCL.
77 of 2022
|
Schedule | |
1277 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
|
Schedule | |
1278 | Tue 28/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mayura Steels Pvt. Ltd. seeking implementation of Regulation 3, 7, 9 and 10 of the MERC (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2010 W.R.T following the procedures envisaged therein and pay for the power which has already been Accouted towards RPO and under Section 86 (1) (e) of the Electricity Act, 2003 seeking directions to MSEDCL for payment of power w.e.f 25.03.2012 till 06.06.2018 since the power injected by the petitioner was injected on the basis of assuance of a long-term EPA.
71 of 2022
|
Schedule | |
1279 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ambuja Intermediates Pvt. Ltd. (Formerly known as Sinewave Biomass Power (P) Limited) under Regulation 20 of the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date and petition under the provisions of Section 86 (1) (e) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of late payment surchagre in terms of Energy Purchase Agreement dated 05.02.2011 entered in accordance with the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010.
70 of 2022
|
Schedule | |
1280 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
|
Scheduled | |
1281 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon'ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003.
66 of 2022
|
Schedule | |
1282 | Fri 24/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kalika Steel Alloys Pvt Ltd. & Ors. under Section under Section 57, 61, 86 and 181 of the Electricity Act 2003 seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand.
65 of 2022
|
Schedule | |
1283 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
|
Schedule | |
1284 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
|
Schedule | |
1285 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
|
Schedule | |
1286 | Tue 21/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited seeking clarification of Obseravtions under Para 13.4 of Order dated 06.08.2021 passed in Case No. 67 of 2021 by this Hon'ble Commission and petition as per the Judgment dated 10.12.2021 passed by the Hon'ble Supreme Court in Civil Appeal Nos. 5074-5075/2018 â"MSEDCL Versus M/s. JSW Steel Limited & Orsâ"
61 of 2022
|
Schedule | |
1287 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
|
Schedule | |
1288 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
|
Reschedule | |
1289 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon'ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
|
Schedule | |
1290 | Fri 17/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited under the provisions of Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case No. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and direction to revise incorrect monthly billing methodology followed by Maharashtra State Electricity Distribution Company Limited for FY 2018-19.
57 of 2022
|
Schedule | |
1291 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
|
Schedule | |
1292 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Mahindra Sanyo Special Steel Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
81 of 2022
|
Schedule | |
1293 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Inox Air Products Private Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
75 of 2022
|
Schedule | |
1294 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Asahi India Glass Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
55 of 2022
|
Schedule | |
1295 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
|
Schedule | |
1296 | Tue 14/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Section 86 (1) (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Articles 3, 4 and 11 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, extension of Scheduled Commercial Operation Date due to Force Majeure events.
53 of 2022
|
Schedule | |
1297 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to
directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval
of claims related to flexible utilization of coal (coal tolling) arrangement carried out
as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under
Case IV Phase II.
128 of 2021
|
Schedule | |
1298 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Tata Power-Distribution) under Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 92 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for part commissioning of 225 MW Long Term Hybrid project and procurement of Non-solar (Wind) power to meet the Renewable Purchase Obligation of Tata Power-Distribution.
52 of 2022
|
Schedule | |
1299 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Dhariwal Infrastructure Limited (DIL) in the matter of Section 94 (1) (g) read with Regulation 32, 35 to 39, 92 and 94 of the MERC (Conduct of Business) Regulations, 2004; and In the matter of Methodology for use of coal by State in Private Generating Stations (IPPS) namely, Case - 4: Flexibility in utilization of coal in IPP Stations, dated 20.02.2017 evolved by Government of India through a mode of competitive bidding along with the amendments to it, issued till date; and under Regulation 33 (Principles of Merit Order Despatch for Operation of INSG connected to INSGS) of MERC (State Grid Code) Regulations, 2020; and in the matter of order dated 30.11.2021 passed by this Hon'ble Commission in the Case No. 128 of 2021.
48 of 2022
|
Schedule | |
1300 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85(a) of the MERC (Conduct of Business) Regulations, 2004, seeking review and modification of Order dated 17.08.2021 passed by this Hon'ble Commission in Case No. 27 of 2021.
47 of 2022
|
Schedule | |
1301 | Fri 10/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
|
Schedule | |
1302 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
|
Reschedule | |
1303 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Anil Yashawantrao Jadhav under Sections 143, 146 of the Electricity Act, 2003, seeking compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 February, 2021 in Case No. 21 of 2020.
42 of 2022
|
Completed | |
1304 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner The Tata Power Company Limited- Distribution (TPC-D) seeking review and recall of the Order dated 09.12.2020 in Case No. 58 of 2020 in terms of the liberty granted by the Hon'ble Tribunal in its Order dated 31.08.2021 in Appeal No. 5 of 2021 - TPC-D v. MERC & Ors.
166 of 2021
|
Completed | |
1305 | Tue 07/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & IA No. 25 of 2021
|
Completed | |
1306 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs.
and
Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021
|
Reschedule with further notice | |
1307 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Govindrao Prithviraj Potdar for execution of the Order dated 28.01.2019 of Consumer Grievance Redressal Forum, Kolhapur in Case No. 42/2018-19/20 and Order dated 22.08.2019 of MERC in Case No. 144 of 2019.
25 of 2022
|
Completed | |
1308 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Gro Solar Energy Private Limited under section 86(1)(f) of the Electricity Act 2003 for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules and increase in rate of basic customs duty on import of solar inverters in terms of Article 8 of the Power Purchase Agreement dated 31.10.2019 entered between M/s Gro Solar Energy Private Limited and Maharashtra State Power Generation Co. Ltd. for development of solar energy based power plant of 07 MW capacity at Village Degaon, Taluka Sindakhede, District. Dhule, Maharashtra.
28 of 2022
|
Completed | |
1309 | Fri 03/06/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Nareshkumar Motilal Ahuja under Non - Revenue Grievance - Others Type Category (Removal & Shifting of Meter Cabin) of the Indian Electricity Act, 2003 (IEA) under Section 42 & 46 for not passing transparent Order / Judgment as prayed for in the Complaint / Grievance / Representation filed by the Petitioner instead of declaring / issuing Judgment / Order (Dated : 22/09/2021 in Representation No. 54 of 2021) against the Codes & Standards + MERC norms by Mr. Deepak Lad (Chairman & Coram : Hon'ble Electricity Ombudsman (Mumbai) [EO(M)]).
20 of 2022
|
Completed | |
1310 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Ltd. for directions on behalf of the Petitioner / Applicant pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 118 of 2021. And
Case of Adani Power Maharashtra Limited pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 40 of 2022.
MA No .76 of 2022 in 227 of 2018 And 124 of 2018
|
Completed | |
1311 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar (STKWSNNSL) seeking appropriate dispensation or relaxation from applicability of amended Regulation 20.3 under Regulation 39 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019, particularly applicability of monthly Banking provisions thereunder for its Four (4) of the Hydro Electric Projects.
88 of 2022
|
Completed | |
1312 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Wind World (India) Limited for determination of the Average Power Procurement Cost of the MSEDCL each year from FY 2016-17 to FY 2019-20 in order to comply with the provisions of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.01.2010 and for seeking directions to MSEDCL for releasing payments towards purchase of unutilized banked energy for FY 2016-17 to FY 2020-21 in terms of the MERC (Distribution Open Access) Regulations, 2016 and amendment thereof.
14 of 2022
|
Completed | |
1313 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Morries Energy Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills and delayed payment charges in terms of energy purchase agreement dated 26.02.2009.
171 of 2021
|
Completed | |
1314 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Hercules Hoists Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding amounts in terms of energy purchase agreement's executed between the parties from time to time.
170 of 2021
|
Completed | |
1315 | Tue 31/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
|
Completed | |
1316 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Trust (JNPT) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and 'Guidelines for Shortterm (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process' issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1 MW for a period of one year from 1 July, 2022 to 30 June, 2023.
90 of 2022
|
Completed | |
1317 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
|
Completed | |
1318 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
|
Reschedule with further notice | |
1319 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. TP Kirnali Limited & M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 read with Regulation 92 of the MERC (Conduct of Business) Regulations 2004 seeking extension of the Scheduled Commercial Operation Date of the proposed 100 MW project to 21.08.2022 ("SCOD").
167 of 2021
|
Completed | |
1320 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
|
Reschedule with further notice | |
1321 | Fri 27/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
|
Completed | |
1322 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
163 of 2021 And IA No. 02 of 2022 in 163 of 2021
|
Completed | |
1323 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ACME Heergarh Powertech Private Limited (AHPPL) seeking extension of the scheduled commercial operation date from 28 December 2021 to 14 September 2022, account of certain Force Majeure events including second surge of Covid-19 in India and disruption in import of modules from China impacting the development of the project.
7 of 2022
|
Completed | |
1324 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
|
Completed | |
1325 | Tue 24/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited for approval of the Power Procurement Plan for both its SEZ's combinedly in its capacity as a Distribution Licensee & approve the deviations in medium term power procurement Guidelines for "Procurement of Electricity for Medium Term from Power Stations set upon Finance, Own and Operate (FOO) basis" dated 30.01.2019 issued by the Ministry of Power, Government of India, considering operational expediencies, for the period of 3 years starting from 1st November 2022 to 31st October 2025 for both its IT and ITES SEZ at Survey No.72, Village Kharadi, Pune (EON SEZ Phase-I) and survey no. 77, MIDC Knowledge Park, Kharadi, District Pune,(EON SEZ Phase-II) in the State of Maharashtra.
82 of 2022 & IA No. 05 of 2022 in 82 of 2022
|
Completed | |
1326 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Essel Mining & Industries Limited under Sections 86(1)(e), 86(1)(f) and 86(1)(K) of the Electricity Act, 2003 seeking appropriate relief for adjudication of disputes between the petitioner and MSEDCL under provisions of Power Purchase Agreement dated November 22, 2018 and quashing of notice dated January 27, 2022 issued by the MSEDCL.
79 of 2022 And IA No. 04 of 2022 in 79 of 2022
|
Completed | |
1327 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1328 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Roha Dyechem Pvt. Ltd. for directions to Maharashtra State Electricity Distribution Company Ltd. with regard to the terms of Open Access permissions.
119 of 2018 And 19 of 2019 And 118 of 2019 And 119 of 2019
|
Completed | |
1329 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 15.85 MW wind power from the wind generators whose EPAS with MSEDCL have expired.
67 of 2022
|
Completed | |
1330 | Fri 20/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Application of RattanIndia Power Ltd. for directions on behalf of the Petitioner / Applicant pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 118 of 2021.
AND
Case of Adani Power Maharashtra Limited pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 40 of 2022.
MA No.76 of 2022 in Re-opened Case No. 227 of 2018 And 124 of 2018
|
Completed | |
1331 | Tue 17/05/2022 11:00:00 AM |
e-Public Hearing
Re-scheduling of public hearing on Suo- Motu Draft Order on Renewable Energy Tariff for FY 2022-23 and extension of time for comments on proposed Draft Order
1 of 2022
|
Completed | |
1332 | Tue 17/05/2022 10:30:00 AM |
e-Public Hearing
Inviting Comments on amendment of Specific Conditions Regulations of Gigaplex Estate Pvt. Ltd. under Section 18 of the Electricity Act, 2003
74 of 2021
|
Completed | |
1333 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nature International Private Limited under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(e), 86(1)(f), 86(1)(k), of the Electricity Act, 2003, seeking appropriate relief on account of change in law as provided under Power Purchase Agreement dated September 30, 2020 due to the increase in goods and service tax rates on solar panels/modules and increase in custom duty on solar inverter.
41 of 2022
|
Completed | |
1334 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
|
Completed | |
1335 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
|
Completed | |
1336 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Cogeneration Association of India (CAI) under Section 94(f) of the Electricity Act, 2003 read with Regulation 85 and 92 of the MERC (Conduct of Business) Regulations, 2004 for seeking clarifications/ review of the order dated 11.01.2022 passed in Case No. 129 of 2021.
40 of 2022
|
Completed | |
1337 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sunfree Paschim Renewable Energy Private Limited under the provisions of the Electricity act, 2003 and more particularly sections 86(1)(e), 86(1)(f), 86(1)(k), of the electricity act, 2003, seeking appropriate relief on account of change in law as provided under power purchase agreement dated September 30, 2020 due to the increase in goods and service tax rates on solar panels/modules and increase in custom duty on solar inverter.
39 of 2022
|
Completed | |
1338 | Fri 13/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Honâ??ble Commission in Case No. 103/2021.
38 of 2022
|
Reschedule | |
1339 | Tue 10/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Hon'ble Commission in Case No. 103/2021.
38 of 2022
|
Completed | |
1340 | Tue 10/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra CIE Automotive Limited seeking action against MSEDCL seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Honâ??ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
37 of 2022
|
Completed | |
1341 | Tue 10/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of City and Industrial Development Corporation (CIDCO) for Energy Bill wrongly charged by MSEDCL in Tariff of HT- II Commercial instead of HT-IV public water works for CIDCO's Public Water Works and Sewage Treatment Plant (STP), Sewage Pump House in CIDCO's jurisdiction area.
36 of 2022
|
Completed | |
1342 | Tue 10/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Shree Steel Castings P. Ltd. under Regulation 95 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 , section 94(f), section 45(4) and Section 142 of Electricity Act 2003 for Recovery of benefit of High Tension Non-Continuous Tariff given to various consumers across the State of Maharashtra during the period commencing from 1.6.2008 despite the fact that they did not observe staggering holiday on various occasions and not taking appropriate action with regard to selective, inconsistent and discriminatory treatment given to different applicants for changing tariff from continuous to non continuous.
35 of 2022
|
Completed | |
1343 | Tue 10/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon'ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
31 of 2022
|
Completed | |
1344 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 42(1) and Section 86 (1) (b) of the Electricity Act, 2003 for approval of Short term Power Purchase Arrangement for sourcing of Power to Cater to the demand of the State.
87 of 2022
|
Completed | |
1345 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Dhariwal Infrastructure Limited (DIL) in the matter of Section 94 (1) (g) read with Regulation 32, 35 to 39, 92 and 94 of the MERC (Conduct of Business) Regulations, 2004; and In the matter of Methodology for use of coal by State in Private Generating Stations (IPPS) namely, Case - 4: Flexibility in utilization of coal in IPP Stations, dated 20.02.2017 evolved by Government of India through a mode of competitive bidding along with the amendments to it, issued till date; and under Regulation 33 (Principles of Merit Order Despatch for Operation of INSG connected to INSGS) of MERC (State Grid Code) Regulations, 2020; and in the matter of order dated 30.11.2021 passed by this Hon'ble Commission in the Case No. 128 of 2021.
48 of 2022
|
Completed | |
1346 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
|
Completed | |
1347 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
|
Completed | |
1348 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Avaada Sunce Energy Private Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of the Scheduled Commissioning Date on account of Force Majeure events which have prevented M/s. Avaada Sunce Energy Private Limited from commissioning of 150 MW capacity out of the total 350 MW solar photovoltiac power plant at Village Noorsar, Taluka - Bikaner, District - Bikaner, State - Rajasthan by the Scheduled Commissioning Date, on account of certain Force Majeure events including Covid-19 and disruption in import of modules from China impacting the progress of the Project.
33 of 2022
|
Completed | |
1349 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
|
Reschedule | |
1350 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Generation under Sections 86 (1)(k) of the Electricity Act, 2003 read with this Hon'ble Commission's Guidelines for In-principle Clearance of Proposed Investment Schemes.
29 of 2022
|
Completed | |
1351 | Fri 06/05/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the Electricity Act, 2003 seeking Review of Order dated 2 November 2021 passed by the Maharashtra Electricity Regulatory Commission in Case No. 91 of 2021 filed by Atnu Solar Power Pvt. Ltd. seeking extension in the SCOD of the Project to the actual date of commissioning.
17 of 2022
|
Completed | |
1352 | Fri 29/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 07.09.2021 passed by the Honâ??ble Commission in Case No. 51 of 2021.
4 of 2022
|
Reschedule with further notice | |
1353 | Fri 29/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition The Tata Power Company Limited- Distribution (TPC-D) seeking review and recall of the Order dated 09.12.2020 in Case No. 58 of 2020 in terms of the liberty granted by the Honâ??ble Tribunal in its Order dated 31.08.2021 in Appeal No. 5 of 2021 â?? TPC-D v. MERC & Ors.
166 of 2021
|
Completed | |
1354 | Fri 29/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
|
Completed | |
1355 | Fri 29/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1356 | Tue 26/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.
AND
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021, MA No 23 of 2021, 36 of 2021 and I.A. No 38 of 2021 in 70 of 2021
|
Completed | |
1357 | Tue 26/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Aurangabad Industrial Township Limited (AITL) for the exemption granted to AITL pursuant to the Order dated 3rd September 2021 in Case No. 29 of 2019 from License stipulation for distributing Electricity.
161 of 2021
|
Completed | |
1358 | Tue 26/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of RattanIndia Power Limited seeking issuance of appropriate directions to MSEDCL to pay 75% of the total amount due and payable to the petitioner in terms of the Remand Judgment in Appeal No. 264 of 2018 as an interim relief.
153 of 2021
|
Completed | |
1359 | Tue 26/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Sai Wardha Power Generation Limited seeking adjudication on the operational parameters and methodologies for computing compensation for change in law events.
150 of 2021
|
Completed | |
1360 | Tue 26/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) RattanIndia Power Limited in terms of liberty granted by the Commission in its Order dated 27.02.2018 passed in Case No. 138 of 2015 seeking capacity charges for over injection during FY 2013-14 to July 2016 and seeking damages for inordinate delay in making payments.
146 of 2021
|
Completed | |
1361 | Fri 22/04/2022 10:30:00 AM |
e-Public Hearing
Inviting Suggestions / Objections in the matter of Generic Renewable Energy Tariff for FY 2022-23 under MERC (Renewable Energy Tariff) Regulations, 2019
1 of 2022
|
Reschedule | |
1362 | Fri 22/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
|
Reschedule | |
1363 | Fri 22/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
|
Reschedule | |
1364 | Fri 22/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Honâ??ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
|
Reschedule | |
1365 | Fri 22/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.
AND
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021, MA No 23 of 2021, 36 of 2021 and I.A. No 38 of 2021 in 70 of 2021
|
Reschedule | |
1366 | Tue 19/04/2022 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
|
Reschedule | |
1367 | Tue 19/04/2022 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the â??Change in Lawâ?? event being increase in Acquisition Price.
142 of 2021
|
Reschedule | |
1368 | Tue 19/04/2022 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
|
Reschedule | |
1369 | Tue 19/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for in principle approval for procurement of the power re-allocated
by Ministry of Power, Government of India from NTPC power stations to Maharashtra for short term period.
68 of 2022
|
Completed | |
1370 | Tue 19/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Roha Dyechem Pvt. Ltd. for directions to Maharashtra State Electricity Distribution Company Ltd. with regard to the terms of Open Access permissions.
AND
Petition of Arvind Cotsyn (India) Ltd. regarding unilateral reduction of Open Access capacity and non-compliance of MERC Order dated 27 February 2018 in Case No. 80 of 2016 by Maharashtra State Electricity Distribution Co. Ltd.
AND
Petition of Western Precicast Pvt. Ltd. for adjudication of dispute regarding wrongful curtailment of Open Access capacity and denial of Medium Term Open Access.
AND
Petition of Jsons Foundry Pvt. Ltd. for adjudication of dispute regarding wrongful curtailment of Open Access capacity and denial of Medium Term Open Access
119 of 2018 And 19 of 2019 And 118 of 2019 And 119 of 2019
|
Completed | |
1371 | Tue 19/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
|
Completed | |
1372 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for Adoption of Tariff discovered for Long Term Procurement of 385.3 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
50 of 2022
|
Schedule | |
1373 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for Adoption of Tariff discovered for Long Term Procurement of 10.5 MW Solar Power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
51 of 2022
|
Schedule | |
1374 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
|
Schedule | |
1375 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I.A. No. 25 of 2021
|
Schedule | |
1376 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Maharashtra State Electricity Company Limited seeking directions to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 pandemic.
84 of 2021
|
Schedule | |
1377 | Tue 12/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
AND
Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable provisisons of law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020 and Dairy No. 139 of 2021 in 226 of 2020
|
Schedule | |
1378 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
|
Completed | |
1379 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution under Sections 86, 142, 146 and 149 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 07.01.2022 in Case No. 82 of 2021.
44 of 2022
|
Completed | |
1380 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
|
Reschedule with further notice | |
1381 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Talegaon Floriculture Park Flower (Through Shri Malharrao Virchand Dhole, Secretary) for MSEDCL has changed the tariff classification of growers of the MIDC Floriculture Park, Talegaon, Dist. Pune from LT IV (B)-Agriculture-metered pumpsets to LT IV (C)-Agriculture-others as per their Commercial Circular dt 03/04/2020 and has discontinued Govt. subsidy. The classification of floriculture should be restored to LT IV (B) and the subsidy restored.
124 of 2021
|
Completed | |
1382 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs.
and
Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021 in 119 of 2021
|
Reschedule with further notice | |
1383 | Fri 08/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
|
Completed | |
1384 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the "Change in Law" event being increase in Acquisition Price.
142 of 2021
|
Completed | |
1385 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
30 of 2022 in 142 of 2021
|
Completed | |
1386 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
28 of 2022
|
Completed | |
1387 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited for granting special relaxation and to issue directions to MSEDCL to issue credit note against the wind power (from WTG L-12 located at Bhramanvel in Dhule District commissioned on 24.03.2006) already injected power for the only one month of March, 2020 into grid and also consumed by MSEDCL because prior and after of which there are valid LTPPA/ SPPAs valid up to 31.12.2022 but due to technical snag in online Short Term PPA system during the month Feb-March-2020 and also ongoing sub-judice pending issue of Inter-state open Access(Still pending in APTEL vide DFR no 356 of 2020) still unpaid.
27 of 2022
|
Completed | |
1388 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Govindrao Prithviraj Potdar for execution of the Order dated 28.01.2019 of Consumer Grievance Redressal Forum, Kolhapur in Case No. 42/2018-19/20 and Order dated 22.08.2019 of MERC in Case No. 144 of 2019.
25 of 2022
|
Completed | |
1389 | Tue 05/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Wind World Wind Farms (Sai) Private Limited under Section 86(1)(b), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to the Respondent for releasing payment against the outstanding monthly invoices towards sale of wind energy along with the interest/late payment surcharge on such delayed payments as per Article 12.02 of the Eight identical Power Purchase Agreements dated 21.05.2007, 03.07.2008, 01.10.2008, 01.10.2008, 10.12.2008, 17.03.2009, 17.03.2009 and 30.03.2009.
24 of 2022
|
5 | |
1390 | Fri 01/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for Adoption of Tariff discovered for Long Term Procurement of 31.75 MW Solar Power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of The Electricity Act 2003 for Meeting the Solar Renewable Purchase Obligations.
23 of 2022
|
Completed | |
1391 | Fri 01/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Nareshkumar Motilal Ahuja under Non - Revenue Grievance - Others Type Category (Removal & Shifting of Meter Cabin) of the Indian Electricity Act, 2003 (IEA) under Section 42 & 46 for not passing transparent Order / Judgment as prayed for in the Complaint / Grievance / Representation filed by the Petitioner instead of declaring / issuing Judgment / Order (Dated : 22/09/2021 in Representation No. 54 of 2021) against the Codes & Standards + MERC norms by Mr. Deepak Lad (Chairman & Coram : Hon'ble Electricity Ombudsman (Mumbai) [EO(M)]).
20 of 2022
|
Reschedule with further notice | |
1392 | Fri 01/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Pegasus Properties Pvt. Ltd. seeking compliance of the Consumer Grievance Redressal Forum, Pune's Order dated 21 October, 2021 in Case No. 10 of 2021
16 of 2022
|
Completed | |
1393 | Fri 01/04/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Wind World (India) Limited for determination of the Average Power Procurement Cost of the MSEDCL each year from FY 2016-17 to FY 2019-20 in order to comply with the provisions of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.01.2010 and for seeking directions to MSEDCL for releasing payments towards purchase of unutilized banked energy for FY 2016-17 to FY 2020-21 in terms of the MERC (Distribution Open Access) Regulations, 2016 and amendment thereof.
14 of 2022
|
Completed | |
1394 | Tue 29/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for refund of Rs. 50.44 crore paid to Sai Wardha Power Ltd. in pursuance of Tripartite Energy Purchase
Agreements, and Rs. 8.79 crore towards the balance of Cross-Subsidy Surcharge for FY 2012-13.
Case No. 206 of 2014 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 15.03.2022 IN Appeal No. 46 of 2018 & IA Nos. 233 of 2018 & 35 of 2019 directions to the
Commission therein.)]
206 of 2014
|
Completed | |
1395 | Tue 29/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Vidharbha Private Limited (MHPVPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 24 MW Gosikhurd Small Hydro Project as per EPA dated 25 July, 2016.
13 of 2022
|
Completed | |
1396 | Tue 29/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 4.8 MW Veer Small Hydro Project as per EPA dated 12 April, 2017.
12 of 2022
|
Completed | |
1397 | Tue 29/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 4 MW Sonawade Small Hydro Project as per EPA dated 22 November, 2010.
11 of 2022
|
Completed | |
1398 | Tue 29/03/2022 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on Maharashtra Airport Development Company Limited-
Distribution Business's Multi Year Tariff Petition for Final True up of FY 2014-15 to FY 2019-20 and Approval of ARR and
Tariff for Fourth Control Period from FY 2020-21 to FY 2024-25
235 of 2020
|
Completed | |
1399 | Fri 25/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) under Regulation 22 of MERC (Multi-Year Tariff) Regulations, 2019, in respect of Additional Power Procurement and approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period April'2022 to June'2022 and Ministry of Powerâ??s Guidelines dated 30th Marchâ??2016 for short-term procurement of power by Distribution Licensees through tariff-based bidding process.
46 of 2022
|
Completed | |
1400 | Fri 25/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. AEML SEEPZ Limited under Section 14, 16 of the Electricity Act, 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006, for taking on record the deemed distribution licensee status of the petitioner and for issuance of Specific Conditions of Distribution License in pursuance of the Govt of India Notification dated 03.03.2010 issued by the Central Government under Clause (b) of sub-section (1) of the Section 49 of the Special economic Zones Act, 2005.
2 of 2022
|
Completed | |
1401 | Fri 25/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
|
Completed | |
1402 | Fri 25/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Morries Energy Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills and delayed payment charges in terms of energy purchase agreement dated 26.02.2009.
171 of 2021
|
Completed | |
1403 | Fri 25/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Hercules Hoists Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding amounts in terms of energy purchase agreement's executed between the parties from time to time.
170 of 2021
|
Completed | |
1404 | Tue 22/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
|
Completed | |
1405 | Tue 22/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Bhulani Steel Pvt. Ltd. against MSEDCL under Section 142 & 146 of the Electricity Act, 2003 for not complying with the Order dated 21st February 2018 of the CGRF, Kalyan and the Order dated 30th May, 2018 of the Electricity Ombudsman (Mumbai) in Representation No. 55 of 2018.
169 of 2021
|
Completed | |
1406 | Tue 22/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Agarwal Fastners Pvt. Ltd. against MSEDCL under Section 142 & 146 of the Electricity Act, 2003 for not complying with the Order dated 21st February 2018 of the CGRF, Kalyan and Order dated 30th May 2018 of Electricity Ombudsman (Mumbai) in Representation No. 56 of 2018.
168 of 2021
|
Completed | |
1407 | Tue 22/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. TP Kirnali Limited & M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 read with Regulation 92 of the MERC (Conduct of Business) Regulations 2004 seeking extension of the Scheduled Commercial Operation Date of the proposed 100 MW project to 21.08.2022 ("SCOD").
167 of 2021
|
Completed | |
1408 | Fri 11/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 03.01.2020 filed on behalf of M/s. Tata Power Renewable Energy Limited for approval of the cost incurred due to imposition of safeguard duty for the period of 30.07.2020 to 29.07.2021 on the import of solar cells vide Notification No. 02/2020- Customs (SG) dated 29.07.2020 of the Ministry of Finance, being declared as an event of 'change in law' by this Hon'ble Commission vide order dated 05.03.2021 in Case No. 218 of 2020.
21 of 2022
|
Completed | |
1409 | Fri 11/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ACME Heergarh Powertech Private Limited (AHPPL) seeking extension of the scheduled commercial operation date from 28 December 2021 to 14 September 2022, account of certain Force Majeure events including second surge of Covid-19 in India and disruption in import of modules from China impacting the development of the project.
7 of 2022
|
Completed | |
1410 | Fri 11/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Tata Power Renewable Energy Limited (TPREL) under Section 86(1)(b), Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 03.01.2020 filed on behalf of M/s. Tata Power Renewable Energy Limited for approval of the cost incurred due to change in the rate of Basic Custom Duty from 5% to 20% effective from 02.02.2021 on the import of Solar Inverters vide Notification No. 07/2021- Customs dated 01.02.2021 issued by the Ministry of Finance.
5 of 2022
|
Completed | |
1411 | Fri 11/03/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
AND
Application of Adani Electricity Mumbai Limited- Distribution seeking under Section 94(2) of the Electricity Act, 2003 for placing on record additional information/ documents and for seeking appropriate directions.
163 of 2021 and IA No. 2 of 2022 in 163 of 2021
|
Reschedule with further notice | |
1412 | Fri 25/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
|
Reschedule with further notice | |
1413 | Fri 25/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rajmal Lakhichand Jewellers under Section 86 (1) (E) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Honâ??ble Commission to MSEDCL for payment @ Rs. 2.52/unit for the power injected by Petitioner from 01.04.2020 to 31.08.2020.
123 of 2021
|
Completed | |
1414 | Fri 25/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Case of Azure Power Thirty Four Private Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax vide Notification dated 31.12.2018 issued by the Ministry of Finance.
Case No. 147 of 2020 (Re-opened in pursuance of Honâ??ble APTELâ??s Judgement
dated 08.11.2021.
IN
DFR No. 270 of 2021 & IA No. 1187 of 2021 & IA No. 1188 of 2021 directions
to the Commission therein.)]
147 of 2020
|
Completed | |
1415 | Tue 22/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Eon Kharadi Infrastructure Private Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year) procurement of power for Base Load of 6 MW RTC from 00:00 to 24:00 hours for a period of one year from 1st March, 2022 to 28th February, 2023, for its IT and ITES SEZ at Survey No.72,Village Kharadi, Pune ("SEZ Phase II")
Diary No. 31 of 2022
|
Completed | |
1416 | Tue 22/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 500 MW Wind-Solar hybrid power from the grid connected power projects.
15 of 2022
|
Completed | |
1417 | Tue 22/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from grid connected solar power projects under Section 63 of the Electricity Act, 2003 for meeting the Solar Renewable Purchase Obligations.
10 of 2022
|
Completed | |
1418 | Fri 18/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1419 | Fri 18/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
|
Completed | |
1420 | Fri 18/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner The Tata Power Company Limited- Distribution (TPC-D) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking review of the Order dated 11.10.2021 passed by this Hon'ble Commission in Case No. 88 of 2021.
165 of 2021
|
Completed | |
1421 | Fri 18/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
|
Completed | |
1422 | Tue 15/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
163 of 2021
|
Completed | |
1423 | Tue 15/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Aurangabad Industrial Township Limited (AITL) for the exemption granted to AITL pursuant to the Order dated 3rd September 2021 in Case No. 29 of 2019 from License stipulation for distributing Electricity.
161 of 2021
|
Completed | |
1424 | Tue 15/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner M/s. Bhabani Pigments Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. Bhabani Pigments Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited.
160 of 2021
|
Completed | |
1425 | Fri 11/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
|
Completed | |
1426 | Fri 11/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
|
Completed | |
1427 | Fri 11/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. Interocean Shipping Company under Section 86 (1) (e) of the Electricity Act, 2003 for directions to MSEDCL for payment of power w.e.f 31.03.2015 since the power injected by the petitioner was being accounted towards RPO which can only be done through an EPA under the Renewable Energy policy dated 20th July, 2015 issued by the Government of Maharashtra read with the methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra alongwith MERC (Renewable Purchase Obligation, its compliance and implementation of rec framework) regulations, 2010.
157 of 2021
|
Completed | |
1428 | Tue 08/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Mr. Shantilal K. Jain seeking Non-compliance of Consumer Grievance Redressal Forum, Mumbai Order dated 03.04.2018 in Case No. 82 of 2018 & Electricity Ombudsman Mumbai Order dated 05.07.2018.
156 of 2021
|
Completed | |
1429 | Tue 08/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of Steel Manufacturers Association of Maharashtra seeking review under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 regarding applicability of "Load Factor Incentive" as provided under the Order dated 30.03.2020 in Case No. 322 of 2019.
155 of 2021
|
Completed | |
1430 | Tue 08/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petitioner of Steel Manufacturers Association of Maharashtra seeking review under Regulation 85 of The MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of The Electricity Act, 2003 regarding applicability of 'Baseline consumption for determination of rebate on incremental consumption' for financial year commencing 01.04.2023 as provided under the Order dated 30.03.2020 in Case No. 322 of 2019.
154 of 2021
|
Completed | |
1431 | Fri 04/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of RattanIndia Power Limited seeking directions to Respondent / Maharashtra State Electricity Distribution Co. Ltd for Payment of Amounts Due.
153 of 2021
|
Completed | |
1432 | Fri 04/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Steel Manufacturers Association of Maharashtra under Regulation 32 and 35 of the MERC (Distribution Open Access) Regulation, 2016 seeking grant of Load Factor Incentive on Open Access consumption from Renewable sources of Energy.
152 of 2021
|
Completed | |
1433 | Fri 04/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Dayashankar Harinath Pasi seeking compliance of the Consumer Grievance Redressal Forum, BEST Undertaking Order dated 27 April, 2021.
151 of 2021
|
Completed | |
1434 | Tue 01/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Sai Wardha Power Generation Limited under Section 86(1)(b) read with Section 86(1)(f) of the Electricity Act, 2003 and Article 10 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication on the operational parameters and methodologies for computing compensation for change in law events.
150 of 2021
|
Completed | |
1435 | Tue 01/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. Dhayafule Spinning Mills Pvt. Ltd. seeking compliance of the Consumer Grievance Redressal Forum, Latur Order Case No. 370/05/2013 dated 18 November 2013.
149 of 2021
|
Completed | |
1436 | Tue 01/02/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Minex Metallurgical Co. Ltd.under section 86 of EA 2003 against charging transmission charges and transmission losses by MSEDCL in open access for wheeling of power from Wind mill and penalizing MSEDCL under section 142 for violating DOA 1st amendment Regulation 2019 and violating section 42 of Electricity Act 2003.
147 of 2021
|
Completed | |
1437 | Fri 28/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and in terms of Liberty granted by this Hon'ble Commission in its Order dated 27.02.2018 passed in Case No. 138 of 2015.
146 of 2021
|
Completed | |
1438 | Fri 28/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
|
Completed | |
1439 | Fri 28/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
|
Completed | |
1440 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 500 mw wind-solar hybrid power from the grid connected power projects.
15 of 2022
|
Completed | |
1441 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from grid connected solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar renewable purchase obligations.
10 of 2022
|
Completed | |
1442 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 12.5 MW solar power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 mw capacity projects connected to distribution network under section 63 of the Electricity Act, 2003 for meeting the solar renewable purchase obligations.
9 of 2022
|
Completed | |
1443 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 157.9 mw wind power from the wind generators whose EPAS with MSEDCL have expired.
8 of 2022
|
Completed | |
1444 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the 'Change in Law' event being increase in Acquisition Price.
142 of 2021
|
Completed | |
1445 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Limited under section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act 2003 and Regulation 105 & 106 of the MERC MYT Regulations 2019 for review of Order dated 30.03.2020 in Case No. 296 of 2019 regarding separation of tariff for Koradi unit 6 and 7 for balance MYT control period from FY 21-22 to FY 24-25.
133 of 2021
|
Completed | |
1446 | Fri 21/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.
AND
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021
AND
Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021 AND MA No. 23 of 2021 AND IA No. 36 of 2021 AND IA No. 38 of 2021 in 70 of 2021
|
Completed | |
1447 | Tue 18/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
|
Reschedule with further notice | |
1448 | Tue 18/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Commissions Order dated 22.03.2021 passed by the MERC in Case No. 162 of 2019 filed by Pune Bio Energy Systems Pvt. Limited for determination of tariff of its Municipal Solid Waste processing project situated at Pune and the Order dated 03.07.2021 passed in Case No. 48 of 2021 by the Maharashtra Electricity Regulatory Commission in Review of the Order dated 22.03.2021.
130 of 2021
|
Completed | |
1449 | Fri 14/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
|
Reschedule with further notice | |
1450 | Fri 14/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
|
Reschedule with further notice | |
1451 | Fri 14/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
|
Completed | |
1452 | Tue 11/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner Laxmipati Balaji Supply Chain Management Limited (LBSCML) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2022 to January 31, 2023 for its for FTWZ and IT/ITES SEZ at Village
Sai, Tal. Panvel, Dist. Raigad.
