Move Back

Hearing

S.No. Schedule Description Status Attachments
1 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Chetan Purushottam Patel under provisions of Electricity Act, 2003 more particularly section 86(1)(e) and section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
212 of 2023
Scheduled
2 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Jignesh Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
216 of 2023
Scheduled
3 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jayesh Purushottam Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
217 of 2023
Scheduled
4 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Purushottam Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
218 of 2023
Scheduled
5 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vallabhbhai Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vallabhbhai Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
219 of 2023
Scheduled
6 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for deferment of interest on security deposit to be paid to the consumers of the Petitioner.
209 of 2023
Scheduled
7 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shivam Oil Industries for non-compliance of CGRF order in complaint No: 79 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
210 of 2023
Scheduled
8 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Rescheduled on Tuesday 23/January/2024 10:30 AM
9 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 04.07.2023, seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change In Law event.
215 of 2023
Scheduled
10 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
Rescheduled on Fri 12/January/2024 10:30 AM
11 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. ICC Realty India Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
206 of 2023
Scheduled
12 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Eon Hinjewadi Infrastructure Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
207 of 2023
Scheduled
13 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Panchshil Infrastructure Holdings Pvt Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
208 of 2023
Scheduled
14 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Panchshil Corporate Park Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
211 of 2023
Scheduled
15 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
Scheduled
16 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
Scheduled
17 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Mayur Naik against Unethical Billing Recovery and ASD Billed Amount for Consumer No – 160250946560 (BU 4637).
201 of 2023
Scheduled
18 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Urjankur Shree Datta Power Company Limited under Section 86 (1)(f) of the Electricity Act 2003 read with Regulations 14 and 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 having been aggrieved by the high handed and unilateral actions on part of the Respondent No.1, MSEDCL, in arbitrarily reducing the tenure of the Energy Purchase Agreement dated 21.06.2013 (hereinafter referred to as the EPA) and for seeking issuance of appropriate directions to the Respondent No.1 to abide by the provisions of the EPA in letter and spirit. A copy of the EPA dated 21.06.2013.
202 of 2023
Scheduled
19 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kumar Plasto Pack Industries for non-compliance of CGRF Kalyan Order dated 31/01/2022 in Case No. K/E/1813/2254 of 2021-22.
203 of 2023
Scheduled
20 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Dinesh Manohar Sharma for Non-compliance of CGRF order in complaint No:19 OF 2021passed by CGRF, MSEDCL, Nashik Zone, Nashik.
204 of 2023
Scheduled
21 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed thereunder, seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
194 of 2023
Scheduled
22 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
Scheduled
23 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed thereunder, seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
194 of 2023
Rescheduled on Tuesday 19/March/2024 10:30 AM
24 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
Rescheduled on Tuesday 19/March/2024 10:30 AM
25 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
Rescheduled on Friday 22/March/2024 10:30 AM
26 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
Rescheduled on Friday 22/March/2024 10:30 AM
27 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Vivek Laxman Pawar (Marathi Asmita samajik Sanstha) against MSEDCL seeking compliance of the CGRF, Bhandup Orders dated 28/06/2023.
191 of 2023
Scheduled
28 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) against MSEDCL seeking compliance of the CGRF, Bhandup Orders in Case No. 42 dated 28/06/2021. And Interlocutory Application of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) for urgent hearing in Case No. 192/MP/2023.
192 of 2023 & I.A. No. 64 of 2023
Scheduled
29 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sunil Shantilal Agrawal for non-compliance of CGRF Order in complaint No: 20 of 2021 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
193 of 2023
Scheduled
30 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
176 of 2023
Rescheduled till further notice
31 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Schreiber Dynamics Dairies Pvt. Ltd. for not allowing Power Factor Incentive on Open Access charges by the Respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under Section 142, 146 & 149 of Electricity Act, 2003.
