Move Back

Hearing

S.No. Schedule Description Status Attachments
1 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 8 January 2024 in Case No. 181 of 2023 in the matter of non-compliance of Regulation 22.14 and 25.2 of the MERC (Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 regarding installation of power quality meters and Mechanism for Automatic Compensation.
12 of 2024
Scheduled
2 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Rishabh Enterprises for non-compliance of CGRF Order in Complaint No. 66 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
22 of 2024
Scheduled
3 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under Section 86 of the EA 2003 before the MERC for (i) an in-principle approval of “Change in Law” and (ii) seeking an appropriate mechanism for appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events in terms of Article 12 of the PPA dated 21.08.2019 between Petitioner and Respondent along with carrying cost and interest on carrying cost.
23 of 2024
Scheduled
4 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between MSEDCL and Indian Railways qua non payment of Cross Subsidy Surcharge (CSS) and Additional Surcharge (ASC) as directed under the MERC order dated 21.12.2018 and 05.09.2019 passed in Case No. 149 of 2017 and Case No. 154 of 2019 respectively.
24 of 2024
Scheduled
5 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited–Distribution under Section 86 of the EA, 2003 for adjudication of dispute between TPC-D and Indian Railways for non-payment of outstanding dues including fixed charges as well as cross subsidy surcharge in terms of the Order dated 05.09.2019 passed in Case No. 154 of 2019.
70 of 2024
Scheduled
6 Fri 13/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking amendments in existing Regulations for establishing and operating wind-solar-thermal hybrid power plant in line with the National Wind-Solar Hybrid Scheme, 2018 and the MoP scheme for Flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power.
246 of 2023
Scheduled
7 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16. And Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17. And Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18. Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 31st May, 2024. IN Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
Scheduled
8 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Garware Technical Fibres Limited (GTFL) Intervention Application in Case No. 372 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.)
110 of 2024
Scheduled
9 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 323 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16.)
111 of 2024
Scheduled
10 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 324 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17.)
112 of 2024
Scheduled
11 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Supreme Industries Limited (TSIL) Intervention Application in Case No. 372 of 2018 (Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18.)
113 of 2024
Scheduled
12 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant. And Interlocutory Application Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking amendments of pleadings in the petition filed by the petitioner seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
233 of 2023 & IA. No. 1 of 2024
Scheduled
13 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for determination and approval of provisional Tariff for Bhusawal Unit 6 (1 X 660 MW) for FY 2023-24 and FY 2024-25.
236 of 2023
Scheduled
14 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
Preponed and Rescheduled on Tue 13/August/2024 10:30 AM
15 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Pravin D. Thakkar for non-compliance of Electricity Ombudsman (Mumbai) Order dated 18 October, 2023.
241 of 2023
Scheduled
16 Tue 10/09/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
242 of 2023
Scheduled
17 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
Scheduled
18 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Supercraft Foundry Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
51 of 2024
Scheduled
19 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Supercraft Foundry Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
52 of 2024
Scheduled
20 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jupiter Lifeline Hospitals Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
53 of 2024
Scheduled
21 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jupiter Lifeline Hospitals Limited under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
54 of 2024
Scheduled
22 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jathar Textiles Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
55 of 2024
Scheduled
23 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
56 of 2024
Scheduled
24 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
57 of 2024
Scheduled
25 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Ascent Hotels Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
75 of 2024
Scheduled
26 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Mahabal Foundries Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
76 of 2024
Scheduled
27 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Mahabal Metals Pvt. Ltd. under Sections 42(3), 42(4) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period April-21 up till May 2023 with interest.
77 of 2024
Scheduled
28 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period October 2020 up till May 2023 with interest.
232 of 2023
Scheduled
29 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
Scheduled
30 Fri 23/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
Scheduled
31 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW. And Petition of Mr. Sudhir Sukharup Budhay for interim Order for “Grid Support Charges” (GSC) Solar Generators above 10 KW & Below 1 MW.
176 of 2023 & IA. No. 26 of 2024
Scheduled
32 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 seeking declaration of Change in Law in respect of revision in the Fees for Consent to Operate notified vide Notification dated 25.08.2011 issued by the MPCB, GoM and levy of Add-on charges by WCL for supply of coal.
224 of 2023
Scheduled
33 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of National Highway Authority of India Through its Project Director Bhausaheb S Salunke for Non-compliance of the Order dated 06.03.2023 passed by Consumer Grievance Redressal Forum, Nashik in Complaint No.2481/ 2022.
229 of 2023
Scheduled
34 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Pushkaraj Ispat (India) LLP for Non-compliance of CGRF Nasik Order dated 18/07/2023 in Case No. 06 of 2022-23.
230 of 2023
Scheduled
35 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for Clarifications on “Grid Interactive Roof Top Amendment 2023” and “DOA (Second Amendment) 2023”
231 of 2023
Scheduled
36 Tue 20/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
Scheduled
37 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MEGC, 2020.
5 of 2024
Scheduled
38 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Scheduled
39 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited seeking in-principle declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 04.07.2023.
215 of 2023
Scheduled
40 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kasturi Electricals & Engineering for approval of ‘Change in Law’ on account of increase in the rate of GST from 5% to 12 % as per Ministry of Finance, Government of India notification dated 30 September 2021.
222 of 2023
Scheduled
41 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & IA. No. 23 of 2021
Scheduled
42 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
Scheduled
43 Tue 13/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
Scheduled
44 Fri 09/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
Rescheduled on Tue 20/August/2024 10:30 AM
45 Fri 09/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
Rescheduled on Fri 23/August/2024 10:30 AM
46 Fri 09/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
Rescheduled on Tue 10/September/2024 10:30 AM
47 Fri 09/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 8 January 2024 in Case No. 181 of 2023 in the matter of non-compliance of Regulation 22.14 and 25.2 of the MERC (Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 regarding installation of power quality meters and Mechanism for Automatic Compensation.
12 of 2024
Rescheduled on Fri 13/September/2024 10:30 AM
48 Fri 09/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
Rescheduled on Tue 13/August/2024 10:30 AM
49 Fri 02/08/2024 10:30:00 AM
e-Public Hearing
Inviting Comments on Application of the Tata Power Company Ltd.-Transmission for amendment of Transmission licence under section 18 of the electricity Act, 2003.
13 of 2024
Scheduled
50 Fri 02/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under the Energy Banking Agreement dated 29 June 2022 executed between MSEDCL and Saranyu Power Trading Pvt. Ltd for banking of energy.
122 of 2023
Scheduled
51 Fri 02/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Ltd. against MSEDCL under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12%. And Interlocutory Application of Energy Efficiency Services Limited (EESL) for Amendment of Petition in Case No. 150/AD/2023.
150 of 2023 & IA. No. 6 of 2024
Scheduled
52 Fri 02/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
Scheduled
53 Fri 02/08/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Kreate Energy (I) Pvt. Ltd. under Section 94 (1) f of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 for review of the Order dated 27.09.2023 passed by the Hon’ble Commission in Case No. 162/AD/2022 seeking compensation from Kreate Energy India Pvt. Ltd. (KEIPL) (Petitioner herein) for the alleged additional power purchase cost incurred in the months from April, 2022 to June, 2022.
221 of 2023
Scheduled
54 Fri 26/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers against MSEDCL seeking appropriate relief to stop levying wheeling charges, transmission charges, export unit charges and other operating charges upon the Petitioner for being a power Generator and wheeling power to 220 kV EHV pooling substation through the 33 kV common evacuation line under Open Access.
194 of 2023
Scheduled
55 Fri 26/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. seeking directions against MSEDCL for correctly applying open Access permission for Captive use.
198 of 2023
Scheduled
56 Fri 26/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on Adoption of Tariff for Long Term Procurement of 1468 MW Firm and Dispatchable Renewable Energy Power from Grid Connected Renewable Energy Power Projects (FDRE) with Energy Storage Systems Selected by SJVN under Section 63 of the Electricity Act 2003 for Meeting the other Renewable Purchase Obligations.
82 of 2024
Scheduled
57 Fri 26/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16. And Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17. And Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18. Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 31st May, 2024. IN Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
Rescheduled on Tue 10/September/2024 10:30 AM
58 Tue 23/07/2024 11:00:00 AM
e-Public Hearing
Petition of Khare and Tarkunde Green Energy Private Limited (KTGEPL) for determination of Project Specific Tariff for Isapur Hydro Electric Project of capacity 4 MW (2 x 2 MW) located on Right Bank Canal of Isapur Dam at village Kadapdev, Tal Kalamnuri, Dist Hingoli."
59 of 2024
Completed
59 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kukreja Enterprises for dispute resolution filed under Section 86 (1) (f) of the Electricity Act 2003, read with Regulations 92, 93 and 94 of the MERC Regulations 2004 petition seeking Order for payment of Principal / LPS Sum
40 of 2024
Completed
60 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 11 of the Electricity Act, 2003 read with Section 86(1)(h) and 86(1)(k) of the Electricity Act, 2003 along with Regulation 101 and 102 of the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations 2020 including amendments thereto and all enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission, thereby seeking this Hon’ble Commission to consider relaxation/ amendment/ modification in Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations 2020 for enabling power sale by generator.
41 of 2024
Rescheduled on Fri 17/May/2024 10:30 AM
61 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited for seeking relaxation through Amendment/Modifications to Regulation 50 (Provisions related to GCV of Coal in Computation of Energy Charge Rate), Regulation 47.2 (O&M Charges for New Stations) and Regulation 32 (Interest on Working Capital) of MERC (Multi Year Tariff) Regulations 2019.
42 of 2024
Completed
62 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. N.R.C. Limited for non-compliance of CGRF Kalyan Order dated 08/11/2023 in Case No. K/E/081 of 2022 of M/s. N.R.C. Ltd, Kalyan in the matter of billing dispute
43 of 2024
Completed
63 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusawal, Chandrapur, Khaparkheda and Nashik. And Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking impleadment of MSEDCL as Respondent and early hearing of Case No. 167/MP/2023.
167 of 2023 & I.A No. 21 of 2024
Completed
64 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Services Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act, 2003, MERC (Distribution Open Access) Regulations, 2016 and MERC (Conduct of Business) Regulations, 2004 seeking adjudication of disputes between Petitioner and Respondent in relation to payment of outstanding dues to the Petitioner for sale of wind energy to the Respondent during the period 01.04.2015 to 31.05.2015.
31 of 2024
Completed
65 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 96 of 2024 wherein only deviation sought was for combining of Thermal and Solar bids in procurement of 1600 MW Thermal Power and 5000 MW Solar power through tariff based competitive bidding for long term in the state of Maharashtra.
108 of 2024
Completed
66 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 108 of 2024. (Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 96 of 2024 wherein only deviation sought was for combining of Thermal and Solar bids in procurement of 1600 MW Thermal Power and 5000 MW Solar power through tariff based competitive bidding for long term in the state of Maharashtra.)
IA. No. 35 of 2024 in Case No. 108 of 2024
Completed
67 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 98 of 2024 seeking approval for procurement of additional green shoe capacity.
109 of 2024
Completed
68 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 109/MP/2024. (Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking further directions and clarification from the Hon. Commission in Order dated July 12, 2024 passed in Case No. 98 of 2024 seeking approval for procurement of additional green shoe capacity.)
IA. No. 36 of 2024 in Case No. 109 of 2024
Completed
69 Tue 23/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Nidar Utilities Panvel LLP for early hearing in Petition No. 107/AP/2024. (Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 7.00 MW Round the Clock (RTC) power for a period of 4 months i.e. from 1 August 2024 to 30 November 2024.)
IA. No. 34 of 2024 in Case No. 107 of 2024
Completed
70 Fri 19/07/2024 10:30:00 AM
e-Public Hearing
Suggestions/Objections on Shreehari Associates Private Limited Petition for determination of Project Specific Tariff for Mukane Hydro Electric Project(MHEP) (1*1.45MW) under Regulation 9.1 & 10.2 of MERC(Term and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019 and Section 62(1) (a) & 86 (1) (e) of the Electricity Act, 2003.
57 of 2023
Completed
71 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 seeking Consideration/Adjudication with respect to the interpretation being so adopted by both the parties herein on the implementation of the operative direction no. 2 of Order dated 28.11.2020 in Case No. 132 of 2020.
26 of 2024
Completed
72 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Pravin Dalpatbhai Thakkar seeking action against MSEDCL for non-compliance of Electricity Act-2003 (36 of 2003), Section No.42/5 and MEER Regulation No.8.15, 37 of 21.09.2020.
33 of 2024
Completed
73 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 8.03 of the Energy Purchase Agreement dated 30.04.2013entered between the Petitioner and the Respondent.
34 of 2024
Completed
74 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for under Regulation 21 of the MERC (terms and conditions for determination of re tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
35 of 2024
Completed
75 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S.F.M. for non-compliance of Order in complaint No: 209 of 2021 passed by Chief Electrical Inspector, Govt of Maharashtra, Mumbai.
36 of 2024
Withdrawn
76 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 86 (1) (k), 94 (1) (g) of the EA, 2003 read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, and Regulation 105 of MERC (MYT) Regulations, 2019 seeking certain clarification in respect of the Letter dated 06.10.2022 issued by this Hon’ble Commission.
39 of 2024
Completed
77 Fri 19/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Diwanka Energy Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
86 of 2024
Completed
78 Tue 16/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 seeking Consideration/Adjudication with respect to the interpretation being so adopted by both the parties herein on the implementation of the operative direction no. 2 of Order dated 28.11.2020 in Case No. 132 of 2020.
26 of 2024
Rescheduled on Fri 19/July/2024 10:30 AM
79 Tue 16/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Services Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act, 2003, MERC (Distribution Open Access) Regulations, 2016 and MERC (Conduct of Business) Regulations, 2004 seeking adjudication of disputes between Petitioner and Respondent in relation to payment of outstanding dues to the Petitioner for sale of wind energy to the Respondent during the period 01.04.2015 to 31.05.2015.
31 of 2024
Rescheduled on Tue 23/July/2024 10:30 AM
80 Tue 16/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Pravin Dalpatbhai Thakkar seeking action against MSEDCL for non-compliance of Electricity Act-2003 (36 of 2003), Section No.42/5 and MEER Regulation No.8.15, 37 of 21.09.2020.
33 of 2024
Rescheduled on Fri 19/July/2024 10:30 AM
81 Tue 16/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Manas Agro Industries and Infrastructure Limited for requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 8.03 of the Energy Purchase Agreement dated 30.04.2013entered between the Petitioner and the Respondent.
34 of 2024
Rescheduled on Fri 19/July/2024 10:30 AM
82 Tue 16/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Diwanka Energy Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
86 of 2024
Rescheduled on Fri 19/July/2024 10:30 AM
83 Fri 12/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
Rescheduled on Friday 14/June/2024 10:30 AM
84 Fri 12/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Rishabh Enterprises for non-compliance of CGRF Order in Complaint No. 66 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
22 of 2024
Postponed till further notice
85 Fri 12/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under Section 86 of the EA 2003 before the MERC for (i) an in-principle approval of “Change in Law” and (ii) seeking an appropriate mechanism for appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events in terms of Article 12 of the PPA dated 21.08.2019 between Petitioner and Respondent along with carrying cost and interest on carrying cost.
23 of 2024
Postponed till further notice
86 Fri 12/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between MSEDCL and Indian Railways qua non payment of Cross Subsidy Surcharge (CSS) and Additional Surcharge (ASC) as directed under the MERC order dated 21.12.2018 and 05.09.2019 passed in Case No. 149 of 2017 and Case No. 154 of 2019 respectively.
24 of 2024
Postponed till further notice
87 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited under Section 86 of the Electricity Act, 2003 read with clause 5.7.2 of the competitive bidding guidelines, 2017 and article 9 of Power Purchase Agreement dated 03.01.2020, seeking in-principle declaration of issuance of working group report, 2022 issued by Central Electricity Authority as a change in law event.
16 of 2024
Completed
88 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited under Section 86 of the Electricity Act, 2003 read with clause 5.7.2 of the competitive bidding guidelines, 2017 and article 9 of Power Purchase Agreement dated 27.07.2018, seeking in-principle declaration of issuance of working group report, 2022 issued by Central Electricity Authority as a change in law event.
17 of 2024
Completed
89 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
Completed
90 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Liberty Oil Mills for Non-Compliance of MERC Order dated 26/05/2021 in Case No. 25 of 2021 in the matter of “allowing revision in contract demand up to 2 occasions to HT Industrial and HT Commercial consumers and up to 1 occasion to LT industrial and LT commercial consumers in a billing cycle up to 31 March, 2022.
18 of 2024
Completed
91 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Yutika Engineering for non-compliance of CGRF Order in Complaint No. 65 of 2022 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
21 of 2024
Completed
92 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Limited (Erstwhile Adani Power Maharashtra Ltd.) for consequent Orders to be passed pursuant to the Order of the Hon’ble Appellate Tribunal dated 17.10.2023 in Appeal No. 130 of 2018.
15 of 2024
Completed
93 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
SUO- MOTU HEARING ON REVIEW OF STATUS OF COMPLIANCES OF VARIOUS DIRECTIONS ISSUED BY THE COMMISSION IN ITS ORDER DATED 31 MARCH 2023 IN CASE NO.226 OF 2022
4/SM/2024
Completed
94 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
Completed
95 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. seeking compliance of CGRF, MSEDCL Pune Order dated 11 September 2023.
244 of 2023
Completed
96 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (KVTL) seeking ex-parte ad-interim relief under Section 94(2) of the EA, 2003 read with Regulation 33 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 in Case No. 44/AD/2024 (Petition of KVTL seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.)
I.A No. 33 of 2024 in Case No. 44 of 2024
Completed
97 Tue 09/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (KVTL) under Section 86 (1) (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Articles 11 and 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.
44 of 2024
Completed
98 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification No.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification No.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification No.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Navindagi and Goudgaon Budruk, Taluka Akkalkot, District Solapur, Maharashtra.
10 of 2024
Rescheduled on Tue 02/July/2024 10:30 AM
99 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 08th January 2024 passed in Case No. 181 of 2023 in the matter of non-compliance of regulation 22.14 & 25.2 of the MERC (supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 regarding installation of power quality meters and mechanism for automatic compensation.
12 of 2024
Rescheduled on Tue 14/May/2024 10:30 AM
100 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Limited (Erstwhile Adani Power Maharashtra Ltd.) for consequent Orders to be passed pursuant to the Order of the Hon’ble Appellate Tribunal dated 17.10.2023 in Appeal No. 130 of 2018.
15 of 2024
Rescheduled on Tue 09/July/2024 10:30 AM
101 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
SUO- MOTU HEARING ON REVIEW OF STATUS OF COMPLIANCES OF VARIOUS DIRECTIONS ISSUED BY THE COMMISSION IN ITS ORDER DATED 31 MARCH 2023 IN CASE NO.226 OF 2022
4/SM/2024
Rescheduled on Tue 09/July/2024 10:30 AM
102 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
Rescheduled on Tue 09/July/2024 10:30 AM
103 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. seeking compliance of CGRF, MSEDCL Pune Order dated 11 September 2023.
244 of 2023
Rescheduled on Tue 09/July/2024 10:30 AM
104 Fri 05/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (KVTL) seeking ex-parte ad-interim relief under Section 94(2) of the EA, 2003 read with Regulation 33 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 in Case No. 44/AD/2024 (Petition of KVTL seeking, inter-alia, extension of Scheduled Commercial Operation Date due to various Force Majeure, appropriate relief for Change in Law events and consequential reliefs on account of delay due to the Force Majeure and Change in Law events.)
I.A No. 33 of 2024 in Case No. 44 of 2024
Rescheduled on Tue 09/July/2024 10:30 AM
105 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shrisai Medicare Services Pvt. Ltd. non-compliance of Electricity Ombudsman Mumbai Order dated 27/04/2020 in Rep. No. 06/2020 of M/s. Shrisai Medicare Services Pvt Ltd, Pune in the matter of billing dispute.
6 of 2024
Completed
106 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Dhuri Ind. Complex Premises Co-operative Industrial Society Limited against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 10 August 2020 passed by the Ld. CGRF, Kalyan in Grievance No. K/E/1657/2013 OF 2019-20 AND Order dated 28 December 2022 passed by the Ld. CGRF, Vasai in Case No. 077 of 2022.
7 of 2024
Completed
107 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification no.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification no.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification no.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Katgaon, Taluka Tuljapur, District Osmanabad, Maharashtra.
8 of 2024
Completed
108 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification no.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification no.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification no.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 5 MW solar power project located at village Vadgaon, Taluka Kallam, District Osmanabad, Maharashtra.
9 of 2024
Completed
109 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sunstream Green Energy One Private Limited (formerly known as Eirene Navals System Private Limited) under Section 86(1) of the EA, 2003 for approval of change in law and seeking compensation against the additional expenditure incurred on account of increase in rate of goods and service tax (GST) from 5% to 12% on renewable energy devices and parts for their manufacture including solar modules, solar inverters vide notification No.8/2021- integrated tax (rate) dated 30.09.2021 of Central Government, notification No.8/2021- central tax (rate) dated 30.09.2021 of Central Government and notification No.08/2021- state tax (rate) of finance department-Government of Maharashtra in terms of article 9 of the Power Purchase Agreement executed between Sunstream Green Energy One Private Limited and MSEDCL inter-alia for generation and supply from 10 MW solar power project located at village Navindagi and Goudgaon Budruk, Taluka Akkalkot, District Solapur, Maharashtra.
10 of 2024
Completed
110 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Diwanka Energy Private Limited for urgent listing in Case No. 86/MP/2024. (Petition of Diwanka Energy Private Limited seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the EA, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25. As well as for compliance of the MERC Mid-Term Review Order in Case No. 226 of 226 dated 31 March 2023 for MSEDCL for Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.)
I.A No. 30 of 2024 in Case No. 86 of 2024
Completed
111 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for deviations in standard bidding documents for long term procurement of 1600 MW thermal power and 5000 MW solar power in the state of Maharashtra.
96 of 2024
Completed
112 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for bidding documents for procurement of 1,000 MW (up to 2000MW under green shoe option) energy storage capacity for 40 years from ISTS/InSTS connected pumped Hydro Storage Plant/s through competitive bidding.
98 of 2024
Completed
113 Tue 02/07/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Urjankur Shree Datta Power Company Limited challenging arbitrary reduction of the tenure of the Energy Purchase Agreement dated 21 June 2013 by MSEDCL.
202 of 2023
Completed
114 Fri 28/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) under Section 86, including 86(1)(b), of the Electricity Act, 2003 read with other provisions of the said Act. And the Order dated 26.09.2023 in Appeal No. 516 of 2023 passed by the Hon’ble Appellate Tribunal for Electricity. And The termination/ discontinuance of the Standby Arrangement between Adani Electricity Mumbai Limited-Distribution and Maharashtra State Distribution Company Limited with effect from October, 2021, and other consequential relief. And Breach of the standby arrangement by MSEDCL prior to its termination by the Petitioner, AEML-D in October, 2021 and other consequential relief;
1 of 2024
Postponed till further notice
115 Fri 28/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval to sign power purchase agreement (PPA) for procurement of power from Kakrapar unit – 3 & 4 and existing generating stations and the allocation of power of 378.67 MW from NPCIL’s Kakrapar Atomic Power Project – unit 3 and 4 (2 x 700 MW) vide Ministry of Power, Govt. of India letter of allocation dated 09.08.2010. and seeking approval for procurement of additional power during the current control period.
2 of 2024
Postponed till further notice
116 Fri 28/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rizwan Ice & Cold Storage against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 29 August 2023 passed by the Ld. Consumer Grievance Redressal Forum, Bhandup in Case No. 98 of 2022.
3 of 2024
Postponed till further notice
117 Fri 28/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MEGC, 2020.
5 of 2024
Postponed till further notice
118 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shriniwas Engineering Auto Comp. Pvt. Ltd. for non-compliance of CGRF Pune Order dated 11/09/2023 in Case No. 77/2022.
244 of 2023
Completed
119 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balaji International for non-compliance of Electricity Ombudsman Order dated 15/09/2021 in Rep. No. 57 of 2021.
245 of 2023
Completed
120 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking in line with the national wind-solar hybrid scheme, 2018 and the ‘scheme for flexibility in generation and scheduling of thermal/hydro power stations through bundling with renewable energy and storage power, 2022 seeking appropriate direction(s) and/or direction(s) from this Hon’ble Commission for framing appropriate regulations/amendments in existing regulations for establishing, operating, scheduling and commercial settlement of wind-solar-thermal hybrid power plant to be setup for utilisation under open access by the consumer in the state of Maharashtra and in the interim, issue appropriate direction to MSEDCL and MSETCL to allow connectivity to the members of captive power producer association with their system for operating wind-solar-thermal hybrid power plant in the state of Maharashtra.
246 of 2023
Completed
121 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
Rescheduled on Friday 14/June/2024 10:30 AM
122 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Industrial Township Limited (MITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement.
214 of 2023
Completed
123 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2015-16. And Petition filed by Bhadreshwar Vidyut Private Limited against wrongful imposition of CSS and Additional Surcharge by the MSEDCL on the captive users of M/s Bhadreshwar Vidyut Private Limited availing Open Access for the FY 2016-17. And Petition filed by Bhadreshwar Vidyut Private Limited in accordance with the Order passed by this Hon’ble Commission in Case No. 175 of 2018 dated 22.10.2018 against unlawful action of MSEDCL in issuing the letter dated 20.12.2018, thereby maintaining its stand as was communicated through their earlier letter dated 15.10.2018 thereby making the captive users of the Petitioner liable to pay Cross Subsidy Surcharge and Additional Surcharge for the power procured for captive use in FY 2017-18. Case No. 323, 324 & 372 of 2018 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 31st May, 2024. IN Appeal No. Appeal No. 89 of 2019, 103 of 2019 and 90 of 2019. [Directions to the Commission therein.]
323, 324 of 2018 & 372 of 2018 (Re-opened Case)
Completed
124 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application for urgent listing of the Petition No. 202/AD/2023
I.A. No. 25 of 2024 in Case No. 202 of 2023
Completed
125 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for Condonation of Delay and early hearing in Case No. 94/AP/2024.
I.A. No. 27 of 2024 in Case No. 94 of 2024
Completed
126 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 96/MP/2024.
I.A. No. 28 of 2024 in Case No. 96 of 2024
Completed
127 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 98/MP/2024.
I.A. No. 29 of 2024 in Case No. 98 of 2024
Completed
128 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of SEZ Bio-Tech Services Pvt Ltd – Manjari SEZ and SEZ Bio-tech Services Pvt Ltd – Hadapsar SEZ for urgent listing in Case No. 66/AP/2024.
IA No 31 of 2024 in Case No 66 of 2024
Scheduled
129 Tue 25/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Pvt. Ltd. – Manjari SEZ and M/s SEZ Bio-Tech Services Pvt. Ltd. - Hadapsar SEZ. for urgent listing in Case No. 92/AP/2024.
IA No 32 of 2024 in Case No 92 of 2024
Scheduled
130 Fri 21/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant. And Interlocutory Application Maharashtra State Electricity Transmission Company Ltd. (MSETCL) seeking amendments of pleadings in the petition filed by the petitioner seeking appropriate directions with timelines against M/s GMR Warora Energy Limited to handover the necessary land with all clearances to the Maharashtra State Electricity Transmission Company Limited for construction of 400/220 kV switchyard for evacuation arrangement for the Maharashtra State Electricity Distribution Company Limited share of 200 MW power from 2x300 MW thermal power plant.
233 of 2023 & IA. No. 1 of 2024
Postponed till further notice
131 Fri 21/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for determination and approval of provisional Tariff for Bhusawal Unit 6 (1 X 660 MW) for FY 2023-24 and FY 2024-25.
236 of 2023
Postponed till further notice
132 Fri 21/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Pravin D. Thakkar seeking non compliance of Electricity Ombudsman (Mumbai) Order dated 18 October, 2023.
241 of 2023
Postponed till further notice
133 Fri 21/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
242 of 2023
Postponed till further notice
134 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of National Highway Authority of India Through its Project Director Bhausaheb S Salunke for Non-compliance of the Order dated 06.03.2023 passed by Consumer Grievance Redressal Forum, Nashik in Complaint No.2481/ 2022.
229 of 2023
Postponed till further notice
135 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Pushkaraj Ispat (India) LLP for Non-compliance of CGRF Nasik Order dated 18/07/2023 in Case No. 06 of 2022-23.
230 of 2023
Postponed till further notice
136 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for Clarifications on “Grid Interactive Roof Top Amendment 2023” and “DOA (Second Amendment) 2023”
231 of 2023
Postponed till further notice
137 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period October 2020 up till May 2023 with interest.
232 of 2023
Postponed till further notice
138 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) for non-compliance of provisions of EA, 2003 Particularly Sections 42, 45, 46, 86, 142 & 146 of the EA, 2003 Read With Regulations 14, 32 & 37 of the MERC (Distribution Open Access) Regulations, 2016 read with MERC Practice Directions (Processing Of Open Access Applications) dated March 8, 2017 by MSEDCL for refund of Amounts on account of adoption of incorrect billing methodology for FY 2016-17 to FY 2023-2024 & seeking directions against MSEDCL for non-compliance of Various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity.
243 of 2023
Postponed till further notice
139 Fri 14/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S K Veerabhadrappa & Co. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period Mar-21 up till May 2023 with interest.
25 of 2024
Postponed till further notice
140 Fri 14/06/2024 10:30:00 AM
e-Public Hearing
Suggestions/Objections on Shreehari Associates Private Limited Petition for determination of Project Specific Tariff for Mukane Hydro Electric Project(MHEP) (1*1.45MW) under Regulation 9.1 & 10.2 of MERC(Term and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019 and Section 62(1) (a) & 86 (1) (e) of the Electricity Act, 2003.
57 of 2023
Rescheduled on Fri 19/July/2024 10:30 AM
141 Tue 11/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Kreate Energy (I) Pvt. Ltd. under Section 94 (1) f of the Electricity Act, 2003 read with Order 47 Rule 1 of the Code of Civil Procedure, 1908 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 for review of the Order dated 27.09.2023 passed by the Hon’ble Commission in Case No. 162/AD/2022 seeking compensation from Kreate Energy India Pvt. Ltd. (KEIPL) (Petitioner herein) for the alleged additional power purchase cost incurred in the months from April, 2022 to June, 2022.
221 of 2023
Postponed till further notice
142 Tue 11/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kasturi Electricals & Engineering under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
222 of 2023
Completed
143 Tue 11/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) under Section 86 of the Electricity Act, 2003 read with Article 13 (“Change in Law”) of the Power Purchase Agreement dated 08.09.2008 for 1320MW and Article 10 (“Change in Law”) of the Power Purchase Agreements dated 31.03.2010, 09.08.2010 and 16.02.2013 of 1200 MW, 125 MW and 440 MW respectively executed between APML and MSEDCL in respect of revision in the Fees for Consent to Operate notified vide Notification dated 25.08.2011 by the Maharashtra Pollution Control Board, Government of Maharashtra and levy of Add-on charges by Western Coalfields Limited for supply of coal.
224 of 2023
Completed
144 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Completed
145 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Chetan Purushottam Patel under provisions of Electricity Act, 2003 more particularly section 86(1)(e) and section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
212 of 2023
Completed
146 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Jignesh Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
216 of 2023
Completed
147 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jayesh Purushottam Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
217 of 2023
Completed
148 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Purushottam Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
218 of 2023
Completed
149 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vallabhbhai Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vallabhbhai Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
219 of 2023
Completed
150 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vipul Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vipul Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
220 of 2023
Completed
151 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Satyen Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Satyen Vallabh Patel and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
223 of 2023
Completed
152 Tue 04/06/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ultratech Cement Limited under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of the Commission’s common Order dated 27 December 2023 in Case No. 151 of 2023 & Others, by Maharashtra State Electricity Distribution Company Limited.
19 of 2024
Completed
153 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27 December 2023 passed by the Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against MSEDCL.
11 of 2024
Completed
154 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
Completed
155 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited Petition seeking Review of Order dated 31 March 2023 in Case No. 226 of 2022 in the matter of final true-up of aggregate revenue requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional true up of ARR of FY 2022-23 and revised tariff and projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
Completed
156 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra. And Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023. And Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition. And Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023
Completed
157 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shivam Oil Industries for non-compliance of CGRF order in complaint No: 79 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
210 of 2023
Completed
158 Fri 31/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 04.07.2023, seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change In Law event.
215 of 2023
Completed
159 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SJVN Limited seeking directions to MSEDCL for payment of outstanding amounts in terms of energy purchase agreements executed between the parties and seeking action against MSEDCL under Section 142,146 & 149 of the Electricity Act, 2003.
74 of 2023
Completed
160 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking in-Principle Declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 22 July, 2022 which was signed on 3 August, 2022.
75 of 2023
Completed
161 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
Completed
162 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
Rescheduled till further notice
163 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for deferment of interest on security deposit to be paid to the consumers of the Petitioner.
209 of 2023
Completed
164 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Industrial Township Limited (MITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement.
214 of 2023
Completed
165 Tue 28/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
Completed
166 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
Completed
167 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
168 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Morries Energy Ltd. regarding non-adjustment of Open Access units for September 2021.
12 of 2023
Completed
169 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking directions under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement (EBA) dated 29 June 2022 executed between MSEDCL and SPTPL for banking of Energy.
122 of 2023
Completed
170 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Schreiber Dynamics Dairies Pvt. Ltd. for not allowing Power Factor Incentive on Open Access charges by the Respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under Section 142, 146 & 149 of Electricity Act, 2003.
178 of 2023
Completed
171 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Harshad Sheth seeking for an appropriate orders and directions regarding validity of T.O. Circular No. C.E. (Dist.)/D-III/NSC/30011 dated 20 December 2018 issued by MSEDCL and subsequent modifications made thereto.
182 of 2023
Completed
172 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
Withdrawn
173 Tue 21/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
Completed
174 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Completed
175 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
176 of 2023
Completed
176 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) against MSEDCL seeking compliance of the CGRF, Bhandup Orders in Case No. 42 dated 28/06/2021. And Interlocutory Application of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) for urgent hearing in Case No. 192/MP/2023.
192 of 2023 & I.A. No. 64 of 2023
Completed
177 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Application by Serum Institute of India Pvt. Ltd before the Commission to get the matter listed on the basis of the Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 passed in Appeal No. 46 of 2019.
210 of 2022
Completed
178 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017. Case No. 173 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 22.09.2022. IN Appeal No. 46 of 2019 directions to the Commission therein.)]
173 of 2017 (Re-opened Case)
Completed
179 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited – Generation under Section 11 of the Electricity Act, 2003 read with Section 86(1)(h) and 86(1)(k) of the Electricity Act, 2003 along with Regulation 101 and 102 of the Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations 2020 including amendments thereto and all enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission, thereby seeking this Hon’ble Commission to consider relaxation/ amendment/ modification in Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations 2020 for enabling power sale by generator.
41 of 2024
Completed
180 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MW ac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under ‘Mukhyamantri Saur Krushi Vahini Yojana’ as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.
148 of 2023
Completed
181 Fri 17/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Limited seeking an Order directing MSEDCL to pay Rs. 2,73,63,784 together with interest, due and payable in view of supply of electricity by it, along with such other and further reliefs as may be necessary.
155 of 2023
Completed
182 Tue 14/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking review of Order dated 08th January 2024 passed in Case No. 181 of 2023 in the matter of non-compliance of regulation 22.14 & 25.2 of the MERC (supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 regarding installation of power quality meters and mechanism for automatic compensation.
12 of 2024
Completed
183 Tue 14/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants. And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent. And Applications of Respondents for striking off their names from the list of Respondents. And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition. And Application of M/s. Asian Colour Coated Ispat Ltd. for change in the name of Respondent No. 97/ Applicant, M/s. Asian Colour Coated Ispat Ltd. to JSW Steel Coated Products Ltd. And Application of Tata Steel Limited Global Wires India Division for deletion of name from the main petition filed by Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking amendment to the Petition in respect of 100% CPP Unit Owners and urgent listing in Case No. 158/MP/2022.
158 of 2022 & Diary Nos. 242, 247, 256, 262, 266, 267 of 2022 and IA. Nos. 25, 29, 31, 34, 40, 45 of 2022 & IA. Nos. 47, 49, 72 of 2023 in Case No. 158 of 2022
Completed
184 Fri 10/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MW ac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under ‘Mukhyamantri Saur Krushi Vahini Yojana’ as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.
148 of 2023
Rescheduled on Fri 17/May/2024 10:30 AM
185 Fri 10/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Limited seeking an Order directing MSEDCL to pay Rs. 2,73,63,784 together with interest, due and payable in view of supply of electricity by it, along with such other and further reliefs as may be necessary.
155 of 2023
Rescheduled on Fri 17/May/2024 10:30 AM
186 Fri 10/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
Rescheduled on Tuesday 21/May/2024 10:30 AM
187 Fri 10/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
Rescheduled on Tuesday 21/May/2024 10:30 AM
188 Fri 10/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of FPEL MH1 Private Limited against MSETCL seeking extension of Grid Connectivity for a further period of 18 months i.e., from 30 November 2023 to 30 May 2025 and declaration of non-completion of 75 MW Solar Power Park within stipulated period.
225 of 2023
Rescheduled on Tuesday 28/May/2024 10:30 AM
189 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd, under Section 86 of the Electricity Act, 2003 and PPA dated 21.08.2019, seeking injunction against Maharashtra Electricity Distribution Company Ltd, from levying any penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
Completed
190 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Limited seeking relief for additional cost of transportation pursuant to the APTEL Judgment dated 21 October, 2022 in Appeal No. 148 of 2019.
84 of 2023
Completed
191 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Azure Power Thirty-Four Private Limited under Section 86 of the Electricity Act 2003 seeking an appropriate compensation for the Change in Law event, on account of Hon’ble the Supreme Court of India’s Order dated 19 April 2021 in Writ Petition (Civil) No. 838 of 2019, in terms of Article 9 of the Power Purchase Agreement dated 30 July 2018.
149 of 2023
Completed
192 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Ltd. against MSEDCL under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12%. And Interlocutory Application of Energy Efficiency Services Limited (EESL) for Amendment of Petition in Case No. 150/AD/2023.
150 of 2023 & IA. No. 6 of 2024
Completed
193 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusaval, Chandrapur, Khaperkheda and Nashik.
167 of 2023
Completed
194 Tue 07/05/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) under Section 86 (1) (b) of the Electricity Act, 2003 for approval of combined short term wind power procurement for the period 01.08.2023 to 31.07.2024.
168 of 2023
Completed
195 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Chetan Purushottam Patel under provisions of Electricity Act, 2003 more particularly section 86(1)(e) and section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
212 of 2023
Postponed till further notice
196 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Jignesh Vallabh Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
216 of 2023
Postponed till further notice
197 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jayesh Purushottam Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
217 of 2023
Postponed till further notice
198 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Purushottam Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
218 of 2023
Postponed till further notice
199 Tue 02/04/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vallabhbhai Laljibhai Patel under provisions of Electricity Act, 2003 more particularly Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mr. Vallabhbhai Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited and seeking directions against Maharashtra State Electricity Distribution Company Limited to comply with the terms of the Wind Energy Purchase Agreements entered into with the Petitioner.
219 of 2023
Postponed till further notice
200 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for deferment of interest on security deposit to be paid to the consumers of the Petitioner.
209 of 2023
Postponed till further notice
201 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shivam Oil Industries for non-compliance of CGRF order in complaint No: 79 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
210 of 2023
Postponed till further notice
202 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Rescheduled on Tuesday 23/January/2024 10:30 AM
203 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86 (1) (b), (e) and (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 04.07.2023, seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change In Law event.
215 of 2023
Postponed till further notice
204 Tue 26/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
Rescheduled on Fri 12/January/2024 10:30 AM
205 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. ICC Realty India Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
206 of 2023
Completed
206 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Eon Hinjewadi Infrastructure Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
207 of 2023
Completed
207 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Panchshil Infrastructure Holdings Pvt Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
208 of 2023
Completed
208 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Panchshil Corporate Park Pvt. Ltd. under Sections 42, 86(1)(f) and 142 of the Electricity Act, 2003 read with Regulations 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and the Practice Directions dated 08.03.2017 issued thereunder, for refund of excess wheeling and transmission charges levied & collected by the Respondent for the period September 2020 up till May 2023 with interest.
211 of 2023
Completed
209 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
Completed
210 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
Completed
211 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sunil Shantilal Agrawal for non-compliance of CGRF Order in complaint No: 20 of 2021 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
193 of 2023
Completed
212 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Gimatex Industries Pvt Ltd., & Ors. for early hearing in Case No. 242/MP/2023. Petition of Gimatex Industries Pvt Ltd., & Ors. for complying the order of CGRF issued in case No. 07/2023, 08/2023, 09/2023 and recalculating the bill of Petitioners for the period of April, May & June 2020 by applying fixed charges in the bill and there by calculating the applicable incentives and subsidies as per the Govt. direction issued from time to time and getting refund from MSEDCL for the differential amount with interest.
IA. No. 18 of 2024 in Case No. 242 of 2023
Completed
213 Fri 22/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of The Tata Power Company Limited – Generation for Urgent Hearing in Case No. 41/MP/2024. (Petition of The Tata Power Company Limited – Generation under Section 11 of the EA, 2003 read with Section 86(1)(h) and 86(1)(k) of the EA, 2003 along with Regulation 101 and 102 of the MERC (State Grid Code) Regulations 2020 including amendments thereto and all enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission, thereby seeking this Hon’ble Commission to consider relaxation/ amendment/ modification in MERC (State Grid Code) Regulations 2020 for enabling
IA. No. 19 of 2024 in Case No. 41 of 2024
Completed
214 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Mayur Naik against Unethical Billing Recovery and ASD Billed Amount for Consumer No – 160250946560 (BU 4637).
201 of 2023
Completed
215 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Urjankur Shree Datta Power Company Limited under Section 86 (1)(f) of the Electricity Act 2003 read with Regulations 14 and 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 having been aggrieved by the high handed and unilateral actions on part of the Respondent No.1, MSEDCL, in arbitrarily reducing the tenure of the Energy Purchase Agreement dated 21.06.2013 (hereinafter referred to as the EPA) and for seeking issuance of appropriate directions to the Respondent No.1 to abide by the provisions of the EPA in letter and spirit. A copy of the EPA dated 21.06.2013.
202 of 2023
Completed
216 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kumar Plasto Pack Industries for non-compliance of CGRF Kalyan Order dated 31/01/2022 in Case No. K/E/1813/2254 of 2021-22.
203 of 2023
Withdrawn
217 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Dinesh Manohar Sharma for Non-compliance of CGRF order in complaint No:19 OF 2021passed by CGRF, MSEDCL, Nashik Zone, Nashik.
204 of 2023
Completed
218 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed thereunder, seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
194 of 2023
Completed
219 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
Completed
220 Tue 19/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of EON Kharadi Infrastructure Private Limited (EON SEZ Phase I) and EON Kharadi Infrastructure Private Limited (EON SEZ Phase II) for early hearing in Case No. 38/MP/2024. (Petition of EON Kharadi Infrastructure Private Limited (EON SEZ Phase I) and EON Kharadi Infrastructure Private Limited (EON SEZ Phase II) for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase and for procuring Round the Clock (RTC) Renewable Energy (RE) power on long-term basis for the period from FY 2025-26 to FY 2045-46.)
IA. No. 17 of 2024 in Case No. 38 of 2024
Completed
221 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters and Developers (SPD) under the provisions of the Electricity Act, 2003 and more particularly Sections 30, 86(1)(a), 86(1)(c), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 read with Regulations framed thereunder, seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
194 of 2023
Rescheduled on Tuesday 19/March/2024 10:30 AM
222 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jai Shrikrishna Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 for approval of ‘Change in Law’ on account of financial/ commercial impact of the ‘Change in Law’ event i.e., increase in the rate of Goods and Services Tax from 5% to 12 % by way of Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 issued by Ministry of Finance, Government of India, in terms of Article 9 of the Power Purchase Agreement executed between the Petitioner and MSEDCL.
197 of 2023
Rescheduled on Tuesday 19/March/2024 10:30 AM
223 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Pvt. Ltd. under Section 42 and 86(1)(f) of the Electricity Act, 2003 read with MERC (Distribution of Open Access) Regulations, 2016, as amended from time to time, for seeking directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) for correctly applying open access permissions for captive use.
198 of 2023
Rescheduled on Friday 22/March/2024 10:30 AM
224 Fri 15/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited (TPGEL) under Section 86(1)(b), (c), (e) & (f) of the Electricity Act, 2003 read with Article 12 of Power Purchase Agreement dated 04.12.2020 seeking Introduction of the Working Group Report 2022 as a Change in Law Event.
200 of 2023
Rescheduled on Friday 22/March/2024 10:30 AM
225 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Vivek Laxman Pawar (Marathi Asmita samajik Sanstha) against MSEDCL seeking compliance of the CGRF, Bhandup Orders dated 28/06/2023.
191 of 2023
Completed
226 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) against MSEDCL seeking compliance of the CGRF, Bhandup Orders in Case No. 42 dated 28/06/2021. And Interlocutory Application of Mr. Shrikant Shripad Patki (Vashi Fantasia Business Park, Premises Co. Soc. Ltd.) for urgent hearing in Case No. 192/MP/2023.
192 of 2023 & I.A. No. 64 of 2023
Completed
227 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sunil Shantilal Agrawal for non-compliance of CGRF Order in complaint No: 20 of 2021 passed by CGRF, MSEDCL, Nashik Zone, Nashik.
193 of 2023
Completed
228 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of The Tata Power Company Limited (Distribution) for Urgent Listing and Hearing in Case No. 27/AP/2024. (Petition of The Tata Power Company Limited (Distribution) under Section 86 (1)(b) read with and Regulation 39 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for Short Term Power Purchase for Tata Power -D for April 2024 to June 2024.)
AI. No. 10 of 2024 in Case No. 27 of 2024
Completed
229 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Shah Promoters and Developers (SPD) for Urgent Listing in Case No. 37/AD/2024. (Petition of Shah Promoters and Developers (SPD) under Section 86 read with Section 94 read with Section 142 of the Electricity Act, 2003 read with Regulation 96 of The MERC (Conduct of Business) Regulations, 2004 against non-compliance of the Order dated February 13, 2023 of the Hon’ble Commission in Case No. 196 of 2022 by MSEDCL read with the relevant provisions of Electricity Act, 2003.)
IA. No. 14 of 2024 in Case No. 37 of 2024
Completed
230 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Jubilant Ingrevia Limited for Urgent Listing and Hearing in Case No. 29/AD/2024. Petition of Jubilant Ingrevia Limited under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited.
IA. No. 15 of 2024 in Case No. 29 of 2024
Completed
231 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Saarloha Advanced Materials Private Limited & Renew Bhanu Shakti Pvt. Ltd. for Urgent Listing and Hearing in Case No. 30/AD/2024. (Petition of M/s. Saarloha Advanced Materials Private Limited & Renew Bhanu Shakti Pvt. Ltd. under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) by MSEDCL).
IA. No. 16 of 2024 in Case No. 30 of 2024
Completed
232 Tue 12/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
Completed
233 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Sudhir Sukharup Budhay for dropping of “Grid Support Charges” (GSC) on Solar Generators Abve 10 KW & Below 1 MW expected after installation base in Maharashtra Reaches 2000 MW.
176 of 2023
Rescheduled till further notice
234 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Schreiber Dynamics Dairies Pvt. Ltd. for not allowing Power Factor Incentive on Open Access charges by the Respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under Section 142, 146 & 149 of Electricity Act, 2003.
178 of 2023
Rescheduled till further notice
235 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Harshad Sheth seeking for an appropriate orders and directions regarding validity of T.O. Circular No. C.E. (Dist.)/D-III/NSC/30011 dated 20 December 2018 issued by MSEDCL and subsequent modifications made thereto.
182 of 2023
Rescheduled till further notice
236 Tue 05/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of New Asian Infrastructure Development Pvt. Ltd. under Regulation 28 of the MERC (Transaction of Business Regulations) 2022 of MERC Case No. 103 of 2022 dated 18.05.2023 seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd.
184 of 2023
Rescheduled till further notice
237 Mon 04/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking approval for deviation in standard bidding document for long term procurement of solar power and for meeting the solar renewable purchase obligations under section 19 of MERC (Renewable Purchase Obligation, its compliance and implementation of renewable energy certificate framework) Regulations, 2019 and to supply day time power to the farmers of the state of Maharashtra under the Mukhyamantri Saur Krushi Vahini yojana 2.0 through competitive bidding process.
28 of 2024
Completed
238 Mon 04/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 7783 MW through competitive bidding under the Mukhyamantri Saur Krushi Vahini Yojana 2.0 Scheme launched for implementation of feeder level solarisation under component C of PM-Kusum scheme connected to the distribution network under Section 63 read with Section 86 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
32 of 2024
Completed
239 Mon 04/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking urgent hearing in Case No. 28/MP/2024 (Petition of MSEDCL for seeking approval for deviation in standard bidding document for long term procurement of solar power and for meeting the solar RPO under section 19 of MERC (Renewable Purchase Obligation, its compliance and implementation of renewable energy certificate framework) Regulations, 2019 and to supply day time power to the farmers of the state of Maharashtra under the Mukhyamantri Saur Krushi Vahini yojana 2.0 through
IA. No. 11 of 2024 in Case No. 28 of 2024
Completed
240 Mon 04/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) f or seeking urgent hearing in Case No. 32/AP/2024. (Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 7783 MW through competitive bidding under the Mukhyamantri Saur Krushi Vahini Yojana 2.0 Scheme launched for implementation of feeder level solarisation under component C of PM-Kusum scheme connected to the distribution network under Section 63 read with Section 86 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
IA. No. 12 of 2024 in Case No. 32 of 2024
Completed
241 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking special allowance as additional O&M expense for its thermal power plant at Bhusaval, Chandrapur, Khaperkheda and Nashik.
167 of 2023
Rescheduled till further notice
242 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) under Section 86 (1) (b) of the Electricity Act, 2003 for approval of combined short term wind power procurement for the period 01.08.2023 to 31.07.2024.
168 of 2023
Rescheduled till further notice
243 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ratnagiri Gas and Power Private Ltd. under Section 65 of the Electricity Act, 2003 read with Section 108 instruction from Govt of Maharashtra praying for refund of transmission charges and losses levied during the sale of power from RGPPL to Indian Railways (2017-2022).
173 of 2023
Rescheduled till further notice
244 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys Pvt Ltd. for getting refund from MSEDCL for differential demand charges considering 25% demand charges with interest as per order of Commission in Case No. 166 of 2020, getting interest from MSEDCL against delayed payment for energy supplied as per conditions of power purchase agreement and refund of excess security deposit held with MSEDCL.
174 of 2023
Rescheduled till further notice
245 Fri 01/03/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
Rescheduled till further notice
246 Tue 27/02/2024 11:00:00 AM
e-Public Hearing
Hearing on Suo-Motu draft Order on Renewable Energy Tariff for FY 2024-25
3 of 2024
Completed
247 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
248 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
249 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra. And Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023. And Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition. And Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
Rescheduled on Tuesday 20/February/2024 10:30 AM
250 Tue 27/02/2024 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited- Distribution's Tariff Petition for Truing up of FY 2022-23, Provisional Truing up for FY 2023-24 and approval of Revised ARR and Tariff for FY 2024-25 [Case No. 237 of 2023]
237 of 2023
Completed
251 Tue 27/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking guidance and directions for further course of action to be taken for procurement of solar power under the Mukhyamantri Saur Krushi Vahini Yojana 2.0.
20 of 2024
Completed
252 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. for Non-compliance of CGRF Nashik Order dated 15 February 2019 in Case No. 58/2018-19 by MSEDCL.
127 of 2023
Completed
253 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 57/2018 by MSEDCL.
128 of 2023
Completed
254 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 63/2018-19 by MSEDCL.
129 of 2023
Completed
255 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Slidewell Meilleur Tech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 15 February2019 in Case No. 67/2018-19 by MSEDCL.
130 of 2023
Completed
256 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February2019 in Case No. 71/2018-19 by MSEDCL.
133 of 2023
Completed
257 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 72/2018-19 by MSEDCL.
134 of 2023
Completed
258 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 73/2018-19 by MSEDCL.
135 of 2023
Completed
259 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reliable Autotech Pvt. Ltd. for Non-compliance of the CGRF, Nashik Order dated 16 February 2019 in Case No. 74/2018-19 by MSEDCL.
136 of 2023
Completed
260 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Completed
261 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
Completed
262 Fri 23/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for seeking guidance and directions for further course of action to be taken for procurement of solar power under the Mukhyamantri Saur Krushi Vahini Yojana 2.0.
20 of 2024
Completed
263 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
264 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
265 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
266 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ajay Mansukhlal Shah against MSEDCL seeking compliance of Order passed by The Electricity Ombudsman dated 06 January 2023.
158 of 2023
Completed
267 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking compensation on account of various change in law events.
86 of 2023
Completed
268 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Classic Marble Company Pvt. Limited (CMCPL) under Sections 86 (1) (f), 142, 146 and 149 of the Electricity Act, 2003 for Non-Compliance of the Commission’s Orders dated 7 September 2021 in Case No. 148 of 2020 by MSEDCL.
97 of 2023
Completed
269 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSEDCL for reclassification of wind zones of wind energy projects in Maharashtra. And Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114 of 2023. And Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition. And Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114 of 2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
114 of 2023 & I.A. No. 61, 66, 67 of 2023 in Case No.114 of 2023
Completed
270 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited in relation thereto.
11 of 2024
Completed
271 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Completed
272 Tue 20/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Ultratech Cement Limited for Urgent Listing in Case No. 19/AD/2024. (Petition of Ultratech Cement Limited under Section 86 read with 142 and 146 of the Electricity Act, 2003 seeking compliance of Order dated 27.12.2023 passed by this Hon’ble Commission in Case No. 151 of 2023 (Batch) by Maharashtra State Electricity Distribution Company Limited.)
IA No. 8 of 2024 in Case No. 19 of 2024
Completed
273 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 27 October 2022.
62 of 2023
Completed
274 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Executive Engineer, Maharashtra State Road Development Corporation (MSRDC) through user M/s. Regent Bhairavi Corporation seeking compliance of the Order dated 24 August 2022 passed by CGRF, Kalyan zone in Case No. K/E/048 of 2022-23.
64 of 2023
Completed
275 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. seeking compliance of CGRF, Vasai Order dated 24 February, 2023.
169 of 2023
Completed
276 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
Completed
277 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 5th January, 2024. IN Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
Completed
278 Fri 16/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for Urgent Listing in Case No. 20/MP/2024.
IA No. 09 of 2024 in Case No 20 of 2024
Completed
279 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Pvt. Ltd. under Section 86(1) (b) read with Section 86(1) (f) and other applicable provisions of the Electricity Act, 2003 and under various power purchase agreements seeking compensation on account of occurrence of Change in Law event.
73 of 2023
Completed
280 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SJVN Ltd. under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
Completed
281 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking in-Principle Declaration of issuance of Notifications dated 19 October, 2022 and 1 February, 2023 as a Change in Law event of the Power Purchase Agreements dated 22 July, 2022 which was signed on 3 August, 2022.
75 of 2023
Completed
282 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31 March 2023 in Case No. 226 of 2022 in the matter of final true-up of aggregate revenue requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional true up of ARR of FY 2022-23 and revised tariff and projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
Completed
283 Tue 13/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent hearing of Case No. 14/MP/2024. (Petition of MSPGCL seeking approval of M/s. Ideal Energy Projects Limited as successful single bidder and allow MSPGCL to enter into Power Purchase Agreement and Tri-Partite agreement pursuant to Case IV, Phase 4 bidding undertaken by MSPGCL as per Case IV Guidelines issued by Ministry of Power, Government of India.)
IA No 07 of 2024 in Case No 14 of 2024
Completed
284 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra Border Check Post Network Limited seeking applicability of appropriate tariff to the Border Check Post Nakas and seeking recovery of differential amount.
32 of 2023
Completed
285 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Adani Electricity Mumbai Limited- Distribution (AEML-D) under Section 86 of the Electricity Act, 2003 in compliance of the directions in Order dated 28 October 2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project on account of occurrence of Force Majeure Events.
33 of 2023
Completed
286 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
Completed
287 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking approval for the Procedure for operationalization of spinning reserve in the state of Maharashtra, as per Order in Case No. 85 of 2022.
142 of 2023
Completed
288 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Rescheduled on Tuesday 06/February/2024 10:30 AM
289 Fri 09/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Rescheduled on Tuesday 06/February/2024 10:30 AM
290 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. Seeking clarification/modification/removal of difficulties/issuance of Practice Directions under MERC Supply Code Regulations, 2021.
11 of 2023
Completed
291 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Morries Energy Ltd. regarding non-adjustment of Open Access units for September 2021.
12 of 2023
Completed
292 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jalna Siddhivinayak Alloys Pvt. Ltd. seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as per the Commission’s Clarificatory Order dated 30 April, 2020.
4 of 2023
Completed
293 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
Completed
294 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Completed
295 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Shah Promoters and Developers (SPD) for urgent listing in Case No. 194/AD/2023 (Petition of Shah Promoters and Developers (SPD) seeking appropriate relief against MSEDCL).
I.A. 4 of 2024 in Case No. 194 of 2023
Completed
296 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. for Urgent Listing in Case No. 11/AD/2024. (Petition of ACME Sikar Solar Private Limited & ACME Solar Holdings Pvt. Ltd. seeking compliance of Order dated 27.12.2023 passed by Commission in Case No. 56 of 2023 and initiation of proceedings under Section 142 read with Section 146 of the EA, 2003 against MSEDCL in relation thereto.)
I.A. 5 of 2024 in Case No. 11 of 2024
Completed
297 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Completed
298 Tue 06/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Completed
299 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants. And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent. And Applications of Respondents for striking off their names from the list of Respondents. And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
Rescheduled till further notice
300 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations
82 of 2021
Completed
301 Fri 02/02/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
302 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking inter alia quashing of the Notice dated 05 January 2023 issued by MSEDCL to Petitioner for alleged contravention of PPA dated 20 August 2014. And Interlocutory Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014. And Interlocutory Application pof M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13, 14 of 2023
Completed
303 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated 29.06.2022 executed between Maharashtra State Electricity Distribution Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022.
122 of 2023
Completed
304 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with Section 40, 43 and 46 of the EA 2003 and directions pertaining to the applicable wheeling charges as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No. 322 of 2019.
54 of 2023
Completed
305 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2024 to 31 January 2025.
213 of 2023
Completed
306 Tue 30/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Completed
307 Tue 30/01/2024 10:30:00 AM
e-Public Hearing
Suggestions/ Objections on Mira-Bhaindar Municipal Corporation's Petition for determination of Project Specific Tariff for supply of electricity generated from waste-to-energy project of cumulative capacity 575 kVA (3 x 125 kVA and 4 x 50 kVA) located in the area of Mira Bhaindar Municipal Corporation.
28 of 2023
Completed
308 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited seeking a declaration that Power Purchase Agreement (PPA) dated 14.01.2022 executed with MSPGCL stands frustrated by efflux of time on account of the various material/fundamental breach(s) committed by MSPGCL.
66 of 2023
Postponed till further notice
309 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for adoption of tariff discovered through competitive bidding process by MITL (Erstwhile AITL) for the period starting from 01.12.2023 to 30.11.2024 (12 Months) under Section 86 of the Electricity Act, 2003 (EA) read with “Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process” dated 30th March, 2016 issued by Ministry of Power, Government of India.
199 of 2023
Postponed till further notice
310 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s T. P. Saurya limited seeking compensation on account of Change in Law events (Goods and Service Tax).
241 of 2022
Postponed till further notice
311 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of T.P. Kirnali Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax rates on Renewable Energy Devices and increase in Basic Custom Duty on import of Solar inverters.
244 of 2022
Postponed till further notice
312 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Postponed till further notice
313 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Postponed till further notice
314 Tue 23/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) for approval of power purchase rate for purchasing of power from Solar Power Project for three years’ period and approval for executing the Power Purchase Agreement, under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.2, and Regulations mentioned under “Part C: Power Procurement” of the Maharashtra Electricity Regulatory Commission (Multi-Year Tariff) Regulations, 2019 along with Regulation 8.3.3 of the Maharashtra Electricity Regulatory Commission (General Conditions of Distribution License) Regulations, 2006.
214 of 2023
Postponed till further notice
315 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2021- 22 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17. And Interlocutory Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as Shri Tradco India Pvt. Ltd. Vs. MSEDCL.
19 of 2023 & I.A. No. 40 of 2023
Completed
316 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2016-17 to FY 2020-21 under the applicable MERC Distribution Open Access Regulations and IA for condonation of delay for filing the claim for FY 2016-17 and FY 2017-18. And Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Interlocutory Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Completed
317 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
80 of 2023
Completed
318 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tejas Sizers for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2017-18 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
81 of 2023
Completed
319 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 and FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
88 of 2023
Completed
320 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
89 of 2023
Completed
321 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s B.S.Channabasappa & Sons and Others for payment for purchase of surplus units / over-injected units with 18 % interest per annum for the period from FY 2018-19 to FY 2021-22 under the applicable MERC Distribution Open Access Regulations.
90 of 2023
Completed
322 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Verroc Engineering Ltd. for payment for purchase of surplus units / over-injected units with 15 % interest per annum for the period from July 2014 to June 2016 under the applicable MERC Distribution Open Access Regulations.
144 of 2023
Completed
323 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -Distribution under Section 63 of the Electricity Act, 2003 seeking adoption of tariff discovered for procurement of 225 MW grid connected Wind- Solar Hybrid capacity on long term basis plus additional 150 MW under Greenshoe Option through Competitive Bidding Process (Followed by E-Reverse Auction) to meet the future demand and Renewable Purchase Obligation as per Regulation 7 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff), 2019.
195 of 2023
Completed
324 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects. Case No. 70 of 2021 And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 MA No. 23 of 2021 in Case No. 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 IA No. 36 of 2021 in Case No. 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021. IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
Completed
325 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled till further notice
326 Fri 19/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra Industrial Township Limited (MITL) Erstwhile Aurangabad Industrial Township Limited (AITL) seeking urgent listing and hearing in Case No. 214/AP/2023.
IA No. 3 of 2024 in Case No. 214 of 2023
Completed
327 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Tue 30/January/2024 10:30 AM
328 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects. Case No. 70 of 2021 and Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021. and MA No. 23 of 2021 in Case No. 70 of 2021 Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021. IA No. 36 of 2021 in Case No. 70 of 2021 and Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021. IA No. 38 of 2021 in Case No. 70 of 2021
70 of 2021 & I.A. No. 23, 36 & 38 of 2021
Rescheduled on Fri 19/January/2024 10:30 AM
329 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled on Fri 19/January/2024 10:30 AM
330 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of Tariff discovered for long term procurement of 49.7 MW Solar Power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
161 of 2023
Rescheduled on Tue 23/January/2024 10:30 AM
331 Tue 16/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) seeking adjudication of dispute under Section 86 (1)(f) and Section 11(2) of the Electricity Act, 2003.
211 of 2022
Rescheduled on Tue 23/January/2024 10:30 AM
332 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Completed
333 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
Completed
334 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
335 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017 And Case No. 173 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 22.09.2022. IN Appeal No. 46 of 2019 directions to the Commission therein.)
173 of 2017 (Re-opened Case)
Completed
336 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
Completed
337 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Completed
338 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Protostar Technologies Private Limited under Section 86(1)(e) and Regulation 16 and Regulation 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 to allow facility of Group Net Metering for multiple electricity service connections of different Consumers within the same premises having single building or buildings with same tariff category.