6 of 2022
|
Completed | |
1453 | Tue 11/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
|
Completed | |
1454 | Tue 11/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
|
Completed | |
1455 | Tue 11/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
|
Completed | |
1456 | Tue 11/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
AND
Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable provisions of law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020 AND Diary No. 139 of 2021 in 226 of 2020
|
Completed | |
1457 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Limited seeking Review of the Order dated
29.10.2020 passed by this Hon'ble Commission in Case No.170 of 2018 under
Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra
Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
AND
Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent
hearing and dismissal of the Review Petitions and vacation of the "No Coercive
Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020.
AND
Application Viraj Profiles Limited seeking recall of Order dated 29.10.2020 passed
by this Hon'ble Commission in Case No. 170 of 2018 in view of the judgment dated
07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
224 of 2020 AND MA No. 21 of 2021 AND Diary No. 138 of 2021 in 224 of 2020
|
Completed | |
1458 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt.
Ltd.) seeking Review of the Order dated 29.10.2020 passed by this Hon'ble
Commission in Case No.170 of 2018 under Section 94 of the Electricity Act, 2003
read with Regulation 85 of the Maharashtra Electricity Regulatory Commission
(Conduct of Business) Regulations, 2004.
AND
Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent
hearing and dismissal of the Review Petitions and vacation of the "No Coercive
Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020.
AND
Application BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt.
Ltd.) seeking recall of Order dated 29.10.2020 passed by this Hon'ble Commission in Case No. 170 of 2018 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
223 of 2020 AND MA No. 20 of 2021 AND Diary No. 137 of 2021 in 223 of 2020
|
Completed | |
1459 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Limited seeking Review of the Order dated
22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under
Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra
Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
AND
Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent
hearing and dismissal of the Review Petitions and vacation of the "No Coercive
Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020.
AND
Application Viraj Profiles Limited seeking recall of Order dated 22.10.2020 passed
by this Hon'ble Commission in Case No. 175 of 2017 in view of the judgment dated
07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
222 of 2020 AND MA No. 19 of 2021 AND Diary No. 136 of 2021 in 222 of 2020
|
Completed | |
1460 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges
Works Pvt. Ltd.) seeking Review of the Order dated 22.10.2020 passed by this
Hon'ble Commission in Case No.175 of 2017 under Section 94 of the Electricity
Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory
Commission (Conduct of Business) Regulations, 2004.
AND
Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent
hearing and dismissal of the Review Petitions and vacation of the "No Coercive
Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020.
AND
Application BFN Forgings Pvt. Ltd.(Formerly known as Bebitz Flanges Works Pvt.
Ltd.) seeking recall of Order dated 22.10.2020 passed by this Hon'ble Commission
in Case No. 175 of 2017 in view of the judgment dated 07.06.2021 passed in Appeal
No. 131/2020 by the Hon'ble APTEL, New Delhi.
221 of 2020 AND MA No. 18 of 2021 AND Diary No. 135 of 2021 in 221 of 2020
|
Completed | |
1461 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of SMW ISPAT Private Limited (Formerly known as Mahalaxmi
TMT Pvt. Ltd). seeking Review of the Order dated 22.10.2020 passed by this
Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity
Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory
Commission (Conduct of Business) Regulations, 2004.
AND
Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent
hearing and dismissal of the Review Petitions and vacation of the "No Coercive
Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020.
AND
Application SMW ISPAT Private Limited (Formerly known as Mahalaxmi TMT
Pvt. Ltd). seeking recall of Order dated 22.10.2020 passed by this Hon'ble
Commission in Case No. 175 of 2017 in view of the judgment dated 07.06.2021
passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
220 of 2020 AND MA No. 17 of 2021 AND Diary No. 134 of 2021 in 220 of 2020
|
Completed | |
1462 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive
Status with respect to its 2 x 135 MW Generating Units No. 3 and 4 for FY 2017-18.
170 of 2018
|
Completed | |
1463 | Fri 07/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive
Status with respect to its 2 x 135 MW Generating Units No. 3 and 4 for FY 2016-17.
175 of 2017
|
Completed | |
1464 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Urgent hearing in Petition of ACME Heergarh Powertech Private Limited under Section 86(1)(e), Section 86(1)(f) and 86(1)(k) of the Electricity Act, 2003, read with Article 8 of the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Private Limited and MSEDCL for supply of 300 MW Solar Power from its Solar PV Power Plant at Village - Badisid, Tehsil: Bap, District: Jodhpur, State: Rajasthan seeking inter alia, extension of the scheduled commercial operation date from 28.12.2021 to 14.09.2022, account of certain force majeure events including second surge of covid-19 in India and disruption in import of modules from china impacting the development of the project.
Diary No. 186 of 2021
|
Completed | |
1465 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
M/s. Juniper Green Energy Private Limited and M/s. Nisagra Renewable Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
Case No. 61 of 2020 and 62 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 16.11.2021.
IN
Appeal No. 613 of 2020 and 171 of 2020 directions to the Commission therein.)]
61 of 2020 and 62 of 2020
|
Completed | |
1466 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Case of Azure Power Thirty Four Private Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax vide Notification dated 31.12.2018 issued by the Ministry of Finance.
Case No. 147 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 08.11.2021.
IN
DFR No. 270 of 2021 & IA No. 1187 of 2021 & IA No. 1188 of 2021 directions
to the Commission therein.)]
147 of 2020
|
Completed | |
1467 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust (JNPT) for obtaining the Hon'ble Commission's relaxation of Regulation 3.2 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 and other related matters with respect to its Distribution Franchisee Agreement with MSEDCL.
143 of 2021
|
Completed | |
1468 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
|
Completed | |
1469 | Tue 04/01/2022 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
|
Completed | |
1470 | Tue 28/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 29.08.2018 passed by the CGRF in Grievance No. K/E/1426/1677/ of 2017-2018.
140 of 2021
|
Reschedule with further notice | |
1471 | Tue 28/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
|
Reschedule | |
1472 | Tue 28/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
|
Reschedule | |
1473 | Tue 28/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
|
Reschedule with further notice | |
1474 | Tue 28/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
|
Reschedule with further notice | |
1475 | Fri 10/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 29.08.2018 passed by the CGRF in Grievance No. K/E/1426/1677/ of 2017-2018.
140 of 2021
|
Reschedule | |
1476 | Fri 10/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
|
Reschedule | |
1477 | Fri 10/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
|
Reschedule | |
1478 | Fri 10/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
|
Reschedule | |
1479 | Fri 10/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
|
Reschedule | |
1480 | Tue 07/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Shri Tradco India Pvt Ltd under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
122 of 2021
|
Completed | |
1481 | Tue 07/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Sridevi Trading Company under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
121 of 2021
|
Completed | |
1482 | Tue 07/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Section 94(1)(g) of the Electricity Act
2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra
Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and
Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution
Open Access) Regulations, 2014 for payment in respect of the purchase of surplus
units / over-injected units of energy.
101 of 2021
|
Completed | |
1483 | Tue 07/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons under Section 94(1)(g) of the Electricity
Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the MERC
(Conduct of Business) Regulations, 2004 and Regulation 26.8 of the MERC
(Distribution Open Access) Regulations, 2014 for payment in respect of the
purchase of surplus units / over-injected units of energy.
100 of 2021
|
Completed | |
1484 | Fri 03/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited under section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act 2003 and Regulation 105 & 106 of the MERC MYT Regulations 2019 for review of Order dated 30.03.2020 in Case No. 296 of 2019 regarding separation of tariff for Koradi unit 6 and 7 for balance MYT control period from FY 21-22 to FY 24-25.
133 of 2021
|
Completed | |
1485 | Fri 03/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited under Section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act, 2003 and Regulation 106 of the MERC MYT Regulations 2019 for Removal of difficulties with regards to payment of Service Tax and GST on lease rent for MSPGCL's Hydro stations.
132 of 2021
|
Completed | |
1486 | Fri 03/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghodawat Energy Private Limited & Ors. under Section 142, 146 and 149 of the Electricity Act, 2003 seeking action against MSEDCL for blatant violation and non-compliance with the mandatory provisions of Regulations Governing Open Access regarding purchase of over-injected units.
131 of 2021
|
Completed | |
1487 | Fri 03/12/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Commissions Order dated 22.03.2021 passed by the MERC in Case No. 162 of 2019 filed by Pune Bio Energy Systems Pvt. Limited for determination of tariff of its Municipal Solid Waste processing project situated at Pune and the Order dated 03.07.2021 passed in Case No. 48 of 2021 by the Maharashtra Electricity Regulatory Commission in Review of the Order dated 22.03.2021.
130 of 2021
|
Completed | |
1488 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
M/s. Juniper Green Energy Private Limited and M/s. Nisagra Renewable Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
Case No. 61 of 2020 and 62 of 2020
(Re-opened in pursuance of Hon'ble APTEL's Judgement dated 16.11.2021 IN Appeal No. 613 of 2020 and 171 of 2020 directions to the Commission therein)
61 of 2020 and 62 of 2020
|
Completed | |
1489 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
|
Completed | |
1490 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
|
Completed | |
1491 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India under Section 61(h), Section 86(1)(e) & Section 181 of the Electricity Act, 2003 for seeking clarifications and/or amendments to the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
129 of 2021
|
Completed | |
1492 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
|
Completed | |
1493 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
|
Completed | |
1494 | Tue 30/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. S. M. Steels under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. S. M. Steels and Maharashtra State Electricity Distribution Company Limited.
126 of 2021
|
Completed | |
1495 | Fri 26/11/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
|
Reschedule | |
1496 | Fri 26/11/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
|
Reschedule | |
1497 | Fri 26/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust (JNPT) for obtaining the Hon'ble
Commission's relaxation of Regulation 3.2 of Maharashtra Electricity Regulatory
Commission (Electricity Supply Code and Standards of Performance of Distribution
Licensees including Power Quality) Regulations, 2021 and other related matters
with respect to its Distribution Franchisee Agreement with MSEDCL.
143 of 2021
|
Completed | |
1498 | Fri 26/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
|
Completed | |
1499 | Fri 26/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Gurupad Shivapa Bageli for non-compliance of Consumer Grievance Redressal Forum, Kolhapur Order in Case No. 14 of 2020 dated 28.12.2020.
89 of 2021
|
Completed | |
1500 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited.
Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
|
Completed | |
1501 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
|
Completed | |
1502 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
|
Completed | |
1503 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
|
Completed | |
1504 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
|
Completed | |
1505 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
|
Completed | |
1506 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
|
Completed | |
1507 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
|
Completed | |
1508 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
|
Completed | |
1509 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
|
Completed | |
1510 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
|
Completed | |
1511 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
|
Completed | |
1512 | Thu 25/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
|
Completed | |
1513 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited.
Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
|
Completed | |
1514 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014.
Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021
directions to the Commission therein.)
26 of 2019
|
Completed | |
1515 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018.
Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021.
IN
Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal
No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614
of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of
2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and
directions to the Commission therein.)
116 of 2018
|
Completed | |
1516 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter
alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable
provisisons of law, seeking adjudication of a dispute arising from a Power Purchase
Agreement.
Dairy No. 139 of 2021 in Case No. 226 of 2020
|
Completed | |
1517 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
|
Completed | |
1518 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
|
Completed | |
1519 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
|
Completed | |
1520 | Tue 16/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
|
Completed | |
1521 | Mon 15/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Urgent hearing in Petition of Maharashtra Industrial Development Corporation
(MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9
and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity
Rules, 2005, the latter to the extent of seeking reasonable time for adopting
appropriate remedy in accordance with law, qua captive status for its Barvi SHP.
This Hon'ble Commission is the parens patriae in respect of RE Generation in the
State. As such, non-compliance with the Statutory Provisions
Diary No. 143 of 2021
|
Completed | |
1522 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
|
Reschedule | |
1523 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
|
Reschedule | |
1524 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
|
Reschedule | |
1525 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
|
Reschedule | |
1526 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
|
Reschedule | |
1527 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
|
Reschedule | |
1528 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
|
Reschedule | |
1529 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
|
Reschedule | |
1530 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
|
Reschedule | |
1531 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
|
Reschedule | |
1532 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
|
Reschedule | |
1533 | Fri 12/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
|
Reschedule | |
1534 | Tue 09/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited & Maharashtra
State Electricity Distribution Company Limited seeking approval for adoption of
tariff for long term procurement of power through MSPGCL for 250 MW Solar
power projects at dondaicha solar park to meet MSEDCL's solar Renewable
Purchase Obligations under section 63 of Electricity Act, 2003 and for seeking
approval to the deviation sought in the draft PSA & PPA, with respect to the
standard bidding guidelines, issued by Ministry of Power for procurement of power
through competitive bidding process,
134 of 2021
|
Completed | |
1535 | Tue 09/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of tariff discovered for long term procurement of 111 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations and for seeking approval to float open tender for procurement of solar power under 'Mukhyamantri Saur Krishi Vahini Yojana' (MSKVY).
141 of 2021
|
Completed | |
1536 | Tue 09/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited.
Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
|
Completed | |
1537 | Tue 09/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014. Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021.
IN
Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021 directions to the Commission therein.)
26 of 2019
|
Completed | |
1538 | Tue 09/11/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018.
Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021.
IN
Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal
No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614
of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of
2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and
directions to the Commission therein.)
116 of 2018
|
Completed | |
1539 | Fri 29/10/2021 10:30:10 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
|
Reschedule | |
1540 | Fri 29/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. J. S. R. M. Foods ( Abhinav Gopal Agrawal) under Section 142 & 146 of the Electricity Act, 2003 for Non-Compliance of Consumer Grievance Redressal Forum Order, Nagpur Order dated 4.6.2021 passed in Case No. 8 of 2021.
102 of 2021
|
Completed | |
1541 | Fri 29/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Clean Wind Power (Bhavnagar) Private Limited seeking urgent listing of the matter and ad-interim relief against the Respondent.
IA No. 26 of 2021 in 119 of 2021
|
Completed | |
1542 | Fri 29/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Talegaon Floriculture Park Flower (Through Shri Malharrao Virchand Dhole, Secretary) for MSEDCL has changed the tariff classification of growers of the MIDC Floriculture Park, Talegaon, Dist. Pune from LT IV (B)-Agriculture-metered pumpsets to LT IV (C)-Agriculture-others as per their Commercial Circular dt 03/04/2020 and has discontinued Govt. subsidy. The classification of floriculture should be restored to LT IV (B) and the subsidy restored.
124 of 2021
|
Completed | |
1543 | Fri 29/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Rajmal Lakhichand Jewellers under Section 86 (1) (E) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment @ Rs. 2.52/unit for the power injected by Petitioner from 01.04.2020 to 31.08.2020.
123 of 2021
|
Completed | |
1544 | Fri 29/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs.
and
Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021
|
Completed | |
1545 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
|
Completed | |
1546 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
|
Completed | |
1547 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
|
Completed | |
1548 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
|
Completed | |
1549 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
|
Completed | |
1550 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
|
Completed | |
1551 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
|
Completed | |
1552 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
|
Completed | |
1553 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
|
Completed | |
1554 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
|
Completed | |
1555 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
|
Completed | |
1556 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
|
Completed | |
1557 | Tue 26/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
|
Reschedule | |
1558 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for approval and
directions under Section 86 of the Electricity Act, 2003 read with "Revised
Guidelines for Procurement of Electricity for Medium Term from Power Stations
set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued
by Ministry of Power, Government of India.
137 of 2021
|
Completed | |
1559 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief.
and
Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
|
Completed | |
1560 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. P. M. Cold Storage under Section 142 & 146 of the Electricity Act 2003 for violating the Order of Hon'ble Consumer Grievance Redressal Forum dated 13.01.2021.
106 of 2021
|
Completed | |
1561 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
|
Completed | |
1562 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of SMW Ispat Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd) under Regulation 32 and 35 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulation, 2016 seeking grant of power factor incentive on open access consumption for the period March 2013 to September, 2016.
103 of 2021
|
Completed | |
1563 | Fri 22/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. J. S. R. M. Foods ( Abhinav Gopal Agrawal) under Section 142 & 146 of the Electricity Act, 2003 for Non-Compliance of Consumer Grievance Redressal Forum Order, Nagpur Order dated 4.6.2021 passed in Case No. 8 of 2021.
102 of 2021
|
Reschedule | |
1564 | Tue 12/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018.
Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 02.09.2021.
IN
Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal
No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614
of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of
2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and
directions to the Commission therein.)
116 of 2018
|
Completed | |
1565 | Tue 12/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Shri Tradco India Pvt Ltd under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
122 of 2021
|
Completed | |
1566 | Tue 12/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Sridevi Trading Company under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
121 of 2021
|
Completed | |
1567 | Tue 12/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Section 94(1)(g) of the Electricity Act
2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra
Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and
Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution
Open Access) Regulations, 2014 for payment in respect of the purchase of surplus
units / over-injected units of energy.
101 of 2021
|
Completed | |
1568 | Tue 12/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons under Section 94(1)(g) of the Electricity
Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the MERC
(Conduct of Business) Regulations, 2004 and Regulation 26.8 of the MERC
(Distribution Open Access) Regulations, 2014 for payment in respect of the
purchase of surplus units / over-injected units of energy.
100 of 2021
|
Completed | |
1569 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Adani Electricity Mumbai Limited- Transmission seeking appropriate directions for dismissal of the present petition on principles analogous to order vii rule 11 of civil procedure code, 1908.
IA No. 27 of 2021 in 95 of 2021
|
Completed | |
1570 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
|
Completed | |
1571 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - T under Section 39(2)(b) & (c) read with Section 86(1)(f) of the EA, 2003 read with Regulations 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and applicable provisions of MERC (State Grid Code) Regulations, 2020 assailing the in-principle approval dated 06.08.2021 of the Capex Scheme of Respondent No. 2 i.e. AEML- T for installation of 220/33 kV Sub-stations with 2 x 125 MVA Power Transformers at BKC, Mumbai The Hon'ble Commission vide the said Capex approval has approved the cost of Rs. 1093.91 Crores (against AEML-T's claims of Rs. 1213.03 Crores) for creation of the AEML Substation.
95 of 2021
|
Completed | |
1572 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s O. P. Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s O. P. Enterprises for release of principal and DPS or LPS from Respondent.
125 of 2021
|
Completed | |
1573 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Kukreja Development Corporation under Section 86 (1) (f) of the
Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of
the Petitioner M/s Kukreja Development Corporation for release of principal and
DPS or LPS from Respondent.
99 of 2021
|
Completed | |
1574 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s L. B. Kunjir under Section 86 (1) (f) of the Electricity Act, 2003
seeking direction from this Hon'ble Commission in favour of the Petitioner M/s
L. B. Kunjir for release of principal and DPS or LPS from Respondent.
98 of 2021
|
Completed | |
1575 | Fri 08/10/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Kukreja Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s Kukreja Enterprises for release of principal and DPS or LPS from Respondent.
97 of 2021
|
Completed | |
1576 | Mon 04/10/2021 10:30:00 AM |
first appearance of the concerned parties
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited.
Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
|
Completed | |
1577 | Mon 04/10/2021 10:30:00 AM |
first appearance of the concerned parties
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014.
Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 20.09.2021.
IN
Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021
directions to the Commission therein.)
26 of 2019
|
Completed | |
1578 | Tue 28/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
|
Completed | |
1579 | Tue 28/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - T under Section 39(2)(b) & (c) read with Section 86(1)(f) of the EA, 2003 read with Regulations 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and applicable provisions of MERC (State Grid Code) Regulations, 2020 assailing the in-principle approval dated 06.08.2021 of the Capex Scheme of Respondent No. 2 i.e. AEML- T for installation of 220/33 kV Sub-stations with 2 x 125 MVA Power Transformers at BKC, Mumbai The Hon'ble Commission vide the said Capex approval has approved the cost of Rs. 1093.91 Crores (against AEML-T's claims of Rs. 1213.03 Crores) for creation of the AEML Substation.
95 of 2021
|
Completed | |
1580 | Tue 28/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Power Pvt. Ltd. under Section 86(1)(b) & (f) of the Electricity Act, 2003 read with PPA dated 27.12.2018 seeking extension of the SCOD of the Project to actual date of commissioning.
91 of 2021
|
Completed | |
1581 | Tue 28/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
|
Completed | |
1582 | Fri 24/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s Eon Kharadi Infrastructure Private Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year) procurement of power for Base Load of 7 MW RTC from 00:00 to 24:00 hours for a period of one year from November 1, 2021 to October 31, 2022 for its IT and ITES SEZ at Survey No.77, MIDC Knowledge Park, Kharadi, Pune ("SEZ Phase I").
105 of 2021
|
Completed | |
1583 | Fri 24/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Seamless Limited seeking "Relaxation" of Regulation 20.5
of the Maharashtra Electricity Regulatory Commission (Distribution Open Access)
(First Amendment) Regulations, 2019 qua the Petitioner in view of the Notification
dated 10.04.2021 issued by the Public Health Department, Government of
Maharashtra diverting all Industrial Oxygen for Medical use in Hospitals.
93 of 2021
|
Completed | |
1584 | Fri 24/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
|
Completed | |
1585 | Fri 24/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
|
Completed | |
1586 | Mon 13/09/2021 10:30:00 AM |
first appearance of the concerned parties
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018.
Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement
dated 02.09.2021.
IN
Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal
No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614
of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of
2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and
directions to the Commission therein.)
116 of 2018
|
Completed | |
1587 | Tue 07/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
|
Completed | |
1588 | Tue 07/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Seamless Limited seeking "Relaxation" of Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 qua the Petitioner in view of the Notification dated 10.04.2021 issued by the Public Health Department, Government of Maharashtra diverting all Industrial Oxygen for Medical use in Hospitals.
93 of 2021
|
Completed | |
1589 | Tue 07/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Indian Railways under Regulation 19 of Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 for removal of difficulties being faced by Indian Railways while scheduling power simultaneously from Renewable (Wind) and Non-Renewable (Thermal) Sources within the State of Maharashtra.
92 of 2021
|
Completed | |
1590 | Tue 07/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Power Pvt. Ltd. under Section 86(1)(b) & (f) of the Electricity Act, 2003 read with PPA dated 27.12.2018 seeking extension of the SCOD of the Project to actual date of commissioning.
91 of 2021
|
Completed | |
1591 | Fri 03/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Inderjit Singh Bahadur Singh for non-compliance of the Order of the Consumer Grievance Redressal Forum shall be treated as violation of the Regulations of the Commission and accordingly liable for action under Sections 142 and 146 of the Electricity Act 2003.
90 of 2021
|
Completed | |
1592 | Fri 03/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Gurupad Shivapa Bageli for non-compliance of Consumer Grievance Redressal Forum, Kolhapur Order in Case No. 14 of 2020 dated 28.12.2020.
89 of 2021
|
Completed | |
1593 | Fri 03/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - D for seeking approval for additional Short term RE Power Purchase for RPO Compliance of Tata Power-D for FY 2021-22.
88 of 2021
|
Completed | |
1594 | Fri 03/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Dawood Peersaab Shaikh for execution of the Orders of the Consumer Grievance Redressal Forum (CGRF), Maharashtra State Electricity Distribution Company Ltd., Pune in Case No: 07 of 2020.
85 of 2021
|
Completed | |
1595 | Wed 01/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010, executed between RattanIndia Power Limited and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RattanIndia Power Limited.
83 of 2021
|
Completed | |
1596 | Wed 01/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Zaveri and Company (Gujarat) LLP under Section 86(1)(f) of The Electricity Act, 2003 pertaining to adjudication of disputes between M/s Zaveri and Company (Gujarat) LLP and Maharashtra State Electricity Distribution Company Limited.
81 of 2021
|
Completed | |
1597 | Wed 01/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The President Matoshri Yuvak Kalyan & Shikshan Prasarak Mandal for non-compliance of CGRF Akola zone Order in complaint no Case No. 27 of 2020 Order dated 03.09.2020 and the refund of Electricity Duty from 10.10.2012 to 31.08.2016 along with interest at bank rate prevailing from time to time & tariff difference amounts from 10.10.2012 till actual refund along with interest at bank rate.
79 of 2021
|
Completed | |
1598 | Wed 01/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Generation under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve the Detailed Project Report submitted by the Petitioner as capital expenditure scheme for Replacement of various electrical equipment in the Petitioner's Hydro Generating Stations sought vide its Letter No. CREG/MUM/MERC/2019/168 dated 24.07.2019.
78 of 2021
|
Completed | |
1599 | Wed 01/09/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Transmission under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve Detailed Project Reports submitted as capital expenditure schemes.
76 of 2021
|
Completed | |
1600 | Tue 31/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010, executed between RattanIndia Power Limited and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RattanIndia Power Limited.
83 of 2021
|
Reschedule | |
1601 | Tue 31/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Zaveri and Company (Gujarat) LLP under Section 86(1)(f) of The Electricity Act, 2003 pertaining to adjudication of disputes between M/s Zaveri and Company (Gujarat) LLP and Maharashtra State Electricity Distribution Company Limited.
81 of 2021
|
Reschedule | |
1602 | Tue 31/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The President Matoshri Yuvak Kalyan & Shikshan Prasarak Mandal for non-compliance of CGRF Akola zone Order in complaint no Case No. 27 of 2020 Order dated 03.09.2020 and the refund of Electricity Duty from 10.10.2012 to 31.08.2016 along with interest at bank rate prevailing from time to time & tariff difference amounts from 10.10.2012 till actual refund along with interest at bank rate.
79 of 2021
|
Reschedule | |
1603 | Tue 31/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Generation under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve the Detailed Project Report submitted by the Petitioner as capital expenditure scheme for Replacement of various electrical equipment in the Petitioner's Hydro Generating Stations sought vide its Letter No. CREG/MUM/MERC/2019/168 dated 24.07.2019.
78 of 2021
|
Reschedule | |
1604 | Fri 27/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of 1. Paras Miracle Poly Products Pvt. Ltd. and 2. Paras PVC Pipes & Fitting Pvt. Ltd seeking "Relaxation" of Proviso to Regulation 3.2 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 in accordance with the relaxation already provided by the Hon'ble Commission vide Order dated 21.05.2020 in Case No. 82/2020 and continued vide subsequent Orders dated 31.07.2020 in Case No. 137/2020 and Order dated 26.05.2021 in Case No. 25/2021 and Clarificatory Order dated 11.06.2021 in Case No. 25/2021.
77 of 2021
|
Completed | |
1605 | Fri 27/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Transmission under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve Detailed Project Reports submitted as capital expenditure schemes.
76 of 2021
|
Reschedule | |
1606 | Fri 27/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Jaisal Mechatronics Private Limited seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills, delayed payment charges and interest accrued thereupon.
75 of 2021
|
Completed | |
1607 | Tue 24/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code
AND
Application of Adani Electricity Mumbai Limited - Distribution seeking Impleadment
of the Applicant as a Party Respondent in Case No 68 of 2021.
68 of 2021 and MA No. 22 of 2021 in 68 of 2021
|
Completed | |
1608 | Tue 24/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia power Limited (Amravati) under Section 86 (1) (f) of the Electricity Act, 2003 for resolution of disputes with MSEDCL under PPA dated 22.04.2010 and 05.06.2010.
65 of 2021
|
Completed | |
1609 | Tue 24/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the 'Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process' issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016, for the procurement of Round the Clock (RTC) power upto 2.60 MW (00:00 to 24:00 Hrs) for a period of 9 months i.e. from 1 October 2021 to 30 June 2022.
94 of 2021
|
Completed | |
1610 | Fri 13/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
|
Completed | |
1611 | Fri 13/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aurangabad Industrial Township Limited (AITL) seeking exemption of Distribution Licence for Aurangabad Industrial City in pursuance of recommendations of the Government of Maharashtra under Section 13 of Electricity Act, 2003. (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 30.06.2021 in Appeal No. 257 of 2019 and directions to the Commission therein)
29 of 2019
|
Completed | |
1612 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution
Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no.
262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated
10.08.2020 in Case No. 23 of 2020.
234 of 2020
|
Completed | |
1613 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue
necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of
the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
|
Completed | |
1614 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
|
Completed | |
1615 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s O.P Enterprises against MSEDCL for willful disobedience of the direction of Commission passed in the Order dated 9 January 2019 in Case No. 285 of 2018 to release Principal and / Delay Payment Charges (DPC)
186 of 2020
|
Completed | |
1616 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Kukreja Enterprises against Maharashtra State Electricity Distribution
Company Limited for willful disobedience of the Direction of the Commission passed in the Order dated 9 January 2019 in Case No. 288 of 2018 to release Principal and / Delay Payment Charges (DPC)
185 of 2020
|
Completed | |
1617 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
|
Completed | |
1618 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
|
Completed | |
1619 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
|
Completed | |
1620 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
|
Completed | |
1621 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
|
Completed | |
1622 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes
between Petitioner and Maharashtra State Electricity Distribution Company (MSEDCL
) limited and against non-compliance by MSEDCL of the order dated November 26,
2019 of the Commission in case no. 274 of 2019.
125 of 2020
|
Completed | |
1623 | Fri 06/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
|
Completed | |
1624 | Tue 03/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Shri Mahindra Devidas Deshmukh for Non-Compliance of Consumer Grievance Redressal Forum Order Akola, Order dated 25.3.2019 passed in Case No. 9 of 2019.
73 of 2021
|
Completed | |
1625 | Tue 03/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Transmission and 2. The Tata Power Company Limited - Distribution seeking prior approval of this Hon'ble Commission to de-capitalize certain immovable assets belonging to the Petitioner.
41 of 2021
|
Completed | |
1626 | Tue 03/08/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited seeking prior approval of this Hon'ble Commission to de-capitalize certain immovable assets belonging to the Transmission Business of the Petitioner.
14 of 2021
|
Completed | |
1627 | Fri 30/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Adani Electricity Mumbai Limited- Distribution seeking Impleadment of the Applicant as a Party Respondent in Case No 68 of 2021.
MA No. 22 of 2021 in Case No. 68 of 2021
|
Completed | |
1628 | Fri 30/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of Abhinav Gopal Agrawal for Non-Compliance of Consumer Grievance Redressal Forum Order, Gondia Order dated 6.11.2020 passed in Case No. 3 of 2020.
72 of 2021
|
Completed | |
1629 | Fri 30/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petitioner of M/s. Shree Tatyasaheb Kore Warana Sahakari Sakhar Karkana Ltd. under Section 86 (1) (E) & (F) read with Section 62 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, Its compliance and implementation of REC Framework) Regulations, 2010 and MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 and the notifications issued by Government of Maharashtra for the bagasse based cogeneration projects.
71 of 2021
|
Completed | |
1630 | Fri 30/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
|
Completed | |
1631 | Tue 27/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
|
Completed | |
1632 | Tue 27/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia power Limited (Amravati) under Section 86 (1) (f) of the Electricity Act, 2003 for resolution of disputes with MSEDCL under PPA dated 22.04.2010 and 05.06.2010.
65 of 2021
|
Completed | |
1633 | Tue 27/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sinner Thermal Power Limited seeking directions to MSEDCL for withdrawal of Termination Notice dated 19 May 2020 and procurement of power generated from RattanIndia Power Limited.
23 of 2021
|
Completed | |
1634 | Fri 16/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021.
MA No. 23 of 2021 in Case No. 70 of 2021
|
Completed | |
1635 | Fri 16/07/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestions and Objections on Maharashtra Electricity Distribution Company Limited's Petition for reclassification of Wind Zones of Wind Energy Projects in Maharashtra
338 of 2019
|
Completed | |
1636 | Fri 16/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for
purchase of over injected units above contracted (export) capacity from bagasse based
co-generation projects.
70 of 2021
|
Completed | |
1637 | Fri 16/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Maharashtra State Electricity Distribution Co. Ltd. for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016.
49 of 2021
|
Completed | |
1638 | Tue 13/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. KRC Infrastructure and Projects Private Limited (KRCIPPL) for approval of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable Purchase Obligation (RPO) obligation of FY 2019-20 and 2020-21 to FY 2021-22 and FY 2022-23
46 of 2021
|
Completed | |
1639 | Tue 13/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval
of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable
Purchase Obligation (RPO) of FY 2020-21 to FY 2021-22 and FY 2022-23.
45 of 2021
|
Completed | |
1640 | Tue 13/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable Purchase Obligation (RPO) of FY 2020-21 to FY 2021-22 and 2022-23.
47 of 2021
|
Completed | |
1641 | Tue 13/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by KRC Infrastructure and Projects Pvt.Ltd (KRCIPPL) for FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
56 of 2021
|
Completed | |
1642 | Tue 13/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Mindspace Business Park Pvt. Ltd (MBPPL) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
55 of 2021
|
Completed | |
1643 | Tue 13/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Gigaplex Estate Pvt. Ltd. (GEPL) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016.
54 of 2021
|
Completed | |
1644 | Fri 09/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Nidar Utilities Panvel LLP (NUPLLP) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
57 of 2021
|
Completed | |
1645 | Fri 09/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Indian Railways (IR) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
53 of 2021
|
Completed | |
1646 | Fri 09/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Tata Power Co. Ltd. (Distribution) (TPC-D) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
52 of 2021
|
Completed | |
1647 | Fri 09/07/2021 10:30:00 AM |
e-Public Hearing
Hearing: Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Ltd. (Distribution) (AEML-D) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
51 of 2021
|
Completed | |
1648 | Fri 09/07/2021 10:30:00 AM |
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by BEST Undertaking for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
50 of 2021
|
Completed | |
1649 | Tue 06/07/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited â?? Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
|
Reschedule with further notice | |
1650 | Tue 06/07/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
|
Reschedule with further notice | |
1651 | Tue 06/07/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Reschedule with further notice | |
1652 | Tue 06/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited)
Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
|
Completed | |
1653 | Tue 06/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association (CPPA) Seeking permission to exercise the option or otherwise for the Financial Year 2020-2021 as per the order dated 6th October 2020 passed in Case No. 111 of 2020.
67 of 2021
|
Completed | |
1654 | Fri 02/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited Petition under Section 86 (1) (f) of the Electricity Act,2003 for resolution of disputes with the Respondent.
Application seeking Interim directions.
65 of 2021
|
Completed | |
1655 | Fri 02/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power Limited) seeking directions to the Maharashtra State Electricity Distribution Company Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of State.
23 of 2021
|
Completed | |
1656 | Fri 02/07/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited)
Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
|
Completed | |
1657 | Tue 29/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s.Khade Mewara Infra Project and mining.seeking invocation of the Provisions of S.142, 146 r/w 149 of Electricity Act, 2003 for Non-compliance of MERC order dtd.16.02.2008 and dtd.08.09.2006 and violations of Regulations made by Hon'ble MERC under Electricity Act,2003.
59 of 2021
|
Completed | |
1658 | Tue 29/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement
AND
Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd. in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement)
226 of 2020 and MA No. 3 of 2021
|
Completed | |
1659 | Tue 29/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND
Interim Application
176 of 2020 and MA No. 8 of 2021
|
Completed | |
1660 | Tue 29/06/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/ Objections on Mahati Hydro Power Veer Project Private Limited (MHPVPPL) Petition for determination of Project Specific Tariff for Veer Hydro Electric Project (2x4.5MW) under Renovation and Modernisation as per the provisions of Section 62(1)(a) and 86(1)(e) of the Electricity Act, 2003 and Regulation 9.1, 10.2, 74 and 77 of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019
63 of 2021
|
Completed | |
1661 | Fri 25/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Limited under Section 86 of The Electricity Act ,2003 read with Article 13 (Change in Law) of PPAs under Case 1 stage 1 and Article 10 (Change in Law) of PPAs under case 1 stage 2.
24 of 2017
|
Completed | |
1662 | Tue 22/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited seeking Review of the Order dated 15.03.2021 passed by this Hon'ble Commission in Case No. 337 of 2019
58 of 2021
|
Completed | |
1663 | Tue 22/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Company Limited ("MSEDCL") Seeking review of order dated 28th November, 2020 in Case No. 132 of 2020 in the matter of petition of Adani Power Maharashtra Limited seeking hypothetical in-land transportation cost of IPT coal.
Application under Regulation 94 of MERC (Conduct of Business) Regulations, 2004 seeking condonation of delay in filling the present Review Petition.
9 of 2021
|
Completed | |
1664 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
69 of 2021
|
Completed | |
1665 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
|
Completed | |
1666 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release Principal and delayed payment charges (DPC)
21 of 2021
|
Completed | |
1667 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment the amounts due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014. And In the matter of Order dated 26th March 2019, passed by this Hon'ble Commission in Case No. 26 of 2019.
40 of 2021
|
Completed | |
1668 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
38 of 2021
|
Completed | |
1669 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Silverline Investment Company Pvt. Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
37 of 2021
|
Completed | |
1670 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
36 of 2021
|
Completed | |
1671 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
32 of 2021
|
Completed | |
1672 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Parmarth Wind Energy Private Limited seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014.
31 of 2021
|
Completed | |
1673 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. IOTA MTech Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 27th March 2017.
30 of 2021
|
Completed | |
1674 | Fri 18/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) seeking directions to the Maharashtra State Electricity Distribution Company("MSEDCL") to make payment of outstanding amounts, including late payment surcharge, due and payable to the Petitioner for supply of power from the petitioner's wind power plants.
27 of 2021
|
Completed | |
1675 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution
Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no.
262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated
10.08.2020 in Case No. 23 of 2020.