178 of 2023
Rescheduled till further notice
32 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Harshad Sheth seeking for an appropriate orders and directions regarding validity of T.O. Circular No. C.E. (Dist.)/D-III/NSC/30011 dated 20 December 2018 issued by MSEDCL and subsequent modifications made thereto.
182 of 2023
Rescheduled till further notice
33 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
Rescheduled till further notice
34 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusaval, Chandrapur, Khaperkheda and Nashik.
167 of 2023
Rescheduled till further notice
35 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) under Section 86 (1) (b) of the Electricity Act, 2003 for approval of combined short term wind power procurement for the period 01.08.2023 to 31.07.2024.
168 of 2023
Rescheduled till further notice
36 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
Rescheduled till further notice
37 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
Rescheduled till further notice
38 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
Rescheduled till further notice
39 Tue 27/02/2024 11:00:00 AM
e-Public Hearing
Hearing on Suo-Motu draft Order on Renewable Energy Tariff for FY 2024-25
3 of 2024
Scheduled
40 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
41 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
42 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra. And Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023. And Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition. And Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
43 Tue 27/02/2024 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited- Distribution's Tariff Petition for Truing up of FY 2022-23, Provisional Truing up for FY 2023-24 and approval of Revised ARR and Tariff for FY 2024-25 [Case No. 237 of 2023]
237 of 2023
Scheduled
44 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. for Non-compliance of CGRF Nashik Order dated 15 February 2019 in Case No. 58/2018-19 by MSEDCL.
127 of 2023
Scheduled
45 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 57/2018 by MSEDCL.
128 of 2023
Scheduled
46 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 63/2018-19 by MSEDCL.
129 of 2023
Scheduled
47 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 67/2018-19 by MSEDCL.
130 of 2023
Scheduled
48 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February2019 in Case No. 71/2018-19 by MSEDCL.
133 of 2023
Scheduled
49 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 72/2018-19 by MSEDCL.
134 of 2023
Scheduled
50 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 73/2018-19 by MSEDCL.
135 of 2023
Scheduled
51 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 74/2018-19 by MSEDCL.
136 of 2023
Scheduled
52 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Scheduled
53 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
Scheduled
54 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking guidance and directions for further course of action to be taken for procurement of solar power under the Mukhyamantri Saur Krushi Vahini Yojana 2.0.
20 of 2024
Scheduled
55 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
56 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
57 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
58 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ajay Mansukhlal Shah against MSEDCL seeking compliance of Order passed by The Electricity Ombudsman dated 06 January 2023.
158 of 2023
Scheduled
59 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
Scheduled
60 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
Scheduled
61 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra. And Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023. And Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition. And Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
Scheduled
62 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited in relation thereto.
11 of 2024
Scheduled
63 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Scheduled
64 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Ultratech Cement Limited for Urgent Listing in Case No. 19/AD/2024. (Petition of Ultratech Cement Limited under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) by Maharashtra State Electricity Distribution Company Limited.)
IA No. 8 of 2024 in Case No. 19 of 2024
Scheduled
65 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 27 October 2022.
62 of 2023
Scheduled
66 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Executive Engineer, Maharashtra State Road Development Corporation (MSRDC) through user M/s. Regent Bhairavi Corporation seeking compliance of the Order dated 24 August 2022 passed by CGRF, Kalyan zone in Case No. K/E/048 of 2022-23.
64 of 2023
Scheduled
67 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. seeking compliance of CGRF, Vasai Order dated 24 February, 2023.
169 of 2023
Scheduled
68 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
Scheduled
69 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 5th January, 2024. IN Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
Scheduled
70 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for Urgent Listing in Case No. 20/MP/2024.
IA No. 09 of 2024 in Case No 20 of 2024
Scheduled
71 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Pvt. Ltd. under Section 86(1) (b) read with Section 86(1) (f) and other applicable provisions of the Electricity Act, 2003 and under various power purchase agreements seeking compensation on account of occurrence of Change in Law event.