226 of 2023
Completed
339 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Sections 63 & 86 of the Electricity Act, 2003 seeking, inter-alia, declaration of Part/Element-wise commissioning and segregation of transmission charges for each Part/Element from the date of its respective deemed COD/ actual COD
205 of 2023
Completed
340 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Ltd. (Distribution) for approval of True-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2021-22 and FY 2021- 22, Provisional Truing-up of ARR for FY 2022-23, and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. Case No. 225 of 2022 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 5 th January, 2024. IN Appeal No. 369 of 2023. [Directions to the Commission therein.]
225 of 2022 (Re-opened Case)
Completed
341 Fri 12/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for Urgent Listing in Case No. 4/AP/2024.
IA. No. 2 of 2024 in Case No. 4 of 2024
Completed
342 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Withdrawn
343 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Completed
344 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Completed
345 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Completed
346 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited (MSPGCL) seeking approval for adoption of Tariff of Rs 2.97/kWh and deviations from competitive bidding guidelines under ‘Mukhyamantri Saur Krishi Vaahini Yojana’.
120 of 2023
Completed
347 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Completed
348 Tue 09/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Completed
349 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
350 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
351 Fri 05/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
352 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Completed
353 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Completed
354 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Completed
355 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Completed
356 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Completed
357 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
Completed
358 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
Completed
359 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Completed
360 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
227 of 2023
Completed
361 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Laxmipati Balaji Supply chain Management Limited (LBSCML) for Impleadment of Respondent in Diary No. 309 of 2023 and Diary No. 315 of 2023 in the matter of the Petition filed for obtaining the Hon'ble Commission’s approval for consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2024 to January 31, 2025 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
228 of 2023
Completed
362 Tue 02/01/2024 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) seeking urgent listing of the Case No. 205/AD/2023.
IA No 73 of 2023 in Case No. 205 of 2023
Completed
363 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Rescheduled on Tuesday 09/January/2024 10:30 AM
364 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Rescheduled on Friday 12/January/2024 10:30 AM
365 Fri 22/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Tuesday 16/January/2024 10:30 AM
366 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Completed
367 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Rescheduled on Friday 03/November/2023 10:30 AM
368 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Rescheduled on Friday 03/November/2023 10:30 AM
369 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Completed
370 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Sunbarn Renewables Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
162 of 2023 & I.A. No. 63 of 2023
Completed
371 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of CIE Automotive India Limited and Strongsun Solar Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the month of March, 2023 raised by MSEDCL levying wheeling charges and wheeling losses on the purchase and sale of Electricity by the Petitioners. And Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
163 of 2023 & I.A. No. 62 of 2023
Completed
372 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited under Section 42, Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 seeking quashing of the invoice for the Month of March, 2023 raised by Maharashtra State Electricity Distribution Company Limited levying Wheeling Charges and Wheeling losses on the Purchase and Sale of Electricity by the Petitioners.
166 of 2023
Completed
373 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Laxmipati Balaji Supply Chain Management Limited seeking early hearing of the Diary No. 309/2023.
Diary No. 315 of 2023
Completed
374 Tue 19/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Protostar Technologies Private Limited seeking urgent and early hearing of the Case No. 226/MP/2023.
IA No. 71 of 2023 in Case No. 226 of 2023
Completed
375 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in Case No. 84 of 2022
Postponed till further notice
376 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Postponed till further notice
377 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Postponed till further notice
378 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Postponed till further notice
379 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
380 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
381 Fri 15/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Friday 05/January/2024 10:30 AM
382 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
Completed
383 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
Completed
384 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
Completed
385 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
Completed
386 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
Completed
387 Tue 12/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025.
225 of 2023
Completed
388 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
Completed
389 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
Completed
390 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
Completed
391 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
Completed
392 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
Completed
393 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
394 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
395 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
396 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
397 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Rescheduled on Tuesday 02/January/2024 10:30 AM
398 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) and Section 86 (1) (f) read with Section 142 of Electricity Act, 2003 for non-compliance and willful defiance of the order dated 15.03.2023 passed by this Hon’ble Commission in case no. 240 of 2022 by the Tata Power Co Ltd- G.
189 of 2023
Completed
399 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s FPEL MH 1 Private Limited under Section 86 of the Electricity Act, 2003 by M/s FPEL MH 1 Private Limited seeking extension of time to complete its 75 MW Solar Power Park at Village Pokhari, Patode, Pimperkhed, Taluka Nandgaon, District Nashik, Maharashtra and extension of Grid Connectivity for a period of 18 months i.e., from 30.11.2023 to 30.05.2025. And Interlocutory Application of M/s FPEL MH 1 Private Limited seeking urgent listing of the Petition (Diary No. 300 of 2023) and interim directions on behalf of M/s FPEL MH 1 Private Limited.
225 of 2023 & I.A. No. 70 of 2023
Completed
400 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 122/MP/2023.
I.A. No. 68 of 2023 in Case No. 122 of 2023
Completed
401 Fri 08/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Bekaert Industries Private Limited and Greenzest Sun Park Private Limited for urgent listing in Case No. 166/AD/2023.
I. A. No. 69 of 2023 in Case No. 166 of 2023
Completed
402 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
403 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Vidyut Nigam Private Limited seeking Review under Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 read with Section 94 (1) (f) of the Electricity Act, 2003 of the Final Order dated 25.05.2023 passed by this Hon’ble Commission in Case No. 55 of 2023
159 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
404 Tue 05/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
405 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sarla Performance Fibers Limited seeking an order directing the Respondent to pay Rs. 2,73,63,784 (Rupees Two Crore Seventy-Three Lakhs Sixty-Three Thousand Seven Hundred and Eighty-Four Only) together with interest, due and payable in view of supply of electricity by the Petitioner, along with such other and further reliefs as may be necessary.
155 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
406 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Metro Rail Corporation Ltd. under 86(1) (e) of the ‘Electricity Act 2003’ for amendments in the definition of the applicability of Definition of Net Billing arrangements in the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
156 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
407 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahyadri Industries Limited (SIL) under provisions of EA, 2003 more particularly Section 86(1)(e) and Section 86(1)(f), pertaining to adjudication of disputes between Sahyadri Industries Limited and MSEDCL and seeking directions against MSEDCL to comply with the terms of the Wind Energy Purchase Agreements entered into with the petitioner and various Orders of this Hon’ble Commission and Hon’ble Appellate Tribunal for Electricity and other disputed recoveries.
157 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
408 Fri 01/12/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
409 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Limited seeking clarifications on the Order dated 13.02.2023 passed by this Hon’ble Commission.
I.A. No. 37 of 2023 in 84 of 2022
Rescheduled on Friday 15/December/2023 10:30 AM
410 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Reddy Construction under Section 86(1) of the EA 2003 for (i) approval of “change in law” and (ii) for seeking a compensation a gainst additional cost incurred on account of implementation of the goods and services tax on procurement of solar modules and other solar equipment increased from 5% to 12% vide notification number 08 of 2021, notification issued in relation thereto by the state of Maharashtra, -central tax (rate) dated 30.09.2021 read with notification number 08 of 2021 - integrated tax (rate) dated 30.09.2021 in terms of article 9 of the PPA dated 04.02.2022 entered between M/s. Reddy Construction and MSEDCL for development of 3 MW capacity power project at village – Gondri, Lodga, Tehsil - Ausa, District - Latur.
152 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
411 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024.
153 of 2023
Rescheduled on Tue 29/August/2023 10:30 AM
412 Tue 28/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Hybrid Energy Jaisalmer Four limited (formerly known as RSEPL Hybrid Power One Limited) under Sections 86, Electricity Act, 2003 read with Articles 12.2 of the Power Purchase Agreement dated 07.07.2020 executed between Adani Hybrid Energy Jaisalmer Four Limited (formerly known as RSEPL Hybrid Power One Limited) and Adani Electricity Mumbai Limited seeking reliefs for the additional expenditure incurred due to occurrence of Change in Law events.
154 of 2023
Rescheduled on Friday 15/December/2023 10:30 AM
413 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Rescheduled on Friday 29/September/2023 10:30 AM
414 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Azure Power Thirty Four Private Limited under section 86 of the Electricity Act 2003 before the MERC for seeking an appropriate adjustment/ compensation to offset the financial/ commercial impact of the Change in Law event, on account of the Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 9 of the Power Purchase Agreement dated 30.07.2018 between M/s. Azure Power Thirty Four Private Limited and MSEDCL.
149 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
415 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Energy Efficiency Services Limited (EESL) under Section 86(1)(b) and Section 86(1)(e) of the Electricity Act, 2003 seeking approval of Change in Law and appropriate mechanism for grant of and appropriate adjustment / compensation to offset financial / commercial impact of Change in Law Event on account of increase in rate of CGST / IGST on Solar Energy Devices from 5% to 12% on account of amendment to Notification No. 1/2017 – Central Tax (Rate) and Notification No. 1/2017 – Integrated Tax (Rate) dated 28.06.2017, vide Notification No. 24/2018-Central Taxes and Notification No. 25/2018-Integrated Taxes dated 31/12/2018 and further vide Notification No. 8/2021 – Central Tax (Rate) and Notification No. 8/2021 – Integrated Tax (Rate) dated 30.09.2021 (effective from 01.10.2021) in terms of Article 15 of the PPA dated 20.01.2018 between M/s. Energy Efficiency Services Limited and MSEDCL.
150 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
416 Fri 24/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited.
151 of 2023
Rescheduled on Tuesday 17/October/2023 10:30 AM
417 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Acme Heergarh Powertech Private Limited (AHPPL) under section 86 of the EA, 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in the rate of CGST / IGST on Renewable Energy Devices from 5% to 12% on account of amendment to Notification No. 01/2017-Central Tax (Rate) and Notification No. 01/2017-Integrated Tax (Rate) dated June 28, 2017 vide Notification No. 8/2021-Central Tax (Rate) and Notification No. 8/2021- Integrated Tax (Rate) dated September 30, 2021 (effective October 1, 2021) respectively, in terms of Article 9 of Power Purchase Agreement dated 21.08.2019 between M/s ACME Heergarh Powertech Private Limited and MSEDCL.
143 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
418 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Persistent Systems Ltd. refund of wheeling & transmission charges recovered on over-injected units under first proviso to Regulation 16.1(a) of MERC (DOA) Regulations, 2014 and Regulation 14.6(a) of MERC (DOA) Regulations, 2016 and amendment thereof.
146 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
419 Tue 21/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Menon and Menon challenging the impugned letter dated 14th July 2022 issued by MSEDCL (Respondent no.1) whereby the Respondent has illegally and arbitrarily has failed to consider the Application for Short Term Open Access.
147 of 2023
Rescheduled on Tuesday 12/December/2023 10:30 AM
420 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Miscellaneous Application in Diary No. 257 of 2022 in Case No. 84 of 2016 dated 06.02.2023.
Diary No. 100 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
421 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Steel Limited under Section 86 (1)(e) of the Electricity Act, 2003, Regulations 16 & 19 of the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 and 2019 seeking a declaration that the Petitioner is exempt from the RPO targets in relation to its Khopoli Unit for the period FY 2018 onwards till date as long as the cogeneration from its Captive Co-Generation Plant/ units at Khopoli (Maharashtra) & Meramandali (Odisha) are in excess of its RPO requirements for the period from 2018 till date. The Petitioner is also seeking quashing of MEDA’s letters dated 22.09.2022, 25.03.2022, 21.09.2021 and 8.03.2021 seeking deposit of amount towards alleged RPO’s shortfall for FY 2021-2022, FY 2020-2021 and FY 2016-2020 and RPO compliance report for the aforementioned periods. Further, the Petitioner is seeking refund of amount of Rs. 75,93,633/- paid on 31.03.2021 UNDER PROTEST towards alleged RPO shortfall for FY 2018-2020 pursuant to MEDA’s letter dated 8.03.2021.
125 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
422 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
423 Fri 17/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Shree Cement Limited (SCL) under Section 86(1)(e) of Electricity Act, 2003 read together with regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulty.
131 of 2023
Rescheduled on Friday 22/December/2023 10:30 AM
424 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
425 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
426 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
427 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
428 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
Completed
429 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
Completed
430 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
Completed
431 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
Completed
432 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT).
148 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
433 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
434 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
435 Fri 10/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Rescheduled on Tuesday 19/December/2023 10:30 AM
436 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
437 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
438 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
439 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
Rescheduled on Friday 20/October/2023 10:30 AM
440 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
Completed
441 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
Completed
442 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
Completed
443 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
Completed
444 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
Completed
445 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory application for impleadment of Wind Independent Power Producers Association as a necessary and proper party in Case No. 114/MP/2023. (Petition of MSEDCL for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.)
I.A. No. 61 of 2023 in 114 of 2023
Completed
446 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Bothe Windfarm Development Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) and the jurisdiction of this Hon’ble Commission to entertain and grant relief sought by MSEDCL in the present Petition.
I.A. No. 66 of 2023 in 114 of 2023
Completed
447 Tue 07/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Vena Energy MH Wind Power Pvt. Ltd. for challenging the maintainability of the Petition No. 114/MP/2023 filed by MSEDCL as the reliefs sought by MSEDCL to the extent that it may lead to altercation/modification/amendment of the existing EPAs executed with the Applicant or the tariff fixed thereunder.
I.A. No. 67 of 2023 in 114 of 2023
Completed
448 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 76.55 MW wind power from the wind Generators whose EPAs with MSEDCL have expired.
119 of 2023
Completed
449 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation company Limited for seeking approval for adoption of tariff rate of Rs 2.97/KWH under ‘Mukhyamantri Saur Krishi Vaahini Yojana’ to meet MSEDCL's Solar Renewable Purchase Obligations under Section 63 of Electricity Act, 2003 and for seeking approval to the Deviations Sought in the Draft PSA & PPA with respect to the Standard Bidding Guidelines, issued by MNRE/MoP, for Procurement of Power through Competitive Bidding Process as per directions in MERC Order dated 19.10.2018 in Case No. 172 of 2017.
120 of 2023
Completed
450 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 Review of Commission Order dated 15th February, 2023 in Case 116 of 2022.
123 of 2023
Completed
451 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bhimashankar Sahakari Sakhar Karkhana Limited requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article 8.02 of the Energy Purchase Agreement dated 21.06.2004 and subsequent amendment EPA dated 12.12.2012 entered between the Petitioner and the Respondent.
124 of 2023
Completed
452 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
179 of 2023
Completed
453 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
180 of 2023
Completed
454 Fri 03/11/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (BEST) for urgent Listing in Case No. 189/AD/2023.
I.A. No. 65 of 2023 in Case No. 189 of 2023
Completed
455 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for Regulatory Framework for sharing of Expenses Amongst all Discoms in the State in respect of procurement of Power from waste to Energy Projects, bagasse, biomass and small/mini/micro Hydro Projects as per directives of Hon’ble Commission vide Order dated 22.03.2021 in Case No. 162 of 2019 and Order dated 26.03.2021 in Case No. 208 of 2020.
115 of 2023
Completed
456 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15.3 of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner’s assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Hedge Banks) in respect of the Petitioner’s Transmission Project.
116 of 2023
Completed
457 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Haldirams Food International Pvt Ltd. under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of distribution licensees including power quality) Regulations, 2021 challenging the “debit bill adjustment” amounting to Rs. 2,79,19,643.09 included by MSEDCL in the petitioner’s monthly energy bill dated 07.01.2023 and under Section 142, 146 and 149 of the EA, 2003 against MSEDCL seeking initaition of appropriate proceedings for violation of provisions of Regulations framed by this Hon’ble Commission including but not limited to violation of provisions of EA, 2003 and petition in the matter of MSEDCL’s commercial circular bearing no. 266 dated 30.07.2016 read with MSEDCL’s commercial circular bearing no. 289 dated 06.06.2017 adopting the government of Maharashtra resolution bearing no. 238/urja/-5 dated 29.06.2016 alongwith the modified government of Maharashtra resolution bearing no. 238/urja/-5 dated 24.03.2017 and thereby providing incentives to Marathwada, north Maharashtra and d & d+ areas and providing the applicable incentive to the petitioner for the period september-2019 to march-2022
117 of 2023
Completed
458 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Niwas Spinning Mills Ltd. regarding Revision in contract demand.
118 of 2023
Completed
459 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
Completed
460 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Completed
461 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
Completed
462 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
Completed
463 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
Completed
464 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
Completed
465 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
Completed
466 Tue 31/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
Completed
467 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Manwat, Tal-Manwat, Distrcit- Parbhani, Maharashtra.
104 of 2023
Postponed till further notice
468 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Nagarwadi, Tal-Karanja, District- Wardha, Maharashtra.
105 of 2023
Postponed till further notice
469 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Goregaon, Tal-Sengaon, Distrcit-Hingoli.
107 of 2023
Postponed till further notice
470 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Aarali Budruk, Tal-Tuljapur, District- Osmanabad.
108 of 2023
Postponed till further notice
471 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Bhendala, Tal- Ghansawangi, District- Jalna.
109 of 2023
Postponed till further notice
472 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Kok, Tal- Jintur, District- Parbhani, Maharashtra.
110 of 2023
Postponed till further notice
473 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. under Section 86(1) of the Electricity Act 2003 for (i) Approval Of “Change In Law” and (ii) Seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification No. 08 of 2021 dated 30.09.2021 in Terms of Article 8 of the Power Purchase Agreement dated 13.01.2020 entered between M/s. Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pedgaon, Tal- Hingoli, District-Hingoli, Maharashtra.
111 of 2023
Postponed till further notice
474 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Pimpranwadi, Tal- Loha, Distrcit- Nanded, Maharashtra.
112 of 2023
Postponed till further notice
475 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Rani Unchegaon, Tal: Ghansawangi, Dist.: Jalna, Maharashtra.
113 of 2023
Postponed till further notice
476 Fri 27/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Karnataka Resco Rooftop Solar Pvt. Ltd. (kresco) under Section 86(1) of the Electricity Act 2003 for (I) approval of “Change in Law” and (II) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the change in rates of GST on procurement of solar modules and other solar equipment increased from 5% to 12% which are the primary components required for setting up of solar power plants and the increase in composite rate of GST on EPC contracts to 13.80%, due to introduction of Notification No. 24 of 2018 dated 31.12.2018 and Notification Number 08 of 2021 dated 30.09.2021 in terms of article 8 of the PPA dated 13.01.2020 entered between M/s Karnataka Resco Rooftop Solar Pvt Ltd. and MSPGCL for development of 10 MW capacity at Hatta.
145 of 2023
Postponed till further notice
477 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
Rescheduled on Friday 11/August/2023 10:30 AM
478 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Classic Marble Company Pvt. Ltd. under Section 142, 146 and 149 of the Electricity Act, 2003 for non compliance of the Order dated 07.09.2021 in Case No. 148 of 2020 passed by this Hon’ble Commission directing the Respondent to make the payment of penal interest and delayed payment charges (DPC).
97 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
479 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nitin Ramling Ghule for Non-Compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur, Nagpur in Case No. 50 of 2022.
103 of 2023
Completed
480 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for Reclassification of Wind Zones of Wind Energy Projects in Maharashtra.
114 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
481 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kokan Beverage and Food Industry under Section 142 and 149 of the Electricity Act, 2003 for initiating strict action against the negligence caused by Licensee/MSEDCL and against the Order dated 04.11.2022 passed by Ld. Electricity Ombudsman in Representation No. 131 of 2022.
126 of 2023
Completed
482 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nasik Steel Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the CGRF, Nashik in Case No.58/2018-19, Dt. of Order: 15/02/2019.
127 of 2023
Completed
483 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Okay Fern Precision Castings Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.57/2018, Dt. of Order: 15/02/2019.
128 of 2023
Completed
484 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd., under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 63/2018, Dt. of Order: 15/02/2019.
129 of 2023
Completed
485 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Slidewell Meilleur Tech Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 67/2018, Dt. of Order: 15/02/2019.
130 of 2023
Completed
486 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 71/2018, Dt. of Order: 16/02/2019.
133 of 2023
Completed
487 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 72/2018, Dt. of Order: 16/02/2019.
134 of 2023
Completed
488 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 73/2018, Dt. of Order: 16/02/2019.
135 of 2023
Completed
489 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Reliable Autotech Pvt Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 74/2018, Dt. of Order: 16/02/2019.
136 of 2023
Completed
490 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vivo Fabrics for non-compliance of Chief Electrical Inspector Mumbai Order passed under Section 127 of EA 2003 Appeal No. 289 of 2021.
141 of 2023
Completed
491 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ajay Mansukhlal Shah for Non-Compliance of Order passed by the Electricity Ombudsman dated 06.01.2023, CGRF Order dated 23.06.2022, IGRF Order dated 18.08.2009 and Order of IGRC dated 04.03.2020. And Non updation of records as per the orders of above stated authority for demand.
158 of 2023
Completed
492 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited contempt Proceedings for failing to abide by Ombudsman Order.
160 of 2023
Completed
493 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
Completed
494 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. Seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination.
56 of 2023
Completed
495 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirementsincluding calibration and testing thereof as stipulated by the Statutory Regulations. And Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No. 181/MP/2023
181 of 2023 & IA No. 51 of 2023
Completed
496 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Sunbarn Renewables Private Limited urgent listing and interim directions in Case No. 162/AD/2023.
I.A. No. 63 of 2023 in 162 of 2023
Completed
497 Fri 20/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of CIE Automotive India Limited and Strongsun Solar Private Limited for urgent listing and interim directions in Case No. 163/AD/2023.
I.A. No. 62 of 2023 in 163 of 2023
Completed
498 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
82 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
499 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gigaplex Estate Private Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties for operationalising Open Access.
83 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
500 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Rahul R. Maroti in the matter of non-compliance of CGRF Order in complaint No: 102 of 2022 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
85 of 2023
Completed
501 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Ltd. and Maharashtra State Electricity Distribution Company Ltd. and Rule 3 of the Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, for compensation on account of Change in Law events.
86 of 2023
Rescheduled on Tuesday 07/November/2023 10:30 AM
502 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals against MSEDCL seeking compliance of the CGRF, Nagpur Order dated 23 November 2020.
15 of 2023
Completed
503 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises against MSEDCL seeking compliance of the CGRF, Akola Order dated 9 September 2022.
46 of 2023
Completed
504 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya, Station Road Ravi, Arvi, Wardha against MSEDCL seeking compliance of the CGRF, Nagpur’s Order dated 20 February, 2018 in complaint No: 114 of 2017.
48 of 2023
Completed
505 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Aspa Bansons Auto Pvt Ltd. against MSEDCL seeking compliance of the CGRF, Akola’s Order dated 23 November 2022 in complaint No: 141 of 2022.
49 of 2023
Completed
506 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
Completed
507 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Lintech Infrastructure Pvt. Ltd. against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 24 February 2023 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 108 of 2022.
169 of 2023
Completed
508 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sanfoods & Cold Storage Pvt Ltd. under Section 142 & 146 for Non-compliance Hon’ble Electricity Ombudsman (Mumbai) has issued order and instructed to charge the bill as Industrial tariff category only from 28/07/2020 till January 2021, by withdrawing interest and DPC levied, if any. In their order no 1/2023/793 dt. 09.03.2023.
170 of 2023
Completed
509 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Swastika Infra-Logic (India) Pvt. Ltd. for directing MSEDCL to Comply Hon. CGRF order in respect of consumer M/s. Swastika Infra-Logic (India) Pvt. Ltd. Consumer No. 128019008040 Under Jalgaon Circle, MSEDCL Jalgaon.
183 of 2023
Completed
510 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ms. Sujata Prasanna Soparkar against the MSEDCL under Section 142 & 146 of the Electricity Act 2003 for not complying with the Order dated 27 June 2022 passed by the Ld. Consumer Grievance Redressal Forum, Vasai in Case No. 42 of 2022 and Order dated 17 October 2022 passed by the Ld. Appellate Authority, Chembur in Appeal No. 4 of 2019.
185 of 2023
Completed
511 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. The Grand Jalsa for non-compliance of Order passed by Hon’ble Electricity Ombudsman, MSEDCL, Akola Zone, Akola in Case No. 04 of 2023.
188 of 2023
Completed
512 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices seeking compliance of CGRF, Amravati’s Order dated 3 June, 2022.
208 of 2022
Completed
513 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of CGRF Amaravati Order dated 27 May, 2022.
223 of 2022
Completed
514 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Mahagaon Yawatmal Highways Private Limited seeking compliance of CGRF Amaravati Order dated 27 May, 2022 and Order dated 18 August, 2022.
243 of 2022
Completed
515 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jubilant Ingrevia Ltd. under Regulation 30 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges by Maharashtra State Electricity Distribution Company Ltd on Jubilant Ingrevia Limited. And Interlocutory Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
151 of 2023 & I.A. No. 45 of 2023
Completed
516 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Infosys Limited (SEZ) under Section 86(1)(c) of the Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on M/s. Infosys Ltd. (SEZ). And Interlocutory Application of M/s Infosys Ltd. (SEZ) seeking urgent listing of Petition and interim directions in Case No. 177/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
177 of 2023 & I.A. No. 55 of 2023
Completed
517 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and losses by Maharashtra State Electricity Distribution Company Ltd on Ultra Tech Cement Ltd. And Interlocutory Application of Ultra Tech Cement Ltd. and ReNew Surya Spark Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 186 of 2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
186 of 2023 & I.A. No. 58 of 2023
Completed
518 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. under Section 86(1)(b) and (c) of Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and wheeling losses by Maharashtra State Electricity Distribution Company Ltd. on M/s Saarloha Advanced Materials Pvt. Ltd. And Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. and Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing of Petition and interim directions in Case No. 187/AD/2023 regarding levy of wheeling charges on the Petitioner’s Captive Open Access.
187 of 2023 & I.A. No. 57 of 2023
Completed
519 Tue 17/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Saarloha Advanced Materials Pvt. Ltd. & M/s Huoban Energy 1 Private Limited under Section 86(1)(c) of the Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations 2016 challenging the levy of wheeling charges and wheeling losses by Maharashtra State Electricity Distribution Company Ltd on M/s Saarloha Advanced Materials Pvt. Ltd.
196 of 2023
Completed
520 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Tradco India Pvt. Ltd. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of Shri Tradco India Pvt. Ltd. for Condonation of Delay of 90 days in filing the claim for FY-2016-17 in the instant Petition titled as “Shri Tradco India Pvt. Ltd. Vs. MSEDCL.”
19 of 2023 & I.A. No. 40 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
521 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. K. Shivaraj under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2016 -17 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”. And Application of M/s. S. K. Shivaraj application for condonation of delay of 115 days in filing the Claim for FY – 2017 -18 in the abovenamed petition titled as “S. K. Shivaraj vs. MSEDCL”.
65 of 2023 & I.A. No. 34 & 35 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
522 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Balkrishna Sizing Industries under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
80 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
523 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Tejas Sizers under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
81 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
524 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa& Co. under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
89 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
525 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons & Others under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the MERC (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the MERC (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
90 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
526 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Varroc Engineering. Ltd. seeking purchase and payment of the surplus/over-injected units with 15% interest per annum under the applicable MERC Distribution Open Access Regulations. The present petition is being filed not to seek adjudication of any dispute but invoking inherent and regulatory powers of the commission for release of the outstanding amounts along with interest.
144 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
527 Fri 13/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pragati Agencies under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a), 39(b) and 39(c) of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022, Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
88 of 2023
Rescheduled on Tuesday 31/October/2023 10:30 AM
528 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Navi Mumbai Cold Storage Owners Welfare Association seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
98 of 2023
Completed
529 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maha Coldstorage Association C/o Ecofresh Cold Storage & Warehousing Pvt Ltd. seeking review of the Order for application of Tariff to “Pre-cooling and Cold Storage units for Agricultural Products – Processed or Otherwise” under the MERC’s approved tariff schedule w.e.f. 01.04.2023 vide Order in Case No. 226 of 2022 dated 31st March, 2023.
99 of 2023
Completed
530 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking Review of Order dated 31st March 2023 in Case No. 226 of 2022 in the matter of final True-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional True Up of ARR of FY 2022-23 and Revised Tarff and Projections of ARR for FY 2023-24 to FY 2024-25.
102 of 2023
Completed
531 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Association of Plant Tissue Culture Industries for proper Tariff Categorization of the Plant Tissue Culture Units, which are the integral part of the Agriculture Category alike Nursery and Horticulture (in LT/HT Agricultural Category). In order to stop improper LT-IV C and HTV B Tariff Application, and with reference to the Hon’ble Commission latest concerned Orders in Case No. 226 of 2022.
121 of 2023
Completed
532 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Ltd. seeking Review of Order dated 31st March 2023 in Case No. 227 of 2022 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2019-20, FY 2020-21 and FY 2021-22, provisional truing-up of ARR of FY 2022-23 and revised tariff for FY 2023-24 and FY 2024-25 and provisional tariff for Bhusawal Unit No. 6
132 of 2023
Completed
533 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
Completed
534 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
Completed
535 Tue 10/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
Completed
536 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order in Case No. 239 of 2022 dated 31st March, 2023 for Truing-up of Intra-State Transmission System Tariff (InSTS) for FY 2020-21 and FY 2021-22 and determination of revised InSTS Tariff for FY 2023-24 and FY 2024-25.
95 of 2023
Completed
537 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Jaigad Powertransco Limited (JPTL) seeking review of the Order in Case No. 213 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and revised ARR for FY 2023-24 and FY 2024-25.
96 of 2023
Completed
538 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Adani Transmission (India) Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 238 of 2022.
100 of 2023
Completed
539 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 28 of MERC (Transaction of Business and Fees and Charges) Regulations, 2022 and Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 31.03.2023 passed by the Hon’ble Commission in Case No. 237 of 2022.
101 of 2023
Completed
540 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. in respect of Order dated 31st March, 2023 notified by Hon’ble Commission in Case No. 232 of 2022 in the matter of Petition of MSETCL for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20 to FY 2021-22, Provisional Truing-up of Aggregate Revenue Requirement for FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25.
137 of 2023
Completed
541 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35. and Application of The Tata Power Company Limited (Distribution) seeking urgent listing.
39 of 2023 & I.A. No. 56 of 2023
Completed
542 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
Completed
543 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Completed
544 Fri 06/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
I.A. No. 60 of 2023 in Case No. 190 of 2023
Completed
545 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of the Tata Power Company Ltd. (Distribution) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 28 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 seeking review of the Order dated 31.03.2023 in Case No. 225 of 2022.
76 of 2023
Rescheduled on Friday 06/October/2023 10:30 AM
546 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Transmission) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 217 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Annual Revenue Requirement for FY 2023-24 and FY 2024-25 for Transmission Business of Tata Power.
91 of 2023
Rescheduled on Friday 06/October/2023 10:30 AM
547 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of The Tata Power Company Ltd. (Generation) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 28 of the MERC (Transaction of Business and Fees and Charges) Regulations 2022 seeking review of the Order in Case No. 221 of 2022 dated 31st March, 2023 for Truing Up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing Up of FY 2022-23 and Revised Aggregate Revenue Requirement for FY 2023-24 and FY 2024-25 for Generation Business of Tata Power.
93 of 2023
Rescheduled on Tuesday 10/October/2023 10:30 AM
548 Tue 03/10/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Amravati Power Transmission Co. Ltd. seeking review of the Order in Case No. 234 of 2022 dated 31st March, 2023 for Truing-up of Aggregate Revenue Requirement (ARR) for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing- up of ARR for FY 2022-23 and revised estimates of ARR for FY 2023-24 and FY 2024-25.
94 of 2023
Rescheduled on Tuesday 10/October/2023 10:30 AM
549 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 14.3 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication of dispute on Respondent’s unilateral post facto decision to deduct Energy Charges for Energy supplied by the Petitioner and consumed by the Respondent.
77 of 2023
Postponed till further notice
550 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Pvt. Ltd. & Anr. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Pvt. Ltd. and Maharashtra State Electricity Distribution Company Ltd., seeking directions to MSEDCL to not levy penalty for shortfall in generation for FY 2022-23 due to force majeure events.
78 of 2023
Postponed till further notice
551 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Jayant alias Janardhan Nivruti Patil in the matter of (i) Wrongful rejection of new connection (ii) Circular No. 30011 dated 20.12.2018.
79 of 2023
Postponed till further notice
552 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13/10 ("Change in Law") of the Power Purchase Agreement dated 08.09.2008 and 31.03.2010 / 09.08.2010 / 16.02.2013 for 1320MW and 1200 MW /125 MW /440 MW respectively executed between Adani Power Maharashtra Limited (amalgamated with Adani Power Limited) and Maharashtra State Electricity Distribution Company Limited in respect of relief for additional cost of Transportation in compliance with the Notification issued by the Ministry of Environment, Forest and Climate Change dated 25.01.2016.
84 of 2023
Postponed till further notice
553 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with M/s Energy Efficiency Services Limited (EESL) to M/s Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT). And Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023.
148 of 2023 & I.A. No. 52 of 2023
Postponed till further notice
554 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited (hereinafter referred to as SEZ Bio-Tech) for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges. And Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023.
179 of 2023 & I.A. No. 53 of 2023
Postponed till further notice
555 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the Maharashtra State Electricity Distribution Company Limited (“MSEDCL”) area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges. And Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023.
180 of 2023 &I.A. No. 54 of 2023
Postponed till further notice
556 Fri 29/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for approval and adoption of tariff determined through transperant bidding process for procurement of short term power for the period from 01.10.2023 to 31.10.2023 and 01.03.2024 to 31.05.2024 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent listing in Case No. 190/AP/2023.
190 of 2023 & I.A. No. 60 of 2023
Postponed till further notice
557 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanshtha Ltd. in the matter of (i) Breach of Distribution Open Access Regulations 2016. (ii) Breach of Practice Directions dated 8 March 2017. (iii) Excess levy and recovery of Wheeling Charges & Transmission Charges. (iv) Breach of A.T.E.’s order dated 06-10-2022 in Appeal No. 20 of 2019.
72 of 2023
Completed
558 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Private Limited under Section 86(1)(b) read with Section 86(1)(f) and other applicable provisions of the Electricity Act, 2003 and under various Power Purchase Agreements, as enumerated below, seeking compensation on account of occurrence of Change in Law events.
73 of 2023
Completed
559 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SJVN LTD under section 86 (1) (e) and 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute seeking directions to the respondent to pay delayed payment surcharge to the petitioner as per the energy / power purchase agreement and seeking punishment to respondent under section 142,146 and 149 of the Electricity Act, 2003.
74 of 2023
Completed
560 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86 (1) (e) and Section 86 (1) (f) of the Electricity Act, 2003 read with Article 9 of Power Purchase Agreement dated 22.07.2022 (signed on 03.08.2022), seeking In-Principle Declaration of issuance of Notifications dated 19.10.2022 and 01.02.2023 as a Change in Law event.
75 of 2023
Completed
561 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
Completed
562 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
Completed
563 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s Saarloha Advanced Materials Pvt. Ltd. & Renew Bhanu Shakti Pvt. Ltd. seeking urgent listing and interim directions in Case No. 187/AD/2023.
I.A. No. 57 of 2023 in Case No. 187 of 2023
Completed
564 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Ultra Tech Cement Ltd. & ReNew Surya Spark Pvt. Ltd. seeking urgent listing and interim directions in Case No. 186/AD/2023.
I.A. No. 58 of 2023 in Case No. 186 of 2023
Completed
565 Tue 26/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing in Case No. 56/AD/2023.
I.A. No. 59 of 2023 in Case No. 56 of 2023
Completed
566 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
Completed
567 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
Completed
568 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Regulation 20 of the MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
68 of 2023
Completed
569 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Vayunandana Power Limited requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 15.02 of the energy purchase agreement dated 22.09.2008 entered between the petitioner and the respondent.
69 of 2023
Completed
570 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Greta Energy Limited under regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
70 of 2023
Completed
571 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Regulation 21 of the MERC (terms and conditions for determination of RE Tariff) Regulations, 2015 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date.
71 of 2023
Completed
572 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s. Infosys Limited (SEZ) seeking interim directions and urgent listing in Case No. 177/AD/2023. (Petition of M/s. Infosys Limited (SEZ) challenging the levy of wheeling charges and losses by MSEDCL on M/s. Infosys Ltd. (SEZ).
I.A. No. 55 of 2023 in Case No. 177 of 2023
Completed
573 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing in Case No. 39/MP/2023. (Petition of TPC-D directions of the Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Commission seeking approval of the Power Procurement Plan of TPC-D for FY 2024-25 to FY 2034-35.)
I.A. No. 56 of 2023 in Case No. 39 of 2023
Completed
574 Fri 22/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited for clarification of Order dated 27.05.2023 passed in Case No. 174 of 2022. And Interlocutory Application of Juniper Green Field Private Limited seeking urgent listing of Case No. 175/MP/2023.
175 of 2023 & I.A. No. 50 of 2023
Completed
575 Fri 15/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises Non-compliance of CGRF order in complaint No: 125 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
62 of 2023
Postponed till further notice
576 Fri 15/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Om Shree Agro-Tech Ltd. for non-compliance of the Electricity Ombudsman Mumbai Order dt.01.09.2022, Case No. 88 of 2022 in the matter of refund of excess recovery for tariff difference arose due to defective meter & billing issue. Action under Section 142, 146 & 149 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Electricity Ombudsman’s Order.
63 of 2023
Postponed till further notice
577 Fri 15/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Regent Bhairavi Corporation under section 142 and 146 of the Electricity Act, 2003 seeking compliance of the Order dated 24.08.2022 passed by CGRF, Kalyan Zone in Case No. K/E/048 Of 2022-23 whereby MSEDCL was directed to revise bill for the month of June 2022 and July 2022 by average consumption of previous year similar period and refund of excess paid amount if any with interest. and Petition for non-compliance of CGRF Order dated 24.08.2022 wherein Licensee/MSEDCL is entitled to recover the Bill only for two months as per Regulation 16.3.6 of MERC (ESC & SoP) Regulation 2021, hence average bills after July 2022 are quashed and consumer need not pay bill for August 2022 as delay for replacement of CTPT.
64 of 2023
Postponed till further notice
578 Fri 15/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Strede Telesoft Consultancy Pvt. Ltd. for non-compliance of CGRF Bhandup’s order in Case No. 54/2021 vide letter No. Secretary / CGRF / MSEDCL / BNDUZ / 152 dated 12/05/2022 against MSEDCL and violation of MERC rules, orders, Regulation and matter under E.A – 2003.
67 of 2023
Postponed till further notice
579 Tue 12/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Hamid Stone Crusher for Non-compliance of CGRF order in complaint No: 39 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
50 of 2023
Completed
580 Tue 12/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Smt. Sheela Rajeshwar Niwal for Non-compliance of CGRF order in complaint No: 64/2022 passed by CGRF, MSEDCL, Amravati Zone, Amravati.
51 of 2023
Completed
581 Tue 12/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Manjusha Amit Mundada for Non-compliance of CGRF order in complaint No: 104 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
52 of 2023
Completed
582 Tue 12/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rajaram Subarao Patil under Section 142 & 146 of the Electricity Act, 2003 seeking compliance of the order dated 02.05.2022 passed by CGRF, Kolhapur in Case No.10/2022, whereby MSEDCL was ordered to release the Electricity connection to the agriculture pump of the petitioner within 3 months from the date of CGRF Order and to compensate the petitioner with twice the amount paid by petitioner against service charge connection.
61 of 2023
Completed
583 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vansh Enterprises for Non-compliance of CGRF order in complaint No: 71 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
46 of 2023
Completed
584 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Usha Packaging for non-compliance of CGRF order in complaint No: 121 of 2022 passed by CGRF, MSEDCL, Akola Zone, AKOLA.
47 of 2023
Completed
585 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shri Kuldeep Mansing Chordiya for non-compliance of CGRF order in complaint No: 114 of 2017 passed by CGRF, MSEDCL, Nagpur Zone, Nagpur.
48 of 2023
Completed
586 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. ASPA BANSONS Auto Pvt Ltd. for non-compliance of CGRF order in complaint No: 141 of 2022 passed by CGRF, MSEDCL, Akola Zone, Akola.
49 of 2023
Completed
587 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Harshawardhan Jadhav flouting of Statutory provisions of the SoP Regulation in Particularly Regulation 22 for non-compliance with metering requirements including calibration and testing thereof as stipulated by the Statutory Regulations. And Application of Mr. Harshawardhan Jadhav seeking urgent listing of Case No. 181/MP/2023.
181 of 2023 & I.A No. 51 of 2023
Completed
588 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of Juniper Green Field Private Limited seeking urgent listing of Case No. 175/MP/2023. (Petition filed by Juniper Green Field Private Limited for clarification of Order dated 27.05.2023 passed in Case No. 174 of 2022.)
I.A. No.50 of 2023 in Case No. 175 of 2023
Completed
589 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Maharashtra State Power Generation Company Limited (MSPGCL) seeking urgent and early hearing of Case No. 148/MP/2023. (Petition filed by MSPGCL seeking transfer of 100 MWac cumulative capacity of grid interactive Solar PV power projects to be developed at various locations in Western and North Maharashtra under “Mukhyamantri Saur Krushi Vahini Yojana” as approved by the Commission in its Order dated 21 May 2020 in Case No 10 of 2020 awarded with EESL to MAHAPREIT.)
I.A. No. 52 of 2023 in Case No. 148 of 2023
Completed
590 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited for early hearing of Case No. 179/GL/2023. (Petition filed by M/s SEZ Bio-Tech Services Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner for the Poonawalla Biotechnology Park at Manjari Budruk, Taluka Haveli, District Pune- 412307, Maharashtra and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing SEZ Bio-Tech to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 53 of 2023 in Case No. 179 of 2023
Completed
591 Fri 08/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of M/s SEZ Bio-Tech Services Private Limited. (SEZBioTech) for early hearing of Case No. 180/GL/2023. (Petition filed by M/s. SEZ Bio-Tech Services Private Limited. for taking on record the deemed Distribution Licensee status of the Petitioner, M/s SEZ Bio-Tech Services Private Limited, at village Hadapsar/Manjari, District Pune, Maharashtra, India and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing M/s SEZ Bio-Tech Services Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.)
I.A. No. 54 of 2023 in Case No. 180 of 2023
Completed
592 Tue 05/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Aarohi Bio Coals for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Nagpur Zone, Order in Case No 17/2020 dated 23.11.2020 related to the revision of energy bills according to contract demand 100 KVA instead of 155 KVA from February 2020.
15 of 2023
Completed
593 Tue 05/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - (Distribution Business) under Section 86, including Sections 86 (1) (b) & (e) of the Electricity Act, 2003 and in compliance of the directions issued by this Hon’ble Commission vide Order dated 28.10.2022 in Case No. 04 of 2022, for submission of requisite information qua extension of Schedule Commissioning Date (SCOD) of 700 MW Renewable Energy Hybrid Project being developed by M/s Adani Hybrid Energy Power Jaisalmer Four Ltd., on account of occurrence of Force Majeure Events falling under Article 11 of Power Purchase Agreement dated 07.07.2020.
33 of 2023
Completed
594 Tue 05/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Green Energy Limited seeking Change in Law compensation in terms of the Power Purchase Agreements (“PPA”) dated 04.12.2020 executed between Tata Power Green Energy Limited (“TPGEL”) and The Tata Power Company Limited (“Tata Power”), on account of increase in costs due to increase in rate of Goods & Services Tax (“GST”), amounting to Change in Law.
34 of 2023
Completed
595 Tue 05/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sun-n-Sand Hotels Private Limited under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner M/s. Sun-n-sand Hotels Private Limited and the Respondent Maharashtra State Electricity Distribution Company Limited and seeking directions to the respondent for making delayed payment charges with interest as per the power purchase agreements dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier orders of this Hon’ble Commission.
35 of 2023
Postponed till further notice
596 Tue 05/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shakila Bano Nijamuddin Shaikh under Electricity Act 2003 for noncompliance of final order of the Electricity Ombudsman, Mumbai by the Respondent.
38 of 2023
Withdrawn
597 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
Completed
598 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
Completed
599 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sanyo Special Steel Manufacturing India Private Limited (SSSMIPL) for non-compliance of provisions of Electricity Act, 2003 particularly Section 62(6) read with Section 42 and 86 of the Electricity Act, 2003 read with Regulations 4.5 and 32 of the MERC (Distribution Open Access) Regulations, 2016 for payment of interest on amounts refunded on account of adoption of incorrect monthly billing methodology for FY 2016-17, 2017-18 and FY 2018-19 by Maharashtra State Electricity Distribution Company Limited read with the relevant provisions of Electricity Act, 2003.
29 of 2023
Completed
600 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility as per Regulation 99 of MEGC, 2020.
31 of 2023
Completed
601 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Border Check Post Network Limited under Section 86(1)(k) read with Sections 61 & 62 of the Electricity Act, 2003 challenging Maharashtra Electricity Distribution Company Limited’s act of arbitrarily changing tariff category of the Border Check Posts from ‘Public Service – Others’ to ‘Commercial’ and retrospectively recovering differential tariff.
32 of 2023
Completed
602 Fri 01/09/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre (MSLDC) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking to prepare procedure for operationalization of spinning reserve in the State of Maharashtra, by MSLDC as per Order in Case No. 85 of 2022.
142 of 2023
Completed
603 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
Completed
604 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
Completed
605 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Green Energy Limited under Section 86(1)(b), (e.) and (f) of the Electricity Act, 2003 read with Regulation 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 seeking extension of Scheduled Commercial Operation Date (“SCOD”) of the 225 MW Wind Solar Hybrid Power Project, located in village Noorsar, Taluka – Bikaner, Rajasthan and the State of Maharashtra (“Hybrid Project”).
14 of 2023
Completed
606 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AEML SEEPZ Ltd. under Section 86 read with Section 43 of the Electricity Act, 2003 for implementation of the orders of this Hon’ble Commission dated 15.10.2009 passed in Case No. 50 of 2009 and 12.06.2017 passed in Case Nos. 182 of 2014 and 40 of 2015, thereby making AEML SEEPZ Ltd. a part of the changeover and switchover protocol as framed in the aforesaid orders existing amongst the parallel distribution licensee in common area of supply.
21 of 2023
Completed
607 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra Airport Development Company Limited (MADC) for determination and approval of “Schedule of Charges” to be recovered by the distribution licensee from the existing / prospective consumers for the various services provided to them.
25 of 2023
Notice Withdrawn and will be rescheduled
608 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Authority (JNPA) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and ‘Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process’ issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1.5 MW for a period of one year Round the clock from 1 July, 2023 to 30 June, 2024. And Interlocutory Application of M/s. Jawaharlal Nehru Port Authority (JNPA) for urgent listing in Case No. 153/AP/2023.
153 of 2023 & IA No 46 of 2023
Completed
609 Tue 29/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Power Procurement plan as per the direction of the Hon’ble Commission in Order dated 24.05.2023 in IA No. 25 of 2023 in Case No. 40 of 2023 and under Regulation 5.1 of MERC (Multi Year Tariff) Regulation, 2019. And Interlocutory Application of AEML SEEPZ Limited (ASL) for urgent listing in Case No. 171/MP/2023.
171 of 2023 & IA No 48 of 2023
Completed
610 Tue 22/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Shaikh Asrar Ishaque for Illegal disconnection of Electricity Supply of applicant's home, re-connection thereof non compliance of Electricity Act, 2003 non compliance of MERC (Electricity Supply Code and other Conditions of Supply) Regulations, 2005.
10 of 2023
Rescheduled on Tuesday 29/August/2023 10:30 AM
611 Tue 22/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Ltd. under Section 181 r/w Sub Section 47(2), Section 30, 32 (3) 39 (2) (a) to (d) and Section 40 (a) & (c) of the Electricity Act, 2003 and under Regulations 29 to 32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 seeking clarification/modification/removal of difficulties/issuance of Practice Directions of Regulations 1.5, 1.6, 4, 4.2, 19 of the said Regulations, as deemed appropriate by this Hon’ble Commission.
11 of 2023
Rescheduled on Tuesday 29/August/2023 10:30 AM
612 Tue 22/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Morries Energy Limited under the provisions of Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 and subsequent amendments thereof regarding non-adjustment of open access units for the month of September, 2021 injected by petitioner for which credit note has already been issued by MSEDCL.
12 of 2023
Rescheduled on Tuesday 01/September/2023 10:30 AM
613 Tue 22/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khed Economic Infrastructure Private Limited under Section 61, 62 & 86 of Electricity Act, 2003 seeking for clarification and for issuing directions to Maharashtra State Electricity Distribution Company Limited (MSEDCL) to apply the tariff category HT IV, LT-III-A and LT-III-B to the Petitioner.
13 of 2023
Rescheduled on Tuesday 01/September/2023 10:30 AM
614 Fri 18/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jalna Siddhi Vinayak Alloys Pvt Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
4 of 2023
Completed
615 Fri 18/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Energy Development Agency (MEDA) under Section 86(1)(e) for appropriate directions to Distribution Licensees to meet 50% of total Renewable Purchase Obligation (RPO) requirement by purchase of energy from Renewable Sources within the State as per amendment dated 30 June 2022 in Renewable Energy Generation Policy 2020 issued by Government of Maharashtra.
6 of 2023
Completed
616 Fri 18/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khandelwal Jinning and Pressing for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 9/2022.
209 of 2022
Withdrawn
617 Fri 18/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 and invoking regulation 92 of MERC (Conduct of Business) Regulations 2004 to seek relaxation of regulations 8.2 of the MERC (Forecasting Scheduling and Deviation Settlement for solar and wind 2018 in the compliance of the Order of the Hon’ble APTEL in the Appeal No. 31 of 2022 dated 11.10.2022.
245 of 2022
Completed
618 Fri 18/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Ashish Subhash Chandarana for Intervention Application in MERC Case No. 04/MP/2023.
172 of 2023
Completed
619 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 12-14/2022 & 18-24/2022 directing MSEDCL to reclassify category of Tariff.
223 of 2022
Completed
620 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. T.P. Saurya Ltd. under Section 86(1)(f) of the Electricity Act, 2003, read with Article 9.2.1 and 9.2.2 of the Power Purchase Agreement dated 22.07.2022 seeking rise in the rate of Goods and Service Tax as a Change in Law relief.
241 of 2022
Completed
621 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DBL Yavatmal Wardha Highways Pvt. Ltd. seeking compliance of the Order dated 27.05.2022 passed by CGRF, Amravati in Representation No. 15-17/2022 and Order dated 18.08.2022 passed by CGRF, Amravati in Representation No. 70-92/2022 whereby MSEDCL was ordered to reclassify the category of tariff.
243 of 2022
Completed
622 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. T. P. Kirnali Limited seeking compensation on account of increase in costs on account of increase in rate of Goods & Services Tax (“GST”) and change in Basic Custom Duty (“BCD”) amounting to Change in Law in terms of the Power Purchase Agreements (“PPA”) dated 16.09.2020, as amended on 25.10.2021, executed between T. P. Kirnali Limited (“TPKL”) and Maharashtra State Electricity Distribution Company Limited (“MSEDCL”).
244 of 2022
Completed
623 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ReNew Dinkar Urja Pvt. Ltd. & Anr. under Section 86(1)(b) read with 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ReNew Dinkar Urja Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly terminated and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 16 Crores pursuant to the termination.
92 of 2023
Completed
624 Fri 11/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Application of Jubilant Ingrevia Ltd. seeking urgent listing of the Petition and interim directions in Case No. 151/AD/2023.
I.A. No. 45 of 2023 in 151 of 2023
Completed
625 Tue 08/08/2023 10:30:00 AM
Admissibility and Maintainability e-Hearing through Video Conferencing
Petition of Mr. Amin Fakir Mohammad Shaikh for safeguarding the rights of the consumers, in reference to the rights given to consumers under Section 55 of EA, 2003, to choose, Purchase and install the electricity meters of his own choice. & Violating Regulation No 4 of CEA (Installation and Operation of Meters) (Amendments) Regulations, 2019 related to replacement of existing meter only in smart meter and Violating Regulation 15.1.1 of MERC (Electricity supply code and standards of performance of distribution licensees including power quality) Regulations, 2021 related to replacement of existing meter only in smart meter.
203 of 2022
Completed
626 Tue 08/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited for Review of the Suo-Moto Order dated 02.08.2022 passed in the matter of Commercial implementation of the MERC (Deviation Settlement Mechanism and related matters) Regulations, 2019, post expiry of stabilization period and related issues thereof limited to the issues and grounds as raised herein.
204 of 2022
Completed
627 Tue 08/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Laxminarayn Bhutada Foundation for Education for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola Zone Order in Case No. 106/2022 dated 30.08.2022 related to wrong multiplying factor grievance (Billing Dispute).
207 of 2022
Completed
628 Tue 08/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlaxmi Food and Spices for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone, Amravati in Case No. 39/2022.
208 of 2022
Completed
629 Fri 04/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent And Applications of Respondents for striking off their names from the list of Respondents And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 242, 247, 256, 262 of 2022 & I.A. No. 25-29, 31, 34, 40 & 45 of 2022 & Dairy No. 266 & 267 of 2022
Completed
630 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
Completed
631 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination And Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I.A. No. 30 of 2023
Completed
632 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Completed
633 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Completed
634 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021. And Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
Completed
635 Tue 01/08/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking appropriate directions from the Commission in compliance with Order dated 24 January, 2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009 of 2023 (Ultratech Cement Limited & Anr vs. MSEDCL), Order dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 (Vaibhav Deshmukh Infra Pvt Ltd. vs. Union of India & Anr.), Civil Writ Petition No. 2516 of 2023 (RNP Concrete (India) Pvt Ltd. v. UOI and Ors.) and Civil Writ Petition No. 2587 of 2023 (M/s. L T Patil and Sons vs MSEDCL)
45 of 2023
Completed
636 Fri 28/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
Completed
637 Fri 28/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021 And Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
Completed
638 Fri 28/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
Completed
639 Fri 28/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
Completed
640 Tue 25/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
Completed
641 Tue 25/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Completed
642 Tue 25/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
Postponed till further notice
643 Tue 25/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22 September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017 (Re-opened Case.)
Postponed till further notice
644 Tue 25/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Pvt. Ltd. seeking appropriate directions from MERC in compliance with Order dated 24.01.2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516 of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
Completed
645 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL And Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition And Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I. A. No.7 of 2023, I. A. No.8 of 2023
Completed
646 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project And Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project And Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I. A. No.9 of 2023, I. A. No.10 of 2023
Completed
647 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 And Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 And Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I. A. No.13 of 2023, I. A. No.14 of 2023
Completed
648 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 And Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 And Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I. A. No.17 of 2023, I. A. No.18 of 2023
Completed
649 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 And Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 And Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I. A. No.15 of 2023, I. A. No.19 of 2023
Completed
650 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 And Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023 And Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I. A. No.16 of 2023, I. A. No.20 of 2023
Completed
651 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
Completed
652 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I. A. No. 23, 36 & 38 of 2021
Completed
653 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for Deviation in Standard Bidding document for Long Term Procurement of 7,000 MW Solar Power and for Meeting the Solar Renewable Purchase Obligations under Section 19 of MERC (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019 and to Supply day time Power to the Farmers of the State of Maharashtra. And Interlocutory Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking urgent hearing in Case No. 164/MP/2023.
164 of 2023 & IA No. 41 of 2023
Completed
654 Fri 21/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pimpri Chinchwad Municipal Corporation & Anr. seeking adoption of the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 as promulgated by the Government of India in June 2022. and Promotion of generation and procurement of power generated through municipal solid waste under the concept of Waste to Energy. and Pimpri Chinchwad Municipal Corporation’s 14 MW Waste to Energy plant at Moshi, Pune. And Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for Interim Reliefs in Case No. 165/AD/2023. And Interlocutory Application of Pimpri Chinchwad Municipal Corporation & Anr. for urgent listing in Case No. 165/AD/2023.
165 of 2023 & IA No. 42 of 2023, 43 of 2023
Completed
655 Tue 18/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Section 86 (1)(b) of the EA, 2003 read with Regulation 20 of the MERC (MYT) Regulations, 2019 and directions of the Hon'ble Commission vide Order dated 30.03.2020 in Case No. 326 of 2019 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval of the Power Procurement Plan of The Tata Power Company Limited - Distribution for FY 2024-25 to FY 2034-35 And Application of The Tata Power Company Limited (Distribution) seeking urgent listing and hearing of the captioned Petition.
39 of 2023 & I. A. No.39 of 2023
Completed
656 Tue 18/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. TP Saurya Limited under Section 86(1)(f) of the EA, 2003 read with Regulation 27 & 39 of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022 And Petition of M/s. TP Saurya Limited under Section 94(2) of the Electricity Act, 2003 read with Regulation 33 of the MERC Regulations, 2022 seeking interim relief(s)/directions on behalf of TP Saurya Limited.
66 of 2023 & I.A. No.32 of 2023
Completed
657 Tue 18/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Energy Limited (JSWEL) under Section 86 (1)(f) & 11(2) of the Electricity Act, 2003 for payment of Fixed Charges and Revision of Energy Charges during Subsistence of S. 11 Direction And Application of JSW Energy Limited (JSWEL) seeking urgent listing of the Petition filed under section 86 (1)(f) & Section 11(2) of the Electricity Act, 2003.
211 of 2022 & I.A. No.33 of 2023
Completed
658 Tue 18/07/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 86 (1) (f) read with 86 (1) (k) of the Electricity Act, 2003 read with Article 4, 10, 18 & 17 of the Energy Banking Agreement dated 29.06.2022 executed between Maharashtra State Electricity Distribution Company Ltd and Saranyu Power Trading Pvt. Ltd for banking of Energy, under Tender No. CE/PP/MSEDCL/2022-23/01 dated 03.06.2022 And Application of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for urgent listing in Case No. 122/MP/2023.
122 of 2023 & I.A No.38 of 2023
Postponed till further notice
659 Tue 16/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
Rescheduled on Tuesday 09/May/2023 10:30 AM
660 Tue 16/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
Rescheduled on Tuesday 09/May/2023 10:30 AM
661 Fri 12/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
Rescheduled till further notice
662 Fri 12/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
Rescheduled till further notice
663 Fri 12/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
Rescheduled on Tuesday 09/May/2023 10:30 AM
664 Fri 12/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
Rescheduled on Tuesday 09/May/2023 10:30 AM
665 Fri 12/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled till further notice
666 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition Case of Maharashtra State Electricity Distribution Co. Ltd. under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants And Application of Captive Power Producers Association seeking Impleadment as a party/Respondent And Applications of Respondents for striking off their names from the list of Respondents And Applications filed by CIPLA Ltd. and Orient Cement Ltd. challenging Maintainability of the Petition.
158 of 2022 & Dairy No. 247, 242, 256, 262, 266, 267 of 2022 & I.A. No. 25, 29, 31, 34, 40 & 45 of 2022
Rescheduled till further notice
667 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
Completed
668 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
Completed
669 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy seeking compliance of CGRF, Amaravati Order dated 27 May, 2022.
175 of 2022
Completed
670 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
Completed
671 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AA Energy Limited under Section 86 (1) (e) read with 86 (1) (b), (k) of the Electricity Act, 2003 Read with Article 5 & 21.8 of Energy Purchase Agreement dated 19.09.2017 executed between Petitioner AA Energy Limited and Respondent Maharashtra State Electricity Distribution Company Ltd for supply of 10 MW Energy, from its Biomass Plant Located at Wadsa, Desaiganj, District Gadchiroli.
60 of 2023
Completed
672 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of AA Energy Limited for seeking urgent listing and issuance of interim directions in Case No. 60/AP/2023.
IA No. 31 of 2023 in Case No. 60 of 2023
Completed
673 Tue 09/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and Article 15 read with Article 10.05 of the Wind Energy Purchase Agreements dated 08.08.2017, 24.03.2017 and 24.03.2017 for adjudication of dispute in relation to timely payment of Energy Bills raised by the Petitioner.
27 of 2023
Completed
674 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited -D under Section 86 (1)(b) read with and Regulation 39 of the Maharashtra Electricity Regulatory Commission (Transaction of Business and Fees and Charges) Regulations, 2022 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for Short Term Power Purchase for Tata Power -D for April 2023 to June 2023 And Interlocutory Application of The Tata Power Company Limited - Distribution for seeking urgent listing and hearing of the captioned petition in Case No. 53/AP/2023.
53 of 2023 & I. A. No.28 of 2023
Completed
675 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking declaration that the PPA dated 04.04.2022 stands validly termination and for return of Performance Bank Guarantee dated 22.03.2022 amounting to Rs. 24 Crores pursuant to the termination And Interlocutory Application of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. for seeking urgent listing and issuance of interim directions in Case No. 56/AD/2023.
56 of 2023 & I. A. No. 30 of 2023
Completed
676 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Joint Petition of 1) Maharashtra State Electricity Distribution Company Ltd. and 2) Dodson-Lindblom Hydro Power Private Limited Section 86 (1) (e) of the Electricity Act, 2003 for amendment to the PPA which is a ministerial act in the present Case for updating the record of the transaction between the Parties And Joint Interlocutory Application of Maharashtra State Electricity Distribution Company Ltd. and Dodson-Lindblom Hydro Power Private Limited for seeking urgent listing and hearing Case No. 58/MP/2023.
58 of 2023 & I. A. No. 29 of 2023
Completed
677 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Ltd. for change in the approved Load Shedding Protocol of AG Load Management Scheme in Gadchiroli District.
59 of 2023
Completed
678 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Interlocutory Application of Shreehari Associates Private Limited for seeking urgent reliefs in Case No. 57/DT/2023
I.A. in 27 of 2023 in Case No. 57 of 2023
Completed
679 Mon 08/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
Completed
680 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
Scheduled
681 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 61 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
178 of 2022
Rescheduled till further notice
682 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by the Commission in Case No. 62 of 2020 against MSEDCL and initiate appropriate action in relation thereto.
179 of 2022
Rescheduled till further notice
683 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events And Application of M/s. Avaada MH Sustainable Pvt. Ltd. seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No. 44 of 2022
Scheduled
684 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021 and Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
Rescheduled till further notice
685 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
54 of 2023
Scheduled
686 Tue 02/05/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Vidyut Nigam Private Limited under Section 86 (1) (e) of the Electricity Act, 2003 requesting the Hon’ble commission to notify separate “auxiliary consumption norms” for air cooled condenser” based technology biomass generation plants in line with the philosophy adopted by the ld. CERC And seeking amendment/relaxation/removal of difficulties/and issuance of practice direction qua regulation 38 by notifying separate “auxiliary consumption norms” for air cooled condenser based technology biomass generation plants And seeking the kind indulgence of the hon’ble commission to exercise its inherent powers.
55 of 2023
Scheduled
687 Fri 28/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. . seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Rescheduled on Friday, 12/May/2023 10:30 AM
688 Fri 28/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
Rescheduled till Further Notice
689 Fri 28/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021 and Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing.
162 of 2022 & I.A. No. 23 of 2022
Rescheduled on Thursday, 02/May/2023 10:30 AM
690 Fri 28/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Implementation of the Appellate Tribunal for Electricity (ATE)’s Judgment dated 22 September 2022 in Appeal No. 46 of 2019 filed by Serum Institute of India Pvt. Ltd. for compensation due to denial of Short Term Open Access for May 2017.
173 of 2017
Rescheduled till further notice
691 Fri 28/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to list the matter as per Appellate Tribunal for Electricity (ATE) Judgment dated 22 September 2022 in Appeal No. 46 of 2019.
210 of 2022
Rescheduled till further notice
692 Tue 25/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for non-compliance dated 05.02.2023 filed by the petitioner in view of daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking action against MSEDCL for wilful violation of directions contained in daily orders dated 17.01.2023 and 31.01.2023 passed by the Hon’ble Commission.
7 of 2023 & I.A. No. 4 of 2023, I.A. No. 5 of 2023, I.A. No. 11 of 2023, I.A. No. 12 of 2023, I.A. No. 21 of 2023, I.A. No. 22 of 2023
Completed
693 Tue 25/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Tata Power Company-Distribution seeking declaration that delay in the switchover of consumers by Adani Electricity Mumbai Ltd.-Distribution is illegal and contrary to the Commission’s Order dated 12 June 2017 in Case Nos. 182 of 2014 and 40 of 2015 read with the Supply Code and Standard of Performance Regulations.