234 of 2020
|
Completed | |
1676 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue
necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of
the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
|
Completed | |
1677 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
|
Completed | |
1678 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
186 of 2020
|
Completed | |
1679 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Kukreja Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 288/2018. to release Principal and / Delay Payment.(DPC)
185 of 2020
|
Completed | |
1680 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
|
Completed | |
1681 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
|
Completed | |
1682 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
|
Completed | |
1683 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
|
Completed | |
1684 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
|
Completed | |
1685 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes
between Petitioner and Maharashtra State Electricity Distribution Company (MSEDCL
) limited and against non-compliance by MSEDCL of the order dated November 26,
2019 of the Commission in case no. 274 of 2019.
125 of 2020
|
Completed | |
1686 | Tue 15/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
|
Completed | |
1687 | Fri 11/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Limited under Section 86 of The Electricity Act ,2003 read with Article 13 (Change in Law) of PPAs under Case 1 stage 1 and Article 10 (Change in Law) of PPAs under case 1 stage 2.
24 of 2017
|
Completed | |
1688 | Fri 11/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking
(Of Municipal Corporation of Greater Mumbai) (BEST) seeking condonation and approval of the inadvertent delay and deficiency in the course of procurement of 100MW Power from Manikaran Power Limited.
61 of 2021
|
Completed | |
1689 | Fri 11/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited seeking directions to the Respondent No. 1 Maharashtra State Electricity Distribution Company("MSEDCL") and Respondent No. 2. Maharashtra Load Despatch Center ("MSLDC")
26 of 2021
|
Completed | |
1690 | Tue 08/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s.Khade Mewara Infra Project and mining.seeking invocation of the Provisions of S.142, 146 r/w 149 of Electricity Act,2003 for Non-compliance of MERC order dtd.16.02.2008 and dtd.08.09.2006 and violations of Regulations made by Hon'ble MERC under Electricity Act,2003.
59 of 2021
|
Completed | |
1691 | Tue 08/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
for removal of difficulties In Implmentation of MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 (Limitation on acceptance of amount through Cheque from the Consumers)
44 of 2021
|
Completed | |
1692 | Tue 08/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s EON Kharadi Infrastructure Pvt. Ltd. for the grant of Transmission Licence for the Transmission Network being set up at Village Kharadi and Village Wagholi, Tal. Haveli, District, Pune
212 of 2020
|
Completed | |
1693 | Fri 04/06/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking
adjudication of a dispute arising from a Power Purchase Agreement.
AND
Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd.
in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy
Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a
Power Purchase Agreement )
226 of 2020 and MA No. 3 of 2021
|
Reschedule with further notice | |
1694 | Fri 04/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
17 of 2021
|
Completed | |
1695 | Fri 04/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
AND
Interim Application
176 of 2020 And MA No. 8 of 2021
|
Completed | |
1696 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 288 of 2019
19 of 2019 & MA No. 15 of 2021
|
Completed | |
1697 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 319 of
2018
119 of 2018 & MA No. 14 of 2021
|
Completed | |
1698 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 377 of 2019
119 of 2019 & MA No. 13 of 2021
|
Completed | |
1699 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 378 of 2019
118 of 2019 & MA No. 12 of 2021
|
Completed | |
1700 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bothe Windfarm Development Pvt. Ltd. against Maharashtra State Electricity Distribution Company Limited(MSEDCL) for non-compliance of this Hon'ble Commission's Order dated 01.07.2020 passed in Case No. 28 of 2020.
60 of 2021
|
Completed | |
1701 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 66 of 2020
43 of 2021
|
Completed | |
1702 | Tue 01/06/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company (MSEDCL) Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 60 of 2020.
42 of 2021
|
Completed | |
1703 | Fri 28/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited seeking Review of the Order dated 15.03.2021 passed by this Hon'ble Commission in Case No. 337 of 2019
58 of 2021
|
Reschedule | |
1704 | Fri 28/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Pune Bioenergy systems Pvt Ltd. (PBESPL) seeking review of Hon'ble Commission Order for determination of Tariff dated 22 March 2021 passed in MERC Case No. 162 of 2019.
48 of 2021
|
Completed | |
1705 | Tue 25/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Avaada Energy Pvt Ltd seeking urgent direction(s) and action against Respondent for being in non-compliance of the specific and express directions/orders of this Hon'ble Commission dated 16.02.2021 in Case No. 04 of 2021
64 of 2021
|
Reschedule with further notice | |
1706 | Tue 25/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khandesh Industrial Development Association ( K.I.A) seeking deferment of new provision related to security deposit i.e., deposit of two month of average billing instead of one month existing) for the period of 3 years i.e.,till the impact of COVID-19 gets streamline and smooth running and to ensure hassle free set off of GST and credit of Tax deducted as Source (TDS) from consumers as per the provisions of law.
62 of 2021
|
Completed | |
1707 | Tue 25/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Laghu Udhyog Bharati under regulation 30 of supply code 2021 and Under Regulation 4.4.5 seeking practice directions to Respondent No 1. for complying with statutory requirements
AND
Application for impleadment filed by Prayas (Energy Group)
39 of 2021 and MA No. 9 of 2021
|
Completed | |
1708 | Tue 18/05/2021 11:00:01 AM |
e-Hearing through Video Conferencing
Petition of Sahebrao Charde Vidyut Mandal Nivruti Karmachari Sang application to raise the Tariff for benefits of the retired employees of all 4 Companies for application of the pension scheme and for economic assistance.
AND
Application for intervention filed by Maharashtra State Electricity Workers Federation
13 of 2021 AND MA No. 10 of 2021
|
Completed | |
1709 | Tue 18/05/2021 11:00:00 AM |
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 288 of 2019
19 of 2019 & MA No. 15 of 2021
|
Completed | |
1710 | Tue 18/05/2021 11:00:00 AM |
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 319 of
2018
119 of 2018 & MA No. 14 of 2021
|
Completed | |
1711 | Tue 18/05/2021 11:00:00 AM |
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 377 of 2019
119 of 2019 & MA No. 13 of 2021
|
Completed | |
1712 | Tue 18/05/2021 11:00:00 AM |
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
AND
Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 378 of 2019
118 of 2019 & MA No. 12 of 2021
|
Completed | |
1713 | Fri 14/05/2021 10:30:04 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited Petition under Section 86 (1) (f) of the Electricity Act,2003 for resolution of disputes with the Respondent.
65 of 2021
|
Completed | |
1714 | Fri 14/05/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Application for impleadment filed by Prayas (Energy Group) in Case No. 39 of 2021
MA No. 9 of 2021 in 39 of 2021
|
Completed | |
1715 | Fri 14/05/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of Laghu Udhyog Bharati under regulation 30 of supply code 2021 and Under Regulation 4.4.5 seeking practice directions to Respondent No 1. for complying with statutory requirements.
39 of 2021
|
Completed | |
1716 | Fri 14/05/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of M/s. Bilt Graphic Paper Products Limited seeking declaration that the Applicant has fulfilled its RPO for the period F. Y. 2016-2017 to F. Y. 2019-2020. under Regulation No. 92 of the MERC (CoB) Regulations, 2004, and Regulation No.16 & 18 of the MERC (RPO Implementation of Renewable Energy Certificate Framework) Regulations, 2016, Order dated 02.04.2018 passed by the Hon'ble Commission in Case No. 75 of 2017
33 of 2021
|
Completed | |
1717 | Fri 14/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Minex Metallurgical Co Lts for penalizing Maharashtra State Electricity Distribution Company("MSEDCL") for violating section 9 of Electricity Act, 2003, violating SOP Regulations of Distribution licensee, violating DOA 1st amendment Regulation 2019, Commissions order in case No. 199 of 2020 and directing MSEDCL to remove illegal sealing of Solar Captive Generation of Petitioner which is sealed after installation of SEM for import of wind power through open access and compensation of losses to the petitioner.
28 of 2021
|
Completed | |
1718 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
|
Completed | |
1719 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution
Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against
MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble
Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release
Principal and delayed payment charges (DPC)
21 of 2021
|
Completed | |
1720 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 66 of 2020
43 of 2021
|
Completed | |
1721 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company(MSEDCL) Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 60 of 2020.
42 of 2021
|
Completed | |
1722 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking
adjudication of a dispute arising from a Power Purchase Agreement.
AND
Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd.
in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy
Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a
Power Purchase Agreement )
226 of 2020 and MA No. 3 of 2021
|
Completed | |
1723 | Tue 11/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
AND
Interim Application
176 of 2020 And MA No. 8 of 2021
|
Completed | |
1724 | Fri 07/05/2021 10:30:09 AM |
e-Hearing through Video Conferencing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
38 of 2021
|
Completed | |
1725 | Fri 07/05/2021 10:30:08 AM |
e-Hearing through Video Conferencing
Petition of M/s. Silverline Investment Company Pvt. Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
37 of 2021
|
Completed | |
1726 | Fri 07/05/2021 10:30:07 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
36 of 2021
|
Completed | |
1727 | Fri 07/05/2021 10:30:06 AM |
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment the amounts due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014. And In the matter of Order dated 26th March 2019, passed by this Hon'ble Commission in Case No. 26 of 2019.
40 of 2021
|
Completed | |
1728 | Fri 07/05/2021 10:30:05 AM |
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
32 of 2021
|
Completed | |
1729 | Fri 07/05/2021 10:30:04 AM |
e-Hearing through Video Conferencing
Petition of M/s. Parmarth Wind Energy Private Limited seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014.
31 of 2021
|
Completed | |
1730 | Fri 07/05/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Petition of M/s. IOTA MTech Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 27th March 2017.
30 of 2021
|
Completed | |
1731 | Fri 07/05/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) seeking directions to the Maharashtra State Electricity Distribution Company("MSEDCL") to make payment of outstanding amounts, including late payment surcharge, due and payable to the Petitioner for supply of power from the petitioner's wind power plants.
27 of 2021
|
Completed | |
1732 | Fri 07/05/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited - Transmission praying to take on
record changes in the group of lenders of Adani Electricity Mumbai Limited and the
capacity of SBICAP Trustee Company Limited as the security trustee acting for the
benefit of such lenders of Adani Electricity Mumbai Limited.
35 of 2021
|
Completed | |
1733 | Fri 07/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited -Distribution praying to take on
record changes in the group of lenders of Adani Electricity Mumbai Limited and the
capacity of SBICAP Trustee Company Limited as the security trustee acting for the
benefit of such lenders of Adani Electricity Mumbai Limited.
34 of 2021
|
Completed | |
1734 | Tue 04/05/2021 10:30:07 AM |
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period.
119 of 2018
|
Completed | |
1735 | Tue 04/05/2021 10:30:06 AM |
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
119 of 2019
|
Completed | |
1736 | Tue 04/05/2021 10:30:05 AM |
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
|
Completed | |
1737 | Tue 04/05/2021 10:30:04 AM |
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
|
Completed | |
1738 | Tue 04/05/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited seeking directions to the Respondent No. 1 Maharashtra State Electricity Distribution Company("MSEDCL") and Respondent No. 2. Maharashtra Load Despatch Center ("MSLDC")
26 of 2021
|
Completed | |
1739 | Tue 04/05/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power
Limited) seeking directions to the Maharashtra State Electricity Distribution Company
Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of
power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of
State.
AND
Application filed by M/s Sai Wardha Power Generation Limited for impleadment.
23 of 2021 and MA No. 11 of 2021
|
Completed | |
1740 | Tue 04/05/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Exide Industries Limited seeking directions against the Respondent no. 1, Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the illegal levy and recovery of additional surcharge on Captive consumption of Electricity by the petitioner.
10 of 2021
|
Completed | |
1741 | Tue 04/05/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of the Maharashtra Electricity Regulatory Commission (MERC) (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case no. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and to direction to revise incorrect monthly billing methodology followed by MSEDCL.
6 of 2021
|
Completed | |
1742 | Fri 30/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders dated passed in Case No. 137 of 2020.
25 of 2021
|
Reschedule | |
1743 | Fri 30/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India AND Application to take on record Amended Petition.
140 of 2020 and MA No. 7 of 2021
|
Reschedule | |
1744 | Fri 30/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power
Limited) seeking directions to the Maharashtra State Electricity Distribution Company
Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of
power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of
State.
23 of 2021
|
Reschedule | |
1745 | Thu 29/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India AND Application to take on record Amended Petition.
140 of 2020 and MA No. 7 of 2021
|
Schedule | |
1746 | Thu 29/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders dated passed in Case No. 137 of 2020.
25 of 2021
|
Schedule | |
1747 | Tue 27/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
|
Schedule | |
1748 | Tue 27/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release Principal and delayed payment charges (DPC)
21 of 2021
|
Schedule | |
1749 | Tue 27/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking appropriate directions on account of the violation of the Hon'ble Commission's Order dated 12.06.2017 in Case Nos. 182 of 2014 & 40 of 2015 by Tata Power Company Limited And Application for Interim relief.
19 of 2021
|
Schedule | |
1750 | Tue 27/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Jugalkishor Rambagas Karwa against Maharashtra State Electricity Distribution Company Ltd.(MSEDCL) for non compliance of Order passed by CGRF, Bhandup
18 of 2021
|
5 | |
1751 | Fri 23/04/2021 10:30:05 AM |
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.).
200 of 2020
|
5 | |
1752 | Fri 23/04/2021 10:30:04 AM |
e-Hearing through Video Conferencing
Petition filed by Tata Power Company - Transmission for review and recall of the order dated 23.01.2021 passed by this Hon'ble Commission in Case No. 141 of 2020 with respect to grant of Transmission License to Kharghar Vikhroli Transmission Private Limited.
15 of 2021
|
Reschedule | |
1753 | Fri 23/04/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Company Limited ("MSEDCL") Seeking review of order dated 28th November, 2020 in Case No. 132 of 2020 in the matter of petition of Adani Power Maharashtra Limited seeking hypothetical in-land transportation cost of IPT coal.
Application under Regulation 94 of MERC (Conduct of Business) Regulations, 2004 seeking condonation of delay in filling the present Review Petition.
9 of 2021
|
Schedule | |
1754 | Fri 23/04/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
|
Schedule | |
1755 | Fri 23/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Krishita Multitrade Pvt. Ltd seeking review of Order dated passed in
Case No. 229 of 2020 (Petition filed by M/s Krishita Multitrade Pvt. Ltd seeking
direction for returning the monies wrongfully realised by encashing performance
Bank Guarantee of the petitioner and declaration of extension of financial closure and
scheduled commercial operation date on account of force majeure).
Application under Regulations 81 and 92 of The Maharashtra Electricity Regulatory
Commission (Conduct Of Business) Regulations, 2004 For urgent listing and for
seeking Interim / Ad-Interim reliefs
24 of 2021
|
Schedule | |
1756 | Tue 20/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sahebrao Charde Vidyut Mandal Nivruti Karmachari Sang application to
raise the Tariff for benefits of the retired employees of all 4 Companies for
application of the pension scheme and for economic assistance
13 of 2021
|
Reschedule with further notice | |
1757 | Tue 20/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Eurotex Industries and Exports Limited seeking appropriate order /directions pertaining to restitution of benefits/incentives wrongly denied to the Petitioner by holding it to be in arrears despite the order of the Hon'ble Commission dated 21st May 2004 and of the Hon'ble Appellate Tribunal of Electricity (APTEL) dated 30th May 2007 being upheld by the Hon'ble Supreme Court in Civil Appeal no. 4304 of 2007 vide order dated 28th February 2020 vis a vis the issues decided in fovour of the Petitioner and for direction to the Respondent to issue correct bills in compliance with the aforesaid orders.
17 of 2021
|
Reschedule with further notice | |
1758 | Tue 20/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited for in principle approval and consequent compensation on account of a Change in Law event i.e. the introduction of new environmental norms under the Environment (Protection) Amendment Rules, 2015 issued by the Ministry of Environment, Forest and Climate Change dated 07.12.2015, impacting the revenues and costs of the Petitioner during the operating period.
11 of 2021
|
Schedule | |
1759 | Fri 16/04/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited Seeking Compliance of the Order Dated May 28, 2019 In Case No. 168 Of 2014 of the Hon'ble Commission Read with relevant provisions of the Electricity Act, 2003 and Works of Licensees Rules, 2006
167 of 2020
|
Schedule | |
1760 | Fri 16/04/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Limited for adjustment of Open Access units under Open Access permission by Maharashtra State Electricity Distribution Company ltd. (MSEDCL), Satara Circle office.
164 of 2020
|
Schedule | |
1761 | Fri 16/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015
50 of 2016
|
Schedule | |
1762 | Thu 15/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
AND
Interim Application
176 of 2020 AND MA No. 8 of 2021 in 176 of 2020
|
Reschedule with further notice | |
1763 | Thu 15/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and and directions under Section 86 of the Electricity Act, 2003 read with "Revised Guidelines for
Procurement of Electricity for Medium Term from Power Stations set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued by Ministry of Power, Government of
India
20 of 2021
|
Completed | |
1764 | Thu 15/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
|
Completed | |
1765 | Fri 09/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and and directions under Section 86 of the Electricity Act, 2003 read with "Revised Guidelines for
Procurement of Electricity for Medium Term from Power Stations set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued by Ministry of Power, Government of
India
20 of 2021
|
Reschedule | |
1766 | Fri 09/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
AND
Interim Application
176 of 2020 AND MA No. 8 of 2021 in 176 of 2020
|
Reschedule | |
1767 | Fri 09/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
|
Reschedule | |
1768 | Tue 06/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Tata Power Company - Transmission for review and recall of the order dated 23.01.2021 passed by this Hon'ble Commission in Case No. 141 of 2020 with respect to grant of Transmission License to Kharghar Vikhroli Transmission Private Limited.
15 of 2021
|
Completed | |
1769 | Tue 06/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Exide Industries Limited seeking directions against the Respondent no. 1, Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the illegal levy and recovery of additional surcharge on Captive consumption of Electricity by the petitioner.
10 of 2021
|
Completed | |
1770 | Tue 06/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of the Maharashtra Electricity Regulatory Commission (MERC) (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case no. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and to direction to revise incorrect monthly billing methodology followed by MSEDCL.
6 of 2021
|
Completed | |
1771 | Tue 06/04/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited seeking issuance of directions to the Respondent No. 1 for complying with the orders and directions issued by this Hon'ble Commission vide the Orders dated 12.09.2018 and 29.01.2019 passed in Case No. 204 of 2017 and Case No. 3 of 2019 respectively, read with the directions issued vide letters dated 20.06.2019, 14.09.2020 and 03.10.2020.
237 of 2020
|
Completed | |
1772 | Tue 30/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (AEML) seeking clarification on applicability of Tariff to Hotels pursuant to Government of Maharashtra Resolution Number: TDS2020 / 9 / Pr. Kr. 502 / Tourism dated 03.12.2020.
8 of 2021
|
Completed | |
1773 | Tue 30/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking seeking approval for procurement of 400 MW Wind-Solar Hybrid Power from proposed 1110 MW ISTS-Connected Wind-Solar Hybrid Power Projects awarded by SECI (Solar Energy Corporation of India Limited) (Tranche-III) for meeting the solar and Non solar RPO of BEST.
16 of 2021
|
Completed | |
1774 | Tue 30/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited)
Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018. AND
Application seeking Amendment of the Petition Case No. 240 of 2020
240 of 2020 AND MA No. 4 of 2021 in 240 of 2020
|
Completed | |
1775 | Fri 26/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No.
5731/2015
228 of 2020
|
Completed | |
1776 | Fri 26/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking
adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
|
Completed | |
1777 | Fri 26/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of the Hon'ble Commission's Multi -Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the wheeling charges to be applicable to the Petitioners.
187 of 2020
|
Completed | |
1778 | Tue 23/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution for the approval of the following for its Distribution Business (i) Truing-up of FY 2014-15 (ii) Provisional Truing-up for FY 2015-16 (iii) Aggregate Revenue Requirement for each year of the Control Period (from FY 2016-17 to FY 2019-20) as per Multi Year Tariff (MYT) Regulations, 2015 (iv) Revenue from the sale of power at existing Tariffs and charges and projected revenue gap for each year of the Control Period (v) Proposed Category-wise Tariffs for each year of the Control Period.
AND
Petition of The Tata Power Company Limited - Distribution seeking Review of Order passed in Case No. 47 of 2016
AND
Application filed by Tata Power-Distribution seeking implementation of the Judgment Order issued on dated 20th October, 2020 passed in Appeal No. 58 of 2018 by the Hon'ble Appellate Tribunal for Electricity ("APTEL")
47 of 2016 and 165 of 2016 and MA No. 5 of 2021
|
Completed | |
1779 | Tue 23/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
|
Completed | |
1780 | Tue 23/03/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to
increase in costs on account of change in rate of Goods & Service Tax amounting to a
Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018,
executed between Tata Power Renewable Energy Limited and Maharashtra State
Electricity Distribution Company Limited. AND Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
|
Completed | |
1781 | Fri 26/02/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited seeking issuance of directions to the Respondent No. 1 for complying with the orders and directions issued by this Hon'ble Commission vide the Orders dated 12.09.2018 and 29.01.2019 passed in Case No. 204 of 2017 and Case No. 3 of 2019 respectively, read with the directions issued vide letters dated 20.06.2019, 14.09.2020 and 03.10.2020.
237 of 2020
|
Reschedule with further notice | |
1782 | Fri 26/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Betul Oil Limited seeking declaration from this Hon'ble Commission that the Short Term Energy Purchase Agreement ("EPA") dated 22.07.2020 executed between Petitioner and MSEDCL stands terminated in view of failure of MSEDCL in discharging its obligations w.r.t timely payments and seeking directions to MSEDCL to discharge its obligations towards outstanding dues accrued till the date of termination of Short Term Energy Purchase Agreement ("EPA") dated 22.07.2020 executed between Petitioner and MSEDCL.
AND
Miscellaneous Application seeking urgent ex-parte ad-interim orders directing MSEDCL not to reject the short term open access application dated 09.02.2021 made by Petitioner seeking open access for the month of March, 2021 during the pendency of main matter filed by the petitioner before this Hon'ble Commission
12 of 2021 and MA No. 06 of 2021 in Case No. 12 of 2021
|
Completed | |
1783 | Fri 26/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
for adoption of the tariff discovered through the competitive bidding process held for Long Term procurement of 1.25 MW wind power from the wind generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003
1 of 2021
|
Completed | |
1784 | Fri 26/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited)
Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
|
Reschedule with further notice | |
1785 | Fri 26/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition on behalf of Late Shakuntala Pralhad Unahale through her heirs Varsha Anil Sabe and others (3) against Maharashtra Eastern Grid Power Transmission Company Ltd, Akola for non-compliance of the Order passed by District Magistrate, Buldhana and for grant of Compensation with interest.
197 of 2020
|
Completed | |
1786 | Tue 23/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by 1) Nidar Utilities Panvel LLP. 2) Persipina Developers Pvt. Ltd for amendment of the terms and conditions of distribution license to include area of 169.72 hectares included as part of the Integrated Township Project ("ITP") being developed by the Applicant No. 2 at Panvel, District Raigad , Maharashtra and lying adjacent to the Panvel SEZ area.
204 of 2020
|
Completed | |
1787 | Tue 23/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution
Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no.
262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated
10.08.2020 in Case No. 23 of 2020..
234 of 2020
|
Completed | |
1788 | Tue 23/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Pandurang Mahipati Patil against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Non compliance of CGRF , Kolhapur Order dated 7.1.2020.
233 of 2020
|
Completed | |
1789 | Tue 23/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
|
Completed | |
1790 | Thu 18/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the
Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No.
5731/2015
228 of 2020
|
Reschedule with further notice | |
1791 | Thu 18/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking
adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
|
Reschedule with further notice | |
1792 | Thu 18/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
|
Reschedule with further notice | |
1793 | Tue 16/02/2021 10:30:06 AM |
e-Hearing through Video Conferencing
Petition filed by Surya Ferrous Alloys Pvt. Ltd. & Ors (2) seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
188 of 2020
|
5 | |
1794 | Tue 16/02/2021 10:30:05 AM |
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of the Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the wheeling charges to be applicable to the Petitioners.
187 of 2020
|
Reschedule with further notice | |
1795 | Tue 16/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015
50 of 2016
|
Completed | |
1796 | Tue 16/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s. Newfound Properties and Leasing Private Limited for taking on record the denotification of IT & ITeS SEZ previously under development by the Petitioner, and consequences on Deemed Distribution Licensee status applicable to the Petitioner
154 of 2020
|
Completed | |
1797 | Tue 16/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Jalna Siddhivinayak Alloys Pvt. Ltd. & Ors (7) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
207 of 2020
|
Completed | |
1798 | Tue 16/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by MITC Rolling Mills Pvt. Ltd seeking appropriate directions and clarifications in respect of the Hon'ble Commission's Orders in Case No 101 of 2016 dated 7 July 2017; Case No 303 and 304 of 2019 dated 30 December 2019 pertaining to Additional Supply Charges.
193 of 2020
|
Completed | |
1799 | Fri 12/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Avaada Energy Pvt Ltd seeking issuance of appropriate Order(s)/ Directions(s) to MSEDCL inter alia executing the Power Purchase Agreement pursuant to the adoption of tariff (vide Hon'ble Commission Order dated 15.05.2020) and letter of award dated 17.06.2020 in terms of request for selection dated 27.12.2019; Petitioner also seeks Orders / Directions restraining MSEDCL from taking any coercive action.
4 of 2021
|
Completed | |
1800 | Fri 12/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) Limited seeking review of the Order dated 07.09.2020 passed by this Hon'ble Commission in Case No. 350 of 2019
206 of 2020
|
Completed | |
1801 | Fri 12/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
|
Completed | |
1802 | Fri 12/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited
AND
Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
|
Completed | |
1803 | Tue 09/02/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Meera Enterprises for non-compliance of CGRF order in complaint No: 30/2020 passed by CGRF, MSEDCL, Akola Zone, Akola
3 of 2021
|
5 | |
1804 | Tue 09/02/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
|
Reschedule with further notice | |
1805 | Tue 09/02/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.).
200 of 2020
|
Completed | |
1806 | Tue 09/02/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/ Objections on Amravati Power Transmission Company Limited's Petition for proposed changes in shareholding pattern of the Company
139 of 2020
|
Completed | |
1807 | Fri 29/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust Petition seeking approval of Power Procurement Plan ( 1st Feb 2021 to 31st Dec 2021), adoption of Tariff discovered through competitive bidding process and approval for executing power purchase
agreement.
5 of 2021
|
Completed | |
1808 | Fri 29/01/2021 10:30:00 AM |
Public Hearing
Inviting Comments on Application of the Tata Power Company Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003
249 of 2019
|
Completed | |
1809 | Fri 29/01/2021 10:30:00 AM |
Public Hearing
Inviting Comments on Application of the Adani Electricity Mumbai Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003
195 of 2019
|
Completed | |
1810 | Fri 29/01/2021 10:30:00 AM |
Public Hearing
Inviting Suggestions/Objections on Application of Adani Electricity Mumbai Infra Ltd.'s Application for grant of Transmission Licence
190 of 2020
|
Completed | |
1811 | Wed 27/01/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestitons / Onjections on Pune Bio Energy Systems Private Limited's Petition for Determination of Tariff of supply of electricity to Distribution Licensee in Maharashtra from 750 TPD capacity of Municipal Solid Waste processing project to be commissioned in pune
162 of 2019
|
Completed | |
1812 | Wed 27/01/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/Objections on the petition of Tata Power- Distribution seeking approval for charging Tariff [" Green Power Tariff"] for supply of Renewable Energy to consumers for meeting their requirement for utilizing 100% green energy for their entire demand
134 of 2020
|
Completed | |
1813 | Wed 27/01/2021 10:30:00 AM |
e-Public Hearing
Inviting Suggestions/ objections on Ashoka Sthapatya Private Limited's Petition for determination of project specific tariff for supply of electricity to Distribution Licensee in Maharashtra to Morna Hydro Electric Project of Capacity 1 MW located in Dist. Satara
208 of 2020
|
Completed | |
1814 | Wed 20/01/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition filed by 1) Nidar Utilities Panvel LLP. 2) Persipina Developers Pvt. Ltd
for amendment of the terms and conditions of distribution license to include area of
169.72 hectares included as part of the Integrated Township Project ("ITP") being
developed by the Applicant No. 2 at Panvel, District Raigad , Maharashtra and
lying adjacent to the Panvel.
SEZ area.
204 of 2020
|
Reschedule with further notice | |
1815 | Wed 20/01/2021 10:30:01 AM |
e-Hearing through Video Conferencing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
|
Reschedule with further notice | |
1816 | Wed 20/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for Purchase of Power from new Bagasse based Co-Generation Projects through MoU Route
2 of 2021
|
Completed | |
1817 | Tue 19/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the
Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No.
5731/2015
228 of 2020
|
Reschedule with further notice | |
1818 | Tue 19/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue
necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of
the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
|
Completed | |
1819 | Tue 19/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking
adjudication of a dispute arising from a Power Purchase Agreement
226 of 2020
|
Completed | |
1820 | Mon 18/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
seeking recovery of variable charges under MERC approved Final Balancing Settlement Mechanism (FBSM) on account of over drawl by Mumbai utilities for period April 01, 2020 onwards till the implementation of intra-state DSM Regulations in Maharashtra.
225 of 2020
|
Completed | |
1821 | Mon 18/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Salahuddin Ziyahuddin Ansari against Maharashtra Electricity Distribution Co. Ltd (MSEDCL) for not providing bill as per the actual consumption of meter Reading as per MSEDCL CPL., Non compliance of CGRF -71/2019 Dated 20.2.2020 and Non compliance of the Order of the Electricity Ombudsman 59 of 2020 dated 14.10.2020.
219 of 2020
|
Completed | |
1822 | Mon 18/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited, seeking declaration from the Commission that the imposition of safeguard duty for the period of 30.07.2020 to 29.07.2021 on the import of solar cells vide Notification No. 02/2020- Customs (SG) dated 29.07.2020 of the Ministry of Finance as an event of 'change in law'.
218 of 2020
|
Completed | |
1823 | Fri 15/01/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
|
Reschedule with further notice | |
1824 | Fri 15/01/2021 10:30:02 AM |
e-Hearing through Video Conferencing
Petition of Ravi Food Products Punishment for Non compliance of order dt. 19.06.2020 , passed Hon'ble Appellate Authority under section 127 of EA 2003 in case No. No. 10/2019-20
217 of 2020
|
5 | |
1825 | Fri 15/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Electricity Distribution Co. Ltd (MSEDCL) against M/s.
Golden Falcon Pacific Ltd for non Compliance of CGRF, Order dtd. 05.10.2020 in
CGRF Zone, Case No. 02/2020,
230 of 2020
|
Completed | |
1826 | Fri 15/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Golden Falcon Pacific Ltd regarding non-compliance by Maharashtra Electricity Distribution Co. Ltd. of CGRF Order, Mumbai's Order dated.05 October 2020 (Case No. 02 of 2020)
216 of 2020
|
Completed | |
1827 | Thu 14/01/2021 10:30:03 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) Limited seeking review of the Order dated 07.09.2020 passed by this Hon'ble Commission in Case No. 350 of 2019
206 of 2020
|
Reschedule with further notice | |
1828 | Thu 14/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra Veej Grahak Sanghatana through its President Pratap Ganapatrao Hogade Application for clarification regarding SCC for underground LT Single Phase connections and Tariff for Hostels in HT Category for proper and correct implementation of the Tariff Order dt. 30th March 2020 in Case No. 322 of 2019.
209 of 2020
|
Completed | |
1829 | Thu 14/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Purna Sahakari Sakhar Karkhana Ltd . In the matter of an Application for recovery of due amount with interest. And
In the matter of Maharashtra Govt. Notification Renewable Energy- 2007/Lt.No. 693/Energy-7 dated 14th October, 2008.
210 of 2020
|
Completed | |
1830 | Wed 13/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Jaygangatara Magasvargiya Co. Op. Ind. Ltd. Through Vitthal Vasant
Gurav to review Order dated 5.09.2020 passed in Case No. 5 of 2020
201 of 2020
|
Completed | |
1831 | Wed 13/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
|
Completed | |
1832 | Wed 13/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Steel Ltd. seeking clarification on the Order dated 5.10.2020 passed in case No. 130 of 2020 regarding the inapplicability of the bifurcated solar and non-solar targets within the composite target of 9%, for CPPs commissioned before 01.04.2016.
203 of 2020
|
Completed | |
1833 | Tue 12/01/2021 10:30:04 AM |
e-Hearing through Video Conferencing
Petition on behalf of Late Shakuntala Pralhad Unahale through her heirs Varsha Anil
Sabe and others (3) against Maharashtra Eastern Grid Power Transmission Company
Ltd, Akola for non-compliance of the Order passed by District Magistrate, Buldhana
and for grant of Compensation with interest.
197 of 2020
|
Reschedule with further notice | |
1834 | Tue 12/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech and ACME Solar Holdings Limited seeking Commission's humble indulgence to direct the Respondent Maharashtra State Electricity Distribution Company (MSEDCL) to replace the Bank Guarantee Number. (being 1945IGFIN005119 & OGT0005190035016 for Rs. 42,00,00,000/-) submitted under the Power Purchase Agreement dated 21.08.2019 by ACME Heergarh Powertech Pvt. Ltd. to MSEDCL be replaced with equally effective mechanism.
162 of 2020
|
Completed | |
1835 | Tue 12/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by R.B. Diversified Pvt. Ltd. (Erstwhile R.B. Investments Pvt. Ltd)
seeking clarification regarding applicability of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 qua captive rooftop solar power plants.
199 of 2020
|
Completed | |
1836 | Tue 12/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Shri Mohd. Akbar Rehman Akbani against Maharashtra State Electricity Distribution Company Ltd. for non-compliance of order passed by the Consumer Greivance Redressal Forum Nagpur Zone, Nagpur dated 07.05.2018 in Case No. CGRF (NZ)/08/2018.
198 of 2020
|
Completed | |
1837 | Mon 11/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Completed | |
1838 | Mon 11/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Brihanmumbai Electric Supply & Transport Undertaking, for allowing limited open access in its area of supply and consequently for determining and allowing open access charges and other fees and charges and / or other sums recoverable.
238 of 2020
|
Completed | |
1839 | Mon 11/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited to review the Order dated 25.8.2020 passed in MERC Case No. 70 of 2020 (Petition filed against Maharashtra State Electricity Distribution Company Limited (MSEDCL) on account of Non-Compliance by MSEDCL of the orders of the Commission including orders dated April 9, 2019 in case No. 22 of 2019 read with the order dated November 7, 2017 in Case No. 77 of 2017.)
196 of 2020
|
Completed | |
1840 | Mon 11/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Appeal filed by Maharashtra State Electricity Distribution Company Ltd. (Formerly known as MSEB) against Electrical Inspector (EI) Thane, Order dated 16.01.2001 Case No. 200/2001. The Energy bill for the month of May, 2000 was quashed and directed to issue revised bills. (Appeal to Industries, Energy & Labour Department, Government of Maharashtra, No. 2002/1288 dated 15.3.2002).
194 of 2020
|
Completed | |
1841 | Mon 11/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SEP Energy Private Limited, The Petitioner is seeking relaxation of the Open Access Regulations.
191 of 2020
|
Completed | |
1842 | Fri 08/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of common order dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
|
Completed | |
1843 | Fri 08/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Jalna Siddhivinayak Alloys Pvt. Ltd. & Ors (7) under Section 142
and 146 of the Electricity Act 2003 seeking appropriate orders as regards pertaining
to the wheeling charges to be applicable to the Petitioners as recorded in the Order
dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control
Period of FY 2020-21 to FY 2024-25.
207 of 2020
|
Reschedule with further notice | |
1844 | Fri 08/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by MITC Rolling Mills Pvt. Ltd seeking appropriate directions and
clarifications in respect of the Hon'ble Commission's Orders in Case No 101 of 2016
dated 7 July 2017; Case No 303 and 304 of 2019 dated 30 December 2019 pertaining
to Additional Supply Charges.
193 of 2020
|
Reschedule with further notice | |
1845 | Fri 08/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Surya Ferrous Alloys Pvt. Ltd. & Ors (2) seeking appropriate orders
as regards pertaining to the wheeling charges to be applicable to the Petitioners as
recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of
Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
for the 4th Control Period of FY 2020-21 to FY 2024-25.
188 of 2020
|
Reschedule with further notice | |
1846 | Fri 08/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of
the Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No.
322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to
the wheeling charges to be applicable to the Petitioners.
187 of 2020
|
Reschedule with further notice | |
1847 | Thu 07/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition by Maharashtra Airport Development Company (MADC) for approval and
directions under Section 86 of the Electricity Act, 2003 read with Revised Guidelines
for Procurement of Electricity for Medium Term from Power Stations set upon Finance,
Own and Operate (FOO) basis dated 30.01.2019issued by the Ministry of Power,
Government of India, for procurement of Power for Medium-Term by Distribution
Licensee
236 of 2020
|
Completed | |
1848 | Thu 07/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule | |
1849 | Thu 07/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Grace Industries Ltd In the matter of considering recording of Petitioners 220 KV outgoing feeder meter instead of LILO meters of MSETCL for FBSM bill calculation
182 of 2020
|
Completed | |
1850 | Thu 07/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
|
Completed | |
1851 | Wed 06/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Krishita Multitrade Pvt. Ltd seeking direction for returning the monies wrongfully realised by encashing performance Bank Guarantee of the petitioner and declaration of extension of financial closure and scheduled commercial operation date on account of force majeure
229 of 2020
|
Completed | |
1852 | Wed 06/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL)
seeking review of Order dated 30th March 2020 in Case No. 296 of 2019 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff Control period FY 2020-21 to FY 2024-25.