73 of 2023
Completed
72 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SJVN Ltd. under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
Completed
73 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking in-Principle Declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 22 July, 2022 which was signed on 3 August, 2022.
75 of 2023
Completed
74 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31 March 2023 in Case No. 226 of 2022 in the matter of final true-up of aggregate revenue requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional true up of ARR of FY 2022-23 and revised tariff and projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
Completed
75 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent hearing of Case No. 14/MP/2024. (Petition of MSPGCL seeking approval of M/s. Ideal Energy Projects Limited as successful single bidder and allow MSPGCL to enter into Power Purchase Agreement and Tri-Partite agreement pursuant to Case IV, Phase 4 bidding undertaken by MSPGCL as per Case IV Guidelines issued by Ministry of Power, Government of India.)
IA No 07 of 2024 in Case No 14 of 2024
Completed
76 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra Border Check Post Network Limited seeking applicability of appropriate tariff to the Border Check Post Nakas and seeking recovery of differential amount.
32 of 2023
Completed
77 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Adani Electricity Mumbai Limited- Distribution (AEML-D) under Section 86 of the Electricity Act, 2003 in compliance of the directions in Order dated 28 October 2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project on account of occurrence of Force Majeure Events.
33 of 2023
Completed
78 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
Completed
79 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
Completed
80 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Rescheduled on Tuesday 06/February/2024 10:30 AM
81 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Rescheduled on Tuesday 06/February/2024 10:30 AM
82 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. Seeking clarification/modification/removal of difficulties/issuance of Practice Directions under MERC Supply Code Regulations, 2021.
11 of 2023
Completed
83 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Morries Energy Ltd. regarding non-adjustment of Open Access units for September 2021.
12 of 2023
Completed
84 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jalna Siddhivinayak Alloys Pvt. Ltd. seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as per the Commission’s Clarificatory Order dated 30 April, 2020.
4 of 2023
Completed
85 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
Completed
86 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Completed
87 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Shah Promoters and Developers (SPD) for urgent listing in Case No. 194/AD/2023 (Petition of Shah Promoters and Developers (SPD) seeking appropriate relief against MSEDCL).
I.A. 4 of 2024 in Case No. 194 of 2023
Completed
88 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. for Urgent Listing in Case No. 11/AD/2024. (Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. seeking compliance of Order dated 27.12.2023 passed by Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the EA, 2003 against MSEDCL in relation thereto.)
I.A. 5 of 2024 in Case No. 11 of 2024
Completed
89 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Completed
90 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Completed
91 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants. And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent. And Applications of Respondents for striking off their names from the list of Respondents. And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
Rescheduled till further notice
92 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations
82 of 2021
Completed
93 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
94 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking inter alia quashing of the Notice dated 05 January 2023 issued by MSEDCL to Petitioner for alleged contravention of PPA dated 20 August 2014. And Interlocutory Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014. And Interlocutory Application pof M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13, 14 of 2023
Completed
95 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated 29.06.2022 executed between Maharashtra State Electricity Distribution Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022.
122 of 2023
Completed
96 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with Section 40, 43 and 46 of the EA 2003 and directions pertaining to the applicable wheeling charges as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No. 322 of 2019.
54 of 2023
Completed
97 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2024 to 31 January 2025.
213 of 2023
Completed
98 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Completed
99 Tue 30/01/2024 10:30:00 AM
e-Public Hearing
Suggestions/ Objections on Mira-Bhaindar Municipal Corporation's Petition for determination of Project Specific Tariff for supply of electricity generated from waste-to-energy project of cumulative capacity 575 kVA (3 x 125 kVA and 4 x 50 kVA) located in the area of Mira Bhaindar Municipal Corporation.
28 of 2023
Completed
100 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Postponed till further notice
101 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Postponed till further notice
102 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
Postponed till further notice
103 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
Postponed till further notice
104 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Postponed till further notice
105 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Postponed till further notice
106 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Postponed till further notice
107 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2021- 22 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17. And Interlocutory Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as Shri Tradco India Pvt. Ltd. Vs. MSEDCL.