82 of 2021
Rescheduled till further notice
694 Tue 25/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Ltd.-Distribution seeking directions against Tata Power Company Ltd.-Distribution for willful violation of the Order dated 12 June 2017 passed by the Commission in Case Nos. 182 of 2014 and 40 of 2015, while carrying out switchover of existing consumers in Mumbai Suburban area.
135 of 2021
Rescheduled till further notice
695 Tue 25/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd Seeking Approval for Purchase of Over Injected Units above Contracted (Export) Capacity from Bagasse Based Co-Generation Projects And Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Cogeneration Association of India (CAI) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 And Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021.
70 of 2021 & I.A. 23, 36 & 38 of 2021
Completed
696 Fri 21/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
697 Fri 21/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
698 Fri 21/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
699 Fri 21/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
700 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
Completed
701 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
Completed
702 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & I.A. No. 13 of 2023, I.A. No. 14 of 2023
Completed
703 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking urgent listing in Petition bearing Case no. 22/AD/2023.
22 of 2023 & I.A. No. 17 of 2023, I.A. No. 18 of 2023
Completed
704 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking urgent listing in Petition bearing Case No. 23/AD/2023.
23 of 2023 & I.A. No. 15 of 2023, I.A. No. 19 of 2023
Completed
705 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking urgent listing in Petition bearing Case No. 24/AD/2023.
24 of 2023 & I.A. No. 16 of 2023, I.A. No. 20 of 2023
Completed
706 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project. And Application for seeking interim directions under regulation 81 read with regulation 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 on behalf of the petitioner.
IA No. 26 of 2023 in Case No. 18 of 2023
Completed
707 Thu 20/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition seeking appropriate directions from Maharashtra Electricity Regulatory Commission in compliance with Order dated 24.01.2023 passed by Hon’ble Bombay High Court in Writ Petition No. 1009 of 2023 filed by Ultratech Cement Limited & Anr v. Maharashtra State Electricity Distribution Co. Pvt. Ltd., Order dated 16.03.2023 in Civil Writ Petition No. 2511 of 2023 filed by Vaibhav Deshmukh Infra Pvt Ltd. v. Union of India & Anr., Civil Writ Petition No. 2516 of 2023 filed by RNP Concrete (India) Pvt Ltd. v. UOI and Ors. and Civil Writ Petition No. 2587 of 2023 filed by M/s. L T Patil and Sons vs MSEDCL.
45 of 2023
Completed
708 Tue 11/04/2023 11:00:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under section 63 of the Electricity Act 2003.
41 of 2023
Completed
709 Tue 11/04/2023 11:00:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 117.5 MW solar power under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (PM-KUSUM) under component-c from solar projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
42 of 2023
Completed
710 Tue 11/04/2023 11:00:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution company Limited (MSEDCL) for seeking approval for adoption of tariff discovered for long term procurement of 150 MW solar power under ‘Mukhyamantri Sour Krishi Vahini Yojana’ from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
43 of 2023
Completed
711 Tue 11/04/2023 11:00:00 AM
e-Hearing through Video Conferencing
Review Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) for the Order dated 31.03.2023 in Case No. 37 of 2023 issued by Hon’ble Commission in the matter of petition filed by BEST Undertaking for approval of tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April, 2023 to March, 2024.
44 of 2023
Completed
712 Tue 11/04/2023 10:30:00 AM
e-Public Hearing
Hearing on SUO- MOTU draft ORDER ON Renewable Energy Tariff for FY 2023-24
01/SM/2023
Completed
713 Tue 11/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & I.A. No. 7 of 2023, I. A. No. 8 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
714 Tue 11/04/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & I.A. No. 9 of 2023, I.A. No. 10 of 2023
Rescheduled on Thursday 20/April/2023 10:30 AM
715 Thu 23/03/2023 11:30:00 AM
e-Hearing through Video Conferencing
Petition of TP Saurya Limited under Section 86 (1) (b) of the Electricity Act, 2003 and all the enabling powers in this regard including the inherent powers and expansive regulatory authority vested unto the Hon'ble Commission seeking approval for sale of non-solar (wind) power under short term arrangement. And Interlocutory Application of TP Saurya Limited seeking urgent listing and hearing of the captioned Petition in Case No. 30/AP/2023.
30 of 2023 & IA. No. 23 of 2023
Completed
716 Thu 23/03/2023 11:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April 2023 to March 2024. And Interlocutory Application of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) seeking urgent hearing of Approval for tariff discovered through competitive bidding process undertaken by BEST for procurement of short term bilateral power purchase for the period April’2023 to March’2024.
37 of 2023 & IA. No. 24 of 2023
Completed
717 Thu 23/03/2023 11:30:00 AM
e-Hearing through Video Conferencing
Petition of AEML SEEPZ Limited (ASL) for approval of Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24 and FY 2024-25 in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019. And Interlocutory Application of AEML SEEPZ Limited (ASL) under Section 86, including Section 86(1)(a) and Section 94(2) of the Electricity Act, 2003 seeking for urgent listing of the captioned petition and for seeking certain interim directions.
40 of 2023 & IA. No. 25 of 2023
Completed
718 Thu 23/03/2023 11:00:00 AM
e-Public Hearing
Inviting Comments on Application of Adani Electricity Mumbai Limited -Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
127 of 2022
Completed
719 Thu 23/03/2023 10:30:00 AM
e-Public Hearing
Inviting Comments on Application of The Tata Power Company Ltd.-Transmission for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
89 of 2022
Completed
720 Fri 03/03/2023 10:30:00 AM
e-Public Hearing at Nagpur
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. (Place/Venue of e-Facilitation Centre: Vanamati Auditorium, V.I.P. Road, Dharampeth, Nagpur, District-Nagpur)
226 of 2022
Completed
721 Thu 02/03/2023 10:30:00 AM
e-Public Hearing at Amravati
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. (Place/Venue of e-Facilitation Centre: Niyojan Bhavan (DPDC Hall), Collector Office Premises, Camp, Amravati, District-Amravati)
226 of 2022
Completed
722 Mon 27/02/2023 10:30:00 AM
e-Public Hearing at Nashik
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. (Place/Venue of e-Facilitation Centre: Niyojan Bhavan, Collector Office Campus, Old Agra Road, Nasik)
226 of 2022
Completed
723 Sat 25/02/2023 10:30:00 AM
e-Public Hearing at Aurangabad
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25. (Place/Venue of e-Facilitation Centre: Meeting Hall, Office of the Divisional Commissioner, Aurangabad, District-Aurangabad)
226 of 2022
Completed
724 Thu 23/02/2023 10:30:00 AM
e-Public Hearing at Pune
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25 (Place/Venue of e-Facilitation Centre: Auditorium, Government College of Engineering, Shivaji Nagar, Pune)
226 of 2022
Completed
725 Tue 21/02/2023 10:30:00 AM
e-Public Hearing at Navi Mumbai
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25 (Place/Venue of e-Facilitation Centre: Agri-Koli Sanskruti Bhavan, Pam Beach Road, Sector-24, Nerul West, Navi Mumbai-400706)
226 of 2022
Completed
726 Mon 20/02/2023 10:30:00 AM
e-Public Hearing
Suggestions and Objections on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Mid Term Review (MTR) Tariff Petition for Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
212 of 2022
Completed
727 Fri 17/02/2023 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on The Tata Power Company Limited - Distribution's Mid-Term-Review Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
225 of 2022
Completed
728 Thu 16/02/2023 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on Adani Electricity Mumbai Limited – Distribution Business Mid-Term Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
231 of 2022
Completed
729 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Corporation Limited (MSEDCL) and Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MAHAPREIT) for Approval of Power Purchase Agreement (PPA) between MSEDCL and MAHAPREIT and Tariff for Solar Power Plant, Sangli of 125 MW capacity under Section 86(1)(A), 86(1)(B), 86(1)(E) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
5 of 2023
Completed
730 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking directions from the Hon’ble Commission in furtherance of directions contained in daily order dated 17.01.2023 and Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for directions dated 30.01.2023 filed by the petitioner in view of daily order dated 17.01.2023 passed by the Hon’ble Commission
7 of 2023 & IA. No. 4 of 2023, 5 of 2023, 11 of 2023, 12 of 2023
Completed
731 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016 and its amendments thereof, for the procurement of 3.00 MW Round the Clock (RTC) power for a period of 12 months i.e. from 1 July 2023 to 30 June 2024.
9 of 2023
Completed
732 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval to tariff and procurement of 500 MW Solar Power through MAHAPREIT’s Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY).
222 of 2022
Completed
733 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from intra-state grid connected solar power projects under Section 63 of the Electricity Act 2003.
242 of 2022
Completed
734 Tue 14/02/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for Adoption of Tariff discovered for Long Term Procurement of 8.7 MW Solar Power Under ‘Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan’ (Pm-Kusum) under component A from 0.5 to 2 MW Capacity Projects Connected to Distribution Network under Section 63 of the Electricity Act 2003 for Meeting the Solar Renewable Purchase Obligations.
26 of 2023
Completed
735 Thu 09/02/2023 12:00:00 PM
e-Public Hearing
Inviting Suggestions and Objections on State Transmission Utility’s (STU) Mid Term Review Petition for Truing up of FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and determination of Intra-State Transmission Tariff for the MYT Control Period from FY 2023-24 to FY 2024-25.
284 of 2022
Completed
736 Thu 09/02/2023 11:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on Laxmipati Balaji Supply Chain Management Limited (LBSCML)’s Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
220 of 2022
Completed
737 Thu 09/02/2023 11:00:00 AM
e-Public Hearing
Inviting Suggestions and Objections on EON Kharadi Infrastructure Private Limited's (EON SEZ Phase II) Multi-Year Tariff Petition for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
236 of 2022
Completed
738 Thu 09/02/2023 10:30:00 AM
e-Public Hearing
Suggestions and Objections on EON Kharadi Infrastructure Private Limited (EON SEZ Phase I)'s Multi-Year Tariff Petition and for Truing-up of FY 2020-21 and FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023-24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019
235 of 2022
Completed
739 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of NuPower Renewables Private Limited (NRPL) under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for stay of the Show Cause Notice dated 30.12.2022 issued by Maharashtra State Electricity Distribution Company Limited (MSEDCL) in respect of disconnection from grid by MSEDCL for non-installation of meters at the Petitioner’s Wind Project and Application of NuPower Renewables Private Limited (NRPL) for urgent listing of the Petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of dispute between NuPower Renewables Private Limited and Maharashtra State Electricity Distribution Company Limited regarding installation of meters and disconnection of the Wind Project.
18 of 2023 & IA. No. 9 of 2023, 10 of 2023
Completed
740 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals for the Notice of Contravention dated 05 January 2023, bearing reference number CE/RE/Wind/00329 issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for stay of the Notice of Contravention dated 05.01.2023, issued by the MSEDCL to Rajlakshmi Minerals for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014 and Application of M/s. Rajlakshmi Minerals for urgent listing of petition and application for interim stay for the Notice of Contraventions dated 05.01.2023 issued by the Respondent to the Petitioner for alleged contraventions under the Wind Energy Purchase Agreement dated 20 August 2014.
20 of 2023 & IA. No. 13 of 2023, 14 of 2023
Completed
741 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of M/s. Khandke Wind Energy Pvt. Ltd. under Section 86(1)(e) and (f) of the Electricity Act, 2003, read with Regulation 32 and 92 to 94 of the MERC (Conduct of Business) Regulations, 2004, challenging the illegal and arbitrary actions and conduct on the part of the MSEDCL, in disconnecting the petitioner’s wind power plant from its distribution system / grid, without prior intimation, basis or affording an opportunity for justification and in derogation of the extant clauses of the relevant energy purchase agreements executed by and between the petitioner and MSEDCL and Application of M/s. Khandke Wind Energy Pvt. Ltd. seeking urgent listing of the captioned Petition and Application of M/s. Khandke Wind Energy Pvt. Ltd. for restoration of the connectivity of the Petitioner to the Distribution Network of the Respondent No. 1 herein, as well as Restraining the said Respondent from taking any coercive action against the Petitioner.
17 of 2023 & IA. No.7 of 2023, 8 of 2023
Completed
742 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of M/s Sispara Renewables Power Private Limited under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 22.03.2017 entered into between M/s Sispara Renewables Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s Sispara Renewables Power Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
22 of 2023 & IA. No. 17 of 2023
Completed
743 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of M/s. Kalsubai Power Private Limited (KPPL) under Sections 86(1)(f), 86(1)(e) of the EA, 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreement dated 23.03.2017 entered into between M/s Kalsubai Power Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 05.01.2023 and Application of M/s. Kalsubai Power Private Limited (KPPL) seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 05.01.2023.
23 of 2023 & IA. No. 15 of 2023
Completed
744 Tue 07/02/2023 12:30:00 PM
e-Hearing through Video Conferencing
Petition of M/s. NSL Wind Power Company (Satara) Private Limited under Sections 86(1)(f), 86(1)(e) of the EA 2003 read with the provisions of Regulation 14, 33(a), 38(a), 39(a) and 39(c) of the MERC (Transaction of Business and Fees and Charges) Regulations, 2022, read with the various provisions of the Wind Energy Purchase Agreements entered into between M/s NSL Wind Power Company (Satara) Private Limited and MSEDCL, seeking inter alia quashing of Impugned Notice dated 09.01.2023 and Application of M/s. NSL Wind Power Company (Satara) Private Limited seeking interim protection against the Respondent to take any action(s) pursuant to the Impugned Notice dated 09.01.2023.
24 of 2023 & IA. No. 16 of 2023
Completed
745 Tue 07/02/2023 12:00:00 PM
e-Public Hearing
Suggestions and Objections on JAWAHARLAL NEHRU PORT TRUST's Multi Year Tariff Petition for Truing-up of FY 2021-22, Provisional Truing-up of FY 2022-23 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period for FY 2023- 24 and FY 2024-25 for its Distribution Business in accordance with Regulation 5.1 (b) of the MERC (Multi Year Tariff) Regulations, 2019
219 of 2022
Completed
746 Tue 07/02/2023 11:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on KRC Infrastructure and Projects Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
214 of 2022
Completed
747 Tue 07/02/2023 11:00:00 AM
e-Public Hearing
Inviting Suggestions and Objections on Gigaplex Estate Private Limited’s Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
215 of 2022
Completed
748 Tue 07/02/2023 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on Mind space Business Parks Private Limited's Mid-Term-Review Tariff Petition for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised ARR and Tariff for FY 2023-24 and FY 2024-25
216 of 2022
Completed
749 Tue 31/01/2023 11:00:00 AM
e-Public Hearing
Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final True-up for FY 2019-20, FY 2020-21 and FY 2021-22, Annual Performance Review and provisional True- up for FY 2022-23 and Revised Aggregate Revenue Requirement and Tariff for FY 2023-24 and FY 2024-25 & provisional tariff for upcoming Bhusawal Unit 6
227 of 2022
Completed
750 Tue 31/01/2023 10:30:00 AM
e-Public Hearing
Inviting Suggestions / Objections on Mid-Term Review Petition of The Tata Power Company Limited - Generation Business for Truing up for FY 2019-20, FY 2020-21 & FY 2021-22, Provisional Truing up for FY 2022-23 and Approval of Revised ARR forecast for the period from FY 2023-24 to FY 2024-25.
221 of 2022
Completed
751 Wed 25/01/2023 12:30:00 PM
e-Public Hearing
Suggestions / Objections on Mid Term Review Petition of The Tata Power Company Limited - Transmission for Truing up of FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up of FY 2022-23 and Revised Projections of Aggregate Revenue Requirement for the period from FY 2023-24 to FY 2024-25
217 of 2022
Completed
752 Wed 25/01/2023 12:00:00 PM
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Generation Business for Truing up for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR), Revised Fixed Charges and Variable Charges for FY 2023-24 and FY 2024-25.
229 of 2022
Completed
753 Wed 25/01/2023 11:30:00 AM
e-Public Hearing
Inviting Suggestions/Objections on Petition of Adani Electricity Mumbai Limited – Transmission Business for Truing up for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing up for FY 2022-23 and approval of Revised Aggregate Revenue Requirement (ARR) for fourth (FY 2023-24) and fifth (FY 2024-25) year of Fourth Control Period.
230 of 2022
Completed
754 Wed 25/01/2023 11:00:00 AM
e-Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
237 of 2022
Completed
755 Wed 25/01/2023 10:30:00 AM
e-Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for Approval of True-Up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing Up of ARR for FY 2022-23 and ARR Projection for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019.
238 of 2022
Completed
756 Tue 24/01/2023 12:30:00 PM
e-Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, Provisional Truing-up of ARR for FY 2022-23 and Revised Estimate of ARR for FY 2023-24 and FY 2024-25.
232 of 2022
Completed
757 Tue 24/01/2023 12:00:00 PM
e-Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited- Transmission Business’s Petition for approval of Truing-up of FY 2019-20 to FY 2021-22, Provisional Truing-up of FY 2022-23, and Aggregate Revenue Requirement (ARR) and Tariff for FY 2023-24 and FY 2024-25
224 of 2022
Completed
758 Tue 24/01/2023 11:30:00 AM
e-Public Hearing
Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for Approval of Truing-Up of ARR for FY 2019-20 as per MERC MYT Regulations, 2015, Truing up of ARR for FY 2020-21 and FY 2021-22 and Provisional Truing-up of ARR for FY 2022-23 and Determination of ARR for FY 2023-24 to FY 2024-25 as per MERC MYT Regulations, 2019
234 of 2022
Completed
759 Tue 24/01/2023 11:00:00 AM
e-Public Hearing
Suggestions/Objections on Jaigad PowerTransco Limited's Petition for approval of True up of ARR for FY 2019-20 as per MYT Regulations 2015, True Up for FY 2020-21 and FY 2021-22, Provisional Truing up of ARR for FY 2022-23 and ARR Projection for FY 2023- 24 to FY 2024-25 as per MYT Regulation 2019
213 of 2022
Completed
760 Tue 24/01/2023 10:30:00 AM
e-Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Truing-up of Annual Fixed Charges (AFC) for FY 2019- 20 to FY 2021-22, Provisional Truing-up of AFC for FY 2022-23 and Determination of AFC and Fees and Charges for FY 2023-24 and FY 2024-25
233 of 2022
Completed
761 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
Completed
762 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Juniper Green Field Private Limited seeking compensation on account of Change in Law events.
174 of 2022
Rescheduled till Further Notice
763 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
Completed
764 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
190 of 2022
Rescheduled till Further Notice
765 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Nashik’s Orders dated 14 December, 2018.
191 of 2022
Rescheduled till Further Notice
766 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
Rescheduled till Further Notice
767 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply & Transport Undertaking of Municipal Corporation of Greater Mumbai (BEST) for under Regulations 20.1 of the MERC (Multi-Year Tariff) Regulations, 2019 (‘MYT Regulations’) in the matter of approval of power procurement plan for 7 (Seven) years period from FY 2023-24 to FY 2029-30 covering next control period.
240 of 2022
Completed
768 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gajkesari Steels & Alloys Private Limited under Regulation 16.2.4 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 challenging the “Debit Bill Adjustment” Amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023. And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking ex-parte ad-interim Orders/directions for stay of the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023. And Interlocutory Application of M/s. Gajkesari Steels & Alloys Private Limited seeking urgent hearing of the interim application for stay filed by the petitioner in the matter of challenging the “debit bill adjustment” amounting to Rs. 24,25,16,847.55 included by MSEDCL in the petitioner’s current monthly energy bill dated 11.01.2023.
7 of 2023 & IA. No. 4 of 2023 & IA. No. 5 of 2023
Completed
769 Tue 17/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Laxmipati Balaji Supply Chain Management Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for seeking consent for execution of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2023 to January 31, 2024 for its FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
8 of 2023
Completed
770 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
Completed
771 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited seeking relief on account of Change in Law due to the increase in Goods and Service Tax (GST) rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
Completed
772 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. seeking execution/ implementation/ compliance of the Order dated 17.02.2022 passed in Case No. 61 of 2020.
178 of 2022
Completed
773 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd seeking execution/ implementation/compliance of the Order dated 17.02.2022 passed in Case No. 62 of 2020.
179 of 2022
Completed
774 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Avaada MH Sustainable Pvt. Ltd. seeking extension of the scheduled commercial operation date on account of certain force Majeure events.
187 of 2022
Completed
775 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s Viraj Profiles Private Limited Seeking Review of the Commission’s Order dated 29 August, 2022 in Case No. 61 of 2022.
193 of 2022
Completed
776 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
194 of 2022
Completed
777 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rathi Steel and Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 and Tariff Order dated 30 March 2020 in Case No. 322 of 2019.
195 of 2022
Completed
778 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of City Corporation Ltd. seeking relief under the Distribution Franchisee Agreement dated 16 October 2010 and subsequent renewals thereafter read with the Commission’s Order dated 24 May 2010 in Case No. 62 of 2007 and dated 1 June 2010 in Case No. 75 of 2007.
198 of 2022
Completed
779 Tue 10/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators. And Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022 & Diary No. 254 of 2022, IA No. 41 of 2022 & IA No. 42 of 2022
Completed
780 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
Completed
781 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd and Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
84 of 2016 and Diary No. 257 of 2022
Completed
782 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of New Asian Infrastructure Development Pvt. Ltd. seeking refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Company Ltd.
103 of 2022
Completed
783 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent. And Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No. 23 of 2021
Completed
784 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014. And Miscellaneous Application of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021 and 167 of 2020
Completed
785 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 7 December 2021 in Case No. 103 of 2021.
161 of 2022
Completed
786 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited for adjudication of dispute between it and Kreate Energy (I) Pvt. Ltd. arising out of the PPA dated 27 May, 2021. And Interlocutory Application of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited in Case No. 162 of 2022 for grant of early hearing on the Petition filed under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and Respondent.
162 of 2022 & I.A No. 23 of 2022
Rescheduled till Further Notice
787 Tue 03/01/2023 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for power procurement plan along with Tender documents for procuring power through Renewable Energy Sources with Energy Storage facility on Long Term Basis for 15 years. And Interlocutory Application for early hearing in Case No. 185/MP/2022 filed by M/s. Eon Kharadi Infrastructure Pvt. Ltd. SEZ Phase-I.
185 of 2022 & Diary No. 264 of 2022
Completed
788 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects and Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 202 and Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 and Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects).
70 of 2021 & 23 of 2021, IA 36 & 38 of 2021
Rescheduled till Further Notice
789 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of Distribution Open Access Regulations, 2016, and Open Access Practice directions dated 08.03.2017.
173 of 2017
Completed
790 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers seeking appropriate reliefs against MSEDCL for reconnecting and re-installation of the jumpers of six wind turbine generators. And Application of Shah Promoters & Developers for urgent listing in Case No. 196/AD/2022. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited. And Interlocutory Application of Shah Promoters & Developers seeking appropriate relief against Maharashtra State Electricity Distribution Company Limited.
196 of 2022, Diary No.254 of 2022 & IA No.41 of 2022, IA No.42 of 2022
Completed
791 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Serum Institute of India Private Ltd. to get the matter listed on the basis of the Order dated 22.09.2022 passed in Appeal No. 46 of 2019 issued by the Appellate Tribunal for Electricity.
210 of 2022
Completed
792 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the PPA based on the tariff determined under Competitive Bidding process u/s. 63 of the EA, 2003, as per the ‘Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process’ issued by the MoP, GoI, dated 30 March 2016 and its amendments thereof, for the procurement of Non-solar (excluding wind energy) renewable power of 3.00 MW Round the Clock (RTC) or as per availability on short-term basis for a period of 12 months i.e. from 1 February 2023 to 31 January 2024.
218 of 2022
Completed
793 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval to tariff and procurement of 500 MW Solar Power through Mahatma Phule Renewable Energy and Infrastructure Technology Limited’s (MAHAPREIT) Decentralised Solar Power Project in One District of Maharashtra under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) as per Section 86(1)(A), 86(1)(B) and Section 62 of the Electricity Act 2003, MERC (Multi Year Tariff) Regulations, 2019 and MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019.
222 of 2022
Completed
794 Tue 27/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for change in the approved Load Shedding Protocol of AG Load Management Scheme in five Districts of Vidharbha Viz. Nagpur, Chandrapur, Bhandara, Gondia and Gadchiroli Districts.
228 of 2022
Completed
795 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the Order dated 13.09.2022 passed by the Hon’ble Commission in Case No. 88 of 2022 and Interlocutory Application of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar seeking urgent listing and hearing in Case No. 199/RC(MP)/2022.
199 of 2022
Rescheduled on Fri 29/November/2022 10:30 AM
796 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Ltd. for compensation in Tariff on account Change in Law events under its PPAs dated 22.04.2010 and 05.06.2010 with Maharashtra State Electricity Distribution Co. Ltd. Case No. 84 of 2016 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 18.10.2022. IN Appeal No. 263 of 2018 directions to the Commission therein.)
84 of 2016
Completed
797 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sridevi Trading Company regarding breach of Distribution Open Access Regulations 2016, Practice Directions dated 8 March 2017 and Excess levy and recovery of Wheeling Charges. Case No. 206 of 2017 (Re-opened in pursuance of Hon’ble APTEL’s Judgement dated 06.10.2022. IN Appeal No. 20 of 2019 directions to the Commission therein.)
206 of 2017
Completed
798 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sri Bhagirath Textiles Ltd., under Section 142 of Electricity Act 2003 to penalized MSEDCL for non compliance of CGRF Order and issue directions to comply the Order.
200 of 2022
Rescheduled till Further Notice
799 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Sunil Madhusudan Joshi under Section 142 of Electricity Act 2003 in the matter of Contempt, Non-compliance and Continuance of Contravene of the Order of CGRF dated 28-10-2022.
201 of 2022
Completed
800 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for adoption of the tariff discovered through the Competitive Bidding Process held for long term procurement of 18.36 MW wind power from the wind generators whose EPAs with MSEDCL have expired.
202 of 2022
Completed
801 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Application RattanIndia Power Limited for directions on behalf of the Applicant/ Petitioner pursuant to Order dated 18.10.2022 passed by the Hon’ble Appellate Tribunal for Electricity in Appeal No. 263 of 2018.
Diary No. 257 of 2022
Completed
802 Fri 16/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Aurangabad Industrial Township Limited for approval of Short Term Power Purchase plan by Aurangabad Industrial Township Limited for one year period starting from 01.04.2023 to 31.03.2024 under Section 86 of the Electricity Act, 2003 (EA) read with Competitive Bidding Guidelines issued by the Ministry of Power (MoP) Government of India (GoI) dated 30 March, 2016 and amendments thereof.
206 of 2022
Completed
803 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86(1)(e), (f) and (k) of the EA, 2003 read with article 8 of the PPA dated 10.08.2021 executed between M/s Avaada MH Sustainable Private Limited and MSEDCL for supply of 250 MW solar power from its solar PV power plant in the state of Maharashtra, seeking inter alia extension of the scheduled commercial operation date on account of certain force majeure events affecting the project implementation and pass appropriate order(s) /direction(s) in relation to certain other incidental issues under the PPA, to the extent prayed by the petitioner herein.
187 of 2022
Completed
804 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Avaada Sunce Energy Private Limited under Section 86(1)(f) of the EA, 2003 and Article 9 of the PPA dated 26.06.2019 seeking declaration that the imposition of Safeguard Duty on import of Solar Cells/ modules on account of promulgation of Ministry of Finance Notification dated 29.07.2020 bearing No. 02/2020-Customs (SG) and enhancement of GST Rates on Solar Energy Devices and Parts on account of promulgation of Ministry of Finance Notification dated 30.09.2021 bearing No. 8/2021-Central Tax (Rate) are ‘Change in Law’ events under Article 9.1 of the said PPA and to further direct the Respondent to pay compensation along with carrying cost to the Petitioner as the relief under Article 9.2.1 of the said PPA as to offset the financial impact of the said Change in Law events and to ensure that the Petitioner is placed in the same financial position as it would have been had it not been for the occurrence of the said Change in Law events.
192 of 2022
Completed
805 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Private Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated August 29, 2022 in Case No. 61 of 2022.
193 of 2022
Completed
806 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Geetai Steels Private Limited under Section 142 and 146 of the EA 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by MSEDCL for the 4th Control Period of FY 2020-21 to FY 2024-25.
194 of 2022
Completed
807 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rathi Steel And Metal Private Limited (Formerly Rajuri Steel Pvt Ltd.) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003 and directions pertaining to the wheeling charges to be applicable to the Petitioner as recorded in the Clarificatory Order dated 30 April 2020 read with Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
195 of 2022
Completed
808 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of City Corporation Limited (CCL) seeking appropriate relief on provided under the distribution franchisee agreements dated October 16, 2010 and subsequent renewals thereafter read with Order of the Hon’ble Commission dated May 24, 2010 in Case No. 62 of 2007 and June 1, 2010 in Case No. 75 of 2007.
198 of 2022
Completed
809 Tue 13/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Application of M/s. Avaada MH Sustainable Pvt. Ltd. under Section 86 read with Section 94 (2) of the Electricity Act, 2003 along with provisions of MERC Conduct of Business Regulations 2004, seeking urgent listing / Hearing of the Accompanying Petition.
187 of 2022 & I.A. No.44 of 2022 in 187 of 2022
Completed
810 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited seeking approval for Power Procurement Plan through Renewable Energy Sources with Energy Storage facility on Long Term Basis For 15 years starting from 1st November 2023 to 31st October 2038 and Approval of Tender Documents for its IT and ITES SEZ at Survey no. 77, MIDC Knowledge Park, Kharadi, District Pune (EON SEZ Phase- I) and Survey No. 72, Village Kharadi, District Pune (EON SEZ Phase-II).
185 of 2022
Rescheduled on Fri 25/November/2022 10:30 AM
811 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Transmission-T) under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 311 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 35 of 2021 (wherein the Commission has already permitted assignment of the Transmission License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of AEML and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
183 of 2022
Completed
812 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 against the Respondent/ Maharashtra State Electricity Distribution Company Limited for wilful disobedience of this Hon’ble Commission’s final order dated 18.07.2022 passed in Case No. 26 of 2022, since disposed and Interlocutory Application filed by Mahanagar Gas Limited under Section 94(2) of the Electricity Act, 2003 seeking urgent hearing in Case No. 186/MP/2022.
186 of 2022 & IA. No.35 of 2022 in 186 of 2022
Completed
813 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited - D under Section 17(3) of the EA, 2003 and in terms of Order dated 02.01.2019 passed by the Commission in Case No. 341 of 2018 and Order dated 01.06.2021 passed by the Commission in Case No. 34 of 2021 (wherein the Commission has already permitted assignment of the Distribution License of AEML in favour of SBICAP Trustee Company Limited, acting as the security trustee for the benefit of the lenders of AEML) for bringing on record and approve the changes / addition in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of AEML.
189 of 2022
Completed
814 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Ferro Metal Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No.43/2018, Dt. of order: 14/12/2018.
190 of 2022
Completed
815 Fri 09/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Bhagawati Steel Cast Pvt. Ltd. under Section 142 & 146 for Non-compliance of the Directions by MSEDCL in the matter of Order of the GGRF, Nashik in Case No. 44/2018, Dt. of order: 14/12/2018.
191 of 2022
Completed
816 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020
159 of 2021
Completed
817 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Ltd. Mumbai seeking compliance of the Commission’s Order dated 28 May, 2019 in Case No. 168 of 2014
167 of 2020
Completed
818 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Manoj Panjabrao Updhye for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Akola zone in the matter of Manoj Panjabrao Upadhye Complaint No 52 of 2022 Order dated 31.05.2022 realted to refund of infrastructure cost spent under commitment of refund by agriculture consumer having no arrears.
176 of 2022
Completed
819 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution/implementation/compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 61 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
178 of 2022
Completed
820 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nisagra Renewable Energy Private Ltd. under Section 86 read with Section 142 of the Electricity Act, 2003 seeking execution / implementation / compliance of the Order dated 17.02.2022 passed by this Hon’ble Commission in Case No. 62 of 2020 against Maharashtra State Electricity Distribution Company Limited and initiate appropriate action in relation thereto.
179 of 2022
Completed
821 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Jaykumar Maniklal Vishwakarma & Anr. for obtaining Electric meter from the Power Supplier M/s. Adani Electricity Generation and Supply Ltd. formerly Reliance Electric Generation and Supply Ltd. Application under Section 43 of Electricity Act 2003.
180 of 2022
Completed
822 Tue 06/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Greta Energy Ltd. & Anr. under Regulation 85 of Maharashtra Electricity Regulatory Commission conduct of Business Regulations 2004 for Review of Order of Commission issued in Case No. 1/SM/2022 dt. 29/7/2022 for Generic renewable energy Tariff for FY 2022-22 under MERC (Renewable Energy Tariff) Regulations, 2019.
181 of 2022
Completed
823 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Shriram Cotetx Khairi for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No 06/2022.
166 of 2022
Completed
824 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Ideal Energy Projects Limited (IEPL) under Section 86(1)(a) and 86(1)(f) seeking directions against Maharashtra State Electricity Distribution Company Limited to apply HT-I Industrial Tariff category to the start-up power consumed by the Petitioner and accordingly issue appropriate refund / credit towards excess amount collected from the Petitioner for the period 27.12.2012 till 31.05.2015 under HT-II Commercial Tariff category along with applicable interest.
168 of 2022
Completed
825 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Viraj Profiles Private Limited against MSEDCL to (i) waive the demand made by MSEDCL for additional security deposit to VPL, pending refund of additional surcharge by MSEDCL to VPL under the Judgement dated 10.12.2021 passed in Civil Appeal Nos. 5074-5075 of 2019 (MSEDCL V/s. M/s. JSW Steel Limited & Ors.) and the Order dated 15.03.2022 passed in Contempt Petition (Civil) Nos. 112-113 of 2022 in Civil Appeal Nos. 5074-5075 of 2019 (M/s. JSW Steel Coated Products Limited V/s. Vijay Singhal & Ors.), of Supreme Court of India, and (ii) alternatively and without prejudice, exempt VPL from payment of additional security deposit under regulation 13.1. and 13.2 of MERC (ESC & SOP) Regulations, 2020 by ordering MSEDCL to revise the billing cycle for VPL to twice a month (i.e., for 15 days) instead of existing billing of once every month, under regulation 16.1.1 of MERC (ESC & SOP) Regulations, 2020.
169 of 2022
Completed
826 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Maharashtra State Power Generation Company Limited under Section 61 of Electricity Act, 2003 read with Regulation 28 and 29 of MERC (Multi Year Tariff) Regulations, 2015 and MERC (Multi Year Tariff) Regulations, 2019 respectively, seeking modification/reconsideration of the Lease Rent from FY 2019-20 onwards, as approved by the Hon’ble Commission in its Order dated 27.10.2008 in Case No. 17 of 2007.
172 of 2022
Completed
827 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited (JGFPL) under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2020 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking compensation on account of Change in Law Events.
174 of 2022
Completed
828 Fri 02/12/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shraddha Dairy for non-compliance of Order passed by Hon’ble CGRF, MSEDCL, Amravati Zone Order in Case No. 26/2022 in the matter of M/s. Shraddha Dairy, Yavatmal.
175 of 2022
Completed
829 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent and Interlocutory Application of Clean Wind Power (Bhavnagar) Pvt. Ltd. seeking interim reliefs, including restraining MSEDCL from invoking/encashing the Petitioner's Performance Bank Guarantee.
119 of 2021 & I.A. No.23 of 2021 in 119 of 2021
Completed
830 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
Completed
831 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
Completed
832 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
Completed
833 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
Completed
834 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
Completed
835 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
Completed
836 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
Completed
837 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
Completed
838 Tue 29/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition filed by M/s. WAACOX Energy Private Limited under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, and principles analogous Order XLVII of Code of Civil Procedure, 1908, for review of Order dated 07.07.2022 passed in Case No. 104 of 2021 filed by M/s. WAACOX Energy Private Ltd. against Maharashtra State Power Generation Co. Ltd. and Maharashtra State Electricity Distribution Co. Ltd. for issuance of appropriate directions to comply with the Power Purchase Agreements dated 14.06.2018 pertaining to Solar Power Projects at Ralegansiddhi and Manjarda
167 of 2022
Completed
839 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Hindustan Petroleum Corporation Limited under Sections 142 & 146 of the Electricity Act, 2003 for non-compliance by of the Commission’s Order dated 17 January 2019 in Case No. 223 of 2018.
66 of 2022
Completed
840 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
Completed
841 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. and NOV India Pvt. Ltd. seeking action against MSEDCL under Section 142 and 146 of the Electricity Act, 2003, for non-compliance of Appellate Authority’s Order dated 4 April 2019.
83 of 2022
Completed
842 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
Completed
843 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of R. L. Steels & Energy Limited under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
163 of 2022 & I.A No.18 of 2022, I.A No.19 of 2022, I.A No.36 of 2022, I.A No.37 of 2022, I.A No.38 of 2022 in 163 of 2022
Completed
844 Fri 25/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) under Regulation 39 of the MERC (Distribution Open Access) Regulation, 2014 against MSEDCL for adjudication of dispute arising under Open Access and petition challenging the “Revised Supplementary Bill” dated 11.08.2022 issued by MSEDCL as the same has not only been raised without any details/explanations but is also completely contrary to this Hon’ble Commission’s Order dated 19.03.2018 in Case No. 159/2016 and Judgment dated 26.11.2021 in Appeal No. 106/2021 passed by the Hon’ble APTEL.
164 of 2022 & I.A No.20 of 2022, I.A No.21 of 2022, in 164 of 2022
Completed
845 Tue 22/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited for in principle approval under the Change in Law provision of the PPA in respect of installation of additional systems in compliance with the Environment (Protection) Amendment Rules, 2015.
84 of 2022
Completed
846 Tue 22/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
Completed
847 Tue 22/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
Completed
848 Tue 22/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s. Maharashtra State Electricity Distribution Co. Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 and of Regulation 85 of the MERC (Conduct of Business) Regulations, 2004, for review of Order dated 06.04.2022 passed by Hon’ble MERC in Case No. 96 of 2021.
170 of 2022
Completed
849 Tue 22/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking direction against Respondents to comply with order of this Hon’ble Commission. And Interlocutory Application filed by Ordnance Factory Ambajhari, Nagpur (OFAJ) seeking urgent hearing in Case No. 184/AD/2022.
184 of 2022 & I.A No.33 of 2022 in 184 of 2022
Completed
850 Fri 18/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Imagicaa World Entertainment Ltd. seeking refund of wheeling and transmission charges levied for over-injected units for FY 2020-21 along with applicable interest and excess refund penalty of wheeling charges.
116 of 2022
Completed
851 Fri 18/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Little Earth Sampada Realities Pvt. Ltd. against MSEDCL seeking compliance of the CGRF, Pune’s Orders dated 16 February, 2022 in Case No. 56 of 2021 and Case No. 57 of 2021.
117 of 2022
Completed
852 Fri 18/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Pvt. Ltd. seeking relief on account of Change in law due to the increase in Goods and Service Tax rates on Solar Panels/ Modules and increase in Custom Duty on Solar inverters.
124 of 2022
Completed
853 Fri 18/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and PPA dated 04 April 2022 seeking amendment in Effective Date of the PPA.
128 of 2022
Completed
854 Tue 15/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the MERC (Conduct of Business) Regulations, 2004 and Section(s) 9 read with 10 of the Electricity Act, 2003 seeking a review of certain arrangements and/or permissions given by the Petitioner to the Respondents under the impression that such entities are Captive Generating Plants.
158 of 2022
Completed
855 Fri 11/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited, Gigaplex Estate Private Limited and KRC Infrastructure and Projects Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute between the Petitioners and the Respondent arising out of the PPA dated 27.05.2021.
162 of 2022
Completed
856 Fri 11/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited under Section 94 (1) (f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business Regulations), 2004 against the Order rendered by the Hon’ble Maharashtra Electricity Regulatory Commission in Case No. 103 of 2021 dated 07.12.2021
161 of 2022
Completed
857 Fri 11/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
159 of 2022
Completed
858 Fri 11/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Ultratech Cement Ltd. under Section 142 of Electricity Act 2003 against wrong recovery of incremental consumption rebate given in monthly energy bills from period April 2021 to March 2022 violating Commissions tariff order issued in Case No. 322 of 2019.
155 of 2022
Completed
859 Fri 04/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Ahad Engineering Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 95 of 2021.
147 of 2022
Completed
860 Fri 04/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Meramax Private Limited against MSEDCL against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non compliance of the Order of the Consumer Grievance Redressal Forum, Bhandup dated 27.04.2021 in Case No. 116 of 2021.
146 of 2022
Completed
861 Fri 04/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sunflag Iron & Steel Company Ltd. & Others under Regulation 29, 30, 31 & 32 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including power quality) Regulations, 2021 for removing difficulty in depositing 2 months Security Deposit with Distribution licensee.
154 of 2022
Completed
862 Fri 04/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the order dated 16.03.2022 passed by the learned commission in case no. 170 of 2018 and seeking appropriate reliefs towards compliance of the order and for refund of amounts by the respondent to the petitioner.
152 of 2022
Completed
863 Tue 01/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited seeking approval for Change in Law due to increase in approved variable cost of thermal generating stations due to mandated use of imported coal as per directions issued by ministry of power, Government of India and prompt recovery of imported coal cost impact by adjustment in variable cost of respective station and billing mechanism.
144 of 2022
Completed
864 Tue 01/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited (PIEL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pertinent Infra and Energy Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 125 of 2020.
136 of 2022
Completed
865 Tue 01/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited (PIL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Pristine Industries Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against non-compliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 124 of 2020.
135 of 2022
Completed
866 Tue 01/11/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited (PPL) under Sections 86(1)(e) and 86(1)(f) of the EA, 2003 pertaining to adjudication of disputes between Priyadarshini Polysacks Limited and MSEDCL and seeking directions against MSEDCL for non-compliance of PPA, short term PPA and against noncompliance by MSEDCL of the Order dated September 07, 2021 of the Hon’ble Commission in Case No. 126 of 2020.
134 of 2022
Completed
867 Fri 21/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers under Sections 86 (1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 245 of 2018 and Order dated September 07, 2021 in Case No. 156 of 2020 read with relevant provisions of Electricity Act, 2003.
142 of 2022
Scheduled
868 Fri 21/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. AMA Extrusion Private Limited under 142, 144 & 146 of the Electricity Act 2003 seeking non compliance of the Electricity Ombudsman at Nagpur, in representation number 08/2021 dated 04.06.2021.
141 of 2022
Scheduled
869 Fri 21/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (Distribution) under Section 86(1)(b) of the Electricity Act, 2003 and under Regulation 22 of MERC (Multi Year Tariff) Regulations 2019, in respect of additional power procurement.
137 of 2022
Scheduled
870 Fri 21/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mphasis Limited under Section 142 of the Electricity Act, 2003 for non-compliance of MERC Order dated 30.03.2020 in Case No. 322 of 2019 by the Distribution Licensee (MSEDCL) of Mumbai.
143 of 2022
Scheduled
871 Tue 18/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ReNew Sun Bright Private Limited under section 86 of the Electricity Act 2003 before the MERC for (i) approval of “Change in Law” and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law event on account of increase in rate of basic customs duty on import of inverters and increase in GST rates.
124 of 2022
Completed
872 Tue 18/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 21 of the (Deviation Settlement Mechanism and Related Matters) Regulation, 2019. And Application of The Tata Power Company Limited-Distribution seeking stay of the Mechanism Devised by Maharashtra State Load Despatch Centre for calculating and raising the DSM bills/invoices on the Petitioner. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
130 of 2022 & I.A No.8 of 2022 & I.A No.9 of 2022 in 130 of 2022
Withdrawn
873 Tue 18/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution for seeking approval for the Bidding Documents, for long term power procurement (25 years) of 225 MW from grid connected Wind-Solar Hybrid Power Projects through competitive bidding process to meet demand of consumers for optimization of power purchase cost.
129 of 2022
Completed
874 Tue 18/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Sikar Solar Pvt. Ltd. and ACME Solar Holdings Pvt. Ltd. under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 04.04.2022 executed between ACME Sikar Solar Private Limited and Maharashtra Electricity Distribution Company Limited, seeking amendment of Effective Date of the Power Purchase Agreement and grant of approval of the Amended PPA by this Hon’ble Commission.
128 of 2022
Completed
875 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2016-2017.
121 of 2022
Completed
876 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2019-2020.
156 of 2022
Completed
877 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2021-2022.
126 of 2022
Completed
878 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Suggestions/Objections on M/s. Sanjay B. Patil's Petition for determination of Project Specific Tariff for Jambre Hydro Electric Project(JHEP)(1 x 2MW) under Regulation 9.1& 10.2of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019and Section 62 (1) (a) & 86 (1) (e) of the Electricity Act,2003.
22 of 2022
Completed
879 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2020-2021.
125 of 2022
Completed
880 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2018-2019.
123 of 2022
Completed
881 Fri 14/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation under Rule 3 of The Electricity Rules, 2005, Section 42 and other applicable provisions of The Electricity Act, 2003 read with this Hon’ble Commission’s Order dated 17.01.2018 in Case No. 23 of 2017 for declaration of the Captive Status of 4.50 MW (2 X 2.25 MW) Captive Generating Stations of the Petitioner Being Barvi Dam SHP for the Financial Year 2017-2018.
122 of 2022
Completed
882 Tue 11/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking for seeking approval for procurement of 300 MW Solar Power from Solar Energy Corporation of India Limited (SECI) for meeting the Solar and Non-solar RPO of BEST under Section 86(1)(b) of Electricity Act 2003 and Regulation 21.1 of MERC (Multi Year Tariff) Regulations, 2019.
120 of 2022
Completed
883 Tue 11/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sarla Performance Fibers Ltd. seeking direction in respect to quash and set aside the alleged notice dated 27th Jan 2022 and 11th Mar 2022 issued by Maharashtra State Electricity Distribution Company Limited upon the Sarla Performance Fibers Limited hereby imposing penalty of Rs 1,14,00,000/- for FY 2019-2020 and 2020-2021 and also seeking direction to amend the Power Purchase Agreement dated 22nd Nov 2018 to the extend of reducing the capacity of the wind power project capacity from 6MW to 4MW with the effect from 20/7/2020.
119 of 2022
Completed
884 Tue 11/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Himadri Speciality Chemical Limited (Formerly known as Himadri Chemicals & Industries Limited) under the provisions of Section 86 (1) (E) of The Electricity Act, 2003 read with Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking directions from The Hon’ble Commission to MSEDCL for payment of delayed payment charges in Terms of Energy Purchase Agreement Dated 26.05.2006 and petition requesting the Hon’ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the energy purchase agreement dated 26.05.2006 entered between the Petitioner and the Respondent.
118 of 2022
Completed
885 Tue 11/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Steel Manufacturers Association of Maharashtra under Regulation 29-32 of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 seeking amendment/relaxation/removal of difficulties in depositing 2 months security deposit with distribution licensees.
131 of 2022
Completed
886 Fri 07/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Imagicaaworld Entertainment Limited (Formerly Known As M/s. Adlabs Entertainment Limited) for refund of improperly levied wheeling and transmission charges and excess demand penalty under regulation 3.2, 14.6(a), 32 & 37 of MERC DOA Regulations, 2016 and amendment thereof.
116 of 2022
Completed
887 Fri 07/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon’ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
Completed
888 Fri 07/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
Rescheduled till Further Notice
889 Fri 07/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Little Earth Sampada Realities Pvt. Ltd. (Mr. Sanjay Lalaji More) against MSEDCL under 142, 146 & 147 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Pune Zone Case No. 56 of 2021/46 Dated 16/02/2022 / Case No 57 of 2021/48 Dated 16/02/2022.
117 of 2022
Completed
890 Fri 07/10/2022 10:30:00 AM
e-Public Hearing
Petition of Adani Electricity Mumbai Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects, complemented with Power from any other Source on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process And Application of Adani Electricity Mumbai Limited under Section 94(2) of the Electricity Act, 2003 for urgent listing and ad-interim relief in Case No. 159/MP/2022.
159 of 2022 & IA No. 32 of 2022 in 159 of 2022
Completed
891 Tue 04/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
Completed
892 Tue 04/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A No.23 of 2021
Completed
893 Tue 04/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
Completed
894 Tue 04/10/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022.
110 of 2022
Completed
895 Tue 04/10/2022 10:30:00 AM
e-Public Hearing
Petition of Viraj Profiles Private Limited seeking clarification of the Order dated March 19, 2018 in Case No. 159 of 2016 read with Order dated November 26, 2021 in Appeal Nos. 106 of 2018 and batch matters in respect of treatment of certain units held as unscheduled and its treatment by MSEDCL which is not in accordance with applicable laws. And Application of Viraj Profiles Private Limited for urgent listing and ad-interim relief in Case No. 171/AD/2022.
171 of 2022 & IA No. 24 of 2022
Completed
896 Fri 30/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units.
109 of 2022
Completed
897 Fri 30/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Mahindra CIE Automotive Limited (MCIE) under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022, in Case No. 116 of 2018. And Application of Mahindra CIE Automotive Limited for bringing on record additional facts and documents, grant of urgent interim relief and initiation contempt proceedings against Respondent No. 1 under section 142, 146 and 149 of the Electricity Act, 2003 for deliberate and willful non-compliance of the order of this Hon’ble Commission.
95 of 2022 & I.A No. 17 of 2022
Completed
898 Fri 30/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Bekaert Industries Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated March 16, 2022, in Case No. 170 of 2018.
94 of 2022
Completed
899 Fri 30/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
Completed
900 Tue 27/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited seeking compliance of the Order dated May 28, 2019 in Case No. 168 of 2014 of the Hon’ble Commission read with relevant provisions of the Electricity Act, 2003 and works of Licensees Rules, 2006.
167 of 2020
Completed
901 Tue 27/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
902 Tue 27/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by JSW Steel Ltd. under Sections 42 and 86 of the Electricity Act 2003 read with this Hon’ble Commission’s Transmission Open Access Regulations 2016, Distribution Open Access Regulations 2016 and Conduct of Business Regulations 2004, seeking appropriate directions and implementation qua Open Access in Maharashtra.
106 of 2022
Completed
903 Tue 27/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003.
103 of 2022
Completed
904 Tue 27/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
Completed
905 Fri 23/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy.
102 of 2022
Completed
906 Fri 23/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief.
99 of 2022
Completed
907 Fri 23/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
Completed
908 Tue 20/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 17 May, 2022 in Case No 12 of 2022.
157 of 2022
Completed
909 Tue 20/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Mahati Hydro Power Vidharbha Private Limited (MHPVPL) under Section 94 (1)(f) of Electricity Act, 2003 and Regulation 85 (a) of MERC (Conduct of Business) Regulations, 2004 against the Order dated 26 May, 2022 in Case No 13 of 2022.
145 of 2022
Completed
910 Tue 20/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 168 of 2021.
133 of 2022
Completed
911 Tue 20/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited seeking review of the Order dated 21.04.2022 passed by the Commission in Case No. 169 of 2021.
132 of 2022
Completed
912 Tue 13/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Distribution under Section 86 (1)(b) read with and Regulations 92 & 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for Short term Power Purchase for Tata Power -D for October 2022. And Application of The Tata Power Company Limited-Distribution seeking early listing of the Petition before this Hon’ble Commission.
165 of 2022 & I.A No.22 of 2022 in 165 of 2022
Completed
913 Tue 13/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (‘DOA Regulations’), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2022 & Appeal No.122 of 2019 in 218 of 2018
Completed
914 Tue 13/09/2022 10:30:00 AM
e-Public Hearing
Suggestions/Objections on Petition of Adani Electricity Mumbai Ltd.-Distribution seeking transfer of assets within the SEEPZ SEZ area located in Andheri East, Mumbai to AEML SEEPZ Ltd. (Case No. 3 of 2022)
3 of 2022
Completed
915 Tue 06/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
Completed
916 Fri 02/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
Completed
917 Fri 02/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
Completed
918 Fri 02/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon’ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003 .
66 of 2022
Completed
919 Fri 02/09/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) seeking approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
Completed
920 Thu 25/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the Electricity Act, 2003 seeking Review of Order dated 2 November 2021 passed by the Maharashtra Electricity Regulatory Commission in Case No. 91 of 2021 filed by Atnu Solar Power Pvt. Ltd. seeking extension in the SCOD of the Project to the actual date of commissioning.
17 of 2022
Completed
921 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 07.09.2021 passed by the Hon’ble Commission in Case No. 51 of 2021.
4 of 2022
Completed
922 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission. Case No. 148/AT/2022
148 of 2022
Completed
923 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Rajendrakumar B. Goenka under Regulation 16,17,18, 19 of Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 for removing difficulty in installation and operations of solar rooftop generating plants and Section 86 (e) of Electricity Act 2003 to promote Renewal Energy Generation and consumption in the State of Maharashtra, revising open access Regulations and other conditions notified in “Electricity (Promoting renewable energy through Green Energy Open Access) Rules, 2022.” notified by Minister of Power, Govt. of India, by suitable modifications in the Regulations.
140 of 2022
Completed
924 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon’ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
Completed
925 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
Completed
926 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
Completed
927 Tue 23/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
Completed
928 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Generation under Sections 86 (1)(k) of the Electricity Act, 2003 read with this Hon’ble Commission’s Guidelines for In-principle Clearance of Proposed Investment Schemes.
29 of 2022
Completed
929 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 63 of Electricity Act, 2003 for adoption of tariff for procurement of 800 MW Round the Clock (“RTC”) power on Medium-term basis for the period starting from 01.09.2022 to 14.10.2024 through Tariff Based Competitive Bidding Guidelines issued by the Ministry of Power (MoP), Government of India (GOI).
149 of 2022 and IA No. 15 of 2022 in 149 of 2022
Completed
930 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Jaju Krushi Utpadan and Prikriya Udhyog Pvt Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking non-compliance of the Consumer Grievance Redressal Forum, Akola dated 11.04.2022 in Case No. 36 of 2022.
150 of 2022
Completed
931 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Balaji Krushi Utpanna Bazar Samiti and Agro Industries against MSEDCL under 124 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 36 of 2022 Order No. EE/CGRF/AKZ/Akola/212 dated 11.04.2022.
113 of 2022
Completed
932 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon’ble Commission in Case Nos. 182 of 2014 and 40 of 2015
163 of 2021 and IA No. 2 of 2022 in 163 of 2021
Completed
933 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Interim Application of Inox Wind Limited to bring subsequent developments on record & addition of prayer in light of these developments in Case No 120/AD/2021.
IA No. 16 of 2022 in 120 of 2021
Completed
934 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner
120 of 2021 & IA No. 25 of 2021 in 120 of 2021
Completed
935 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 and IA No. 23 of 2021 in 119 of 2021
Completed
936 Fri 12/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Juniper Green Field Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 10.02.2022 executed between M/s Juniper Green Field Private Limited and Maharashtra State Electricity Distribution Company Limited, seeking extension of Scheduled Commercial Operation Date due to Force Majeure events.
96 of 2022 and IA No. 7 of 2022 in 96 of 2022
Completed
937 Fri 05/08/2022 10:30:00 AM
Admissibility Hearing
Petition filed by Paranjape Auto Cast Private Limited under sections 86 (1)(k), 94(1)(g), read with Regulations 92 and 94 of the MERC (Conduct of Business) Regulations, 2004 seeking certain clarifications in respect of meaning and scope of the term “premises” as used in the Electricity Act, 2003 and various regulations and orders issued by this Hon?ble Commission from time to time. And Application of Paranjape Auto Cast Private Limited for interim relief.
153 of 2022 and IA No. 14 of 2022 in 153 of 2022
Completed
938 Fri 05/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
Completed
939 Fri 05/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in 139/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for increasing the ceiling for recovery of monthly ZFAC for the period from 1st August 2022.
139 of 2022 and IA No. 13 of 2022 in 139 of 2022
Completed
940 Fri 05/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place. And Application of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) in Case No. 138/MP/2022 for grant of early hearing on the Petition filed for obtaining the Hon'ble Commission’s approval for undertaking combined power purchase at Power Exchange linked rates for the period from July 2022, till alternative arrangements are in place.
138 of 2022 and IA No. 12 of 2022 in Case No.138 of 2022
Completed
941 Fri 05/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. R. L. Steels and Energy Ltd. against MSEDCL under 142 & 146 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Aurangabad Case No. 875/2021 Order dated 26.04.2022. Case No.(111 of 2022)
111 of 2022
Completed
942 Fri 05/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Kamlesh Mohanlal Hargunani against MSEDCL under 43(3), 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 4 of 2022 Order No. EE/CGRF/AKZ/Akola/72 dated 04.02.2022. Case No.(110 of 2022)
110 of 2022
Completed
943 Tue 02/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
Completed
944 Tue 02/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Ltd. Mumbai under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Section 94 of the Electricity Act 2003 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
945 Tue 02/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by AMJ Land Holdings Limited under Section 86(1)(e) of the Electricity Act read with Regulation 14.6 of the Maharashtra Electricity Regulatory Commission (Distribution of Open Access) Regulations, 2016 against the MSEDCL for illegally charging Wheeling and Transmission Charges and not crediting banked units. Case No.(109 of 2022)
109 of 2022
Completed
946 Tue 02/08/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Hindalco Industries Limited under Section 142 of the Electricity Act, 2003 to initiate proceedings/appropriate action against the Respondent for non-compliance of the Order dated 02.02.2022 passed by the learned Commission in Case No. 116 of 2018 and seeking appropriate reliefs towards compliance of the Order and refund amounts by the Respondent to the Petitioner. Case No.(108 of 2022)
108 of 2022
Completed
947 Fri 29/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
31 of 2022
Completed
948 Fri 29/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra CIE Automotive Limited seeking action against MSEDCL seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon’ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
37 of 2022
Completed
949 Fri 29/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Hon’ble Commission in Case No. 103/2021.
38 of 2022
Completed
950 Fri 29/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for approval and adoption of tariff determined through transperant bidding process for procurement of short term power upto 400 MW for the period October-22 and March-23 to May-23 and approval for increase in ceiling rate for short term power purchase at higher cost than the ceiling rate approved by Hon’ble Commission.
148 of 2022
Completed
951 Fri 29/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period August’ 2022 to December’ 2022.
151 of 2022
Rescheduled
952 Tue 26/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by New Asian Infrastructure Development Pvt. Ltd. seeking for refund of evacuation infrastructure/ transmission expenditure from Maharashtra State Electricity Transmission Co Ltd. under Section 86 1 (f) of the Electricity Act 2003 and petition seeking punishment 142, 146 & 149 of the Electricity Act 2003. Case No.(103 of 2022)
103 of 2022
Completed
953 Tue 26/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Gulab Shaha Chand Shaha against MSEDCL under 142, 146 & 149 of the Electricity Act 2003 seeking compliance of the Consumer Grievance Redressal Forum, Akola Case No. 87 of 2021 Order No. EE/CGRF/AKZ/Akola/50 dated 27.01.2022. Case No.(104 of 2022)
104 of 2022
Completed
954 Tue 26/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking, (BEST) under Section 62 of Electricity Act 2003 read with Section 86 (1) (b) of the Electricity Act 2003 in the matter of submission of the proposal for Extension of PPA. Case No.(107 of 2022)
107 of 2022
Completed
955 Tue 19/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of State Transmission Utility’s for implementation of Electricity (Late Payment Surcharge) Rules 2021 notified by Ministry of Power (MoP) on dtd.22.02.2021. (Case No. 97 of 2022)
97 of 2022
Completed
956 Tue 19/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Chittorgarh Solar Energy Private Limited and ACME Solar Holdings Private Limited under Section 86 of the Electricity Act, 2003 and the Power Purchase Agreement dated 27.07.2018 executed between ACME Chittorgarh Solar Energy Pvt. Ltd. and Maharashtra Electricity Distribution Company Ltd., seeking to set aside penalty imposed by MSEDCL vide Notices dated 27.08.2021 and waiver of penalty for under achievement of Capacity Utilisation Factor due to Force Majeure events and consequential relief. (Case No. 99 of 2022)
99 of 2022
Completed
957 Tue 19/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by D’ Décor Home Fabrics Private Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with Regulation 32 of the MERC (Distribution Open Access) Regulations 2016 against Maharashtra State Electricity Distribution Company Limited for non-compliance / non-implementation of this Hon’ble Commission’s Order dated 07.12.2021 in Case No. 103 of 2021 read with the Hon’ble Appellate Tribunal’s Judgment dated 12.08.2021 in Appeal No. 70/2019 (Case no. 101 of 2022)
101 of 2022
Completed
958 Tue 19/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by B. S. Channabasappa & Sons under Sections 86(1)(b), 86(1)(e), 86(1)(f), 86(1)(i) and 86(1)(k) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91, 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 20.6 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 inter alia with respect to payment for purchase of surplus units / over-injected units of energy. (Case no. 102 of 2022)
102 of 2022
Completed
959 Fri 15/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
Completed
960 Fri 15/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s P-One Techpark Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner M/s P-One Techpark Private Limited for the IT/ITeS SEZ at Rajiv Gandhi Infotech Park, MIDC, Hinjewadi Phase III, Pune and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing P-One Techpark Private Limited to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the ‘ceiling tariff’ in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
91 of 2022
Completed
961 Fri 15/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) seeking Review under regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with section 94 (1) (f) of the Electricity Act, 2003 of the Common Order dated 16.03.2022 passed by this Hon’ble Commission in Case No. 175/2017 and petition seeking review of the observations/directions qua injection of power from “non-captive generating units of SWPGL or excess consumption from the grid”
92 of 2022
Completed
962 Fri 15/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. New Parth Developers under Section 142 and 146 of the Electricity Act 2003 for Non-Compliance of Order of CGRF Bhandup Dated 19/04/2021 in Case No.83 of 2021.
93 of 2022
Completed
963 Tue 12/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for procurement of flexible and schedulable power from Renewable Energy sources with energy storage facility on long term basis for 25 Years from Renewable Sources and approval of tender documents.
86 of 2022
Schedule
964 Tue 12/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of State Transmission Utility (STU) under Regulation 102 of MERC (State Grid Code) Regulations, 2020 seeking relaxation of timelines for procedures to prepare by State Transmission Utility (STU) as per Regulation 99 of MERC, 2020.
85 of 2022
Schedule
965 Tue 12/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 and Section 63 of the Electricity Act, 2003 read with Article 10 of the PPAs dated 22.04.2010 and 05.06.2010 seeking in-principle approval of Additional Expenditure on installation of various Emission Control Systems at Amravati Thermal Power Plant having an installed capacity of 1350 MW (5x270 MW) in compliance of Maharashtra Pollution Control Board letter dated 01.10.2021 read with Ministry of Environment and Forest and Climate Change, Government of India Notifications dated 07.12.2015 and 31.03.2021.
84 of 2022
Schedule
966 Tue 12/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) to Revise the Common Order passed on dated 30/08/2019 by Sub Divisional Magistrate (SDM), Pachora, Dist.- Jalgaon in Case No. SDM-2/ KV/ MSETCL Tower/ 317/ 2019. - Case No. 343 of 2019
343 of 2019
Completed
967 Fri 08/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Dangat Media Pvt. Ltd. & NOV India Pvt. Ltd. for punishment under Section 142 and 146 of the Electricity Act, 2003, for Non-compliance of Order dated 4th April 2019 passed by the Hon'ble Appellate Authority in Appeal No. 248 of 2017.
83 of 2022
Schedule
968 Fri 08/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 86(1)(E), 86(1)(F), 142, 146 And 149 of the Electricity Act, 2003 thereof on Account of Non-Compliance by MSEDCL of the Orders of this Hon'ble Commission including Order dated August 25, 2020 in Case No. 70 of 2020 read with Order dated April 09, 2019 in Case No. 22 of 2019, Order dated November 07, 2017 in Case No. 77 of 2017 and Order dated March 16, 2017 in Case No. 68 of 2016.