180 of 2020
|
Completed | |
1853 | Wed 06/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of 1. Indo Count Industries Ltd ,2. Pranavaditya Spinning Mills Ltd.
against Maharashtra State Electricity Distribution Company Ltd. for violating the order-dated 25.01.18 and 7.2.2018 was passed by CGRF as well as Order of the Hon'ble Commission dated 1 November 2018.
178 of 2020
|
Completed | |
1854 | Wed 06/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
176 of 2020
|
Completed | |
1855 | Tue 05/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aurangabad Electricals Limited seeking directions against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure on the part of MSEDCL (i) to give credit for the wind units injected (ii) incorrect calculation of over injected units. and (iii) for the loss caused to the Petitioner on account of inordinate delay in the issuance of credit notes.
157 of 2020
|
Completed | |
1856 | Tue 05/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ramgad Minerals & Mining Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for non-issuance of credit notes and non-adjustment of wind units injected.
151 of 2020
|
Completed | |
1857 | Tue 05/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by MSPL Limited pertaining to adjudication of disputes between MSPL limited and Maharashtra State Electricity Distribution Company (MSEDCL) limited and seeking directions against MSEDCL for non-issuance of credit notes and non-adjustment of wind units injected.
150 of 2020
|
Completed | |
1858 | Tue 05/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. (GCPL) seeking Review under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulation, 2004 of Order dated 25.04.2018 passed inter alia in Case No.99 of 2017 filed by GCPL and others against Maharashtra State Electricity Distribution Co Ltd (MSEDCL).
1 of 2020
|
Completed | |
1859 | Mon 04/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for undertaking combined power purchase for the period from FY 2021-22 to FY 2024-25
231 of 2020
|
Completed | |
1860 | Mon 04/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
|
Completed | |
1861 | Mon 04/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval to consider discount in Tariff offered by generators for preparation of MoD for the month of May-2020 and June 2020.
108 of 2020
|
Completed | |
1862 | Mon 04/01/2021 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited.
AND
Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
|
Completed | |
1863 | Wed 30/12/2020 10:45:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited for Adoption of Transmission Charges with respect to the Transmission System being established at Vikhroli
142 of 2020
|
Completed | |
1864 | Wed 30/12/2020 10:30:00 AM |
Public Hearing
Inviting Suggestion/ Objections on Application of the Kharghar Vikhroli Transmission Private Limited for grant of Transmission License under section 14, 15 and 86(1)d of Electricity Act, 2003
141 of 2020
|
Completed | |
1865 | Tue 29/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
Petition seeking approval of supplementary agreements dated 11.12.2020
232 of 2020
|
Completed | |
1866 | Tue 29/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
|
Completed | |
1867 | Tue 29/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nisagra Renewable Energy Private Limited seeking clarification on certain observation in the Common Order dated 23.07.2020 passed by this Hon'ble Commission in Case No. 62 of 2020.
170 of 2020
|
Completed | |
1868 | Tue 29/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Juniper Green Energy Private Limited seeking clarification on certain observation in the Common Order dated 23.07.2020 passed by this Hon'ble Commission in Case No. 61 of 2020.
169 of 2020
|
Completed | |
1869 | Mon 28/12/2020 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.).
Application for urgent listing/mentioning of the Review Petition
200 of 2020
|
Reschedule with further notice | |
1870 | Mon 28/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity
Distribution Company Limited (MSEDCL) for non-compliance of common order
dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
|
Completed | |
1871 | Mon 28/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Limited for adjustment of Open Access units under Open Access permission by Maharashtra State Electricity Distribution Company ltd. (MSEDCL), Satara Circle office.
164 of 2020
|
Completed | |
1872 | Mon 28/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech and ACME Solar Holdings Limited
seeking Commission's humble indulgence to direct the Respondent Maharashtra State Electricity Distribution Company (MSEDCL) to replace the Bank Guarantee Number. (being 1945IGFIN005119 & OGT0005190035016 for Rs. 42,00,00,000/-) submitted under the Power Purchase Agreement dated 21.08.2019 by ACME Heergarh Powertech Pvt. Ltd. to MSEDCL be replaced with equally effective mechanism.
162 of 2020
|
Completed | |
1873 | Mon 28/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lokmangal Agro Industries Limited for illegal collection of Transmission Charges from the Petitioner and from the end user and refusal to entertain the request for refund of the Transmission Charges recovered twice over.
160 of 2020
|
Completed | |
1874 | Fri 04/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
|
Reschedule with further notice | |
1875 | Fri 04/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule with further notice | |
1876 | Fri 04/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Aurangabad Electricals Limited seeking directions against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure on the part of MSEDCL (i) to give credit for the wind units injected (ii) incorrect calculation of over injected units. and (iii) for the loss caused to the Petitioner on account of inordinate delay in the issuance of credit notes.
157 of 2020
|
Reschedule with further notice | |
1877 | Fri 04/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ramgad Minerals & Mining Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for non-issuance of credit notes and non-adjustment of wind units injected.
151 of 2020
|
Reschedule with further notice | |
1878 | Fri 04/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by MSPL Limited pertaining to adjudication of disputes between MSPL limited and Maharashtra State Electricity Distribution Company (MSEDCL) limited and seeking directions against MSEDCL for non-issuance of credit notes and non-adjustment of wind units injected.
150 of 2020
|
Reschedule with further notice | |
1879 | Thu 03/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval to scheme for creation of 400/220 KV switchyard at M/s GWEL under depository work for evacuation arrangement of MSEDCL share of 200 MW power and allowing recovery of expenditure thereof through ARR.
215 of 2020
|
Completed | |
1880 | Thu 03/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
|
Reschedule with further notice | |
1881 | Thu 03/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Samyak Krushi Utpadak Prakariya Shkari Sansthan through its president Dr. Prakash Yeshwant Ambedkar against MSEDCL for Non-compliance of CGRF order in complaint No: 45/2019 passed by CGRF, MSEDCL, Amravati Zone, Amravati.
146 of 2020
|
Completed | |
1882 | Thu 03/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited.
AND
Application to take on record Amended Petition.
25 of 2020 And MA No. 55 of 2020
|
Reschedule with further notice | |
1883 | Wed 02/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval for floating open tenders under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) scheme.
214 of 2020
|
Completed | |
1884 | Wed 02/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd to Modify/rectify/re-assess the post facto approvals of Hon'ble MERC concerning the FAC vetting reports dated 26 July 2020 for Quarter II and 04 August 2020 for Quarter III of FY 2019-20.
192 of 2020
|
Completed | |
1885 | Wed 02/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Petition filed by Tulasi Casting and machining Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-Compliance of CGRF Kolhapur Order dated 31 July 2018 passed in Case No. 18 (2018-19)/ 175.
129 of 2020
|
Completed | |
1886 | Wed 02/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Guardian Castings Pvt.Ltd. & Ors (15) seeking modification of the
Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No.
322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to
the 10 hour single shift HT Industrial consumers.
128 of 2020
|
Completed | |
1887 | Wed 02/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Guardian Castings Pvt.Ltd. & Ors (15) seeking clarification of the Commission in respect of the Applicability and interpretation of the Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the single shift HT Industrial consumers and applicability of the Load Factor Incentives to such consumers.
127 of 2020
|
Completed | |
1888 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S M/S O.P. Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 285/2018. to release Principal and / Delay Payment.(DPC)
186 of 2020
|
Completed | |
1889 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Kukreja Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis-obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 288/2018. to release Principal and / Delay Payment.(DPC)
185 of 2020
|
Completed | |
1890 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
|
Completed | |
1891 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
|
Completed | |
1892 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
|
Completed | |
1893 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
|
Completed | |
1894 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
|
Completed | |
1895 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 274 of 2019.
125 of 2020
|
Completed | |
1896 | Tue 01/12/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
|
Completed | |
1897 | Fri 27/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Jain Irrigation Systems Limited complaint against Licensee (MSEDCL) for non-compliance of The Elect. Ombudsman Mumbai Order dt.13.02.2020, case No. 220 of 2019.
112 of 2020
|
Completed | |
1898 | Fri 27/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Praxair India Pvt. Ltd In the matter of dispute under Section 86 (1) (k) of the Electricity Act - 2003 read with Regulation 32 of the MERC Distribution Open Access Regulations-2016 for incorrect/excessive charges levied in open access energy bills of Dec-2017 & Jan-2018, Consumer No.- 0180 1905 3600.
109 of 2020
|
Completed | |
1899 | Fri 27/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Lalit Shyamsunder Tapadiya (Prop.), M/S Lalit Industries against Maharashtra State Electricity Distribution Company Limited (MSEDCL) Petition for non-compliance of Hon'ble E.O. order in representation no. 37 of 2019 and so also non-compliance of SoP regulations 2014 pertaining to load reduction
75 of 2020
|
5 | |
1900 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Viraj Profiles Limited seeking Review of the Order dated 29.10.2020
passed by this Hon'ble Commission in Case No.170 OF 2018 under Section 94 of
the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity
Regulatory Commission (Conduct of Business) Regulations, 2004.
224 of 2020
|
Completed | |
1901 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt.
Ltd.) seeking Review of the Order dated 29.10.2020 passed by this Hon'ble
Commission in Case No.170 of 2018 under Section 94 of the Electricity Act, 2003
read with Regulation 85 of the Maharashtra Electricity Regulatory Commission
(Conduct of Business) Regulations, 2004.
223 of 2020
|
Completed | |
1902 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Viraj Profiles Limited seeking Review of the Order dated 22.10.2020
passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of
the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity
Regulatory Commission (Conduct of Business) Regulations, 2004.
222 of 2020
|
Completed | |
1903 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003
read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
221 of 2020
|
Completed | |
1904 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of SMW ISPAT Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd). seeking Review of the Order dated 22.10.2020 passed by this Hon'ble
Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
220 of 2020
|
Completed | |
1905 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Marigold Pharmaceuticals Private Limited under Section 142, 149, 146 of the Electricity Act, 2003 for action on MSEDCL for non compliance of CGRF Baramati Order in Case No. 20/2019 dated 19/12/2019.
63 of 2020
|
Completed | |
1906 | Thu 26/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Axis Bank Limited under Section 94(1) (f) of the Electricity Act, 2003 and Regulation 15 of the MERC (Conduct of Business) Regulations, 2004 seeking further directions and clarification from the Hon'ble Commission in order dated 16 December 2019 passed in Case No. 247 of 2019.
44 of 2020
|
Completed | |
1907 | Wed 25/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of 1. Siddhayu Ayurvedic Research Foundation Pvt. Ltd, 2. M/s. Peethambra Granites Private Limited for relaxing the provisions of "Banking" as a Transitory/Temporary Change" and allowing adjustment of Petitioner's units banked in open access consumer bills for Petitioner No. 1 and 2 on account of "unforeseen conditions" which in the present circumstance is the 1st phase and 2nd phase of nationwide lockdown imposed by the Government of India in view of "Covid-19".
161 of 2020
|
Completed | |
1908 | Wed 25/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for removal of difficulty under Regulation 19 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019, and Relaxation of penalised clauses under RPO Regulations, 2019. [21 of 2020 & MA Nos 1 to 35 Intervention Applications.]
21 of 2020
|
Completed | |
1909 | Tue 24/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. ltd seeking relief for residential consumers for 2% rebate for payment of the first bill based on actual meter reading after relaxation of lock down within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments
149 of 2020
|
Completed | |
1910 | Tue 24/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
|
Reschedule | |
1911 | Tue 24/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule | |
1912 | Mon 23/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Completed | |
1913 | Mon 23/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Abhijeet MADC Nagpur Energy Pvt. Ltd. (In Liquidation) for determination of the user fees in respect of dedicated transmission system as per the direction issued by this Hon'ble Commission vide order dated 22.10.2019 in case No. 292 of 2018.
Along with Miscellaneous Application
331 of 2019
|
Completed | |
1914 | Mon 23/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking directions for compliance of Merit Order Despatch (MOD) principles, compilation of MOD stack in accordance with the Order dated 17.05.2007 in Case No. 42 of 2006 and State Grid Code and seeking compensation for loss suffered by the Petitioner on account of frequent backing down instructions, non-adherence to MOD principles and under-declaration of Energy Charges
AND
Application of M/s. Adani Power Maharashtra Ltd. for Impleadment in Case No. 125 of 2016
AND
Miscellaneous Application filed by RattanIndia Power Limited under Section 86 Read with Sections 142 & 146 of the EA, 2003, seeking compliance of Daily Order dated 04.10.2016 passed by this Commission and necessary directions.
125 of 2016 AND MA No. 18 of 2016 AND MA No. 21 of 2016 in Case No. 125 of 2016
|
5 | |
1915 | Fri 13/11/2020 10:00:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Adani Power Maharashtra Limited under Section 86 read with 63 of the Electricity Act, 2003 and Article 13 of the PPAs dated 08.09.2008,
31.03.2010, 09.08.2010 and 16.02.2013 for approval of relief under Change in Law for shortfall in domestic coal under SHAKTI Policy after 31.03.2017 and grant of Carrying Cost. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 28 September, 2020 in Appeal No. 155 of 2019 and 116 of 2019.- MA No. 54 of 2020
290 of 2018 and MA No. 54 of 2020
|
Completed | |
1916 | Fri 13/11/2020 10:00:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (APML) for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 14 September, 2020 in Appeal No. 182 of 2019. - MA No. 53 of 2020
189 of 2013 and 140 of 2014 and MA No. 53 of 2020
|
Completed | |
1917 | Wed 11/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Laxmipati Balaji Supply Chain Management Limited seeking adoption of tariff discovered through transparent bidding process for Short Term Procurement of Power, up to 1MW for a period of one year from 1st Dec, 2020 to 30th Nov, 2021 for it SEZ at village Sai, Taluka Panvel, District Raigad.
211 of 2020
|
Completed | |
1918 | Wed 11/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited Petition on the issue of standby charges being payable by the Petitioner to TPCG as per TPC-G MYT Order dated 30.03.2020 in Case No. 300 of 2020 and in order to reconcile the issue of standby charges, with the final order dated 20.08.2019 passed by the Hon'ble Supreme Court in MA. 1404/2019 IN C.A. NO(S). 415 OF 2007.
163 of 2020
|
Completed | |
1919 | Wed 11/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking setting up of uniform principles and policies for allocation of various distribution system network assets of a Distribution Licensee to the consumers connected at Extra-High Tension (EHT), High Tension (HT) and Low Tension (LT) Voltage level based on their utilisation for the computation of Wheeling Charges
133 of 2020
|
Completed | |
1920 | Tue 10/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Adani Power Maharashtra Limited under Section 86 read with 63 of the Electricity Act, 2003 and Article 13 of the PPAs dated 08.09.2008,
31.03.2010, 09.08.2010 and 16.02.2013 for approval of relief under Change in Law for shortfall in domestic coal under SHAKTI Policy after 31.03.2017 and grant of Carrying Cost. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 28 September, 2020 in Appeal No. 155 of 2019 and 116 of 2019.- MA No. 54 of 2020
290 of 2018 and MA No. 54 of 2020
|
Completed | |
1921 | Tue 10/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (APML) for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 14 September, 2020 in Appeal No. 182 of 2019. - MA No. 53 of 2020
189 of 2013 and 140 of 2014 and MA No. 53 of 2020
|
Completed | |
1922 | Tue 10/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission
Licence No. 01 of 2014)
137 of 2016
|
Completed | |
1923 | Mon 09/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation seeking compensation on account of occurrence of change in law events.
Application for Interim Directions under Section 94(2) of the Electricity Act, 2003 read with Regulation 81 of the MERC (Conduct of Business) Regulations, 2004
195 of 2020 and MA No. 52 of 2020
|
Completed | |
1924 | Mon 09/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL)
for removal of difficulties with regards to payment of rs 130.46 crore against demand of Service Tax liability claimed by WRD GoM for the period from FY 2009-10 to FY2014-15
168 of 2020
|
Completed | |
1925 | Mon 09/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
167 of 2020
|
Completed | |
1926 | Mon 09/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys P Ltd. in the matter of charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016 & 195 of 2017 & reduction of contract demand to 200 KVA
166 of 2020
|
Completed | |
1927 | Fri 06/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation seeking compensation on account of occurr ence of change in law events.
AND Application for Interim Directions under Section 94(2) of the Electricity Act, 2003 read with Regulation 81 of the MERC (Conduct of Business) Regulations, 2004
195 of 2020 and MA No. 52 of 2020
|
Reschedule with further notice | |
1928 | Fri 06/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL)
for removal of difficulties with regards to payment of rs 130.46 crore against demand
of Service Tax liability claimed by WRD GoM for the period from FY 2009-10 to
FY2014-15
168 of 2020
|
Reschedule with further notice | |
1929 | Fri 06/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited Seeking
Compliance of the Order Dated May 28, 2019 In Case No. 168 Of 2014 of the
Honâ??ble Commission Read with relevant provisions of the Electricity Act, 2003 and
Works of Licensees Rules, 2006
167 of 2020
|
Reschedule with further notice | |
1930 | Fri 06/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys P Ltd. in the matter of charging demand charges at the
rate of 25% applicable for startup power of generating plant as per tariff order of
Commission in case No. 48 of 2016 & 195 of 2017 & reduction of contract demand
to 200 KVA
166 of 2020
|
Reschedule with further notice | |
1931 | Tue 03/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited Petition on the issue of standby
charges being payable by the Petitioner to TPCG as per TPC-G MYT Order dated
30.03.2020 in Case No. 300 of 2020 and in order to reconcile the issue of standby
charges, with the final order dated 20.08.2019 passed by the Hon'ble Supreme Court
in MA. 1404/2019 IN C.A. NO(S). 415 OF 2007.
163 of 2020
|
Reschedule with further notice | |
1932 | Tue 03/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Petition filed by Tulasi Casting and Machining Ltd against
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non- Compliance
of CGRF Kolhapur Order dated 6.12.2019 passed in Case No. 17 (2018-19)/ 217.
153 of 2020
|
5 | |
1933 | Tue 03/11/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking setting up
of uniform principles and policies for allocation of various distribution system
network assets of a Distribution Licensee to the consumers connected at Extra-High
Tension (EHT), High Tension (HT) and Low Tension (LT) Voltage level based on
their utilisation for the computation of Wheeling Charges
133 of 2020
|
Reschedule with further notice | |
1934 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Aurinko Energy Private Limited for (i) approval of "Change in Law"
and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
123 of 2020
|
Completed | |
1935 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Kannad) for (i) approval of "Change in
Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
122 of 2020
|
Completed | |
1936 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Wadwani) for (i) approval of "Change in
Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
121 of 2020
|
Completed | |
1937 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Parner) for (i) approval of "Change in
Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
120 of 2020
|
Completed | |
1938 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Kinwat) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
119 of 2020
|
Completed | |
1939 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Mohol) for (i) approval of "Change in
Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
118 of 2020
|
Completed | |
1940 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Jamkhed) for (i) approval of "Change in
Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
117 of 2020
|
Completed | |
1941 | Tue 27/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Jalna) for (i) approval of "Change in Law"
and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/
compensation to offset financial/ commercial impact of change in law events on
account of imposition of safeguard duty on solar cells/modules.
116 of 2020
|
Completed | |
1942 | Fri 23/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Vidarbha Industries Association for removing difficulty in implementation
of order in case No. 322 of 2019 in the matter of case of MSEDCL for truing up of
aggregate revenue requirement (ARR) of FY 2017-18 and FY 2018-19, provisional
truing up of ARR of FY 2019-20 and projections of ARR and determination for the
4th Multi Year Tariff control period FY 2020-21 to 2024-25.
165 of 2020
|
Completed | |
1943 | Fri 23/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ambad Industries and Manufacturers Association seeking to modify
MYT order Dt. 30/03/2020 in Case no. 322/2019 and to issue appropriate directives
with respect to KVAh billing methodology.
144 of 2020
|
Completed | |
1944 | Fri 23/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Krishna Valley Chamber of Industries & Commerce for extension of
Kwh billing methodology and concerned Korona pandemic related Issues.
143 of 2020
|
Completed | |
1945 | Fri 23/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Khandesh Industrial Development Association ( K.I.A) seeking
appropriate interim order/direction to temporary modify MYT Order dated
30.03.2020 passed by the Commission in respect of Kvah billing methodology for the
period of one year.
135 of 2020
|
Completed | |
1946 | Fri 23/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Chamber of Marathwada Industries and Agriculture ( C.M.I.A.)
Petition for issue of interim order to temporary modify MYT order dt. 30.03.2020 in
respect of kvah billing mechanism during lockdown period declared on account of
Covid-19 pandemic.
131 of 2020
|
Completed | |
1947 | Thu 22/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval to float open tenders and taking land on lease by paying rent under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) scheme.
189 of 2020
|
Completed | |
1948 | Thu 22/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of common order dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
|
Completed | |
1949 | Thu 22/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Ltd for adjudication of dispute under the Power Purchase Agreements entered between Adani Power Maharashtra Limited ("APML") and Maharashtra State Electricity Distribution Company Limited ("MSEDCL") qua nonpayment of certain costs pertaining to Inter-Plant Transfer ("IPT") of coal utilized at Tiroda TPS.
132 of 2020
|
Completed | |
1950 | Wed 21/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Suo-Motu e-Hearing in the matter of Grid Failure in the Mumbai Metropolitan Region (MMR) on 12 October 2020 at 10.02 Hrs. - Compliance under Regulation 46.2.4 of MERC (State Grid Code) Regulations, 2020.
202 of 2020
|
Completed | |
1951 | Tue 20/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking relief for residential consumers for 2% rebate for payment within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments for payment of June -20 and July-20
149 of 2020
|
Completed | |
1952 | Tue 20/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
|
Completed | |
1953 | Tue 20/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Completed | |
1954 | Fri 16/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
|
Completed | |
1955 | Fri 16/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Girish Bhaskar Dohane for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
54 of 2020
|
5 | |
1956 | Fri 16/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Vinod Mohanbhai Makadiya for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
53 of 2020
|
5 | |
1957 | Tue 13/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking this
Hon'ble Commission to suitably clarify / relax / modify Regulations 4 and 10 and
55.1 of the MERC (Deviation Settlement Mechanism and Related Matters)
Regulations, 2019.
114 of 2020
|
Completed | |
1958 | Tue 13/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India seeking Relief / Exemption Under
DSM Regulation, 2019, to Bagasse Based Cogen Power Plants at Sugar Factories in
Maharashtra, with installed Capacity of 25 MW & Above.
Application to take on record Amended Petition.
110 of 2020
|
Completed | |
1959 | Tue 13/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Regulation 19 (Power to Remove
Difficulty), Regulation 20 (Power to Relax) and Regulation 21 (Power to Issue
Directions) of MERC (Deviation Settlement Mechanism and Related Matters)
Regulations, 2019 seeking to remove difficulty, relaxation and/or issue appropriate
direction read with Regulation 92 of the Maharashtra Electricity Regulatory Commission
(conduct of Business), Regulations, 2004 seeking with respect to Regulation 4 and 10 of
the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019
58 of 2020
|
Completed | |
1960 | Fri 09/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Dr. Kirit Somaiya seeking directions against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) pertaining to inflated bills being received by the general public, during the Lockdown period.
159 of 2020
|
Completed | |
1961 | Fri 09/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/S Adlabs Entertainment Limited for waiver of maximum demand penalty, applied to Open Access transaction, Under Covid-19 (Corona Virus Pandemic) by Maharashtra State Electricity Distribution Company Ltd., (MSEDCL).
158 of 2020
|
Completed | |
1962 | Fri 09/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015.
50 of 2016
|
Completed | |
1963 | Tue 06/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking approval
for change in execution entity of 225 MW grid connected Wind-Solar Hybrid Power
Projects from M/s Tata Power Green Energy Limited, a 100% subsidiary of The Tata
Power Company Limited to M/s TP Saurya Limited, a 100% subsidiary of The Tata
Power Company Limited.
181 of 2020
|
Completed | |
1964 | Tue 06/10/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Ltd for adjudication of dispute under the
Power Purchase Agreements entered between Adani Power Maharashtra Limited
("APML") and Maharashtra State Electricity Distribution Company Limited
("MSEDCL") qua nonpayment of certain costs pertaining to Inter-Plant Transfer
("IPT") of coal utilized at Tiroda TPS.
132 of 2020
|
Completed | |
1965 | Tue 29/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
|
Reschedule | |
1966 | Tue 29/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule | |
1967 | Tue 29/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking relief for residential consumers for 2% rebate for payment within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments for payment of June -20 and July-20
149 of 2020
|
Reschedule | |
1968 | Fri 25/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking permission to exercise the option or otherwise for the Financial Year 2020-2021 as per the order dated 22nd May, 2019 passed by the Hon'ble Commission in Case No. 68 of 2019
111 of 2020
|
Completed | |
1969 | Fri 25/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking capping of RPO for captive power plants and to relax or waive the provisions of the MERC RPO Regulations, 2016
130 of 2020
|
Completed | |
1970 | Fri 25/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for long term procurement of wind Power from Maharashtra Energy Development Agency's (MEDA'S) projects who's EPA with MSEDCL is expired, for meeting Non Solar RPO target.
113 of 2020
|
Completed | |
1971 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Laxmipati Balaji Supply Chain Management Limited seeking adoption of tariff discovered through competitive bidding process and consent to continue the selection process with single bidder and adoption of tariff discovered through transparent bidding process for Short Term Procurement of Power, up to 1MW for a period of one year from 1st Oct, 2020 to 30th Sep, 2021
183 of 2020
|
Completed | |
1972 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking review of Order dated passed in Case No. 100 of 2020 Petition for quashing of the communication / e-mail dated 05.06.2020 issued by MSEDCL
Miscellaneous Application for urgent listing and for seeking Interim reliefs
177 of 2020 and MA No. 50 of 2020
|
Completed | |
1973 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
|
Completed | |
1974 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
|
Completed | |
1975 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
|
Reschedule | |
1976 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Girish Bhaskar Dohane for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
54 of 2020
|
Reschedule | |
1977 | Tue 22/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mr. Vinod Mohanbhai Makadiya for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
53 of 2020
|
Reschedule | |
1978 | Fri 18/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
|
Reschedule | |
1979 | Fri 18/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule | |
1980 | Tue 15/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Amravati Power Transmission Company Limited application on behalf of Amravati Power Transmission company limited seeking modification/clarification of the order dated 30.03.2020 passed in Case No 295 of 2019.
145 of 2020
|
Completed | |
1981 | Tue 15/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Naresh Kikubhai Patel against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of CGRF Kalyan Zone Order no 1880 / 19-20 Dt. 23 Dec' 2019 .
74 of 2020
|
Completed | |
1982 | Tue 15/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Lloyd Metals & Energy Ltd has filed Petition on 13.3.2020 under
Section under section 86(f) of the Electricity Act, 2003 ln the matter of charging
demand charges at the rate of 25o/o applicable for startup power of generating plant
as per tariff order of Commission in case No.48 of 2016 & 195 of 2017
106 of 2020
|
Completed | |
1983 | Fri 11/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Dr. Kirit Somaiya seeking directions against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) pertaining to inflated bills being received by the general public, during the Lockdown period.
159 of 2020
|
Reschedule with further notice | |
1984 | Fri 11/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
New Petition, Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval to consider discount in Tariff offered by generators for preparation of MoD for the month of May-2020 and June 2020.
108 of 2020
|
Completed | |
1985 | Fri 11/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Co. Ltd (State Transmission Utility's) for removal of difficulties in implementation of Multi Year Tariff Regulation 2015, 2019 and Transmission open Access Regulation 2016.
52 of 2020
|
Completed | |
1986 | Tue 08/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking review of Order dated passed in Case No. 100 of 2020 Petition for quashing of the communication / e-mail dated 05.06.2020 issued by MSEDCL
Miscellaneous Application for urgent listing and for seeking Interim reliefs
177 of 2020 and MA No. 50 of 2020
|
Completed | |
1987 | Tue 08/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
|
Completed | |
1988 | Tue 08/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
|
Completed | |
1989 | Tue 08/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking this Hon'ble Commission to suitably clarify / relax / modify Regulations 4 and 10 and 55.1 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019.
114 of 2020
|
Reschedule with further notice | |
1990 | Tue 08/09/2020 00:30:00 AM |
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Regulation 19 (Power to Remove Difficulty), Regulation 20 (Power to Relax) and Regulation 21 (Power to Issue Directions) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 seeking to remove difficulty, relaxation and/or issue appropriate direction read with Regulation 92 of the Maharashtra Electricity Regulatory Commission (conduct of Business), Regulations, 2004 seeking with respect to Regulation 4 and 10 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019
58 of 2020
|
Reschedule with further notice | |
1991 | Fri 04/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. ("SEZ Phase II") for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year)
172 of 2020
|
Completed | |
1992 | Fri 04/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff determined for a Short-Term (i.e., for a period of more than one day to one year)
171 of 2020
|
Completed | |
1993 | Fri 04/09/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (hereinafter to be referred to as "MSEDCL" or "the Petitioner") Petition in compliance of the
Directives of the Commission vide Order dated: 11.09.2020 passed in Case No. 145 of 2019.
107 of 2020
|
Completed | |
1994 | Wed 26/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and directions under Section 86 of the Electricity Act, 2003 read with 'Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India
174 of 2020
|
Completed | |
1995 | Wed 26/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
|
Completed | |
1996 | Fri 21/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
|
Reschedule | |
1997 | Fri 21/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
|
Completed | |
1998 | Tue 18/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Impleadment Application filed by M/s Sai Wardha Power Generation Limited (SWPGL). In Case No. 137 of 2016 Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
MA No. 46 of 2020 in Case No. 137 of 2016
|
Completed | |
1999 | Tue 18/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
|
Completed | |
2000 | Tue 18/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking
Compensation as per Power Sale Agreement executed between MSEDCL (Distribution
Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary
Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on
account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as
per Power Purchase Agreement executed Between Solar Energy Corporation of India
Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the
Respondent.
346 of 2019
|
Completed | |
2001 | Tue 18/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
|
Completed | |
2002 | Tue 18/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
|
Completed | |
2003 | Fri 14/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AMJ Land Holdings Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for wrongful denial of Open Access Under Provisions of the Electricity Act, 2003 more particularly Section 42, Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016
345 of 2019
|
Completed | |
2004 | Fri 14/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of AMJ Land Holdings Limited under Regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulties in giving effect to the provisions of the Regulation 20.3 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 and implementation thereof.
115 of 2020
|
Completed | |
2005 | Fri 14/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for Non-Compliance by MSEDCL of order of the Commission dated September 9, 2019 in Case No. 132 of 2019.
71 of 2020
|
Completed | |
2006 | Fri 14/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited for taking suitable steps for bringing about the necessary changes in the Open Access Regulations and the Open Access regime within the State of Maharashtra (under Sections 42 (2); 61 (b); 61 (c); 61 (d); 61 (f); 66; 86 (3) of the Electricity Act, 2003)
6 of 2020
|
Completed | |
2007 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited Petition under
seeking extension/ deferment of Scheduled Commissioning Date on account of Force
Majeure events related to COVID-19 outbreak which prevented the Petitioner from
undertaking its obligations under the Power Purchase Agreement dated 17.07.2019
and consequential reliefs.
.
- Application seeking permission to file Petition online and seeking urgent hearing for
urgent reliefs
- Application seeking ad-interim ex-parte directions against the respondent.
138 of 2020 and MA No. 43 of 2020
|
Completed | |
2008 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
|
Completed | |
2009 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the PPAs dated 22.04.2010 and 05.06.2010, executed between RIPL and MSEDCL for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RIPL.
350 of 2019
|
Completed | |
2010 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of JSW Steel Limited under Sections 61, 86(1)(e), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with MERC (Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010 and subsequent amendments.
335 of 2019
|
Completed | |
2011 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Oil and Natural Gas Corporation Limited (ONGC) for Exemption / Clarification of Renewable Purchase Obligation (RPO) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R Dated 1st February 2019.
65 of 2020
|
Completed | |
2012 | Tue 11/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for recovery of carrying cost of the claims towards Change in law events such as NCDP, SHAKTI Policy and Cancellation of Lohara Coal Block in respect of various orders passed by Hon'ble Commission in the Petitions filed by IPPs through FAC.
45 of 2020
|
Completed | |
2013 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd seeking adjudication of disputes between Renewable Generator (Petitioner) and Distribution Licensee (MSEDCL) w.r.t illegal rejection of online application dated 14.07.2020 preferred by the Petitioner for sale of power to MSEDCL @ Rs. 2.52/unit.
155 of 2020
|
Completed | |
2014 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited under Section 94 (1) of the Electricity Act, 2003 read with Regulation 84 of the MERC (Conduct of Business) Regulations 2004 to Review the Order dated 22nd January, 2020 passed by the Hon'ble MERC in MA No. 39 of 2019 and Case No. 7 of 2002
69 of 2020
|
Completed | |
2015 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Marigold Pharmaceuticals Private Limited under Section 142, 149, 146 of the Electricity Act, 2003 for action on MSEDCL for non compliance of CGRF Baramati Order in Case No. 20/2019 dated 19/12/2019.
63 of 2020
|
Reschedule with further notice | |
2016 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
5 of 2020
|
Completed | |
2017 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
4 of 2020
|
Completed | |
2018 | Fri 07/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri. Vitthal Manaji Dabre under section 43, 142, 146, 149 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Orders 175 of 2019 date 23.10.2019.
3 of 2020
|
Completed | |
2019 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking adoption of tariff for procurement of 225 MW grid connected Wind-Solar Hybrid capacity on long term basis through Competitive Bidding Process (Followed by E-Reverse Auction) to meet the Renewable Purchase Obligation of Tata Power-Distribution.
152 of 2020
|
Completed | |
2020 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
|
Completed | |
2021 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Windmill Owners Welfare Association of India against non compliance by Maharashtra state Electricity Distribution Company Limited (MSEDCL) of the MERC Order dated 16.10.2018 in Case No.187 of 2017 read with relevant provisions of the EA, 2003.
339 of 2019
|
Completed | |
2022 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Sulbha Subhash Lodha under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between hotel golden emerald and Maharashtra State Electricity Distribution Company Limited
334 of 2019
|
Completed | |
2023 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Hotel Golden Emerald under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between hotel golden emerald and Maharashtra State Electricity Distribution Company Limited
333 of 2019
|
Completed | |
2024 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Provisions of Electricity Act, 2003 more particularly Sections 142, 146 and 149 thereof on account of Non-Compliance by Maharashtra State Electricity Distribution Company Limited of the orders of this Hon'ble Commission including orders dated April 9, 2019 in case No. 22 of 2019 read with the order dated November 7, 2017 in Case No. 77 of 2017.
70 of 2020
|
Completed | |
2025 | Tue 04/08/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of MSPL Limited pertaining to adjudication of disputes between MSPL Limited and MSEDCL and seeking directions against MSEDCL for Non-Compliance of terms of the PPA Dated April 29, 2006, short term PPA's and various order of the Commission including but not limited to order dated January 17, 2018 in case no. 78 of 2017 read with relevant provisions of Electricity Act, 2003.
2 of 2020
|
Completed | |
2026 | Fri 31/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Reschedule with further notice | |
2027 | Fri 31/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Riddhi Siddhi Gluco Biols Limited against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Non-Compliance of Common order dated 01.10.2018 in Case No. 28 of 2018 under Section 142, 146 & 149 of the Electricity Act, 2003 read with Regulation 13 (C) (IX) of the Maharashtra Electricity Regulatory Commission (Conduct Of Business) Regulations, 2004.
72 of 2020
|
Completed | |
2028 | Fri 31/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
|
Reschedule with further notice | |
2029 | Fri 31/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Winro Commercial (India) Ltd. seeking direction against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) under Section 86(1) (f) for adjudication of dispute on the issue of outstanding payments of Power Purchases, interest on delayed payment and overdue interest for delay payment surcharge for wind power supplied by it to MSEDCL.
43 of 2020
|
Completed | |
2030 | Fri 31/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of common order dated 09.10.2o19 in case no. 262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 under Section 142, 146 & 149 of the Electricity Act, 2003 read with Regulation 13 (c) (ix) of the Maharashtra Electricity Regulatory Commission (conduct of business) Regulations, 2004.
23 of 2020
|
Completed | |
2031 | Tue 28/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.
138 of 2020
|
Completed | |
2032 | Tue 28/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders in Case No. 82 of 2020.
137 of 2020
|
Completed | |
2033 | Tue 28/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
|
Completed | |
2034 | Tue 28/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
|
Completed | |
2035 | Thu 09/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited (Generation Business) seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.298 of 2019.
105 of 2020
|
Completed | |
2036 | Thu 09/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited (Transmission Business) seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.297 of 2019.
104 of 2020
|
Completed | |
2037 | Thu 09/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited-D seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.325 of 2019.
103 of 2020
|
Completed | |
2038 | Tue 07/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Nisagra Renewable Energy Private seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
62 of 2020
|
Completed | |
2039 | Tue 07/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. Juniper Green Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
61 of 2020
|
Completed | |
2040 | Tue 07/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
|
Completed | |
2041 | Tue 07/07/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
|
Completed | |
2042 | Fri 26/06/2020 10:30:03 AM |
e-Hearing through Video Conferencing
New Petition, Petition filed by ReNew Vayu Urja Private Limited (formerly known as KCT Renewable Energy Private Limited)seeking direction for not encashing the performance bank guarantee of the petitioner and declaration of extension of Scheduled Commercial Operation Date on account of Force Majeure Application Application for urgent listing and for seeking Interim ad-interim reliefs.