19 of 2023 & I.A. No. 40 of 2023
Completed
108 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2020-21 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17 and FY 2017-18. And Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Completed
109 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
80 of 2023
Completed
110 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tejas Sizers for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2017-18 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
81 of 2023
Completed
111 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
88 of 2023
Completed
112 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
89 of 2023
Completed
113 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s B.S.Channabasappa & Sons and Others for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
90 of 2023
Completed
114 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Verroc Engineering Ltd. for payment for purchase of surplus units / over-injected units with 15 % interest per annum for the period from July 2014 to June 2016 under the applicable MERC Distribution Open Access Regulations.
144 of 2023
Completed
115 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -Distribution under Section 63 of the Electricity Act, 2003 seeking adoption of tariff discovered for procurement of 225 MW grid connected Wind- Solar Hybrid capacity on long term basis plus additional 150 MW under Greenshoe Option through Competitive Bidding Process (Followed by E-Reverse Auction) to meet the future demand and Renewable Purchase Obligation as per Regulation 7 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff), 2019.
195 of 2023
Completed
116 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects. Case No. 70 of 2021 And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 MA No. 23 of 2021 in Case No. 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 IA No. 36 of 2021 in Case No. 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021. IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
Completed
117 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled till further notice
118 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) seeking urgent listing and hearing in Case No. 214/AP/2023.
IA No. 3 of 2024 in Case No. 214 of 2023
Completed
119 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Tue 30/January/2024 10:30 AM
120 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects. Case No. 70 of 2021 and Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021. and MA No. 23 of 2021 in Case No. 70 of 2021 Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021. IA No. 36 of 2021 in Case No. 70 of 2021 and Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021. IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
Rescheduled on Fri 19/January/2024 10:30 AM
121 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled on Fri 19/January/2024 10:30 AM
122 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Rescheduled on Tue 23/January/2024 10:30 AM
123 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Rescheduled on Tue 23/January/2024 10:30 AM
124 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Completed
125 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
Completed
126 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
127 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017 And Case No. 173 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 22.09.2022. IN Appeal No. 46 of 2019 directions to the Commission therein.)
173 of 2017 (Re-opened Case)
Completed
128 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
Completed
129 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Completed
130 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Protostar Technologies Private Limited under Section 86(1)(e) and Regulation 16 and Regulation 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 to allow facility of Group Net Metering for multiple electricity service connections of different Consumers within the same premises having single building or buildings with same tariff category.
226 of 2023
Completed
131 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
Completed
132 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 5 th January, 2024. IN Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
Completed
133 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for Urgent Listing in Case No. 4/AP/2024.
IA. No. 2 of 2024 in Case No. 4 of 2024
Completed
134 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Withdrawn
135 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Completed
136 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Completed
137 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Completed
138 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited (MSPGCL) seeking approval for adoption of Tariff of Rs 2.97/kWh and deviations from competitive bidding guidelines under ‘Mukhyamantri Saur Krishi Vaahini Yojana’.
120 of 2023
Completed
139 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Completed
140 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Completed
141 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
142 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
143 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
144 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Completed
145 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Completed
146 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Completed
147 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Completed
148 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Completed
149 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
Completed
150 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
Completed
151 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Completed
152 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
227 of 2023
Completed
153 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for Impleadment of Respondent in Diary No. 309 of 2023 and Diary No. 315 of 2023 in the matter of the Petition filed for obtaining the Hon'ble Commission’s approval for consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
228 of 2023
Completed
154 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) seeking urgent listing of the Case No. 205/AD/2023.