80 of 2022
Schedule
969 Fri 08/07/2022 10:30:00 AM
Admissibility Hearing
Petition of Nidar Utilities Panvel LLP (NUPLLP) for approval of Final Truing up of FY 2018-19, FY 2019-20 and FY 2020-21 and Aggregate Revenue Requirement (ARR) and Tariff for the Multi-Year Tariff period from FY 2021-22 to FY 2024-25.
19 of 2022
Completed
970 Fri 08/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
Completed
971 Fri 08/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
Completed
972 Fri 08/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
Completed
973 Fri 01/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
Schedule
974 Fri 01/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pee Vee Textiles Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking Grant of Power Factor Incentive on Open Access Consumption for the period June 2015 to July 2016. & Petition seeking Implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
74 of 2022
Schedule
975 Fri 01/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Fiat India Automobiles Pvt. Ltd. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 seeking grant of Power Factor Incentive on open access consumption for the period May 2015 to July 2019. & Petition seeking implementation of the Judgment dated 12.08.2021 passed by the APTEL in Appeal No. 70/2019 in the matter of Jindal Poly Films Limited V/s. MERC and Anr. on the issue of applicability of Power Factor Incentive on Open Access consumption in MSEDCL's distribution license area.
73 of 2022
Schedule
976 Fri 01/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Gimatex Industries Pvt. Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 07.12.2021 passed by this Hon'ble Commission in Case No. 103/2021 and petition seeking implementation of The Judgment dated 12.08.2021 passed by The Hon'ble APTEL in Appeal No. 70/2019 in the matter of "Jindal Poly Films Limited Vs. MERC & Anr" on the issue of applicability of Power Factor Incetive on Open Access consumption in MSEDCL Distribution License Area.
49 of 2022
Schedule
977 Fri 01/07/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pudumjee Paper Products Limited under section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to MSEDCL for refund of power factor incentive levied on Open Access consumption for the period from January, 2015 to March, 2020 along with interest.
78 of 2022
Completed
978 Tue 28/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited & Anr. under Regulation 32 of the MERC (Distribution Open Access) Regulation, 2016 against MSEDCL for adjudication of dispute arising under Open Access and for payment of interest on the amount illegally recovered under the Open Access Regulations and petition under Section 62 (6) of the Electricity Act, 2003 for payment of interest on the amount illegally recovered by MSEDCL.
77 of 2022
Schedule
979 Tue 28/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Uni Deritend Limited Petition under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(E), 86(1)(F), 86(1)(K), of the Electricity Act, 2003, seeking reliefs for unutilized units from FY 2005-06 to FY 2009-10 and pending credit for units from April, 2014 to September, 2014.
72 of 2022
Schedule
980 Tue 28/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mayura Steels Pvt. Ltd. seeking implementation of Regulation 3, 7, 9 and 10 of the MERC (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2010 W.R.T following the procedures envisaged therein and pay for the power which has already been Accouted towards RPO and under Section 86 (1) (e) of the Electricity Act, 2003 seeking directions to MSEDCL for payment of power w.e.f 25.03.2012 till 06.06.2018 since the power injected by the petitioner was injected on the basis of assuance of a long-term EPA.
71 of 2022
Schedule
981 Fri 24/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ambuja Intermediates Pvt. Ltd. (Formerly known as Sinewave Biomass Power (P) Limited) under Regulation 20 of the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010 for payment of late payment surcharge on energy bills paid belatedley by MSEDCL after the due date and petition under the provisions of Section 86 (1) (e) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of late payment surchagre in terms of Energy Purchase Agreement dated 05.02.2011 entered in accordance with the MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010.
70 of 2022
Schedule
982 Fri 24/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shalivahana Green Energy Limited under Section 86(1)(b) of the Electricity Act, 2003 seeking extension of Energy Purchase Agreement entered into between the M/s Shalivahana Green Energy Limited and Maharashtra State Electricity Distribution Company Limited.
69 of 2022
Scheduled
983 Fri 24/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited (HPCL) under Sections 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and Maharashtra State Electricity Distribution Company Limited and against non-compliance by Maharashtra State Electricity Distribution Company Limited of the order dated January 17, 2019 of the Hon'ble Commission in Case No. 223 of 2018 read with relevant provisions of Electricity Act, 2003.
66 of 2022
Schedule
984 Fri 24/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kalika Steel Alloys Pvt Ltd. & Ors. under Section under Section 57, 61, 86 and 181 of the Electricity Act 2003 seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand.
65 of 2022
Schedule
985 Tue 21/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jaideep Mettalics and Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
64 of 2022
Schedule
986 Tue 21/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
63 of 2022
Schedule
987 Tue 21/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Surya Ferrous Alloys Pvt. Ltd. under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders and directions against Maharashtra State Electricity Transmission Company Ltd. (MSETCL) and MSEDCL as regards laying of EHT Lines and necessary infrastructure for supply of power at EHV Levels in accordance with the provisions of Section 40 read with S. 43 and 46 of the Electricity Act, 2003.
62 of 2022
Schedule
988 Tue 21/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited seeking clarification of Obseravtions under Para 13.4 of Order dated 06.08.2021 passed in Case No. 67 of 2021 by this Hon'ble Commission and petition as per the Judgment dated 10.12.2021 passed by the Hon'ble Supreme Court in Civil Appeal Nos. 5074-5075/2018 â"MSEDCL Versus M/s. JSW Steel Limited & Orsâ"
61 of 2022
Schedule
989 Fri 17/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 (2) of the Electricity Act, 2003 read with Regulation 105 & 106 of the MERC (Multi Year Tarff) Regulations, 2019 and Regulation 92, 93 & 94 of MERC (Conduct of Business) Regulations, 2004 seeking interim Relief for recovery of under recovery of Cross Subsidy and the additional working capital requirement for FY 2020-21.
60 of 2022
Schedule
990 Fri 17/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
Reschedule
991 Fri 17/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jamnadas Steel Private Limited under Sections 142, 146, 86 (1) (k) read with 62 (6) of Electricity Act 2003 for non-compliance of the directions issued by CGRF in Case No. CGRC (NZ)/95/2017 decided on 20-12-2017 and for violation of Section 62(6) of EA 2003 and violation of directions and Orders issued by this Hon'ble Commission in Case No 94/2015 on 19-08-2016, and Case No 121/2017 decided on 31-01-2018 and Case No 90/2019 decided on 22-07-2019.
58 of 2022
Schedule
992 Fri 17/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited under the provisions of Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case No. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and direction to revise incorrect monthly billing methodology followed by Maharashtra State Electricity Distribution Company Limited for FY 2018-19.
57 of 2022
Schedule
993 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Unison Enviro Private Limited under Section 86 (1) (k) challenging the circular dated 01.12.2021 issued by Maharashtra State Electricity Distribution Company Limited.
56 of 2022
Schedule
994 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Mahindra Sanyo Special Steel Private Limited under Sections 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
81 of 2022
Schedule
995 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Inox Air Products Private Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
75 of 2022
Schedule
996 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Asahi India Glass Limited under the purview of Section 94 of the Electricity Act, 2003 read with Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 of Order dated February 02, 2022 in Case No. 116 of 2018.
55 of 2022
Schedule
997 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Khed Economic Infrastructure Private Limited under Section 86 of Electricity Act, 2003 in the matter for seeking directions against the Maharashtra State Electricity Distribution Company Limited (MSEDCL) restraining them from connecting 11 KV rural feeder to 33/11KV Khed City Substations erected under the Dedicated Distribution Facility Scheme.
54 of 2022
Schedule
998 Tue 14/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Limited (Formerly known as Kharghar Vikhroli Transmission Private Limited) under Section 86 (1) (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Articles 3, 4 and 11 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, extension of Scheduled Commercial Operation Date due to Force Majeure events.
53 of 2022
Schedule
999 Fri 10/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
Schedule
1000 Fri 10/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Tata Power-Distribution) under Section 86(1)(b) of the Electricity Act, 2003 read with Regulation 92 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking approval for part commissioning of 225 MW Long Term Hybrid project and procurement of Non-solar (Wind) power to meet the Renewable Purchase Obligation of Tata Power-Distribution.
52 of 2022
Schedule
1001 Fri 10/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Dhariwal Infrastructure Limited (DIL) in the matter of Section 94 (1) (g) read with Regulation 32, 35 to 39, 92 and 94 of the MERC (Conduct of Business) Regulations, 2004; and In the matter of Methodology for use of coal by State in Private Generating Stations (IPPS) namely, Case - 4: Flexibility in utilization of coal in IPP Stations, dated 20.02.2017 evolved by Government of India through a mode of competitive bidding along with the amendments to it, issued till date; and under Regulation 33 (Principles of Merit Order Despatch for Operation of INSG connected to INSGS) of MERC (State Grid Code) Regulations, 2020; and in the matter of order dated 30.11.2021 passed by this Hon'ble Commission in the Case No. 128 of 2021.
48 of 2022
Schedule
1002 Fri 10/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85(a) of the MERC (Conduct of Business) Regulations, 2004, seeking review and modification of Order dated 17.08.2021 passed by this Hon'ble Commission in Case No. 27 of 2021.
47 of 2022
Schedule
1003 Fri 10/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Transport Corporation of India Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking Order for payment of principal and LPS from Respondent.
43 of 2022
Schedule
1004 Tue 07/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
Reschedule
1005 Tue 07/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Anil Yashawantrao Jadhav under Sections 143, 146 of the Electricity Act, 2003, seeking compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 February, 2021 in Case No. 21 of 2020.
42 of 2022
Completed
1006 Tue 07/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner The Tata Power Company Limited- Distribution (TPC-D) seeking review and recall of the Order dated 09.12.2020 in Case No. 58 of 2020 in terms of the liberty granted by the Hon'ble Tribunal in its Order dated 31.08.2021 in Appeal No. 5 of 2021 - TPC-D v. MERC & Ors.
166 of 2021
Completed
1007 Tue 07/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & IA No. 25 of 2021
Completed
1008 Fri 03/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021
Reschedule with further notice
1009 Fri 03/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Govindrao Prithviraj Potdar for execution of the Order dated 28.01.2019 of Consumer Grievance Redressal Forum, Kolhapur in Case No. 42/2018-19/20 and Order dated 22.08.2019 of MERC in Case No. 144 of 2019.
25 of 2022
Completed
1010 Fri 03/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Gro Solar Energy Private Limited under section 86(1)(f) of the Electricity Act 2003 for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules and increase in rate of basic customs duty on import of solar inverters in terms of Article 8 of the Power Purchase Agreement dated 31.10.2019 entered between M/s Gro Solar Energy Private Limited and Maharashtra State Power Generation Co. Ltd. for development of solar energy based power plant of 07 MW capacity at Village Degaon, Taluka Sindakhede, District. Dhule, Maharashtra.
28 of 2022
Completed
1011 Fri 03/06/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Nareshkumar Motilal Ahuja under Non - Revenue Grievance - Others Type Category (Removal & Shifting of Meter Cabin) of the Indian Electricity Act, 2003 (IEA) under Section 42 & 46 for not passing transparent Order / Judgment as prayed for in the Complaint / Grievance / Representation filed by the Petitioner instead of declaring / issuing Judgment / Order (Dated : 22/09/2021 in Representation No. 54 of 2021) against the Codes & Standards + MERC norms by Mr. Deepak Lad (Chairman & Coram : Hon'ble Electricity Ombudsman (Mumbai) [EO(M)]).
20 of 2022
Completed
1012 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Ltd. for directions on behalf of the Petitioner / Applicant pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 118 of 2021. And Case of Adani Power Maharashtra Limited pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 40 of 2022.
MA No .76 of 2022 in 227 of 2018 And 124 of 2018
Completed
1013 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha Limited, Warananagar (STKWSNNSL) seeking appropriate dispensation or relaxation from applicability of amended Regulation 20.3 under Regulation 39 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019, particularly applicability of monthly Banking provisions thereunder for its Four (4) of the Hydro Electric Projects.
88 of 2022
Completed
1014 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Wind World (India) Limited for determination of the Average Power Procurement Cost of the MSEDCL each year from FY 2016-17 to FY 2019-20 in order to comply with the provisions of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.01.2010 and for seeking directions to MSEDCL for releasing payments towards purchase of unutilized banked energy for FY 2016-17 to FY 2020-21 in terms of the MERC (Distribution Open Access) Regulations, 2016 and amendment thereof.
14 of 2022
Completed
1015 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Morries Energy Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills and delayed payment charges in terms of energy purchase agreement dated 26.02.2009.
171 of 2021
Completed
1016 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Hercules Hoists Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding amounts in terms of energy purchase agreement's executed between the parties from time to time.
170 of 2021
Completed
1017 Tue 31/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
Completed
1018 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jawaharlal Nehru Port Trust (JNPT) for approval of Power Purchase and Adoption of Tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and 'Guidelines for Shortterm (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process' issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power up to 1 MW for a period of one year from 1 July, 2022 to 30 June, 2023.
90 of 2022
Completed
1019 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of T.P. Saurya Limited (TPSL) under Section 94 (1)(f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 and Order 47 Rule 1 of the Code of Civil Procedure, 1908 seeking review of the Order dated 11.03.2022 passed by this Hon'ble Commission in Case No. 15 of 2022.
59 of 2022
Completed
1020 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
Reschedule with further notice
1021 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. TP Kirnali Limited & M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 read with Regulation 92 of the MERC (Conduct of Business) Regulations 2004 seeking extension of the Scheduled Commercial Operation Date of the proposed 100 MW project to 21.08.2022 ("SCOD").
167 of 2021
Completed
1022 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
Reschedule with further notice
1023 Fri 27/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
Completed
1024 Tue 24/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
163 of 2021 And IA No. 02 of 2022 in 163 of 2021
Completed
1025 Tue 24/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ACME Heergarh Powertech Private Limited (AHPPL) seeking extension of the scheduled commercial operation date from 28 December 2021 to 14 September 2022, account of certain Force Majeure events including second surge of Covid-19 in India and disruption in import of modules from China impacting the development of the project.
7 of 2022
Completed
1026 Tue 24/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
Completed
1027 Tue 24/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Private Limited for approval of the Power Procurement Plan for both its SEZ's combinedly in its capacity as a Distribution Licensee & approve the deviations in medium term power procurement Guidelines for "Procurement of Electricity for Medium Term from Power Stations set upon Finance, Own and Operate (FOO) basis" dated 30.01.2019 issued by the Ministry of Power, Government of India, considering operational expediencies, for the period of 3 years starting from 1st November 2022 to 31st October 2025 for both its IT and ITES SEZ at Survey No.72, Village Kharadi, Pune (EON SEZ Phase-I) and survey no. 77, MIDC Knowledge Park, Kharadi, District Pune,(EON SEZ Phase-II) in the State of Maharashtra.
82 of 2022 & IA No. 05 of 2022 in 82 of 2022
Completed
1028 Fri 20/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Essel Mining & Industries Limited under Sections 86(1)(e), 86(1)(f) and 86(1)(K) of the Electricity Act, 2003 seeking appropriate relief for adjudication of disputes between the petitioner and MSEDCL under provisions of Power Purchase Agreement dated November 22, 2018 and quashing of notice dated January 27, 2022 issued by the MSEDCL.
79 of 2022 And IA No. 04 of 2022 in 79 of 2022
Completed
1029 Fri 20/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
1030 Fri 20/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Roha Dyechem Pvt. Ltd. for directions to Maharashtra State Electricity Distribution Company Ltd. with regard to the terms of Open Access permissions.
119 of 2018 And 19 of 2019 And 118 of 2019 And 119 of 2019
Completed
1031 Fri 20/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 15.85 MW wind power from the wind generators whose EPAS with MSEDCL have expired.
67 of 2022
Completed
1032 Fri 20/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Application of RattanIndia Power Ltd. for directions on behalf of the Petitioner / Applicant pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 118 of 2021. AND Case of Adani Power Maharashtra Limited pursuant to Order dated 22.03.2022 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal No. 40 of 2022.
MA No.76 of 2022 in Re-opened Case No. 227 of 2018 And 124 of 2018
Completed
1033 Tue 17/05/2022 11:00:00 AM
e-Public Hearing
Re-scheduling of public hearing on Suo- Motu Draft Order on Renewable Energy Tariff for FY 2022-23 and extension of time for comments on proposed Draft Order
1 of 2022
Completed
1034 Tue 17/05/2022 10:30:00 AM
e-Public Hearing
Inviting Comments on amendment of Specific Conditions Regulations of Gigaplex Estate Pvt. Ltd. under Section 18 of the Electricity Act, 2003
74 of 2021
Completed
1035 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nature International Private Limited under the provisions of the Electricity Act, 2003 and more particularly Sections 86(1)(e), 86(1)(f), 86(1)(k), of the Electricity Act, 2003, seeking appropriate relief on account of change in law as provided under Power Purchase Agreement dated September 30, 2020 due to the increase in goods and service tax rates on solar panels/modules and increase in custom duty on solar inverter.
41 of 2022
Completed
1036 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
Completed
1037 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
Completed
1038 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Cogeneration Association of India (CAI) under Section 94(f) of the Electricity Act, 2003 read with Regulation 85 and 92 of the MERC (Conduct of Business) Regulations, 2004 for seeking clarifications/ review of the order dated 11.01.2022 passed in Case No. 129 of 2021.
40 of 2022
Completed
1039 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sunfree Paschim Renewable Energy Private Limited under the provisions of the Electricity act, 2003 and more particularly sections 86(1)(e), 86(1)(f), 86(1)(k), of the electricity act, 2003, seeking appropriate relief on account of change in law as provided under power purchase agreement dated September 30, 2020 due to the increase in goods and service tax rates on solar panels/modules and increase in custom duty on solar inverter.
39 of 2022
Completed
1040 Fri 13/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Honâ??ble Commission in Case No. 103/2021.
38 of 2022
Reschedule
1041 Tue 10/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW Ispat Private Ltd. (Formerly known as Mahalaxmi TMT Pvt. Ltd.) for contempt under Section 142, 146 & 149 of the Electricity Act, 2003 read with regulation 13 (c) (ix) of the MERC (conduct of business) Regulations, 2004 against MSEDCL for non-compliance of order dated 07.12.2021 passed by this Hon'ble Commission in Case No. 103/2021.
38 of 2022
Completed
1042 Tue 10/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra CIE Automotive Limited seeking action against MSEDCL seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Honâ??ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
37 of 2022
Completed
1043 Tue 10/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of City and Industrial Development Corporation (CIDCO) for Energy Bill wrongly charged by MSEDCL in Tariff of HT- II Commercial instead of HT-IV public water works for CIDCO's Public Water Works and Sewage Treatment Plant (STP), Sewage Pump House in CIDCO's jurisdiction area.
36 of 2022
Completed
1044 Tue 10/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Shree Steel Castings P. Ltd. under Regulation 95 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 , section 94(f), section 45(4) and Section 142 of Electricity Act 2003 for Recovery of benefit of High Tension Non-Continuous Tariff given to various consumers across the State of Maharashtra during the period commencing from 1.6.2008 despite the fact that they did not observe staggering holiday on various occasions and not taking appropriate action with regard to selective, inconsistent and discriminatory treatment given to different applicants for changing tariff from continuous to non continuous.
35 of 2022
Completed
1045 Tue 10/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against MSEDCL under the provisions of including but not limited to Sections 86, 142, 146 and 149 of the Electricity Act, 2003 and for non-compliance of the MERC (Distribution Open Access) Regulations, 2005, 2014 & 2016 with respect to the applicability of Power Factor Incentive to the Open Access power consumption of HT consumers and non-compliance of orders of Appellate Tribunal for Electricity dated August 12, 2021 in Appeal No. 70 of 2019 and Orders of Hon'ble Commission dated November 28, 2017 in Case No. 110 of 2017 & Order in Case No. 103 of 2021 dated December 07, 2021.
31 of 2022
Completed
1046 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 42(1) and Section 86 (1) (b) of the Electricity Act, 2003 for approval of Short term Power Purchase Arrangement for sourcing of Power to Cater to the demand of the State.
87 of 2022
Completed
1047 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Dhariwal Infrastructure Limited (DIL) in the matter of Section 94 (1) (g) read with Regulation 32, 35 to 39, 92 and 94 of the MERC (Conduct of Business) Regulations, 2004; and In the matter of Methodology for use of coal by State in Private Generating Stations (IPPS) namely, Case - 4: Flexibility in utilization of coal in IPP Stations, dated 20.02.2017 evolved by Government of India through a mode of competitive bidding along with the amendments to it, issued till date; and under Regulation 33 (Principles of Merit Order Despatch for Operation of INSG connected to INSGS) of MERC (State Grid Code) Regulations, 2020; and in the matter of order dated 30.11.2021 passed by this Hon'ble Commission in the Case No. 128 of 2021.
48 of 2022
Completed
1048 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
Completed
1049 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
Completed
1050 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Avaada Sunce Energy Private Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of the Scheduled Commissioning Date on account of Force Majeure events which have prevented M/s. Avaada Sunce Energy Private Limited from commissioning of 150 MW capacity out of the total 350 MW solar photovoltiac power plant at Village Noorsar, Taluka - Bikaner, District - Bikaner, State - Rajasthan by the Scheduled Commissioning Date, on account of certain Force Majeure events including Covid-19 and disruption in import of modules from China impacting the progress of the Project.
33 of 2022
Completed
1051 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Sections 17(3) & 17(4) of Electricity Act, 2003 read with Regulation 15 (3) of the MERC (Transmission License Conditions) Regulations, 2004 seeking approval for creation of security interest over the Petitioner's assets in favour of Respondent No. 9 (as the Security Trustee acting for the benefit of the Lenders) in respect of the Petitioner's Transmission Project.
30 of 2022 in 142 of 2021
Reschedule
1052 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Generation under Sections 86 (1)(k) of the Electricity Act, 2003 read with this Hon'ble Commission's Guidelines for In-principle Clearance of Proposed Investment Schemes.
29 of 2022
Completed
1053 Fri 06/05/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 94 of the Electricity Act, 2003 seeking Review of Order dated 2 November 2021 passed by the Maharashtra Electricity Regulatory Commission in Case No. 91 of 2021 filed by Atnu Solar Power Pvt. Ltd. seeking extension in the SCOD of the Project to the actual date of commissioning.
17 of 2022
Completed
1054 Fri 29/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 framed under Section 181 of the Electricity Act, 2003 read with Order 47 Rule 1 of the CPC, 1908 seeking review of the order dated 07.09.2021 passed by the Honâ??ble Commission in Case No. 51 of 2021.
4 of 2022
Reschedule with further notice
1055 Fri 29/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition The Tata Power Company Limited- Distribution (TPC-D) seeking review and recall of the Order dated 09.12.2020 in Case No. 58 of 2020 in terms of the liberty granted by the Honâ??ble Tribunal in its Order dated 31.08.2021 in Appeal No. 5 of 2021 â?? TPC-D v. MERC & Ors.
166 of 2021
Completed
1056 Fri 29/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
Completed
1057 Fri 29/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
1058 Tue 26/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects. AND Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021, MA No 23 of 2021, 36 of 2021 and I.A. No 38 of 2021 in 70 of 2021
Completed
1059 Tue 26/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Aurangabad Industrial Township Limited (AITL) for the exemption granted to AITL pursuant to the Order dated 3rd September 2021 in Case No. 29 of 2019 from License stipulation for distributing Electricity.
161 of 2021
Completed
1060 Tue 26/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of RattanIndia Power Limited seeking issuance of appropriate directions to MSEDCL to pay 75% of the total amount due and payable to the petitioner in terms of the Remand Judgment in Appeal No. 264 of 2018 as an interim relief.
153 of 2021
Completed
1061 Tue 26/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Sai Wardha Power Generation Limited seeking adjudication on the operational parameters and methodologies for computing compensation for change in law events.
150 of 2021
Completed
1062 Tue 26/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) RattanIndia Power Limited in terms of liberty granted by the Commission in its Order dated 27.02.2018 passed in Case No. 138 of 2015 seeking capacity charges for over injection during FY 2013-14 to July 2016 and seeking damages for inordinate delay in making payments.
146 of 2021
Completed
1063 Fri 22/04/2022 10:30:00 AM
e-Public Hearing
Inviting Suggestions / Objections in the matter of Generic Renewable Energy Tariff for FY 2022-23 under MERC (Renewable Energy Tariff) Regulations, 2019
1 of 2022
Reschedule
1064 Fri 22/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
Reschedule
1065 Fri 22/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
Reschedule
1066 Fri 22/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Honâ??ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
Reschedule
1067 Fri 22/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects. AND Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021, MA No 23 of 2021, 36 of 2021 and I.A. No 38 of 2021 in 70 of 2021
Reschedule
1068 Tue 19/04/2022 10:30:01 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
Reschedule
1069 Tue 19/04/2022 10:30:01 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the â??Change in Lawâ?? event being increase in Acquisition Price.
142 of 2021
Reschedule
1070 Tue 19/04/2022 10:30:01 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
Reschedule
1071 Tue 19/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for in principle approval for procurement of the power re-allocated by Ministry of Power, Government of India from NTPC power stations to Maharashtra for short term period.
68 of 2022
Completed
1072 Tue 19/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Roha Dyechem Pvt. Ltd. for directions to Maharashtra State Electricity Distribution Company Ltd. with regard to the terms of Open Access permissions. AND Petition of Arvind Cotsyn (India) Ltd. regarding unilateral reduction of Open Access capacity and non-compliance of MERC Order dated 27 February 2018 in Case No. 80 of 2016 by Maharashtra State Electricity Distribution Co. Ltd. AND Petition of Western Precicast Pvt. Ltd. for adjudication of dispute regarding wrongful curtailment of Open Access capacity and denial of Medium Term Open Access. AND Petition of Jsons Foundry Pvt. Ltd. for adjudication of dispute regarding wrongful curtailment of Open Access capacity and denial of Medium Term Open Access
119 of 2018 And 19 of 2019 And 118 of 2019 And 119 of 2019
Completed
1073 Tue 19/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
Completed
1074 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for Adoption of Tariff discovered for Long Term Procurement of 385.3 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
50 of 2022
Schedule
1075 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for Adoption of Tariff discovered for Long Term Procurement of 10.5 MW Solar Power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
51 of 2022
Schedule
1076 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
Schedule
1077 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I.A. No. 25 of 2021
Schedule
1078 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Maharashtra State Electricity Company Limited seeking directions to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 pandemic.
84 of 2021
Schedule
1079 Tue 12/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement. AND Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable provisisons of law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020 and Dairy No. 139 of 2021 in 226 of 2020
Schedule
1080 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
Completed
1081 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution under Sections 86, 142, 146 and 149 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 07.01.2022 in Case No. 82 of 2021.
44 of 2022
Completed
1082 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
Reschedule with further notice
1083 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Talegaon Floriculture Park Flower (Through Shri Malharrao Virchand Dhole, Secretary) for MSEDCL has changed the tariff classification of growers of the MIDC Floriculture Park, Talegaon, Dist. Pune from LT IV (B)-Agriculture-metered pumpsets to LT IV (C)-Agriculture-others as per their Commercial Circular dt 03/04/2020 and has discontinued Govt. subsidy. The classification of floriculture should be restored to LT IV (B) and the subsidy restored.
124 of 2021
Completed
1084 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021 in 119 of 2021
Reschedule with further notice
1085 Fri 08/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
Completed
1086 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the "Change in Law" event being increase in Acquisition Price.
142 of 2021
Completed
1087 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
30 of 2022 in 142 of 2021
Completed
1088 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
28 of 2022
Completed
1089 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited for granting special relaxation and to issue directions to MSEDCL to issue credit note against the wind power (from WTG L-12 located at Bhramanvel in Dhule District commissioned on 24.03.2006) already injected power for the only one month of March, 2020 into grid and also consumed by MSEDCL because prior and after of which there are valid LTPPA/ SPPAs valid up to 31.12.2022 but due to technical snag in online Short Term PPA system during the month Feb-March-2020 and also ongoing sub-judice pending issue of Inter-state open Access(Still pending in APTEL vide DFR no 356 of 2020) still unpaid.
27 of 2022
Completed
1090 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Govindrao Prithviraj Potdar for execution of the Order dated 28.01.2019 of Consumer Grievance Redressal Forum, Kolhapur in Case No. 42/2018-19/20 and Order dated 22.08.2019 of MERC in Case No. 144 of 2019.
25 of 2022
Completed
1091 Tue 05/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Wind World Wind Farms (Sai) Private Limited under Section 86(1)(b), 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 seeking directions to the Respondent for releasing payment against the outstanding monthly invoices towards sale of wind energy along with the interest/late payment surcharge on such delayed payments as per Article 12.02 of the Eight identical Power Purchase Agreements dated 21.05.2007, 03.07.2008, 01.10.2008, 01.10.2008, 10.12.2008, 17.03.2009, 17.03.2009 and 30.03.2009.
24 of 2022
5
1092 Fri 01/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for Adoption of Tariff discovered for Long Term Procurement of 31.75 MW Solar Power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 MW capacity projects connected to distribution network under Section 63 of The Electricity Act 2003 for Meeting the Solar Renewable Purchase Obligations.
23 of 2022
Completed
1093 Fri 01/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Nareshkumar Motilal Ahuja under Non - Revenue Grievance - Others Type Category (Removal & Shifting of Meter Cabin) of the Indian Electricity Act, 2003 (IEA) under Section 42 & 46 for not passing transparent Order / Judgment as prayed for in the Complaint / Grievance / Representation filed by the Petitioner instead of declaring / issuing Judgment / Order (Dated : 22/09/2021 in Representation No. 54 of 2021) against the Codes & Standards + MERC norms by Mr. Deepak Lad (Chairman & Coram : Hon'ble Electricity Ombudsman (Mumbai) [EO(M)]).
20 of 2022
Reschedule with further notice
1094 Fri 01/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Pegasus Properties Pvt. Ltd. seeking compliance of the Consumer Grievance Redressal Forum, Pune's Order dated 21 October, 2021 in Case No. 10 of 2021
16 of 2022
Completed
1095 Fri 01/04/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Wind World (India) Limited for determination of the Average Power Procurement Cost of the MSEDCL each year from FY 2016-17 to FY 2019-20 in order to comply with the provisions of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.01.2010 and for seeking directions to MSEDCL for releasing payments towards purchase of unutilized banked energy for FY 2016-17 to FY 2020-21 in terms of the MERC (Distribution Open Access) Regulations, 2016 and amendment thereof.
14 of 2022
Completed
1096 Tue 29/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for refund of Rs. 50.44 crore paid to Sai Wardha Power Ltd. in pursuance of Tripartite Energy Purchase Agreements, and Rs. 8.79 crore towards the balance of Cross-Subsidy Surcharge for FY 2012-13. Case No. 206 of 2014 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 15.03.2022 IN Appeal No. 46 of 2018 & IA Nos. 233 of 2018 & 35 of 2019 directions to the Commission therein.)]
206 of 2014
Completed
1097 Tue 29/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Vidharbha Private Limited (MHPVPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 24 MW Gosikhurd Small Hydro Project as per EPA dated 25 July, 2016.
13 of 2022
Completed
1098 Tue 29/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 4.8 MW Veer Small Hydro Project as per EPA dated 12 April, 2017.
12 of 2022
Completed
1099 Tue 29/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahati Hydro Power Projects Private Limited (MHPPPL) seeking dispensation of this Hon'ble Commission in view of the approval sought by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for pass through of various claims as stated in the petition for the 4 MW Sonawade Small Hydro Project as per EPA dated 22 November, 2010.
11 of 2022
Completed
1100 Tue 29/03/2022 10:30:00 AM
e-Public Hearing
Inviting Suggestions/Objections on Maharashtra Airport Development Company Limited- Distribution Business's Multi Year Tariff Petition for Final True up of FY 2014-15 to FY 2019-20 and Approval of ARR and Tariff for Fourth Control Period from FY 2020-21 to FY 2024-25
235 of 2020
Completed
1101 Fri 25/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (of the Municipal Corporation of Greater Mumbai) (BEST) under Regulation 22 of MERC (Multi-Year Tariff) Regulations, 2019, in respect of Additional Power Procurement and approval for tariff discovered through competitive bidding process undertaken by BEST for short term bilateral power purchase for the period April'2022 to June'2022 and Ministry of Powerâ??s Guidelines dated 30th Marchâ??2016 for short-term procurement of power by Distribution Licensees through tariff-based bidding process.
46 of 2022
Completed
1102 Fri 25/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. AEML SEEPZ Limited under Section 14, 16 of the Electricity Act, 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006, for taking on record the deemed distribution licensee status of the petitioner and for issuance of Specific Conditions of Distribution License in pursuance of the Govt of India Notification dated 03.03.2010 issued by the Central Government under Clause (b) of sub-section (1) of the Section 49 of the Special economic Zones Act, 2005.
2 of 2022
Completed
1103 Fri 25/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for additional power purchase cost incurred in the month of October 2021 on account of uncontrollable factors.
1 of 2022
Completed
1104 Fri 25/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Morries Energy Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills and delayed payment charges in terms of energy purchase agreement dated 26.02.2009.
171 of 2021
Completed
1105 Fri 25/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Hercules Hoists Limited under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding amounts in terms of energy purchase agreement's executed between the parties from time to time.
170 of 2021
Completed
1106 Tue 22/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 seeking for approval of Long-Term procurement of power qua 1000 MW (500 MW + additional 500 MW under green shoe option) from grid connected Renewable Energy Power Projects, complemented with Power from Coal based Thermal Power Projects in India on Round the Clock (RTC) basis, under Tariff-based Competitive Bidding process.
32 of 2022
Completed
1107 Tue 22/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Bhulani Steel Pvt. Ltd. against MSEDCL under Section 142 & 146 of the Electricity Act, 2003 for not complying with the Order dated 21st February 2018 of the CGRF, Kalyan and the Order dated 30th May, 2018 of the Electricity Ombudsman (Mumbai) in Representation No. 55 of 2018.
169 of 2021
Completed
1108 Tue 22/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Agarwal Fastners Pvt. Ltd. against MSEDCL under Section 142 & 146 of the Electricity Act, 2003 for not complying with the Order dated 21st February 2018 of the CGRF, Kalyan and Order dated 30th May 2018 of Electricity Ombudsman (Mumbai) in Representation No. 56 of 2018.
168 of 2021
Completed
1109 Tue 22/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. TP Kirnali Limited & M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), (e) and (f) of the Electricity Act, 2003 read with Regulation 92 of the MERC (Conduct of Business) Regulations 2004 seeking extension of the Scheduled Commercial Operation Date of the proposed 100 MW project to 21.08.2022 ("SCOD").
167 of 2021
Completed
1110 Fri 11/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Tata Power Renewable Energy Limited under Section 86(1)(b), Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 03.01.2020 filed on behalf of M/s. Tata Power Renewable Energy Limited for approval of the cost incurred due to imposition of safeguard duty for the period of 30.07.2020 to 29.07.2021 on the import of solar cells vide Notification No. 02/2020- Customs (SG) dated 29.07.2020 of the Ministry of Finance, being declared as an event of 'change in law' by this Hon'ble Commission vide order dated 05.03.2021 in Case No. 218 of 2020.
21 of 2022
Completed
1111 Fri 11/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ACME Heergarh Powertech Private Limited (AHPPL) seeking extension of the scheduled commercial operation date from 28 December 2021 to 14 September 2022, account of certain Force Majeure events including second surge of Covid-19 in India and disruption in import of modules from China impacting the development of the project.
7 of 2022
Completed
1112 Fri 11/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Tata Power Renewable Energy Limited (TPREL) under Section 86(1)(b), Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 03.01.2020 filed on behalf of M/s. Tata Power Renewable Energy Limited for approval of the cost incurred due to change in the rate of Basic Custom Duty from 5% to 20% effective from 02.02.2021 on the import of Solar Inverters vide Notification No. 07/2021- Customs dated 01.02.2021 issued by the Ministry of Finance.
5 of 2022
Completed
1113 Fri 11/03/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015. AND Application of Adani Electricity Mumbai Limited- Distribution seeking under Section 94(2) of the Electricity Act, 2003 for placing on record additional information/ documents and for seeking appropriate directions.
163 of 2021 and IA No. 2 of 2022 in 163 of 2021
Reschedule with further notice
1114 Fri 25/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahanagar Gas Limited under Section 86(1)(k) of the Electricity Act, 2003, challenging the impugned circular dated 1 December, 2021, issued by the Maharashtra State Electricity Distribution Company Limited
26 of 2022
Reschedule with further notice
1115 Fri 25/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rajmal Lakhichand Jewellers under Section 86 (1) (E) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Honâ??ble Commission to MSEDCL for payment @ Rs. 2.52/unit for the power injected by Petitioner from 01.04.2020 to 31.08.2020.
123 of 2021
Completed
1116 Fri 25/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Case of Azure Power Thirty Four Private Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax vide Notification dated 31.12.2018 issued by the Ministry of Finance. Case No. 147 of 2020 (Re-opened in pursuance of Honâ??ble APTELâ??s Judgement dated 08.11.2021. IN DFR No. 270 of 2021 & IA No. 1187 of 2021 & IA No. 1188 of 2021 directions to the Commission therein.)]
147 of 2020
Completed
1117 Tue 22/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Eon Kharadi Infrastructure Private Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year) procurement of power for Base Load of 6 MW RTC from 00:00 to 24:00 hours for a period of one year from 1st March, 2022 to 28th February, 2023, for its IT and ITES SEZ at Survey No.72,Village Kharadi, Pune ("SEZ Phase II")
Diary No. 31 of 2022
Completed
1118 Tue 22/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 500 MW Wind-Solar hybrid power from the grid connected power projects.
15 of 2022
Completed
1119 Tue 22/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from grid connected solar power projects under Section 63 of the Electricity Act, 2003 for meeting the Solar Renewable Purchase Obligations.
10 of 2022
Completed
1120 Fri 18/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
1121 Fri 18/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
Completed
1122 Fri 18/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner The Tata Power Company Limited- Distribution (TPC-D) under Section 94(1)(f) of the Electricity Act, 2003 and Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking review of the Order dated 11.10.2021 passed by this Hon'ble Commission in Case No. 88 of 2021.
165 of 2021
Completed
1123 Fri 18/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Sterling Agro Industries Ltd. under Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 20.07.2018 read with the approved amended Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation in accordance with the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 dated 19.12.2019 for waiver of deviation charges levied upon the Petitioner from 06.01.2020 to 28.06.2020.
164 of 2021
Completed
1124 Tue 15/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Adani Electricity Mumbai Limited-Distribution under Regulations 15, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004, seeking setting aside of the decision dated 21.10.2021 of MDNAC being not in accordance with the protocol established under Para 136 read with Para 143 of the Order dated 12.06.2017 passed by the Hon'ble Commission in Case Nos. 182 of 2014 and 40 of 2015.
163 of 2021
Completed
1125 Tue 15/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Aurangabad Industrial Township Limited (AITL) for the exemption granted to AITL pursuant to the Order dated 3rd September 2021 in Case No. 29 of 2019 from License stipulation for distributing Electricity.
161 of 2021
Completed
1126 Tue 15/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner M/s. Bhabani Pigments Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. Bhabani Pigments Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited.
160 of 2021
Completed
1127 Fri 11/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner/Applicant of New Ushanagar Co-operative Housing Society Limited under Regulations 81 and 92 of the MERC (Conduct of Business) Regulations, 2004 for urgent listing and for seeking interim/ad-interim reliefs in Case No. 167 of 2020.
159 of 2021
Completed
1128 Fri 11/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner of M/s. J. S. R. M. Foods (Abhinav Gopal Agrawal) seeking review of Order passed by the Commission in Case No. 72 of 2021 dated 11.10.2021.
158 of 2021
Completed
1129 Fri 11/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. Interocean Shipping Company under Section 86 (1) (e) of the Electricity Act, 2003 for directions to MSEDCL for payment of power w.e.f 31.03.2015 since the power injected by the petitioner was being accounted towards RPO which can only be done through an EPA under the Renewable Energy policy dated 20th July, 2015 issued by the Government of Maharashtra read with the methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra alongwith MERC (Renewable Purchase Obligation, its compliance and implementation of rec framework) regulations, 2010.
157 of 2021
Completed
1130 Tue 08/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Mr. Shantilal K. Jain seeking Non-compliance of Consumer Grievance Redressal Forum, Mumbai Order dated 03.04.2018 in Case No. 82 of 2018 & Electricity Ombudsman Mumbai Order dated 05.07.2018.
156 of 2021
Completed
1131 Tue 08/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner of Steel Manufacturers Association of Maharashtra seeking review under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 regarding applicability of "Load Factor Incentive" as provided under the Order dated 30.03.2020 in Case No. 322 of 2019.
155 of 2021
Completed
1132 Tue 08/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petitioner of Steel Manufacturers Association of Maharashtra seeking review under Regulation 85 of The MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of The Electricity Act, 2003 regarding applicability of 'Baseline consumption for determination of rebate on incremental consumption' for financial year commencing 01.04.2023 as provided under the Order dated 30.03.2020 in Case No. 322 of 2019.
154 of 2021
Completed
1133 Fri 04/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of RattanIndia Power Limited seeking directions to Respondent / Maharashtra State Electricity Distribution Co. Ltd for Payment of Amounts Due.
153 of 2021
Completed
1134 Fri 04/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Steel Manufacturers Association of Maharashtra under Regulation 32 and 35 of the MERC (Distribution Open Access) Regulation, 2016 seeking grant of Load Factor Incentive on Open Access consumption from Renewable sources of Energy.
152 of 2021
Completed
1135 Fri 04/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Dayashankar Harinath Pasi seeking compliance of the Consumer Grievance Redressal Forum, BEST Undertaking Order dated 27 April, 2021.
151 of 2021
Completed
1136 Tue 01/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Sai Wardha Power Generation Limited under Section 86(1)(b) read with Section 86(1)(f) of the Electricity Act, 2003 and Article 10 of the Power Purchase Agreement dated 02.07.2020 entered into between the Petitioner and the Respondent, seeking adjudication on the operational parameters and methodologies for computing compensation for change in law events.
150 of 2021
Completed
1137 Tue 01/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. Dhayafule Spinning Mills Pvt. Ltd. seeking compliance of the Consumer Grievance Redressal Forum, Latur Order Case No. 370/05/2013 dated 18 November 2013.
149 of 2021
Completed
1138 Tue 01/02/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Minex Metallurgical Co. Ltd.under section 86 of EA 2003 against charging transmission charges and transmission losses by MSEDCL in open access for wheeling of power from Wind mill and penalizing MSEDCL under section 142 for violating DOA 1st amendment Regulation 2019 and violating section 42 of Electricity Act 2003.
147 of 2021
Completed
1139 Fri 28/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and in terms of Liberty granted by this Hon'ble Commission in its Order dated 27.02.2018 passed in Case No. 138 of 2015.
146 of 2021
Completed
1140 Fri 28/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in Implmentation of MERC (Grid Interactive Rooftop Renewable Energy Generating System) Regulations, 2019.
145 of 2021
Completed
1141 Fri 28/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003 imploring this Hon'ble Commission to intervene in the current coal crisis being faced in India and to issue necessary directions to the Respondent i.e., Maharashtra State Electricity Distribution Company Ltd. enabling the Petitioner to sustain its generation and meet the power demand of the State of Maharashtra.
144 of 2021
Completed
1142 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 500 mw wind-solar hybrid power from the grid connected power projects.
15 of 2022
Completed
1143 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff for long term procurement of 500 MW power from grid connected solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar renewable purchase obligations.
10 of 2022
Completed
1144 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 12.5 MW solar power under 'Pradhan Mantri Kisan Urja Suraksha Evem Uthhan Mahabhiyan' (PM-KUSUM) under component a from 0.5 to 2 mw capacity projects connected to distribution network under section 63 of the Electricity Act, 2003 for meeting the solar renewable purchase obligations.
9 of 2022
Completed
1145 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Section 63 of the Electricity Act, 2003 for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 157.9 mw wind power from the wind generators whose EPAS with MSEDCL have expired.
8 of 2022
Completed
1146 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kharghar Vikhroli Transmission Private Limited under Section 86 (1) (a), (c) & (f) and other applicable provisions of the Electricity Act, 2003 read with Article 12 of the Transmission Service Agreement dated 14.08.2019 seeking, inter-alia, compensation/ relief for increased cost of Project during Construction Period due to the 'Change in Law' event being increase in Acquisition Price.
142 of 2021
Completed
1147 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Power Generation Company Limited under section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act 2003 and Regulation 105 & 106 of the MERC MYT Regulations 2019 for review of Order dated 30.03.2020 in Case No. 296 of 2019 regarding separation of tariff for Koradi unit 6 and 7 for balance MYT control period from FY 21-22 to FY 24-25.
133 of 2021
Completed
1148 Fri 21/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects. AND Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Cogeneration Association of India seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021 AND Application of Maharashtra State Electricity Distribution Co. Ltd filed by amended Petition in Case No. 70 of 2021 (Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.)
70 of 2021 AND MA No. 23 of 2021 AND IA No. 36 of 2021 AND IA No. 38 of 2021 in 70 of 2021
Completed
1149 Tue 18/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
Reschedule with further notice
1150 Tue 18/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Commissions Order dated 22.03.2021 passed by the MERC in Case No. 162 of 2019 filed by Pune Bio Energy Systems Pvt. Limited for determination of tariff of its Municipal Solid Waste processing project situated at Pune and the Order dated 03.07.2021 passed in Case No. 48 of 2021 by the Maharashtra Electricity Regulatory Commission in Review of the Order dated 22.03.2021.
130 of 2021
Completed
1151 Fri 14/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
Reschedule with further notice
1152 Fri 14/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
Reschedule with further notice
1153 Fri 14/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
Completed
1154 Tue 11/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner Laxmipati Balaji Supply Chain Management Limited (LBSCML) under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Purchase Agreement and Adoption of Tariff for Short-Term procurement of power of 1 MW RTC from 00:00 to 24:00 hours for a period of one year from February 1, 2022 to January 31, 2023 for its for FTWZ and IT/ITES SEZ at Village Sai, Tal. Panvel, Dist. Raigad.
6 of 2022
Completed
1155 Tue 11/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions.
148 of 2021
Completed
1156 Tue 11/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
Completed
1157 Tue 11/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
Completed
1158 Tue 11/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement. AND Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable provisions of law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020 AND Diary No. 139 of 2021 in 226 of 2020
Completed
1159 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Limited seeking Review of the Order dated 29.10.2020 passed by this Hon'ble Commission in Case No.170 of 2018 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004. AND Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent hearing and dismissal of the Review Petitions and vacation of the "No Coercive Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020. AND Application Viraj Profiles Limited seeking recall of Order dated 29.10.2020 passed by this Hon'ble Commission in Case No. 170 of 2018 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
224 of 2020 AND MA No. 21 of 2021 AND Diary No. 138 of 2021 in 224 of 2020
Completed
1160 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking Review of the Order dated 29.10.2020 passed by this Hon'ble Commission in Case No.170 of 2018 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004. AND Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent hearing and dismissal of the Review Petitions and vacation of the "No Coercive Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020. AND Application BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking recall of Order dated 29.10.2020 passed by this Hon'ble Commission in Case No. 170 of 2018 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
223 of 2020 AND MA No. 20 of 2021 AND Diary No. 137 of 2021 in 223 of 2020
Completed
1161 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Viraj Profiles Limited seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004. AND Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent hearing and dismissal of the Review Petitions and vacation of the "No Coercive Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020. AND Application Viraj Profiles Limited seeking recall of Order dated 22.10.2020 passed by this Hon'ble Commission in Case No. 175 of 2017 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
222 of 2020 AND MA No. 19 of 2021 AND Diary No. 136 of 2021 in 222 of 2020
Completed
1162 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 of 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004. AND Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent hearing and dismissal of the Review Petitions and vacation of the "No Coercive Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020. AND Application BFN Forgings Pvt. Ltd.(Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking recall of Order dated 22.10.2020 passed by this Hon'ble Commission in Case No. 175 of 2017 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
221 of 2020 AND MA No. 18 of 2021 AND Diary No. 135 of 2021 in 221 of 2020
Completed
1163 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of SMW ISPAT Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd). seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004. AND Application of Maharashtra State Electricity Distribution Co. Ltd. seeking urgent hearing and dismissal of the Review Petitions and vacation of the "No Coercive Order" passed by the Hon'ble Commission vide Daily Order dated 26.11.2020. AND Application SMW ISPAT Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd). seeking recall of Order dated 22.10.2020 passed by this Hon'ble Commission in Case No. 175 of 2017 in view of the judgment dated 07.06.2021 passed in Appeal No. 131/2020 by the Hon'ble APTEL, New Delhi.
220 of 2020 AND MA No. 17 of 2021 AND Diary No. 134 of 2021 in 220 of 2020
Completed
1164 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status with respect to its 2 x 135 MW Generating Units No. 3 and 4 for FY 2017-18.
170 of 2018
Completed
1165 Fri 07/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status with respect to its 2 x 135 MW Generating Units No. 3 and 4 for FY 2016-17.
175 of 2017
Completed
1166 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Urgent hearing in Petition of ACME Heergarh Powertech Private Limited under Section 86(1)(e), Section 86(1)(f) and 86(1)(k) of the Electricity Act, 2003, read with Article 8 of the Power Purchase Agreement dated 21.08.2019 executed between ACME Heergarh Powertech Private Limited and MSEDCL for supply of 300 MW Solar Power from its Solar PV Power Plant at Village - Badisid, Tehsil: Bap, District: Jodhpur, State: Rajasthan seeking inter alia, extension of the scheduled commercial operation date from 28.12.2021 to 14.09.2022, account of certain force majeure events including second surge of covid-19 in India and disruption in import of modules from china impacting the development of the project.
Diary No. 186 of 2021
Completed
1167 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
M/s. Juniper Green Energy Private Limited and M/s. Nisagra Renewable Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells. Case No. 61 of 2020 and 62 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 16.11.2021. IN Appeal No. 613 of 2020 and 171 of 2020 directions to the Commission therein.)]
61 of 2020 and 62 of 2020
Completed
1168 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Case of Azure Power Thirty Four Private Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax vide Notification dated 31.12.2018 issued by the Ministry of Finance. Case No. 147 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 08.11.2021. IN DFR No. 270 of 2021 & IA No. 1187 of 2021 & IA No. 1188 of 2021 directions to the Commission therein.)]
147 of 2020
Completed
1169 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust (JNPT) for obtaining the Hon'ble Commission's relaxation of Regulation 3.2 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 and other related matters with respect to its Distribution Franchisee Agreement with MSEDCL.
143 of 2021
Completed
1170 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
Completed
1171 Tue 04/01/2022 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
Completed
1172 Tue 28/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 29.08.2018 passed by the CGRF in Grievance No. K/E/1426/1677/ of 2017-2018.
140 of 2021
Reschedule with further notice
1173 Tue 28/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
Reschedule
1174 Tue 28/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
Reschedule
1175 Tue 28/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
Reschedule with further notice
1176 Tue 28/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
Reschedule with further notice
1177 Fri 10/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Viraj Profile Limited against Maharashtra State Electricity Distribution Company Limited for non-compliance of Order dated 29.08.2018 passed by the CGRF in Grievance No. K/E/1426/1677/ of 2017-2018.
140 of 2021
Reschedule
1178 Fri 10/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Electrical Contractor's Association of Maharashtra Nashik Region for Amendment and Modification of Maharashtra State Electricity Distribution Company Limited Circular No. CE/(DIST)/M-I/NSC/6660 Dated 19 March 2021 Regarding Supplementary guidelines for infrastructure development to release new connections.
139 of 2021
Reschedule
1179 Fri 10/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Ltd. under Section 94 of the Electricity Act, 2003 & Regulation 85 of the MERC (Conduct of Business) Regulation, 2004 for review of the Order dated 9th June 2021 in Case No. 164 of 2020.
138 of 2021
Reschedule
1180 Fri 10/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
Reschedule
1181 Fri 10/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
Reschedule
1182 Tue 07/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Shri Tradco India Pvt Ltd under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
122 of 2021
Completed
1183 Tue 07/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Sridevi Trading Company under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
121 of 2021
Completed
1184 Tue 07/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
101 of 2021
Completed
1185 Tue 07/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the MERC (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
100 of 2021
Completed
1186 Fri 03/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited under section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act 2003 and Regulation 105 & 106 of the MERC MYT Regulations 2019 for review of Order dated 30.03.2020 in Case No. 296 of 2019 regarding separation of tariff for Koradi unit 6 and 7 for balance MYT control period from FY 21-22 to FY 24-25.
133 of 2021
Completed
1187 Fri 03/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited under Section 62 (a) and 86(1) clause (a) and (b) of the Electricity Act, 2003 and Regulation 106 of the MERC MYT Regulations 2019 for Removal of difficulties with regards to payment of Service Tax and GST on lease rent for MSPGCL's Hydro stations.
132 of 2021
Completed
1188 Fri 03/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghodawat Energy Private Limited & Ors. under Section 142, 146 and 149 of the Electricity Act, 2003 seeking action against MSEDCL for blatant violation and non-compliance with the mandatory provisions of Regulations Governing Open Access regarding purchase of over-injected units.
131 of 2021
Completed
1189 Fri 03/12/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Commissions Order dated 22.03.2021 passed by the MERC in Case No. 162 of 2019 filed by Pune Bio Energy Systems Pvt. Limited for determination of tariff of its Municipal Solid Waste processing project situated at Pune and the Order dated 03.07.2021 passed in Case No. 48 of 2021 by the Maharashtra Electricity Regulatory Commission in Review of the Order dated 22.03.2021.
130 of 2021
Completed
1190 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
M/s. Juniper Green Energy Private Limited and M/s. Nisagra Renewable Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells. Case No. 61 of 2020 and 62 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 16.11.2021 IN Appeal No. 613 of 2020 and 171 of 2020 directions to the Commission therein)
61 of 2020 and 62 of 2020
Completed
1191 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
Completed
1192 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
Completed
1193 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India under Section 61(h), Section 86(1)(e) & Section 181 of the Electricity Act, 2003 for seeking clarifications and/or amendments to the MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019.
129 of 2021
Completed
1194 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase II.
128 of 2021
Completed
1195 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Ltd. in compliance to directives of the Hon'ble Commission in Case No. 296 of 2019 for seeking approval of claims related to flexible utilization of coal (coal tolling) arrangement carried out as per MoP policy dated 20.02.2018 with M/s Dhariwal Infrastructure Ltd. under Case IV Phase I.
127 of 2021
Completed
1196 Tue 30/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. S. M. Steels under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. S. M. Steels and Maharashtra State Electricity Distribution Company Limited.
126 of 2021
Completed
1197 Fri 26/11/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited-(Distribution Business) (AEML-D) under sections 86(1)(f), read with Sections 142 and 146 of the Electricity Act, 2003, seeking appropriate directions against willful violation of the order dated 12.06.2017 passed by this Hon'ble Commission in case nos. 182 of 2014 and 40 of 2015, by TPC-D for carrying out illegal switchover of consumers, which order was towards implementation of the principles enshrined in the judgment and the order dated 28.11.2014 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal Nos. 229 and 246 of 2012.
135 of 2021
Reschedule
1198 Fri 26/11/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
Reschedule
1199 Fri 26/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust (JNPT) for obtaining the Hon'ble Commission's relaxation of Regulation 3.2 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021 and other related matters with respect to its Distribution Franchisee Agreement with MSEDCL.
143 of 2021
Completed
1200 Fri 26/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
Completed
1201 Fri 26/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Gurupad Shivapa Bageli for non-compliance of Consumer Grievance Redressal Forum, Kolhapur Order in Case No. 14 of 2020 dated 28.12.2020.
89 of 2021
Completed
1202 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited. Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
Completed
1203 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
Completed
1204 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
Completed
1205 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
Completed
1206 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
Completed
1207 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
Completed
1208 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
Completed
1209 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
Completed
1210 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
Completed
1211 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
Completed
1212 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
Completed
1213 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
Completed
1214 Thu 25/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
Completed
1215 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited. Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
Completed
1216 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014. Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021 directions to the Commission therein.)
26 of 2019
Completed
1217 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018. Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021. IN Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614 of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of 2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and directions to the Commission therein.)
116 of 2018
Completed
1218 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Application Lloyds Metals & Energy Ltd. for amendment of petition in Petition inter alia under section 86 (1) (f) of the Electricity Act, 2003 read with other applicable provisisons of law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
Dairy No. 139 of 2021 in Case No. 226 of 2020
Completed
1219 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kreate Energy (I) Pvt. Ltd. inter alia under section 86(1)(f) of the Electricity Act, 2003 read with other applicable provisions of Law, seeking adjudication of a dispute arising from a Power Purchase Agreement.
136 of 2021
Completed
1220 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
Completed
1221 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
Completed
1222 Tue 16/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
Completed
1223 Mon 15/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Urgent hearing in Petition of Maharashtra Industrial Development Corporation (MIDC) invoking the provisions of Section 86 (1) (e) and (f) read with Sections 9 and 42 (2) of the Electricity Act, 2003 and further read with Rule 3 of the Electricity Rules, 2005, the latter to the extent of seeking reasonable time for adopting appropriate remedy in accordance with law, qua captive status for its Barvi SHP. This Hon'ble Commission is the parens patriae in respect of RE Generation in the State. As such, non-compliance with the Statutory Provisions
Diary No. 143 of 2021
Completed
1224 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
Reschedule
1225 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
Reschedule
1226 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
Reschedule
1227 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
Reschedule
1228 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
Reschedule
1229 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
Reschedule
1230 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
Reschedule
1231 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
Reschedule
1232 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
Reschedule
1233 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
Reschedule
1234 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
Reschedule
1235 Fri 12/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
Reschedule
1236 Tue 09/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited & Maharashtra State Electricity Distribution Company Limited seeking approval for adoption of tariff for long term procurement of power through MSPGCL for 250 MW Solar power projects at dondaicha solar park to meet MSEDCL's solar Renewable Purchase Obligations under section 63 of Electricity Act, 2003 and for seeking approval to the deviation sought in the draft PSA & PPA, with respect to the standard bidding guidelines, issued by Ministry of Power for procurement of power through competitive bidding process,
134 of 2021
Completed
1237 Tue 09/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of tariff discovered for long term procurement of 111 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations and for seeking approval to float open tender for procurement of solar power under 'Mukhyamantri Saur Krishi Vahini Yojana' (MSKVY).
141 of 2021
Completed
1238 Tue 09/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited. Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
Completed
1239 Tue 09/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014. Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021 directions to the Commission therein.)
26 of 2019
Completed
1240 Tue 09/11/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018. Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021. IN Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614 of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of 2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and directions to the Commission therein.)
116 of 2018
Completed
1241 Fri 29/10/2021 10:30:10 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
Reschedule
1242 Fri 29/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. J. S. R. M. Foods ( Abhinav Gopal Agrawal) under Section 142 & 146 of the Electricity Act, 2003 for Non-Compliance of Consumer Grievance Redressal Forum Order, Nagpur Order dated 4.6.2021 passed in Case No. 8 of 2021.
102 of 2021
Completed
1243 Fri 29/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Application of Clean Wind Power (Bhavnagar) Private Limited seeking urgent listing of the matter and ad-interim relief against the Respondent.
IA No. 26 of 2021 in 119 of 2021
Completed
1244 Fri 29/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Talegaon Floriculture Park Flower (Through Shri Malharrao Virchand Dhole, Secretary) for MSEDCL has changed the tariff classification of growers of the MIDC Floriculture Park, Talegaon, Dist. Pune from LT IV (B)-Agriculture-metered pumpsets to LT IV (C)-Agriculture-others as per their Commercial Circular dt 03/04/2020 and has discontinued Govt. subsidy. The classification of floriculture should be restored to LT IV (B) and the subsidy restored.
124 of 2021
Completed
1245 Fri 29/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Rajmal Lakhichand Jewellers under Section 86 (1) (E) of the Electricity Act, 2003 read with Regulation 92, 93 and 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 seeking directions from the Hon'ble Commission to MSEDCL for payment @ Rs. 2.52/unit for the power injected by Petitioner from 01.04.2020 to 31.08.2020.
123 of 2021
Completed
1246 Fri 29/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Clean Wind Power (Bhavnagar) Private Limited under Section 86(l)(f) and other relevant provisions of the Electricity Act, 2003 inter alia seeking directions against Maharashtra State Electricity Distribution Limited by declaring that the Power Purchase Agreement dated 17.07.2018 stands frustrated on account of various prolonged and continuing Force Majeure events causing impossibility of performance, and consequential reliefs. and Application on behalf of the Applicant/Petitioner seeking ad Interim Ex-parte directions against the Respondent.
119 of 2021 & I.A. No. 23 of 2021
Completed
1247 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Welturi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
118 of 2021
Completed
1248 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Shivpur) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
117 of 2021
Completed
1249 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajasthan) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 07.07.2014 in Case No. 100 of 2014 and Order dated 25.10.2016 in Case No. 135 of 2015. dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
116 of 2021
Completed
1250 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Rajkot) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
115 of 2021
Completed
1251 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Devgarh) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
114 of 2021
Completed
1252 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Jath) Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff dated 20.03.2012 in Case No. 10 of 2012 and Order dated 22.03.2013 in Case No. 6 of 2013 for the Renewable Sources of Energy passed by this Hon'ble Commission and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
113 of 2021
Completed
1253 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Varekarwadi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
112 of 2021
Completed
1254 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of ReNew Wind Energy (Delhi) Private Limited under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013 dated and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
111 of 2021
Completed
1255 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Projects Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the Electricity Act, 2003 for directions to the Respondent, Maharashtra State Electricity Distribution Company Limited, to perform its obligations under the Energy Purchase Agreements executed with the Petitioners for purchase of energy generated from the Petitioners? wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the Electricity Act, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (Renewable Purchase Obligation, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019
110 of 2021
Completed
1256 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Wind Energy Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance And Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 22.03.2013 in Case No. 6 of 2013, Order dated 24.11.2003 in Case No. 17(3), 3, 4, & 5 of 2002 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
109 of 2021
Completed
1257 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra Corporate Solar Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy Order dated 07.07.2014 in Case No. 100 of 2014, and Order dated 25.01.2016 in Case No. 135 of 2015 and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
108 of 2021
Completed
1258 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Green Infra BTV Ltd. under Sections 86 (1) (e), 86 (1) (f) and 142 of the EA, 2003 for directions to the Respondent, MSEDCL, to perform its obligations under the EPA executed with the Petitioner for purchase of energy generated from the Petitioners wind power projects situated in the State of Maharashtra and to initiate proceedings against the Respondent for non-compliance of the provisions of the EA, 2003, the MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010, the MERC (RPO, its Compliance and Implementation of RFC Framework) Regulations, 2010, the Suo-Motu Orders for the Determination of Generic Tariff for the Renewable Sources of Energy dated 29.04.2011 in Case No. 39 of 2011, Order dated 30.03.2012 in Case No. 10 of 2012, and the MYT/ARR Order dated 30.03.2020 in Case No. 322 of 2019.
107 of 2021
Completed
1259 Tue 26/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
Reschedule
1260 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company (MADC) for approval and directions under Section 86 of the Electricity Act, 2003 read with "Revised Guidelines for Procurement of Electricity for Medium Term from Power Stations set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued by Ministry of Power, Government of India.
137 of 2021
Completed
1261 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Inox Wind Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 and Indian Contract Act, 1872 seeking declaration that the Power Purchase Agreement dated 17.07.2018 entered into between Inox Wind Limited and Maharashtra State Electricity Distribution Corporation Limited stands frustrated on account of Force Majeure and impossibility of performance and for consequent relief. and Miscellaneous Application for urgent Interim Reliefs on behalf of the Applicant/Petitioner.