102 of 2020
|
Completed | |
2043 | Fri 26/06/2020 10:30:02 AM |
e-Hearing through Video Conferencing
Petition filed by WinIndia Ventures Pvt Ltd seeking adjudication of disputes between Petitioner and MSEDCL illegal disconnection of wind turbine , seeking restitution/compensation from MSEDCL for loss of generation on account of illegal disconnection of petitioner's wind turbine.
101 of 2020
|
Completed | |
2044 | Fri 26/06/2020 10:30:01 AM |
e-Hearing through Video Conferencing
Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking quashing of the communication / e-mail dated 05.06.2020 issued by Respondent No. 1 and stay on disconnection of the Petitioner's 2 MW Wind Turbine Generator and Application for urgent listing and for seeking Interim reliefs.
100 of 2020
|
Completed | |
2045 | Fri 26/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Shri Gajlaxmi Industries HUF and other 28 Cases (Case No's Case No.12 to 20 and 29 to 42 and 49 to 51, 55 and 56 of 2020) Petitions for Non-compliance of Case Nos.172 of 2019, 173 of 2019, 176 to 181 of 2019, 185 to 194 of 2019,200 to 224 of 2019 and MA No. 32 of 2019 and 33 of 2019 in respect of Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 for removal of difficulties in giving effect to the provisions of the Regulation and implementation thereof.
12 to 20, 29 to 42, 49 to 51, 55 and 56 of 2020
|
Completed | |
2046 | Fri 19/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-T) seeking this Hon'ble Commission to reconsider and suitably clarify / relax / modify certain provisions of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019.
99 of 2020
|
Completed | |
2047 | Fri 19/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Navalakha Translines & Other under Section 42, 86 of the Electricity Act, 2003 Wrongful rejection of Open Access (O.A.) Permission.
340 of 2019
|
Completed | |
2048 | Fri 19/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited for review of the Order dated 14.11.2019 passed by the Hon'ble Commission in the Case No. 260 of 2019, in terms of the liberty granted by the Hon'ble Appellate Tribunal in its Judgment dated 25.02.2020 in Appeal No. 65 of 2020.
73 of 2020
|
Completed | |
2049 | Fri 12/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking review of the Multi Year Tariff Order issued on 30.03.2020 by the Hon'ble Commission in Case No. 326 of 2019.
98 of 2020
|
Completed | |
2050 | Fri 12/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
The Petitioner The Tata Power Company Limited (Tata Power-D) has filed this Petition on 23.5.2020 Petition seeking review of the Multi Year Tariff Order issued on the date 30.03.2020 ("Impugned Order") by the Hon'ble Commission in Case No. 326 of 2019 for approval of Truing Up of FY 2017-18, Truing Up of FY 2018-19, Provisional Truing Up of FY 2019-20 and Tariff Projections for the Fourth MYT Control period from FY 2020-21 to FY 2024-25 for the Distribution Business of Tata Power (Tata Power-D).
96 of 2020
|
Completed | |
2051 | Fri 12/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-T) seeking review of the Multi Year Tariff Order issued on the date 30.03.2020 ("Impugned Order") by the Hon'ble Commission in Case No. 299 of 2019.
95 of 2020
|
Completed | |
2052 | Fri 12/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-G) seeking review and clarifications of certain issues arising out of the Multi Year Tariff Order issued on 30.03.2020 by the Hon'ble Commission in Case No. 300 of 2019.
94 of 2020
|
Completed | |
2053 | Tue 09/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for removal of difficulties regarding implementation of fuel plan and difficulties faced during present forced majeure COVID-19 situation.
97 of 2020
|
Completed | |
2054 | Tue 09/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Ghatge Patil Industries Limited seeking waiver of fixed demand charges reduction and reinstatement of contract demand and relaxation of banking.
93 of 2020
|
Completed | |
2055 | Tue 09/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Indian Wind Power Association-Maharashtra State Council Seeking relaxation of Regulation 20.3 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 ("DOAR, 2016") pertaining to the banking period.
92 of 2020
|
Completed | |
2056 | Tue 09/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s ReNew Solar Power Private Limited under section 86(1)(f) of the Electricity Act 2003 before the MERC for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules in terms of Article 9 of the PPA dated 27.07.2018 between M/s ReNew Solar Power Private Limited and Maharashtra State Electricity Distribution Co. Ltd.
8 of 2020
|
Completed | |
2057 | Wed 03/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd under Section 86 (1) (e) of the Electricity Act, 2003 seeking appropriate directions and declaration against Distribution licensee Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) as well as nodal agency Maharashtra Energy Development Authority (MEDA) for in ordinate delay in implementing the renewable energy policy dated 20th july, 2015 issued by the Government of Maharashtra read with methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra W.R.T the petitioner's wind unit of 1.5 MW.
24 of 2020
|
Completed | |
2058 | Wed 03/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Section 86 of the Electricity Act, 2003 seeking directions against Maharashtra State Electricity Distribution Company Limited qua supply of power from the Petitioner's 1.6 MW Wind Turbine Generators located at Satara, Maharashtra.
Miscellaneous Application seeking urgent ex-parte ad-interim reliefs.
66 of 2020
|
Completed | |
2059 | Wed 03/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Section 86 of the Electricity Act, 2003 seeking directions against Maharashtra State Electricity Distribution Company Limited qua supply of power from the Petitioner's 5.6 MW Wind Turbine Generators located at Ahmednagar, Maharashtra.
AND
Miscellaneous Application seeking urgent ex-parte ad-interim reliefs.
60 of 2020 and MA No. 38 of 2020
|
Completed | |
2060 | Tue 02/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
M/s. ACME Heergarh Powertech Private Limited Petition for declaration that PPA dated 21.08.2019 stands frustrated on account of force majeure and impossibility of performance and consequential relief.
78 of 2020
|
Completed | |
2061 | Tue 02/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking review of order dated 30th March 2020 in Case no. 322of 2019 in the matter of Truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff control period FY 2020-21 to FY 2024-25.
84 of 2020
|
Completed | |
2062 | Tue 02/06/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s. ACME Chittorgarh Solar Energy Pvt. seeking Issuance of appropriate Order(s)/Directions(s) for a mechanism for recovery of the compensation towards increase in capital cost due to introduction and imposition of Safe Guard Duty.
7 of 2020
|
Completed | |
2063 | Fri 29/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking Grant of time to comply with clause No. 3 of operative part of the Common Order dated 26th September 2019 passed by the Hon'ble Maharashtra Electricity Regulatory Commission, Mumbai in Case No. 297 of 2018.
59 of 2020
|
Completed | |
2064 | Fri 29/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking approval to adoption of Tariff under Section 63 of The Electricity Act, 2003 for long term procurement of 210 MW Power from M/s. Sai Wardha Power Generation Limited (SWPGL).
91 of 2020
|
Completed | |
2065 | Fri 29/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL)
seeking immediate recovery of pending claims of MSEDCL along with carrying cost
under MERC approved FBSM AND
Miscellaneous Application for Interim Relief
90 of 2020 and MA No. 37 of 2020
|
Completed | |
2066 | Fri 29/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
The Tata Power Company Limited Petition seeking approval of extension of the Power Purchase Agreement between the Distribution Business of The Tata Power Company Limited and the Wind Energy Business of The Tata Power Company Limited.
89 of 2020
|
Completed | |
2067 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Bothe Windfarm Development Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited qua supply of power from the Petitioner's 6.3 MW Wind Turbine Generators located at Satara, Maharashtra under Section 86 of the Electricity Act, 2003.
28 of 2020
|
Completed | |
2068 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking review of order dated 30th March 2020 in Case no. 322of 2019 in the matter of Truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff control period FY 2020-21 to FY 2024-25.
84 of 2020
|
Completed | |
2069 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Jaigad Power Transco Ltd ("JPTL") seeking review of Tariff Order issued by the Hon'ble Commission on 30th March 2020 in Case No. 294 of 2019.
83 of 2020
|
Completed | |
2070 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
The Tata Power Company Petition seeking approval for the Bidding Documents, for long term procurement (25 years) of 225 MW capacity from grid connected Wind-Solar Hybrid Power Projects through competitive bidding process for meeting the Renewable Purchase Obligations based on National Wind-Solar Hybrid Policy dated 14th May 2018.
88 of 2020
|
Completed | |
2071 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of KRC Infrastructure and Projects Private Limited for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 329 of 2019.
87 of 2020
|
Completed | |
2072 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Mindspace Business Parks Private Limited Review Petition of for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 328 of 2019.
86 of 2020
|
Completed | |
2073 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Review Petition of Gigaplex Estate Private Limited for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 330 of 2019.
85 of 2020
|
Completed | |
2074 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for taking on record the deemed Distribution Licensee status of the Petitioner , M/s Eon Kharadi Infrastructure Pvt. Ltd. for the IT & ITeS SEZ at Survey no. 72, Village-Kharadi, Pune and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing EON to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the 'ceiling tariff' in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
68 of 2020
|
Completed | |
2075 | Tue 26/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for taking on record the deemed Distribution Licensee status of the Petitioner, M/s Eon Kharadi Infrastructure Pvt. Ltd. for the IT & ITeS SEZ at MIDC Knowledge Park- Kharadi, Pune and for issuing the Specific Conditions of Distribution Licence and for allowing EON to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the 'ceiling tariff' in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
67 of 2020
|
Completed | |
2076 | Thu 14/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) against Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking appropriate orders/ directions modifying the Regulations pertaining to the Revision/ Change in Contract Demand of the Consumers of the MSEDCL
And
Application seeking urgent relief.
82 of 2020
|
Completed | |
2077 | Thu 14/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd seeking approval for adoption of tariff for long term procurement of 350 MW power.
81 of 2020
|
Completed | |
2078 | Thu 14/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 283 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana'.
80 of 2020
|
Completed | |
2079 | Thu 14/05/2020 10:30:00 AM |
e-Hearing through Video Conferencing
Joint Petition filed by Maharashtra State Power Generation Company Limited & Maharashtra State Electricity Distribution Company Ltd. seeking approval seeking approval of tariff rate of Rs. 3.11/kwh for long term procurement of power through MSPGCL for 100 MWAC cumulative capacity grid interactive solar PV power projects at western (a) and northern region of Maharashtra under 'Mukhyamantri Saur Krushi Vahini Yojana' to meet MSEDCL'S solar renewable purchase obligations.
10 of 2020
|
Completed | |
2080 | Mon 16/03/2020 10:00:00 AM |
Hearing
Petition of Axis Bank Limited under Section 94(1) (f) of the Electricity Act, 2003 and Regulation 15 of the MERC (Conduct of Business) Regulations, 2004 seeking further directions and clarification from the Hon'ble Commission in order dated 16 December 2019 passed in Case No. 247 of 2019.
44 of 2020
|
Reschedule with further notice | |
2081 | Mon 16/03/2020 10:00:00 AM |
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of Power Purchase Agreement (PPA) based on tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and 'Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process' issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power upto 3MW (09:00-23:00 hours) (Weekdays, i.e., Monday to Friday and excluding Saturday, Sunday and national holidays)for a period of one year from 1st April, 2020 to 31st March, 2021.
64 of 2020
|
Completed | |
2082 | Tue 18/02/2020 10:00:00 AM |
Hearing
Petition of Bothe Windfarm Development Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited qua supply of power from the Petitioner's 6.3 MW Wind Turbine Generators located at Satara, Maharashtra under Section 86 of the Electricity Act, 2003.
28 of 2020
|
Reschedule with further notice | |
2083 | Tue 18/02/2020 10:00:00 AM |
Hearing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
|
Reschedule with further notice | |
2084 | Tue 18/02/2020 10:00:00 AM |
Hearing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
|
Reschedule with further notice | |
2085 | Tue 18/02/2020 10:00:00 AM |
Hearing
Petition of WinIndia Ventures Pvt Ltd under Section 86 (1) (e) of the Electricity Act, 2003 seeking appropriate directions and declaration against Distribution licensee Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) as well as nodal agency Maharashtra Energy Development Authority (MEDA) for in ordinate delay in implementing the renewable energy policy dated 20th july, 2015 issued by the Government of Maharashtra read with methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra W.R.T the petitionerâ??s wind unit of 1.5 MW.
24 of 2020
|
Reschedule with further notice | |
2086 | Tue 18/02/2020 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for removal of difficulty under Regulation 19 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019, and Relaxation of penalised clauses under RPO Regulations, 2019
21 of 2020
|
Reschedule with further notice | |
2087 | Sat 15/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2088 | Thu 13/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2089 | Tue 11/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2090 | Mon 10/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2091 | Sat 08/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2092 | Thu 06/02/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
|
Completed | |
2093 | Tue 04/02/2020 10:00:09 AM |
Public Hearing
Inviting Suggestions and Objections on Gigplex Estate Private Limited's Multi Year Tariff Petition for Final True up of ARR for FY 2017-18 and FY 2018-19, Provisional True up of ARR for FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
330 of 2019
|
Completed | |
2094 | Tue 04/02/2020 10:00:08 AM |
Public Hearing
Inviting Suggestion and Objection on KRC Infrastructure and Projects Private Limited's Multi Year Tariff Petition for Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
329 of 2019
|
Completed | |
2095 | Tue 04/02/2020 10:00:07 AM |
Public Hearing
Inviting Suggestion and Objection on Mindspace Business Parks Private Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up for FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
328 of 2019
|
Completed | |
2096 | Tue 04/02/2020 10:00:06 AM |
Public Hearing
Inviting Suggestion and Objection on Tata Power Company Limited-Distribution Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
326 of 2019
|
Completed | |
2097 | Tue 04/02/2020 10:00:05 AM |
Public Hearing
Inviting Suggestion and Objection on Adani Electricity Mumbai Limited-Distribution Business Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
325 of 2019
|
Completed | |
2098 | Tue 04/02/2020 10:00:04 AM |
Public Hearing
Inviting Suggestions and Objections on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Multi YearTariff Petition for Final True up of ARR for FY 2017-18 and FY 2018-19, Provisional True up of ARR for FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
324 of 2019
|
Completed | |
2099 | Tue 28/01/2020 10:00:00 AM |
Public Hearing
Suggestions/ Objections on Petitions filed by Adani Electricity Mumbai Limited for proposed changes in shareholding pattern of the Company under Clause 5.2 of the Distribution Licence No. 1 of 2011 dated 11 August, 2011 and Clause 5.2 of the Transmission Licence No. 1 of 2011 dated 11 August, 2011 and Orders dated 28 June, 2018 in Case No. 139 of 2017 and Case No. 140 of 2017 passed by the Commission
341 of 2019 AND 342 of 2019
|
Schedule | |
2100 | Mon 27/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions/Objections on State Transmission Utility's (Maharashtra State Electricity Transmission Co. Ltd.) Petition for determination of Intra-State Transmission Tariff for the MYT Control Period from FY 2020-21 to FY 2024-25.
327 of 2019
|
Schedule | |
2101 | Thu 09/01/2020 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of Tariff for Long Term Procurement of 500 MW solar power from Intra-State solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
349 of 2019
|
Reschedule | |
2102 | Wed 08/01/2020 10:30:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of Tariff for Long Term Procurement of 500 MW solar power from Intra-State solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
349 of 2019
|
Completed | |
2103 | Wed 08/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestion/ Objection on Maharashtra State Power Generation Company Limited Petition for approval of final True up for FY 2017-18 and FY 2018-19, Provisional True up for FY 2019-20 and Aggregate Revenue Requirement for forecast from FY 2020-21 to FY 2024-25 (296 of 2019)
296 of 2019
|
Completed | |
2104 | Wed 08/01/2020 10:00:00 AM |
Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Truing-up of Annual Fixed Charges (AFC) for FY 2017-18 and FY 2018-19, Provisional Truing-up of AFC for FY 2019-20 and Determination of AFC and Fees and Charges for FY 2020-21 to FY 2024-25
291 of 2019
|
Completed | |
2105 | Wed 08/01/2020 10:00:00 AM |
Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for the 4th Control Period from FY 2020-21 to FY 2024-25 .
302 of 2019
|
Completed | |
2106 | Tue 07/01/2020 10:00:00 AM |
Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for approval of True up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
290 of 2019
|
Completed | |
2107 | Tue 07/01/2020 10:00:00 AM |
Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for approval of True up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
289 of 2019
|
Completed | |
2108 | Tue 07/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestion/ Objection on Adani Electricity Mumbai-Transmission Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for 4th Control period from FY 2020-21 to FY 2024-25 (Case No. 297 of 2019)
297 of 2019
|
Completed | |
2109 | Tue 07/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestion/ Objection on Petition of Adani Electricity Mumbai-Generation Business for Truing up for FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and approval of ARR and Tariff for each year of control period from FY 2020-21 to FY 2024-25
298 of 2019
|
Completed | |
2110 | Tue 07/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions/Objections on Vidarbha Industries Power Limited-Transmission Business's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
301 of 2019
|
Completed | |
2111 | Mon 06/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestion/ Objection on The Tata Power Company Limited-Transmission for Truing-up of FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and Approval of ARR for the Control Period from FY 2020-21 to FY 2024-25
299 of 2019
|
Completed | |
2112 | Mon 06/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestion/ Objection on The Tata Power Company Limited-Generation Business for Truing-up for FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and Approval of ARR forecast from FY 2020-21 to FY 2024-25
300 of 2019
|
Completed | |
2113 | Mon 06/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
295 of 2019
|
Completed | |
2114 | Mon 06/01/2020 10:00:00 AM |
Public Hearing
Inviting Suggestions/Objections on Jaigad PowerTransco Ltd's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
294 of 2019
|
Completed | |
2115 | Tue 17/12/2019 10:00:00 AM |
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006.
312 of 2019
|
Completed | |
2116 | Tue 17/12/2019 10:00:00 AM |
Hearing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
|
Completed | |
2117 | Tue 17/12/2019 10:00:00 AM |
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
|
Completed | |
2118 | Tue 17/12/2019 10:00:00 AM |
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
|
Completed | |
2119 | Tue 17/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Clean Wind Power (Bhavnagar) Private Limitedunder Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of Financial Closure and Scheduled Commissioning Date on account of Force Majeure.
286 of 2019
|
Completed | |
2120 | Mon 16/12/2019 10:00:00 AM |
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006
312 of 2019
|
Reschedule | |
2121 | Mon 16/12/2019 10:00:00 AM |
Hearing
Petition filed by JSW Steel Limited seeking clarification of the Order dated 12 September, 2018 passed in Case No. 195 of 2017, in relation to applicability of Additional Surcharge of Rs. 1.25/- per unit to it.
320 of 2019
|
Completed | |
2122 | Mon 16/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s. B.P. Marine Academy for execution of the CGRF Bhandupâ??s Order dated 11 June, 2019 in Case No. 272/2018
318 of 2019
|
Completed | |
2123 | Mon 16/12/2019 10:00:00 AM |
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal No's 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008.
AND
Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
7 of 2002 AND MA No. 39 of 2019 in Case No. 7 of 2002
|
Completed | |
2124 | Fri 06/12/2019 10:00:00 AM |
Hearing
Petition of Vidarbha Industries Power Limited- Generation Business (VIPL-G) for challenging the legality, validity and propriety of the Termination Letter dated 20 April 2019 issued by Adani Electricity Mumbai Limited.
AND
Applicant Vidarbha Industries Power Limited (VIPL) seeking directions in compliance with Order dated 17.10.2019 passed by this Hon'ble Commission. M. A. No. 36 of 2019 in Case No 247 of 2019.
247 of 2019 AND MA No. 41 of 2019 in Case No. 247 of 2019
|
Completed | |
2125 | Fri 06/12/2019 10:00:00 AM |
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
|
Completed | |
2126 | Fri 06/12/2019 10:00:00 AM |
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
|
Completed | |
2127 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff discovered for Long Term Procurement of 5MW Solar PV Power under 'Mukhyamantri Saur Krishi Vahini Yojana' from 2 to 10 MW capacity project connected to Distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchases Obligations.
323 of 2019
|
Completed | |
2128 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Clean Wind Power (Bhavnagar) Private Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of Finanical Closure and Scheduled Commissioning Date on account of Force Majeure.
286 of 2019
|
Reschedule | |
2129 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Shah Lulla Estate Developers under Section 86(1)(f) of the Electricity Act, 2003 seeking direction against Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for (a) payment of interest in terms of Order dated 19.10.2018 passed by this Hon'ble Commission; (b) payment of outstanding payment (principal as well as interest) for power supplied from October, 2018 to March, 2019; and (c) payment of future invoices.
285 of 2019
|
Completed | |
2130 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Consumer No. 073039016990 for Review of MERC Order dated 07.07.2019 passed in MERC Case No. 101 of 2016 (Petition of MSEDCL for discontinuing refund of Additional supply charge for application received after 01.01.2016).
309 of 2019
|
Completed | |
2131 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Consumer No. 073759015370 for Review of MERC Order dated 07.07.2019 passed in MERC Case No. 101 of 2016 (Petition of MSEDCL for discontinuing refund of Additional supply charge for application received after 01.01.2016).
308 of 2019
|
Completed | |
2132 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited for Review of MERC Order dated 19.09.2019 passed in MERC Case No. 227 of 2019 filed by MITC Rolling Mills Pvt Ltd (MITC) against MSEDCL for refund/ adjustment of ASC charges for the period from 1 May, 2007 to 31 May, 2008
304 of 2019
|
Completed | |
2133 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited for Review of MERC Order dated 19.09.2019 passed in MERC Case No.226 of 2019 filed by MITC Rolling Mills Pvt Ltd (MITC) against MSEDCL for refund/ adjustment of ASC charges for the period from 1 May, 2007 to 31 May, 2008.
303 of 2019
|
Completed | |
2134 | Thu 05/12/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited for Review of MERC Order dated 22ndJuly 2019 in Case No. 90 of 2019 in the matter of Petition of MSEDCL seeking clarification about interest on refund on account of change in tariff from HT continuous to HT non continuous consumers.
305 of 2019
|
Completed | |
2135 | Wed 04/12/2019 10:00:00 AM |
Hearing
Petition filed by B.P Marine Academy under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Bhandup Order No. 272/2018 dated 11 June 2019.
318 of 2019
|
Reschedule | |
2136 | Wed 04/12/2019 10:00:00 AM |
Hearing
Petition filed by Paras Miracle Poly Product Private Limited under under Section 86 of the Electricity Act, 2003 Wrongful rejection of Open Access (O.A.) Permission & Purchase of units delivered into the grid of the Respondent.
314 of 2019
|
Completed | |
2137 | Wed 04/12/2019 10:00:00 AM |
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
142 of 2019
|
Completed | |
2138 | Wed 04/12/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Completed | |
2139 | Wed 04/12/2019 10:00:00 AM |
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006
312 of 2019
|
Reschedule | |
2140 | Wed 04/12/2019 09:00:00 AM |
Hearing
Revision Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012 against the Order passed on against the order of the Hon'ble District Collector, Nashik dated 01/10/2019, passed in 1/POL 1/4541/2019.
287 of 2019
|
Completed | |
2141 | Tue 03/12/2019 10:00:00 AM |
Hearing
Petition filed by JSW Steel Limited seeking clarification of the Order dated 12.09.2018 passed in Case No. 195 of 2017, in relation to applicability of Additional Surcharge of Rs. 1.25/- per unit to the Applicant.
320 of 2019
|
Reschedule | |
2142 | Tue 03/12/2019 10:00:00 AM |
Hearing
Petition filed by Zaveri & Co. Private Limited for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 143 of 2018 (Zaveri & Co. Private Limited seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
317 of 2019
|
Completed | |
2143 | Tue 03/12/2019 10:00:00 AM |
Hearing
Petition filed by Zaveri & Co Exports for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 144 of 2018 (Zaveri & Co Exports seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 12,18,004 (Rs twelve lakh eighteen thousand four only).
316 of 2019
|
Completed | |
2144 | Tue 03/12/2019 10:00:00 AM |
Hearing
Petition filed by Purushottam Lohia for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 145 of 2018 (Purushottam Lohia seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27, 26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).
315 of 2019
|
Completed | |
2145 | Tue 03/12/2019 10:00:00 AM |
Hearing
Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
MA No. 39 of 2019 in Case No. 7 of 2002
|
Reschedule | |
2146 | Tue 03/12/2019 10:00:00 AM |
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal No's 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008.
7 of 2002
|
Reschedule | |
2147 | Tue 03/12/2019 10:00:00 AM |
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
|
Completed | |
2148 | Tue 03/12/2019 10:00:00 AM |
Hearing
311 of 2019
|
Completed | |
2149 | Tue 03/12/2019 10:00:00 AM |
Hearing
The Joint Petition filed by 1) Maharashtra State Power Generation Co. Ltd. (MSPGCL) 2) Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in regards to seeking adoption of tariff rate of Rs. 2.99/kWH for long term procurement of power through MSPGCL for 50MW solar power plant set up at various location at Western Maharashtra under 'Mukhyamantri Saur Krishi Vaahini Yojana' and seeking approval as per direction in MERC order dated 19.10.2018 in Case No. 172 of 2017.
310 of 2019
|
Completed | |
2150 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for long term procurement of Baggase based co-generation power from the projects whose EPA with MSEDCL is expired / going to expire.
321 of 2019
|
Completed | |
2151 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by AMJ Land Holding Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties in giving effect to the provisions of the Regulation 17.8(a) of Maharashtra Electricity Regulatory Commission (Distribution Open Access)(First Amendment) Regulations, 2019 and implementation thereof:
319 of 2019
|
Completed | |
2152 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Serum institute of India Private Limited under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
313 of 2019
|
Completed | |
2153 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
|
Completed | |
2154 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
|
Completed | |
2155 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
|
Completed | |
2156 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
|
Completed | |
2157 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
|
Completed | |
2158 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s Mahabal Metals Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
307 of 2019
|
Completed | |
2159 | Mon 02/12/2019 10:00:00 AM |
Hearing
Petition filed by M/s Mahabal Auto Ancill Pvt. Ltd. under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
306 of 2019
|
Completed | |
2160 | Fri 22/11/2019 10:00:00 AM |
Hearing
Applicant Vidarbha Industries Power Limited (VIPL) seeking directions in compliance with Order dated 17.10.2019 passed by this Hon'ble Commission. M. A. No. 36 of 2019 in Case No 247 of 2019.
MA No. 41 of 2019 in Case No. 247 of 2019
|
Completed | |
2161 | Fri 22/11/2019 10:00:00 AM |
Hearing
Petition of Vidarbha Industries Power Limited- Generation Business (VIPL-G) for challenging the legality, validity and propriety of the Termination Letter dated 20 April 2019 issued by Adani Electricity Mumbai Limited.
And
All other Miscellaneous Applications.
247 of 2019
|
Completed | |
2162 | Fri 22/11/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17
AND
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
|
Completed | |
2163 | Fri 22/11/2019 10:00:00 AM |
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
|
Completed | |
2164 | Fri 22/11/2019 10:00:00 AM |
Hearing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
|
Reschedule with further notice | |
2165 | Fri 22/11/2019 10:00:00 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Completed | |
2166 | Wed 20/11/2019 10:00:00 AM |
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal Noâ??s 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008.
AND
Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
7 of 2002 and MA No. 39 of 2019 in Case No. 7 of 2002
|
Reschedule with further notice | |
2167 | Tue 19/11/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Reschedule | |
2168 | Tue 19/11/2019 10:00:00 AM |
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
|
Reschedule | |
2169 | Tue 19/11/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the M-DNAC in violation of the order dated 12 June 2017 passed by the Honâ??ble Maharashtra Electricity Regulatory Commission in Case No. 182 of 2014 and Case No. 40 of 2015. under Regulations 15, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
283 of 2019
|
Reschedule | |
2170 | Fri 15/11/2019 10:00:10 AM |
Hearing
Petition filed by M/s. KRC Infrastructure and Projects Private Limited for approval of PPA and adoption of tariff under Section 63 of the Electricity Act 2003 for procurement of power up to 2 MW RTC from 00:00 to 24:00 hours for a period of six months from December 1, 2019 to May 31, 2020.
293 of 2019
|
Completed | |
2171 | Fri 15/11/2019 10:00:06 AM |
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
|
Completed | |
2172 | Fri 15/11/2019 10:00:04 AM |
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
|
Completed | |
2173 | Fri 15/11/2019 10:00:03 AM |
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
|
Completed | |
2174 | Fri 15/11/2019 10:00:02 AM |
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
|
Completed | |
2175 | Fri 15/11/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company -Distribution Business seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the MDNAC in violation of the Order dated 12 June 2017 passed by the Commission in Case No. 182 of 2014 and Case No. 40 of 2015.
283 of 2019
|
Completed | |
2176 | Fri 15/11/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited - D seeking approval for adoption of Tariff discovered for Long Term Procurement of 150 MW Solar Power from Grid Connected Solar PV Projects through Competitive Bidding Process (Followed by e-Reverse Auction) for meeting the Renewable Purchase Obligation under Section 63 of the Electricity Act, 2003 read with Regulation 5 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff), 2015, Regulation 92 and 94 of MERC (Conduct of Business) Regulations, 2004.
292 of 2019
|
Completed | |
2177 | Fri 15/11/2019 10:00:00 AM |
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
|
Reschedule | |
2178 | Fri 15/11/2019 10:00:00 AM |
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
|
Reschedule | |
2179 | Fri 15/11/2019 10:00:00 AM |
Hearing
Petition of M/s. Ceat Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF Nasik Order dated 09/08/2019 in Case No. 94 of 2019, in the matter of refund of â??change of tariff category from HT I continuous to HT I non-continuous.
288 of 2019
|
5 | |
2180 | Fri 15/11/2019 10:00:00 AM |
Hearing
Revision Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012 against the Order passed on against the order of the Hon'ble District Collector, Nashik dated 01/10/2019, passed in 1/POL 1/4541/2019.
287 of 2019
|
Reschedule | |
2181 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Completed | |
2182 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
|
Completed | |
2183 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
|
Completed | |
2184 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
|
Completed | |
2185 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
|
Completed | |
2186 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
|
Completed | |
2187 | Thu 14/11/2019 10:00:00 AM |
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
|
Completed | |
2188 | Wed 13/11/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the M-DNAC in violation of the order dated 12 June 2017 passed by the Hon'ble Maharashtra Electricity Regulatory Commission in Case No. 182 of 2014 and Case No. 40 of 2015. under Regulations 15, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
283 of 2019
|
Completed | |
2189 | Wed 13/11/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Completed | |
2190 | Wed 13/11/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 7 MW wind power from the Wind Generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003.
275 of 2019
|
Completed | |
2191 | Wed 13/11/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Reorganizations of Consumer Grievance Redressal Forums (CGRFs) based on cases dealt and Geographical Vicinity.
237 of 2019
|
Completed | |
2192 | Wed 13/11/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Reschedule with further notice | |
2193 | Fri 08/11/2019 10:00:00 AM |
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
|
Reschedule | |
2194 | Fri 08/11/2019 10:00:00 AM |
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
|
Reschedule | |
2195 | Fri 08/11/2019 10:00:00 AM |
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
|
Reschedule | |
2196 | Fri 08/11/2019 10:00:00 AM |
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
|
Reschedule | |
2197 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
|
Reschedule | |
2198 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
|
Reschedule | |
2199 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
|
Reschedule | |
2200 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
|
Reschedule | |
2201 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
|
Reschedule | |
2202 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 7 MW wind power from the Wind Generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003.
275 of 2019
|
Reschedule | |
2203 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Reorganizations of Consumer Grievance Redressal Forums (CGRFs) based on cases dealt and Geographical Vicinity.
237 of 2019
|
Reschedule | |
2204 | Thu 07/11/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Reschedule | |
2205 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
|
Completed | |
2206 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition filed by Adani Electricity Mumbai Limited for adoption of tariff for procurement of upto 350 MW grid connected Wind-Solar Hybrid Power capacity with green shoe option of additional 350 MW grid connected Wind-Solar Hybrid Power capacity on long term basis through competitive bidding process to meet the Renewable Purchase Obligation.
281 of 2019
|
Completed | |
2207 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
|
Reschedule | |
2208 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
|
Reschedule | |
2209 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
|
Reschedule | |
2210 | Wed 06/11/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Reschedule | |
2211 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
|
Reschedule | |
2212 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
|
Completed | |
2213 | Wed 06/11/2019 10:00:00 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Reschedule | |
2214 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Bhanudas G. Raibage under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) in installation of Individual SEM.
271 of 2019
|
Completed | |
2215 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Sai Service Private Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
270 of 2019
|
Completed | |
2216 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. seeking approval for deviation from Ministry of New &Renewable Energy Guidelines for Tariff based competitive bidding to undertake the development of 552mw solar projects through Engineering Procurement and Construction (EPC) contracting route based on competitive bidding.
258 of 2019
|
Completed | |
2217 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
|
Completed | |
2218 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
AND
Intervention Application of Indian Wind Power Association - Maharashtra State
Councilin Case No. 196 of 2019Petition filed by Maharashtra State Electricity
Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of
Regulation 20 of MERC (Distribution Open Access) Regulations, 2016 (Provision
of Banking) and amended Regulation 38 of MERC (Distribution Open Access)
(First Amendment) Regulations, 2019 (Provision of Banking)
196 of 2019 and MA No 34 of 2019 in 196 of 2019
|
Completed | |
2219 | Wed 23/10/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Reschedule | |
2220 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Reschedule | |
2221 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Reschedule | |
2222 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
|
Completed | |
2223 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Dr. Babasaheb Ambedkar Sahakari Sakhar Karkhana Ltd. Seeking Clarification, Modification and review of the order dated 18.07.2019 in MERC Case No. 83 of 2019 and Petition seeking punishment 142, 146 & 149 of the Electricity Act, 2003
254 of 2019
|
Completed | |
2224 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Jindal Polyfilms Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated June 29, 2018 passed by the Hon'ble Consumer Grievance Redressal Forum in Case No. CGRF / Nashik /NUC/N.R.DN./671/ 03/2018-19 (42 of 2018).
253 of 2019
|
Completed | |
2225 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition of Shah Promoters & Developers pertaining to denial of short term open access under the provisions of Electricity Act, 2003 more particularly Sections 86(1)(e) and 42 thereof and Electricity Act, 2003 in Gross non-compliance of the MERC (Distribution Open Access) Regulations, 2016
251 of 2019
|
Completed | |
2226 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Jathar Textile Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
269 of 2019
|
Completed | |
2227 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Balkrishna Sizing Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
268 of 2019
|
Completed | |
2228 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Shri Tejas Sizers under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
267 of 2019
|
Completed | |
2229 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by B.S. Chanabasappa & Sons under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
266 of 2019
|
Completed | |
2230 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Gajanan Towers Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
265 of 2019
|
Completed | |
2231 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by S. K. Veerbhadrappa & Co. under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
264 of 2019
|
Completed | |
2232 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by Sheela Shivraj under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
263 of 2019
|
Completed | |
2233 | Wed 23/10/2019 10:00:00 AM |
Hearing
Petition filed by S.K. Shivraj under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
262 of 2019
|
Completed | |
2234 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17
AND
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
|
Completed | |
2235 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha, Maryadit, & Others for Wrongful Rejection of Banking & Breach of D. O. A. Regulation 2016 and 2019 Amendments.
255 of 2019
|
Completed | |
2236 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
|
Completed | |
2237 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
|
Reschedule with further notice | |
2238 | Fri 18/10/2019 10:00:00 AM |
Hearing
Review Petition filed by Adani Power Maharashtra Ltd. under Section 94(1) (f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business), Regulation 2004 of the Order passed by Hon'ble Commission dated 06.09.2019 in Case No. 68 of 2012.
261 of 2019
|
Completed | |
2239 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of Kamal Encon Ind. Limited (Formerly KEC IND LTD) under Section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between kamal Encon Industries Limited and MSEDCL.
260 of 2019
|
Completed | |
2240 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of Azure Power Thirty Four Private Limited seeking appropriate relief on Account of Change in Law due to introduction and imposition of safeguard duty on import of solar Panel/Modules, through Notification No. 01/2018 - Custom (SG) dated 30.07.2018 issued by the Department of Revenue, Ministry of Finance Government of India, in terms of Article 9 of the Power Purchase Agreement dated 30.10.2018 executed between the Petitioner and the Respondent.
259 of 2019
|
Completed | |
2241 | Fri 18/10/2019 10:00:00 AM |
Hearing
Petition of M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and Maharashtra State Electricity Distribution Company Limited, seeking determination of amounts expended towards payment of Safeguard Duty and recovery thereof.
228 of 2019
|
Completed | |
2242 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
|
Reschedule | |
2243 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Reschedule | |
2244 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Reschedule | |
2245 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17
AND
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
|
Reschedule | |
2246 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Dr. Babasaheb Ambedkar Sahakari Sakhar Karkhana Ltd. Seeking Clarification, Modification and review of the order dated 18.07.2019 in MERC Case No. 83 of 2019 and Petition seeking punishment 142, 146 & 149 of the Electricity Act, 2003
254 of 2019
|
Reschedule | |
2247 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Shah Promoters & Developers pertaining to denial of short term open access under the provisions of Electricity Act, 2003 more particularly Sections 86(1)(e) and 42 thereof and Electricity Act, 2003 in Gross non-compliance of the MERC (Distribution Open Access) Regulations, 2016
251 of 2019
|
Reschedule | |
2248 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Jindal Polyfilms Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated June 29, 2018 passed by the Hon'ble Consumer Grievance Redressal Forum in Case No. CGRF / Nashik /NUC/N.R.DN./671/ 03/2018-19 (42 of 2018).