IA No 73 of 2023 in Case No. 205 of 2023
Completed
155 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
156 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Rescheduled on Friday 12/January/2024 10:30 AM
157 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Tuesday 16/January/2024 10:30 AM
158 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Completed
159 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Rescheduled on Friday 03/November/2023 10:30 AM
160 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Rescheduled on Friday 03/November/2023 10:30 AM
161 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Completed
162 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
Completed
163 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
Completed
164 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
Completed
165 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Laxmipati Balaji Supply Chain Management Limited seeking early hearing of the Diary No. 309/2023.
Diary No. 315 of 2023
Completed
166 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Protostar Technologies Private Limited seeking urgent and early hearing of the Case No. 226/MP/2023.
IA No. 71 of 2023 in Case No. 226 of 2023
Completed
167 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
Postponed till further notice
168 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Postponed till further notice
169 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Postponed till further notice
170 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Postponed till further notice
171 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
172 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
173 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
174 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
Completed
175 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
Completed
176 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
Completed
177 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
Completed
178 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
Completed
179 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
Completed
180 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
Completed
181 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
Completed
182 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
Completed
183 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
Completed
184 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
Completed
185 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
186 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
187 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
188 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
189 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
190 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) and Section 86 (1) (f) read with Section 142 of Electricity Act, 2003 for non-compliance and willful defiance of the order dated 15.03.2023 passed by this Hon’ble Commission in case no. 240 of 2022 by the Tata Power Co Ltd- G.
189 of 2023
Completed
191 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025. And Interlocutory Application of M/s FPEL MH 1 Private Limited seeking urgent listing of the Petition (Diary No. 300 of 2023) and interim directions on behalf of M/s FPEL MH 1 Private Limited.
225 of 2023 & I.A. No. 70 of 2023
Completed
192 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 122/MP/2023.
I.A. No. 68 of 2023 in Case No. 122 of 2023
Completed
193 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited for urgent listing in Case No. 166/AD/2023.
I. A. No. 69 of 2023 in Case No. 166 of 2023
Completed
194 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
195 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
196 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
197 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
198 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
199 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
200 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
201 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in 84 of 2022
Rescheduled on Friday 15/December/2023 10:30 AM
202 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
203 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
153 of 2023
Rescheduled on Tue 29/August/2023 10:30 AM
204 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
205 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Rescheduled on Friday 29/September/2023 10:30 AM
206 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
207 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
208 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited.
151 of 2023
Rescheduled on Tuesday 17/October/2023 10:30 AM
209 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
210 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
211 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
212 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
213 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
214 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
215 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
216 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
217 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
218 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
219 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
220 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
Completed
221 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
Completed
222 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
Completed
223 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
Completed
224 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
225 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
226 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
227 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
228 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
229 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
230 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
231 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
232 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
Completed
233 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
Completed
234 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
Completed
235 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
Completed
236 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
Completed
237 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114/MP/2023. (Petition of MSEDCL for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.)
I.A. No. 61 of 2023 in 114 of 2023
Completed
238 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
I.A. No. 66 of 2023 in 114 of 2023
Completed
239 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
I.A. No. 67 of 2023 in 114 of 2023
Completed
240 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 76.55 MW wind power from the wind Generators whose EPAs with MSEDCL have expired.
119 of 2023
Completed
241 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited for seeking approval for adoption of tariff rate of Rs 2.97/KWH under ‘Mukhyamantri Saur Krishi Vaahini Yojana’ to meet MSEDCL's Solar Renewable Purchase Obligations under Section 63 of Electricity Act, 2003 and for seeking approval to the Deviations Sought in the Draft PSA & PPA with respect to the Standard Bidding Guidelines, issued by MNRE/MoP, for Procurement of Power through Competitive Bidding Process as per directions in MERC Order dated 19.10.2018 in Case No. 172 of 2017.
120 of 2023
Completed
242 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 Review of Commission Order dated 15th February, 2023 in Case 116 of 2022.
123 of 2023
Completed
243 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bhimashankar Sahakari Sakhar Karkhana Limited requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 8.02 of the Energy Purchase Agreement dated 21.06.2004 and subsequent amendment EPA dated 12.12.2012 entered between the Petitioner and the Respondent.