120 of 2021 & I. A. No. 25 of 2021
Completed
1262 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. P. M. Cold Storage under Section 142 & 146 of the Electricity Act 2003 for violating the Order of Hon'ble Consumer Grievance Redressal Forum dated 13.01.2021.
106 of 2021
Completed
1263 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/S. WAACOX Energy Private Limited under Section 86(1)(f) of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, for issuing appropriate directions to the Respondents to comply with the Power Purchase Agreements dated 14.06.2018, pursuant to availability of power and other consequential relief, for solar power Projects at Ralegansiddhi and Manjarda.
104 of 2021
Completed
1264 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of SMW Ispat Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd) under Regulation 32 and 35 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulation, 2016 seeking grant of power factor incentive on open access consumption for the period March 2013 to September, 2016.
103 of 2021
Completed
1265 Fri 22/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. J. S. R. M. Foods ( Abhinav Gopal Agrawal) under Section 142 & 146 of the Electricity Act, 2003 for Non-Compliance of Consumer Grievance Redressal Forum Order, Nagpur Order dated 4.6.2021 passed in Case No. 8 of 2021.
102 of 2021
Reschedule
1266 Tue 12/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018. Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021. IN Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614 of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of 2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and directions to the Commission therein.)
116 of 2018
Completed
1267 Tue 12/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Shri Tradco India Pvt Ltd under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
122 of 2021
Completed
1268 Tue 12/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Sridevi Trading Company under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
121 of 2021
Completed
1269 Tue 12/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of S. K. Veerbhadrappa & Co. under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
101 of 2021
Completed
1270 Tue 12/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of B. S. Channabasappa & Sons under Section 94(1)(g) of the Electricity Act 2003 read with the provisions of Regulation 32, 81, 91 and 92 of the MERC (Conduct of Business) Regulations, 2004 and Regulation 26.8 of the MERC (Distribution Open Access) Regulations, 2014 for payment in respect of the purchase of surplus units / over-injected units of energy.
100 of 2021
Completed
1271 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Application of Adani Electricity Mumbai Limited- Transmission seeking appropriate directions for dismissal of the present petition on principles analogous to order vii rule 11 of civil procedure code, 1908.
IA No. 27 of 2021 in 95 of 2021
Completed
1272 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
Completed
1273 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - T under Section 39(2)(b) & (c) read with Section 86(1)(f) of the EA, 2003 read with Regulations 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and applicable provisions of MERC (State Grid Code) Regulations, 2020 assailing the in-principle approval dated 06.08.2021 of the Capex Scheme of Respondent No. 2 i.e. AEML- T for installation of 220/33 kV Sub-stations with 2 x 125 MVA Power Transformers at BKC, Mumbai The Hon'ble Commission vide the said Capex approval has approved the cost of Rs. 1093.91 Crores (against AEML-T's claims of Rs. 1213.03 Crores) for creation of the AEML Substation.
95 of 2021
Completed
1274 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s O. P. Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s O. P. Enterprises for release of principal and DPS or LPS from Respondent.
125 of 2021
Completed
1275 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Kukreja Development Corporation under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s Kukreja Development Corporation for release of principal and DPS or LPS from Respondent.
99 of 2021
Completed
1276 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s L. B. Kunjir under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s L. B. Kunjir for release of principal and DPS or LPS from Respondent.
98 of 2021
Completed
1277 Fri 08/10/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Kukreja Enterprises under Section 86 (1) (f) of the Electricity Act, 2003 seeking direction from this Hon'ble Commission in favour of the Petitioner M/s Kukreja Enterprises for release of principal and DPS or LPS from Respondent.
97 of 2021
Completed
1278 Mon 04/10/2021 10:30:00 AM
first appearance of the concerned parties
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Services Tax amounting to a Change in Law event in terms of the Power Purchase Agreement dated 27 July 2018, executed with Maharashtra State Electricity Distribution Company Limited. Case No. 25 of 2020 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 215 of 2021 directions to the Commission therein.)
25 of 2020
Completed
1279 Mon 04/10/2021 10:30:00 AM
first appearance of the concerned parties
Petition of M/s Rajlakshmi Minerals for the amount due and payable by Maharashtra State Electricity Distribution Company Limited for electricity supplied under the Wind Energy Purchases Agreement dated 20 August 2014. Case No. 26 of 2019 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 20.09.2021. IN Appeal No. 386 of 2019 & IA Nos. 1888 of 2019, 279 of 2020 & 1256 of 2021 directions to the Commission therein.)
26 of 2019
Completed
1280 Tue 28/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ordnance Factory Ambajhari, Nagpur (OFAJ) under Section 142 of the Electricity Act, 2003, for seeking relief in view of contravention of the provisions of the Electricity Act, 2003 particularly Section 184, applicable to the petitioner as the petitioner is the department under Ministry of Defence, Government of India and consequential relief.
96 of 2021
Completed
1281 Tue 28/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - T under Section 39(2)(b) & (c) read with Section 86(1)(f) of the EA, 2003 read with Regulations 92 to 94 of MERC (Conduct of Business) Regulations, 2004 and applicable provisions of MERC (State Grid Code) Regulations, 2020 assailing the in-principle approval dated 06.08.2021 of the Capex Scheme of Respondent No. 2 i.e. AEML- T for installation of 220/33 kV Sub-stations with 2 x 125 MVA Power Transformers at BKC, Mumbai The Hon'ble Commission vide the said Capex approval has approved the cost of Rs. 1093.91 Crores (against AEML-T's claims of Rs. 1213.03 Crores) for creation of the AEML Substation.
95 of 2021
Completed
1282 Tue 28/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Power Pvt. Ltd. under Section 86(1)(b) & (f) of the Electricity Act, 2003 read with PPA dated 27.12.2018 seeking extension of the SCOD of the Project to actual date of commissioning.
91 of 2021
Completed
1283 Tue 28/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
Completed
1284 Fri 24/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s Eon Kharadi Infrastructure Private Limited under Section 86(1)(b) read with Section 63 of the Electricity Act, 2003 for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year) procurement of power for Base Load of 7 MW RTC from 00:00 to 24:00 hours for a period of one year from November 1, 2021 to October 31, 2022 for its IT and ITES SEZ at Survey No.77, MIDC Knowledge Park, Kharadi, Pune ("SEZ Phase I").
105 of 2021
Completed
1285 Fri 24/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Seamless Limited seeking "Relaxation" of Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 qua the Petitioner in view of the Notification dated 10.04.2021 issued by the Public Health Department, Government of Maharashtra diverting all Industrial Oxygen for Medical use in Hospitals.
93 of 2021
Completed
1286 Fri 24/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Revised Petition of Maharashtra State Electricity Distribution Company Limited seeking directions from Hon'ble Commission to all IPPs having long term PPA with MSEDCL for providing rebate in fixed charges, interest free deferment of capacity charges and reduced late payment surcharge on account of Covid-19 Pandemic in view of the Ministry of Power Notification dated 15.05.2020/16.05.2020.
84 of 2021
Completed
1287 Fri 24/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
Completed
1288 Mon 13/09/2021 10:30:00 AM
first appearance of the concerned parties
Petition of Sai Wardha Power Generation Ltd. for directions to Maharashtra State Electricity Distribution Co. Ltd regarding the terms of Open Access granted for the period from 1 April 2018. Case No. 116 of 2018 (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 02.09.2021. IN Appeal No. 78 of 2019, Appeal No. 81 of 2019, Appeal No. 82 of 2019, Appeal No. 111 of 2019, Appeal No. 112 of 2019, Appeal No. 147 of 2019, & IA Nos. 614 of 2019 & Appeal No. 117 of 2019 & IA No. 1507 of 2019 and DFR No. 146 of 2020 & IA No. 443 of 2020 & IA No. 442 of 2020 & IA No. 444 of 2020 and directions to the Commission therein.)
116 of 2018
Completed
1289 Tue 07/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
Completed
1290 Tue 07/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Seamless Limited seeking "Relaxation" of Regulation 20.5 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 qua the Petitioner in view of the Notification dated 10.04.2021 issued by the Public Health Department, Government of Maharashtra diverting all Industrial Oxygen for Medical use in Hospitals.
93 of 2021
Completed
1291 Tue 07/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Indian Railways under Regulation 19 of Maharashtra Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 for removal of difficulties being faced by Indian Railways while scheduling power simultaneously from Renewable (Wind) and Non-Renewable (Thermal) Sources within the State of Maharashtra.
92 of 2021
Completed
1292 Tue 07/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Power Pvt. Ltd. under Section 86(1)(b) & (f) of the Electricity Act, 2003 read with PPA dated 27.12.2018 seeking extension of the SCOD of the Project to actual date of commissioning.
91 of 2021
Completed
1293 Fri 03/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Inderjit Singh Bahadur Singh for non-compliance of the Order of the Consumer Grievance Redressal Forum shall be treated as violation of the Regulations of the Commission and accordingly liable for action under Sections 142 and 146 of the Electricity Act 2003.
90 of 2021
Completed
1294 Fri 03/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Gurupad Shivapa Bageli for non-compliance of Consumer Grievance Redressal Forum, Kolhapur Order in Case No. 14 of 2020 dated 28.12.2020.
89 of 2021
Completed
1295 Fri 03/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - D for seeking approval for additional Short term RE Power Purchase for RPO Compliance of Tata Power-D for FY 2021-22.
88 of 2021
Completed
1296 Fri 03/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Dawood Peersaab Shaikh for execution of the Orders of the Consumer Grievance Redressal Forum (CGRF), Maharashtra State Electricity Distribution Company Ltd., Pune in Case No: 07 of 2020.
85 of 2021
Completed
1297 Wed 01/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010, executed between RattanIndia Power Limited and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RattanIndia Power Limited.
83 of 2021
Completed
1298 Wed 01/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Zaveri and Company (Gujarat) LLP under Section 86(1)(f) of The Electricity Act, 2003 pertaining to adjudication of disputes between M/s Zaveri and Company (Gujarat) LLP and Maharashtra State Electricity Distribution Company Limited.
81 of 2021
Completed
1299 Wed 01/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The President Matoshri Yuvak Kalyan & Shikshan Prasarak Mandal for non-compliance of CGRF Akola zone Order in complaint no Case No. 27 of 2020 Order dated 03.09.2020 and the refund of Electricity Duty from 10.10.2012 to 31.08.2016 along with interest at bank rate prevailing from time to time & tariff difference amounts from 10.10.2012 till actual refund along with interest at bank rate.
79 of 2021
Completed
1300 Wed 01/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Generation under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve the Detailed Project Report submitted by the Petitioner as capital expenditure scheme for Replacement of various electrical equipment in the Petitioner's Hydro Generating Stations sought vide its Letter No. CREG/MUM/MERC/2019/168 dated 24.07.2019.
78 of 2021
Completed
1301 Wed 01/09/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Transmission under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve Detailed Project Reports submitted as capital expenditure schemes.
76 of 2021
Completed
1302 Tue 31/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010, executed between RattanIndia Power Limited and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RattanIndia Power Limited.
83 of 2021
Reschedule
1303 Tue 31/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Zaveri and Company (Gujarat) LLP under Section 86(1)(f) of The Electricity Act, 2003 pertaining to adjudication of disputes between M/s Zaveri and Company (Gujarat) LLP and Maharashtra State Electricity Distribution Company Limited.
81 of 2021
Reschedule
1304 Tue 31/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The President Matoshri Yuvak Kalyan & Shikshan Prasarak Mandal for non-compliance of CGRF Akola zone Order in complaint no Case No. 27 of 2020 Order dated 03.09.2020 and the refund of Electricity Duty from 10.10.2012 to 31.08.2016 along with interest at bank rate prevailing from time to time & tariff difference amounts from 10.10.2012 till actual refund along with interest at bank rate.
79 of 2021
Reschedule
1305 Tue 31/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Generation under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve the Detailed Project Report submitted by the Petitioner as capital expenditure scheme for Replacement of various electrical equipment in the Petitioner's Hydro Generating Stations sought vide its Letter No. CREG/MUM/MERC/2019/168 dated 24.07.2019.
78 of 2021
Reschedule
1306 Fri 27/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of 1. Paras Miracle Poly Products Pvt. Ltd. and 2. Paras PVC Pipes & Fitting Pvt. Ltd seeking "Relaxation" of Proviso to Regulation 3.2 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 in accordance with the relaxation already provided by the Hon'ble Commission vide Order dated 21.05.2020 in Case No. 82/2020 and continued vide subsequent Orders dated 31.07.2020 in Case No. 137/2020 and Order dated 26.05.2021 in Case No. 25/2021 and Clarificatory Order dated 11.06.2021 in Case No. 25/2021.
77 of 2021
Completed
1307 Fri 27/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Transmission under Section 62 read with Regulation 25.2 Proviso A to C of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019, Approve Detailed Project Reports submitted as capital expenditure schemes.
76 of 2021
Reschedule
1308 Fri 27/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Jaisal Mechatronics Private Limited seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills, delayed payment charges and interest accrued thereupon.
75 of 2021
Completed
1309 Tue 24/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code AND Application of Adani Electricity Mumbai Limited - Distribution seeking Impleadment of the Applicant as a Party Respondent in Case No 68 of 2021.
68 of 2021 and MA No. 22 of 2021 in 68 of 2021
Completed
1310 Tue 24/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia power Limited (Amravati) under Section 86 (1) (f) of the Electricity Act, 2003 for resolution of disputes with MSEDCL under PPA dated 22.04.2010 and 05.06.2010.
65 of 2021
Completed
1311 Tue 24/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Nidar Utilities Panvel LLP for the adoption of the Tariff and approval of the Power Purchase Agreement (PPA) based on the tariff determined under Competitive Bidding process under Section 63 of the Electricity Act, 2003, as per the 'Guidelines for Short-Term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees through Tariff based bidding process' issued by the Ministry of Power, Government of India (GoI), dated 30 March 2016, for the procurement of Round the Clock (RTC) power upto 2.60 MW (00:00 to 24:00 Hrs) for a period of 9 months i.e. from 1 October 2021 to 30 June 2022.
94 of 2021
Completed
1312 Fri 13/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited (Distribution) under Sections 86, 142 and 146 of the Electricity Act, 2003 read with this Hon'ble Commission's Order dated 12.06.2017 in Case No. 182 of 2014 and 40 of 2015.
82 of 2021
Completed
1313 Fri 13/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Aurangabad Industrial Township Limited (AITL) seeking exemption of Distribution Licence for Aurangabad Industrial City in pursuance of recommendations of the Government of Maharashtra under Section 13 of Electricity Act, 2003. (Re-opened in pursuance of Hon'ble APTEL's Judgement dated 30.06.2021 in Appeal No. 257 of 2019 and directions to the Commission therein)
29 of 2019
Completed
1314 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no. 262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated 10.08.2020 in Case No. 23 of 2020.
234 of 2020
Completed
1315 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
Completed
1316 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
Completed
1317 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s O.P Enterprises against MSEDCL for willful disobedience of the direction of Commission passed in the Order dated 9 January 2019 in Case No. 285 of 2018 to release Principal and / Delay Payment Charges (DPC)
186 of 2020
Completed
1318 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Kukreja Enterprises against Maharashtra State Electricity Distribution Company Limited for willful disobedience of the Direction of the Commission passed in the Order dated 9 January 2019 in Case No. 288 of 2018 to release Principal and / Delay Payment Charges (DPC)
185 of 2020
Completed
1319 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
Completed
1320 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
Completed
1321 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
Completed
1322 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
Completed
1323 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
Completed
1324 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company (MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 274 of 2019.
125 of 2020
Completed
1325 Fri 06/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
Completed
1326 Tue 03/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Shri Mahindra Devidas Deshmukh for Non-Compliance of Consumer Grievance Redressal Forum Order Akola, Order dated 25.3.2019 passed in Case No. 9 of 2019.
73 of 2021
Completed
1327 Tue 03/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited-Transmission and 2. The Tata Power Company Limited - Distribution seeking prior approval of this Hon'ble Commission to de-capitalize certain immovable assets belonging to the Petitioner.
41 of 2021
Completed
1328 Tue 03/08/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited seeking prior approval of this Hon'ble Commission to de-capitalize certain immovable assets belonging to the Transmission Business of the Petitioner.
14 of 2021
Completed
1329 Fri 30/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Application of Adani Electricity Mumbai Limited- Distribution seeking Impleadment of the Applicant as a Party Respondent in Case No 68 of 2021.
MA No. 22 of 2021 in Case No. 68 of 2021
Completed
1330 Fri 30/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of Abhinav Gopal Agrawal for Non-Compliance of Consumer Grievance Redressal Forum Order, Gondia Order dated 6.11.2020 passed in Case No. 3 of 2020.
72 of 2021
Completed
1331 Fri 30/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petitioner of M/s. Shree Tatyasaheb Kore Warana Sahakari Sakhar Karkana Ltd. under Section 86 (1) (E) & (F) read with Section 62 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, Its compliance and implementation of REC Framework) Regulations, 2010 and MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 and the notifications issued by Government of Maharashtra for the bagasse based cogeneration projects.
71 of 2021
Completed
1332 Fri 30/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
Completed
1333 Tue 27/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
Completed
1334 Tue 27/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia power Limited (Amravati) under Section 86 (1) (f) of the Electricity Act, 2003 for resolution of disputes with MSEDCL under PPA dated 22.04.2010 and 05.06.2010.
65 of 2021
Completed
1335 Tue 27/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sinner Thermal Power Limited seeking directions to MSEDCL for withdrawal of Termination Notice dated 19 May 2020 and procurement of power generated from RattanIndia Power Limited.
23 of 2021
Completed
1336 Fri 16/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Application of Shri Datta Sakhar Karkhana (A unit of Dalmia Bharat Sugar and Industries Ltd.) seeking Impleadment of the Applicant as a Party Respondent in Case No 70 of 2021.
MA No. 23 of 2021 in Case No. 70 of 2021
Completed
1337 Fri 16/07/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestions and Objections on Maharashtra Electricity Distribution Company Limited's Petition for reclassification of Wind Zones of Wind Energy Projects in Maharashtra
338 of 2019
Completed
1338 Fri 16/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd for seeking approval for purchase of over injected units above contracted (export) capacity from bagasse based co-generation projects.
70 of 2021
Completed
1339 Fri 16/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Maharashtra State Electricity Distribution Co. Ltd. for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016.
49 of 2021
Completed
1340 Tue 13/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. KRC Infrastructure and Projects Private Limited (KRCIPPL) for approval of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable Purchase Obligation (RPO) obligation of FY 2019-20 and 2020-21 to FY 2021-22 and FY 2022-23
46 of 2021
Completed
1341 Tue 13/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable Purchase Obligation (RPO) of FY 2020-21 to FY 2021-22 and FY 2022-23.
45 of 2021
Completed
1342 Tue 13/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon'ble Commission to allow carrying forward of the shortfall in Renewable Purchase Obligation (RPO) of FY 2020-21 to FY 2021-22 and 2022-23.
47 of 2021
Completed
1343 Tue 13/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by KRC Infrastructure and Projects Pvt.Ltd (KRCIPPL) for FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
56 of 2021
Completed
1344 Tue 13/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Mindspace Business Park Pvt. Ltd (MBPPL) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
55 of 2021
Completed
1345 Tue 13/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Gigaplex Estate Pvt. Ltd. (GEPL) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016.
54 of 2021
Completed
1346 Fri 09/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Nidar Utilities Panvel LLP (NUPLLP) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
57 of 2021
Completed
1347 Fri 09/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Indian Railways (IR) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
53 of 2021
Completed
1348 Fri 09/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Tata Power Co. Ltd. (Distribution) (TPC-D) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
52 of 2021
Completed
1349 Fri 09/07/2021 10:30:00 AM
e-Public Hearing
Hearing: Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Ltd. (Distribution) (AEML-D) for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
51 of 2021
Completed
1350 Fri 09/07/2021 10:30:00 AM
e-Public Hearing
Suo-Motu Proceedings for Verification and Compliance of Renewable Purchase Obligation targets by BEST Undertaking for FY 2018-19 & FY 2019-20 as specified under MERC (RPO-REC) Regulations, 2016
50 of 2021
Completed
1351 Tue 06/07/2021 10:30:03 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited â?? Distribution Business seeking declaration from this Hon'ble Commission that the letters dated 08.10.2020 and 09.12.2020 issued by the Maharashtra State Electricity Transmission Company Limited (STU) regarding grant of grid connectivity to its Extra High Voltage consumers wherein Maharashtra State Electricity Transmission Company Limited (STU) has approved connectivity of Extra High Voltage consumers directly to the intra-state transmission network without any intervening Distribution System, are contrary to the provisions of the Electricity Act, 2003 and without following the procedure contemplated under the State Grid Code.
68 of 2021
Reschedule with further notice
1352 Tue 06/07/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of M/s NVR Mahasolar Pvt. Ltd. seeking directions from the Hon'ble Commission for removal of difficulties in implementation of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018.
66 of 2021
Reschedule with further notice
1353 Tue 06/07/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Reschedule with further notice
1354 Tue 06/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited) Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
Completed
1355 Tue 06/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association (CPPA) Seeking permission to exercise the option or otherwise for the Financial Year 2020-2021 as per the order dated 6th October 2020 passed in Case No. 111 of 2020.
67 of 2021
Completed
1356 Fri 02/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited Petition under Section 86 (1) (f) of the Electricity Act,2003 for resolution of disputes with the Respondent. Application seeking Interim directions.
65 of 2021
Completed
1357 Fri 02/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power Limited) seeking directions to the Maharashtra State Electricity Distribution Company Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of State.
23 of 2021
Completed
1358 Fri 02/07/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited) Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
Completed
1359 Tue 29/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s.Khade Mewara Infra Project and mining.seeking invocation of the Provisions of S.142, 146 r/w 149 of Electricity Act, 2003 for Non-compliance of MERC order dtd.16.02.2008 and dtd.08.09.2006 and violations of Regulations made by Hon'ble MERC under Electricity Act,2003.
59 of 2021
Completed
1360 Tue 29/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement AND Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd. in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement)
226 of 2020 and MA No. 3 of 2021
Completed
1361 Tue 29/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND Interim Application
176 of 2020 and MA No. 8 of 2021
Completed
1362 Tue 29/06/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestions/ Objections on Mahati Hydro Power Veer Project Private Limited (MHPVPPL) Petition for determination of Project Specific Tariff for Veer Hydro Electric Project (2x4.5MW) under Renovation and Modernisation as per the provisions of Section 62(1)(a) and 86(1)(e) of the Electricity Act, 2003 and Regulation 9.1, 10.2, 74 and 77 of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019
63 of 2021
Completed
1363 Fri 25/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Limited under Section 86 of The Electricity Act ,2003 read with Article 13 (Change in Law) of PPAs under Case 1 stage 1 and Article 10 (Change in Law) of PPAs under case 1 stage 2.
24 of 2017
Completed
1364 Tue 22/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited seeking Review of the Order dated 15.03.2021 passed by this Hon'ble Commission in Case No. 337 of 2019
58 of 2021
Completed
1365 Tue 22/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Company Limited ("MSEDCL") Seeking review of order dated 28th November, 2020 in Case No. 132 of 2020 in the matter of petition of Adani Power Maharashtra Limited seeking hypothetical in-land transportation cost of IPT coal. Application under Regulation 94 of MERC (Conduct of Business) Regulations, 2004 seeking condonation of delay in filling the present Review Petition.
9 of 2021
Completed
1366 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
69 of 2021
Completed
1367 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
Completed
1368 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release Principal and delayed payment charges (DPC)
21 of 2021
Completed
1369 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment the amounts due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014. And In the matter of Order dated 26th March 2019, passed by this Hon'ble Commission in Case No. 26 of 2019.
40 of 2021
Completed
1370 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
38 of 2021
Completed
1371 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Silverline Investment Company Pvt. Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
37 of 2021
Completed
1372 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
36 of 2021
Completed
1373 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
32 of 2021
Completed
1374 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Parmarth Wind Energy Private Limited seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014.
31 of 2021
Completed
1375 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. IOTA MTech Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 27th March 2017.
30 of 2021
Completed
1376 Fri 18/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) seeking directions to the Maharashtra State Electricity Distribution Company("MSEDCL") to make payment of outstanding amounts, including late payment surcharge, due and payable to the Petitioner for supply of power from the petitioner's wind power plants.
27 of 2021
Completed
1377 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no. 262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated 10.08.2020 in Case No. 23 of 2020.
234 of 2020
Completed
1378 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
Completed
1379 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
Completed
1380 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
186 of 2020
Completed
1381 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Kukreja Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 288/2018. to release Principal and / Delay Payment.(DPC)
185 of 2020
Completed
1382 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
Completed
1383 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
Completed
1384 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
Completed
1385 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
Completed
1386 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
Completed
1387 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company (MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 274 of 2019.
125 of 2020
Completed
1388 Tue 15/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
Completed
1389 Fri 11/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Limited under Section 86 of The Electricity Act ,2003 read with Article 13 (Change in Law) of PPAs under Case 1 stage 1 and Article 10 (Change in Law) of PPAs under case 1 stage 2.
24 of 2017
Completed
1390 Fri 11/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking (Of Municipal Corporation of Greater Mumbai) (BEST) seeking condonation and approval of the inadvertent delay and deficiency in the course of procurement of 100MW Power from Manikaran Power Limited.
61 of 2021
Completed
1391 Fri 11/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited seeking directions to the Respondent No. 1 Maharashtra State Electricity Distribution Company("MSEDCL") and Respondent No. 2. Maharashtra Load Despatch Center ("MSLDC")
26 of 2021
Completed
1392 Tue 08/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s.Khade Mewara Infra Project and mining.seeking invocation of the Provisions of S.142, 146 r/w 149 of Electricity Act,2003 for Non-compliance of MERC order dtd.16.02.2008 and dtd.08.09.2006 and violations of Regulations made by Hon'ble MERC under Electricity Act,2003.
59 of 2021
Completed
1393 Tue 08/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for removal of difficulties In Implmentation of MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees Including Power Quality) Regulations, 2021 (Limitation on acceptance of amount through Cheque from the Consumers)
44 of 2021
Completed
1394 Tue 08/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s EON Kharadi Infrastructure Pvt. Ltd. for the grant of Transmission Licence for the Transmission Network being set up at Village Kharadi and Village Wagholi, Tal. Haveli, District, Pune
212 of 2020
Completed
1395 Fri 04/06/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement. AND Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd. in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement )
226 of 2020 and MA No. 3 of 2021
Reschedule with further notice
1396 Fri 04/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
17 of 2021
Completed
1397 Fri 04/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND Interim Application
176 of 2020 And MA No. 8 of 2021
Completed
1398 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016 AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 288 of 2019
19 of 2019 & MA No. 15 of 2021
Completed
1399 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 319 of 2018
119 of 2018 & MA No. 14 of 2021
Completed
1400 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 377 of 2019
119 of 2019 & MA No. 13 of 2021
Completed
1401 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner. AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 378 of 2019
118 of 2019 & MA No. 12 of 2021
Completed
1402 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bothe Windfarm Development Pvt. Ltd. against Maharashtra State Electricity Distribution Company Limited(MSEDCL) for non-compliance of this Hon'ble Commission's Order dated 01.07.2020 passed in Case No. 28 of 2020.
60 of 2021
Completed
1403 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 66 of 2020
43 of 2021
Completed
1404 Tue 01/06/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company (MSEDCL) Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 60 of 2020.
42 of 2021
Completed
1405 Fri 28/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited seeking Review of the Order dated 15.03.2021 passed by this Hon'ble Commission in Case No. 337 of 2019
58 of 2021
Reschedule
1406 Fri 28/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Pune Bioenergy systems Pvt Ltd. (PBESPL) seeking review of Hon'ble Commission Order for determination of Tariff dated 22 March 2021 passed in MERC Case No. 162 of 2019.
48 of 2021
Completed
1407 Tue 25/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s Avaada Energy Pvt Ltd seeking urgent direction(s) and action against Respondent for being in non-compliance of the specific and express directions/orders of this Hon'ble Commission dated 16.02.2021 in Case No. 04 of 2021
64 of 2021
Reschedule with further notice
1408 Tue 25/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khandesh Industrial Development Association ( K.I.A) seeking deferment of new provision related to security deposit i.e., deposit of two month of average billing instead of one month existing) for the period of 3 years i.e.,till the impact of COVID-19 gets streamline and smooth running and to ensure hassle free set off of GST and credit of Tax deducted as Source (TDS) from consumers as per the provisions of law.
62 of 2021
Completed
1409 Tue 25/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Laghu Udhyog Bharati under regulation 30 of supply code 2021 and Under Regulation 4.4.5 seeking practice directions to Respondent No 1. for complying with statutory requirements AND Application for impleadment filed by Prayas (Energy Group)
39 of 2021 and MA No. 9 of 2021
Completed
1410 Tue 18/05/2021 11:00:01 AM
e-Hearing through Video Conferencing
Petition of Sahebrao Charde Vidyut Mandal Nivruti Karmachari Sang application to raise the Tariff for benefits of the retired employees of all 4 Companies for application of the pension scheme and for economic assistance. AND Application for intervention filed by Maharashtra State Electricity Workers Federation
13 of 2021 AND MA No. 10 of 2021
Completed
1411 Tue 18/05/2021 11:00:00 AM
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016 AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 288 of 2019
19 of 2019 & MA No. 15 of 2021
Completed
1412 Tue 18/05/2021 11:00:00 AM
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 319 of 2018
119 of 2018 & MA No. 14 of 2021
Completed
1413 Tue 18/05/2021 11:00:00 AM
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 377 of 2019
119 of 2019 & MA No. 13 of 2021
Completed
1414 Tue 18/05/2021 11:00:00 AM
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner. AND Application seeking compliance of the Order dated April 27, 2021 in Appeal No. 378 of 2019
118 of 2019 & MA No. 12 of 2021
Completed
1415 Fri 14/05/2021 10:30:04 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited Petition under Section 86 (1) (f) of the Electricity Act,2003 for resolution of disputes with the Respondent.
65 of 2021
Completed
1416 Fri 14/05/2021 10:30:03 AM
e-Hearing through Video Conferencing
Application for impleadment filed by Prayas (Energy Group) in Case No. 39 of 2021
MA No. 9 of 2021 in 39 of 2021
Completed
1417 Fri 14/05/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of Laghu Udhyog Bharati under regulation 30 of supply code 2021 and Under Regulation 4.4.5 seeking practice directions to Respondent No 1. for complying with statutory requirements.
39 of 2021
Completed
1418 Fri 14/05/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of M/s. Bilt Graphic Paper Products Limited seeking declaration that the Applicant has fulfilled its RPO for the period F. Y. 2016-2017 to F. Y. 2019-2020. under Regulation No. 92 of the MERC (CoB) Regulations, 2004, and Regulation No.16 & 18 of the MERC (RPO Implementation of Renewable Energy Certificate Framework) Regulations, 2016, Order dated 02.04.2018 passed by the Hon'ble Commission in Case No. 75 of 2017
33 of 2021
Completed
1419 Fri 14/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Minex Metallurgical Co Lts for penalizing Maharashtra State Electricity Distribution Company("MSEDCL") for violating section 9 of Electricity Act, 2003, violating SOP Regulations of Distribution licensee, violating DOA 1st amendment Regulation 2019, Commissions order in case No. 199 of 2020 and directing MSEDCL to remove illegal sealing of Solar Captive Generation of Petitioner which is sealed after installation of SEM for import of wind power through open access and compensation of losses to the petitioner.
28 of 2021
Completed
1420 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
Completed
1421 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release Principal and delayed payment charges (DPC)
21 of 2021
Completed
1422 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 66 of 2020
43 of 2021
Completed
1423 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Sections 86, 142 and 146 of the Electricity Act, 2003 against Maharashtra State Electricity Distribution Company(MSEDCL) Limited for non-compliance of this Hon'ble Commission's Order dated 04.07.2020 passed in Case No. 60 of 2020.
42 of 2021
Completed
1424 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement. AND Application filed by Kreate Energy (I) Pvt. Ltd. for Impleadment of Tata Power Co. Ltd. in the Present Proceedings.in Case No 226 of 2020 ( Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement )
226 of 2020 and MA No. 3 of 2021
Completed
1425 Tue 11/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND Interim Application
176 of 2020 And MA No. 8 of 2021
Completed
1426 Fri 07/05/2021 10:30:09 AM
e-Hearing through Video Conferencing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
38 of 2021
Completed
1427 Fri 07/05/2021 10:30:08 AM
e-Hearing through Video Conferencing
Petition of M/s. Silverline Investment Company Pvt. Ltd under section 142 and 146 of the Electricity Act, 2003 against the Respondents Maharashtra State Electricity Distribution Company Limited (MSEDCL) for repeatedly failing to comply with the orders and directions passed by this Hon'ble Commission.
37 of 2021
Completed
1428 Fri 07/05/2021 10:30:07 AM
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
36 of 2021
Completed
1429 Fri 07/05/2021 10:30:06 AM
e-Hearing through Video Conferencing
Petition of M/s. Rajlakshmi Minerals seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment the amounts due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014. And In the matter of Order dated 26th March 2019, passed by this Hon'ble Commission in Case No. 26 of 2019.
40 of 2021
Completed
1430 Fri 07/05/2021 10:30:05 AM
e-Hearing through Video Conferencing
Petition of M/s. Sidhidata Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 10th October 2014.
32 of 2021
Completed
1431 Fri 07/05/2021 10:30:04 AM
e-Hearing through Video Conferencing
Petition of M/s. Parmarth Wind Energy Private Limited seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 20th August 2014.
31 of 2021
Completed
1432 Fri 07/05/2021 10:30:03 AM
e-Hearing through Video Conferencing
Petition of M/s. IOTA MTech Power LLP seeking directions to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) to make payment amounts due and payable by MSEDCL for electricity supplied under the Wind Energy Purchase Agreement dated 27th March 2017.
30 of 2021
Completed
1433 Fri 07/05/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of Enel Wind Project (Amberi) Private Limited (formerly known as BLP Wind Project (Amberi) Private Limited) seeking directions to the Maharashtra State Electricity Distribution Company("MSEDCL") to make payment of outstanding amounts, including late payment surcharge, due and payable to the Petitioner for supply of power from the petitioner's wind power plants.
27 of 2021
Completed
1434 Fri 07/05/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited - Transmission praying to take on record changes in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
35 of 2021
Completed
1435 Fri 07/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited -Distribution praying to take on record changes in the group of lenders of Adani Electricity Mumbai Limited and the capacity of SBICAP Trustee Company Limited as the security trustee acting for the benefit of such lenders of Adani Electricity Mumbai Limited.
34 of 2021
Completed
1436 Tue 04/05/2021 10:30:07 AM
e-Hearing through Video Conferencing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period.
119 of 2018
Completed
1437 Tue 04/05/2021 10:30:06 AM
e-Hearing through Video Conferencing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
119 of 2019
Completed
1438 Tue 04/05/2021 10:30:05 AM
e-Hearing through Video Conferencing
Petition filed by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
Completed
1439 Tue 04/05/2021 10:30:04 AM
e-Hearing through Video Conferencing
Petition filed by Arvind Cotsyn (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
Completed
1440 Tue 04/05/2021 10:30:03 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited seeking directions to the Respondent No. 1 Maharashtra State Electricity Distribution Company("MSEDCL") and Respondent No. 2. Maharashtra Load Despatch Center ("MSLDC")
26 of 2021
Completed
1441 Tue 04/05/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power Limited) seeking directions to the Maharashtra State Electricity Distribution Company Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of State. AND Application filed by M/s Sai Wardha Power Generation Limited for impleadment.
23 of 2021 and MA No. 11 of 2021
Completed
1442 Tue 04/05/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Exide Industries Limited seeking directions against the Respondent no. 1, Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the illegal levy and recovery of additional surcharge on Captive consumption of Electricity by the petitioner.
10 of 2021
Completed
1443 Tue 04/05/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of the Maharashtra Electricity Regulatory Commission (MERC) (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case no. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and to direction to revise incorrect monthly billing methodology followed by MSEDCL.
6 of 2021
Completed
1444 Fri 30/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders dated passed in Case No. 137 of 2020.
25 of 2021
Reschedule
1445 Fri 30/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India AND Application to take on record Amended Petition.
140 of 2020 and MA No. 7 of 2021
Reschedule
1446 Fri 30/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sinnar Thermal Power Limited (erstwhile RattanIndia (Nasik) Power Limited) seeking directions to the Maharashtra State Electricity Distribution Company Limited for withdrawal of Termination Notice dated 19.05.2020 and procurement of power generated from Petitioner, i.e., Sinnar Thermal Power Ltd. in the Interest of State.
23 of 2021
Reschedule
1447 Thu 29/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India AND Application to take on record Amended Petition.
140 of 2020 and MA No. 7 of 2021
Schedule
1448 Thu 29/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders dated passed in Case No. 137 of 2020.
25 of 2021
Schedule
1449 Tue 27/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Seeking Order/ Directing the Respondents to pay Principal & Late Payment Surcharge.
22 of 2021
Schedule
1450 Tue 27/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharshi Udyog against Maharashtra State Electricity Distribution Company Ltd (MSEDCL) under section 142 of the Electricity Act 2003 against MSEDCL Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 04/01/2019 Case No 339/2018. To release Principal and delayed payment charges (DPC)
21 of 2021
Schedule
1451 Tue 27/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking appropriate directions on account of the violation of the Hon'ble Commission's Order dated 12.06.2017 in Case Nos. 182 of 2014 & 40 of 2015 by Tata Power Company Limited And Application for Interim relief.
19 of 2021
Schedule
1452 Tue 27/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Jugalkishor Rambagas Karwa against Maharashtra State Electricity Distribution Company Ltd.(MSEDCL) for non compliance of Order passed by CGRF, Bhandup
18 of 2021
5
1453 Fri 23/04/2021 10:30:05 AM
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.).
200 of 2020
5
1454 Fri 23/04/2021 10:30:04 AM
e-Hearing through Video Conferencing
Petition filed by Tata Power Company - Transmission for review and recall of the order dated 23.01.2021 passed by this Hon'ble Commission in Case No. 141 of 2020 with respect to grant of Transmission License to Kharghar Vikhroli Transmission Private Limited.
15 of 2021
Reschedule
1455 Fri 23/04/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Company Limited ("MSEDCL") Seeking review of order dated 28th November, 2020 in Case No. 132 of 2020 in the matter of petition of Adani Power Maharashtra Limited seeking hypothetical in-land transportation cost of IPT coal. Application under Regulation 94 of MERC (Conduct of Business) Regulations, 2004 seeking condonation of delay in filling the present Review Petition.
9 of 2021
Schedule
1456 Fri 23/04/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
Schedule
1457 Fri 23/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Krishita Multitrade Pvt. Ltd seeking review of Order dated passed in Case No. 229 of 2020 (Petition filed by M/s Krishita Multitrade Pvt. Ltd seeking direction for returning the monies wrongfully realised by encashing performance Bank Guarantee of the petitioner and declaration of extension of financial closure and scheduled commercial operation date on account of force majeure). Application under Regulations 81 and 92 of The Maharashtra Electricity Regulatory Commission (Conduct Of Business) Regulations, 2004 For urgent listing and for seeking Interim / Ad-Interim reliefs
24 of 2021
Schedule
1458 Tue 20/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sahebrao Charde Vidyut Mandal Nivruti Karmachari Sang application to raise the Tariff for benefits of the retired employees of all 4 Companies for application of the pension scheme and for economic assistance
13 of 2021
Reschedule with further notice
1459 Tue 20/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Eurotex Industries and Exports Limited seeking appropriate order /directions pertaining to restitution of benefits/incentives wrongly denied to the Petitioner by holding it to be in arrears despite the order of the Hon'ble Commission dated 21st May 2004 and of the Hon'ble Appellate Tribunal of Electricity (APTEL) dated 30th May 2007 being upheld by the Hon'ble Supreme Court in Civil Appeal no. 4304 of 2007 vide order dated 28th February 2020 vis a vis the issues decided in fovour of the Petitioner and for direction to the Respondent to issue correct bills in compliance with the aforesaid orders.
17 of 2021
Reschedule with further notice
1460 Tue 20/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited for in principle approval and consequent compensation on account of a Change in Law event i.e. the introduction of new environmental norms under the Environment (Protection) Amendment Rules, 2015 issued by the Ministry of Environment, Forest and Climate Change dated 07.12.2015, impacting the revenues and costs of the Petitioner during the operating period.
11 of 2021
Schedule
1461 Fri 16/04/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited Seeking Compliance of the Order Dated May 28, 2019 In Case No. 168 Of 2014 of the Hon'ble Commission Read with relevant provisions of the Electricity Act, 2003 and Works of Licensees Rules, 2006
167 of 2020
Schedule
1462 Fri 16/04/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Limited for adjustment of Open Access units under Open Access permission by Maharashtra State Electricity Distribution Company ltd. (MSEDCL), Satara Circle office.
164 of 2020
Schedule
1463 Fri 16/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015
50 of 2016
Schedule
1464 Thu 15/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND Interim Application
176 of 2020 AND MA No. 8 of 2021 in 176 of 2020
Reschedule with further notice
1465 Thu 15/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and and directions under Section 86 of the Electricity Act, 2003 read with "Revised Guidelines for Procurement of Electricity for Medium Term from Power Stations set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued by Ministry of Power, Government of India
20 of 2021
Completed
1466 Thu 15/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
Completed
1467 Fri 09/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and and directions under Section 86 of the Electricity Act, 2003 read with "Revised Guidelines for Procurement of Electricity for Medium Term from Power Stations set up on Finance, Own and Operate (FOO) basis" dated 30th January, 2019 issued by Ministry of Power, Government of India
20 of 2021
Reschedule
1468 Fri 09/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009 AND Interim Application
176 of 2020 AND MA No. 8 of 2021 in 176 of 2020
Reschedule
1469 Fri 09/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
Reschedule
1470 Tue 06/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Tata Power Company - Transmission for review and recall of the order dated 23.01.2021 passed by this Hon'ble Commission in Case No. 141 of 2020 with respect to grant of Transmission License to Kharghar Vikhroli Transmission Private Limited.
15 of 2021
Completed
1471 Tue 06/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Exide Industries Limited seeking directions against the Respondent no. 1, Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the illegal levy and recovery of additional surcharge on Captive consumption of Electricity by the petitioner.
10 of 2021
Completed
1472 Tue 06/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mahindra Sanyo Special Steel Private Limited seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of the Maharashtra Electricity Regulatory Commission (MERC) (Distribution Open Access) Regulations, 2016 and Order dated August 11, 2017 in Case no. 139 of 2016 and adoption of incorrect monthly billing methodology under Regulation 4.1 thereof and to direction to revise incorrect monthly billing methodology followed by MSEDCL.
6 of 2021
Completed
1473 Tue 06/04/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited seeking issuance of directions to the Respondent No. 1 for complying with the orders and directions issued by this Hon'ble Commission vide the Orders dated 12.09.2018 and 29.01.2019 passed in Case No. 204 of 2017 and Case No. 3 of 2019 respectively, read with the directions issued vide letters dated 20.06.2019, 14.09.2020 and 03.10.2020.
237 of 2020
Completed
1474 Tue 30/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited (AEML) seeking clarification on applicability of Tariff to Hotels pursuant to Government of Maharashtra Resolution Number: TDS2020 / 9 / Pr. Kr. 502 / Tourism dated 03.12.2020.
8 of 2021
Completed
1475 Tue 30/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Brihanmumbai Electric Supply and Transport Undertaking seeking approval for procurement of 400 MW Wind-Solar Hybrid Power from proposed 1110 MW ISTS-Connected Wind-Solar Hybrid Power Projects awarded by SECI (Solar Energy Corporation of India Limited) (Tranche-III) for meeting the solar and Non solar RPO of BEST.
16 of 2021
Completed
1476 Tue 30/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited) Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018. AND Application seeking Amendment of the Petition Case No. 240 of 2020
240 of 2020 AND MA No. 4 of 2021 in 240 of 2020
Completed
1477 Fri 26/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No. 5731/2015
228 of 2020
Completed
1478 Fri 26/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
Completed
1479 Fri 26/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of the Hon'ble Commission's Multi -Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the wheeling charges to be applicable to the Petitioners.
187 of 2020
Completed
1480 Tue 23/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited - Distribution for the approval of the following for its Distribution Business (i) Truing-up of FY 2014-15 (ii) Provisional Truing-up for FY 2015-16 (iii) Aggregate Revenue Requirement for each year of the Control Period (from FY 2016-17 to FY 2019-20) as per Multi Year Tariff (MYT) Regulations, 2015 (iv) Revenue from the sale of power at existing Tariffs and charges and projected revenue gap for each year of the Control Period (v) Proposed Category-wise Tariffs for each year of the Control Period. AND Petition of The Tata Power Company Limited - Distribution seeking Review of Order passed in Case No. 47 of 2016 AND Application filed by Tata Power-Distribution seeking implementation of the Judgment Order issued on dated 20th October, 2020 passed in Appeal No. 58 of 2018 by the Hon'ble Appellate Tribunal for Electricity ("APTEL")
47 of 2016 and 165 of 2016 and MA No. 5 of 2021
Completed
1481 Tue 23/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
Completed
1482 Tue 23/03/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited. AND Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
Completed
1483 Fri 26/02/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited seeking issuance of directions to the Respondent No. 1 for complying with the orders and directions issued by this Hon'ble Commission vide the Orders dated 12.09.2018 and 29.01.2019 passed in Case No. 204 of 2017 and Case No. 3 of 2019 respectively, read with the directions issued vide letters dated 20.06.2019, 14.09.2020 and 03.10.2020.
237 of 2020
Reschedule with further notice
1484 Fri 26/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Betul Oil Limited seeking declaration from this Hon'ble Commission that the Short Term Energy Purchase Agreement ("EPA") dated 22.07.2020 executed between Petitioner and MSEDCL stands terminated in view of failure of MSEDCL in discharging its obligations w.r.t timely payments and seeking directions to MSEDCL to discharge its obligations towards outstanding dues accrued till the date of termination of Short Term Energy Purchase Agreement ("EPA") dated 22.07.2020 executed between Petitioner and MSEDCL. AND Miscellaneous Application seeking urgent ex-parte ad-interim orders directing MSEDCL not to reject the short term open access application dated 09.02.2021 made by Petitioner seeking open access for the month of March, 2021 during the pendency of main matter filed by the petitioner before this Hon'ble Commission
12 of 2021 and MA No. 06 of 2021 in Case No. 12 of 2021
Completed
1485 Fri 26/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for Long Term procurement of 1.25 MW wind power from the wind generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003
1 of 2021
Completed
1486 Fri 26/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) (formerly Indiabulls Power Limited) Petition under Section 86 of the Electricity Act, 2003 read with Competitive Bidding Guidelines and Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for computation of compensation pursuant to judgment dated 13.11.2020 passed by the Hon'ble Appellate Tribunal for Electricity in Appeal 264 of 2018.
240 of 2020
Reschedule with further notice
1487 Fri 26/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition on behalf of Late Shakuntala Pralhad Unahale through her heirs Varsha Anil Sabe and others (3) against Maharashtra Eastern Grid Power Transmission Company Ltd, Akola for non-compliance of the Order passed by District Magistrate, Buldhana and for grant of Compensation with interest.
197 of 2020
Completed
1488 Tue 23/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by 1) Nidar Utilities Panvel LLP. 2) Persipina Developers Pvt. Ltd for amendment of the terms and conditions of distribution license to include area of 169.72 hectares included as part of the Integrated Township Project ("ITP") being developed by the Applicant No. 2 at Panvel, District Raigad , Maharashtra and lying adjacent to the Panvel SEZ area.
204 of 2020
Completed
1489 Tue 23/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL), for non-compliance of common order dated 09.10.2o19 in case no. 262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 and Order Dated 10.08.2020 in Case No. 23 of 2020..
234 of 2020
Completed
1490 Tue 23/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Pandurang Mahipati Patil against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Non compliance of CGRF , Kolhapur Order dated 7.1.2020.
233 of 2020
Completed
1491 Tue 23/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
Completed
1492 Thu 18/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No. 5731/2015
228 of 2020
Reschedule with further notice
1493 Thu 18/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement.
226 of 2020
Reschedule with further notice
1494 Thu 18/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
Reschedule with further notice
1495 Tue 16/02/2021 10:30:06 AM
e-Hearing through Video Conferencing
Petition filed by Surya Ferrous Alloys Pvt. Ltd. & Ors (2) seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
188 of 2020
5
1496 Tue 16/02/2021 10:30:05 AM
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of the Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the wheeling charges to be applicable to the Petitioners.
187 of 2020
Reschedule with further notice
1497 Tue 16/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015
50 of 2016
Completed
1498 Tue 16/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s. Newfound Properties and Leasing Private Limited for taking on record the denotification of IT & ITeS SEZ previously under development by the Petitioner, and consequences on Deemed Distribution Licensee status applicable to the Petitioner
154 of 2020
Completed
1499 Tue 16/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Jalna Siddhivinayak Alloys Pvt. Ltd. & Ors (7) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
207 of 2020
Completed
1500 Tue 16/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by MITC Rolling Mills Pvt. Ltd seeking appropriate directions and clarifications in respect of the Hon'ble Commission's Orders in Case No 101 of 2016 dated 7 July 2017; Case No 303 and 304 of 2019 dated 30 December 2019 pertaining to Additional Supply Charges.
193 of 2020
Completed
1501 Fri 12/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s Avaada Energy Pvt Ltd seeking issuance of appropriate Order(s)/ Directions(s) to MSEDCL inter alia executing the Power Purchase Agreement pursuant to the adoption of tariff (vide Hon'ble Commission Order dated 15.05.2020) and letter of award dated 17.06.2020 in terms of request for selection dated 27.12.2019; Petitioner also seeks Orders / Directions restraining MSEDCL from taking any coercive action.
4 of 2021
Completed
1502 Fri 12/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) Limited seeking review of the Order dated 07.09.2020 passed by this Hon'ble Commission in Case No. 350 of 2019
206 of 2020
Completed
1503 Fri 12/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
Completed
1504 Fri 12/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited AND Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
Completed
1505 Tue 09/02/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition filed by M/s Meera Enterprises for non-compliance of CGRF order in complaint No: 30/2020 passed by CGRF, MSEDCL, Akola Zone, Akola
3 of 2021
5
1506 Tue 09/02/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
Reschedule with further notice
1507 Tue 09/02/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.).
200 of 2020
Completed
1508 Tue 09/02/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestions/ Objections on Amravati Power Transmission Company Limited's Petition for proposed changes in shareholding pattern of the Company
139 of 2020
Completed
1509 Fri 29/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jawaharlal Nehru Port Trust Petition seeking approval of Power Procurement Plan ( 1st Feb 2021 to 31st Dec 2021), adoption of Tariff discovered through competitive bidding process and approval for executing power purchase agreement.
5 of 2021
Completed
1510 Fri 29/01/2021 10:30:00 AM
Public Hearing
Inviting Comments on Application of the Tata Power Company Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003
249 of 2019
Completed
1511 Fri 29/01/2021 10:30:00 AM
Public Hearing
Inviting Comments on Application of the Adani Electricity Mumbai Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003
195 of 2019
Completed
1512 Fri 29/01/2021 10:30:00 AM
Public Hearing
Inviting Suggestions/Objections on Application of Adani Electricity Mumbai Infra Ltd.'s Application for grant of Transmission Licence
190 of 2020
Completed
1513 Wed 27/01/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestitons / Onjections on Pune Bio Energy Systems Private Limited's Petition for Determination of Tariff of supply of electricity to Distribution Licensee in Maharashtra from 750 TPD capacity of Municipal Solid Waste processing project to be commissioned in pune
162 of 2019
Completed
1514 Wed 27/01/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestions/Objections on the petition of Tata Power- Distribution seeking approval for charging Tariff [" Green Power Tariff"] for supply of Renewable Energy to consumers for meeting their requirement for utilizing 100% green energy for their entire demand
134 of 2020
Completed
1515 Wed 27/01/2021 10:30:00 AM
e-Public Hearing
Inviting Suggestions/ objections on Ashoka Sthapatya Private Limited's Petition for determination of project specific tariff for supply of electricity to Distribution Licensee in Maharashtra to Morna Hydro Electric Project of Capacity 1 MW located in Dist. Satara
208 of 2020
Completed
1516 Wed 20/01/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition filed by 1) Nidar Utilities Panvel LLP. 2) Persipina Developers Pvt. Ltd for amendment of the terms and conditions of distribution license to include area of 169.72 hectares included as part of the Integrated Township Project ("ITP") being developed by the Applicant No. 2 at Panvel, District Raigad , Maharashtra and lying adjacent to the Panvel. SEZ area.
204 of 2020
Reschedule with further notice
1517 Wed 20/01/2021 10:30:01 AM
e-Hearing through Video Conferencing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
Reschedule with further notice
1518 Wed 20/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for Purchase of Power from new Bagasse based Co-Generation Projects through MoU Route
2 of 2021
Completed
1519 Tue 19/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sai Wardha Power Generation Limited Seeking directions to the Respondent No.1 For Purchase/Procurement of additional power from the Petitioner in terms of the Judgment of The Appellate Tribunal For Electricity Dated 10.02.2015 in Appeal No. 70 Of 2013 as further upheld by the Hon'ble Supreme Court of India Vide Its Judgment Dated 10.05.2018 in Civil Appeal No. 5731/2015
228 of 2020
Reschedule with further notice
1520 Tue 19/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Avon Cycles Limited petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12.02 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
227 of 2020
Completed
1521 Tue 19/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lloyds Metals & Energy Ltd. against Kreate Energy (I) Pvt. Ltd. seeking adjudication of a dispute arising from a Power Purchase Agreement
226 of 2020
Completed
1522 Mon 18/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking recovery of variable charges under MERC approved Final Balancing Settlement Mechanism (FBSM) on account of over drawl by Mumbai utilities for period April 01, 2020 onwards till the implementation of intra-state DSM Regulations in Maharashtra.
225 of 2020
Completed
1523 Mon 18/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Salahuddin Ziyahuddin Ansari against Maharashtra Electricity Distribution Co. Ltd (MSEDCL) for not providing bill as per the actual consumption of meter Reading as per MSEDCL CPL., Non compliance of CGRF -71/2019 Dated 20.2.2020 and Non compliance of the Order of the Electricity Ombudsman 59 of 2020 dated 14.10.2020.
219 of 2020
Completed
1524 Mon 18/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited, seeking declaration from the Commission that the imposition of safeguard duty for the period of 30.07.2020 to 29.07.2021 on the import of solar cells vide Notification No. 02/2020- Customs (SG) dated 29.07.2020 of the Ministry of Finance as an event of 'change in law'.
218 of 2020
Completed
1525 Fri 15/01/2021 10:30:03 AM
e-Hearing through Video Conferencing
Petition filed by Kolhapur Zilha Sahakari Pani Purvatha Sansthancha Sahakari Sangha Maryadit Seeking Review of MERC Multi Year Tariff Order dated 30th March 2020 passed in Case No. 322 of 2019
213 of 2020
Reschedule with further notice
1526 Fri 15/01/2021 10:30:02 AM
e-Hearing through Video Conferencing
Petition of Ravi Food Products Punishment for Non compliance of order dt. 19.06.2020 , passed Hon'ble Appellate Authority under section 127 of EA 2003 in case No. No. 10/2019-20
217 of 2020
5
1527 Fri 15/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Electricity Distribution Co. Ltd (MSEDCL) against M/s. Golden Falcon Pacific Ltd for non Compliance of CGRF, Order dtd. 05.10.2020 in CGRF Zone, Case No. 02/2020,
230 of 2020
Completed
1528 Fri 15/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Golden Falcon Pacific Ltd regarding non-compliance by Maharashtra Electricity Distribution Co. Ltd. of CGRF Order, Mumbai's Order dated.05 October 2020 (Case No. 02 of 2020)
216 of 2020
Completed
1529 Thu 14/01/2021 10:30:03 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) Limited seeking review of the Order dated 07.09.2020 passed by this Hon'ble Commission in Case No. 350 of 2019
206 of 2020
Reschedule with further notice
1530 Thu 14/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra Veej Grahak Sanghatana through its President Pratap Ganapatrao Hogade Application for clarification regarding SCC for underground LT Single Phase connections and Tariff for Hostels in HT Category for proper and correct implementation of the Tariff Order dt. 30th March 2020 in Case No. 322 of 2019.
209 of 2020
Completed
1531 Thu 14/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Purna Sahakari Sakhar Karkhana Ltd . In the matter of an Application for recovery of due amount with interest. And In the matter of Maharashtra Govt. Notification Renewable Energy- 2007/Lt.No. 693/Energy-7 dated 14th October, 2008.
210 of 2020
Completed
1532 Wed 13/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Jaygangatara Magasvargiya Co. Op. Ind. Ltd. Through Vitthal Vasant Gurav to review Order dated 5.09.2020 passed in Case No. 5 of 2020
201 of 2020
Completed
1533 Wed 13/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Gujrat JHM Hotels Ltd. against Maharashtra State Electricity Distribution Co. Ltd, seeking directions to the respondent for making payments as per the power purchase agreements dated 31.07.2006, 23.11.2006, 31.07.2006 and 31.07.2006
205 of 2020
Completed
1534 Wed 13/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Steel Ltd. seeking clarification on the Order dated 5.10.2020 passed in case No. 130 of 2020 regarding the inapplicability of the bifurcated solar and non-solar targets within the composite target of 9%, for CPPs commissioned before 01.04.2016.
203 of 2020
Completed
1535 Tue 12/01/2021 10:30:04 AM
e-Hearing through Video Conferencing
Petition on behalf of Late Shakuntala Pralhad Unahale through her heirs Varsha Anil Sabe and others (3) against Maharashtra Eastern Grid Power Transmission Company Ltd, Akola for non-compliance of the Order passed by District Magistrate, Buldhana and for grant of Compensation with interest.
197 of 2020
Reschedule with further notice
1536 Tue 12/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech and ACME Solar Holdings Limited seeking Commission's humble indulgence to direct the Respondent Maharashtra State Electricity Distribution Company (MSEDCL) to replace the Bank Guarantee Number. (being 1945IGFIN005119 & OGT0005190035016 for Rs. 42,00,00,000/-) submitted under the Power Purchase Agreement dated 21.08.2019 by ACME Heergarh Powertech Pvt. Ltd. to MSEDCL be replaced with equally effective mechanism.
162 of 2020
Completed
1537 Tue 12/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by R.B. Diversified Pvt. Ltd. (Erstwhile R.B. Investments Pvt. Ltd) seeking clarification regarding applicability of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 and Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019 qua captive rooftop solar power plants.
199 of 2020
Completed
1538 Tue 12/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Shri Mohd. Akbar Rehman Akbani against Maharashtra State Electricity Distribution Company Ltd. for non-compliance of order passed by the Consumer Greivance Redressal Forum Nagpur Zone, Nagpur dated 07.05.2018 in Case No. CGRF (NZ)/08/2018.
198 of 2020
Completed
1539 Mon 11/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Completed
1540 Mon 11/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Brihanmumbai Electric Supply & Transport Undertaking, for allowing limited open access in its area of supply and consequently for determining and allowing open access charges and other fees and charges and / or other sums recoverable.
238 of 2020
Completed
1541 Mon 11/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited to review the Order dated 25.8.2020 passed in MERC Case No. 70 of 2020 (Petition filed against Maharashtra State Electricity Distribution Company Limited (MSEDCL) on account of Non-Compliance by MSEDCL of the orders of the Commission including orders dated April 9, 2019 in case No. 22 of 2019 read with the order dated November 7, 2017 in Case No. 77 of 2017.)
196 of 2020
Completed
1542 Mon 11/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Appeal filed by Maharashtra State Electricity Distribution Company Ltd. (Formerly known as MSEB) against Electrical Inspector (EI) Thane, Order dated 16.01.2001 Case No. 200/2001. The Energy bill for the month of May, 2000 was quashed and directed to issue revised bills. (Appeal to Industries, Energy & Labour Department, Government of Maharashtra, No. 2002/1288 dated 15.3.2002).
194 of 2020
Completed
1543 Mon 11/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SEP Energy Private Limited, The Petitioner is seeking relaxation of the Open Access Regulations.
191 of 2020
Completed
1544 Fri 08/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of common order dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
Completed
1545 Fri 08/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Jalna Siddhivinayak Alloys Pvt. Ltd. & Ors (7) under Section 142 and 146 of the Electricity Act 2003 seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
207 of 2020
Reschedule with further notice
1546 Fri 08/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by MITC Rolling Mills Pvt. Ltd seeking appropriate directions and clarifications in respect of the Hon'ble Commission's Orders in Case No 101 of 2016 dated 7 July 2017; Case No 303 and 304 of 2019 dated 30 December 2019 pertaining to Additional Supply Charges.
193 of 2020
Reschedule with further notice
1547 Fri 08/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Surya Ferrous Alloys Pvt. Ltd. & Ors (2) seeking appropriate orders as regards pertaining to the wheeling charges to be applicable to the Petitioners as recorded in the Order dated 30 March 2020 in Case No 322 of 2019 in the matter of Tariff Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for the 4th Control Period of FY 2020-21 to FY 2024-25.
188 of 2020
Reschedule with further notice
1548 Fri 08/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Sant Gyaneshwar Steels Pvt. Ltd. & Ors (13) seeking relaxation of the Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the wheeling charges to be applicable to the Petitioners.
187 of 2020
Reschedule with further notice
1549 Thu 07/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition by Maharashtra Airport Development Company (MADC) for approval and directions under Section 86 of the Electricity Act, 2003 read with Revised Guidelines for Procurement of Electricity for Medium Term from Power Stations set upon Finance, Own and Operate (FOO) basis dated 30.01.2019issued by the Ministry of Power, Government of India, for procurement of Power for Medium-Term by Distribution Licensee
236 of 2020
Completed
1550 Thu 07/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule
1551 Thu 07/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Grace Industries Ltd In the matter of considering recording of Petitioners 220 KV outgoing feeder meter instead of LILO meters of MSETCL for FBSM bill calculation
182 of 2020
Completed
1552 Thu 07/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
Completed
1553 Wed 06/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Krishita Multitrade Pvt. Ltd seeking direction for returning the monies wrongfully realised by encashing performance Bank Guarantee of the petitioner and declaration of extension of financial closure and scheduled commercial operation date on account of force majeure
229 of 2020
Completed
1554 Wed 06/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) seeking review of Order dated 30th March 2020 in Case No. 296 of 2019 in the matter of final truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff Control period FY 2020-21 to FY 2024-25.
180 of 2020
Completed
1555 Wed 06/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of 1. Indo Count Industries Ltd ,2. Pranavaditya Spinning Mills Ltd. against Maharashtra State Electricity Distribution Company Ltd. for violating the order-dated 25.01.18 and 7.2.2018 was passed by CGRF as well as Order of the Hon'ble Commission dated 1 November 2018.
178 of 2020
Completed
1556 Wed 06/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bharat Mumbai Container Terminals Private Limited against Maharashtra State Electricity Distribution Company Limited and Jawaharlal Nehru Port Trust for non-compliance of directions contained in Order dated 24.05.2010 passed by the Hon'ble Commission in Case No. 62 of 2009
176 of 2020
Completed
1557 Tue 05/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Aurangabad Electricals Limited seeking directions against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure on the part of MSEDCL (i) to give credit for the wind units injected (ii) incorrect calculation of over injected units. and (iii) for the loss caused to the Petitioner on account of inordinate delay in the issuance of credit notes.
157 of 2020
Completed
1558 Tue 05/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Ramgad Minerals & Mining Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for non-issuance of credit notes and non-adjustment of wind units injected.