253 of 2019
|
Reschedule | |
2249 | Wed 16/10/2019 10:00:00 AM |
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
|
Reschedule | |
2250 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. seeking approval for deviation from Ministry of New &Renewable Energy Guidelines for Tariff based competitive bidding to undertake the development of 552mw solar projects through Engineering Procurement and Construction (EPC) contracting route based on competitive bidding.
258 of 2019
|
Reschedule | |
2251 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
|
Reschedule | |
2252 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
|
Reschedule | |
2253 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha, Maryadit, & Others for Wrongful Rejection of Banking & Breach of D. O. A. Regulation 2016 and 2019 Amendments.
255 of 2019
|
Reschedule | |
2254 | Tue 15/10/2019 10:00:00 AM |
Hearing
Intervention Application of Indian Wind Power Association - Maharashtra State Council in Case No. 196 of 2019 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of Regulation 20 of MERC (Distribution Open Access) Regulations, 2016 (Provision of Banking) and amended Regulation 38 of MERC (Distribution Open Access) (First Amendment) Regulations, 2019 (Provision of Banking)
MA No. 34 of 2019 in Case No. 196 of 2019
|
Reschedule | |
2255 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
|
Reschedule | |
2256 | Tue 15/10/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Reschedule | |
2257 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
|
Reschedule | |
2258 | Tue 15/10/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
|
Reschedule | |
2259 | Mon 14/10/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of
Captive Status of its Captive Generating Units (III & IV) for the financial year
2016 -17. AND
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 AND 170 of 2018
|
Reschedule | |
2260 | Mon 14/10/2019 10:00:00 AM |
Hearing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the denotification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
|
Reschedule with further notice | |
2261 | Mon 14/10/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Reschedule | |
2262 | Mon 14/10/2019 10:00:00 AM |
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
|
Reschedule | |
2263 | Fri 04/10/2019 10:00:00 AM |
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86 (1)(f) of the Electricity Act, 2003 ("Act") challenging the legality, validity and propriety of the Termination Letter dated 20.04.2019 ("Termination Letter") issued by Respondent i.e. Adani Electricity Mumbai Limited ("AEML").
AND
Applicant Vidarbha Industries Power Limited (VIPL) under Regulation 92 of the MERC (Conduct of Business) Regulations, 2004 read with Order 6 Rule 17 of the Civil Procedure Code, 1908.
247 of 2019 AND MA No. 36 of 2019 in Case No. 247 of 2019
|
Completed | |
2264 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
|
Completed | |
2265 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in various writ petitions filed by renewable energy generators.
246 of 2019
|
Completed | |
2266 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in W.P. No. 2116 of 2019.
245 of 2019
|
Completed | |
2267 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind
Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
242 of 2019
|
Completed | |
2268 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of Mahabal Metals Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
241 of 2019
|
Completed | |
2269 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
240 of 2019
|
Completed | |
2270 | Tue 01/10/2019 10:00:00 AM |
Hearing
239 of 2019
|
Completed | |
2271 | Tue 01/10/2019 10:00:00 AM |
Hearing
Petition of M/s Siddhanath Fabrics (India) Private Limited for non Compliance of CGRF Order, Kolhapur Division Order in Case No 52(2018-19) dated 04.04.2019.
238 of 2019
|
Completed | |
2272 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Maharashtra State Electricity Distribution Company Limited
(MSEDCL) for seeking approval for long term procurement of bagasse based co-
generation power through competitive bidding from the projects whose EPA with
MSEDCL is expired/going to expire, for meeting non-solar RPO target.
248 of 2019
|
Completed | |
2273 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in various writ petitions filed by renewable energy generators.
246 of 2019
|
Reschedule | |
2274 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order
dated 21.08.2019 passed in W.P. No. 2116 of 2019.
245 of 2019
|
Reschedule | |
2275 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind
Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
242 of 2019
|
Reschedule | |
2276 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of Mahabal Metals Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation)
Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
241 of 2019
|
Reschedule | |
2277 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
240 of 2019
|
Reschedule | |
2278 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition filed by M/s Pranavaditya Spinning Mills Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of the Hon'ble Commission dated 1 November 2018 in Case No. 213 of 2018.
234 of 2019
|
Completed | |
2279 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
|
Reschedule | |
2280 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Vitthal Manaji Dabre against Maharashtra State Electricity Distribution Company Limited for non-compliance of the Consumer Grievance Redressal Forum, Akola Case No 05/2019. CGRF/AKZ/AKOLA/70 dated 29/03/2019.
175 of 2019
|
Completed | |
2281 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Sachin Prahlad Dhule against Maharashtra State Electricity Distribution Company Limited for non-compliance of Electricity Ombudsman, Nagpur Case No 93/2018. No. EO/NGP/458/2018 dated 27/02/2019.
174 of 2019
|
Completed | |
2282 | Mon 30/09/2019 10:00:00 AM |
Hearing
Petition filed by M/s Indo Count Industrial Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of the Hon'ble Commission dated 1 November 2018 in Case No. 212 of 2018.
233 of 2019
|
Completed | |
2283 | Thu 26/09/2019 10:00:00 AM |
Hearing
Petition of S. R. Thorat Milk Products Private Limited for adjudication of dispute between a Renewable Energy Generator and Distribution Licensee.
199 of 2019
|
Completed | |
2284 | Thu 26/09/2019 10:00:00 AM |
Hearing
Petitioner of Modern India Limited for adjudication of dispute between a Solar
Energy Generator (Petitioner) and Trading Licensee (GEPL) under Section 86 (1)
(f) of the Electricity Act, 2003.
182 of 2019
|
Completed | |
2285 | Thu 26/09/2019 10:00:00 AM |
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of
the compensation under "Change in law" on account of introduction of Safeguard
Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
|
Completed | |
2286 | Thu 26/09/2019 10:00:00 AM |
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86 (1)(f) of the Electricity Act, 2003 ("Act") challenging the legality, validity and propriety of the Termination Letter dated 20.04.2019 ("Termination Letter") issued by Respondent i.e. Adani Electricity Mumbai Limited ("AEML").
247 of 2019
|
Completed | |
2287 | Thu 19/09/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligation under Section 63 of the Electricity Act 2003.
243 of 2019
|
Completed | |
2288 | Thu 19/09/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for modification of clauses in the PPA executed between successful bidders and MSEDCL regarding grid connectivity, for procurement of 500 MW wind power through competitive bidding process
235 of 2019
|
Completed | |
2289 | Thu 19/09/2019 10:00:00 AM |
Hearing
Petition of Vidarbha Industries Power Limited (VIPL) for seeking clarification on netting off the energy drawn by the generator with the energy injected into the grid for the power plant having section 62 PPA with the Distribution Licensee.
232 of 2019
|
Completed | |
2290 | Wed 18/09/2019 10:00:02 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Order for securing compliance for excess ASC charged for consumer bearing No. 073759015370 by MSEDCL for period from 01-05-2007 to 31-07-2008.
227 of 2019
|
Completed | |
2291 | Wed 18/09/2019 10:00:01 AM |
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Order for securing compliance for excess ASC charged for consumer bearing No. 073039016990 by MSEDCL for period from 01-05-2007 to 31-07-2008.
226 of 2019
|
Completed | |
2292 | Wed 18/09/2019 10:00:00 AM |
Hearing
Petition of Shree Sushma Ferrous Alloys Pvt. Ltd. & 12 Others under Section 142 & 146 of the Electricity Act 2003 seeking orders directing against MSEDCL for Non-compliance of Order dated 9 August, 2004 of the Commission in the matter of Case No.6 of 2004.
164 of 2019
|
Completed | |
2293 | Tue 17/09/2019 10:00:05 AM |
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86(1)(k) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations, 2004 for determination of the user Fees in respect of dedicated transmission system and for adjudication of issues thereof.
292 of 2018
|
Completed | |
2294 | Tue 17/09/2019 10:00:03 AM |
Hearing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Company Limited for non-compliance of common Order dated 09.10.2019 in Case No. 262 of 2018.
197 of 2019
|
Completed | |
2295 | Tue 17/09/2019 10:00:02 AM |
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
|
Completed | |
2296 | Tue 17/09/2019 10:00:01 AM |
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non- Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
|
Completed | |
2297 | Tue 17/09/2019 10:00:00 AM |
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
|
Completed | |
2298 | Tue 17/09/2019 10:00:00 AM |
Hearing
Petition of S. R. Thorat Milk Products Private Limited for adjudication of dispute between a Renewable Energy Generator and Distribution Licensee.
199 of 2019
|
Reschedule | |
2299 | Mon 16/09/2019 10:00:08 AM |
Hearing
Petition of M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and Maharashtra State Electricity Distribution Company Limited, seeking determination of amounts expended towards payment of Safeguard Duty and recovery thereof.
228 of 2019
|
Completed | |
2300 | Mon 16/09/2019 10:00:05 AM |
Hearing
Petition of M/s. Trimurti Spinning Mills Pvt Ltd under Section 142 and section 149 of the Electricity Act, 2003 for non compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 28 January,2019 by MSEDCL
158 of 2019
|
Completed | |
2301 | Mon 16/09/2019 10:00:04 AM |
Hearing
Petition of Maharashtra State Power Generation Co. Limited for Removal of Difficulties regarding Procurement of Solar Power Generation under the Mechanism of "Flexibility in Generation and Scheduling of Thermal Power Stations to Reduce Emissions" Issued on 5th April 2018 by Ministry of Power and under the approved Power Purchase Agreement dated 01.04.2009 executed by Mahagenco with Mahadiscom in Maharashtra, Under Section 62 of the Electricity Act 2003 and Section 102 of the MERC (Multi Year Tariff) Regulations, 2015
121 of 2019
|
Completed | |
2302 | Mon 16/09/2019 10:00:03 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
|
Completed | |
2303 | Mon 16/09/2019 10:00:02 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
|
Completed | |
2304 | Mon 16/09/2019 10:00:01 AM |
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
|
Completed | |
2305 | Mon 16/09/2019 10:00:00 AM |
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of the compensation under "Change in law" on account of introduction of Safeguard Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
|
Reschedule | |
2306 | Mon 16/09/2019 10:00:00 AM |
Hearing
Petitioner of Modern India Limited for adjudication of dispute between a Solar Energy Generator (Petitioner) and Trading Licensee (GEPL) under Section 86 (1) (f) of the Electricity Act, 2003.
182 of 2019
|
Reschedule | |
2307 | Thu 05/09/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
|
Reschedule | |
2308 | Wed 04/09/2019 10:00:00 AM |
Hearing
Revised Petition of Maharashtra State Power Generation Company Limited (MSPGCL) in Case No. 172 of 2018 in the matter of compliance to directives regarding development of allotted coal block in order dated 14.12.2017 in Case no. 59 of 2017.
231 of 2019
|
Reschedule | |
2309 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) towards compliance to directives in Order dated 27.03.2018 in Case No. 42 of 2017 & Order dated 01.08.2018 in Case No. 154 of 2018 in reference to the 2 x 660 MW replacement units proposed at Koradi against older units due for retirement, under provisions of Electricity Act, 2003 and part E of MERC MYT regulations, 2015.
230 of 2019
|
Reschedule | |
2310 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
AND
Miscellaneous Applications field in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
170 of 2018 AND MA Nos. 13, 14, 18, 20, 22, 24, 27, 28 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2311 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
AND
Miscellaneous Applications of filed in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
175 of 2017 AND MA No. 12, 15, 17, 19, 21, 23, 29 and 30 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2312 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86(1)(b) read with Article 15.3 of the Power Purchase Agreement (PPA) dated 14.08.2013 for approval of Amendment Agreement of power Purchase Agreement between the Petitioner and the Respondent with regard to passing of discount in tariff to the consumers for the balance period of the PPA as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India" ("Shakti Policy")
225 of 2019
|
Reschedule | |
2313 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Bengal Cardboard Industries & Printers Pvt. Ltd against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
171 of 2019
|
Reschedule | |
2314 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Silverline Investment Company Pvt. Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
170 of 2019
|
Reschedule | |
2315 | Wed 04/09/2019 10:00:00 AM |
Hearing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
169 of 2019
|
Reschedule | |
2316 | Fri 30/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra Airport Development Company Limited under Section 86 read with Section 61 of the Electricity Act, 2003 read with 'Guidelines for shortterm (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India seeking consent of the Hon'ble Commission to select the single bidder under the Tender floated by MADC pursuant to the Order of this Hon'ble Commission passed under Case No. 165of 2019dated 19.07.2019 for procurement of the Short Term Power for the period of one year commencing from 01.09.2019 to 31.08.2020.
244 of 2019
|
Completed | |
2317 | Fri 30/08/2019 10:00:00 AM |
Hearing
Revised Petition of Maharashtra State Power Generation Company Limited (MSPGCL) in Case No. 172 of 2018 in the matter of compliance to directives regarding development of allotted coal block in order dated 14.12.2017 in Case no. 59 of 2017.
231 of 2019
|
Completed | |
2318 | Fri 30/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) towards compliance to directives in Order dated 27.03.2018 in Case No. 42 of 2017 & Order dated 01.08.2018 in Case No. 154 of 2018 in reference to the 2 x 660 MW replacement units proposed at Koradi against older units due for retirement, under provisions of Electricity Act, 2003 and part E of MERC MYT regulations, 2015.
230 of 2019
|
Completed | |
2319 | Fri 30/08/2019 10:00:00 AM |
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86(1)(b) read with Article 15.3 of the Power Purchase Agreement (PPA) dated 14.08.2013 for approval of Amendment Agreement of power Purchase Agreement between the Petitioner and the Respondent with regard to passing of discount in tariff to the consumers for the balance period of the PPA as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India" ("Shakti Policy")
225 of 2019
|
Completed | |
2320 | Fri 30/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
|
Completed | |
2321 | Fri 23/08/2019 10:00:02 AM |
Hearing
Petition of Shree Sushma Ferrous Alloys Pvt. Ltd. & 12 Others under Section 142 & 146 of the Electricity Act 2003 seeking orders directing against Respondents for Non-compliance of Order dated 9.8.2004 of the Hon'ble Commission in the matter of Case No.6 of 2004.
164 of 2019
|
Completed | |
2322 | Fri 23/08/2019 10:00:01 AM |
Hearing
163 of 2019
|
Completed | |
2323 | Fri 23/08/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Completed | |
2324 | Fri 23/08/2019 10:00:00 AM |
Hearing
Petition of M/s Team Ferro Alloys Pvt Ltd under Section 86 (1) (b) & (f) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations 2004 in compliance to the directions given by the Commission in the Order dated 12 July, 2018 in Case No. 84 of 2015 inter alia seeking approval of the Commission for renewal of EPA as per previous terms and conditions and tariff determined by the Hon'ble MERC in the said order.
55 of 2019
|
Completed | |
2325 | Fri 23/08/2019 10:00:00 AM |
Hearing
Petition of Shri. Mohammad Sajid Haji Sardar for execution of the CGRF Kalyan's Order dated 10 October, 2018 by MSEDCL.
130 of 2019
|
Completed | |
2326 | Fri 23/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of additional 300 MW Solar power from M/S EESL on long term basis from ground mounted solar power projects proposed to be set up in the premises of existing MSEDCL/MSETCL substations/Govt. & Grampanchayat lands for fulfillment of MSEDCL's Solar RPO Target.
198 of 2019
|
Completed | |
2327 | Fri 23/08/2019 10:00:00 AM |
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of the compensation under "Change in law" on account of introduction of Safeguard Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
|
Reschedule | |
2328 | Fri 23/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company in review petition in respect of MERC's order in Case No. 64 of 2019, MSEDCL seeking approval for adoption of tariff discovered for Long term procurement of 1170 MW solar power under "Mukhyamantri saur Krishi Vahini Yojana" for meeting the solar Renewable Purchase Obligation under section 63 & 94 (1) (f) of the electricity act, 2003.
168 of 2019
|
Reschedule | |
2329 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
|
Completed | |
2330 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sridevi Trading Company (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
224 of 2019
|
Completed | |
2331 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sridevi Trading Company under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
223 of 2019
|
Completed | |
2332 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Gajanan Towers Pvt Ltd under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
222 of 2019
|
Completed | |
2333 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Rama Handicrafts under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
221 of 2019
|
Completed | |
2334 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Vanke Bihari Construction Pvt Ltd under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
220 of 2019
|
Completed | |
2335 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sree Veerbhadreshwara Rice & Flour Mill under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
219 of 2019
|
Completed | |
2336 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. C. And Sons under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
218 of 2019
|
Completed | |
2337 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shri Charbhuja Sales Corporation (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
217 of 2019
|
Completed | |
2338 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shri Amareshwara Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
216 of 2019
|
Completed | |
2339 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sri Laxmi Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
215 of 2019
|
Completed | |
2340 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Ushahkal Nursing Home under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
214 of 2019
|
Completed | |
2341 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of S. K. Veerabhadrappa & Co under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
213 of 2019
|
Completed | |
2342 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shri. Charbhuja Sales Corporation under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
212 of 2019
|
Completed | |
2343 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. S. Channabasappa & Sons (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
211 of 2019
|
Completed | |
2344 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. S. Channabasappa & Sons under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
210 of 2019
|
Completed | |
2345 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Vandana Textiles (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
209 of 2019
|
Completed | |
2346 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Pragati Agencies (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
208 of 2019
|
Completed | |
2347 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Vandana Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
207 of 2019
|
Completed | |
2348 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Umang Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
205 of 2019
|
Completed | |
2349 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Pragati Agencies under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
204 of 2019
|
Completed | |
2350 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. C. Shivakumar under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
203 of 2019
|
Completed | |
2351 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of BSC Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
202 of 2019
|
Completed | |
2352 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. C. Chandrashekar under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
201 of 2019
|
Completed | |
2353 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. C. Umapathy under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
200 of 2019
|
Completed | |
2354 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Ankur Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
206 of 2019
|
Completed | |
2355 | Thu 22/08/2019 10:00:00 AM |
Hearing
Joint Petitioner's of Maharashtra State Power Generation Co. Ltd. and Maharashtra State Electricity Distribution Co. Ltd. in regards to seeking approval for adoption of Tariff Rate of Rs. 3.10/Kwh for 7 MW Solar Power Plant Set Up Under 'Mukhyamantri Saur Krishi Vaahini Yojana' and Seeking Approval for for Modifications to the Draft PSA & PPA for the projects undertaken through EOI bidding process.
184 of 2019
|
Completed | |
2356 | Thu 22/08/2019 10:00:00 AM |
Hearing
Amended Petition filed by Maharashtra State Power Generation Co. Ltd in Case No. 112 of 2019 for seeking approval for adoption of tariff of long term procurement of 252 MW out of approved 302 MW solar power through MSPGCL from the solar projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA under section 63 and 86(1)(a) of the Electricity Act 2003.
112 of 2019
|
Completed | |
2357 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Balkrishna Sizing Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
194 of 2019
|
Completed | |
2358 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Jathar Textile Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
193 of 2019
|
Completed | |
2359 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Harshita Sales Corporation under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
192 of 2019
|
Completed | |
2360 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of M/s Vaanya Resources under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
191 of 2019
|
Completed | |
2361 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Balkrishna Sizing Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
190 of 2019
|
Completed | |
2362 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Jathar Textile Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof
189 of 2019
|
Completed | |
2363 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Raysons Marketing Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
188 of 2019
|
Completed | |
2364 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shree Tejas Sizers under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
187 of 2019
|
Completed | |
2365 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sai Services Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
186 of 2019
|
Completed | |
2366 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of B. G. Raibage under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
185 of 2019
|
Completed | |
2367 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shri Gajlaxmi Industries HUF under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
181 of 2019
|
Completed | |
2368 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of S.K Shivaraj under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
180 of 2019
|
Completed | |
2369 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sheela Shivaraj under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
179 of 2019
|
Completed | |
2370 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Sun Irrigation System Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
178 of 2019
|
Completed | |
2371 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Shivashri Techno Homes Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
177 of 2019
|
Completed | |
2372 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of S. K. Parik under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
176 of 2019
|
Completed | |
2373 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of AMJ Land Holdings Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
173 of 2019
|
Completed | |
2374 | Thu 22/08/2019 10:00:00 AM |
Hearing
Petition of Bajaj Finserv Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
172 of 2019
|
Completed | |
2375 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition of M/s. Bengal Cardboard Industries & Printers Pvt. Ltd against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
171 of 2019
|
Completed | |
2376 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition of M/s. Silverline Investment Company Pvt. Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
170 of 2019
|
Completed | |
2377 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
169 of 2019
|
Completed | |
2378 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for procurement of 500 MW flexible and schedulable power from renewable energy sources with energy storage facility on Long Term basis for 25 years from renewable sources and approval of Tender Documents.
167 of 2019
|
Completed | |
2379 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Completed | |
2380 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
|
Completed | |
2381 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
|
Reschedule with further notice | |
2382 | Wed 21/08/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
|
Reschedule with further notice | |
2383 | Tue 20/08/2019 10:00:01 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for allowing investment in contingency reserves which could not be invested earlier due to precarious financial position under regulation 34 of the MERC (Multi Year Tariff) Regulations 2015.
160 of 2019
|
Completed | |
2384 | Tue 20/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for short term procurement of power from captive power plants (conventional) under section 62 and 86 (1) (b), (e) of the Electricity Act, 2003.
183 of 2019
|
Completed | |
2385 | Tue 20/08/2019 10:00:00 AM |
Hearing
Subject: Petition filed by The Tata Power Company Limited of Floor- wise Metering in High Rise Buildings.
AND
Intervention Applications of Adani Electricity Mumbai Limited (Distribution)
61 of 2019 AND MA No. 11 of 2019 in Case No. 61 of 2019 61 of 2019
|
Completed | |
2386 | Tue 20/08/2019 10:00:00 AM |
Hearing
Petition of Urjankur Shree Tatyasaheb Kore Warana Power Company Limited to seek directions against Maharashtra State Electricity Distribution Co Ltd for non-compliance of the RE Tariff provisions and the EPA provision.
159 of 2019
|
Completed | |
2387 | Tue 20/08/2019 10:00:00 AM |
Public Hearing
Inviting Objections/ Comments on Maharashtra Airport Development Company Limited (MADC)'s Petition for Distribution business, including True Up for FY 2014-15, FY 2015-16 as per MERC (Multi Year Tariff) Regulations, 2011, Provisional True Up for FY 2016-17 to FY 2018-19 and ARR and Tariff for FY 2019-20 as per MERC (Multi Year Tariff), Regulations, 2015 and its Amendments (Case No. 96 of 2017)
96 of 2017
|
Completed | |
2388 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s Classic Marble Company Pvt. Ltd. for Non Compliance of the order dated 28.09.2018 in Case No. 128 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC)
128 of 2019
|
Completed | |
2389 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s Relishah Export for Non Compliance of the Order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC).
127 of 2019
|
Completed | |
2390 | Mon 19/08/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
|
Completed | |
2391 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition of Sri Amareshwara Industries under Section 142 & 146 of Electricity Act 2003 for wrongful cancellation of STOA permission.
161 of 2019
|
Completed | |
2392 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition of M/s. Trimurti Spinning Mills Pvt Ltd under Section 142 and section 149 of the Electricity Act, 2003 for non compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 28 January,2019 by MSEDCL
158 of 2019
|
Reschedule with further notice | |
2393 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition of Mrs. Aishwarya Rai Bachchan for non compliance of the Order dated 04.01.2019 in Case No. 256 of 2018 passed by this Hon'ble Commission directing the Respondent to make the payment of delayed payment charges (DPC).
157 of 2019
|
Completed | |
2394 | Mon 19/08/2019 10:00:00 AM |
Hearing
Petition of M/s Bhabani Pigments Pvt. Limited for Non Compliance of the order dated 04.01.2019 in Case No. 293 of 2018 passed by this Hon'ble Commission directing the Respondent to make the payment of delayed payment charges. (DPC)
155 of 2019
|
Completed | |
2395 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
|
Completed | |
2396 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019
AND
Intervention Application filed by Sun-N-Sand Hotels Pvt Ltd in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019 AND MA No. 16 of 2019 in Case No. 103 of 2019
|
Completed | |
2397 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
|
Completed | |
2398 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s Aquapharm Chemicals Private Limited under Section 86 (1) (f), Section 142 with Section 42(2) and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for non-compliance of the order dated 05/04/2019 in the grant of open access and seeking damages for wrongful denial of Open Access.
139 of 2019
|
Completed | |
2399 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Peethambra Granites Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
138 of 2019
|
Completed | |
2400 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by Siddhayu Ayurvedic Research Foundation Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
137 of 2019
|
Completed | |
2401 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by Liberty Oil Mills Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Liberty Oil Mills Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
133 of 2019
|
Completed | |
2402 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by Ghatge Patil Industries Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
132 of 2019
|
Completed | |
2403 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
|
Completed | |
2404 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
|
Completed | |
2405 | Fri 09/08/2019 10:00:00 AM |
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
|
Completed | |
2406 | Thu 08/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra Airport Development Company for approval and direction under section 86 of the Electricity Act, 2003 read with 'Guidelines for short term (i.e. for a period of more than one day to one year) Procurement of power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India.
165 of 2019
|
Completed | |
2407 | Thu 08/08/2019 10:00:00 AM |
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
|
Completed | |
2408 | Thu 08/08/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
|
Completed | |
2409 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
|
Completed | |
2410 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
|
Completed | |
2411 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
|
Completed | |
2412 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
|
Completed | |
2413 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
|
Completed | |
2414 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
|
Completed | |
2415 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
|
Completed | |
2416 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
|
Completed | |
2417 | Thu 08/08/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner,
Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
|
Completed | |
2418 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
|
Completed | |
2419 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
|
Completed | |
2420 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
|
Completed | |
2421 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
|
Completed | |
2422 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
|
Completed | |
2423 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
|
Completed | |
2424 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
|
Completed | |
2425 | Thu 08/08/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
|
Completed | |
2426 | Thu 08/08/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
|
Completed | |
2427 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company in review petition in respect of MERC's order in Case No. 64 of 2019, MSEDCL seeking approval for adoption of tariff discovered for Long term procurement of 1170 MW solar power under "Mukhyamantri saur Krishi Vahini Yojana" for meeting the solar Renewable Purchase Obligation under section 63 & 94 (1) (f) of the electricity act, 2003.
168 of 2019
|
Completed | |
2428 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s. New Steel Trading Pvt. Ltd. seeking clarification of the Hon'ble Commission in respect of the Applicability and interpretation of Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014 (SOP Regulations).
152 of 2019
|
Completed | |
2429 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
|
Completed | |
2430 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
|
5 | |
2431 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by Murlidhar Shriram Bagav against Maharashtra State Electricity Distribution Company Limited for non-compliance of the order of CGRF Ratnagiri bearing No.9/2018.
135 of 2019
|
Completed | |
2432 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by Yashwant Krishna Wareshi against Maharashtra State Electricity Distribution Company Limited for Non-Compliance of the CGRF order Ratnagiri bearing No.1/2019.
134 of 2019
|
Completed | |
2433 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by Yatin Prakash Gupte against Maharashtra State Electricity Distribution Co Ltd for non-compliance with order of CGRF Ratnagiri dated 25.01.2019.
122 of 2019
|
Completed | |
2434 | Wed 07/08/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308 of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA.
112 of 2019
|
Completed | |
2435 | Tue 06/08/2019 10:00:05 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Completed | |
2436 | Tue 06/08/2019 10:00:04 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane Order coved by Letter dated 17.6.2002. (The bills issued since July, 1998 till 18.11.2001 were quashed and MSEB was directed to issue revise bill. (Faulty meter)
150 of 2019
|
Completed | |
2437 | Tue 06/08/2019 10:00:03 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane, Order dated 2.6.2003 all bills issued since January, 1999 to January, 2002 were quashed and directed to issue revised bills (meter showing zero consumption) average bill issue.
149 of 2019
|
Completed | |
2438 | Tue 06/08/2019 10:00:02 AM |
Hearing
Appeal filed by Vanaz Engineers Limited against the Electrical Inspector (EI) Pune, Order dated 11.9.2002 in Dispute No. 4 of 1999 for refund of excess bill charged as the Order was in favor of the Appellant, Pune Order dated 11.9.2002 (Issue on CT ratio bill for period of 6 months preceding 6.2.1992 on the basis CT ratio of 12.5/5 Amps. Billing issue since 1984) The Appellant has filed an application for condonation of delay in filing appeal.
148 of 2019
|
Completed | |
2439 | Tue 06/08/2019 10:00:01 AM |
Hearing
Application filed by Shri Rama Krishna Flour & Besan Mills Pvt. Ltd., to Government of Maharashtra, Industries, Energy and Labour Department, to allow to avail the scheme of Amnesty, 2018 for waiver of 100% DPC, Interest, after giving sufficient notice time to deposit the arrears.
147 of 2019
|
Completed | |
2440 | Tue 06/08/2019 10:00:00 AM |
Hearing
Petition filed by Indian Railways for issuing specific conditions with regard to distribution activities of Indian Railways as deemed distribution licensee.
154 of 2019
|
Completed | |
2441 | Tue 06/08/2019 10:00:00 AM |
Hearing
Petition filed by M/s Jindal Polyfilms Ltd seeking punishment for the Non Compliance of the Open Access Regulations and practice directions issued dated 08.03.2017 issued by the Maharashtra Electricity Regulations by the MSEDCL.
153 of 2019
|
Completed | |
2442 | Tue 06/08/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Nagpur Order dated 26.8.2002. (M/s Paras Pulses, Nagpur, Appeal filed by MSEB on 22.11.2002, Issue - 66 HP load sanctioned but found using 68 HP load EI decided in favor of consumer)
146 of 2019
|
Completed | |
2443 | Thu 25/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No. 68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
|
Reschedule | |
2444 | Thu 25/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
|
Reschedule | |
2445 | Thu 25/07/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
|
Reschedule | |
2446 | Thu 25/07/2019 10:00:00 AM |
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
|
Reschedule | |
2447 | Wed 24/07/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
|
Reschedule | |
2448 | Wed 24/07/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane Order coved by Letter dated 17.6.2002. (The bills issued since July, 1998 till 18.11.2001 were quashed and MSEB was directed to issue revise bill. (Faulty meter)
150 of 2019
|
Reschedule | |
2449 | Wed 24/07/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane, Order dated 2.6.2003 all bills issued since January, 1999 to January, 2002 were quashed and directed to issue revised bills (meter showing zero consumption) average bill issue.
149 of 2019
|
Reschedule | |
2450 | Wed 24/07/2019 10:00:00 AM |
Hearing
Appeal filed by Vanaz Engineers Limited against the Electrical Inspector (EI) Pune, Order dated 11.9.2002 in Dispute No. 4 of 1999 for refund of excess bill charged as the Order was in favor of the Appellant, Pune Order dated 11.9.2002 (Issue on CT ratio bill for period of 6 months preceding 6.2.1992 on the basis CT ratio of 12.5/5 Amps. Billing issue since 1984) The Appellant has filed an application for condonation of delay in filing appeal.
148 of 2019
|
Reschedule | |
2451 | Wed 24/07/2019 10:00:00 AM |
Hearing
Application filed by Shri Rama Krishna Flour & Besan Mills Pvt. Ltd., to Government of Maharashtra, Industries, Energy and Labour Department, to allow to avail the scheme of Amnesty, 2018 for waiver of 100% DPC, Interest, after giving sufficient notice time to deposit the arrears.
147 of 2019
|
Reschedule | |
2452 | Wed 24/07/2019 10:00:00 AM |
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Nagpur Order dated 26.8.2002. (M/s Paras Pulses, Nagpur, Appeal filed by MSEB on 22.11.2002, Issue - 66 HP load sanctioned but found using 68 HP load EI decided in favor of consumer.)
146 of 2019
|
Reschedule | |
2453 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
|
Reschedule | |
2454 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by M/s Aquapharm Chemicals Private Limited under Section 86 (1) (f), Section 142 with Section 42(2) and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for non-compliance of the order dated 05/04/2019 in the grant of open access and seeking damages for wrongful denial of Open Access.
139 of 2019
|
Reschedule | |
2455 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Peethambra Granites Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
138 of 2019
|
Reschedule | |
2456 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by Siddhayu Ayurvedic Research Foundation Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
137 of 2019
|
Reschedule | |
2457 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by Liberty Oil Mills Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Liberty Oil Mills Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
133 of 2019
|
Reschedule | |
2458 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by Ghatge Patil Industries Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
132 of 2019
|
Reschedule | |
2459 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
|
Reschedule | |
2460 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
|
Reschedule | |
2461 | Tue 23/07/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
|
Reschedule | |
2462 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
|
Reschedule | |
2463 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
|
Reschedule | |
2464 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
|
Reschedule | |
2465 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Murlidhar Shriram Bagav against Maharashtra State Electricity Distribution Company Limited for non-compliance of the order of CGRF Ratnagiri bearing No.9/2018.
135 of 2019
|
Reschedule | |
2466 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Yashwant Krishna Wareshi against Maharashtra State Electricity Distribution Company Limited for Non-Compliance of the CGRF order Ratnagiri bearing No.1/2019.
134 of 2019
|
Reschedule | |
2467 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Yatin Prakash Gupte against Maharashtra State Electricity Distribution Co Ltd for non-compliance with order of CGRF Ratnagiri dated 25.01.2019.
122 of 2019
|
Reschedule | |
2468 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
|
Reschedule | |
2469 | Mon 22/07/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
|
Reschedule | |
2470 | Thu 18/07/2019 10:00:00 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Reschedule | |
2471 | Wed 17/07/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
28 of 2019
|
Reschedule | |
2472 | Wed 17/07/2019 10:00:00 AM |
Hearing
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Honâ??ble commissionâ??s interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY
2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
MA No. 05 of 2019 in Case No. 25 of 2019
|
Reschedule | |
2473 | Wed 17/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019
|
Reschedule | |
2474 | Wed 17/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
|
Reschedule | |
2475 | Wed 17/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule | |
2476 | Tue 16/07/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Reschedule with further notice | |
2477 | Tue 16/07/2019 10:00:00 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Reschedule | |
2478 | Tue 16/07/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
|
Reschedule | |
2479 | Mon 15/07/2019 10:00:00 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Completed | |
2480 | Mon 15/07/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
28 of 2019
|
Completed | |
2481 | Mon 15/07/2019 10:00:00 AM |
Hearing
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble Commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
MA No. 05 of 2019 in Case No. 25 of 2019
|
Completed | |
2482 | Mon 15/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019
|
Completed | |
2483 | Mon 15/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
|
Completed | |
2484 | Mon 15/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Completed | |
2485 | Mon 15/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No. 68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
|
Completed | |
2486 | Fri 12/07/2019 10:00:05 AM |
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
|
Reschedule with further notice | |
2487 | Fri 12/07/2019 10:00:00 AM |
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
|
Completed | |
2488 | Fri 12/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
|
Completed | |
2489 | Fri 12/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09
April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
|
Completed | |
2490 | Fri 12/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 27 March, 2019 in Appeal No. 354 of 2017 filed by JSW Energy Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 23 August, 2017 in Case No. 117 of 2016 (Petition of JSW Energy Ltd. for revision in Tariff on account of Changes in Law under PPA dated 23.2.2010 with Maharashtra State Electricity Distribution Co. Ltd.)
117 of 2016
|
Completed | |
2491 | Thu 11/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited for seeking approval for Quantum and deviations sought in the Bidding Documents, as compared to the standard bidding documents notified by Ministry of Power, Government of India, for Long Term Procurement (25 years) of 150 MW capacity from grid connected solar PV projects through competitive bidding process for meeting the Renewable Purchase Obligations.
136 of 2019
|
Completed | |
2492 | Thu 11/07/2019 10:00:00 AM |
Hearing
Petition of Shri. Mohammad Sajid Haji Sardar regarding non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order dtd.10.10.2018 in Grievance No.1686 of 2017-18 of CGRF, Kalyan.
130 of 2019
|
Reschedule with further notice | |
2493 | Wed 10/07/2019 10:00:11 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
|
Reschedule with further notice | |
2494 | Wed 10/07/2019 10:00:10 AM |
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308 of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA.
112 of 2019
|
Reschedule | |
2495 | Wed 10/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking approval for deviation in bidding document from MOP guidelines for Long Term Procurement of Solar Power under "Mukhyamantri Saur Krishi Vaahini Yojana" with 2 to 10 MW capacity projects connected to distribution network with total quantum of 184 MW (50 MW each for western Maharashtra, Northern Maharashtra and Marathwada region and 34 MW for Vidarbha Region) through competitive bidding (E- Reverse Auction).