124 of 2023
Completed
244 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Completed
245 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Completed
246 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (BEST) for urgent Listing in Case No. 189/AD/2023.
I.A. No. 65 of 2023 in Case No. 189 of 2023
Completed
247 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for Regulatory Framework for sharing of Expenses Amongst all Discoms in the State in respect of procurement of Power from waste to Energy Projects, bagasse, biomass and small/mini/micro Hydro Projects as per directives of Hon’ble Commission vide Order dated 22.03.2021 in Case No. 162 of 2019 and Order dated 26.03.2021 in Case No. 208 of 2020.
115 of 2023
Completed
248 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15.3 of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner’s assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Hedge Banks) in respect of the Petitioner’s Transmission Project.
116 of 2023
Completed
249 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Haldirams Food International Pvt Ltd. under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of distribution licensees including power quality) Regulations, 2021 challenging the “debit bill adjustment” amounting to Rs. 2,79,19,643.09 included by MSEDCL in the petitioner’s monthly energy bill dated 07.01.2023 and under Section 142, 146 and 149 of the EA, 2003 against MSEDCL seeking initaition of appropriate proceedings for violation of provisions of Regulations framed by this Hon’ble Commission including but not limited to violation of provisions of EA, 2003 and petition in the matter of MSEDCL’s commercial circular bearing no. 266 dated 30.07.2016 read with MSEDCL’s commercial circular bearing no. 289 dated 06.06.2017 adopting the government of Maharashtra resolution bearing no. 238/urja/-5 dated 29.06.2016 alongwith the modified government of Maharashtra resolution bearing no. 238/urja/-5 dated 24.03.2017 and thereby providing incentives to Marathwada, north Maharashtra and d & d+ areas and providing the applicable incentive to the petitioner for the period september-2019 to march-2022
117 of 2023
Completed
250 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Niwas Spinning Mills Ltd. regarding Revision in contract demand.
118 of 2023
Completed
251 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
Completed
252 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Completed
253 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
Completed
254 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
Completed
255 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
Completed
256 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
Completed
257 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
Completed
258 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
Completed
259 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
Postponed till further notice
260 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
Postponed till further notice
261 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
Postponed till further notice
262 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
Postponed till further notice
263 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
Postponed till further notice
264 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Postponed till further notice
265 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Postponed till further notice
266 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Postponed till further notice
267 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Postponed till further notice
268 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Postponed till further notice
269 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
Rescheduled on Friday 11/August/2023 10:30 AM
270 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
271 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nitin Ramling Ghule for Non-Compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur, Nagpur in Case No. 50 of 2022.
103 of 2023
Completed
272 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
273 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
Completed
274 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
Completed
275 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
Completed
276 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
Completed
277 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
Completed
278 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
Completed
279 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
Completed
280 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
Completed
281 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
Completed
282 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
Completed
283 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
Completed
284 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
Completed
285 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
Completed
286 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. Seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination.
56 of 2023
Completed
287 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirementsincluding calibration and testing thereof as stipulated by the Statutory Regulations. And Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No. 181/MP/2023
181 of 2023 & IA No. 51 of 2023
Completed
288 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
I.A. No. 63 of 2023 in 162 of 2023
Completed
289 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
I.A. No. 62 of 2023 in 163 of 2023
Completed
290 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
291 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
292 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Rahul R. Maroti in the matter of non-compliance of CGRF Order in complaint No: 102 of 2022 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
85 of 2023
Completed
293 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
294 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals against MSEDCL seeking compliance of the CGRF, Nagpur Order dated 23 November 2020.
15 of 2023
Completed
295 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 9 September 2022.
46 of 2023
Completed
296 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya, Station Road Ravi, Arvi, Wardha against MSEDCL seeking compliance of the CGRF, Nagpur’s Order dated 20 February, 2018 in complaint No: 114 of 2017.