151 of 2020
Completed
1559 Tue 05/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by MSPL Limited pertaining to adjudication of disputes between MSPL limited and Maharashtra State Electricity Distribution Company (MSEDCL) limited and seeking directions against MSEDCL for non-issuance of credit notes and non-adjustment of wind units injected.
150 of 2020
Completed
1560 Tue 05/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Guardian Castings Pvt. Ltd. (GCPL) seeking Review under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulation, 2004 of Order dated 25.04.2018 passed inter alia in Case No.99 of 2017 filed by GCPL and others against Maharashtra State Electricity Distribution Co Ltd (MSEDCL).
1 of 2020
Completed
1561 Mon 04/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mindspace Business Parks Private Limited (MBPPL), Gigaplex Estate Private Limited (GEPL), and KRC Infrastructure and Projects Private Limited (KRCIPPL) for obtaining the Hon'ble Commission's approval for undertaking combined power purchase for the period from FY 2021-22 to FY 2024-25
231 of 2020
Completed
1562 Mon 04/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
Completed
1563 Mon 04/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval to consider discount in Tariff offered by generators for preparation of MoD for the month of May-2020 and June 2020.
108 of 2020
Completed
1564 Mon 04/01/2021 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited. AND Application to take on record Amended Petition.
25 of 2020 and MA No. 55 of 2020
Completed
1565 Wed 30/12/2020 10:45:00 AM
e-Hearing through Video Conferencing
Petition filed by Kharghar Vikhroli Transmission Private Limited for Adoption of Transmission Charges with respect to the Transmission System being established at Vikhroli
142 of 2020
Completed
1566 Wed 30/12/2020 10:30:00 AM
Public Hearing
Inviting Suggestion/ Objections on Application of the Kharghar Vikhroli Transmission Private Limited for grant of Transmission License under section 14, 15 and 86(1)d of Electricity Act, 2003
141 of 2020
Completed
1567 Tue 29/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) Petition seeking approval of supplementary agreements dated 11.12.2020
232 of 2020
Completed
1568 Tue 29/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech Private Limited seeking issuance of appropriate order(s)/ directions(s) for a mechanism for recovery of the compensation to offset financial/ commercial impact of change in law events on account of increase in capital cost due to imposition of Safeguard Duty
175 of 2020
Completed
1569 Tue 29/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nisagra Renewable Energy Private Limited seeking clarification on certain observation in the Common Order dated 23.07.2020 passed by this Hon'ble Commission in Case No. 62 of 2020.
170 of 2020
Completed
1570 Tue 29/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Juniper Green Energy Private Limited seeking clarification on certain observation in the Common Order dated 23.07.2020 passed by this Hon'ble Commission in Case No. 61 of 2020.
169 of 2020
Completed
1571 Mon 28/12/2020 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited to review the Order dated 15.9.2020 passed in MERC Case No. 138 of 2020 (Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.). Application for urgent listing/mentioning of the Review Petition
200 of 2020
Reschedule with further notice
1572 Mon 28/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of common order dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
Completed
1573 Mon 28/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Bramhacorp Limited for adjustment of Open Access units under Open Access permission by Maharashtra State Electricity Distribution Company ltd. (MSEDCL), Satara Circle office.
164 of 2020
Completed
1574 Mon 28/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of ACME Heergarh Powertech and ACME Solar Holdings Limited seeking Commission's humble indulgence to direct the Respondent Maharashtra State Electricity Distribution Company (MSEDCL) to replace the Bank Guarantee Number. (being 1945IGFIN005119 & OGT0005190035016 for Rs. 42,00,00,000/-) submitted under the Power Purchase Agreement dated 21.08.2019 by ACME Heergarh Powertech Pvt. Ltd. to MSEDCL be replaced with equally effective mechanism.
162 of 2020
Completed
1575 Mon 28/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lokmangal Agro Industries Limited for illegal collection of Transmission Charges from the Petitioner and from the end user and refusal to entertain the request for refund of the Transmission Charges recovered twice over.
160 of 2020
Completed
1576 Fri 04/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
Reschedule with further notice
1577 Fri 04/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule with further notice
1578 Fri 04/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Aurangabad Electricals Limited seeking directions against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure on the part of MSEDCL (i) to give credit for the wind units injected (ii) incorrect calculation of over injected units. and (iii) for the loss caused to the Petitioner on account of inordinate delay in the issuance of credit notes.
157 of 2020
Reschedule with further notice
1579 Fri 04/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Ramgad Minerals & Mining Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for non-issuance of credit notes and non-adjustment of wind units injected.
151 of 2020
Reschedule with further notice
1580 Fri 04/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by MSPL Limited pertaining to adjudication of disputes between MSPL limited and Maharashtra State Electricity Distribution Company (MSEDCL) limited and seeking directions against MSEDCL for non-issuance of credit notes and non-adjustment of wind units injected.
150 of 2020
Reschedule with further notice
1581 Thu 03/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval to scheme for creation of 400/220 KV switchyard at M/s GWEL under depository work for evacuation arrangement of MSEDCL share of 200 MW power and allowing recovery of expenditure thereof through ARR.
215 of 2020
Completed
1582 Thu 03/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Azure Power Thirty Four Private Limited against MSEDCL seeking compensation on account of a Change in Law, increasing the Goods and Services Tax rates on solar power generating systems.
147 of 2020
Reschedule with further notice
1583 Thu 03/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Samyak Krushi Utpadak Prakariya Shkari Sansthan through its president Dr. Prakash Yeshwant Ambedkar against MSEDCL for Non-compliance of CGRF order in complaint No: 45/2019 passed by CGRF, MSEDCL, Amravati Zone, Amravati.
146 of 2020
Completed
1584 Thu 03/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Renewable Energy Limited seeking compensation due to increase in costs on account of change in rate of Goods & Service Tax amounting to a Change in Law event in terms of the Power Purchases Agreement dated 27.07.2018, executed between Tata Power Renewable Energy Limited and Maharashtra State Electricity Distribution Company Limited. AND Application to take on record Amended Petition.
25 of 2020 And MA No. 55 of 2020
Reschedule with further notice
1585 Wed 02/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval for floating open tenders under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) scheme.
214 of 2020
Completed
1586 Wed 02/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd to Modify/rectify/re-assess the post facto approvals of Hon'ble MERC concerning the FAC vetting reports dated 26 July 2020 for Quarter II and 04 August 2020 for Quarter III of FY 2019-20.
192 of 2020
Completed
1587 Wed 02/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Petition filed by Tulasi Casting and machining Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-Compliance of CGRF Kolhapur Order dated 31 July 2018 passed in Case No. 18 (2018-19)/ 175.
129 of 2020
Completed
1588 Wed 02/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Guardian Castings Pvt.Ltd. & Ors (15) seeking modification of the Hon'ble Commission's Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the 10 hour single shift HT Industrial consumers.
128 of 2020
Completed
1589 Wed 02/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Guardian Castings Pvt.Ltd. & Ors (15) seeking clarification of the Commission in respect of the Applicability and interpretation of the Multi-Year Tariff Order dated 30 March 2020 in Case No. 322 of 2019 for the Maharashtra State Electricity Distribution Co. Ltd, pertaining to the single shift HT Industrial consumers and applicability of the Load Factor Incentives to such consumers.
127 of 2020
Completed
1590 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S M/S O.P. Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 285/2018. to release Principal and / Delay Payment.(DPC)
186 of 2020
Completed
1591 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Kukreja Enterprises against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis-obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 288/2018. to release Principal and / Delay Payment.(DPC)
185 of 2020
Completed
1592 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Kukreja Development Corporation against Maharashtra State Electricity Distribution Co. Ltd, Aggrieved from willful dis- obedience of the Direction of Hon'ble Commission passed in the Order dated 09/01/2019 Case No. 287/2018. to release Principal and / Delay Payment.(DPC)
184 of 2020
Completed
1593 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Sun N Sand Hotels Pvt. Ltd for Adjudication of Disputes Between the Petitioner (M/S Sun N Sand Hotels Private Limited) and the Respondent (Maharashtra State Electricity Distribution Company Limited) and Seeking Directions to the Respondent for making payments as Per the Power Purchase Agreements Dated 31.07.2006, 11.10.2006 and 20.04.2009 and various earlier Orders of this Hon'ble Commission.
173 of 2020
Completed
1594 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shah Promoters & Developers pertaining to adjudication of disputes between shah promoters & developers and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated January 17, 2019 of the Commission in Case No.245 of 2018 read with relevant provisions of Electricity Act, 2003
156 of 2020
Completed
1595 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by M/s Classic Marble Company Pvt. Ltd. petition under section 86(1)(f) of the electricity act, 2003 pertaining to adjudication of disputes between classic marble company pvt. ltd. and Maharashtra State Electricity Distribution Company Limited
148 of 2020
Completed
1596 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Priyadarshini Polysacks Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL) limited and seeking directions against MSEDCL for Non Compliance of Power Purchase Agreements, Short Term Power Purchase Agreements and against Non-Compliance by MSEDCL of the Order dated November 26, 2019 of the Commission in Case No. 273 of 2019.
126 of 2020
Completed
1597 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pertinent Infra and Energy Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 274 of 2019.
125 of 2020
Completed
1598 Tue 01/12/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Pristine Industries Limited pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company(MSEDCL ) limited and against non-compliance by MSEDCL of the order dated November 26, 2019 of the Commission in case no. 272 of 2019.
124 of 2020
Completed
1599 Fri 27/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Jain Irrigation Systems Limited complaint against Licensee (MSEDCL) for non-compliance of The Elect. Ombudsman Mumbai Order dt.13.02.2020, case No. 220 of 2019.
112 of 2020
Completed
1600 Fri 27/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Praxair India Pvt. Ltd In the matter of dispute under Section 86 (1) (k) of the Electricity Act - 2003 read with Regulation 32 of the MERC Distribution Open Access Regulations-2016 for incorrect/excessive charges levied in open access energy bills of Dec-2017 & Jan-2018, Consumer No.- 0180 1905 3600.
109 of 2020
Completed
1601 Fri 27/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Lalit Shyamsunder Tapadiya (Prop.), M/S Lalit Industries against Maharashtra State Electricity Distribution Company Limited (MSEDCL) Petition for non-compliance of Hon'ble E.O. order in representation no. 37 of 2019 and so also non-compliance of SoP regulations 2014 pertaining to load reduction
75 of 2020
5
1602 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Viraj Profiles Limited seeking Review of the Order dated 29.10.2020 passed by this Hon'ble Commission in Case No.170 OF 2018 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
224 of 2020
Completed
1603 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking Review of the Order dated 29.10.2020 passed by this Hon'ble Commission in Case No.170 of 2018 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
223 of 2020
Completed
1604 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Viraj Profiles Limited seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
222 of 2020
Completed
1605 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of BFN Forgings Pvt. Ltd. (Formerly known as Bebitz Flanges Works Pvt. Ltd.) seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
221 of 2020
Completed
1606 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of SMW ISPAT Private Limited (Formerly known as Mahalaxmi TMT Pvt. Ltd). seeking Review of the Order dated 22.10.2020 passed by this Hon'ble Commission in Case No.175 OF 2017 under Section 94 of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
220 of 2020
Completed
1607 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Marigold Pharmaceuticals Private Limited under Section 142, 149, 146 of the Electricity Act, 2003 for action on MSEDCL for non compliance of CGRF Baramati Order in Case No. 20/2019 dated 19/12/2019.
63 of 2020
Completed
1608 Thu 26/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Axis Bank Limited under Section 94(1) (f) of the Electricity Act, 2003 and Regulation 15 of the MERC (Conduct of Business) Regulations, 2004 seeking further directions and clarification from the Hon'ble Commission in order dated 16 December 2019 passed in Case No. 247 of 2019.
44 of 2020
Completed
1609 Wed 25/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of 1. Siddhayu Ayurvedic Research Foundation Pvt. Ltd, 2. M/s. Peethambra Granites Private Limited for relaxing the provisions of "Banking" as a Transitory/Temporary Change" and allowing adjustment of Petitioner's units banked in open access consumer bills for Petitioner No. 1 and 2 on account of "unforeseen conditions" which in the present circumstance is the 1st phase and 2nd phase of nationwide lockdown imposed by the Government of India in view of "Covid-19".
161 of 2020
Completed
1610 Wed 25/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for removal of difficulty under Regulation 19 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019, and Relaxation of penalised clauses under RPO Regulations, 2019. [21 of 2020 & MA Nos 1 to 35 Intervention Applications.]
21 of 2020
Completed
1611 Tue 24/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. ltd seeking relief for residential consumers for 2% rebate for payment of the first bill based on actual meter reading after relaxation of lock down within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments
149 of 2020
Completed
1612 Tue 24/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
Reschedule
1613 Tue 24/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule
1614 Mon 23/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Completed
1615 Mon 23/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Abhijeet MADC Nagpur Energy Pvt. Ltd. (In Liquidation) for determination of the user fees in respect of dedicated transmission system as per the direction issued by this Hon'ble Commission vide order dated 22.10.2019 in case No. 292 of 2018. Along with Miscellaneous Application
331 of 2019
Completed
1616 Mon 23/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by RattanIndia Power Limited seeking directions for compliance of Merit Order Despatch (MOD) principles, compilation of MOD stack in accordance with the Order dated 17.05.2007 in Case No. 42 of 2006 and State Grid Code and seeking compensation for loss suffered by the Petitioner on account of frequent backing down instructions, non-adherence to MOD principles and under-declaration of Energy Charges AND Application of M/s. Adani Power Maharashtra Ltd. for Impleadment in Case No. 125 of 2016 AND Miscellaneous Application filed by RattanIndia Power Limited under Section 86 Read with Sections 142 & 146 of the EA, 2003, seeking compliance of Daily Order dated 04.10.2016 passed by this Commission and necessary directions.
125 of 2016 AND MA No. 18 of 2016 AND MA No. 21 of 2016 in Case No. 125 of 2016
5
1617 Fri 13/11/2020 10:00:00 AM
e-Hearing through Video Conferencing
Petition of M/s Adani Power Maharashtra Limited under Section 86 read with 63 of the Electricity Act, 2003 and Article 13 of the PPAs dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013 for approval of relief under Change in Law for shortfall in domestic coal under SHAKTI Policy after 31.03.2017 and grant of Carrying Cost. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 28 September, 2020 in Appeal No. 155 of 2019 and 116 of 2019.- MA No. 54 of 2020
290 of 2018 and MA No. 54 of 2020
Completed
1618 Fri 13/11/2020 10:00:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (APML) for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 14 September, 2020 in Appeal No. 182 of 2019. - MA No. 53 of 2020
189 of 2013 and 140 of 2014 and MA No. 53 of 2020
Completed
1619 Wed 11/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Laxmipati Balaji Supply Chain Management Limited seeking adoption of tariff discovered through transparent bidding process for Short Term Procurement of Power, up to 1MW for a period of one year from 1st Dec, 2020 to 30th Nov, 2021 for it SEZ at village Sai, Taluka Panvel, District Raigad.
211 of 2020
Completed
1620 Wed 11/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited Petition on the issue of standby charges being payable by the Petitioner to TPCG as per TPC-G MYT Order dated 30.03.2020 in Case No. 300 of 2020 and in order to reconcile the issue of standby charges, with the final order dated 20.08.2019 passed by the Hon'ble Supreme Court in MA. 1404/2019 IN C.A. NO(S). 415 OF 2007.
163 of 2020
Completed
1621 Wed 11/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking setting up of uniform principles and policies for allocation of various distribution system network assets of a Distribution Licensee to the consumers connected at Extra-High Tension (EHT), High Tension (HT) and Low Tension (LT) Voltage level based on their utilisation for the computation of Wheeling Charges
133 of 2020
Completed
1622 Tue 10/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Adani Power Maharashtra Limited under Section 86 read with 63 of the Electricity Act, 2003 and Article 13 of the PPAs dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013 for approval of relief under Change in Law for shortfall in domestic coal under SHAKTI Policy after 31.03.2017 and grant of Carrying Cost. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 28 September, 2020 in Appeal No. 155 of 2019 and 116 of 2019.- MA No. 54 of 2020
290 of 2018 and MA No. 54 of 2020
Completed
1623 Tue 10/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Power Maharashtra Limited (APML) for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013. AND Application filed by APML on 10.10.2020 to issue the consequential order in view of Appellate Tribunal for Electricity Judgment on 14 September, 2020 in Appeal No. 182 of 2019. - MA No. 53 of 2020
189 of 2013 and 140 of 2014 and MA No. 53 of 2020
Completed
1624 Tue 10/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Completed
1625 Mon 09/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation seeking compensation on account of occurrence of change in law events. Application for Interim Directions under Section 94(2) of the Electricity Act, 2003 read with Regulation 81 of the MERC (Conduct of Business) Regulations, 2004
195 of 2020 and MA No. 52 of 2020
Completed
1626 Mon 09/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for removal of difficulties with regards to payment of rs 130.46 crore against demand of Service Tax liability claimed by WRD GoM for the period from FY 2009-10 to FY2014-15
168 of 2020
Completed
1627 Mon 09/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
167 of 2020
Completed
1628 Mon 09/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys P Ltd. in the matter of charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016 & 195 of 2017 & reduction of contract demand to 200 KVA
166 of 2020
Completed
1629 Fri 06/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation seeking compensation on account of occurr ence of change in law events. AND Application for Interim Directions under Section 94(2) of the Electricity Act, 2003 read with Regulation 81 of the MERC (Conduct of Business) Regulations, 2004
195 of 2020 and MA No. 52 of 2020
Reschedule with further notice
1630 Fri 06/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for removal of difficulties with regards to payment of rs 130.46 crore against demand of Service Tax liability claimed by WRD GoM for the period from FY 2009-10 to FY2014-15
168 of 2020
Reschedule with further notice
1631 Fri 06/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of New Ushanagar Co-operative Housing Society Limited Seeking Compliance of the Order Dated May 28, 2019 In Case No. 168 Of 2014 of the Honâ??ble Commission Read with relevant provisions of the Electricity Act, 2003 and Works of Licensees Rules, 2006
167 of 2020
Reschedule with further notice
1632 Fri 06/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Team Ferro Alloys P Ltd. in the matter of charging demand charges at the rate of 25% applicable for startup power of generating plant as per tariff order of Commission in case No. 48 of 2016 & 195 of 2017 & reduction of contract demand to 200 KVA
166 of 2020
Reschedule with further notice
1633 Tue 03/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited Petition on the issue of standby charges being payable by the Petitioner to TPCG as per TPC-G MYT Order dated 30.03.2020 in Case No. 300 of 2020 and in order to reconcile the issue of standby charges, with the final order dated 20.08.2019 passed by the Hon'ble Supreme Court in MA. 1404/2019 IN C.A. NO(S). 415 OF 2007.
163 of 2020
Reschedule with further notice
1634 Tue 03/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Petition filed by Tulasi Casting and Machining Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non- Compliance of CGRF Kolhapur Order dated 6.12.2019 passed in Case No. 17 (2018-19)/ 217.
153 of 2020
5
1635 Tue 03/11/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking setting up of uniform principles and policies for allocation of various distribution system network assets of a Distribution Licensee to the consumers connected at Extra-High Tension (EHT), High Tension (HT) and Low Tension (LT) Voltage level based on their utilisation for the computation of Wheeling Charges
133 of 2020
Reschedule with further notice
1636 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Aurinko Energy Private Limited for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
123 of 2020
Completed
1637 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Kannad) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
122 of 2020
Completed
1638 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Wadwani) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
121 of 2020
Completed
1639 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Parner) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
120 of 2020
Completed
1640 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Kinwat) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
119 of 2020
Completed
1641 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Mohol) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
118 of 2020
Completed
1642 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Jamkhed) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
117 of 2020
Completed
1643 Tue 27/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Atnu Solar Private Limited (Jalna) for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules.
116 of 2020
Completed
1644 Fri 23/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Vidarbha Industries Association for removing difficulty in implementation of order in case No. 322 of 2019 in the matter of case of MSEDCL for truing up of aggregate revenue requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing up of ARR of FY 2019-20 and projections of ARR and determination for the 4th Multi Year Tariff control period FY 2020-21 to 2024-25.
165 of 2020
Completed
1645 Fri 23/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Ambad Industries and Manufacturers Association seeking to modify MYT order Dt. 30/03/2020 in Case no. 322/2019 and to issue appropriate directives with respect to KVAh billing methodology.
144 of 2020
Completed
1646 Fri 23/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Krishna Valley Chamber of Industries & Commerce for extension of Kwh billing methodology and concerned Korona pandemic related Issues.
143 of 2020
Completed
1647 Fri 23/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Khandesh Industrial Development Association ( K.I.A) seeking appropriate interim order/direction to temporary modify MYT Order dated 30.03.2020 passed by the Commission in respect of Kvah billing methodology for the period of one year.
135 of 2020
Completed
1648 Fri 23/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Chamber of Marathwada Industries and Agriculture ( C.M.I.A.) Petition for issue of interim order to temporary modify MYT order dt. 30.03.2020 in respect of kvah billing mechanism during lockdown period declared on account of Covid-19 pandemic.
131 of 2020
Completed
1649 Thu 22/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking approval to float open tenders and taking land on lease by paying rent under Mukhyamantri Saur Krishi Vahini Yojana (MSKVY) scheme.
189 of 2020
Completed
1650 Thu 22/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd. against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of common order dated 03.07.2020 in case no. 24 of 2020.
179 of 2020
Completed
1651 Thu 22/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Ltd for adjudication of dispute under the Power Purchase Agreements entered between Adani Power Maharashtra Limited ("APML") and Maharashtra State Electricity Distribution Company Limited ("MSEDCL") qua nonpayment of certain costs pertaining to Inter-Plant Transfer ("IPT") of coal utilized at Tiroda TPS.
132 of 2020
Completed
1652 Wed 21/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Suo-Motu e-Hearing in the matter of Grid Failure in the Mumbai Metropolitan Region (MMR) on 12 October 2020 at 10.02 Hrs. - Compliance under Regulation 46.2.4 of MERC (State Grid Code) Regulations, 2020.
202 of 2020
Completed
1653 Tue 20/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking relief for residential consumers for 2% rebate for payment within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments for payment of June -20 and July-20
149 of 2020
Completed
1654 Tue 20/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
Completed
1655 Tue 20/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Completed
1656 Fri 16/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
Completed
1657 Fri 16/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Girish Bhaskar Dohane for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
54 of 2020
5
1658 Fri 16/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vinod Mohanbhai Makadiya for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
53 of 2020
5
1659 Tue 13/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking this Hon'ble Commission to suitably clarify / relax / modify Regulations 4 and 10 and 55.1 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019.
114 of 2020
Completed
1660 Tue 13/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India seeking Relief / Exemption Under DSM Regulation, 2019, to Bagasse Based Cogen Power Plants at Sugar Factories in Maharashtra, with installed Capacity of 25 MW & Above. Application to take on record Amended Petition.
110 of 2020
Completed
1661 Tue 13/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Regulation 19 (Power to Remove Difficulty), Regulation 20 (Power to Relax) and Regulation 21 (Power to Issue Directions) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 seeking to remove difficulty, relaxation and/or issue appropriate direction read with Regulation 92 of the Maharashtra Electricity Regulatory Commission (conduct of Business), Regulations, 2004 seeking with respect to Regulation 4 and 10 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019
58 of 2020
Completed
1662 Fri 09/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Dr. Kirit Somaiya seeking directions against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) pertaining to inflated bills being received by the general public, during the Lockdown period.
159 of 2020
Completed
1663 Fri 09/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/S Adlabs Entertainment Limited for waiver of maximum demand penalty, applied to Open Access transaction, Under Covid-19 (Corona Virus Pandemic) by Maharashtra State Electricity Distribution Company Ltd., (MSEDCL).
158 of 2020
Completed
1664 Fri 09/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Eastern Grid Power Transmission Co. Ltd. (MEGPTCL) for approval of capital cost as on Commercial Operation Date of the Project, and True-up of ARR and determination of ARR for MEGPTCL; under the provisions of Section 61 and Section 62 read with Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (MERC) (Multi Year Tariff) Regulations, 2011 and MERC (Multi Year Tariff) Regulations, 2015.
50 of 2016
Completed
1665 Tue 06/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking approval for change in execution entity of 225 MW grid connected Wind-Solar Hybrid Power Projects from M/s Tata Power Green Energy Limited, a 100% subsidiary of The Tata Power Company Limited to M/s TP Saurya Limited, a 100% subsidiary of The Tata Power Company Limited.
181 of 2020
Completed
1666 Tue 06/10/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Power Maharashtra Ltd for adjudication of dispute under the Power Purchase Agreements entered between Adani Power Maharashtra Limited ("APML") and Maharashtra State Electricity Distribution Company Limited ("MSEDCL") qua nonpayment of certain costs pertaining to Inter-Plant Transfer ("IPT") of coal utilized at Tiroda TPS.
132 of 2020
Completed
1667 Tue 29/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
Reschedule
1668 Tue 29/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule
1669 Tue 29/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd seeking relief for residential consumers for 2% rebate for payment within due date and waiver of delayed payment charges and interest for delay in making payments of electricity bills due to opting for three equal installments for payment of June -20 and July-20
149 of 2020
Reschedule
1670 Fri 25/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking permission to exercise the option or otherwise for the Financial Year 2020-2021 as per the order dated 22nd May, 2019 passed by the Hon'ble Commission in Case No. 68 of 2019
111 of 2020
Completed
1671 Fri 25/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Captive Power Producers Association seeking capping of RPO for captive power plants and to relax or waive the provisions of the MERC RPO Regulations, 2016
130 of 2020
Completed
1672 Fri 25/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for long term procurement of wind Power from Maharashtra Energy Development Agency's (MEDA'S) projects who's EPA with MSEDCL is expired, for meeting Non Solar RPO target.
113 of 2020
Completed
1673 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Laxmipati Balaji Supply Chain Management Limited seeking adoption of tariff discovered through competitive bidding process and consent to continue the selection process with single bidder and adoption of tariff discovered through transparent bidding process for Short Term Procurement of Power, up to 1MW for a period of one year from 1st Oct, 2020 to 30th Sep, 2021
183 of 2020
Completed
1674 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking review of Order dated passed in Case No. 100 of 2020 Petition for quashing of the communication / e-mail dated 05.06.2020 issued by MSEDCL Miscellaneous Application for urgent listing and for seeking Interim reliefs
177 of 2020 and MA No. 50 of 2020
Completed
1675 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
Completed
1676 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
Completed
1677 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
Reschedule
1678 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Girish Bhaskar Dohane for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
54 of 2020
Reschedule
1679 Tue 22/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mr. Vinod Mohanbhai Makadiya for implementation of grid interactive RRE Regulation 2019 till 31st March 2020 as the charges proposed in the MYT Petition 2019 of MSEDCL are not finalized.
53 of 2020
Reschedule
1680 Fri 18/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking approval of procurement of 1000 MW of Power from grid connected Renewable Energy (RE) Power Projects, complemented with Power from Coal based Thermal Power Projects in India.
140 of 2020
Reschedule
1681 Fri 18/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule
1682 Tue 15/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Amravati Power Transmission Company Limited application on behalf of Amravati Power Transmission company limited seeking modification/clarification of the order dated 30.03.2020 passed in Case No 295 of 2019.
145 of 2020
Completed
1683 Tue 15/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Naresh Kikubhai Patel against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance of CGRF Kalyan Zone Order no 1880 / 19-20 Dt. 23 Dec' 2019 .
74 of 2020
Completed
1684 Tue 15/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Lloyd Metals & Energy Ltd has filed Petition on 13.3.2020 under Section under section 86(f) of the Electricity Act, 2003 ln the matter of charging demand charges at the rate of 25o/o applicable for startup power of generating plant as per tariff order of Commission in case No.48 of 2016 & 195 of 2017
106 of 2020
Completed
1685 Fri 11/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Dr. Kirit Somaiya seeking directions against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) pertaining to inflated bills being received by the general public, during the Lockdown period.
159 of 2020
Reschedule with further notice
1686 Fri 11/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
New Petition, Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval to consider discount in Tariff offered by generators for preparation of MoD for the month of May-2020 and June 2020.
108 of 2020
Completed
1687 Fri 11/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Transmission Co. Ltd (State Transmission Utility's) for removal of difficulties in implementation of Multi Year Tariff Regulation 2015, 2019 and Transmission open Access Regulation 2016.
52 of 2020
Completed
1688 Tue 08/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking review of Order dated passed in Case No. 100 of 2020 Petition for quashing of the communication / e-mail dated 05.06.2020 issued by MSEDCL Miscellaneous Application for urgent listing and for seeking Interim reliefs
177 of 2020 and MA No. 50 of 2020
Completed
1689 Tue 08/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
Completed
1690 Tue 08/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
Completed
1691 Tue 08/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking this Hon'ble Commission to suitably clarify / relax / modify Regulations 4 and 10 and 55.1 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019.
114 of 2020
Reschedule with further notice
1692 Tue 08/09/2020 00:30:00 AM
e-Hearing through Video Conferencing
Petition of Adani Electricity Mumbai Limited under Regulation 19 (Power to Remove Difficulty), Regulation 20 (Power to Relax) and Regulation 21 (Power to Issue Directions) of MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 seeking to remove difficulty, relaxation and/or issue appropriate direction read with Regulation 92 of the Maharashtra Electricity Regulatory Commission (conduct of Business), Regulations, 2004 seeking with respect to Regulation 4 and 10 of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019
58 of 2020
Reschedule with further notice
1693 Fri 04/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. ("SEZ Phase II") for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff for a Short-Term (i.e., for a period of more than one day to one year)
172 of 2020
Completed
1694 Fri 04/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for approval of Power Procurement Plan, Power Purchase Agreement and Adoption of Tariff determined for a Short-Term (i.e., for a period of more than one day to one year)
171 of 2020
Completed
1695 Fri 04/09/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (hereinafter to be referred to as "MSEDCL" or "the Petitioner") Petition in compliance of the Directives of the Commission vide Order dated: 11.09.2020 passed in Case No. 145 of 2019.
107 of 2020
Completed
1696 Wed 26/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra Airport Development Company Limited for approval and directions under Section 86 of the Electricity Act, 2003 read with 'Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India
174 of 2020
Completed
1697 Wed 26/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
Completed
1698 Fri 21/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
Reschedule
1699 Fri 21/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
Completed
1700 Tue 18/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Impleadment Application filed by M/s Sai Wardha Power Generation Limited (SWPGL). In Case No. 137 of 2016 Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
MA No. 46 of 2020 in Case No. 137 of 2016
Completed
1701 Tue 18/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Completed
1702 Tue 18/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
Completed
1703 Tue 18/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018 AND MA No. 44 of 2020
Completed
1704 Tue 18/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
Completed
1705 Fri 14/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AMJ Land Holdings Limited seeking directions against Maharashtra State Electricity Distribution Company Limited for wrongful denial of Open Access Under Provisions of the Electricity Act, 2003 more particularly Section 42, Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016
345 of 2019
Completed
1706 Fri 14/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of AMJ Land Holdings Limited under Regulation 37 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 for removal of difficulties in giving effect to the provisions of the Regulation 20.3 of Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019 and implementation thereof.
115 of 2020
Completed
1707 Fri 14/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Sections 142, 146 and 149 of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for Non-Compliance by MSEDCL of order of the Commission dated September 9, 2019 in Case No. 132 of 2019.
71 of 2020
Completed
1708 Fri 14/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Hindustan Petroleum Corporation Limited for taking suitable steps for bringing about the necessary changes in the Open Access Regulations and the Open Access regime within the State of Maharashtra (under Sections 42 (2); 61 (b); 61 (c); 61 (d); 61 (f); 66; 86 (3) of the Electricity Act, 2003)
6 of 2020
Completed
1709 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs. . - Application seeking permission to file Petition online and seeking urgent hearing for urgent reliefs - Application seeking ad-interim ex-parte directions against the respondent.
138 of 2020 and MA No. 43 of 2020
Completed
1710 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Completed
1711 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of RattanIndia Power Limited (RIPL) under Section 86 of the Electricity Act, 2003, read with the statutory framework governing procurement of power through competitive bidding and Article 10 of the PPAs dated 22.04.2010 and 05.06.2010, executed between RIPL and MSEDCL for compensation due to Change in Law impacting revenues and costs for the period from the date of commencement of supply of power by RIPL.
350 of 2019
Completed
1712 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of JSW Steel Limited under Sections 61, 86(1)(e), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with MERC (Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010 and subsequent amendments.
335 of 2019
Completed
1713 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Oil and Natural Gas Corporation Limited (ONGC) for Exemption / Clarification of Renewable Purchase Obligation (RPO) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R Dated 1st February 2019.
65 of 2020
Completed
1714 Tue 11/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for recovery of carrying cost of the claims towards Change in law events such as NCDP, SHAKTI Policy and Cancellation of Lohara Coal Block in respect of various orders passed by Hon'ble Commission in the Petitions filed by IPPs through FAC.
45 of 2020
Completed
1715 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd seeking adjudication of disputes between Renewable Generator (Petitioner) and Distribution Licensee (MSEDCL) w.r.t illegal rejection of online application dated 14.07.2020 preferred by the Petitioner for sale of power to MSEDCL @ Rs. 2.52/unit.
155 of 2020
Completed
1716 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of The Tata Power Company Limited under Section 94 (1) of the Electricity Act, 2003 read with Regulation 84 of the MERC (Conduct of Business) Regulations 2004 to Review the Order dated 22nd January, 2020 passed by the Hon'ble MERC in MA No. 39 of 2019 and Case No. 7 of 2002
69 of 2020
Completed
1717 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Marigold Pharmaceuticals Private Limited under Section 142, 149, 146 of the Electricity Act, 2003 for action on MSEDCL for non compliance of CGRF Baramati Order in Case No. 20/2019 dated 19/12/2019.
63 of 2020
Reschedule with further notice
1718 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
5 of 2020
Completed
1719 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
4 of 2020
Completed
1720 Fri 07/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri. Vitthal Manaji Dabre under section 43, 142, 146, 149 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Orders 175 of 2019 date 23.10.2019.
3 of 2020
Completed
1721 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Tata Power Company Limited - Distribution (TPC-D) seeking adoption of tariff for procurement of 225 MW grid connected Wind-Solar Hybrid capacity on long term basis through Competitive Bidding Process (Followed by E-Reverse Auction) to meet the Renewable Purchase Obligation of Tata Power-Distribution.
152 of 2020
Completed
1722 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking Compensation as per Power Sale Agreement executed between MSEDCL (Distribution Licensee) and Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) under Section 86(1)(f) of the Electricity Act, 2003 and compensation on account of delay in achieving the Scheduled Commercial Operation Date ("SCOD") as per Power Purchase Agreement executed Between Solar Energy Corporation of India Limited (SECI) (Intermediary Procurer) And Solar Power Developer (SPD) by the Respondent.
346 of 2019
Completed
1723 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Windmill Owners Welfare Association of India against non compliance by Maharashtra state Electricity Distribution Company Limited (MSEDCL) of the MERC Order dated 16.10.2018 in Case No.187 of 2017 read with relevant provisions of the EA, 2003.
339 of 2019
Completed
1724 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Sulbha Subhash Lodha under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between hotel golden emerald and Maharashtra State Electricity Distribution Company Limited
334 of 2019
Completed
1725 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Hotel Golden Emerald under Section 86(1)(e) and 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between hotel golden emerald and Maharashtra State Electricity Distribution Company Limited
333 of 2019
Completed
1726 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Ghatge Patil Industries Limited under Provisions of Electricity Act, 2003 more particularly Sections 142, 146 and 149 thereof on account of Non-Compliance by Maharashtra State Electricity Distribution Company Limited of the orders of this Hon'ble Commission including orders dated April 9, 2019 in case No. 22 of 2019 read with the order dated November 7, 2017 in Case No. 77 of 2017.
70 of 2020
Completed
1727 Tue 04/08/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of MSPL Limited pertaining to adjudication of disputes between MSPL Limited and MSEDCL and seeking directions against MSEDCL for Non-Compliance of terms of the PPA Dated April 29, 2006, short term PPA's and various order of the Commission including but not limited to order dated January 17, 2018 in case no. 78 of 2017 read with relevant provisions of Electricity Act, 2003.
2 of 2020
Completed
1728 Fri 31/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Reschedule with further notice
1729 Fri 31/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Riddhi Siddhi Gluco Biols Limited against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Non-Compliance of Common order dated 01.10.2018 in Case No. 28 of 2018 under Section 142, 146 & 149 of the Electricity Act, 2003 read with Regulation 13 (C) (IX) of the Maharashtra Electricity Regulatory Commission (Conduct Of Business) Regulations, 2004.
72 of 2020
Completed
1730 Fri 31/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of DLI Power (India) Private Limited under Section 86 (1) (e) of the Electricity Act, 2003, for implementation of the terms and conditions of the EPA dated 06.12.2010 executed between the Petitioner and the Respondent read with MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, to the extent of the payment of delayed payment charges and release of bills by the Respondent along with entitlement of the Petitioner for adjustment in tariff due to the cost incurred by the Petitioner for ensuring online visibility to SLDC as directed by the Respondent.
57 of 2020
Reschedule with further notice
1731 Fri 31/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Winro Commercial (India) Ltd. seeking direction against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) under Section 86(1) (f) for adjudication of dispute on the issue of outstanding payments of Power Purchases, interest on delayed payment and overdue interest for delay payment surcharge for wind power supplied by it to MSEDCL.
43 of 2020
Completed
1732 Fri 31/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of common order dated 09.10.2o19 in case no. 262 of 2018 and order dated 26.09.2019 in case no. 197 of 2019 under Section 142, 146 & 149 of the Electricity Act, 2003 read with Regulation 13 (c) (ix) of the Maharashtra Electricity Regulatory Commission (conduct of business) Regulations, 2004.
23 of 2020
Completed
1733 Tue 28/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Clean Wind Power (Bhavnagar) Private Limited Petition under seeking extension/ deferment of Scheduled Commissioning Date on account of Force Majeure events related to COVID-19 outbreak which prevented the Petitioner from undertaking its obligations under the Power Purchase Agreement dated 17.07.2019 and consequential reliefs.
138 of 2020
Completed
1734 Tue 28/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) seeking appropriate orders/directions pertaining to the Revision/ Change in Contract Demand / extension of the earlier orders in Case No. 82 of 2020.
137 of 2020
Completed
1735 Tue 28/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
Completed
1736 Tue 28/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
Completed
1737 Thu 09/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited (Generation Business) seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.298 of 2019.
105 of 2020
Completed
1738 Thu 09/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited (Transmission Business) seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.297 of 2019.
104 of 2020
Completed
1739 Thu 09/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited-D seeking review of the order dated 30.03.2020 passed by the Hon'ble Commission in Case No.325 of 2019.
103 of 2020
Completed
1740 Tue 07/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Nisagra Renewable Energy Private seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
62 of 2020
Completed
1741 Tue 07/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. Juniper Green Energy Private Limited seeking approval and determination of quantum and mechanism of compensation along with interest, if any, on account of the Change in Law event of imposition of safeguard duty on the import of solar cells.
61 of 2020
Completed
1742 Tue 07/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
Completed
1743 Tue 07/07/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
Completed
1744 Fri 26/06/2020 10:30:03 AM
e-Hearing through Video Conferencing
New Petition, Petition filed by ReNew Vayu Urja Private Limited (formerly known as KCT Renewable Energy Private Limited)seeking direction for not encashing the performance bank guarantee of the petitioner and declaration of extension of Scheduled Commercial Operation Date on account of Force Majeure Application Application for urgent listing and for seeking Interim ad-interim reliefs.
102 of 2020
Completed
1745 Fri 26/06/2020 10:30:02 AM
e-Hearing through Video Conferencing
Petition filed by WinIndia Ventures Pvt Ltd seeking adjudication of disputes between Petitioner and MSEDCL illegal disconnection of wind turbine , seeking restitution/compensation from MSEDCL for loss of generation on account of illegal disconnection of petitioner's wind turbine.
101 of 2020
Completed
1746 Fri 26/06/2020 10:30:01 AM
e-Hearing through Video Conferencing
Petition filed by Orange Maha Wind Energy Pvt. Ltd seeking quashing of the communication / e-mail dated 05.06.2020 issued by Respondent No. 1 and stay on disconnection of the Petitioner's 2 MW Wind Turbine Generator and Application for urgent listing and for seeking Interim reliefs.
100 of 2020
Completed
1747 Fri 26/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Shri Gajlaxmi Industries HUF and other 28 Cases (Case No's Case No.12 to 20 and 29 to 42 and 49 to 51, 55 and 56 of 2020) Petitions for Non-compliance of Case Nos.172 of 2019, 173 of 2019, 176 to 181 of 2019, 185 to 194 of 2019,200 to 224 of 2019 and MA No. 32 of 2019 and 33 of 2019 in respect of Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 for removal of difficulties in giving effect to the provisions of the Regulation and implementation thereof.
12 to 20, 29 to 42, 49 to 51, 55 and 56 of 2020
Completed
1748 Fri 19/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-T) seeking this Hon'ble Commission to reconsider and suitably clarify / relax / modify certain provisions of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2019.
99 of 2020
Completed
1749 Fri 19/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Navalakha Translines & Other under Section 42, 86 of the Electricity Act, 2003 Wrongful rejection of Open Access (O.A.) Permission.
340 of 2019
Completed
1750 Fri 19/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Kamal Encon Industries Limited for review of the Order dated 14.11.2019 passed by the Hon'ble Commission in the Case No. 260 of 2019, in terms of the liberty granted by the Hon'ble Appellate Tribunal in its Judgment dated 25.02.2020 in Appeal No. 65 of 2020.
73 of 2020
Completed
1751 Fri 12/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Adani Electricity Mumbai Limited seeking review of the Multi Year Tariff Order issued on 30.03.2020 by the Hon'ble Commission in Case No. 326 of 2019.
98 of 2020
Completed
1752 Fri 12/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
The Petitioner The Tata Power Company Limited (Tata Power-D) has filed this Petition on 23.5.2020 Petition seeking review of the Multi Year Tariff Order issued on the date 30.03.2020 ("Impugned Order") by the Hon'ble Commission in Case No. 326 of 2019 for approval of Truing Up of FY 2017-18, Truing Up of FY 2018-19, Provisional Truing Up of FY 2019-20 and Tariff Projections for the Fourth MYT Control period from FY 2020-21 to FY 2024-25 for the Distribution Business of Tata Power (Tata Power-D).
96 of 2020
Completed
1753 Fri 12/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-T) seeking review of the Multi Year Tariff Order issued on the date 30.03.2020 ("Impugned Order") by the Hon'ble Commission in Case No. 299 of 2019.
95 of 2020
Completed
1754 Fri 12/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by The Tata Power Company Limited Petition (Tata Power-G) seeking review and clarifications of certain issues arising out of the Multi Year Tariff Order issued on 30.03.2020 by the Hon'ble Commission in Case No. 300 of 2019.
94 of 2020
Completed
1755 Tue 09/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for removal of difficulties regarding implementation of fuel plan and difficulties faced during present forced majeure COVID-19 situation.
97 of 2020
Completed
1756 Tue 09/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Ghatge Patil Industries Limited seeking waiver of fixed demand charges reduction and reinstatement of contract demand and relaxation of banking.
93 of 2020
Completed
1757 Tue 09/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Indian Wind Power Association-Maharashtra State Council Seeking relaxation of Regulation 20.3 of the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 ("DOAR, 2016") pertaining to the banking period.
92 of 2020
Completed
1758 Tue 09/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s ReNew Solar Power Private Limited under section 86(1)(f) of the Electricity Act 2003 before the MERC for (i) approval of "Change in Law" and (ii) seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of imposition of safeguard duty on solar cells/modules in terms of Article 9 of the PPA dated 27.07.2018 between M/s ReNew Solar Power Private Limited and Maharashtra State Electricity Distribution Co. Ltd.
8 of 2020
Completed
1759 Wed 03/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of WinIndia Ventures Pvt Ltd under Section 86 (1) (e) of the Electricity Act, 2003 seeking appropriate directions and declaration against Distribution licensee Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) as well as nodal agency Maharashtra Energy Development Authority (MEDA) for in ordinate delay in implementing the renewable energy policy dated 20th july, 2015 issued by the Government of Maharashtra read with methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra W.R.T the petitioner's wind unit of 1.5 MW.
24 of 2020
Completed
1760 Wed 03/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Khandke Wind Energy Private Limited under Section 86 of the Electricity Act, 2003 seeking directions against Maharashtra State Electricity Distribution Company Limited qua supply of power from the Petitioner's 1.6 MW Wind Turbine Generators located at Satara, Maharashtra. Miscellaneous Application seeking urgent ex-parte ad-interim reliefs.
66 of 2020
Completed
1761 Wed 03/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Lalpur Wind Energy Private Limited under Section 86 of the Electricity Act, 2003 seeking directions against Maharashtra State Electricity Distribution Company Limited qua supply of power from the Petitioner's 5.6 MW Wind Turbine Generators located at Ahmednagar, Maharashtra. AND Miscellaneous Application seeking urgent ex-parte ad-interim reliefs.
60 of 2020 and MA No. 38 of 2020
Completed
1762 Tue 02/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
M/s. ACME Heergarh Powertech Private Limited Petition for declaration that PPA dated 21.08.2019 stands frustrated on account of force majeure and impossibility of performance and consequential relief.
78 of 2020
Completed
1763 Tue 02/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking review of order dated 30th March 2020 in Case no. 322of 2019 in the matter of Truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff control period FY 2020-21 to FY 2024-25.
84 of 2020
Completed
1764 Tue 02/06/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s. ACME Chittorgarh Solar Energy Pvt. seeking Issuance of appropriate Order(s)/Directions(s) for a mechanism for recovery of the compensation towards increase in capital cost due to introduction and imposition of Safe Guard Duty.
7 of 2020
Completed
1765 Fri 29/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Load Dispatch Centre seeking Grant of time to comply with clause No. 3 of operative part of the Common Order dated 26th September 2019 passed by the Hon'ble Maharashtra Electricity Regulatory Commission, Mumbai in Case No. 297 of 2018.
59 of 2020
Completed
1766 Fri 29/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking approval to adoption of Tariff under Section 63 of The Electricity Act, 2003 for long term procurement of 210 MW Power from M/s. Sai Wardha Power Generation Limited (SWPGL).
91 of 2020
Completed
1767 Fri 29/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking immediate recovery of pending claims of MSEDCL along with carrying cost under MERC approved FBSM AND Miscellaneous Application for Interim Relief
90 of 2020 and MA No. 37 of 2020
Completed
1768 Fri 29/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
The Tata Power Company Limited Petition seeking approval of extension of the Power Purchase Agreement between the Distribution Business of The Tata Power Company Limited and the Wind Energy Business of The Tata Power Company Limited.
89 of 2020
Completed
1769 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Bothe Windfarm Development Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited qua supply of power from the Petitioner's 6.3 MW Wind Turbine Generators located at Satara, Maharashtra under Section 86 of the Electricity Act, 2003.
28 of 2020
Completed
1770 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Petition seeking review of order dated 30th March 2020 in Case no. 322of 2019 in the matter of Truing-up of Aggregate Revenue Requirement (ARR) of FY 2017-18 and FY 2018-19, provisional truing-up of ARR of FY 2019-20 and projections of ARR and determination of tariff for the 4th Multi Year Tariff control period FY 2020-21 to FY 2024-25.
84 of 2020
Completed
1771 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Jaigad Power Transco Ltd ("JPTL") seeking review of Tariff Order issued by the Hon'ble Commission on 30th March 2020 in Case No. 294 of 2019.
83 of 2020
Completed
1772 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
The Tata Power Company Petition seeking approval for the Bidding Documents, for long term procurement (25 years) of 225 MW capacity from grid connected Wind-Solar Hybrid Power Projects through competitive bidding process for meeting the Renewable Purchase Obligations based on National Wind-Solar Hybrid Policy dated 14th May 2018.
88 of 2020
Completed
1773 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of KRC Infrastructure and Projects Private Limited for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 329 of 2019.
87 of 2020
Completed
1774 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Mindspace Business Parks Private Limited Review Petition of for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 328 of 2019.
86 of 2020
Completed
1775 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Review Petition of Gigaplex Estate Private Limited for review of the MYT Order issued by Hon'ble Commission dated 30th March 2020 in Case No. 330 of 2019.
85 of 2020
Completed
1776 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for taking on record the deemed Distribution Licensee status of the Petitioner , M/s Eon Kharadi Infrastructure Pvt. Ltd. for the IT & ITeS SEZ at Survey no. 72, Village-Kharadi, Pune and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner and for allowing EON to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the 'ceiling tariff' in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
68 of 2020
Completed
1777 Tue 26/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of M/s Eon Kharadi Infrastructure Pvt. Ltd. for taking on record the deemed Distribution Licensee status of the Petitioner, M/s Eon Kharadi Infrastructure Pvt. Ltd. for the IT & ITeS SEZ at MIDC Knowledge Park- Kharadi, Pune and for issuing the Specific Conditions of Distribution Licence and for allowing EON to charge consumers in its licence area the tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, as the 'ceiling tariff' in its area of supply, and for approving the appropriate tariff schedule and schedule of charges.
67 of 2020
Completed
1778 Thu 14/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Kalika Steel Alloys Pvt Ltd. & Ors (27) against Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking appropriate orders/ directions modifying the Regulations pertaining to the Revision/ Change in Contract Demand of the Consumers of the MSEDCL And Application seeking urgent relief.
82 of 2020
Completed
1779 Thu 14/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition of Maharashtra State Electricity Distribution Co. Ltd seeking approval for adoption of tariff for long term procurement of 350 MW power.
81 of 2020
Completed
1780 Thu 14/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking approval for adoption of tariff discovered for long term procurement of 283 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana'.
80 of 2020
Completed
1781 Thu 14/05/2020 10:30:00 AM
e-Hearing through Video Conferencing
Joint Petition filed by Maharashtra State Power Generation Company Limited & Maharashtra State Electricity Distribution Company Ltd. seeking approval seeking approval of tariff rate of Rs. 3.11/kwh for long term procurement of power through MSPGCL for 100 MWAC cumulative capacity grid interactive solar PV power projects at western (a) and northern region of Maharashtra under 'Mukhyamantri Saur Krushi Vahini Yojana' to meet MSEDCL'S solar renewable purchase obligations.
10 of 2020
Completed
1782 Mon 16/03/2020 10:00:00 AM
Hearing
Petition of Axis Bank Limited under Section 94(1) (f) of the Electricity Act, 2003 and Regulation 15 of the MERC (Conduct of Business) Regulations, 2004 seeking further directions and clarification from the Hon'ble Commission in order dated 16 December 2019 passed in Case No. 247 of 2019.
44 of 2020
Reschedule with further notice
1783 Mon 16/03/2020 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of Power Purchase Agreement (PPA) based on tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and 'Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process' issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of power upto 3MW (09:00-23:00 hours) (Weekdays, i.e., Monday to Friday and excluding Saturday, Sunday and national holidays)for a period of one year from 1st April, 2020 to 31st March, 2021.
64 of 2020
Completed
1784 Tue 18/02/2020 10:00:00 AM
Hearing
Petition of Bothe Windfarm Development Pvt. Ltd. seeking directions against Maharashtra State Electricity Distribution Limited qua supply of power from the Petitioner's 6.3 MW Wind Turbine Generators located at Satara, Maharashtra under Section 86 of the Electricity Act, 2003.
28 of 2020
Reschedule with further notice
1785 Tue 18/02/2020 10:00:00 AM
Hearing
Petition of Cogeneration Association of India for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
27 of 2020
Reschedule with further notice
1786 Tue 18/02/2020 10:00:00 AM
Hearing
Petition of Maharashtra State Cooperative Sugar Factories Federation Ltd. for increase the ceiling tariff of Rs 3.56/kWh kept by MSEDCL under tender no MSEDCL/RE/Bagasse/2019/75 Dated 27.12.2019 and to extend the bid submission date from 27.01.2020 by at least 2 month.
26 of 2020
Reschedule with further notice
1787 Tue 18/02/2020 10:00:00 AM
Hearing
Petition of WinIndia Ventures Pvt Ltd under Section 86 (1) (e) of the Electricity Act, 2003 seeking appropriate directions and declaration against Distribution licensee Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) as well as nodal agency Maharashtra Energy Development Authority (MEDA) for in ordinate delay in implementing the renewable energy policy dated 20th july, 2015 issued by the Government of Maharashtra read with methodology for registration of projects dated 9th September, 2015 issued by the Government of Maharashtra W.R.T the petitionerâ??s wind unit of 1.5 MW.
24 of 2020
Reschedule with further notice
1788 Tue 18/02/2020 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for removal of difficulty under Regulation 19 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019, and Relaxation of penalised clauses under RPO Regulations, 2019
21 of 2020
Reschedule with further notice
1789 Sat 15/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1790 Thu 13/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1791 Tue 11/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1792 Mon 10/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1793 Sat 08/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1794 Thu 06/02/2020 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19. Provisional True up of FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
322 of 2019
Completed
1795 Tue 04/02/2020 10:00:09 AM
Public Hearing
Inviting Suggestions and Objections on Gigplex Estate Private Limited's Multi Year Tariff Petition for Final True up of ARR for FY 2017-18 and FY 2018-19, Provisional True up of ARR for FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
330 of 2019
Completed
1796 Tue 04/02/2020 10:00:08 AM
Public Hearing
Inviting Suggestion and Objection on KRC Infrastructure and Projects Private Limited's Multi Year Tariff Petition for Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
329 of 2019
Completed
1797 Tue 04/02/2020 10:00:07 AM
Public Hearing
Inviting Suggestion and Objection on Mindspace Business Parks Private Limited's Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up for FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
328 of 2019
Completed
1798 Tue 04/02/2020 10:00:06 AM
Public Hearing
Inviting Suggestion and Objection on Tata Power Company Limited-Distribution Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
326 of 2019
Completed
1799 Tue 04/02/2020 10:00:05 AM
Public Hearing
Inviting Suggestion and Objection on Adani Electricity Mumbai Limited-Distribution Business Multi Year Tariff Petition for Final True up of FY 2017-18 and 2018-19, Provisional True up of FY 2019-20 and Approval of ARR and Tariff for fourth Control Period from 2020-21 to 2024-25
325 of 2019
Completed
1800 Tue 04/02/2020 10:00:04 AM
Public Hearing
Inviting Suggestions and Objections on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Multi YearTariff Petition for Final True up of ARR for FY 2017-18 and FY 2018-19, Provisional True up of ARR for FY 2019-20 and Projection of ARR for Fourth Control Period from FY 2020-21 to 2024-25
324 of 2019
Completed
1801 Tue 28/01/2020 10:00:00 AM
Public Hearing
Suggestions/ Objections on Petitions filed by Adani Electricity Mumbai Limited for proposed changes in shareholding pattern of the Company under Clause 5.2 of the Distribution Licence No. 1 of 2011 dated 11 August, 2011 and Clause 5.2 of the Transmission Licence No. 1 of 2011 dated 11 August, 2011 and Orders dated 28 June, 2018 in Case No. 139 of 2017 and Case No. 140 of 2017 passed by the Commission
341 of 2019 AND 342 of 2019
Schedule
1802 Mon 27/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on State Transmission Utility's (Maharashtra State Electricity Transmission Co. Ltd.) Petition for determination of Intra-State Transmission Tariff for the MYT Control Period from FY 2020-21 to FY 2024-25.
327 of 2019
Schedule
1803 Thu 09/01/2020 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of Tariff for Long Term Procurement of 500 MW solar power from Intra-State solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
349 of 2019
Reschedule
1804 Wed 08/01/2020 10:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for adoption of Tariff for Long Term Procurement of 500 MW solar power from Intra-State solar power projects under Section 63 of the Electricity Act 2003 for meeting the solar Renewable Purchase Obligations.
349 of 2019
Completed
1805 Wed 08/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestion/ Objection on Maharashtra State Power Generation Company Limited Petition for approval of final True up for FY 2017-18 and FY 2018-19, Provisional True up for FY 2019-20 and Aggregate Revenue Requirement for forecast from FY 2020-21 to FY 2024-25 (296 of 2019)
296 of 2019
Completed
1806 Wed 08/01/2020 10:00:00 AM
Public Hearing
Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Truing-up of Annual Fixed Charges (AFC) for FY 2017-18 and FY 2018-19, Provisional Truing-up of AFC for FY 2019-20 and Determination of AFC and Fees and Charges for FY 2020-21 to FY 2024-25
291 of 2019
Completed
1807 Wed 08/01/2020 10:00:00 AM
Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for the 4th Control Period from FY 2020-21 to FY 2024-25 .
302 of 2019
Completed
1808 Tue 07/01/2020 10:00:00 AM
Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for approval of True up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
290 of 2019
Completed
1809 Tue 07/01/2020 10:00:00 AM
Public Hearing
Suggestions/Objections on Adani Transmission (India) Limited's Petition for approval of True up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
289 of 2019
Completed
1810 Tue 07/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestion/ Objection on Adani Electricity Mumbai-Transmission Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for 4th Control period from FY 2020-21 to FY 2024-25 (Case No. 297 of 2019)
297 of 2019
Completed
1811 Tue 07/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestion/ Objection on Petition of Adani Electricity Mumbai-Generation Business for Truing up for FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and approval of ARR and Tariff for each year of control period from FY 2020-21 to FY 2024-25
298 of 2019
Completed
1812 Tue 07/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Vidarbha Industries Power Limited-Transmission Business's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
301 of 2019
Completed
1813 Mon 06/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestion/ Objection on The Tata Power Company Limited-Transmission for Truing-up of FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and Approval of ARR for the Control Period from FY 2020-21 to FY 2024-25
299 of 2019
Completed
1814 Mon 06/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestion/ Objection on The Tata Power Company Limited-Generation Business for Truing-up for FY 2017-18 and FY 2018-19, Provisional Truing-up for FY 2019-20 and Approval of ARR forecast from FY 2020-21 to FY 2024-25
300 of 2019
Completed
1815 Mon 06/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
295 of 2019
Completed
1816 Mon 06/01/2020 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Jaigad PowerTransco Ltd's Petition for approval of Truing-up of ARR for FY 2017-18 and FY 2018-19, Provisional Truing-up of ARR for FY 2019-20 and Determination of ARR for FY 2020-21 to FY 2024-25
294 of 2019
Completed
1817 Tue 17/12/2019 10:00:00 AM
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006.
312 of 2019
Completed
1818 Tue 17/12/2019 10:00:00 AM
Hearing
Petition filed by NuPower Renewables Private Limited pertaining to wrongful denial of permission to commission wind power project under the provisions of Electricity Act, 2003 and various government of Maharashtra policies.
337 of 2019
Completed
1819 Tue 17/12/2019 10:00:00 AM
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
Completed
1820 Tue 17/12/2019 10:00:00 AM
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
Completed
1821 Tue 17/12/2019 10:00:00 AM
Hearing
Petition filed by M/s. Clean Wind Power (Bhavnagar) Private Limitedunder Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of Financial Closure and Scheduled Commissioning Date on account of Force Majeure.
286 of 2019
Completed
1822 Mon 16/12/2019 10:00:00 AM
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006
312 of 2019
Reschedule
1823 Mon 16/12/2019 10:00:00 AM
Hearing
Petition filed by JSW Steel Limited seeking clarification of the Order dated 12 September, 2018 passed in Case No. 195 of 2017, in relation to applicability of Additional Surcharge of Rs. 1.25/- per unit to it.
320 of 2019
Completed
1824 Mon 16/12/2019 10:00:00 AM
Hearing
Petition filed by M/s. B.P. Marine Academy for execution of the CGRF Bhandupâ??s Order dated 11 June, 2019 in Case No. 272/2018
318 of 2019
Completed
1825 Mon 16/12/2019 10:00:00 AM
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal No's 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008. AND Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
7 of 2002 AND MA No. 39 of 2019 in Case No. 7 of 2002
Completed
1826 Fri 06/12/2019 10:00:00 AM
Hearing
Petition of Vidarbha Industries Power Limited- Generation Business (VIPL-G) for challenging the legality, validity and propriety of the Termination Letter dated 20 April 2019 issued by Adani Electricity Mumbai Limited. AND Applicant Vidarbha Industries Power Limited (VIPL) seeking directions in compliance with Order dated 17.10.2019 passed by this Hon'ble Commission. M. A. No. 36 of 2019 in Case No 247 of 2019.
247 of 2019 AND MA No. 41 of 2019 in Case No. 247 of 2019
Completed
1827 Fri 06/12/2019 10:00:00 AM
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
Completed
1828 Fri 06/12/2019 10:00:00 AM
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
Completed
1829 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for adoption of tariff discovered for Long Term Procurement of 5MW Solar PV Power under 'Mukhyamantri Saur Krishi Vahini Yojana' from 2 to 10 MW capacity project connected to Distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchases Obligations.
323 of 2019
Completed
1830 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s. Clean Wind Power (Bhavnagar) Private Limited under Section 86(1)(f) and other relevant provisions of the Electricity Act, 2003 seeking extension/ deferment of Finanical Closure and Scheduled Commissioning Date on account of Force Majeure.
286 of 2019
Reschedule
1831 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s. Shah Lulla Estate Developers under Section 86(1)(f) of the Electricity Act, 2003 seeking direction against Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for (a) payment of interest in terms of Order dated 19.10.2018 passed by this Hon'ble Commission; (b) payment of outstanding payment (principal as well as interest) for power supplied from October, 2018 to March, 2019; and (c) payment of future invoices.
285 of 2019
Completed
1832 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Consumer No. 073039016990 for Review of MERC Order dated 07.07.2019 passed in MERC Case No. 101 of 2016 (Petition of MSEDCL for discontinuing refund of Additional supply charge for application received after 01.01.2016).
309 of 2019
Completed
1833 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Consumer No. 073759015370 for Review of MERC Order dated 07.07.2019 passed in MERC Case No. 101 of 2016 (Petition of MSEDCL for discontinuing refund of Additional supply charge for application received after 01.01.2016).
308 of 2019
Completed
1834 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited for Review of MERC Order dated 19.09.2019 passed in MERC Case No. 227 of 2019 filed by MITC Rolling Mills Pvt Ltd (MITC) against MSEDCL for refund/ adjustment of ASC charges for the period from 1 May, 2007 to 31 May, 2008
304 of 2019
Completed
1835 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited for Review of MERC Order dated 19.09.2019 passed in MERC Case No.226 of 2019 filed by MITC Rolling Mills Pvt Ltd (MITC) against MSEDCL for refund/ adjustment of ASC charges for the period from 1 May, 2007 to 31 May, 2008.
303 of 2019
Completed
1836 Thu 05/12/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited for Review of MERC Order dated 22ndJuly 2019 in Case No. 90 of 2019 in the matter of Petition of MSEDCL seeking clarification about interest on refund on account of change in tariff from HT continuous to HT non continuous consumers.
305 of 2019
Completed
1837 Wed 04/12/2019 10:00:00 AM
Hearing
Petition filed by B.P Marine Academy under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Bhandup Order No. 272/2018 dated 11 June 2019.
318 of 2019
Reschedule
1838 Wed 04/12/2019 10:00:00 AM
Hearing
Petition filed by Paras Miracle Poly Product Private Limited under under Section 86 of the Electricity Act, 2003 Wrongful rejection of Open Access (O.A.) Permission & Purchase of units delivered into the grid of the Respondent.
314 of 2019
Completed
1839 Wed 04/12/2019 10:00:00 AM
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
142 of 2019
Completed
1840 Wed 04/12/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Completed
1841 Wed 04/12/2019 10:00:00 AM
Hearing
Petition filed by Adani Electricity Mumbai Limited (Distribution) seeking review of the Order dated 26.09.2019 in Case No. 297 of 2018 Petition filed by MSEDCL for recovery of annual fixed cost component, Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No. 42 of 2006
312 of 2019
Reschedule
1842 Wed 04/12/2019 09:00:00 AM
Hearing
Revision Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012 against the Order passed on against the order of the Hon'ble District Collector, Nashik dated 01/10/2019, passed in 1/POL 1/4541/2019.