141 of 2019
|
Completed | |
2496 | Wed 10/07/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
|
Completed | |
2497 | Wed 10/07/2019 10:00:00 AM |
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patilunder Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
|
Completed | |
2498 | Wed 10/07/2019 10:00:00 AM |
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for non-compliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
|
Completed | |
2499 | Tue 09/07/2019 10:00:00 AM |
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
|
Completed | |
2500 | Tue 09/07/2019 10:00:00 AM |
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commission's order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
|
Completed | |
2501 | Tue 09/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
AND
Intervention Application filed by Sun-N-Sand Hotels Pvt Ltd in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019 AND MA No. 16 of 2019 in Case No. 103 of 2019
|
Completed | |
2502 | Tue 09/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
|
Completed | |
2503 | Tue 09/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
|
Completed | |
2504 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2505 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2506 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2507 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2508 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2509 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2510 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2511 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2512 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2513 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2514 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2515 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2516 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2517 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2518 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2519 | Mon 08/07/2019 10:00:10 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2520 | Mon 08/07/2019 10:00:10 AM |
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
|
Reschedule with further notice | |
2521 | Mon 08/07/2019 10:00:00 AM |
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
|
Completed | |
2522 | Mon 08/07/2019 10:00:00 AM |
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
|
Completed | |
2523 | Mon 08/07/2019 10:00:00 AM |
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
|
Completed | |
2524 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
|
Reschedule with further notice | |
2525 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited for seeking approval for Quantum and deviations sought in the Bidding Documents, as compared to the standard bidding documents notified by Ministry of Power, Government of India, for Long Term Procurement (25 years) of 150 MW capacity from grid connected solar PV projects through competitive bidding process for meeting the Renewable Purchase Obligations.
136 of 2019
|
Reschedule with further notice | |
2526 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking approval for deviation in bidding document from MOP guidelines for Long Term Procurement of Solar Power under "Mukhyamantri Saur Krishi Vaahini Yojana" with 2 to 10 MW capacity projects connected to distribution network with total quantum of 184 MW (50 MW each for western Maharashtra, Northern Maharashtra and Marathwada region and 34 MW for Vidarbha Region) through competitive bidding (E- Reverse Auction).
141 of 2019
|
Reschedule with further notice | |
2527 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
|
Reschedule with further notice | |
2528 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition of Shri.Mohammad Sajid Haji Sardar regarding non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order dtd.10.10.2018 in Grievance No.1686 of 2017-18 of CGRF, Kalyan.
130 of 2019
|
Reschedule with further notice | |
2529 | Fri 05/07/2019 10:00:00 AM |
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
|
Reschedule with further notice | |
2530 | Thu 04/07/2019 10:00:09 AM |
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
|
Reschedule | |
2531 | Thu 04/07/2019 10:00:08 AM |
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
|
Reschedule | |
2532 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
|
Reschedule with further notice | |
2533 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
|
Reschedule with further notice | |
2534 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
|
Reschedule | |
2535 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patil under Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
|
Reschedule with further notice | |
2536 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
|
Reschedule with further notice | |
2537 | Thu 04/07/2019 10:00:00 AM |
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
|
Reschedule with further notice | |
2538 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
|
Reschedule with further notice | |
2539 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
|
Reschedule | |
2540 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
|
Reschedule | |
2541 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308
of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under "Mukhyamantri Saur Krishi Vahini Yojana" and for modification to the approved draft PSA.
112 of 2019
|
Reschedule with further notice | |
2542 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
|
Reschedule with further notice | |
2543 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
|
Reschedule with further notice | |
2544 | Wed 03/07/2019 10:00:00 AM |
Hearing
Intervention Application in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
MA No. 16 of 2019 in Case No. 103 of 2019
|
Reschedule with further notice | |
2545 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commission's order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
|
Reschedule with further notice | |
2546 | Wed 03/07/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019
|
Reschedule with further notice | |
2547 | Tue 02/07/2019 10:00:30 AM |
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
|
Reschedule | |
2548 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2549 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2550 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2551 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2552 | Tue 02/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No 68 of 2012 AND MA No. 25 of 2019 in Case No. 68 of 2012
|
Reschedule with further notice | |
2553 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2554 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2555 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2556 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2557 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2558 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2559 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2560 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2561 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2562 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2563 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
|
Reschedule with further notice | |
2564 | Tue 02/07/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
|
Reschedule with further notice | |
2565 | Tue 02/07/2019 10:00:00 AM |
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
|
Reschedule with further notice | |
2566 | Tue 02/07/2019 10:00:00 AM |
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
|
Reschedule with further notice | |
2567 | Tue 02/07/2019 10:00:00 AM |
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
|
Reschedule with further notice | |
2568 | Tue 02/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09 April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
|
Reschedule | |
2569 | Tue 02/07/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 27 March, 2019 in Appeal No. 354 of 2017 filed by JSW Energy Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 23 August, 2017 in Case No. 117 of 2016 (Petition of JSW Energy Ltd. for revision in Tariff on account of Changes in Law under PPA dated 23.2.2010 with Maharashtra State Electricity Distribution Co. Ltd.)
117 of 2016
|
Reschedule | |
2570 | Tue 02/07/2019 10:00:00 AM |
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
|
Reschedule with further notice | |
2571 | Wed 26/06/2019 10:00:00 AM |
Hearing
Petition filed by M/s Classic Marble Company Pvt. Ltd. for Non Compliance of the order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC)
128 of 2019
|
Reschedule with further notice | |
2572 | Wed 26/06/2019 10:00:00 AM |
Hearing
Petition filed by M/s Relishah Export for Non Compliance of the Order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC).
127 of 2019
|
Reschedule with further notice | |
2573 | Tue 25/06/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
|
Reschedule | |
2574 | Tue 25/06/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nisagra Renewable Energy Private Limited seeking declaration from the Hon'ble Commission of imposition of Safeguard Duty on the import of solar cells vide notification no. 1/2018-Customs (SG) dated 30.07.2018 of the Ministry of Finance as an event of Change in Law with effect from 30.07.2018 and seeking approval and determination of quantum and mechanism of compensation along with interest, if any on account of the said Change in Law event, alongwith supporting affidavit.
124 of 2019
|
Completed | |
2575 | Tue 25/06/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Juniper Green Energy Private Limited seeking declaration from the Commission of imposition of Safeguard Duty on the import of solar cells vide notification no. 1/2018-Customs (SG) dated 30.07.2018 of the Ministry of Finance as an event of Change in Law with effect from 30.07.2018 and for seeking approval and determination of quantum and mechanism of compensation along with interest, if any on account of the said Change in Law event.
123 of 2019
|
Completed | |
2576 | Tue 25/06/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Co. Limited for removal of diffficulties regarding procurement of solar power generatiom under the mechanism of " flexibility in generation and scheduling of thermal power stations to reduce emissions."
121 of 2019
|
Completed | |
2577 | Mon 24/06/2019 10:00:04 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
|
Reschedule | |
2578 | Mon 24/06/2019 10:00:03 AM |
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
|
Reschedule | |
2579 | Mon 24/06/2019 10:00:00 AM |
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
|
Completed | |
2580 | Mon 24/06/2019 10:00:00 AM |
Hearing
Petition of Mytrah Vayu (vedavati) Private Limited under the provisions of the Electricity Act, 2003 particularly Sections 86(1)(e), 86(1)(f), 86(1)(k), of the Electricity Act, 2003, read with provisions of RFS and Power Purchase Agreement dated July 16, 2018 seeking grant of extension of time for financial closure and scheduled commercial operation date due to force majeure events.
131 of 2019
|
Completed | |
2581 | Fri 21/06/2019 10:00:00 AM |
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
|
Reschedule | |
2582 | Fri 21/06/2019 10:00:00 AM |
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
|
Reschedule | |
2583 | Wed 19/06/2019 10:00:00 AM |
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
|
Reschedule | |
2584 | Tue 18/06/2019 14:00:00 PM |
Public Hearing
Objections / comments on Tata Power-Distribution Business' (Tata Power-D) Petition for determination of Wheeling Charges for EHV consumers as per ATE Judgment dated 18 March, 2019.
95 of 2019
|
Completed | |
2585 | Tue 18/06/2019 10:00:00 AM |
Public Hearing
Inviting Comments, Suggestions and/or Objections on the Report submitted by Maharashtra Energy Development Agency (MEDA) for Review of Classification of Wind Zone for the State of Maharashtra
108 of 2019
|
Completed | |
2586 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
|
Reschedule | |
2587 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
|
Reschedule | |
2588 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.2 of 2018 by MSEDCL Execution of CGRF's Order dated 29.06.2018 in Case No.2 of 2018.
116 of 2019
|
Completed | |
2589 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.1 of 2018 by MSEDCL Execution of CGRF's Order dated 29.06.2018 in Case No.1 of 2018.
115 of 2019
|
Completed | |
2590 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition of Afcons Infrastructure Limited under Section 142 or under Sections 146, 149 and 151 of the E. A. 2003 against the Respondent, for the failure and neglect of
the Respondent to comply with the Order dated 5th October 2017 passed by the Appellate Authority, resulting in contravention of Section 127 (4) of the E. A. 2003 and/or Regulation 8.2.2 of the MERC (General Conditions of Distribution Licence) Regulations 2006.
98 of 2019
|
Completed | |
2591 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
|
Completed | |
2592 | Mon 17/06/2019 10:00:00 AM |
Hearing
Petition of M/s Managing Trustee Grant Medical Foundation Ruby Hall Clinic for denial of shot term open access permission by Maharashtra State Electricity Distribution Company Ltd., (MSEDCL) and request for grant of STOA for April 2019, as per Open Access applications.
101 of 2019
|
Completed | |
2593 | Mon 10/06/2019 10:00:00 AM |
Public Hearing
Objections / comments on Tata Power-Distribution Business' (Tata Power-D) Petition for determination of Wheeling Charges for EHV consumers as per ATE Judgment dated 18 March, 2019.
95 of 2019
|
Reschedule | |
2594 | Fri 07/06/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
|
Reschedule | |
2595 | Fri 07/06/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
|
Reschedule | |
2596 | Fri 07/06/2019 10:00:00 AM |
Hearing
Intervention Application in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
MA No. 16 of 2019 in Case No. 103 of 2019
|
Reschedule | |
2597 | Fri 07/06/2019 10:00:00 AM |
Public Hearing
Inviting Comments, Suggestions and/or Objections on the Report submitted by Maharashtra Energy Development Agency (MEDA) for Review of Classification of Wind Zone for the State of Maharashtra
108 of 2019
|
Reschedule | |
2598 | Fri 07/06/2019 10:00:00 AM |
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commissionâ??s order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
|
Reschedule | |
2599 | Fri 07/06/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019
|
Reschedule | |
2600 | Fri 07/06/2019 10:00:00 AM |
Hearing
Petition of M/s. Waacox Energy Private Limited seeking review of the Order dated 22.02.2019 passed by this Commission in Case No. 15 of 2019 in the matter of approval for adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for Long Term Procurement of 200 MW Solar Power, under Section 63 of the Electricity Act, 2003 from the solar Projects (Phase-I) to be set up under 'Mukhyamantri Saur KrishiVahiniYojana' to meet Solar Renewable Purchase Obligations of the Maharashtra State Electricity Distribution Company Limited.
92 of 2019
|
5 | |
2601 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.2 of 2018 by MSEDCL
Execution of CGRFâ??s Order dated 29.06.2018 in Case No.2 of 2018.
116 of 2019
|
Reschedule | |
2602 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.1 of 2018 by MSEDCL
Execution of CGRFâ??s Order dated 29.06.2018 in Case No.1 of 2018.
115 of 2019
|
Reschedule | |
2603 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
|
Reschedule | |
2604 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
|
Reschedule | |
2605 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
|
Reschedule | |
2606 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
|
Reschedule | |
2607 | Thu 06/06/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09 April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
|
Reschedule | |
2608 | Thu 06/06/2019 10:00:00 AM |
Hearing
117 of 2016
|
Reschedule | |
2609 | Thu 06/06/2019 10:00:00 AM |
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
|
Reschedule | |
2610 | Tue 04/06/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
|
Reschedule | |
2611 | Tue 04/06/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
|
Reschedule | |
2612 | Tue 04/06/2019 10:00:00 AM |
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
|
Reschedule | |
2613 | Tue 04/06/2019 10:00:00 AM |
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist :
Osmanabad
83 of 2019
|
Reschedule | |
2614 | Tue 04/06/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
|
Reschedule | |
2615 | Thu 23/05/2019 10:00:00 AM |
Hearing
Petition of M/s Shalimar Hotel Pvt Ltd. for contempt and the execution of the Hon. Commission's Order dated 28th September, 2018 in Case No 101 0f 2018 under Sections 142, 146 & 86(1) (f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
91 of 2019
|
Reschedule | |
2616 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
|
Completed | |
2617 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by Shri Mahavira Jaina Vidyalaya for non Implementation of an order passed by the Consumer Grievance Redressal Forum, Pune in Case No. 21 of 2018 dtd. 08.05.2018. This attracts the provision of Section 142 & Section 149 of Maharashtra Regulatory Commission (Conduct of Business) Regulation, 2014.
63 of 2019
|
5 | |
2618 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by New Natraj Industries for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Wrongly Recovered AEC, additional FAC
and excess collected FAC. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003
for non implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 676 / 08 / 2018-19/133 Dt. 13/07/2018.
60 of 2019
|
Completed | |
2619 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by Wadhwa Infracore Steel Pvt Ltd for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 677 /
09/2018-19/134Dt.13/07/2018 and Its Clarificatory Order No. / CGRF / Nashik / NUC / U.Dn.1 / N.R.Dn / 09,10/17-18/244 Dt. 14/12/2018.
59 of 2019
|
Completed | |
2620 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Wrongly Recovered additional FAC and Interest thereupon and Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF/Nashik/NUC/N.R.Dn/678/10/2018-19/134 Dt. 13/07/2018 and Its Clarificatory Order No./CGRF/Nashik/NUC/U.Dn.1/N.R.Dn /09,10/17-
18/244 Dt. 14/12/2018.
58 of 2019
|
Completed | |
2621 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Cost of Infrastructure incurred for getting power supply, along with interest. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non - implementation of CGRF's order No. / CGRF / Nashik / NUC / N.R.Dn / 680/12/2018-19/176 dt.07.09.2018.
57 of 2019
|
Completed | |
2622 | Wed 22/05/2019 10:00:00 AM |
Hearing
Petition filed by M/s Wada Alums & Acids Pvt. Ltd. under section 142 & 146 of the Electricity Act 2003 regarding non-compliance of Order dtd. 23.01.2018 in appeal No. 237/2016 of Chief Electrical Inspector / Appellate Authority, by MSEDCL.
67 of 2019
|
Completed | |
2623 | Tue 21/05/2019 10:00:00 AM |
Hearing
Petition of M/s Shalimar Hotel Pvt Ltd. for contempt and the execution of the Hon. Commission's Order dated 28th September, 2018 in Case No 101 0f 2018 under Sections 142, 146 & 86(1) (f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
91 of 2019
|
Completed | |
2624 | Tue 21/05/2019 10:00:00 AM |
Hearing
Petition filed by Mohite Industries Limited Petition under Section 42 and other applicable provisions of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for directions to the Respondent in regard to the curtailment of open access granted to the Petitioner by the Respondent
82 of 2019
|
Completed | |
2625 | Tue 21/05/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Hon'ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)
2 of 2019
|
Completed | |
2626 | Tue 21/05/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
|
Completed | |
2627 | Tue 21/05/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
|
Completed | |
2628 | Mon 20/05/2019 10:00:13 AM |
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patil under Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
|
Completed | |
2629 | Mon 20/05/2019 10:00:11 AM |
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
|
Completed | |
2630 | Mon 20/05/2019 10:00:10 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
|
Completed | |
2631 | Mon 20/05/2019 10:00:09 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for procurement of bagasse based co-generation power under Section 62 and 86 (1) (b), (e) of the Electricity Act, 2003 for meeting the non-solar Renewable Purchase Obligation.
88 of 2019
|
Completed | |
2632 | Mon 20/05/2019 10:00:08 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for adoption of Tariff for Long Term Procurement of 1000MW solar power under Section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations.
87 of 2019
|
Completed | |
2633 | Mon 20/05/2019 10:00:07 AM |
Hearing
Miscellaneous Applications of POSCO Maharashtra Steel Pvt. Ltd and Siddhayu Ayurvedic Research Foundation Pvt. Ltd. seeking the permission of this Hon'ble Commission to intervene and be impleaded as parties in Case No. 86 of 2019 to the Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide order dated 27.04.2018 in Case No.132 of 2015.
MA No. 10 of 2019 in Case No. 86 of 2019
|
Completed | |
2634 | Mon 20/05/2019 10:00:06 AM |
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
|
Completed | |
2635 | Mon 20/05/2019 10:00:05 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Reschedule | |
2636 | Mon 20/05/2019 10:00:04 AM |
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
|
Completed | |
2637 | Mon 20/05/2019 10:00:03 AM |
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
|
Completed | |
2638 | Mon 20/05/2019 10:00:02 AM |
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility.
AND
Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018.
AND
Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
|
Reschedule | |
2639 | Mon 20/05/2019 10:00:01 AM |
Hearing
Miscellaneous Applications of Adani Electricity Mumbai Limited (Distribution) who are a necessary party in Case No 61 of 2019 - Petition filed by The Tata Power Company Limited of Floor - wise Metering in High Rise Buildings.
MA No. 11 of 2019 in Case No. 61 of 2019
|
Completed | |
2640 | Mon 20/05/2019 10:00:00 AM |
Hearing
Petition of Afcons Infrastructure Limited under Section 142 or under Sections 146, 149 and 151 of the E. A. 2003 against the Respondent, for the failure and neglect of
the Respondent to comply with the Order dated 5th October 2017 passed by the Appellate Authority, resulting in contravention of Section 127 (4) of the E. A. 2003 and/or Regulation 8.2.2 of the MERC (General Conditions of Distribution Licence) Regulations 2006.
98 of 2019
|
Reschedule | |
2641 | Mon 20/05/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited of Floor-wise Metering in High Rise Buildings.
61 of 2019
|
Completed | |
2642 | Fri 10/05/2019 10:00:00 AM |
Hearing
97 of 2019
|
Completed | |
2643 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal of difficulties in implementation of MERC (standards of performance of distribution licensees, period for giving supply and determination of compensation) regulations, 2014 in connection with release of agriculture connections. Clarification of Case No. 6 of 2019 passed on 22.2.2019
102 of 2019
|
Completed | |
2644 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commission's Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
|
Completed | |
2645 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
|
Reschedule | |
2646 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 â?? Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
|
Reschedule | |
2647 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Mohite Industries Limited Petition under Section 42 and other applicable provisions of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for directions to the Respondent in regard to the curtailment of open access granted to the Petitioner by the Respondent
82 of 2019
|
Reschedule | |
2648 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Jagannath Narayan Appa against Maharashtra State Electricity Distribution Company Limited for non-Compliance of CGRF, Aurangabad Order dated 22.01.2019 passed in Case No. 705 of 2018
80 of 2019
|
Completed | |
2649 | Fri 10/05/2019 10:00:00 AM |
Hearing
Petition filed by Jagannath Narayan Appa against Maharashtra State Electricity Distribution Company Limited for non-Compliance of CGRF, Aurangabad Order dated 22.01.2019 passed in Case No. 706 of 2018
79 of 2019
|
Completed | |
2650 | Thu 09/05/2019 11:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
|
Completed | |
2651 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commission's Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
|
Reschedule | |
2652 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for procurement of bagasse based co-generation power under Section 62 and 86 (1) (b), (e) of the Electricity Act 2003 for meeting the non-solar Renewable Purchase Obligations.
72 of 2019
|
Completed | |
2653 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
|
Completed | |
2654 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Completed | |
2655 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
357 of 2018
|
Completed | |
2656 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
|
Completed | |
2657 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
|
Reschedule | |
2658 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition filed by Powerica Limited seeking directions against Maharashtra State Electricity Transmission Company Limited for forfeiture of security deposit under various provisions of the Electricity Act, 2003 read with MERC (Transmission Open Access) Regulations, 2016
81 of 2019
|
Completed | |
2659 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition filed by Shri Gajendrasingh Ramsingh Pawar against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Nagpur Order Case No. 76/2018 dated 07/12/2018.
78 of 2019
|
Completed | |
2660 | Thu 09/05/2019 10:00:00 AM |
Hearing
Petition filed by Electrical Contractor's Association of Maharashtra (Nashik Region) Nashik for withdrawal of Maharashtra State Electricity Distribution Company Limited Circular no. CE (Dist)./D-III/NSC/30011 dated 20 Dec 2018 regarding Infrastructure Development for release of new connections and submission of objections and suggestions.
77 of 2019
|
Completed | |
2661 | Wed 08/05/2019 11:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Completed | |
2662 | Wed 08/05/2019 11:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
AND
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated
06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
AND
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
|
Completed | |
2663 | Wed 08/05/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
|
Completed | |
2664 | Wed 08/05/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Nitin Sanjiva Shetty for intervention and impleadment in the Case No. 64 of 2019 (Petition filed by MSEDCL for seeking approval for adoption of tariff discovered for Long Term Procurement of 1170 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.)
MA No. 7 of 2019 in Case No. 64 of 2019
|
Completed | |
2665 | Wed 08/05/2019 10:00:00 AM |
Hearing
64 of 2019
|
Completed | |
2666 | Wed 08/05/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. against Global Energy Private Limited for non-compliance of Order dated 10.01.2019 in case no. 78 of 2018 passed by the Hon'ble Commission
62 of 2019
|
Completed | |
2667 | Wed 08/05/2019 10:00:00 AM |
Hearing
Petition of Classic Citi Investments Pvt. Ltd. for non compliance of the Hon'ble Commission's order dated 04.05.2018 in Case No. 36 of 2017 by Maharashtra State Electricity Distribution Company Ltd.
51 of 2019
|
Completed | |
2668 | Wed 08/05/2019 10:00:00 AM |
Hearing
Petition filed by Serum Institute of India Private Limited for Purchase of banked wind units with MSEDCL, generated and injected by Serum Institute of India Private Limited (SIIPL) in distribution system over and above open access wheeling, during the period April 2016 to March 2018 and MSEDCL denied the purchase of the same against SIIPL's applications.
49 of 2019
|
Completed | |
2669 | Tue 07/05/2019 10:00:00 AM |
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility.
AND
Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018.
AND
Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
|
Completed | |
2670 | Tue 07/05/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 355 of 2017 filed by JSW Energy Ltd. v/s The MERC and MSEDCL Challenging the Commission's Order dated 29 August, 2017
in Case No. 90 of 2016 (Petition of JSW Energy Ltd. regarding recovery of incentive payments by Maharashtra State Electricity Distribution Co. Ltd. under PPA dated 23.2.2010)
90 of 2016
|
Completed | |
2671 | Tue 07/05/2019 10:00:00 AM |
Hearing
Petition of M/s Team Ferro Alloys Pvt Ltd. under Section 86 (1) (b) & (f) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations 2004 in compliance to the directions given by the Commission in the Order dated 12 July, 2018 in Case No. 84 of 2015 inter alia seeking approval of the Commission for renewal of EPA as per previous terms and conditions and tariff determined by the Hon'ble MERC in the said order.
55 of 2019
|
Completed | |
2672 | Tue 07/05/2019 10:00:00 AM |
Hearing
Petition filed by Loknete Sundarraoji Solanke Sahakari Sakhar Karkhana Ltd., (LSSSSKL) (Formerly Majalgaon Sahakari Sakhar Karkhana Ltd.) for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 22 MW Bagasse Based Cogeneration Power Project.
8 of 2019
|
Completed | |
2673 | Tue 07/05/2019 10:00:00 AM |
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
|
Completed | |
2674 | Tue 07/05/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Century Rayon for exemption of Renewable Purchase Obligation (RPO) to be discharge by Century Rayon (Under the Management and Operation of Grasim Industries Ltd) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R dated 1.2.2019
71 of 2019
|
Completed | |
2675 | Tue 07/05/2019 10:00:00 AM |
Hearing
Petition filed by Captive Power Producers Association Seeking rollover of entire RPO Obligations or otherwise of the Applicant for the financial year 2016-17, 2017-18 and 2018-19 to financial year 2019-20.
68 of 2019
|
Completed | |
2676 | Mon 06/05/2019 11:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)â??s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commissionâ??s Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbaiâ??s Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
|
Reschedule | |
2677 | Mon 06/05/2019 11:00:00 AM |
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
|
Reschedule | |
2678 | Mon 06/05/2019 11:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule | |
2679 | Mon 06/05/2019 11:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
AND
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated
06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
AND
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
|
Reschedule | |
2680 | Mon 06/05/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 355 of 2017 filed by JSW Energy Ltd. v/s The MERC and MSEDCL Challenging the Commission's Order dated 29 August, 2017
in Case No. 90 of 2016 (Petition of JSW Energy Ltd. regarding recovery of incentive payments by Maharashtra State Electricity Distribution Co. Ltd. under PPA dated 23.2.2010)
90 of 2016
|
Reschedule | |
2681 | Thu 25/04/2019 10:00:00 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Reschedule | |
2682 | Thu 25/04/2019 10:00:00 AM |
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
|
Reschedule | |
2683 | Thu 25/04/2019 10:00:00 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Reschedule | |
2684 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Completed | |
2685 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
|
Completed | |
2686 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited -Distribution seeking a declaration that Adani Electricity Mumbai Limited (AEML) is engaged in process of migrating a consumer in a manner which would defeat the intent and purpose of the governing framework regarding switchover of consumers as laid down by this Hon'ble Commission.
97 of 2019
|
Completed | |
2687 | Wed 24/04/2019 10:00:00 AM |
Hearing
Miscellaneous Application of Tata Power Company - Generation Business in Case No. 89 of 2019 ( Petition of Tata Power Company - Generation Business for Removal of Difficulties in implementation of MOD Guidelines in the case of generating units at its Trombay Thermal Power station of Tata Power-G under the Regulation 38 of the MERC (State Grid Code) Regulations, 2006.
MA No. 09 of 2019 in Case No. 89 of 2019
|
Completed | |
2688 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of Tata Power Company - Generation Business for Removal of Difficulties in implementation of MOD Guidelines in the case of generating units at its Trombay Thermal Power station.
89 of 2019
|
Completed | |
2689 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commissionâ??s Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
|
Completed | |
2690 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
|
Reschedule with further notice | |
2691 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Reschedule with further notice | |
2692 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
|
Reschedule | |
2693 | Wed 24/04/2019 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
|
Reschedule | |
2694 | Tue 23/04/2019 10:00:00 AM |
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
|
Reschedule with further notice | |
2695 | Tue 23/04/2019 10:00:00 AM |
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
|
Reschedule | |
2696 | Tue 23/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Hon'ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)
2 of 2019
|
Reschedule | |
2697 | Tue 23/04/2019 10:00:00 AM |
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility.
AND
Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018.
AND
Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
|
Reschedule | |
2698 | Mon 22/04/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Century Rayon for exemption of Renewable Purchase Obligation (RPO) to be discharge by Century Rayon (Under the Management and Operation of Grasim Industries Ltd) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R dated 1.2.2019
71 of 2019
|
Reschedule | |
2699 | Mon 22/04/2019 10:00:00 AM |
Hearing
Petition filed by Captive Power Producers Association Seeking rollover of entire RPO Obligations or otherwise of the Applicant for the financial year 2016-17, 2017-18 and 2018-19 to financial year 2019-20.
68 of 2019
|
Reschedule | |
2700 | Mon 22/04/2019 10:00:00 AM |
Hearing
Petition filed by M/s Wada Alums & Acids Pvt. Ltd. under section 142 & 146 of the Electricity Act 2003 regarding non-compliance of Order dtd. 23.01.2018 in appeal No. 237/2016 of Chief Electrical Inspector / Appellate Authority, by MSEDCL.
67 of 2019
|
Reschedule | |
2701 | Mon 22/04/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited of Floor -wise Metering in High Rise Buildings
61 of 2019
|
Reschedule with further notice | |
2702 | Thu 18/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for adoption of tariff discovered for Long Term Procurement of 1170 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
64 of 2019
|
Reschedule with further notice | |
2703 | Thu 18/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
|
Reschedule | |
2704 | Thu 18/04/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
AND
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated
06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
AND
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
|
Reschedule with further notice | |
2705 | Thu 18/04/2019 10:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule with further notice | |
2706 | Mon 15/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
|
Reschedule | |
2707 | Fri 12/04/2019 10:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule | |
2708 | Fri 12/04/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
AND
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the
Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
AND
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 and MA No 5 of 2019 in Case No 25 of 2019 and 28 of 2019
|
Reschedule | |
2709 | Fri 12/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
|
Reschedule | |
2710 | Fri 12/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
|
Reschedule | |
2711 | Thu 11/04/2019 10:00:00 AM |
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
|
Completed | |
2712 | Thu 11/04/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
|
Reschedule with further notice | |
2713 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
|
Reschedule | |
2714 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition filed by New Natraj Industries for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Wrongly Recovered AEC, additional FAC and excess collected FAC. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 676 / 08 / 2018-19/133 Dt. 13/07/2018.
60 of 2019
|
Reschedule with further notice | |
2715 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition filed by Wadhwa Infracore Steel Pvt Ltd for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 677 / 09/2018-19/134Dt.13/07/2018 and Its Clarificatory Order No. / CGRF / Nashik / NUC / U.Dn.1 / N.R.Dn / 09,10/17-18/244 Dt. 14/12/2018.
59 of 2019
|
Reschedule with further notice | |
2716 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Wrongly Recovered additional FAC and Interest thereupon and Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF/Nashik/NUC/N.R.Dn/678/10/2018-19/134 Dt. 13/07/2018 and Its Clarificatory Order No./CGRF/Nashik/NUC/U.Dn.1/N.R.Dn /09,10/17-18/244 Dt. 14/12/2018.
58 of 2019
|
Reschedule with further notice | |
2717 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Cost of Infrastructure incurred for getting power supply, along with interest. The CGRF, Nasik zone is established under section 42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. / CGRF / Nashik / NUC / N.R.Dn /680 /12 / 2018-19 / 176 dt.07.09.2018.
57 of 2019
|
Reschedule with further notice | |
2718 | Thu 11/04/2019 10:00:00 AM |
Hearing
Petition filed by Loknete Sundarraoji Solanke Sahakari Sakhar Karkhana Ltd., (LSSSSKL) (Formerly Majalgaon Sahakari Sakhar Karkhana Ltd.) for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 22 MW Bagasse Based Cogeneration Power Project.
8 of 2019
|
Reschedule with further notice | |
2719 | Wed 10/04/2019 10:00:00 AM |
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
|
Reschedule | |
2720 | Wed 10/04/2019 10:00:00 AM |
Hearing
Petition filed by Shri Mahavira Jaina Vidyalaya for non Implementation of an order passed by the Consumer Grievance Redressal Forum, Pune in Case No. 21 of 2018 dtd. 08.05.2018. This attracts the provision of Section 142 & Section 149 of Maharashtra Regulatory Commission (Conduct of Business) Regulation, 2014.
63 of 2019
|
Reschedule with further notice | |
2721 | Wed 10/04/2019 10:00:00 AM |
Hearing
62 of 2019
|
Reschedule with further notice | |
2722 | Wed 10/04/2019 10:00:00 AM |
Admissibility Hearing
Petition of UjwalRai Moreshwar Joshi against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Mumbai's Review order, Ref. Case No. 14/2018 dated 08/10/2018.
32 of 2019
|
Completed | |
2723 | Wed 10/04/2019 10:00:00 AM |
Hearing
Petition of Classic Citi Investments Pvt. Ltd. for non compliance of the Hon'ble Commission's order dated 04.05.2018 in Case No. 36 of 2017 by Maharashtra State Electricity Distribution Company Ltd.
51 of 2019
|
Reschedule with further notice | |
2724 | Wed 10/04/2019 10:00:00 AM |
Hearing
49 of 2019
|
Reschedule with further notice | |
2725 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company for in principle approval for short term power purchase at higher cost than the ceiling rate approved by Hon'ble Commission.
85 of 2019
|
Completed | |
2726 | Tue 09/04/2019 10:00:00 AM |
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
|
Completed | |
2727 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
|
Completed | |
2728 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
|
Completed | |
2729 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
|
Reschedule with further notice | |
2730 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power India Private Limited seeking appropriate relief on Account of change in law as provided in request for proposal documents dated February 08, 2018 due to the introduction of safeguard duty on import of solar panels/modules
47 of 2019
|
Completed | |
2731 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018 - Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
|
Reschedule with further notice | |
2732 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
|
Completed | |
2733 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Power Generation Company Limited for review Order dated 5th February, 2019 passed by the Hon'ble MERC in Case No. 354 of 2018 on the Petition of Maharashtra State Power Generation Co. Ltd. for Removal of Difficulties by invoking Power to Relax Conditions for approval and adoption of Tariff and approval of PPA for Long Term Procurement of 50 MW Solar Power from Solar Power Plant at Kaudgaon under Section 63 and Section 86 (1) (b) of the Electricity Act 2003.
75 of 2019
|
Completed | |
2734 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd for Amendment / Modification in FAC Regulations of MERC (Multi Year Tariff) Regulations, 2015.
65 of 2019
|
Completed | |
2735 | Tue 09/04/2019 10:00:00 AM |
Hearing
Petition of M/s. Marigold Pharmaceuticals Pvt. Limited seeking review of the Commission's Order dated 22.11.2018 in Case No. 210 of 2018.
352 of 2018
|
Completed | |
2736 | Mon 08/04/2019 10:00:00 AM |
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
|
Reschedule | |
2737 | Mon 08/04/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
|
Reschedule | |
2738 | Tue 02/04/2019 10:00:00 AM |
Admissibility Hearing
Petition of UjwalRai Moreshwar Joshi against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Mumbai's Review order, Ref. Case No. 14/2018 dated 08/10/2018.
32 of 2019
|
Reschedule | |
2739 | Thu 28/03/2019 10:00:00 AM |
Hearing
64 of 2019
|
Completed | |
2740 | Thu 28/03/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Limited seeking approval for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding under Section 19 of MERC (RPO, Its Compliance and Implementation of REC Framework) Regulations, 2016 and Regulation 94 of MERC (Conduct of Business) Regulations, 2004
53 of 2019
|
Completed | |
2741 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition of Mrs. Geetha Pundaleeka (Geetha Pundaleeka a Proprietorship Firm) under Regulation 32 of the MERC (Distribution Open Access) Regulations, 2016 for adjudication of wrongful and illegal denial of open access by MSEDCL and petition under Section 86 (1) (f) 2003 and under Section 60 & 66 of the Electricity Act, 2003 and petition under regulation 92, 93 and 94 of the MERC (conduct of business) regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers.
66 of 2019
|
Completed | |
2742 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
|
Completed | |
2743 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power India Private Limited seeking appropriate relief on Account of change in law as provided in request for proposal documents dated February 08, 2018 due to the introduction of safeguard duty on import of solar panels/modules
47 of 2019
|
Completed | |
2744 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
|
Completed | |
2745 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
|
Completed | |
2746 | Wed 27/03/2019 10:00:00 AM |
Hearing
Petition filed by Ajay Maniklal Udasi against Maharashtra State Electricity Distribution Company Ltd. for non-Compliance of CGRF, Akola Zone's Order dated 04.10.2018 passed in Complaint No. 36/2018.
24 of 2019
|
Completed | |
2747 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for procurement of power from wind projects who's EPAS with MSEDCL are expired.
50 of 2019
|
Completed | |
2748 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s Khandesh Paper Mill Pvt. Ltd. for directing MSEDCL to Comply CGRF, Jalgaon Complaint No. 6-2018-19 order dated 18.9.2018 in respect of consumer.
31 of 2019
|
5 | |
2749 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s CG Power and Industrial Solutions Ltd. for directing MSEDCL, to comply Hon. CGRF order in respect of consumer M/s CG Power and Industrial Solutions Ltd.
30 of 2019
|
Completed | |
2750 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
|
Completed | |
2751 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
|
Completed | |
2752 | Tue 26/03/2019 10:00:00 AM |
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for contempt and the execution of the Hon. Commission's Order dated 15th January 2019 in Case No 342 of 2018 under Sections 142,146 & 86(1)(f) of the Electricity Act 2003(with amendments) for adjudication of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
43 of 2019
|
Completed | |
2753 | Mon 25/03/2019 10:00:00 AM |
Hearing
Petition filed by Arvind Cotsin (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
|
Completed | |
2754 | Mon 25/03/2019 10:00:00 AM |
Public Hearing
Inviting Comments, Suggestions and/or Objections on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2019-20
52 of 2019
|
Completed | |
2755 | Mon 25/03/2019 10:00:00 AM |
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for post facto approval of MSEDCL's Fuel Adjustment Charges (FAC) for the period of January, 2018 to March, 2018.
23 of 2019
|
Completed | |
2756 | Mon 25/03/2019 10:00:00 AM |
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
|
Reschedule with further notice | |
2757 | Mon 25/03/2019 10:00:00 AM |
Hearing
Petition of Arvind Cotsin India Ltd. against Maharashtra State Electricity Distribution Co. Ltd. for Discriminatory Treatment for Renewable Energy generator/ Consumer by MSEDCL for imposition of Individual Metering Policy.
34 of 2019
|
Completed | |
2758 | Tue 19/03/2019 10:00:00 AM |
Hearing
74 of 2019
|
Completed | |
2759 | Tue 19/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s. KRC Infrastructure and Projects Private Limited for approval of Power Purchase Plan for 5 years and adoption of tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and "Guidelines for Short-term (i.e., for a period of more than one day to one year) Procurement of Power by Distribution Licensees Through Tariff Based Bidding Process" issued by Government of India, for procurement of power up to 2 MW RTC from 00:00 to 24:00 hours for a period of six months from April 1, 2019 to September 30, 2019
73 of 2019
|
Completed | |
2760 | Tue 19/03/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited for approval of short term power procurement at a rate higher than the ceiling rate approved by the Hon'ble Commission.