48 of 2023
Completed
297 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Aspa Bansons Auto Pvt Ltd. against MSEDCL seeking compliance of the CGRF, Akola’s Order dated 23 November 2022 in complaint No: 141 of 2022.
49 of 2023
Completed
298 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
Completed
299 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 24 February 2023 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 108 of 2022.
169 of 2023
Completed
300 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sanfoods & Cold Storage Pvt Ltd. under Section 142 & 146 for Non-compliance Hon’ble Electricity Ombudsman (Mumbai) has issued order and instructed to charge the bill as Industrial tariff category only from 28/07/2020 till January 2021, by withdrawing interest and DPC levied, if any. In their order no 1/2023/793 dt. 09.03.2023.
170 of 2023
Completed
301 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Swastika Infra-Logic (India) Pvt. Ltd. for directing MSEDCL to Comply Hon. CGRF order in respect of consumer M/s. Swastika Infra-Logic (India) Pvt. Ltd. Consumer No. 128019008040 Under Jalgaon Circle, MSEDCL Jalgaon.
183 of 2023
Completed
302 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ms. Sujata Prasanna Soparkar against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 27 June 2022 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 42 of 2022 and Order dated 17 October 2022 passed by the Ld. Appellate Authority, Chembur in Appeal No. 4 of 2019.
185 of 2023
Completed
303 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. The Grand Jalsa for non-compliance of Order passed by Hon’ble Electricity Ombudsman, MSEDCL, Akola Zone, Akola in Case No. 04 of 2023.
188 of 2023
Completed
304 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
Completed
305 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of CGRF Amaravati Order dated 27 May, 2022.
223 of 2022
Completed
306 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Mahagaon Yawatmal Highways Private Limited seeking compliance of CGRF Amaravati Order dated 27 May, 2022 and Order dated 18 August, 2022.
243 of 2022
Completed
307 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited. And Interlocutory Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
151 of 2023 & I.A. No. 45 of 2023
Completed
308 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Infosys Limited (SEZ) under Section 86(1)(c) of the Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on M/s. Infosys Ltd. (SEZ). And Interlocutory Application of M/s Infosys Ltd. (SEZ) seeking urgent listing of Petition and interim directions in Case No. 177/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
177 of 2023 & I.A. No. 55 of 2023
Completed
309 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on Ultra Tech Cement Ltd. And Interlocutory Application of Ultra Tech Cement Ltd. and ReNew Surya Spark Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 186 of 2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
186 of 2023 & I.A. No. 58 of 2023
Completed
310 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and wheeling losses by Maharashtra State Electricity Distribution Company Ltd. on M/s Saarloha Advanced Materials Pvt. Ltd. And Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. and Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 187/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
187 of 2023 & I.A. No. 57 of 2023
Completed
311 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & M/s Huoban Energy 1 Private Limited under Section 86(1)(c) of the Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and wheeling losses by Maharashtra State Electricity Distribution Company Ltd on M/s Saarloha Advanced Materials Pvt. Ltd.
196 of 2023
Completed
312 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
313 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
314 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
315 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
316 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa& Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
317 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
318 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
319 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
320 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Navi Mumbai Cold Storage Owners Welfare Association seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
98 of 2023
Completed
321 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maha Coldstorage Association C/o Ecofresh Cold Storage & Warehousing Pvt Ltd. seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
99 of 2023
Completed
322 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31st March 2023 in Case No. 226 of 2022 in the matter of final True-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional True Up of ARR of FY 2022-23 and Revised Tarff and Projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
Completed
323 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Association of Plant Tissue Culture Industries for proper Tariff Categorization of the Plant Tissue Culture Units, which are the integral part of the Agriculture Category alike Nursery and Horticulture (in LT/HT Agricultural Category). In order to stop improper LT-IV C and HTV B Tariff Application, and with reference to the Hon’ble Commission latest concerned Orders in Case No. 226 of 2022.