287 of 2019
Completed
1843 Tue 03/12/2019 10:00:00 AM
Hearing
Petition filed by JSW Steel Limited seeking clarification of the Order dated 12.09.2018 passed in Case No. 195 of 2017, in relation to applicability of Additional Surcharge of Rs. 1.25/- per unit to the Applicant.
320 of 2019
Reschedule
1844 Tue 03/12/2019 10:00:00 AM
Hearing
Petition filed by Zaveri & Co. Private Limited for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 143 of 2018 (Zaveri & Co. Private Limited seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
317 of 2019
Completed
1845 Tue 03/12/2019 10:00:00 AM
Hearing
Petition filed by Zaveri & Co Exports for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 144 of 2018 (Zaveri & Co Exports seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 12,18,004 (Rs twelve lakh eighteen thousand four only).
316 of 2019
Completed
1846 Tue 03/12/2019 10:00:00 AM
Hearing
Petition filed by Purushottam Lohia for non compliance of MERC Order dated 01.01.2019 passed in MERC Case No. 145 of 2018 (Purushottam Lohia seeking Order / Direction to Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27, 26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).
315 of 2019
Completed
1847 Tue 03/12/2019 10:00:00 AM
Hearing
Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
MA No. 39 of 2019 in Case No. 7 of 2002
Reschedule
1848 Tue 03/12/2019 10:00:00 AM
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal No's 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008.
7 of 2002
Reschedule
1849 Tue 03/12/2019 10:00:00 AM
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
Completed
1850 Tue 03/12/2019 10:00:00 AM
Hearing
311 of 2019
Completed
1851 Tue 03/12/2019 10:00:00 AM
Hearing
The Joint Petition filed by 1) Maharashtra State Power Generation Co. Ltd. (MSPGCL) 2) Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in regards to seeking adoption of tariff rate of Rs. 2.99/kWH for long term procurement of power through MSPGCL for 50MW solar power plant set up at various location at Western Maharashtra under 'Mukhyamantri Saur Krishi Vaahini Yojana' and seeking approval as per direction in MERC order dated 19.10.2018 in Case No. 172 of 2017.
310 of 2019
Completed
1852 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking approval for long term procurement of Baggase based co-generation power from the projects whose EPA with MSEDCL is expired / going to expire.
321 of 2019
Completed
1853 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by AMJ Land Holding Limited under Regulation 37 of MERC (Distribution Open Access) Regulations, 2016 for removal of difficulties in giving effect to the provisions of the Regulation 17.8(a) of Maharashtra Electricity Regulatory Commission (Distribution Open Access)(First Amendment) Regulations, 2019 and implementation thereof:
319 of 2019
Completed
1854 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Serum institute of India Private Limited under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
313 of 2019
Completed
1855 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
Completed
1856 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
Completed
1857 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
Completed
1858 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
Completed
1859 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
Completed
1860 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by M/s Mahabal Metals Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
307 of 2019
Completed
1861 Mon 02/12/2019 10:00:00 AM
Hearing
Petition filed by M/s Mahabal Auto Ancill Pvt. Ltd. under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
306 of 2019
Completed
1862 Fri 22/11/2019 10:00:00 AM
Hearing
Applicant Vidarbha Industries Power Limited (VIPL) seeking directions in compliance with Order dated 17.10.2019 passed by this Hon'ble Commission. M. A. No. 36 of 2019 in Case No 247 of 2019.
MA No. 41 of 2019 in Case No. 247 of 2019
Completed
1863 Fri 22/11/2019 10:00:00 AM
Hearing
Petition of Vidarbha Industries Power Limited- Generation Business (VIPL-G) for challenging the legality, validity and propriety of the Termination Letter dated 20 April 2019 issued by Adani Electricity Mumbai Limited. And All other Miscellaneous Applications.
247 of 2019
Completed
1864 Fri 22/11/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17 AND Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
Completed
1865 Fri 22/11/2019 10:00:00 AM
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
Completed
1866 Fri 22/11/2019 10:00:00 AM
Hearing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the de notification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
Reschedule with further notice
1867 Fri 22/11/2019 10:00:00 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Completed
1868 Wed 20/11/2019 10:00:00 AM
Hearing
Implementation of APTEL Judgment dated 12 May, 2008 passed in Appeal No. 3 of 2008 Appeal filed by Reliance Energy Ltd. against the Order dated 12 December, 2007 passed in MERC Case No. 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.) and Order dated 23 July, 2019 passed by Supreme Court in Appeal Noâ??s 4161 and 4423 of 2008, against the ATE Order dated 12 May, 2008 passed in Appeal No. 3 of 2008. AND Miscellaneous Application filed by The Tata Power Company Limited on 14 October, 2019 in MERC Case No 7 of 2002 (Petition filed by TPC seeking payment of dues from REL for supply of energy in terms of Principles of Agreement dated January 31, 1998 as entered into between the parties.)
7 of 2002 and MA No. 39 of 2019 in Case No. 7 of 2002
Reschedule with further notice
1869 Tue 19/11/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Reschedule
1870 Tue 19/11/2019 10:00:00 AM
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
Reschedule
1871 Tue 19/11/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the M-DNAC in violation of the order dated 12 June 2017 passed by the Honâ??ble Maharashtra Electricity Regulatory Commission in Case No. 182 of 2014 and Case No. 40 of 2015. under Regulations 15, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
283 of 2019
Reschedule
1872 Fri 15/11/2019 10:00:10 AM
Hearing
Petition filed by M/s. KRC Infrastructure and Projects Private Limited for approval of PPA and adoption of tariff under Section 63 of the Electricity Act 2003 for procurement of power up to 2 MW RTC from 00:00 to 24:00 hours for a period of six months from December 1, 2019 to May 31, 2020.
293 of 2019
Completed
1873 Fri 15/11/2019 10:00:06 AM
Hearing
Review Petition filed by ITC Limited under Section 94 of the Electricity Act, 2003 read with Regulation 85 of MERC (Conduct of Business) Regulations, 2004 of Order dated September 9, 2019 in Case No. 4 of 2019.
284 of 2019
Completed
1874 Fri 15/11/2019 10:00:04 AM
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
Completed
1875 Fri 15/11/2019 10:00:03 AM
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
Completed
1876 Fri 15/11/2019 10:00:02 AM
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
Completed
1877 Fri 15/11/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company -Distribution Business seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the MDNAC in violation of the Order dated 12 June 2017 passed by the Commission in Case No. 182 of 2014 and Case No. 40 of 2015.
283 of 2019
Completed
1878 Fri 15/11/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited - D seeking approval for adoption of Tariff discovered for Long Term Procurement of 150 MW Solar Power from Grid Connected Solar PV Projects through Competitive Bidding Process (Followed by e-Reverse Auction) for meeting the Renewable Purchase Obligation under Section 63 of the Electricity Act, 2003 read with Regulation 5 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff), 2015, Regulation 92 and 94 of MERC (Conduct of Business) Regulations, 2004.
292 of 2019
Completed
1879 Fri 15/11/2019 10:00:00 AM
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
Reschedule
1880 Fri 15/11/2019 10:00:00 AM
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
Reschedule
1881 Fri 15/11/2019 10:00:00 AM
Hearing
Petition of M/s. Ceat Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF Nasik Order dated 09/08/2019 in Case No. 94 of 2019, in the matter of refund of â??change of tariff category from HT I continuous to HT I non-continuous.
288 of 2019
5
1882 Fri 15/11/2019 10:00:00 AM
Hearing
Revision Petition of Maharashtra State Electricity Transmission Company Limited (MSETCL) under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012 against the Order passed on against the order of the Hon'ble District Collector, Nashik dated 01/10/2019, passed in 1/POL 1/4541/2019.
287 of 2019
Reschedule
1883 Thu 14/11/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Completed
1884 Thu 14/11/2019 10:00:00 AM
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
Completed
1885 Thu 14/11/2019 10:00:00 AM
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
Completed
1886 Thu 14/11/2019 10:00:00 AM
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
Completed
1887 Thu 14/11/2019 10:00:00 AM
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
Completed
1888 Thu 14/11/2019 10:00:00 AM
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
Completed
1889 Thu 14/11/2019 10:00:00 AM
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
Completed
1890 Wed 13/11/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited seeking orders quashing and setting aside a decision, dated 5 September 2019, taken by the M-DNAC in violation of the order dated 12 June 2017 passed by the Hon'ble Maharashtra Electricity Regulatory Commission in Case No. 182 of 2014 and Case No. 40 of 2015. under Regulations 15, 91 and 92 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004.
283 of 2019
Completed
1891 Wed 13/11/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Completed
1892 Wed 13/11/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 7 MW wind power from the Wind Generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003.
275 of 2019
Completed
1893 Wed 13/11/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Reorganizations of Consumer Grievance Redressal Forums (CGRFs) based on cases dealt and Geographical Vicinity.
237 of 2019
Completed
1894 Wed 13/11/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Reschedule with further notice
1895 Fri 08/11/2019 10:00:00 AM
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
Reschedule
1896 Fri 08/11/2019 10:00:00 AM
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
Reschedule
1897 Fri 08/11/2019 10:00:00 AM
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
Reschedule
1898 Fri 08/11/2019 10:00:00 AM
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
Reschedule
1899 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Shri Tradco India Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
280 of 2019
Reschedule
1900 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Sridevi Trading Company under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
279 of 2019
Reschedule
1901 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Sri Amareshwara Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
278 of 2019
Reschedule
1902 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Sri Laxmi Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
277 of 2019
Reschedule
1903 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Pragati Agencies under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
276 of 2019
Reschedule
1904 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 7 MW wind power from the Wind Generators whose EPAs with MSEDCL have expired under Section 63 of the Electricity Act, 2003.
275 of 2019
Reschedule
1905 Thu 07/11/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Reorganizations of Consumer Grievance Redressal Forums (CGRFs) based on cases dealt and Geographical Vicinity.
237 of 2019
Reschedule
1906 Thu 07/11/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Reschedule
1907 Wed 06/11/2019 10:00:00 AM
Hearing
Petition filed by Spark Green Energy (Satara) Limited under Section 86 (1) (f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/237/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner and the Respondent as valid and binding upon both parties.
282 of 2019
Completed
1908 Wed 06/11/2019 10:00:00 AM
Hearing
Petition filed by Adani Electricity Mumbai Limited for adoption of tariff for procurement of upto 350 MW grid connected Wind-Solar Hybrid Power capacity with green shoe option of additional 350 MW grid connected Wind-Solar Hybrid Power capacity on long term basis through competitive bidding process to meet the Renewable Purchase Obligation.
281 of 2019
Completed
1909 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of Pertinent Infra and Energy Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 306 of 2018.
274 of 2019
Reschedule
1910 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of Priyadarshini Polysacks Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and MSEDCL and against non-compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 305 of 2018.
273 of 2019
Reschedule
1911 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of Pristine Industries Limited under Sections 86(1)(f), 142, 146 and 149 of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Maharashtra State Electricity Distribution Company Limited (MSEDCL) and against Non-Compliance by MSEDCL of the Order dated February 11, 2019 of the Commission in Case No. 307 of 2018.
272 of 2019
Reschedule
1912 Wed 06/11/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Reschedule
1913 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
Reschedule
1914 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
Completed
1915 Wed 06/11/2019 10:00:00 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Reschedule
1916 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Bhanudas G. Raibage under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) in installation of Individual SEM.
271 of 2019
Completed
1917 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Sai Service Private Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
270 of 2019
Completed
1918 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. seeking approval for deviation from Ministry of New &Renewable Energy Guidelines for Tariff based competitive bidding to undertake the development of 552mw solar projects through Engineering Procurement and Construction (EPC) contracting route based on competitive bidding.
258 of 2019
Completed
1919 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
Completed
1920 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking). AND Intervention Application of Indian Wind Power Association - Maharashtra State Councilin Case No. 196 of 2019Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of Regulation 20 of MERC (Distribution Open Access) Regulations, 2016 (Provision of Banking) and amended Regulation 38 of MERC (Distribution Open Access) (First Amendment) Regulations, 2019 (Provision of Banking)
196 of 2019 and MA No 34 of 2019 in 196 of 2019
Completed
1921 Wed 23/10/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Reschedule
1922 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Reschedule
1923 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Reschedule
1924 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
Completed
1925 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Dr. Babasaheb Ambedkar Sahakari Sakhar Karkhana Ltd. Seeking Clarification, Modification and review of the order dated 18.07.2019 in MERC Case No. 83 of 2019 and Petition seeking punishment 142, 146 & 149 of the Electricity Act, 2003
254 of 2019
Completed
1926 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Jindal Polyfilms Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated June 29, 2018 passed by the Hon'ble Consumer Grievance Redressal Forum in Case No. CGRF / Nashik /NUC/N.R.DN./671/ 03/2018-19 (42 of 2018).
253 of 2019
Completed
1927 Wed 23/10/2019 10:00:00 AM
Hearing
Petition of Shah Promoters & Developers pertaining to denial of short term open access under the provisions of Electricity Act, 2003 more particularly Sections 86(1)(e) and 42 thereof and Electricity Act, 2003 in Gross non-compliance of the MERC (Distribution Open Access) Regulations, 2016
251 of 2019
Completed
1928 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Jathar Textile Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
269 of 2019
Completed
1929 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Balkrishna Sizing Industries under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
268 of 2019
Completed
1930 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Shri Tejas Sizers under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
267 of 2019
Completed
1931 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by B.S. Chanabasappa & Sons under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
266 of 2019
Completed
1932 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Gajanan Towers Pvt Ltd under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
265 of 2019
Completed
1933 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by S. K. Veerbhadrappa & Co. under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
264 of 2019
Completed
1934 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by Sheela Shivraj under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
263 of 2019
Completed
1935 Wed 23/10/2019 10:00:00 AM
Hearing
Petition filed by S.K. Shivraj under Section 86(e) of the Electricity Act, 2003, deliberate delay by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) in installation of Individual SEM.
262 of 2019
Completed
1936 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17 AND Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
Completed
1937 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha, Maryadit, & Others for Wrongful Rejection of Banking & Breach of D. O. A. Regulation 2016 and 2019 Amendments.
255 of 2019
Completed
1938 Fri 18/10/2019 10:00:00 AM
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
Completed
1939 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
Reschedule with further notice
1940 Fri 18/10/2019 10:00:00 AM
Hearing
Review Petition filed by Adani Power Maharashtra Ltd. under Section 94(1) (f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business), Regulation 2004 of the Order passed by Hon'ble Commission dated 06.09.2019 in Case No. 68 of 2012.
261 of 2019
Completed
1941 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of Kamal Encon Ind. Limited (Formerly KEC IND LTD) under Section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between kamal Encon Industries Limited and MSEDCL.
260 of 2019
Completed
1942 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of Azure Power Thirty Four Private Limited seeking appropriate relief on Account of Change in Law due to introduction and imposition of safeguard duty on import of solar Panel/Modules, through Notification No. 01/2018 - Custom (SG) dated 30.07.2018 issued by the Department of Revenue, Ministry of Finance Government of India, in terms of Article 9 of the Power Purchase Agreement dated 30.10.2018 executed between the Petitioner and the Respondent.
259 of 2019
Completed
1943 Fri 18/10/2019 10:00:00 AM
Hearing
Petition of M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and Maharashtra State Electricity Distribution Company Limited, seeking determination of amounts expended towards payment of Safeguard Duty and recovery thereof.
228 of 2019
Completed
1944 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
Reschedule
1945 Wed 16/10/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Reschedule
1946 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Reschedule
1947 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17 AND Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 and 170 of 2018
Reschedule
1948 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Dr. Babasaheb Ambedkar Sahakari Sakhar Karkhana Ltd. Seeking Clarification, Modification and review of the order dated 18.07.2019 in MERC Case No. 83 of 2019 and Petition seeking punishment 142, 146 & 149 of the Electricity Act, 2003
254 of 2019
Reschedule
1949 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Shah Promoters & Developers pertaining to denial of short term open access under the provisions of Electricity Act, 2003 more particularly Sections 86(1)(e) and 42 thereof and Electricity Act, 2003 in Gross non-compliance of the MERC (Distribution Open Access) Regulations, 2016
251 of 2019
Reschedule
1950 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Jindal Polyfilms Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated June 29, 2018 passed by the Hon'ble Consumer Grievance Redressal Forum in Case No. CGRF / Nashik /NUC/N.R.DN./671/ 03/2018-19 (42 of 2018).
253 of 2019
Reschedule
1951 Wed 16/10/2019 10:00:00 AM
Hearing
Petition of Spark Green Energy (Ahmednagar) Pvt. Ltd under Section 86(1)(f) of the Electricity Act, 2003 for setting aside the letter bearing ref. no. AGML/236/2019 dated 5th March 2019 issued by the Respondent to the Petitioner and declare the Energy Purchase Agreement dated 1st October 2009 entered into between the Petitioner the Respondent as valid and binding upon both parties.
252 of 2019
Reschedule
1952 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. seeking approval for deviation from Ministry of New &Renewable Energy Guidelines for Tariff based competitive bidding to undertake the development of 552mw solar projects through Engineering Procurement and Construction (EPC) contracting route based on competitive bidding.
258 of 2019
Reschedule
1953 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of 1) Netmagic Solution Pvt. Ltd. (NSPL) 2. Netmagic IT Services Pvt. Ltd. (NMIT) seeking issuance of practice direction under the MERC (Electricity Supply Code and Other Condition of Supply) Regulations, 2005 for brining uniformity in billing method for Partial Open Access Consumers among Distribution Licensees in Maharashtra.
257 of 2019
Reschedule
1954 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
Reschedule
1955 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of Shree Tatyasaheb Kore Warana Sahakari Navshakti Nirman Sanstha, Maryadit, & Others for Wrongful Rejection of Banking & Breach of D. O. A. Regulation 2016 and 2019 Amendments.
255 of 2019
Reschedule
1956 Tue 15/10/2019 10:00:00 AM
Hearing
Intervention Application of Indian Wind Power Association - Maharashtra State Council in Case No. 196 of 2019 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of Regulation 20 of MERC (Distribution Open Access) Regulations, 2016 (Provision of Banking) and amended Regulation 38 of MERC (Distribution Open Access) (First Amendment) Regulations, 2019 (Provision of Banking)
MA No. 34 of 2019 in Case No. 196 of 2019
Reschedule
1957 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
Reschedule
1958 Tue 15/10/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Reschedule
1959 Tue 15/10/2019 10:00:00 AM
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
Reschedule
1960 Tue 15/10/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
Reschedule
1961 Mon 14/10/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17. AND Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
175 of 2017 AND 170 of 2018
Reschedule
1962 Mon 14/10/2019 10:00:00 AM
Hearing
Petition of 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP for taking on record the denotification of SEZ area of 134.79 Hectares at Panvel, District Raigarh, Maharashtra and to further apprise the Commission about certain developments for seeking approval of the Commission to continue power distribution operation in the area defined under the MERC Specific Condition Regulations.
111 of 2019
Reschedule with further notice
1963 Mon 14/10/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Reschedule
1964 Mon 14/10/2019 10:00:00 AM
Hearing
Petition of Shri Dinkar Shankar Powar under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of CGRF Kolhapur Order No. 83/2018-19 dated 15 June 2019.
250 of 2019
Reschedule
1965 Fri 04/10/2019 10:00:00 AM
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86 (1)(f) of the Electricity Act, 2003 ("Act") challenging the legality, validity and propriety of the Termination Letter dated 20.04.2019 ("Termination Letter") issued by Respondent i.e. Adani Electricity Mumbai Limited ("AEML"). AND Applicant Vidarbha Industries Power Limited (VIPL) under Regulation 92 of the MERC (Conduct of Business) Regulations, 2004 read with Order 6 Rule 17 of the Civil Procedure Code, 1908.
247 of 2019 AND MA No. 36 of 2019 in Case No. 247 of 2019
Completed
1966 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of MSPL Limited under Regulation 19 of the MERC (forecasting, scheduling and deviation settlement for solar and wind generation) Regulations 2018 for removal of difficulties in giving effect to the provisions of the Regulations and implementation thereof.
256 of 2019
Completed
1967 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in various writ petitions filed by renewable energy generators.
246 of 2019
Completed
1968 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in W.P. No. 2116 of 2019.
245 of 2019
Completed
1969 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
242 of 2019
Completed
1970 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of Mahabal Metals Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
241 of 2019
Completed
1971 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
240 of 2019
Completed
1972 Tue 01/10/2019 10:00:00 AM
Hearing
239 of 2019
Completed
1973 Tue 01/10/2019 10:00:00 AM
Hearing
Petition of M/s Siddhanath Fabrics (India) Private Limited for non Compliance of CGRF Order, Kolhapur Division Order in Case No 52(2018-19) dated 04.04.2019.
238 of 2019
Completed
1974 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of M/s. Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for long term procurement of bagasse based co- generation power through competitive bidding from the projects whose EPA with MSEDCL is expired/going to expire, for meeting non-solar RPO target.
248 of 2019
Completed
1975 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in various writ petitions filed by renewable energy generators.
246 of 2019
Reschedule
1976 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited under Regulation 18 read with Regulation 19 of the MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulations, 2018 ("F&S Regulations") on behalf of Petitioner for amendment of the F&S Regulations on the ground that certain provisions of the same are ultra vires and/or inconsistent with the Electricity Act 2003 and other regulations passed by this Hon'ble Commission, and also in furtherance of the liberty granted by the Hon'ble Bombay High Court vide its order dated 21.08.2019 passed in W.P. No. 2116 of 2019.
245 of 2019
Reschedule
1977 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
242 of 2019
Reschedule
1978 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of Mahabal Metals Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
241 of 2019
Reschedule
1979 Mon 30/09/2019 10:00:00 AM
Hearing
Petition of Mahabal Auto Ancillaries Private Limited (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
240 of 2019
Reschedule
1980 Mon 30/09/2019 10:00:00 AM
Hearing
Petition filed by M/s Pranavaditya Spinning Mills Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of the Hon'ble Commission dated 1 November 2018 in Case No. 213 of 2018.
234 of 2019
Completed
1981 Mon 30/09/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited under Section 42 (2), 61 (b), 61 (c), 61 (d), 61 (f), 61 (h), 66, 86 (1) (e), 86 (3) of the Electricity Act 2003 to take suitable steps for the protection of Small Wind Energy Generators by providing for a suitable banking mechanism.
229 of 2019
Reschedule
1982 Mon 30/09/2019 10:00:00 AM
Hearing
Petition filed by Shri. Vitthal Manaji Dabre against Maharashtra State Electricity Distribution Company Limited for non-compliance of the Consumer Grievance Redressal Forum, Akola Case No 05/2019. CGRF/AKZ/AKOLA/70 dated 29/03/2019.
175 of 2019
Completed
1983 Mon 30/09/2019 10:00:00 AM
Hearing
Petition filed by Shri. Sachin Prahlad Dhule against Maharashtra State Electricity Distribution Company Limited for non-compliance of Electricity Ombudsman, Nagpur Case No 93/2018. No. EO/NGP/458/2018 dated 27/02/2019.
174 of 2019
Completed
1984 Mon 30/09/2019 10:00:00 AM
Hearing
Petition filed by M/s Indo Count Industrial Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of the Hon'ble Commission dated 1 November 2018 in Case No. 212 of 2018.
233 of 2019
Completed
1985 Thu 26/09/2019 10:00:00 AM
Hearing
Petition of S. R. Thorat Milk Products Private Limited for adjudication of dispute between a Renewable Energy Generator and Distribution Licensee.
199 of 2019
Completed
1986 Thu 26/09/2019 10:00:00 AM
Hearing
Petitioner of Modern India Limited for adjudication of dispute between a Solar Energy Generator (Petitioner) and Trading Licensee (GEPL) under Section 86 (1) (f) of the Electricity Act, 2003.
182 of 2019
Completed
1987 Thu 26/09/2019 10:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of the compensation under "Change in law" on account of introduction of Safeguard Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
Completed
1988 Thu 26/09/2019 10:00:00 AM
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86 (1)(f) of the Electricity Act, 2003 ("Act") challenging the legality, validity and propriety of the Termination Letter dated 20.04.2019 ("Termination Letter") issued by Respondent i.e. Adani Electricity Mumbai Limited ("AEML").
247 of 2019
Completed
1989 Thu 19/09/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligation under Section 63 of the Electricity Act 2003.
243 of 2019
Completed
1990 Thu 19/09/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for seeking approval for modification of clauses in the PPA executed between successful bidders and MSEDCL regarding grid connectivity, for procurement of 500 MW wind power through competitive bidding process
235 of 2019
Completed
1991 Thu 19/09/2019 10:00:00 AM
Hearing
Petition of Vidarbha Industries Power Limited (VIPL) for seeking clarification on netting off the energy drawn by the generator with the energy injected into the grid for the power plant having section 62 PPA with the Distribution Licensee.
232 of 2019
Completed
1992 Wed 18/09/2019 10:00:02 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Order for securing compliance for excess ASC charged for consumer bearing No. 073759015370 by MSEDCL for period from 01-05-2007 to 31-07-2008.
227 of 2019
Completed
1993 Wed 18/09/2019 10:00:01 AM
Hearing
Petition filed by M/s MITC Rolling Mills Private Limited Order for securing compliance for excess ASC charged for consumer bearing No. 073039016990 by MSEDCL for period from 01-05-2007 to 31-07-2008.
226 of 2019
Completed
1994 Wed 18/09/2019 10:00:00 AM
Hearing
Petition of Shree Sushma Ferrous Alloys Pvt. Ltd. & 12 Others under Section 142 & 146 of the Electricity Act 2003 seeking orders directing against MSEDCL for Non-compliance of Order dated 9 August, 2004 of the Commission in the matter of Case No.6 of 2004.
164 of 2019
Completed
1995 Tue 17/09/2019 10:00:05 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86(1)(k) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations, 2004 for determination of the user Fees in respect of dedicated transmission system and for adjudication of issues thereof.
292 of 2018
Completed
1996 Tue 17/09/2019 10:00:03 AM
Hearing
Petition of Mrs. Geetha Pundaleeka against Maharashtra State Electricity Distribution Company Limited for non-compliance of common Order dated 09.10.2019 in Case No. 262 of 2018.
197 of 2019
Completed
1997 Tue 17/09/2019 10:00:02 AM
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
Completed
1998 Tue 17/09/2019 10:00:01 AM
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non- Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
Completed
1999 Tue 17/09/2019 10:00:00 AM
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
Completed
2000 Tue 17/09/2019 10:00:00 AM
Hearing
Petition of S. R. Thorat Milk Products Private Limited for adjudication of dispute between a Renewable Energy Generator and Distribution Licensee.
199 of 2019
Reschedule
2001 Mon 16/09/2019 10:00:08 AM
Hearing
Petition of M/s. Adani Renewable Energy (RJ) Limited under Section 86(1)(b) and Section 86(1)(f) of the Electricity Act, 2003 read with Article 9 of the Power Purchase Agreement dated 27.07.2018, executed between Adani Renewable Energy (RJ) Limited and Maharashtra State Electricity Distribution Company Limited, seeking determination of amounts expended towards payment of Safeguard Duty and recovery thereof.
228 of 2019
Completed
2002 Mon 16/09/2019 10:00:05 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Pvt Ltd under Section 142 and section 149 of the Electricity Act, 2003 for non compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 28 January,2019 by MSEDCL
158 of 2019
Completed
2003 Mon 16/09/2019 10:00:04 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for Removal of Difficulties regarding Procurement of Solar Power Generation under the Mechanism of "Flexibility in Generation and Scheduling of Thermal Power Stations to Reduce Emissions" Issued on 5th April 2018 by Ministry of Power and under the approved Power Purchase Agreement dated 01.04.2009 executed by Mahagenco with Mahadiscom in Maharashtra, Under Section 62 of the Electricity Act 2003 and Section 102 of the MERC (Multi Year Tariff) Regulations, 2015
121 of 2019
Completed
2004 Mon 16/09/2019 10:00:03 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
Completed
2005 Mon 16/09/2019 10:00:02 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
Completed
2006 Mon 16/09/2019 10:00:01 AM
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
Completed
2007 Mon 16/09/2019 10:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of the compensation under "Change in law" on account of introduction of Safeguard Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
Reschedule
2008 Mon 16/09/2019 10:00:00 AM
Hearing
Petitioner of Modern India Limited for adjudication of dispute between a Solar Energy Generator (Petitioner) and Trading Licensee (GEPL) under Section 86 (1) (f) of the Electricity Act, 2003.
182 of 2019
Reschedule
2009 Thu 05/09/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
Reschedule
2010 Wed 04/09/2019 10:00:00 AM
Hearing
Revised Petition of Maharashtra State Power Generation Company Limited (MSPGCL) in Case No. 172 of 2018 in the matter of compliance to directives regarding development of allotted coal block in order dated 14.12.2017 in Case no. 59 of 2017.
231 of 2019
Reschedule
2011 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) towards compliance to directives in Order dated 27.03.2018 in Case No. 42 of 2017 & Order dated 01.08.2018 in Case No. 154 of 2018 in reference to the 2 x 660 MW replacement units proposed at Koradi against older units due for retirement, under provisions of Electricity Act, 2003 and part E of MERC MYT regulations, 2015.
230 of 2019
Reschedule
2012 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18. AND Miscellaneous Applications field in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
170 of 2018 AND MA Nos. 13, 14, 18, 20, 22, 24, 27, 28 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2013 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17. AND Miscellaneous Applications of filed in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
175 of 2017 AND MA No. 12, 15, 17, 19, 21, 23, 29 and 30 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2014 Wed 04/09/2019 10:00:00 AM
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86(1)(b) read with Article 15.3 of the Power Purchase Agreement (PPA) dated 14.08.2013 for approval of Amendment Agreement of power Purchase Agreement between the Petitioner and the Respondent with regard to passing of discount in tariff to the consumers for the balance period of the PPA as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India" ("Shakti Policy")
225 of 2019
Reschedule
2015 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of M/s. Bengal Cardboard Industries & Printers Pvt. Ltd against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
171 of 2019
Reschedule
2016 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of M/s. Silverline Investment Company Pvt. Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
170 of 2019
Reschedule
2017 Wed 04/09/2019 10:00:00 AM
Hearing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
169 of 2019
Reschedule
2018 Fri 30/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra Airport Development Company Limited under Section 86 read with Section 61 of the Electricity Act, 2003 read with 'Guidelines for shortterm (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India seeking consent of the Hon'ble Commission to select the single bidder under the Tender floated by MADC pursuant to the Order of this Hon'ble Commission passed under Case No. 165of 2019dated 19.07.2019 for procurement of the Short Term Power for the period of one year commencing from 01.09.2019 to 31.08.2020.
244 of 2019
Completed
2019 Fri 30/08/2019 10:00:00 AM
Hearing
Revised Petition of Maharashtra State Power Generation Company Limited (MSPGCL) in Case No. 172 of 2018 in the matter of compliance to directives regarding development of allotted coal block in order dated 14.12.2017 in Case no. 59 of 2017.
231 of 2019
Completed
2020 Fri 30/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) towards compliance to directives in Order dated 27.03.2018 in Case No. 42 of 2017 & Order dated 01.08.2018 in Case No. 154 of 2018 in reference to the 2 x 660 MW replacement units proposed at Koradi against older units due for retirement, under provisions of Electricity Act, 2003 and part E of MERC MYT regulations, 2015.
230 of 2019
Completed
2021 Fri 30/08/2019 10:00:00 AM
Hearing
Petitioner Vidarbha Industries Power Limited (VIPL) under Section 86(1)(b) read with Article 15.3 of the Power Purchase Agreement (PPA) dated 14.08.2013 for approval of Amendment Agreement of power Purchase Agreement between the Petitioner and the Respondent with regard to passing of discount in tariff to the consumers for the balance period of the PPA as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India" ("Shakti Policy")
225 of 2019
Completed
2022 Fri 30/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016 and MERC (Distribution Open Access) (first amendment) Regulations, 2019, (provision of banking).
196 of 2019
Completed
2023 Fri 23/08/2019 10:00:02 AM
Hearing
Petition of Shree Sushma Ferrous Alloys Pvt. Ltd. & 12 Others under Section 142 & 146 of the Electricity Act 2003 seeking orders directing against Respondents for Non-compliance of Order dated 9.8.2004 of the Hon'ble Commission in the matter of Case No.6 of 2004.
164 of 2019
Completed
2024 Fri 23/08/2019 10:00:01 AM
Hearing
163 of 2019
Completed
2025 Fri 23/08/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Completed
2026 Fri 23/08/2019 10:00:00 AM
Hearing
Petition of M/s Team Ferro Alloys Pvt Ltd under Section 86 (1) (b) & (f) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations 2004 in compliance to the directions given by the Commission in the Order dated 12 July, 2018 in Case No. 84 of 2015 inter alia seeking approval of the Commission for renewal of EPA as per previous terms and conditions and tariff determined by the Hon'ble MERC in the said order.
55 of 2019
Completed
2027 Fri 23/08/2019 10:00:00 AM
Hearing
Petition of Shri. Mohammad Sajid Haji Sardar for execution of the CGRF Kalyan's Order dated 10 October, 2018 by MSEDCL.
130 of 2019
Completed
2028 Fri 23/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of additional 300 MW Solar power from M/S EESL on long term basis from ground mounted solar power projects proposed to be set up in the premises of existing MSEDCL/MSETCL substations/Govt. & Grampanchayat lands for fulfillment of MSEDCL's Solar RPO Target.
198 of 2019
Completed
2029 Fri 23/08/2019 10:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd. for approval and determination of the compensation under "Change in law" on account of introduction of Safeguard Duty for 150 MW Solar Project at Village-Vairag.
166 of 2019
Reschedule
2030 Fri 23/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company in review petition in respect of MERC's order in Case No. 64 of 2019, MSEDCL seeking approval for adoption of tariff discovered for Long term procurement of 1170 MW solar power under "Mukhyamantri saur Krishi Vahini Yojana" for meeting the solar Renewable Purchase Obligation under section 63 & 94 (1) (f) of the electricity act, 2003.
168 of 2019
Reschedule
2031 Thu 22/08/2019 10:00:00 AM
Hearing
Petition filed by Mytrah Vayu (Vedavati) Pvt. Ltd. for the grant of extension of time to complete financial closure under the Power Purchase Agreement 16 July 2018 entered between the Petitioner and Maharashtra State Electricity Distribution Co. Ltd. for its 100 MW wind power project.
131 of 2019
Completed
2032 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sridevi Trading Company (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
224 of 2019
Completed
2033 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sridevi Trading Company under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
223 of 2019
Completed
2034 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Gajanan Towers Pvt Ltd under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
222 of 2019
Completed
2035 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Rama Handicrafts under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
221 of 2019
Completed
2036 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Vanke Bihari Construction Pvt Ltd under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
220 of 2019
Completed
2037 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sree Veerbhadreshwara Rice & Flour Mill under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
219 of 2019
Completed
2038 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. C. And Sons under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
218 of 2019
Completed
2039 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shri Charbhuja Sales Corporation (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
217 of 2019
Completed
2040 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shri Amareshwara Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
216 of 2019
Completed
2041 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sri Laxmi Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
215 of 2019
Completed
2042 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Ushahkal Nursing Home under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
214 of 2019
Completed
2043 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of S. K. Veerabhadrappa & Co under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
213 of 2019
Completed
2044 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shri. Charbhuja Sales Corporation under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
212 of 2019
Completed
2045 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. S. Channabasappa & Sons (Sangli) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
211 of 2019
Completed
2046 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. S. Channabasappa & Sons under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
210 of 2019
Completed
2047 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Vandana Textiles (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
209 of 2019
Completed
2048 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Pragati Agencies (Satara) under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
208 of 2019
Completed
2049 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Vandana Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
207 of 2019
Completed
2050 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Umang Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
205 of 2019
Completed
2051 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Pragati Agencies under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
204 of 2019
Completed
2052 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. C. Shivakumar under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
203 of 2019
Completed
2053 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of BSC Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
202 of 2019
Completed
2054 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. C. Chandrashekar under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
201 of 2019
Completed
2055 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. C. Umapathy under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
200 of 2019
Completed
2056 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Ankur Textiles under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
206 of 2019
Completed
2057 Thu 22/08/2019 10:00:00 AM
Hearing
Joint Petitioner's of Maharashtra State Power Generation Co. Ltd. and Maharashtra State Electricity Distribution Co. Ltd. in regards to seeking approval for adoption of Tariff Rate of Rs. 3.10/Kwh for 7 MW Solar Power Plant Set Up Under 'Mukhyamantri Saur Krishi Vaahini Yojana' and Seeking Approval for for Modifications to the Draft PSA & PPA for the projects undertaken through EOI bidding process.
184 of 2019
Completed
2058 Thu 22/08/2019 10:00:00 AM
Hearing
Amended Petition filed by Maharashtra State Power Generation Co. Ltd in Case No. 112 of 2019 for seeking approval for adoption of tariff of long term procurement of 252 MW out of approved 302 MW solar power through MSPGCL from the solar projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA under section 63 and 86(1)(a) of the Electricity Act 2003.
112 of 2019
Completed
2059 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Balkrishna Sizing Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
194 of 2019
Completed
2060 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Jathar Textile Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
193 of 2019
Completed
2061 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Harshita Sales Corporation under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
192 of 2019
Completed
2062 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of M/s Vaanya Resources under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
191 of 2019
Completed
2063 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Balkrishna Sizing Industries under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
190 of 2019
Completed
2064 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Jathar Textile Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof
189 of 2019
Completed
2065 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Raysons Marketing Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
188 of 2019
Completed
2066 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shree Tejas Sizers under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
187 of 2019
Completed
2067 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sai Services Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
186 of 2019
Completed
2068 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of B. G. Raibage under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
185 of 2019
Completed
2069 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shri Gajlaxmi Industries HUF under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
181 of 2019
Completed
2070 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of S.K Shivaraj under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
180 of 2019
Completed
2071 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sheela Shivaraj under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
179 of 2019
Completed
2072 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Sun Irrigation System Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
178 of 2019
Completed
2073 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Shivashri Techno Homes Private Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
177 of 2019
Completed
2074 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of S. K. Parik under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
176 of 2019
Completed
2075 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of AMJ Land Holdings Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
173 of 2019
Completed
2076 Thu 22/08/2019 10:00:00 AM
Hearing
Petition of Bajaj Finserv Limited under Regulation 19 of MERC (Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation) Regulation, 2018 for removal of difficulties in giving effect to the provision of the Regulation and implementation thereof.
172 of 2019
Completed
2077 Wed 21/08/2019 10:00:00 AM
Hearing
Petition of M/s. Bengal Cardboard Industries & Printers Pvt. Ltd against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
171 of 2019
Completed
2078 Wed 21/08/2019 10:00:00 AM
Hearing
Petition of M/s. Silverline Investment Company Pvt. Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
170 of 2019
Completed
2079 Wed 21/08/2019 10:00:00 AM
Hearing
Petition of M/s. Vostok (Fareast) Securities Pvt Ltd. against the Maharashtra State Electricity Distribution Co. Ltd for failing to comply with the orders and directions passed by the Commission vide Common Order dated 01.01.2019, passed in Case Nos. 229 of 2018, 230 of 2018, 231 of 2018, 256 of 2018 and 293 of 2018 2018 in favour of the Petitioners.
169 of 2019
Completed
2080 Wed 21/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for procurement of 500 MW flexible and schedulable power from renewable energy sources with energy storage facility on Long Term basis for 25 years from renewable sources and approval of Tender Documents.
167 of 2019
Completed
2081 Wed 21/08/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Completed
2082 Wed 21/08/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
Completed
2083 Wed 21/08/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
Reschedule with further notice
2084 Wed 21/08/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
Reschedule with further notice
2085 Tue 20/08/2019 10:00:01 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for allowing investment in contingency reserves which could not be invested earlier due to precarious financial position under regulation 34 of the MERC (Multi Year Tariff) Regulations 2015.
160 of 2019
Completed
2086 Tue 20/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for short term procurement of power from captive power plants (conventional) under section 62 and 86 (1) (b), (e) of the Electricity Act, 2003.
183 of 2019
Completed
2087 Tue 20/08/2019 10:00:00 AM
Hearing
Subject: Petition filed by The Tata Power Company Limited of Floor- wise Metering in High Rise Buildings. AND Intervention Applications of Adani Electricity Mumbai Limited (Distribution)
61 of 2019 AND MA No. 11 of 2019 in Case No. 61 of 2019 61 of 2019
Completed
2088 Tue 20/08/2019 10:00:00 AM
Hearing
Petition of Urjankur Shree Tatyasaheb Kore Warana Power Company Limited to seek directions against Maharashtra State Electricity Distribution Co Ltd for non-compliance of the RE Tariff provisions and the EPA provision.
159 of 2019
Completed
2089 Tue 20/08/2019 10:00:00 AM
Public Hearing
Inviting Objections/ Comments on Maharashtra Airport Development Company Limited (MADC)'s Petition for Distribution business, including True Up for FY 2014-15, FY 2015-16 as per MERC (Multi Year Tariff) Regulations, 2011, Provisional True Up for FY 2016-17 to FY 2018-19 and ARR and Tariff for FY 2019-20 as per MERC (Multi Year Tariff), Regulations, 2015 and its Amendments (Case No. 96 of 2017)
96 of 2017
Completed
2090 Mon 19/08/2019 10:00:00 AM
Hearing
Petition filed by M/s Classic Marble Company Pvt. Ltd. for Non Compliance of the order dated 28.09.2018 in Case No. 128 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC)
128 of 2019
Completed
2091 Mon 19/08/2019 10:00:00 AM
Hearing
Petition filed by M/s Relishah Export for Non Compliance of the Order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC).
127 of 2019
Completed
2092 Mon 19/08/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
Completed
2093 Mon 19/08/2019 10:00:00 AM
Hearing
Petition of Sri Amareshwara Industries under Section 142 & 146 of Electricity Act 2003 for wrongful cancellation of STOA permission.
161 of 2019
Completed
2094 Mon 19/08/2019 10:00:00 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Pvt Ltd under Section 142 and section 149 of the Electricity Act, 2003 for non compliance of the Consumer Grievance Redressal Forum, Kolhapur's Order dated 28 January,2019 by MSEDCL
158 of 2019
Reschedule with further notice
2095 Mon 19/08/2019 10:00:00 AM
Hearing
Petition of Mrs. Aishwarya Rai Bachchan for non compliance of the Order dated 04.01.2019 in Case No. 256 of 2018 passed by this Hon'ble Commission directing the Respondent to make the payment of delayed payment charges (DPC).
157 of 2019
Completed
2096 Mon 19/08/2019 10:00:00 AM
Hearing
Petition of M/s Bhabani Pigments Pvt. Limited for Non Compliance of the order dated 04.01.2019 in Case No. 293 of 2018 passed by this Hon'ble Commission directing the Respondent to make the payment of delayed payment charges. (DPC)
155 of 2019
Completed
2097 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
Completed
2098 Fri 09/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019 AND Intervention Application filed by Sun-N-Sand Hotels Pvt Ltd in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019 AND MA No. 16 of 2019 in Case No. 103 of 2019
Completed
2099 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
Completed
2100 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by M/s Aquapharm Chemicals Private Limited under Section 86 (1) (f), Section 142 with Section 42(2) and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for non-compliance of the order dated 05/04/2019 in the grant of open access and seeking damages for wrongful denial of Open Access.
139 of 2019
Completed
2101 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by M/s. Peethambra Granites Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
138 of 2019
Completed
2102 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by Siddhayu Ayurvedic Research Foundation Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
137 of 2019
Completed
2103 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by Liberty Oil Mills Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Liberty Oil Mills Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
133 of 2019
Completed
2104 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by Ghatge Patil Industries Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
132 of 2019
Completed
2105 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
Completed
2106 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
Completed
2107 Fri 09/08/2019 10:00:00 AM
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
Completed
2108 Thu 08/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra Airport Development Company for approval and direction under section 86 of the Electricity Act, 2003 read with 'Guidelines for short term (i.e. for a period of more than one day to one year) Procurement of power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India.
165 of 2019
Completed
2109 Thu 08/08/2019 10:00:00 AM
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
Completed
2110 Thu 08/08/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
Completed
2111 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
Completed
2112 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
Completed
2113 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
Completed
2114 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
Completed
2115 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
Completed
2116 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
Completed
2117 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
Completed
2118 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
Completed
2119 Thu 08/08/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Completed
2120 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
Completed
2121 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
Completed
2122 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
Completed
2123 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
Completed
2124 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
Completed
2125 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
Completed
2126 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
Completed
2127 Thu 08/08/2019 10:00:00 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
Completed
2128 Thu 08/08/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units (III & IV) for the financial year 2016 -17.
175 of 2017
Completed
2129 Wed 07/08/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company in review petition in respect of MERC's order in Case No. 64 of 2019, MSEDCL seeking approval for adoption of tariff discovered for Long term procurement of 1170 MW solar power under "Mukhyamantri saur Krishi Vahini Yojana" for meeting the solar Renewable Purchase Obligation under section 63 & 94 (1) (f) of the electricity act, 2003.
168 of 2019
Completed
2130 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by M/s. New Steel Trading Pvt. Ltd. seeking clarification of the Hon'ble Commission in respect of the Applicability and interpretation of Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014 (SOP Regulations).
152 of 2019
Completed
2131 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
Completed
2132 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
5
2133 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by Murlidhar Shriram Bagav against Maharashtra State Electricity Distribution Company Limited for non-compliance of the order of CGRF Ratnagiri bearing No.9/2018.
135 of 2019
Completed
2134 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by Yashwant Krishna Wareshi against Maharashtra State Electricity Distribution Company Limited for Non-Compliance of the CGRF order Ratnagiri bearing No.1/2019.
134 of 2019
Completed
2135 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by Yatin Prakash Gupte against Maharashtra State Electricity Distribution Co Ltd for non-compliance with order of CGRF Ratnagiri dated 25.01.2019.
122 of 2019
Completed
2136 Wed 07/08/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308 of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA.
112 of 2019
Completed
2137 Tue 06/08/2019 10:00:05 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Completed
2138 Tue 06/08/2019 10:00:04 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane Order coved by Letter dated 17.6.2002. (The bills issued since July, 1998 till 18.11.2001 were quashed and MSEB was directed to issue revise bill. (Faulty meter)
150 of 2019
Completed
2139 Tue 06/08/2019 10:00:03 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane, Order dated 2.6.2003 all bills issued since January, 1999 to January, 2002 were quashed and directed to issue revised bills (meter showing zero consumption) average bill issue.
149 of 2019
Completed
2140 Tue 06/08/2019 10:00:02 AM
Hearing
Appeal filed by Vanaz Engineers Limited against the Electrical Inspector (EI) Pune, Order dated 11.9.2002 in Dispute No. 4 of 1999 for refund of excess bill charged as the Order was in favor of the Appellant, Pune Order dated 11.9.2002 (Issue on CT ratio bill for period of 6 months preceding 6.2.1992 on the basis CT ratio of 12.5/5 Amps. Billing issue since 1984) The Appellant has filed an application for condonation of delay in filing appeal.
148 of 2019
Completed
2141 Tue 06/08/2019 10:00:01 AM
Hearing
Application filed by Shri Rama Krishna Flour & Besan Mills Pvt. Ltd., to Government of Maharashtra, Industries, Energy and Labour Department, to allow to avail the scheme of Amnesty, 2018 for waiver of 100% DPC, Interest, after giving sufficient notice time to deposit the arrears.
147 of 2019
Completed
2142 Tue 06/08/2019 10:00:00 AM
Hearing
Petition filed by Indian Railways for issuing specific conditions with regard to distribution activities of Indian Railways as deemed distribution licensee.
154 of 2019
Completed
2143 Tue 06/08/2019 10:00:00 AM
Hearing
Petition filed by M/s Jindal Polyfilms Ltd seeking punishment for the Non Compliance of the Open Access Regulations and practice directions issued dated 08.03.2017 issued by the Maharashtra Electricity Regulations by the MSEDCL.
153 of 2019
Completed
2144 Tue 06/08/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Nagpur Order dated 26.8.2002. (M/s Paras Pulses, Nagpur, Appeal filed by MSEB on 22.11.2002, Issue - 66 HP load sanctioned but found using 68 HP load EI decided in favor of consumer)
146 of 2019
Completed
2145 Thu 25/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No. 68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
Reschedule
2146 Thu 25/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
Reschedule
2147 Thu 25/07/2019 10:00:00 AM
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
Reschedule
2148 Thu 25/07/2019 10:00:00 AM
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
Reschedule
2149 Wed 24/07/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector Order dated 11.9.2002 (As the bill was quashed and directed to issue revised bill for month of June- July 2000 dispute period 4.3.2000 to 31.7.2000).
151 of 2019
Reschedule
2150 Wed 24/07/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane Order coved by Letter dated 17.6.2002. (The bills issued since July, 1998 till 18.11.2001 were quashed and MSEB was directed to issue revise bill. (Faulty meter)
150 of 2019
Reschedule
2151 Wed 24/07/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Thane, Order dated 2.6.2003 all bills issued since January, 1999 to January, 2002 were quashed and directed to issue revised bills (meter showing zero consumption) average bill issue.
149 of 2019
Reschedule
2152 Wed 24/07/2019 10:00:00 AM
Hearing
Appeal filed by Vanaz Engineers Limited against the Electrical Inspector (EI) Pune, Order dated 11.9.2002 in Dispute No. 4 of 1999 for refund of excess bill charged as the Order was in favor of the Appellant, Pune Order dated 11.9.2002 (Issue on CT ratio bill for period of 6 months preceding 6.2.1992 on the basis CT ratio of 12.5/5 Amps. Billing issue since 1984) The Appellant has filed an application for condonation of delay in filing appeal.
148 of 2019
Reschedule
2153 Wed 24/07/2019 10:00:00 AM
Hearing
Application filed by Shri Rama Krishna Flour & Besan Mills Pvt. Ltd., to Government of Maharashtra, Industries, Energy and Labour Department, to allow to avail the scheme of Amnesty, 2018 for waiver of 100% DPC, Interest, after giving sufficient notice time to deposit the arrears.
147 of 2019
Reschedule
2154 Wed 24/07/2019 10:00:00 AM
Hearing
Appeal filed by Maharashtra State Electricity Company Ltd. formerly known as MSEB against Electrical Inspector (EI) Nagpur Order dated 26.8.2002. (M/s Paras Pulses, Nagpur, Appeal filed by MSEB on 22.11.2002, Issue - 66 HP load sanctioned but found using 68 HP load EI decided in favor of consumer.)
146 of 2019
Reschedule
2155 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by SEP Energy Private Limited against Maharashtra State Electricity Distribution Co. Ltd for rejecting the Open Access Application, of the Petitioner due to non-availability/installation of Individual Special Energy Meters (hereinafter "SEMs").
140 of 2019
Reschedule
2156 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by M/s Aquapharm Chemicals Private Limited under Section 86 (1) (f), Section 142 with Section 42(2) and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for non-compliance of the order dated 05/04/2019 in the grant of open access and seeking damages for wrongful denial of Open Access.
139 of 2019
Reschedule
2157 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by M/s. Peethambra Granites Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
138 of 2019
Reschedule
2158 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by Siddhayu Ayurvedic Research Foundation Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute regarding arbitrary denial of Short Term Open Access for the month of June, 2019 by MSEDCL to Petitioner who is a "Wind Energy Generator" in the State of Maharashtra.
137 of 2019
Reschedule
2159 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by Liberty Oil Mills Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Liberty Oil Mills Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
133 of 2019
Reschedule
2160 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by Ghatge Patil Industries Limited under Section 42, Section 86(1)(e) and Section 86(1)(f) of the E A, 2003 read with MERC (Distribution Open Access) Regulations, 2016 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Co. Ltd (Short Term Open Access)
132 of 2019
Reschedule
2161 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
Reschedule
2162 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
Reschedule
2163 Tue 23/07/2019 10:00:00 AM
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
Reschedule
2164 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. seeking review of Hon'ble Commission order dated 16.01.2019 in Case No. 278 of 2018 in the matter of Miscellaneous Application in Case No. 220 of 2014 in the matter of section 86 (1) (E) of the Electricity Act, 2003 and Suggestive Promotional Measures as called for by the order dated 2 May, 2018
145 of 2019
Reschedule
2165 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Shri. Govindrao Prithviraj Potdar against Maharashtra State Electricity Distribution Co Ltd for non-compliance of CGRF order case no 42/2018-19/20,dated 28.01.2019
144 of 2019
Reschedule
2166 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by M/s. National Stone Crusher against Maharashtra State Electricity Distribution Co Ltd for Non-Compliance of CGRF Akola Zone Order in Complaint No 13 of 2019 Order dated 21.05.2019 and Non-Release of new connection thereof in the matter M/s National Stone Crusher Medshi Tq. Malegaon Dist. Washim.
143 of 2019
Reschedule
2167 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Murlidhar Shriram Bagav against Maharashtra State Electricity Distribution Company Limited for non-compliance of the order of CGRF Ratnagiri bearing No.9/2018.
135 of 2019
Reschedule
2168 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Yashwant Krishna Wareshi against Maharashtra State Electricity Distribution Company Limited for Non-Compliance of the CGRF order Ratnagiri bearing No.1/2019.
134 of 2019
Reschedule
2169 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Yatin Prakash Gupte against Maharashtra State Electricity Distribution Co Ltd for non-compliance with order of CGRF Ratnagiri dated 25.01.2019.
122 of 2019
Reschedule
2170 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
Reschedule
2171 Mon 22/07/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
Reschedule
2172 Thu 18/07/2019 10:00:00 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Reschedule
2173 Wed 17/07/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
28 of 2019
Reschedule
2174 Wed 17/07/2019 10:00:00 AM
Hearing
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Honâ??ble commissionâ??s interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
MA No. 05 of 2019 in Case No. 25 of 2019
Reschedule
2175 Wed 17/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committeeâ??s Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019
Reschedule
2176 Wed 17/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
Reschedule
2177 Wed 17/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule
2178 Tue 16/07/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Reschedule with further notice
2179 Tue 16/07/2019 10:00:00 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Reschedule
2180 Tue 16/07/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
Reschedule
2181 Mon 15/07/2019 10:00:00 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Completed
2182 Mon 15/07/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
28 of 2019
Completed
2183 Mon 15/07/2019 10:00:00 AM
Hearing
Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble Commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
MA No. 05 of 2019 in Case No. 25 of 2019
Completed
2184 Mon 15/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019
Completed
2185 Mon 15/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
Completed
2186 Mon 15/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Completed
2187 Mon 15/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No. 68 of 2012 & MA No. 25 of 2019 in Case No. 68 of 2012
Completed
2188 Fri 12/07/2019 10:00:05 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
Reschedule with further notice
2189 Fri 12/07/2019 10:00:00 AM
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
Completed
2190 Fri 12/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
Completed
2191 Fri 12/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09 April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Completed
2192 Fri 12/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 27 March, 2019 in Appeal No. 354 of 2017 filed by JSW Energy Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 23 August, 2017 in Case No. 117 of 2016 (Petition of JSW Energy Ltd. for revision in Tariff on account of Changes in Law under PPA dated 23.2.2010 with Maharashtra State Electricity Distribution Co. Ltd.)
117 of 2016
Completed
2193 Thu 11/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking approval for Quantum and deviations sought in the Bidding Documents, as compared to the standard bidding documents notified by Ministry of Power, Government of India, for Long Term Procurement (25 years) of 150 MW capacity from grid connected solar PV projects through competitive bidding process for meeting the Renewable Purchase Obligations.
136 of 2019
Completed
2194 Thu 11/07/2019 10:00:00 AM
Hearing
Petition of Shri. Mohammad Sajid Haji Sardar regarding non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order dtd.10.10.2018 in Grievance No.1686 of 2017-18 of CGRF, Kalyan.
130 of 2019
Reschedule with further notice
2195 Wed 10/07/2019 10:00:11 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
Reschedule with further notice
2196 Wed 10/07/2019 10:00:10 AM
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308 of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana' and for modification to the approved draft PSA.
112 of 2019
Reschedule
2197 Wed 10/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking approval for deviation in bidding document from MOP guidelines for Long Term Procurement of Solar Power under "Mukhyamantri Saur Krishi Vaahini Yojana" with 2 to 10 MW capacity projects connected to distribution network with total quantum of 184 MW (50 MW each for western Maharashtra, Northern Maharashtra and Marathwada region and 34 MW for Vidarbha Region) through competitive bidding (E- Reverse Auction).
141 of 2019
Completed
2198 Wed 10/07/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
Completed
2199 Wed 10/07/2019 10:00:00 AM
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patilunder Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
Completed
2200 Wed 10/07/2019 10:00:00 AM
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for non-compliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
Completed
2201 Tue 09/07/2019 10:00:00 AM
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
Completed
2202 Tue 09/07/2019 10:00:00 AM
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commission's order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
Completed
2203 Tue 09/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019. AND Intervention Application filed by Sun-N-Sand Hotels Pvt Ltd in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019 AND MA No. 16 of 2019 in Case No. 103 of 2019
Completed
2204 Tue 09/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
Completed
2205 Tue 09/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
Completed
2206 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2207 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2208 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2209 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2210 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2211 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2212 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2213 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2214 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2215 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2216 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2217 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2218 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2219 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2220 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2221 Mon 08/07/2019 10:00:10 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2222 Mon 08/07/2019 10:00:10 AM
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
Reschedule with further notice
2223 Mon 08/07/2019 10:00:00 AM
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
Completed
2224 Mon 08/07/2019 10:00:00 AM
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
Completed
2225 Mon 08/07/2019 10:00:00 AM
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
Completed
2226 Fri 05/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
Reschedule with further notice
2227 Fri 05/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking approval for Quantum and deviations sought in the Bidding Documents, as compared to the standard bidding documents notified by Ministry of Power, Government of India, for Long Term Procurement (25 years) of 150 MW capacity from grid connected solar PV projects through competitive bidding process for meeting the Renewable Purchase Obligations.
136 of 2019
Reschedule with further notice
2228 Fri 05/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking approval for deviation in bidding document from MOP guidelines for Long Term Procurement of Solar Power under "Mukhyamantri Saur Krishi Vaahini Yojana" with 2 to 10 MW capacity projects connected to distribution network with total quantum of 184 MW (50 MW each for western Maharashtra, Northern Maharashtra and Marathwada region and 34 MW for Vidarbha Region) through competitive bidding (E- Reverse Auction).
141 of 2019
Reschedule with further notice
2229 Fri 05/07/2019 10:00:00 AM
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
Reschedule with further notice
2230 Fri 05/07/2019 10:00:00 AM
Hearing
Petition of Shri.Mohammad Sajid Haji Sardar regarding non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order dtd.10.10.2018 in Grievance No.1686 of 2017-18 of CGRF, Kalyan.
130 of 2019
Reschedule with further notice
2231 Fri 05/07/2019 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
Reschedule with further notice
2232 Thu 04/07/2019 10:00:09 AM
Hearing
Petition filled by 1. Spark Green Energy (Ahmednagar) Private Limited 2. Spark Green Energy (Satara) Limited under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003, Regulation 8 and 9 of MERC (Terms and Conditions for determination of Renewable Energy (RE) Tariff) Regulations, 2015 for determination of tariff and sale of electricity to Maharashtra State Electricity Distribution Company Limited ("MSEDCL").
117 of 2019
Reschedule
2233 Thu 04/07/2019 10:00:08 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited against Global Energy Private Limited for non-compliance of Order dated 27.11.2018 in Case No. 141 of 2018 passed by the Hon'ble Commission.
107 of 2019
Reschedule
2234 Thu 04/07/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
Reschedule with further notice
2235 Thu 04/07/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
Reschedule with further notice
2236 Thu 04/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for Review of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
Reschedule
2237 Thu 04/07/2019 10:00:00 AM
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patil under Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
Reschedule with further notice
2238 Thu 04/07/2019 10:00:00 AM
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
Reschedule with further notice
2239 Thu 04/07/2019 10:00:00 AM
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
Reschedule with further notice
2240 Wed 03/07/2019 10:00:00 AM
Hearing
Petition filled by Arvind Cotsin India Ltd. & Arvind Dying and Bleaching Mills Pvt. Ltd. for Contempt & Non-Compliance of MERC Order in Case No.34 of 2019.
125 of 2019
Reschedule with further notice
2241 Wed 03/07/2019 10:00:00 AM
Hearing
Petition filled by Jsons Foundry Private Limited against Maharashtra State Electricity Distribution Co. Limited for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner
119 of 2019
Reschedule
2242 Wed 03/07/2019 10:00:00 AM
Hearing
Petition filled by Western Precicast Private Limited against Maharashtra State Electricity Distribution Co. Ltd for directions to the respondent in regard to wrongful curtailment and denial of open access to the petitioner.
118 of 2019
Reschedule
2243 Wed 03/07/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd in regards to Order Dated 16.10.2018 in case No. 172 of 2017 and order dated 29.11.2018 in case no. 308 of 2018 in the matter of seeking approval for adoption of Tariff of Long Term Procurement of 252 MW out of approved 302 MW Solar Power through MSPGCL from the solar Projects to be set up under "Mukhyamantri Saur Krishi Vahini Yojana" and for modification to the approved draft PSA.
112 of 2019
Reschedule with further notice
2244 Wed 03/07/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
Reschedule with further notice
2245 Wed 03/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
Reschedule with further notice
2246 Wed 03/07/2019 10:00:00 AM
Hearing
Intervention Application in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
MA No. 16 of 2019 in Case No. 103 of 2019
Reschedule with further notice
2247 Wed 03/07/2019 10:00:00 AM
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commission's order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
Reschedule with further notice
2248 Wed 03/07/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019
Reschedule with further notice
2249 Tue 02/07/2019 10:00:30 AM
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
Reschedule
2250 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra Sayno Special Steel Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 30 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2251 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 29 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2252 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of INOX Air Products Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 28 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2253 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra Sanyo Special Steel Private Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 27 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2254 Tue 02/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 31May, 2019 in Appeal No. 241 of 2016 filed by Adani Power Maharashtra Ltd.against Order dated 21.8.2013 passed in MERC Case No. 68 of 2012(Petition of Adani Power Maharashtra Ltd for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.)
Case No 68 of 2012 AND MA No. 25 of 2019 in Case No. 68 of 2012
Reschedule with further notice
2255 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 24 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2256 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra vehicle Manufacturers Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 23 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2257 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 22 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2258 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra and Mahindra Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 21 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2259 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 20 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2260 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Pudumjee Paper Products Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 19 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2261 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 18 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2262 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Mahindra CIE Automotive Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 17 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2263 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 15 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2264 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Lupin Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 14 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2265 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 170 of 2018 (Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18)
MA No. 13 of 2019 in Case No. 170 of 2018
Reschedule with further notice
2266 Tue 02/07/2019 10:00:00 AM
Hearing
Miscellaneous Application of Tata Power Company Limited in Case No. 175 of 2017 (Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.)
MA No. 12 of 2019 in Case No. 175 of 2017
Reschedule with further notice
2267 Tue 02/07/2019 10:00:00 AM
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
Reschedule with further notice
2268 Tue 02/07/2019 10:00:00 AM
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
Reschedule with further notice
2269 Tue 02/07/2019 10:00:00 AM
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
Reschedule with further notice
2270 Tue 02/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09 April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Reschedule
2271 Tue 02/07/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 27 March, 2019 in Appeal No. 354 of 2017 filed by JSW Energy Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 23 August, 2017 in Case No. 117 of 2016 (Petition of JSW Energy Ltd. for revision in Tariff on account of Changes in Law under PPA dated 23.2.2010 with Maharashtra State Electricity Distribution Co. Ltd.)