69 of 2019
|
Completed | |
2761 | Tue 19/03/2019 10:00:00 AM |
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
|
Reschedule | |
2762 | Mon 18/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s Khandesh Paper Mill Pvt. Ltd. for directing MSEDCL to Comply CGRF, Jalgaon Complaint No. 6-2018-19 order dated 18.9.2018 in respect of consumer.
31 of 2019
|
Reschedule | |
2763 | Mon 18/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s CG Power and Industrial Solutions Ltd. for directing MSEDCL, to comply Hon. CGRF order in respect of consumer M/s CG Power and Industrial Solutions Ltd.
30 of 2019
|
Reschedule | |
2764 | Mon 18/03/2019 10:00:00 AM |
Hearing
Petition filed by Ajay Maniklal Udasi against Maharashtra State Electricity Distribution Company Ltd. for non-Compliance of CGRF, Akola Zone's Order dated 04.10.2018 passed in Complaint No. 36/2018.
24 of 2019
|
Reschedule | |
2765 | Mon 18/03/2019 10:00:00 AM |
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for post facto approval of MSEDCL's Fuel Adjustment Charges (FAC) for the period of January, 2018 to March, 2018.
23 of 2019
|
Reschedule | |
2766 | Mon 18/03/2019 10:00:00 AM |
Hearing
Petition filed by Arvind Cotsin (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
|
Reschedule | |
2767 | Sat 16/03/2019 10:00:00 AM |
Public Hearing
Inviting Comments In Proceedings For Verification Of Renewable Purchase Obligation Compliance Targets For FY 2017-18 By Distribution Licensees In Maharashtra
36 of 2019, 37 of 2019, 38 of 2019, 39 of 2019, 40 of 2019, 41 of 2019 and 42 of 2019
|
Completed | |
2768 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
|
Reschedule | |
2769 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Laxmi Narayan Udhyog against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No. 51/2018 order dated 11.12.2018 and Non-Release of new connection.
13 of 2019
|
5 | |
2770 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
|
Reschedule | |
2771 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Wasim Oil Mill and Ginning Pressing against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Akola Zone order in complaint No 52/2018 order dated 11.12.2018 and Non-Release of New Connection thereof in the matter of Wasim Oil Mill and Ginning Pressing.
12 of 2019
|
5 | |
2772 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Umesh Board and Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd under Regulation 22 of MERC CGRF & EO Regulation due to Non-Compliance of CGRF Aurangabad Zone order in Case No CGRF/AZ/AUC/684/2018/24 order dated 18.09.2018 related to differential amount of continuous non-continuous tariff issue and allied Grievances & thereby to initiate Non-Compliance proceedings under section 142 and 149 of EA 2003
11 of 2019
|
Completed | |
2773 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Raj Laxmi Food and Spices against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Amravati Zone order in complaint No. 24/2018 order dated 11.10.2018 and Non-Release of new connection.
10 of 2019
|
5 | |
2774 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Ambabai Yantramag Audyogik Sahakari Sanstha for seeking Non-Compliance of Consumer Grievance Redressal Forum, Kolhapur Zone's consumer Grievance case No.31/2018-19/Letter dt.207 dated 30 August,2018 under section 142 and section 149 of 2018 electricity act 2003.
16 of 2019
|
5 | |
2775 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Vimal Trading Centre against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No 50/2018 order dated 11.12.2018 and Non-Release of New Connection.
14 of 2019
|
5 | |
2776 | Fri 15/03/2019 10:00:00 AM |
Hearing
Petition of Govind Shankar Gadgil against Maharashtra State Electricity Distribution Co. Ltd for non-Compliance of CGRF, Ratnagiri Zone Order dated 22.5.2018 passed in Complaint No. 6 of 2018.
9 of 2019
|
Completed | |
2777 | Thu 14/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s Rajlakshmi Minerals for amount due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the wind Energy Purchases Agreement dated 20th August, 2014.
26 of 2019
|
Completed | |
2778 | Thu 14/03/2019 10:00:00 AM |
Hearing
Petition of Ghatge Patil Industries Limited under provisions of the Electricity Act, 2003 and more particularly Section 42, Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Company Limited.
22 of 2019
|
Completed | |
2779 | Thu 14/03/2019 10:00:00 AM |
Hearing
Petition of Kamal Encon India Ltd. (Formerly known as KEC INDL LTD) under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Kamal Encon Industries Limited and Maharashtra State Electricity Distribution Company Ltd.
21 of 2019
|
Completed | |
2780 | Thu 14/03/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. Seeking the inclusion of revenue expenditure being incurred on providing discount under the GO-GREEN initiative & revenue expenditure being incurred on providing messaging service (SMS) as a part of aggregate revenue requirement (ARR) of respective year.
1 of 2019
|
Completed | |
2781 | Wed 13/03/2019 10:00:00 AM |
Hearing
Petition filed by Adani Electricity Mumbai Limited seeking approval of the Hon'ble Commission for levy of Rs 750/- as charges for second and each subsequent dishonoured cheque under Regulation 18 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005.
45 of 2019
|
Completed | |
2782 | Wed 13/03/2019 10:00:00 AM |
Hearing
Petition filed by The Tata Power Company Limited - Distribution Business seeking approval of the Power Procurement Arrangement of The Tata Power Company Limited - Distribution Business for FY 2019-20 to FY 2024-25 as per directions of the Hon'ble Commission vide order dated 27.03.2018 in Case No. 39 of 2017 read with Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2015
44 of 2019
|
Completed | |
2783 | Wed 13/03/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Consideration of Deemed Generation on Account of Installation of OFF-GRID solar pump under various solar AG pump Scheme towards RPO fulfilment section 86 of the Electricity Act 2003.
33 of 2019
|
Completed | |
2784 | Wed 13/03/2019 10:00:00 AM |
Hearing
Petition filed by M/s Rajlakshmi Minerals for amount due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the wind Energy Purchases Agreement dated 20th August, 2014.
26 of 2019
|
Reschedule | |
2785 | Tue 12/03/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Consideration of Deemed Generation on Account of Installation of OFF-GRID solar pump under various solar AG pump Scheme towards RPO fulfilment section 86 of the Electricity Act 2003.
33 of 2019
|
Reschedule | |
2786 | Sat 02/03/2019 10:00:00 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Reschedule with further notice | |
2787 | Wed 27/02/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
|
Reschedule | |
2788 | Wed 27/02/2019 10:00:00 AM |
Hearing
Petition of Laxmi Narayan Udhyog against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No. 51/2018 order dated 11.12.2018 and Non-Release of new connection.
13 of 2019
|
Reschedule | |
2789 | Tue 26/02/2019 10:00:00 AM |
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
|
Reschedule | |
2790 | Tue 26/02/2019 10:00:00 AM |
Hearing
Petition of Wasim Oil Mill and Ginning Pressing against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Akola Zone order in complaint No 52/2018 order dated 11.12.2018 and Non-Release of New Connection thereof in the matter of Wasim Oil Mill and Ginning Pressing.
12 of 2019
|
Reschedule | |
2791 | Tue 26/02/2019 10:00:00 AM |
Hearing
Petition of Umesh Board and Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd under Regulation 22 of MERC CGRF & EO Regulation due to Non-Compliance of CGRF Aurangabad Zone order in Case No CGRF/AZ/AUC/684/2018/24 order dated 18.09.2018 related to differential amount of continuous non-continuous tariff issue and allied Grievances & thereby to initiate Non-Compliance proceedings under section 142 and 149 of EA 2003
11 of 2019
|
Reschedule | |
2792 | Tue 26/02/2019 10:00:00 AM |
Hearing
Petition of Raj Laxmi Food and Spices against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Amravati Zone order in complaint No. 24/2018 order dated 11.10.2018 and Non-Release of new connection.
10 of 2019
|
Reschedule | |
2793 | Mon 25/02/2019 10:00:00 AM |
Hearing
Petition of Ambabai Yantramag Audyogik Sahakari Sanstha for seeking Non-Compliance of Consumer Grievance Redressal Forum, Kolhapur Zone's consumer Grievance case No.31/2018-19/Letter dt.207 dated 30 August,2018 under section 142 and section 149 of 2018 electricity act 2003.
16 of 2019
|
Reschedule | |
2794 | Mon 25/02/2019 10:00:00 AM |
Hearing
Petition of Vimal Trading Centre against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No 50/2018 order dated 11.12.2018 and Non-Release of New Connection.
14 of 2019
|
Reschedule | |
2795 | Mon 25/02/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for review of Order dated 24.10.2018 by Hon'ble Commission in Case No. 186 of 2018 (petition of MSEDCL to review certain issues in the Commission's Order dated 02.05.2018 in Case No. 111 of 2017), under Sections 85 of MERC (Conduct of Business) Regulations, 2004 and under Section 94 of the Electricity Act, 2003.
364 of 2018
|
Reschedule with further notice | |
2796 | Fri 22/02/2019 10:00:00 AM |
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
|
Completed | |
2797 | Fri 22/02/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Removal of difficulties in implementation of MERC (Net Metering for Roof-Top Solar Photo Voltaic System) Regulations, 2015
20 of 2019
|
Completed | |
2798 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
28 of 2019
|
Reschedule with further notice | |
2799 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra
State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
25 of 2019
|
Reschedule with further notice | |
2800 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
|
Reschedule with further notice | |
2801 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Reschedule with further notice | |
2802 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by
Maharashtra State Electricity Distribution Company Limited of the Order dated March
16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity
Act, 2003 in Case No. 74 of 2016.
358 of 2018
|
Completed | |
2803 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the
Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind
Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co.
Limited.
357 of 2018
|
Completed | |
2804 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.
356 of 2018
|
Completed | |
2805 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
|
Completed | |
2806 | Thu 21/02/2019 10:00:00 AM |
Hearing
Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section
86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC
(Renewable Purchase Obligation, its compliance and implementation of REC
Framework), Regulations, 2010 for adjudication of disputes between Petitioner and
Respondent No. 1.
251 of 2018
|
Completed | |
2807 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
|
Reschedule with further notice | |
2808 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
|
Completed | |
2809 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule with further notice | |
2810 | Thu 21/02/2019 10:00:00 AM |
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License
agreement executed between the Petitioner and Respondent.
247 of 2018
|
5 | |
2811 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
|
Reschedule with further notice | |
2812 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Reschedule | |
2813 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
|
Reschedule | |
2814 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
|
Reschedule | |
2815 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
|
Reschedule | |
2816 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License
agreement executed between the Petitioner and Respondent.
247 of 2018
|
Reschedule | |
2817 | Wed 20/02/2019 10:00:00 AM |
Hearing
358 of 2018
|
Reschedule | |
2818 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the
Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind
Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co.
Limited.
357 of 2018
|
Reschedule | |
2819 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March
16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.
356 of 2018
|
Reschedule | |
2820 | Wed 20/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the
Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind
Farms (India) Private Limited and Maharashtra State Electricity Distribution Co.
Limited.
355 of 2018
|
Reschedule | |
2821 | Mon 11/02/2019 10:00:00 AM |
Hearing
358 of 2018
|
Reschedule | |
2822 | Mon 11/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the
Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind
Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co.
Limited.
357 of 2018
|
Reschedule | |
2823 | Mon 11/02/2019 10:00:00 AM |
Hearing
356 of 2018
|
Reschedule | |
2824 | Mon 11/02/2019 10:00:00 AM |
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the
Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind
Farms (India) Private Limited and Maharashtra State Electricity Distribution Co.
Limited.
355 of 2018
|
Reschedule | |
2825 | Fri 08/02/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under 'Mukhyamantri Sour Krishi Vahini Yojana' to meet MSEDCL's Solar Renewable Purchase Obligations.
15 of 2019
|
Reschedule | |
2826 | Fri 08/02/2019 10:00:00 AM |
Hearing
Petition for approval for purchase of bilateral power above Average rate approved for FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017 & Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of Additional Power Procurement
5 of 2019
|
Reschedule | |
2827 | Fri 08/02/2019 10:00:00 AM |
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003
seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL)
for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations,
2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
|
Reschedule | |
2828 | Fri 08/02/2019 10:00:00 AM |
Hearing
Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003.
AND
Miscellaneous Intervention Application filed by Adani Transmission (India) Ltd., in
Case No. 326 of 2018
MA No. 28 of 2018 in Case No. 326 of 2018 AND 326 of 2018
|
Reschedule with further notice | |
2829 | Fri 08/02/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking recovery
of additional expenditure to be incurred due to sharing of fly ash transportation cost
consequent to Ministry of Environment and Forest, Government of India notification
dated 25.01.2016.
371 of 2018
|
Reschedule | |
2830 | Fri 08/02/2019 10:00:00 AM |
Hearing
Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section
86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC
(Renewable Purchase Obligation, its compliance and implementation of REC
Framework), Regulations, 2010 for adjudication of disputes between Petitioner and
Respondent No. 1.
251 of 2018
|
Reschedule | |
2831 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of
compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.
6 of 2019
|
Reschedule | |
2832 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for
Non-Compliance of the DOA Regulations 2016 by MSEDCL and seeking directions
for restoration of the Petitionerâ??s Contract Demand for the billing month August 2016
and consequential reliefs from the MSEDCL.
272 of 2018
|
Reschedule | |
2833 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of
the Honâ??ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section
142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State
Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of
over-drawal by Indian Railways)
2 of 2019
|
Reschedule with further notice | |
2834 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section
63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and
dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.
343 of 2018
|
Reschedule | |
2835 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order
dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail
Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the
Roof-top Solar PV Net Metering Regulations, 2015.)
286 of 2018
|
Reschedule | |
2836 | Thu 07/02/2019 10:00:00 AM |
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
|
Reschedule | |
2837 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition filled by Adani Electricity Mumbai Limited seeking Quashing/setting aside of Impugned Bill dated 25th January 2019 issued by the Maharashtra State Power Committee (MSPC.)
28 of 2019
|
Completed | |
2838 | Wed 06/02/2019 10:00:00 AM |
Hearing
The Petitioner The Tata Power Company Limited (Distribution) has filed under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
-MA No. 4 of 2019 in Case No. 25 of 2019
|
Completed | |
2839 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Reschedule | |
2840 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and
(4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
367 of 2018
|
Completed | |
2841 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No.
236/2016.
363 of 2018
|
Completed | |
2842 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition of Shri Shriram Tukaram Hissal regarding non-compliance of the CGRF Akola, Case No. 32/2018 dated 28.09.2018 by Maharashtra State Electricity Distribution Co. Ltd.
350 of 2018
|
Completed | |
2843 | Wed 06/02/2019 10:00:00 AM |
Hearing
Petition of Shri Purnaji Omkar Hage regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 27/2018 dated 23.08.2018 by Maharashtra State Electricity Distribution Co. Ltd.
348 of 2018
|
Completed | |
2844 | Tue 05/02/2019 12:00:00 PM |
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking recovery of additional expenditure to be incurred due to sharing of fly ash transportation cost consequent to Ministry of Environment and Forest, Government of India notification dated 25.01.2016.
371 of 2018
|
Reschedule with further notice | |
2845 | Tue 05/02/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)
286 of 2018
|
Completed | |
2846 | Tue 05/02/2019 10:00:00 AM |
Hearing
272 of 2018
|
Completed | |
2847 | Tue 05/02/2019 10:00:00 AM |
Hearing
Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section
63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and
dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.
343 of 2018
|
Completed | |
2848 | Tue 05/02/2019 10:00:00 AM |
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
|
Completed | |
2849 | Mon 04/02/2019 10:00:00 AM |
Hearing
Application for Impleadment by The Tata Power Company Limited in Case No. 326 of
18 (Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity
Act, 2003 and other applicable provisions of the Electricity Act, 2003.(Recovery of
transmission Charges from STU, Reference Case No 162 of 2016).)
MA No. 3 of 2019 in Case No. 326 of 2018
|
Completed | |
2850 | Mon 04/02/2019 10:00:00 AM |
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.
6 of 2019
|
Completed | |
2851 | Mon 04/02/2019 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under 'Mukhyamantri Sour Krishi Vahini Yojana' to meet MSEDCL's Solar Renewable Purchase Obligations.
15 of 2019
|
Completed | |
2852 | Mon 04/02/2019 10:00:00 AM |
Hearing
Petition for approval for purchase of bilateral power above Average rate approved for
FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017
& Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of
Additional Power Procurement
5 of 2019
|
Completed | |
2853 | Mon 28/01/2019 10:00:00 AM |
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
|
Reschedule | |
2854 | Mon 28/01/2019 10:00:00 AM |
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
367 of 2018
|
Reschedule | |
2855 | Wed 23/01/2019 10:00:00 AM |
Hearing
Petition of Shri Dilip Bhikaji Dethe against Maharashtra Eastern Grid Power Transmission Company, Akola for non-compliance of the MERC Order and non compliance of Order passed by Sub Divisional Magistrate Order, Buldhana.
359 of 2018
|
Reschedule with further notice | |
2856 | Wed 23/01/2019 10:00:00 AM |
Hearing
Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No. 236/2016
363 of 2018
|
Reschedule | |
2857 | Wed 23/01/2019 10:00:00 AM |
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
|
Reschedule | |
2858 | Wed 28/11/2018 10:00:00 AM |
Hearing
Petition of Tata Power Renewable Energy Limited under Section 63 of the Electricity Act, 2003 for approval and determination of compensation on account of Change in Law for Solar Project.
276 of 2018
|
Reschedule with further notice | |
2859 | Tue 27/11/2018 10:00:00 AM |
Hearing
Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.
216 of 2018
|
Reschedule with further notice | |
2860 | Tue 27/11/2018 10:00:00 AM |
Hearing
Petition of Shri. Rajesh s/o Mahadeorao Babhulkar under Section 67 (2) (e) of Electricity Act 2003 r/w rule 13 (3) of Maharashtra Electricity work license rules 2012 for the determination of valuation and payment of compensation of neera of palm tree (sindi tree).
253 of 2018
|
Reschedule with further notice | |
2861 | Tue 27/11/2018 10:00:00 AM |
Hearing
Petition of CLC Global A division of CLC Industries Ltd (formerly known as Spentex Industries Limited) under Section 142 & 149 (2) of the Electricity Act, 2003 for non-compliance of the MERC direction by MSEDCL and to reconsideration of Interst Rate & Period of applicability for refund of SLC /ORC /Meter Cost Etc.
261 of 2018
|
Completed | |
2862 | Mon 26/11/2018 10:00:00 AM |
Hearing
Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Comopliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitionerâ??s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.
272 of 2018
|
Reschedule with further notice | |
2863 | Mon 26/11/2018 10:00:00 AM |
Hearing
Petition of Pudumjee Paper Products Ltd. under Section 62(6) of the Electricity Act, 2003 for Illegal levy of Voltage Surcharge from the Petitioner Company by the Respondent Distribution Licensee on power supplied through Express Feeder as well as on power supplied through Distribution Open Access.
271 of 2018
|
Reschedule with further notice | |
2864 | Mon 26/11/2018 10:00:00 AM |
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
|
Reschedule with further notice | |
2865 | Mon 26/11/2018 10:00:00 AM |
Hearing
Petition of The President General Merchants Distributor's Co-operative market cum Housebuilding Society Ltd., for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 15/2018 order dated 28.05.2018
255 of 2018
|
Reschedule with further notice | |
2866 | Mon 26/11/2018 10:00:00 AM |
Hearing
Petition of M/s Maa Rajulde Agro Industries against MSEDCL for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 16/2018 order dated 28.05.2018.
254 of 2018
|
Reschedule with further notice | |
2867 | Thu 15/11/2018 10:00:00 AM |
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
|
Reschedule | |
2868 | Thu 15/11/2018 10:00:00 AM |
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
|
Reschedule | |
2869 | Wed 14/11/2018 10:00:00 AM |
Hearing
Petition of Mrs. Geetha Pundaleeka under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers.
262 of 2018
|
Reschedule with further notice | |
2870 | Wed 14/11/2018 10:00:00 AM |
Hearing
Petition of M/s. Krishna Valley Power Private Limited and Sahyadri Renewable Energy Private Ltd for non compliance of the Order of Hon'ble Commission, Order dated 15.01.2018 passed in Case No. 137 of 2017.
260 of 2018
|
Reschedule | |
2871 | Wed 14/11/2018 10:00:00 AM |
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
|
Reschedule | |
2872 | Wed 14/11/2018 10:00:00 AM |
Hearing
Petition of Century Rayon seeking Review of the Order dated 25.04.2018 passed by this Hon'ble Commission in Case i.e. M.A. No.18 of 2017 filed in MERC Case No.99 of 2017 and by review seeking implementation of interim relief from retrospective effect i.e. from the date of MYT Order i.e. dated 03.11.2016 passed in Case No.48 of 2016.
246 of 2018
|
Reschedule | |
2873 | Wed 14/11/2018 10:00:00 AM |
Hearing
Petition of Mahati Hydro Power Projects Private Limited under Section 86(1)(f) of the Electricity Act, 2003 for seeking compliance of MSEDCL to meet start-up power requirement for its 2 X 2 MW Sonawade Small Hydro Electric Project through existing evacuation network and allow to continue the netting-off of start-up power against power supplied by Mahati Hydro Power Projects Private Limited from its Sonawade Small Hydro Electric Project according to the Energy Purchase Agreement and as per the MYT Order dated November 03, 2016 in Case No 48 of 2016 pronounced by this Hon'ble Commission.
244 of 2018
|
Reschedule | |
2874 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Green Infra Corporate Solar Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding
amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Corporate Solar Limited.
267 of 2018
|
Reschedule with further notice | |
2875 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Dr. Shri. Girish Dadasaheb Dhadwad, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.29/2017-18, Dt. of order: 02/02/2018.
241 of 2018
|
Reschedule | |
2876 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Dr. Shri. Hemant Janardan Kotwal, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.30/2017-18, Dt. of order: 02/02/2018.
240 of 2018
|
Reschedule | |
2877 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.
228 of 2018
|
Reschedule | |
2878 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Mutual Technologies Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately along with delayed payment charges and interest accrued thereupon and Petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
221 of 2018
|
Reschedule with further notice | |
2879 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreements executed on 19.08.2014 and 07.10.2014
259 of 2018
|
Reschedule with further notice | |
2880 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreement executed on 19.07.2007.
258 of 2018
|
Reschedule with further notice | |
2881 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Green Infra Wind Energy Project Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Project Limited under Energy Purchase Agreements executed on 03.03.2014, 11.03.2014 and 15.03.2014.
257 of 2018
|
Reschedule with further notice | |
2882 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Green Infra BTV Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra BTV Limited under Energy Purchase Agreements executed on 06.11.2012 and 21.02.2013
243 of 2018
|
Reschedule with further notice | |
2883 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Dynamic Process Private Limited for seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
205 of 2018
|
Reschedule with further notice | |
2884 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Asahi India Glass Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (â??DOA Regulationsâ??), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
219 of 2018
|
Reschedule | |
2885 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2018
|
Reschedule | |
2886 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
|
Reschedule | |
2887 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of M/s Nagreeka Exports Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (â??DOA Regulationsâ??), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
209 of 2018
|
Reschedule | |
2888 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Orient Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
206 of 2018
|
Reschedule | |
2889 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
|
Reschedule | |
2890 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Mahindra & Mahindra Limited against MSEDCL for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer, hence liable for action under section 142 & 146 of Electricity Act, 2003.
179 of 2018
|
Reschedule | |
2891 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Jindal Poly Films Limited under Section 86 (1) (K) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations, 2016 for clarification regarding the applicability of power factor incentive to the Open Access power consumption of HT Consumers.
173 of 2018
|
Reschedule | |
2892 | Tue 13/11/2018 10:00:00 AM |
Hearing
Petition of Praxair India Pvt. Limited under section 142, 146 & 149 of Electricity Act, 2003 for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action.
169 of 2018
|
Reschedule | |
2893 | Mon 12/11/2018 10:00:00 AM |
Hearing
Petition of M/s. Orange Maha Wind Energy Private Limited under Section 86(1) of the Electricity Act, 2003 for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the various Wind Energy Purchase Agreements entered into between the parties
268 of 2018
|
Reschedule with further notice | |
2894 | Mon 12/11/2018 10:00:00 AM |
Hearing
Petition of M/s. Paranjape Autocast Private Limited under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of order of the CGRF, Baramati Zone, constituted by the MERC Regulations and offence has been committed is attributable to most careless neglect on the part of officer of Company regarding the matter of non compliance of CGRF order and wrong application of the dedicated distribution facility by the MSEDCL and attempt of illegal recovery against existing infrastructure by the MSETCL.
234 of 2018
|
Reschedule | |
2895 | Mon 12/11/2018 10:00:00 AM |
Hearing
Petition of Jain Agriculture Equipment against Maharashtra State Electricity Distribution Co. Ltd under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of Orders dated 08/06/2018 passed by Hon'ble Appellate Authority in case No. 01/2018.
220 of 2018
|
Reschedule | |
2896 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Dr. Shri. Girish Dadasaheb Dhadwad, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.29/2017-18, Dt. of order: 02/02/2018.
241 of 2018
|
Reschedule with further notice | |
2897 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Dr. Shri. Hemant Janardan Kotwal, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.30/2017-18, Dt. of order: 02/02/2018.
240 of 2018
|
Reschedule with further notice | |
2898 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.
228 of 2018
|
Reschedule with further notice | |
2899 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Asahi India Glass Limited under Section 86 (1) (k) of the Electricity Act
(EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access)
Regulations ('DOA Regulations'), 2016 for clarification regarding the applicability of
Power Factor Incentive to the Open Access power consumption by HT consumers.
219 of 2018
|
Reschedule with further notice | |
2900 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2018
|
Reschedule with further notice | |
2901 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
|
Reschedule with further notice | |
2902 | Sat 03/11/2018 10:00:00 AM |
Hearing
209 of 2018
|
Reschedule with further notice | |
2903 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Orient Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
206 of 2018
|
Reschedule with further notice | |
2904 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
|
Reschedule with further notice | |
2905 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Mahindra & Mahindra Limited against MSEDCL for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer, hence liable for action under section 142 & 146 of Electricity Act, 2003.
179 of 2018
|
Reschedule with further notice | |
2906 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Jindal Poly Films Limited under Section 86 (1) (K) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations, 2016 for clarification regarding the applicability of power factor incentive to the Open Access power consumption of HT Consumers.
173 of 2018
|
Reschedule with further notice | |
2907 | Sat 03/11/2018 10:00:00 AM |
Hearing
Petition of Praxair India Pvt. Limited under section 142, 146 & 149 of Electricity Act, 2003 for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action.
169 of 2018
|
Reschedule with further notice | |
2908 | Fri 02/11/2018 10:00:00 AM |
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
|
Completed | |
2909 | Fri 02/11/2018 10:00:00 AM |
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
|
Reschedule with further notice | |
2910 | Fri 02/11/2018 10:00:00 AM |
Hearing
Petition of Ordnance Factory Ambajhari Seeking Intervention and Direction of this Hon'ble Commission U/s. 86 (1) (e) of the Electricity Act, 2003 in matter of 5 MW Ground Mounted Grid Connected PV Solar Power Plant installed by M/s. Azure Power Uranus Pvt. Ltd. at Ordnance Factory Ambajhari, Nagpur, under 300 MW Defence Scheme of Government of India.
211 of 2018
|
Reschedule with further notice | |
2911 | Thu 01/11/2018 10:00:00 AM |
Hearing
Petition of M/s. Krishna Valley Power Private Limited and Sahyadri Renewable Energy Private Ltd for non compliance of the Order of Hon'ble Commission, Order dated 15.01.2018 passed in Case No. 137 of 2017.
260 of 2018
|
Reschedule with further notice | |
2912 | Thu 01/11/2018 10:00:00 AM |
Hearing
Petition of Century Rayon seeking Review of the Order dated 25.04.2018 passed by this Hon'ble Commission in Case i.e. M.A. No.18 of 2017 filed in MERC Case No.99 of 2017 and by review seeking implementation of interim relief from retrospective effect i.e. from the date of MYT Order i.e. dated 03.11.2016 passed in Case No.48 of 2016.
246 of 2018
|
Reschedule with further notice | |
2913 | Thu 01/11/2018 10:00:00 AM |
Hearing
Petition of Mahati Hydro Power Projects Private Limited under Section 86(1)(f) of the Electricity Act, 2003 for seeking compliance of MSEDCL to meet start-up power requirement for its 2 X 2 MW Sonawade Small Hydro Electric Project through existing evacuation network and allow to continue the netting-off of start-up power against power supplied by Mahati Hydro Power Projects Private Limited from its Sonawade Small Hydro Electric Project according to the Energy Purchase Agreement and as per the MYT Order dated November 03, 2016 in Case No 48 of 2016 pronounced by this Hon'ble Commission.
244 of 2018
|
Reschedule with further notice | |
2914 | Thu 01/11/2018 10:00:00 AM |
Hearing
Petition of M/s. Paranjape Autocast Private Limited under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of order of the CGRF, Baramati Zone, constituted by the MERC Regulations and offence has been committed is attributable to most careless neglect on the part of officer of Company regarding the matter of non compliance of CGRF order and wrong application of the dedicated distribution facility by the MSEDCL and attempt of illegal recovery against existing infrastructure by the MSETCL.
234 of 2018
|
Reschedule with further notice | |
2915 | Thu 01/11/2018 10:00:00 AM |
Hearing
Petition of Jain Agriculture Equipment against Maharashtra State Electricity Distribution Co. Ltd under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of Orders dated 08/06/2018 passed by Hon'ble Appellate Authority in case No. 01/2018.
220 of 2018
|
Reschedule with further notice | |
2916 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.
172 of 2018
|
Reschedule with further notice | |
2917 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
|
Reschedule | |
2918 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
231 of 2018
|
Reschedule | |
2919 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
230 of 2018
|
Reschedule | |
2920 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
229 of 2018
|
Reschedule | |
2921 | Wed 31/10/2018 10:00:00 AM |
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for clarification of Order dated 12th July, 2018 passed by Hon'ble Commission in MERC case No. 84 of 2015.
225 of 2018
|
Reschedule with further notice | |
2922 | Tue 30/10/2018 10:00:00 AM |
Hearing
Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)
148 of 2014
|
Reschedule with further notice | |
2923 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
|
Reschedule with further notice | |
2924 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Reschedule with further notice | |
2925 | Tue 30/10/2018 10:00:00 AM |
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
|
Reschedule with further notice | |
2926 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
|
Reschedule with further notice | |
2927 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
|
Reschedule with further notice | |
2928 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.
245 of 2018
|
Reschedule | |
2929 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Honâ??ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)
237 of 2018
|
Reschedule | |
2930 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Honâ??ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge (â??LPSâ??) and interest accrued thereupon.
236 of 2018
|
Reschedule | |
2931 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.
235 of 2018
|
Reschedule | |
2932 | Tue 30/10/2018 10:00:00 AM |
Hearing
Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .
232 of 2018
|
Reschedule | |
2933 | Sat 27/10/2018 10:00:00 AM |
Hearing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
|
Reschedule | |
2934 | Sat 27/10/2018 10:00:00 AM |
Hearing
Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.
172 of 2018
|
Reschedule | |
2935 | Tue 23/10/2018 10:00:00 AM |
Hearing
Petition of Laxmipati Balaji Supply Chain Management Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Laxmipati Balaji Supply Chain Management Limited ("LBSCML"/Co-Developer") for the Sector Specific SEZ and Information Technology (IT) SEZ being developed by Arshiya International Limited ("AIL"/"Developer") at Village Sai, Taluka Panvel, Dist. Raigad, Maharashtra, and for issuing the Specific Conditions of Distribution License, as may be made applicable to the Petitioner.
275 of 2018
|
Reschedule with further notice | |
2936 | Tue 23/10/2018 10:00:00 AM |
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
|
Reschedule with further notice | |
2937 | Tue 23/10/2018 10:00:00 AM |
Public Hearing
Inviting Suggestions/ Objections on VIPL-Generation's Petition for Revised Truing up of ARR for FY 2014-15, Truing up of ARR for FY 2015-16 and FY 2016-17, Provisional Truing up of ARR for FY 2017-18, Revised ARR and Tariff for FY 2018-19 and FY 2019-20
199 of 2017
|
Reschedule with further notice | |
2938 | Mon 22/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
|
Reschedule | |
2939 | Mon 22/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
|
Reschedule | |
2940 | Mon 22/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
|
Reschedule | |
2941 | Mon 22/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.
222 of 2018
|
Reschedule | |
2942 | Sat 20/10/2018 10:00:00 AM |
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
|
Reschedule | |
2943 | Fri 19/10/2018 22:00:00 PM |
Hearing
Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)
217 of 2018
|
Reschedule | |
2944 | Fri 19/10/2018 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval on adoption of Tariff for long term procurement of 235 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' with 2 to 10 MW capacity projects connected to Distribution Network under Section 63 of the Electricity Act, 2003 for Meeting the Solar Renewable Purchase Obligations.
277 of 2018
|
Reschedule with further notice | |
2945 | Fri 19/10/2018 10:00:00 AM |
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking direction of the Commission to Global Energy Private Limited (GEPL) to pay outstanding amount of the Standby Arrangement under the Standby Power Agreements dated 13 June, 2014, 29 August, 2015 and 30 June, 2016.
78 of 2018
|
Reschedule with further notice | |
2946 | Fri 19/10/2018 10:00:00 AM |
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity
Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
|
Reschedule with further notice | |
2947 | Fri 19/10/2018 10:00:00 AM |
Hearing
Suo moto proceeding in the matter of taking on record the Deemed Distribution Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.
149 of 2017
|
Reschedule with further notice | |
2948 | Fri 19/10/2018 10:00:00 AM |
Hearing
Petition of Shyam Indus Power Solutions Pvt. Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Global Energy Pvt Ltd.
274 of 2018
|
Reschedule with further notice | |
2949 | Wed 17/10/2018 10:00:00 AM |
Hearing
Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.
245 of 2018
|
Reschedule with further notice | |
2950 | Wed 17/10/2018 10:00:00 AM |
Hearing
Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)
237 of 2018
|
Reschedule with further notice | |
2951 | Wed 17/10/2018 10:00:00 AM |
Hearing
Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge ("LPS") and interest accrued thereupon.
236 of 2018
|
Reschedule with further notice | |
2952 | Wed 17/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.
235 of 2018
|
Reschedule with further notice | |
2953 | Wed 17/10/2018 10:00:00 AM |
Hearing
Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .
232 of 2018
|
Reschedule with further notice | |
2954 | Tue 16/10/2018 22:00:00 PM |
Hearing
Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)
217 of 2018
|
Reschedule with further notice | |
2955 | Tue 16/10/2018 10:00:00 AM |
Hearing
Petition of M/s Topworth Urja and Metals Ltd under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4 May, 2018 passed in Case No.5 of 2016.
174 of 2018
|
Reschedule with further notice | |
2956 | Tue 16/10/2018 10:00:00 AM |
Hearing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) of Electricity Act, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
249 of 2018
|
Reschedule with further notice | |
2957 | Tue 16/10/2018 10:00:00 AM |
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
|
Reschedule with further notice | |
2958 | Tue 16/10/2018 10:00:00 AM |
Hearing
Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
227 of 2018
|
Reschedule with further notice | |
2959 | Tue 16/10/2018 10:00:00 AM |
Hearing
Petition of Maharashtra Krushak Hitwardhak Sanghatana for directions, the respondent company be directed not to disconnect the electricity supply of the agriculturists on the basis of non- payment of the electricity bills as such the State Government has already paid the said bills to respondent company. The Petition is filed in view of the directions given by the Hon'ble High Court.
250 of 2018
|
Reschedule with further notice | |
2960 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.
190 of 2018
|
Reschedule with further notice | |
2961 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of Spentex Industries Ltd. against MSEDCL's action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Baramati, Pune
187 of 2018
|
Reschedule with further notice | |
2962 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of Spentex Industries Ltd. against MSEDCLâ??s action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Butibori, Nagpur.
159 of 2018
|
Reschedule with further notice | |
2963 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
|
Reschedule with further notice | |
2964 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
231 of 2018
|
Reschedule with further notice | |
2965 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
230 of 2018
|
Reschedule with further notice | |
2966 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
229 of 2018
|
Reschedule with further notice | |
2967 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.
222 of 2018
|
Reschedule with further notice | |
2968 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
|
Reschedule with further notice | |
2969 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
|
Reschedule with further notice | |
2970 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
|
Reschedule with further notice | |
2971 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
227 of 2018
|
Reschedule | |
2972 | Mon 15/10/2018 10:00:00 AM |
Hearing
Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Section 142, 146 and 149 the Electricity Act, 2003 for non-compliance of Hon'ble CGRF, Baramati zone's Order dated 14 May, 2018 for Case No. 03 of 2018 and non resolution matter related to the connection by MSEDCL.
210 of 2018
|
Reschedule | |
2973 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.
223 of 2018
|
Reschedule | |
2974 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.
216 of 2018
|
Reschedule | |
2975 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
|
Reschedule | |
2976 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
|
Reschedule | |
2977 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon'ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.
175 of 2018
|
Reschedule | |
2978 | Fri 12/10/2018 10:00:00 AM |
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
|
Reschedule |