121 of 2023
Completed
324 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Ltd. seeking Review of Order dated 31st March 2023 in Case No. 227 of 2022 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional truing-up of ARR of FY 2022-23 and revised tariff for FY 2023-24 and FY 2024-25 and provisional tariff for Bhusawal Unit No. 6
132 of 2023
Completed
325 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
Completed
326 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
Completed
327 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
Completed
328 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order in Case No. 239 of 2022 dated 31st March, 2023 for Truing-up of Intra-State Transmission System Tariff (InSTS) for FY 2020-21 and FY 2021-22 and determination of revised InSTS Tariff for FY 2023-24 and FY 2024-25.
95 of 2023
Completed
329 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Jaigad Powertransco Limited (JPTL) seeking review of the Order in Case No. 213 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
96 of 2023
Completed
330 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Adani Transmission (India) Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 238 of 2022.
100 of 2023
Completed
331 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 and Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 237 of 2022.
101 of 2023
Completed
332 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. in respect of Order dated 31st March, 2023 notified by Hon’ble Commission in Case No. 232 of 2022 in the matter of Petition of MSETCL for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20 to FY 2021-22, Provisional Truing-up of Aggregate Revenue Requirement for FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25.
137 of 2023
Completed
333 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35. and Application of The Tata Power Company Limited (Distribution) seeking urgent listing.
39 of 2023 & I.A. No. 56 of 2023
Completed
334 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
Completed
335 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Completed
336 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
I.A. No. 60 of 2023 in Case No. 190 of 2023
Completed
337 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
Rescheduled on Friday 06/October/2023 10:30 AM
338 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Rescheduled on Friday 06/October/2023 10:30 AM
339 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
Rescheduled on Tuesday 10/October/2023 10:30 AM
340 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
Rescheduled on Tuesday 10/October/2023 10:30 AM
341 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
Postponed till further notice
342 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
Postponed till further notice
343 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
Postponed till further notice
344 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
Postponed till further notice
345 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT). And Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023.
148 of 2023 & I.A. No. 52 of 2023
Postponed till further notice
346 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges. And Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
179 of 2023 & I.A. No. 53 of 2023
Postponed till further notice
347 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges. And Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
180 of 2023 &I.A. No. 54 of 2023
Postponed till further notice
348 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
Postponed till further notice
349 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanshtha Ltd. in the matter of (i) Breach of Distribution Open Access Regulations 2016. (ii) Breach of Practice Directions dated 8 March 2017. (iii) Excess levy and recovery of Wheeling Charges & Transmission Charges. (iv) Breach of A.T.E.’s order dated 06-10-2022 in Appeal No. 20 of 2019.
72 of 2023
Completed
350 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(b) read with Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 and under various Power Purchase Agreements, as enumerated below, seeking compensation on account of occurrence of Change in Law events.
73 of 2023
Completed
351 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SJVN LTD under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
Completed
352 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86 (1) (e) and Section 86 (1) (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 22.07.2022 (signed on 03.08.2022), seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change in Law event.
75 of 2023
Completed
353 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
Completed
354 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
Completed
355 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing and interim directions in Case No. 187/AD/2023.
I.A. No. 57 of 2023 in Case No. 187 of 2023
Completed
356 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. seeking urgent listing and interim directions in Case No. 186/AD/2023.
I.A. No. 58 of 2023 in Case No. 186 of 2023
Completed
357 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing in Case No. 56/AD/2023.
I.A. No. 59 of 2023 in Case No. 56 of 2023
Completed
358 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
Completed
359 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
Completed
360 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Regulation 20 of the MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
68 of 2023
Completed
361 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Vayunandana Power Limited requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 15.02 of the energy purchase agreement dated 22.09.2008 entered between the petitioner and the respondent.
69 of 2023
Completed
362 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Greta Energy Limited under regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
70 of 2023
Completed
363 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
71 of 2023
Completed