117 of 2016
Reschedule
2272 Tue 02/07/2019 10:00:00 AM
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
Reschedule with further notice
2273 Wed 26/06/2019 10:00:00 AM
Hearing
Petition filed by M/s Classic Marble Company Pvt. Ltd. for Non Compliance of the order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC)
128 of 2019
Reschedule with further notice
2274 Wed 26/06/2019 10:00:00 AM
Hearing
Petition filed by M/s Relishah Export for Non Compliance of the Order dated 28.09.2018 in Case No. 134 of 2018 passed by the Commission directing the respondent to make the payment of delayed payment charges (DPC).
127 of 2019
Reschedule with further notice
2275 Tue 25/06/2019 10:00:00 AM
Hearing
Petition filed by M/s. Sridevi Trading Company under Section 42, 86(1)(f), 142 and other applicable provisions of the Electricity Act, 2003 for issuing necessary directions against the respondent for Non-Compliance of the order dated 05/04/2019 in the grant of Open Access and seeking damages for wrongful denial of Open Access.
126 of 2019
Reschedule
2276 Tue 25/06/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nisagra Renewable Energy Private Limited seeking declaration from the Hon'ble Commission of imposition of Safeguard Duty on the import of solar cells vide notification no. 1/2018-Customs (SG) dated 30.07.2018 of the Ministry of Finance as an event of Change in Law with effect from 30.07.2018 and seeking approval and determination of quantum and mechanism of compensation along with interest, if any on account of the said Change in Law event, alongwith supporting affidavit.
124 of 2019
Completed
2277 Tue 25/06/2019 10:00:00 AM
Hearing
Petition filed by M/s. Juniper Green Energy Private Limited seeking declaration from the Commission of imposition of Safeguard Duty on the import of solar cells vide notification no. 1/2018-Customs (SG) dated 30.07.2018 of the Ministry of Finance as an event of Change in Law with effect from 30.07.2018 and for seeking approval and determination of quantum and mechanism of compensation along with interest, if any on account of the said Change in Law event.
123 of 2019
Completed
2278 Tue 25/06/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for removal of diffficulties regarding procurement of solar power generatiom under the mechanism of " flexibility in generation and scheduling of thermal power stations to reduce emissions."
121 of 2019
Completed
2279 Mon 24/06/2019 10:00:04 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 09.04.2019 passed by the Hon'ble Commission in Case No. 53 of 2019 in respect of approval sought for by Adani Electricity Mumbai Limited for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding.
129 of 2019
Reschedule
2280 Mon 24/06/2019 10:00:03 AM
Hearing
Petition of Adani Electricity Mumbai Limited against Commission Order dated 04.04.2019 passed by the Hon'ble Commission in Case No. 39 of 2019 in respect of Verification of compliance of Renewable Purchase Obligation targets by Adani Electricity Mumbai Limited for FY 2017-18.
120 of 2019
Reschedule
2281 Mon 24/06/2019 10:00:00 AM
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
Completed
2282 Mon 24/06/2019 10:00:00 AM
Hearing
Petition of Mytrah Vayu (vedavati) Private Limited under the provisions of the Electricity Act, 2003 particularly Sections 86(1)(e), 86(1)(f), 86(1)(k), of the Electricity Act, 2003, read with provisions of RFS and Power Purchase Agreement dated July 16, 2018 seeking grant of extension of time for financial closure and scheduled commercial operation date due to force majeure events.
131 of 2019
Completed
2283 Fri 21/06/2019 10:00:00 AM
Hearing
Petition filed by 1) Persipina Developers Pvt. Ltd. 2) Nidar Utilities Panvel LLP under Sections 14, 16 and 86 of the Electricity Act, 2003 for taking on record the decrease (denotification) of SEZ area of 134.79 hectares at Panvel, District Raigarh, Maharashtra.
111 of 2019
Reschedule
2284 Fri 21/06/2019 10:00:00 AM
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
Reschedule
2285 Wed 19/06/2019 10:00:00 AM
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
Reschedule
2286 Tue 18/06/2019 14:00:00 PM
Public Hearing
Objections / comments on Tata Power-Distribution Business' (Tata Power-D) Petition for determination of Wheeling Charges for EHV consumers as per ATE Judgment dated 18 March, 2019.
95 of 2019
Completed
2287 Tue 18/06/2019 10:00:00 AM
Public Hearing
Inviting Comments, Suggestions and/or Objections on the Report submitted by Maharashtra Energy Development Agency (MEDA) for Review of Classification of Wind Zone for the State of Maharashtra
108 of 2019
Completed
2288 Mon 17/06/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under section 142 of Electricity Act,2003 for Non Compliance of the Hon'ble Commission's orders Case No.42/2016 Order dated 14 December,2016, Case No.143/2017 Order dated 14 March,2018, Case No.140/2018 Order dated 28 September, 2018
114 of 2019
Reschedule
2289 Mon 17/06/2019 10:00:00 AM
Hearing
Petition filed by Shri. Haribhau Digambar Khapre under Section 142 of Electricity Act, 2003 for Non Compliance of the Hon'ble Commission Mumbai's letter issued Vide No. MERC/Tech/FY 2017-18/3955 Dt.20 July, 2017, and other Commission's orders. (Reference to Case No. 82 of 2006 Order date 17.5.2007)
113 of 2019
Reschedule
2290 Mon 17/06/2019 10:00:00 AM
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.2 of 2018 by MSEDCL Execution of CGRF's Order dated 29.06.2018 in Case No.2 of 2018.
116 of 2019
Completed
2291 Mon 17/06/2019 10:00:00 AM
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.1 of 2018 by MSEDCL Execution of CGRF's Order dated 29.06.2018 in Case No.1 of 2018.
115 of 2019
Completed
2292 Mon 17/06/2019 10:00:00 AM
Hearing
Petition of Afcons Infrastructure Limited under Section 142 or under Sections 146, 149 and 151 of the E. A. 2003 against the Respondent, for the failure and neglect of the Respondent to comply with the Order dated 5th October 2017 passed by the Appellate Authority, resulting in contravention of Section 127 (4) of the E. A. 2003 and/or Regulation 8.2.2 of the MERC (General Conditions of Distribution Licence) Regulations 2006.
98 of 2019
Completed
2293 Mon 17/06/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Commission Order dated 26.03.2019 in Case No. 26 of 2019 in which the Commission has held that 1.25% interest shall be levied as penal interest every month, in addition to the penalty in the form of "delayed payment charges" ("DPC") for late payment of outstanding bills by MSEDCL.
105 of 2019
Completed
2294 Mon 17/06/2019 10:00:00 AM
Hearing
Petition of M/s Managing Trustee Grant Medical Foundation Ruby Hall Clinic for denial of shot term open access permission by Maharashtra State Electricity Distribution Company Ltd., (MSEDCL) and request for grant of STOA for April 2019, as per Open Access applications.
101 of 2019
Completed
2295 Mon 10/06/2019 10:00:00 AM
Public Hearing
Objections / comments on Tata Power-Distribution Business' (Tata Power-D) Petition for determination of Wheeling Charges for EHV consumers as per ATE Judgment dated 18 March, 2019.
95 of 2019
Reschedule
2296 Fri 07/06/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
Reschedule
2297 Fri 07/06/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
Reschedule
2298 Fri 07/06/2019 10:00:00 AM
Hearing
Intervention Application in Case No. 103 of 2019 Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
MA No. 16 of 2019 in Case No. 103 of 2019
Reschedule
2299 Fri 07/06/2019 10:00:00 AM
Public Hearing
Inviting Comments, Suggestions and/or Objections on the Report submitted by Maharashtra Energy Development Agency (MEDA) for Review of Classification of Wind Zone for the State of Maharashtra
108 of 2019
Reschedule
2300 Fri 07/06/2019 10:00:00 AM
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for non-compliance of 5th April, 2019 Commission Order in Case No. 43 of 2019 by the Respondent. the petitioner also seeks review of Hon. Commission's Order in Case No. 43 of 2019 as originally sought for contempt and the execution of the Hon. Commissionâ??s order dated 15th January, 2019 in Case No 342 of 2018 under Sections 142, 146 & 86(1)(f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
106 of 2019
Reschedule
2301 Fri 07/06/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. under section 94 (1) (f) of the Electricity Act, 2003 read with regulation 85 of the MERC (conduct of business) regulations, 2004 requesting the Hon'ble Commission to review its Order dated 05.04.2019 passed in Case No. 34 of 2019.
103 of 2019
Reschedule
2302 Fri 07/06/2019 10:00:00 AM
Hearing
Petition of M/s. Waacox Energy Private Limited seeking review of the Order dated 22.02.2019 passed by this Commission in Case No. 15 of 2019 in the matter of approval for adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for Long Term Procurement of 200 MW Solar Power, under Section 63 of the Electricity Act, 2003 from the solar Projects (Phase-I) to be set up under 'Mukhyamantri Saur KrishiVahiniYojana' to meet Solar Renewable Purchase Obligations of the Maharashtra State Electricity Distribution Company Limited.
92 of 2019
5
2303 Thu 06/06/2019 10:00:00 AM
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.2 of 2018 by MSEDCL Execution of CGRFâ??s Order dated 29.06.2018 in Case No.2 of 2018.
116 of 2019
Reschedule
2304 Thu 06/06/2019 10:00:00 AM
Hearing
Petition of M/s MITC Rolling Mills Pvt Ltd has Petition against Maharashtra State Electricity Distribution Co Ltd. for Non Compliance of Order dated 29.06.2018 passed by Consumer Grievance Redressal Forum in matter of refund of excess collected FAC, AEC and Additional FAC in consumer bearing No.07303906990 in Case No.1 of 2018 by MSEDCL Execution of CGRFâ??s Order dated 29.06.2018 in Case No.1 of 2018.
115 of 2019
Reschedule
2305 Thu 06/06/2019 10:00:00 AM
Hearing
Petition seeking approval for deviation in Standard Bidding Document for Long Term Procurement of 500 MW wind power from the Wind Generators whose Energy Purchase Agreement with Maharashtra State Electricity Distribution Co. Ltd are expired / going to expire in FY 2019-20, for meeting non-solar RPO target.
110 of 2019
Reschedule
2306 Thu 06/06/2019 10:00:00 AM
Hearing
Petition for seeking approval on adoption of tariff for long term procurement of bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 63 of the Electricity Act, 2003.
109 of 2019
Reschedule
2307 Thu 06/06/2019 10:00:00 AM
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad.
83 of 2019
Reschedule
2308 Thu 06/06/2019 10:00:00 AM
Hearing
Petition of Mahindra CIE Automotive Limited against non-compliance by Maharashtra State Electricity Distribution Co. Ltd of the Order Dated October 23, 2018 in Case No. 71 of 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 and MERC (Distribution Open Access) Regulations, 2016.
93 of 2019
Reschedule
2309 Thu 06/06/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 09 April, 2019 in Appeal No. 368 of 2018 filed by Tata Power Company Ltd. Transmission Business v/s The MERC and Hindustan Petroleum Corporation Ltd. (HPCL) Challenging the Commission's Order dated 01 August, 2018 in Case No. 137 of 2016 (Application of The Tata Power Company Ltd. for amendment of Transmission Licence No. 01 of 2014)
137 of 2016
Reschedule
2310 Thu 06/06/2019 10:00:00 AM
Hearing
117 of 2016
Reschedule
2311 Thu 06/06/2019 10:00:00 AM
Hearing
Petition of Shri Tradco Dessan Pvt. Ltd. for the wrongful rejection of STOA permission.
96 of 2019
Reschedule
2312 Tue 04/06/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for grant of clarification about Interest on refund on account of change in tariff from HT continuous to HT non-continuous Consumers.
90 of 2019
Reschedule
2313 Tue 04/06/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution Business) for Review Petition in MTR Tariff Order in Case No. 69 of 2018 for the Distribution Business of Tata Power-D.
94 of 2019
Reschedule
2314 Tue 04/06/2019 10:00:00 AM
Hearing
Petition filed by Mr. Shafique Siddiqui against BEST Undertaking for noncompliance of The Electricity Ombudsman Order in Case No 267 of 2018 dated 06/02/2019.
84 of 2019
Reschedule
2315 Tue 04/06/2019 10:00:00 AM
Hearing
Petition filed by Dr. Babasaheb Ambedkar SSKL for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 26 MW Bagasse Based Cogeneration Power Project of Dr. Babasaheb Ambedkar SSKL, Kashegaon, Dist : Osmanabad
83 of 2019
Reschedule
2316 Tue 04/06/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
Reschedule
2317 Thu 23/05/2019 10:00:00 AM
Hearing
Petition of M/s Shalimar Hotel Pvt Ltd. for contempt and the execution of the Hon. Commission's Order dated 28th September, 2018 in Case No 101 0f 2018 under Sections 142, 146 & 86(1) (f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
91 of 2019
Reschedule
2318 Wed 22/05/2019 10:00:00 AM
Hearing
Petition of Shri Shankarsa Vishwanath Wade through of Shri. Aditya Rajendra Wade under Section 142, 146 and 149 of Electricity Act, 2003 for Non-Compliance of CGRF Nashik Order dated 15.02.2019.
104 of 2019
Completed
2319 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by Shri Mahavira Jaina Vidyalaya for non Implementation of an order passed by the Consumer Grievance Redressal Forum, Pune in Case No. 21 of 2018 dtd. 08.05.2018. This attracts the provision of Section 142 & Section 149 of Maharashtra Regulatory Commission (Conduct of Business) Regulation, 2014.
63 of 2019
5
2320 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by New Natraj Industries for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Wrongly Recovered AEC, additional FAC and excess collected FAC. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 676 / 08 / 2018-19/133 Dt. 13/07/2018.
60 of 2019
Completed
2321 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by Wadhwa Infracore Steel Pvt Ltd for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 677 / 09/2018-19/134Dt.13/07/2018 and Its Clarificatory Order No. / CGRF / Nashik / NUC / U.Dn.1 / N.R.Dn / 09,10/17-18/244 Dt. 14/12/2018.
59 of 2019
Completed
2322 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Wrongly Recovered additional FAC and Interest thereupon and Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF/Nashik/NUC/N.R.Dn/678/10/2018-19/134 Dt. 13/07/2018 and Its Clarificatory Order No./CGRF/Nashik/NUC/U.Dn.1/N.R.Dn /09,10/17- 18/244 Dt. 14/12/2018.
58 of 2019
Completed
2323 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Cost of Infrastructure incurred for getting power supply, along with interest. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non - implementation of CGRF's order No. / CGRF / Nashik / NUC / N.R.Dn / 680/12/2018-19/176 dt.07.09.2018.
57 of 2019
Completed
2324 Wed 22/05/2019 10:00:00 AM
Hearing
Petition filed by M/s Wada Alums & Acids Pvt. Ltd. under section 142 & 146 of the Electricity Act 2003 regarding non-compliance of Order dtd. 23.01.2018 in appeal No. 237/2016 of Chief Electrical Inspector / Appellate Authority, by MSEDCL.
67 of 2019
Completed
2325 Tue 21/05/2019 10:00:00 AM
Hearing
Petition of M/s Shalimar Hotel Pvt Ltd. for contempt and the execution of the Hon. Commission's Order dated 28th September, 2018 in Case No 101 0f 2018 under Sections 142, 146 & 86(1) (f) of the Electricity Act, 2003 (with amendments) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
91 of 2019
Completed
2326 Tue 21/05/2019 10:00:00 AM
Hearing
Petition filed by Mohite Industries Limited Petition under Section 42 and other applicable provisions of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for directions to the Respondent in regard to the curtailment of open access granted to the Petitioner by the Respondent
82 of 2019
Completed
2327 Tue 21/05/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Hon'ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)
2 of 2019
Completed
2328 Tue 21/05/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Completed
2329 Tue 21/05/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Completed
2330 Mon 20/05/2019 10:00:13 AM
Hearing
Petition of Shri Shrikant alias Suryakant Rau Patil under Section 142 and Section 149 of Electricity Act, 2003 for Non-Compliance of Electricity Ombudsman, Mumbai's Order dated 25.10.2018 passed in Representation No.216/2016
100 of 2019
Completed
2331 Mon 20/05/2019 10:00:11 AM
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
Completed
2332 Mon 20/05/2019 10:00:10 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
Completed
2333 Mon 20/05/2019 10:00:09 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for seeking approval for procurement of bagasse based co-generation power under Section 62 and 86 (1) (b), (e) of the Electricity Act, 2003 for meeting the non-solar Renewable Purchase Obligation.
88 of 2019
Completed
2334 Mon 20/05/2019 10:00:08 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for adoption of Tariff for Long Term Procurement of 1000MW solar power under Section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations.
87 of 2019
Completed
2335 Mon 20/05/2019 10:00:07 AM
Hearing
Miscellaneous Applications of POSCO Maharashtra Steel Pvt. Ltd and Siddhayu Ayurvedic Research Foundation Pvt. Ltd. seeking the permission of this Hon'ble Commission to intervene and be impleaded as parties in Case No. 86 of 2019 to the Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide order dated 27.04.2018 in Case No.132 of 2015.
MA No. 10 of 2019 in Case No. 86 of 2019
Completed
2336 Mon 20/05/2019 10:00:06 AM
Hearing
Petition of Global Energy Private Limited for surrender of Trading License No.1 of 2018, issued to the Applicant vide Order dated 27.04.2018 in Case No.132 of 2015
86 of 2019
Completed
2337 Mon 20/05/2019 10:00:05 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Reschedule
2338 Mon 20/05/2019 10:00:04 AM
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
Completed
2339 Mon 20/05/2019 10:00:03 AM
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
Completed
2340 Mon 20/05/2019 10:00:02 AM
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility. AND Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018. AND Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
Reschedule
2341 Mon 20/05/2019 10:00:01 AM
Hearing
Miscellaneous Applications of Adani Electricity Mumbai Limited (Distribution) who are a necessary party in Case No 61 of 2019 - Petition filed by The Tata Power Company Limited of Floor - wise Metering in High Rise Buildings.
MA No. 11 of 2019 in Case No. 61 of 2019
Completed
2342 Mon 20/05/2019 10:00:00 AM
Hearing
Petition of Afcons Infrastructure Limited under Section 142 or under Sections 146, 149 and 151 of the E. A. 2003 against the Respondent, for the failure and neglect of the Respondent to comply with the Order dated 5th October 2017 passed by the Appellate Authority, resulting in contravention of Section 127 (4) of the E. A. 2003 and/or Regulation 8.2.2 of the MERC (General Conditions of Distribution Licence) Regulations 2006.
98 of 2019
Reschedule
2343 Mon 20/05/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited of Floor-wise Metering in High Rise Buildings.
61 of 2019
Completed
2344 Fri 10/05/2019 10:00:00 AM
Hearing
97 of 2019
Completed
2345 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal of difficulties in implementation of MERC (standards of performance of distribution licensees, period for giving supply and determination of compensation) regulations, 2014 in connection with release of agriculture connections. Clarification of Case No. 6 of 2019 passed on 22.2.2019
102 of 2019
Completed
2346 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commission's Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
Completed
2347 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
Reschedule
2348 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 â?? Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
Reschedule
2349 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Mohite Industries Limited Petition under Section 42 and other applicable provisions of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for directions to the Respondent in regard to the curtailment of open access granted to the Petitioner by the Respondent
82 of 2019
Reschedule
2350 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Jagannath Narayan Appa against Maharashtra State Electricity Distribution Company Limited for non-Compliance of CGRF, Aurangabad Order dated 22.01.2019 passed in Case No. 705 of 2018
80 of 2019
Completed
2351 Fri 10/05/2019 10:00:00 AM
Hearing
Petition filed by Jagannath Narayan Appa against Maharashtra State Electricity Distribution Company Limited for non-Compliance of CGRF, Aurangabad Order dated 22.01.2019 passed in Case No. 706 of 2018
79 of 2019
Completed
2352 Thu 09/05/2019 11:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
Completed
2353 Thu 09/05/2019 10:00:00 AM
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commission's Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
Reschedule
2354 Thu 09/05/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for procurement of bagasse based co-generation power under Section 62 and 86 (1) (b), (e) of the Electricity Act 2003 for meeting the non-solar Renewable Purchase Obligations.
72 of 2019
Completed
2355 Thu 09/05/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
Completed
2356 Thu 09/05/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Completed
2357 Thu 09/05/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
357 of 2018
Completed
2358 Thu 09/05/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
Completed
2359 Thu 09/05/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
Reschedule
2360 Thu 09/05/2019 10:00:00 AM
Hearing
Petition filed by Powerica Limited seeking directions against Maharashtra State Electricity Transmission Company Limited for forfeiture of security deposit under various provisions of the Electricity Act, 2003 read with MERC (Transmission Open Access) Regulations, 2016
81 of 2019
Completed
2361 Thu 09/05/2019 10:00:00 AM
Hearing
Petition filed by Shri Gajendrasingh Ramsingh Pawar against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Nagpur Order Case No. 76/2018 dated 07/12/2018.
78 of 2019
Completed
2362 Thu 09/05/2019 10:00:00 AM
Hearing
Petition filed by Electrical Contractor's Association of Maharashtra (Nashik Region) Nashik for withdrawal of Maharashtra State Electricity Distribution Company Limited Circular no. CE (Dist)./D-III/NSC/30011 dated 20 Dec 2018 regarding Infrastructure Development for release of new connections and submission of objections and suggestions.
77 of 2019
Completed
2363 Wed 08/05/2019 11:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Completed
2364 Wed 08/05/2019 11:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019. AND Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction. AND Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
Completed
2365 Wed 08/05/2019 10:00:00 AM
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
Completed
2366 Wed 08/05/2019 10:00:00 AM
Hearing
Miscellaneous Application of Nitin Sanjiva Shetty for intervention and impleadment in the Case No. 64 of 2019 (Petition filed by MSEDCL for seeking approval for adoption of tariff discovered for Long Term Procurement of 1170 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.)
MA No. 7 of 2019 in Case No. 64 of 2019
Completed
2367 Wed 08/05/2019 10:00:00 AM
Hearing
64 of 2019
Completed
2368 Wed 08/05/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. against Global Energy Private Limited for non-compliance of Order dated 10.01.2019 in case no. 78 of 2018 passed by the Hon'ble Commission
62 of 2019
Completed
2369 Wed 08/05/2019 10:00:00 AM
Hearing
Petition of Classic Citi Investments Pvt. Ltd. for non compliance of the Hon'ble Commission's order dated 04.05.2018 in Case No. 36 of 2017 by Maharashtra State Electricity Distribution Company Ltd.
51 of 2019
Completed
2370 Wed 08/05/2019 10:00:00 AM
Hearing
Petition filed by Serum Institute of India Private Limited for Purchase of banked wind units with MSEDCL, generated and injected by Serum Institute of India Private Limited (SIIPL) in distribution system over and above open access wheeling, during the period April 2016 to March 2018 and MSEDCL denied the purchase of the same against SIIPL's applications.
49 of 2019
Completed
2371 Tue 07/05/2019 10:00:00 AM
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility. AND Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018. AND Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
Completed
2372 Tue 07/05/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 355 of 2017 filed by JSW Energy Ltd. v/s The MERC and MSEDCL Challenging the Commission's Order dated 29 August, 2017 in Case No. 90 of 2016 (Petition of JSW Energy Ltd. regarding recovery of incentive payments by Maharashtra State Electricity Distribution Co. Ltd. under PPA dated 23.2.2010)
90 of 2016
Completed
2373 Tue 07/05/2019 10:00:00 AM
Hearing
Petition of M/s Team Ferro Alloys Pvt Ltd. under Section 86 (1) (b) & (f) of the Electricity Act, 2003 read with Regulation 94 of MERC (Conduct of Business) Regulations 2004 in compliance to the directions given by the Commission in the Order dated 12 July, 2018 in Case No. 84 of 2015 inter alia seeking approval of the Commission for renewal of EPA as per previous terms and conditions and tariff determined by the Hon'ble MERC in the said order.
55 of 2019
Completed
2374 Tue 07/05/2019 10:00:00 AM
Hearing
Petition filed by Loknete Sundarraoji Solanke Sahakari Sakhar Karkhana Ltd., (LSSSSKL) (Formerly Majalgaon Sahakari Sakhar Karkhana Ltd.) for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 22 MW Bagasse Based Cogeneration Power Project.
8 of 2019
Completed
2375 Tue 07/05/2019 10:00:00 AM
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Completed
2376 Tue 07/05/2019 10:00:00 AM
Hearing
Petition filed by M/s. Century Rayon for exemption of Renewable Purchase Obligation (RPO) to be discharge by Century Rayon (Under the Management and Operation of Grasim Industries Ltd) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R dated 1.2.2019
71 of 2019
Completed
2377 Tue 07/05/2019 10:00:00 AM
Hearing
Petition filed by Captive Power Producers Association Seeking rollover of entire RPO Obligations or otherwise of the Applicant for the financial year 2016-17, 2017-18 and 2018-19 to financial year 2019-20.
68 of 2019
Completed
2378 Mon 06/05/2019 11:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)â??s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commissionâ??s Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbaiâ??s Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
Reschedule
2379 Mon 06/05/2019 11:00:00 AM
Hearing
Miscellaneous Application of Maharashtra State Electricity Distribution Company Limited seeking urgent and immediate intervention of this Hon'ble Commission in directing the MSLDC to implement the methodology of operation of Decentralised MoD i.e. utility wise Load generation balance from 1st of May, 2019.
MA No. 08 of 2019 in Case No. 297 of 2018
Reschedule
2380 Mon 06/05/2019 11:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule
2381 Mon 06/05/2019 11:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019. AND Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction. AND Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
Reschedule
2382 Mon 06/05/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 355 of 2017 filed by JSW Energy Ltd. v/s The MERC and MSEDCL Challenging the Commission's Order dated 29 August, 2017 in Case No. 90 of 2016 (Petition of JSW Energy Ltd. regarding recovery of incentive payments by Maharashtra State Electricity Distribution Co. Ltd. under PPA dated 23.2.2010)
90 of 2016
Reschedule
2383 Thu 25/04/2019 10:00:00 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Reschedule
2384 Thu 25/04/2019 10:00:00 AM
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
Reschedule
2385 Thu 25/04/2019 10:00:00 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Reschedule
2386 Wed 24/04/2019 10:00:00 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Completed
2387 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd and Maharashtra State Power Generation Co. Ltd for review MERC Order dated 22.02.2017 passed in Case no.15 of 2019 Petition of MSPGCL In the matter of adoption of Tariff discovered through competitive bidding process conducted by MSPGCL for long term procurement of 200 MW solar Power, under section 63 of The Electricity Act, 2003 from The Solar Projects (Phase-1) to be set up under 'Mukhyamantri Saur Krishi Vahini Yojana'.
76 of 2019
Completed
2388 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited -Distribution seeking a declaration that Adani Electricity Mumbai Limited (AEML) is engaged in process of migrating a consumer in a manner which would defeat the intent and purpose of the governing framework regarding switchover of consumers as laid down by this Hon'ble Commission.
97 of 2019
Completed
2389 Wed 24/04/2019 10:00:00 AM
Hearing
Miscellaneous Application of Tata Power Company - Generation Business in Case No. 89 of 2019 ( Petition of Tata Power Company - Generation Business for Removal of Difficulties in implementation of MOD Guidelines in the case of generating units at its Trombay Thermal Power station of Tata Power-G under the Regulation 38 of the MERC (State Grid Code) Regulations, 2006.
MA No. 09 of 2019 in Case No. 89 of 2019
Completed
2390 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of Tata Power Company - Generation Business for Removal of Difficulties in implementation of MOD Guidelines in the case of generating units at its Trombay Thermal Power station.
89 of 2019
Completed
2391 Wed 24/04/2019 10:00:00 AM
Hearing
Petition filed by Pegasus Properties Pvt. Ltd seeking review of the Commissionâ??s Order dated 18.01.2019 passed in Case No. 351 of 2018 regarding refund of amounts incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines and substation.
35 of 2019
Completed
2392 Wed 24/04/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016.
4 of 2019
Reschedule with further notice
2393 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Reschedule with further notice
2394 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Reschedule
2395 Wed 24/04/2019 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Reschedule
2396 Tue 23/04/2019 10:00:00 AM
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
Reschedule with further notice
2397 Tue 23/04/2019 10:00:00 AM
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Reschedule
2398 Tue 23/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Hon'ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)
2 of 2019
Reschedule
2399 Tue 23/04/2019 10:00:00 AM
Hearing
Case of Jaigad Power Transmission Co. Ltd. under Section 86 of EA, 2003 and other applicable provisions of the Electricity Act, 2003 for Recovery of Transmission Charges from State Transmission Utility. AND Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018. AND Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 2018.
326 of 2018 AND MA No. 28 of 2018, MA No. 03 of 2019 in Case No. 326 of 2018
Reschedule
2400 Mon 22/04/2019 10:00:00 AM
Hearing
Petition filed by M/s. Century Rayon for exemption of Renewable Purchase Obligation (RPO) to be discharge by Century Rayon (Under the Management and Operation of Grasim Industries Ltd) in the light of the latest communication issued by the Government of India, Ministry of Power, bearing No. 30/04/18-R&R dated 1.2.2019
71 of 2019
Reschedule
2401 Mon 22/04/2019 10:00:00 AM
Hearing
Petition filed by Captive Power Producers Association Seeking rollover of entire RPO Obligations or otherwise of the Applicant for the financial year 2016-17, 2017-18 and 2018-19 to financial year 2019-20.
68 of 2019
Reschedule
2402 Mon 22/04/2019 10:00:00 AM
Hearing
Petition filed by M/s Wada Alums & Acids Pvt. Ltd. under section 142 & 146 of the Electricity Act 2003 regarding non-compliance of Order dtd. 23.01.2018 in appeal No. 237/2016 of Chief Electrical Inspector / Appellate Authority, by MSEDCL.
67 of 2019
Reschedule
2403 Mon 22/04/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited of Floor -wise Metering in High Rise Buildings
61 of 2019
Reschedule with further notice
2404 Thu 18/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for seeking approval for adoption of tariff discovered for Long Term Procurement of 1170 MW Solar Power under 'Mukhyamantri Sour Krishi Vahini Yojana' from 2 to 10 MW capacity projects connected to distribution network under Section 63 of the Electricity Act 2003 for meeting the Solar Renewable Purchase Obligations.
64 of 2019
Reschedule with further notice
2405 Thu 18/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
Reschedule
2406 Thu 18/04/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019. AND Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction. AND Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 AND MA No. 05 of 2019 in Case No. 25 of 2019 AND 28 of 2019
Reschedule with further notice
2407 Thu 18/04/2019 10:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule with further notice
2408 Mon 15/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
Reschedule
2409 Fri 12/04/2019 10:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule
2410 Fri 12/04/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019. AND Application of The Tata Power Company Limited (Distribution) seeking clarification/ modification of this Hon'ble commission's interim order dated 06.02.2019 passed in Case No. 25 of 2019 Petition under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction. AND Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019.
25 of 2019 and MA No 5 of 2019 in Case No 25 of 2019 and 28 of 2019
Reschedule
2411 Fri 12/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
Reschedule
2412 Fri 12/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
Reschedule
2413 Thu 11/04/2019 10:00:00 AM
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
Completed
2414 Thu 11/04/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
Reschedule with further notice
2415 Thu 11/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
Reschedule
2416 Thu 11/04/2019 10:00:00 AM
Hearing
Petition filed by New Natraj Industries for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Wrongly Recovered AEC, additional FAC and excess collected FAC. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 676 / 08 / 2018-19/133 Dt. 13/07/2018.
60 of 2019
Reschedule with further notice
2417 Thu 11/04/2019 10:00:00 AM
Hearing
Petition filed by Wadhwa Infracore Steel Pvt Ltd for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF / Nashik / NUC / N.R.Dn / 677 / 09/2018-19/134Dt.13/07/2018 and Its Clarificatory Order No. / CGRF / Nashik / NUC / U.Dn.1 / N.R.Dn / 09,10/17-18/244 Dt. 14/12/2018.
59 of 2019
Reschedule with further notice
2418 Thu 11/04/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Pending Refund of Wrongly Recovered additional FAC and Interest thereupon and Interest on the refunded Principal amount. The CGRF, Nasik zone is established under section42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. CGRF/Nashik/NUC/N.R.Dn/678/10/2018-19/134 Dt. 13/07/2018 and Its Clarificatory Order No./CGRF/Nashik/NUC/U.Dn.1/N.R.Dn /09,10/17-18/244 Dt. 14/12/2018.
58 of 2019
Reschedule with further notice
2419 Thu 11/04/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nashik Ispat Pvt Ltd. for non implementation of CGRF's order of Nasik zone by MSEDCL for refund of the Cost of Infrastructure incurred for getting power supply, along with interest. The CGRF, Nasik zone is established under section 42 (5) of Electricity Act, 2003, the respondent should be fined u/s 142 & 149 of EA, 2003 for non-implementation of CGRF's order No. / CGRF / Nashik / NUC / N.R.Dn /680 /12 / 2018-19 / 176 dt.07.09.2018.
57 of 2019
Reschedule with further notice
2420 Thu 11/04/2019 10:00:00 AM
Hearing
Petition filed by Loknete Sundarraoji Solanke Sahakari Sakhar Karkhana Ltd., (LSSSSKL) (Formerly Majalgaon Sahakari Sakhar Karkhana Ltd.) for Refund of Expenditure for Power Evacuation System by MSEDCL / MSETCL, 22 MW Bagasse Based Cogeneration Power Project.
8 of 2019
Reschedule with further notice
2421 Wed 10/04/2019 10:00:00 AM
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
Reschedule
2422 Wed 10/04/2019 10:00:00 AM
Hearing
Petition filed by Shri Mahavira Jaina Vidyalaya for non Implementation of an order passed by the Consumer Grievance Redressal Forum, Pune in Case No. 21 of 2018 dtd. 08.05.2018. This attracts the provision of Section 142 & Section 149 of Maharashtra Regulatory Commission (Conduct of Business) Regulation, 2014.
63 of 2019
Reschedule with further notice
2423 Wed 10/04/2019 10:00:00 AM
Hearing
62 of 2019
Reschedule with further notice
2424 Wed 10/04/2019 10:00:00 AM
Admissibility Hearing
Petition of UjwalRai Moreshwar Joshi against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Mumbai's Review order, Ref. Case No. 14/2018 dated 08/10/2018.
32 of 2019
Completed
2425 Wed 10/04/2019 10:00:00 AM
Hearing
Petition of Classic Citi Investments Pvt. Ltd. for non compliance of the Hon'ble Commission's order dated 04.05.2018 in Case No. 36 of 2017 by Maharashtra State Electricity Distribution Company Ltd.
51 of 2019
Reschedule with further notice
2426 Wed 10/04/2019 10:00:00 AM
Hearing
49 of 2019
Reschedule with further notice
2427 Tue 09/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company for in principle approval for short term power purchase at higher cost than the ceiling rate approved by Hon'ble Commission.
85 of 2019
Completed
2428 Tue 09/04/2019 10:00:00 AM
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
Completed
2429 Tue 09/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review in the Hon'ble Commission's Order dated 15.02.2019 in Case No. 07 of 2019 in the matter of adoption of tariff discovered for long term procurement of 180 MW solar power.
56 of 2019
Completed
2430 Tue 09/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
Completed
2431 Tue 09/04/2019 10:00:00 AM
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
Reschedule with further notice
2432 Tue 09/04/2019 10:00:00 AM
Hearing
Petition filed by Azure Power India Private Limited seeking appropriate relief on Account of change in law as provided in request for proposal documents dated February 08, 2018 due to the introduction of safeguard duty on import of solar panels/modules
47 of 2019
Completed
2433 Tue 09/04/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018 - Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
Reschedule with further notice
2434 Tue 09/04/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
Completed
2435 Tue 09/04/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Power Generation Company Limited for review Order dated 5th February, 2019 passed by the Hon'ble MERC in Case No. 354 of 2018 on the Petition of Maharashtra State Power Generation Co. Ltd. for Removal of Difficulties by invoking Power to Relax Conditions for approval and adoption of Tariff and approval of PPA for Long Term Procurement of 50 MW Solar Power from Solar Power Plant at Kaudgaon under Section 63 and Section 86 (1) (b) of the Electricity Act 2003.
75 of 2019
Completed
2436 Tue 09/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd for Amendment / Modification in FAC Regulations of MERC (Multi Year Tariff) Regulations, 2015.
65 of 2019
Completed
2437 Tue 09/04/2019 10:00:00 AM
Hearing
Petition of M/s. Marigold Pharmaceuticals Pvt. Limited seeking review of the Commission's Order dated 22.11.2018 in Case No. 210 of 2018.
352 of 2018
Completed
2438 Mon 08/04/2019 10:00:00 AM
Hearing
Implementation of Appellate Tribunal for Electricity (ATE)'s Judgment dated 15 March, 2019 in Appeal No. 50 of 2017 filed by New Ushanagar Co-Operative Housing Society Ltd. v/s The Maharashtra Electricity Regulatory Commission and Others Challenging the Commission's Order dated 5 May, 2015 in Case No. 168 of 2014 (Petition of New Ushanagar Co-operative Housing Society for revision of Commissioner of Police, Mumbai's Order dated 11 September, 2014 permitting the erection of Transmission Tower by Tata Power Co. Ltd., and for interim reliefs.)
168 of 2014
Reschedule
2439 Mon 08/04/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for review of Order dated 16.02.2018 in Case No. 44 of 2017 and Order dated 03.10.2018 in Case No. 111 of 2018 passed by the Hon'ble Commission.
54 of 2019
Reschedule
2440 Tue 02/04/2019 10:00:00 AM
Admissibility Hearing
Petition of UjwalRai Moreshwar Joshi against Maharashtra State Electricity Distribution Co. Ltd. for non-compliance of Electricity Ombudsman Mumbai's Review order, Ref. Case No. 14/2018 dated 08/10/2018.
32 of 2019
Reschedule
2441 Thu 28/03/2019 10:00:00 AM
Hearing
64 of 2019
Completed
2442 Thu 28/03/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Limited seeking approval for deviation in bidding document from Standard Bidding Guidelines (SBG) for long term procurement of Solar Power through competitive bidding under Section 19 of MERC (RPO, Its Compliance and Implementation of REC Framework) Regulations, 2016 and Regulation 94 of MERC (Conduct of Business) Regulations, 2004
53 of 2019
Completed
2443 Wed 27/03/2019 10:00:00 AM
Hearing
Petition of Mrs. Geetha Pundaleeka (Geetha Pundaleeka a Proprietorship Firm) under Regulation 32 of the MERC (Distribution Open Access) Regulations, 2016 for adjudication of wrongful and illegal denial of open access by MSEDCL and petition under Section 86 (1) (f) 2003 and under Section 60 & 66 of the Electricity Act, 2003 and petition under regulation 92, 93 and 94 of the MERC (conduct of business) regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers.
66 of 2019
Completed
2444 Wed 27/03/2019 10:00:00 AM
Hearing
Petition filed by Azure Power India Private Limited under Section 86(1)(a) and (b) of the E Act, 2003 read with the Letters of Award dated 17.05.2018 and Section 21.12 of the draft PPA issued by Maharashtra State Power Generation Company (MSPGCL) inter alia seeking declaratory and compensatory reliefs on account of a 'Change in Law' viz.
48 of 2019
Completed
2445 Wed 27/03/2019 10:00:00 AM
Hearing
Petition filed by Azure Power India Private Limited seeking appropriate relief on Account of change in law as provided in request for proposal documents dated February 08, 2018 due to the introduction of safeguard duty on import of solar panels/modules
47 of 2019
Completed
2446 Wed 27/03/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited under Section 86(1) and (b) of the Electricity Act, 2003 and Article 9 read with Article 11.4 of the Power Purchase Agreement executed by the Petitioner with MSEDCL dated 30.07.2018 seeking relief on account of a 'Change in Law' viz. the Notification Nos. 24 and 27 of 2018- Central Tax (Rate) and 25 and 28 of 2018 - Integrated Tax (Rate) dated 31.12.2018 issued by the Ministry of Finance, Go I, inter alia effectively amending the Goods and Services Tax rates relating to setting up of solar power projects, resulting in additional non-recurring expenditure in the form of an additional tax burden to be borne by the Petitioner with effect from 01.01.2019.
46 of 2019
Completed
2447 Wed 27/03/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
Completed
2448 Wed 27/03/2019 10:00:00 AM
Hearing
Petition filed by Ajay Maniklal Udasi against Maharashtra State Electricity Distribution Company Ltd. for non-Compliance of CGRF, Akola Zone's Order dated 04.10.2018 passed in Complaint No. 36/2018.
24 of 2019
Completed
2449 Tue 26/03/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for procurement of power from wind projects who's EPAS with MSEDCL are expired.
50 of 2019
Completed
2450 Tue 26/03/2019 10:00:00 AM
Hearing
Petition filed by M/s Khandesh Paper Mill Pvt. Ltd. for directing MSEDCL to Comply CGRF, Jalgaon Complaint No. 6-2018-19 order dated 18.9.2018 in respect of consumer.
31 of 2019
5
2451 Tue 26/03/2019 10:00:00 AM
Hearing
Petition filed by M/s CG Power and Industrial Solutions Ltd. for directing MSEDCL, to comply Hon. CGRF order in respect of consumer M/s CG Power and Industrial Solutions Ltd.
30 of 2019
Completed
2452 Tue 26/03/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
Completed
2453 Tue 26/03/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
Completed
2454 Tue 26/03/2019 10:00:00 AM
Hearing
Petition filed by Sun-N-Sand Hotels Pvt Limited for contempt and the execution of the Hon. Commission's Order dated 15th January 2019 in Case No 342 of 2018 under Sections 142,146 & 86(1)(f) of the Electricity Act 2003(with amendments) for adjudication of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent.
43 of 2019
Completed
2455 Mon 25/03/2019 10:00:00 AM
Hearing
Petition filed by Arvind Cotsin (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
Completed
2456 Mon 25/03/2019 10:00:00 AM
Public Hearing
Inviting Comments, Suggestions and/or Objections on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2019-20
52 of 2019
Completed
2457 Mon 25/03/2019 10:00:00 AM
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for post facto approval of MSEDCL's Fuel Adjustment Charges (FAC) for the period of January, 2018 to March, 2018.
23 of 2019
Completed
2458 Mon 25/03/2019 10:00:00 AM
Hearing
Review Petition filed by Pegasus Properties Pvt. Ltd for MERC Order dated 18.01.2019 passed in Case No. 351 of 2018, Petition seeking Refund of Amounts/Costs incurred by the Petitioner towards establishing 220 kV EHV Transmission Lines/Towers and 220 kV EHV substations/Switchyard.
35 of 2019
Reschedule with further notice
2459 Mon 25/03/2019 10:00:00 AM
Hearing
Petition of Arvind Cotsin India Ltd. against Maharashtra State Electricity Distribution Co. Ltd. for Discriminatory Treatment for Renewable Energy generator/ Consumer by MSEDCL for imposition of Individual Metering Policy.
34 of 2019
Completed
2460 Tue 19/03/2019 10:00:00 AM
Hearing
74 of 2019
Completed
2461 Tue 19/03/2019 10:00:00 AM
Hearing
Petition filed by M/s. KRC Infrastructure and Projects Private Limited for approval of Power Purchase Plan for 5 years and adoption of tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and "Guidelines for Short-term (i.e., for a period of more than one day to one year) Procurement of Power by Distribution Licensees Through Tariff Based Bidding Process" issued by Government of India, for procurement of power up to 2 MW RTC from 00:00 to 24:00 hours for a period of six months from April 1, 2019 to September 30, 2019
73 of 2019
Completed
2462 Tue 19/03/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited for approval of short term power procurement at a rate higher than the ceiling rate approved by the Hon'ble Commission.
69 of 2019
Completed
2463 Tue 19/03/2019 10:00:00 AM
Hearing
Petition filed by Azure Power Thirty Four Private Limited seeking appropriate relief on account of change in law as provided under the Power Purchases Agreement dated July 30, 2018 due to the introduction of safeguard duty on import of Solar Panels/Modules.
27 of 2019
Reschedule
2464 Mon 18/03/2019 10:00:00 AM
Hearing
Petition filed by M/s Khandesh Paper Mill Pvt. Ltd. for directing MSEDCL to Comply CGRF, Jalgaon Complaint No. 6-2018-19 order dated 18.9.2018 in respect of consumer.
31 of 2019
Reschedule
2465 Mon 18/03/2019 10:00:00 AM
Hearing
Petition filed by M/s CG Power and Industrial Solutions Ltd. for directing MSEDCL, to comply Hon. CGRF order in respect of consumer M/s CG Power and Industrial Solutions Ltd.
30 of 2019
Reschedule
2466 Mon 18/03/2019 10:00:00 AM
Hearing
Petition filed by Ajay Maniklal Udasi against Maharashtra State Electricity Distribution Company Ltd. for non-Compliance of CGRF, Akola Zone's Order dated 04.10.2018 passed in Complaint No. 36/2018.
24 of 2019
Reschedule
2467 Mon 18/03/2019 10:00:00 AM
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd. for post facto approval of MSEDCL's Fuel Adjustment Charges (FAC) for the period of January, 2018 to March, 2018.
23 of 2019
Reschedule
2468 Mon 18/03/2019 10:00:00 AM
Hearing
Petition filed by Arvind Cotsin (India) Ltd. for illegal One-sided Reduction of consumer's Open Access Energy Capacity by violating State Government's Non-Conventional Energy Policy and Provisions of MERC Open Access Regulation 2016.
19 of 2019
Reschedule
2469 Sat 16/03/2019 10:00:00 AM
Public Hearing
Inviting Comments In Proceedings For Verification Of Renewable Purchase Obligation Compliance Targets For FY 2017-18 By Distribution Licensees In Maharashtra
36 of 2019, 37 of 2019, 38 of 2019, 39 of 2019, 40 of 2019, 41 of 2019 and 42 of 2019
Completed
2470 Fri 15/03/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
Reschedule
2471 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Laxmi Narayan Udhyog against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No. 51/2018 order dated 11.12.2018 and Non-Release of new connection.
13 of 2019
5
2472 Fri 15/03/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
Reschedule
2473 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Wasim Oil Mill and Ginning Pressing against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Akola Zone order in complaint No 52/2018 order dated 11.12.2018 and Non-Release of New Connection thereof in the matter of Wasim Oil Mill and Ginning Pressing.
12 of 2019
5
2474 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Umesh Board and Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd under Regulation 22 of MERC CGRF & EO Regulation due to Non-Compliance of CGRF Aurangabad Zone order in Case No CGRF/AZ/AUC/684/2018/24 order dated 18.09.2018 related to differential amount of continuous non-continuous tariff issue and allied Grievances & thereby to initiate Non-Compliance proceedings under section 142 and 149 of EA 2003
11 of 2019
Completed
2475 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Raj Laxmi Food and Spices against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Amravati Zone order in complaint No. 24/2018 order dated 11.10.2018 and Non-Release of new connection.
10 of 2019
5
2476 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Ambabai Yantramag Audyogik Sahakari Sanstha for seeking Non-Compliance of Consumer Grievance Redressal Forum, Kolhapur Zone's consumer Grievance case No.31/2018-19/Letter dt.207 dated 30 August,2018 under section 142 and section 149 of 2018 electricity act 2003.
16 of 2019
5
2477 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Vimal Trading Centre against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No 50/2018 order dated 11.12.2018 and Non-Release of New Connection.
14 of 2019
5
2478 Fri 15/03/2019 10:00:00 AM
Hearing
Petition of Govind Shankar Gadgil against Maharashtra State Electricity Distribution Co. Ltd for non-Compliance of CGRF, Ratnagiri Zone Order dated 22.5.2018 passed in Complaint No. 6 of 2018.
9 of 2019
Completed
2479 Thu 14/03/2019 10:00:00 AM
Hearing
Petition filed by M/s Rajlakshmi Minerals for amount due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the wind Energy Purchases Agreement dated 20th August, 2014.
26 of 2019
Completed
2480 Thu 14/03/2019 10:00:00 AM
Hearing
Petition of Ghatge Patil Industries Limited under provisions of the Electricity Act, 2003 and more particularly Section 42, Section 86(1)(e) and Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Ghatge Patil Industries Limited and Maharashtra State Electricity Distribution Company Limited.
22 of 2019
Completed
2481 Thu 14/03/2019 10:00:00 AM
Hearing
Petition of Kamal Encon India Ltd. (Formerly known as KEC INDL LTD) under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Kamal Encon Industries Limited and Maharashtra State Electricity Distribution Company Ltd.
21 of 2019
Completed
2482 Thu 14/03/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. Seeking the inclusion of revenue expenditure being incurred on providing discount under the GO-GREEN initiative & revenue expenditure being incurred on providing messaging service (SMS) as a part of aggregate revenue requirement (ARR) of respective year.
1 of 2019
Completed
2483 Wed 13/03/2019 10:00:00 AM
Hearing
Petition filed by Adani Electricity Mumbai Limited seeking approval of the Hon'ble Commission for levy of Rs 750/- as charges for second and each subsequent dishonoured cheque under Regulation 18 of Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005.
45 of 2019
Completed
2484 Wed 13/03/2019 10:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited - Distribution Business seeking approval of the Power Procurement Arrangement of The Tata Power Company Limited - Distribution Business for FY 2019-20 to FY 2024-25 as per directions of the Hon'ble Commission vide order dated 27.03.2018 in Case No. 39 of 2017 read with Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2015
44 of 2019
Completed
2485 Wed 13/03/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Consideration of Deemed Generation on Account of Installation of OFF-GRID solar pump under various solar AG pump Scheme towards RPO fulfilment section 86 of the Electricity Act 2003.
33 of 2019
Completed
2486 Wed 13/03/2019 10:00:00 AM
Hearing
Petition filed by M/s Rajlakshmi Minerals for amount due and payable by Maharashtra State Electricity Distribution Company Limited to Rajlakshmi Minerals for electricity supplied under the wind Energy Purchases Agreement dated 20th August, 2014.
26 of 2019
Reschedule
2487 Tue 12/03/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Consideration of Deemed Generation on Account of Installation of OFF-GRID solar pump under various solar AG pump Scheme towards RPO fulfilment section 86 of the Electricity Act 2003.
33 of 2019
Reschedule
2488 Sat 02/03/2019 10:00:00 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Reschedule with further notice
2489 Wed 27/02/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for directing MSEDCL to comply Hon. CGRF, Nashik order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020250
17 of 2019
Reschedule
2490 Wed 27/02/2019 10:00:00 AM
Hearing
Petition of Laxmi Narayan Udhyog against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No. 51/2018 order dated 11.12.2018 and Non-Release of new connection.
13 of 2019
Reschedule
2491 Tue 26/02/2019 10:00:00 AM
Hearing
Petition filed by Cable Corporation of India Ltd. for Seeking directing MSEDCL to comply Hon. CGRF order in respect of consumer M/S. Cable Corporation of India- Consumer No.075949020490
18 of 2019
Reschedule
2492 Tue 26/02/2019 10:00:00 AM
Hearing
Petition of Wasim Oil Mill and Ginning Pressing against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Akola Zone order in complaint No 52/2018 order dated 11.12.2018 and Non-Release of New Connection thereof in the matter of Wasim Oil Mill and Ginning Pressing.
12 of 2019
Reschedule
2493 Tue 26/02/2019 10:00:00 AM
Hearing
Petition of Umesh Board and Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd under Regulation 22 of MERC CGRF & EO Regulation due to Non-Compliance of CGRF Aurangabad Zone order in Case No CGRF/AZ/AUC/684/2018/24 order dated 18.09.2018 related to differential amount of continuous non-continuous tariff issue and allied Grievances & thereby to initiate Non-Compliance proceedings under section 142 and 149 of EA 2003
11 of 2019
Reschedule
2494 Tue 26/02/2019 10:00:00 AM
Hearing
Petition of Raj Laxmi Food and Spices against Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of CGRF Amravati Zone order in complaint No. 24/2018 order dated 11.10.2018 and Non-Release of new connection.
10 of 2019
Reschedule
2495 Mon 25/02/2019 10:00:00 AM
Hearing
Petition of Ambabai Yantramag Audyogik Sahakari Sanstha for seeking Non-Compliance of Consumer Grievance Redressal Forum, Kolhapur Zone's consumer Grievance case No.31/2018-19/Letter dt.207 dated 30 August,2018 under section 142 and section 149 of 2018 electricity act 2003.
16 of 2019
Reschedule
2496 Mon 25/02/2019 10:00:00 AM
Hearing
Petition of Vimal Trading Centre against Maharashtra State Electricity Distribution Co. Ltd. for Non-Compliance of CGRF Akola Zone order in complaint No 50/2018 order dated 11.12.2018 and Non-Release of New Connection.
14 of 2019
Reschedule
2497 Mon 25/02/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for review of Order dated 24.10.2018 by Hon'ble Commission in Case No. 186 of 2018 (petition of MSEDCL to review certain issues in the Commission's Order dated 02.05.2018 in Case No. 111 of 2017), under Sections 85 of MERC (Conduct of Business) Regulations, 2004 and under Section 94 of the Electricity Act, 2003.
364 of 2018
Reschedule with further notice
2498 Fri 22/02/2019 10:00:00 AM
Hearing
Petition filed by Aurangabad Industrial Township Limited (AITL) under Section 2(41), Section12, Section 13 of the Electricity Act 2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution License) Regulations, 2006 for issuance of Special Conditions of Distribution License to Aurangabad Industrial Township Limited (AITL) in pursuance of recommendations of the Government of Maharashtra under Section 13 of the Electricity Act 2003.
29 of 2019
Completed
2499 Fri 22/02/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Removal of difficulties in implementation of MERC (Net Metering for Roof-Top Solar Photo Voltaic System) Regulations, 2015
20 of 2019
Completed
2500 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of Adani Electricity Mumbai Ltd regarding quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
28 of 2019
Reschedule with further notice
2501 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited (Distribution) seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
25 of 2019
Reschedule with further notice
2502 Thu 21/02/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
Reschedule with further notice
2503 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Reschedule with further notice
2504 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 74 of 2016.
358 of 2018
Completed
2505 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
357 of 2018
Completed
2506 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.
356 of 2018
Completed
2507 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
Completed
2508 Thu 21/02/2019 10:00:00 AM
Hearing
Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Completed
2509 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
Reschedule with further notice
2510 Thu 21/02/2019 10:00:00 AM
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
Completed
2511 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule with further notice
2512 Thu 21/02/2019 10:00:00 AM
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
5
2513 Wed 20/02/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
Reschedule with further notice
2514 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Reschedule
2515 Wed 20/02/2019 10:00:00 AM
Hearing
Petition filed by Shri Hiren Jayendra Nagda under Sections 61 and 62 of Electricity Act, 2003 under Regulations 94, 95, 97 R/w 96 MERC (Conduct of Business) Regulations, 2004, and under Regulations 22,24 of MERC (Electricity Supply Code & Other Conditions of Supply) Regulations, 2005 for removal of difficulty in implementation of Regulation 12.2.
360 of 2018
Reschedule
2516 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of MSEDCL seeking recovery of annual fixed cost component in respect of MSEDCL for the energy supplied to the State pool, recovery of differential amount to be recovered towards variable rate, removal of anomalies and directions in regards to overdrawal by Mumbai utilities in Balancing and Settlement Mechanism as per provision of ABT Order dated 17.05.2007 in Case No 42 of 2006.
297 of 2018
Reschedule
2517 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22ndJuly, 2016in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
Reschedule
2518 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
Reschedule
2519 Wed 20/02/2019 10:00:00 AM
Hearing
358 of 2018
Reschedule
2520 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
357 of 2018
Reschedule
2521 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited against non-compliance by Maharashtra State Electricity Distribution Company Limited of the Order dated March 16, 2017 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 75 of 2016.
356 of 2018
Reschedule
2522 Wed 20/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
Reschedule
2523 Mon 11/02/2019 10:00:00 AM
Hearing
358 of 2018
Reschedule
2524 Mon 11/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
357 of 2018
Reschedule
2525 Mon 11/02/2019 10:00:00 AM
Hearing
356 of 2018
Reschedule
2526 Mon 11/02/2019 10:00:00 AM
Hearing
Petition of CLP Wind Farms (India) Private Limited under Section 86(1) (f) of the Electricity Act, 2003 for pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Co. Limited.
355 of 2018
Reschedule
2527 Fri 08/02/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under 'Mukhyamantri Sour Krishi Vahini Yojana' to meet MSEDCL's Solar Renewable Purchase Obligations.
15 of 2019
Reschedule
2528 Fri 08/02/2019 10:00:00 AM
Hearing
Petition for approval for purchase of bilateral power above Average rate approved for FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017 & Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of Additional Power Procurement
5 of 2019
Reschedule
2529 Fri 08/02/2019 10:00:00 AM
Hearing
Petition filed by ITC Limited under section 86(1) (f) of the Electricity Act, 2003 seeking action against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for failure in complying with regulation 26.8 of MERC (Distribution Open Access) Regulations, 2014 and Regulation 20 of MERC (distribution open access) regulations, 2016
4 of 2019
Reschedule
2530 Fri 08/02/2019 10:00:00 AM
Hearing
Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003. AND Miscellaneous Intervention Application filed by Adani Transmission (India) Ltd., in Case No. 326 of 2018
MA No. 28 of 2018 in Case No. 326 of 2018 AND 326 of 2018
Reschedule with further notice
2531 Fri 08/02/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking recovery of additional expenditure to be incurred due to sharing of fly ash transportation cost consequent to Ministry of Environment and Forest, Government of India notification dated 25.01.2016.
371 of 2018
Reschedule
2532 Fri 08/02/2019 10:00:00 AM
Hearing
Addendum Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Reschedule
2533 Thu 07/02/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.
6 of 2019
Reschedule
2534 Thu 07/02/2019 10:00:00 AM
Hearing
Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Compliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitionerâ??s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.
272 of 2018
Reschedule
2535 Thu 07/02/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for Non-Compliance of the Honâ??ble MERC Order dated 19.03.2018 (in case no. 114 of 2016) under Section 142 & 146 of EA 2003 by Indian Railways (114 of 2016) Petition of Maharashtra State Electricity Distribution Co. Ltd for a mechanism for recovery of charges on account of over-drawal by Indian Railways)
2 of 2019
Reschedule with further notice
2536 Thu 07/02/2019 10:00:00 AM
Hearing
Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.
343 of 2018
Reschedule
2537 Thu 07/02/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)
286 of 2018
Reschedule
2538 Thu 07/02/2019 10:00:00 AM
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
Reschedule
2539 Wed 06/02/2019 10:00:00 AM
Hearing
Petition filled by Adani Electricity Mumbai Limited seeking Quashing/setting aside of Impugned Bill dated 25th January 2019 issued by the Maharashtra State Power Committee (MSPC.)
28 of 2019
Completed
2540 Wed 06/02/2019 10:00:00 AM
Hearing
The Petitioner The Tata Power Company Limited (Distribution) has filed under the provision of the Electricity Act, 2003 ("Electricity Act") seeking quashing of Maharashtra State Power Committee's Provisional Fixed Charge Bill under Intra State ABT for FY 2011-12 to FY 2017-18 dated 25.01.2019 and for direction.
-MA No. 4 of 2019 in Case No. 25 of 2019
Completed
2541 Wed 06/02/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Reschedule
2542 Wed 06/02/2019 10:00:00 AM
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
367 of 2018
Completed
2543 Wed 06/02/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No. 236/2016.
363 of 2018
Completed
2544 Wed 06/02/2019 10:00:00 AM
Hearing
Petition of Shri Shriram Tukaram Hissal regarding non-compliance of the CGRF Akola, Case No. 32/2018 dated 28.09.2018 by Maharashtra State Electricity Distribution Co. Ltd.
350 of 2018
Completed
2545 Wed 06/02/2019 10:00:00 AM
Hearing
Petition of Shri Purnaji Omkar Hage regarding non-compliance of the Electricity Ombudsman, Nagpur Order No. 27/2018 dated 23.08.2018 by Maharashtra State Electricity Distribution Co. Ltd.
348 of 2018
Completed
2546 Tue 05/02/2019 12:00:00 PM
Hearing
Petition of Maharashtra State Power Generation Company Limited for seeking recovery of additional expenditure to be incurred due to sharing of fly ash transportation cost consequent to Ministry of Environment and Forest, Government of India notification dated 25.01.2016.
371 of 2018
Reschedule with further notice
2547 Tue 05/02/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra Metro Rail Corporation Ltd. seeking Review of Order dated 16.01.2018 passed in Case No. 133 of 2016 (Petition of Maharashtra Metro Rail Corporation Ltd. seeking relaxation in the capacity limits for eligibility under the Roof-top Solar PV Net Metering Regulations, 2015.)
286 of 2018
Completed
2548 Tue 05/02/2019 10:00:00 AM
Hearing
272 of 2018
Completed
2549 Tue 05/02/2019 10:00:00 AM
Hearing
Petition filed by Adani Power Maharashtra Limited under Section 86 read with Section 63 of the Electricity Act, 2003 and Article 13/10 of the PPAs dated 08.09.2008 and dated 31.03.2010, 09.08.2010 & 16.02.2013 for approval of grant of Carrying Cost.
343 of 2018
Completed
2550 Tue 05/02/2019 10:00:00 AM
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
Completed
2551 Mon 04/02/2019 10:00:00 AM
Hearing
Application for Impleadment by The Tata Power Company Limited in Case No. 326 of 18 (Petition filed by Jaigad Power Transco Limited under Section 86 of the Electricity Act, 2003 and other applicable provisions of the Electricity Act, 2003.(Recovery of transmission Charges from STU, Reference Case No 162 of 2016).)
MA No. 3 of 2019 in Case No. 326 of 2018
Completed
2552 Mon 04/02/2019 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for removal difficulties in implementation of Maharashtra Electricity Regulatory Commission (Standard of Performance of Distribution Licensees, Period for giving supply and determination of compensation) Regulations, 2014 for releasing new connection and determination of compensation for Agriculture Connection.
6 of 2019
Completed
2553 Mon 04/02/2019 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for seeking approval on adoption of Tariff for Long Term Procurement of 200 MW Solar Power through MSPGCL from the solar projects (Phase-I) to be set up under 'Mukhyamantri Sour Krishi Vahini Yojana' to meet MSEDCL's Solar Renewable Purchase Obligations.
15 of 2019
Completed
2554 Mon 04/02/2019 10:00:00 AM
Hearing
Petition for approval for purchase of bilateral power above Average rate approved for FY 2018-19 in the Mid-Term Review Order dated 12.09.2018 in Case No. 203 of 2017 & Regulation 21 of MERC (Multi Year Tariff) Regulations 2015, in respect of Additional Power Procurement
5 of 2019
Completed
2555 Mon 28/01/2019 10:00:00 AM
Hearing
Petition of ITC Limited pertaining to wrongful denial/restriction of short term open access applications under Section 42 of the Electricity Act, 2003 read with the provisions of the MERC (Distribution Open Access) Regulations, 2016
370 of 2018
Reschedule
2556 Mon 28/01/2019 10:00:00 AM
Hearing
Petition of SEP Energy Private Limited under Sections 9 read with 42 (2) read with 49 read with 61 read with 62 read with 66 read with 86 (1) (b) and (f) read with 86 (3) and (4) of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016.
367 of 2018
Reschedule
2557 Wed 23/01/2019 10:00:00 AM
Hearing
Petition of Shri Dilip Bhikaji Dethe against Maharashtra Eastern Grid Power Transmission Company, Akola for non-compliance of the MERC Order and non compliance of Order passed by Sub Divisional Magistrate Order, Buldhana.
359 of 2018
Reschedule with further notice
2558 Wed 23/01/2019 10:00:00 AM
Hearing
Petition filed by M/s. Nath Seeds Limited for non compliance of the Order dt. 05.10.2018 passed by Hon'ble Appellate Authority (u/s 127 of EA 2003) in appeal No. 236/2016
363 of 2018
Reschedule
2559 Wed 23/01/2019 10:00:00 AM
Hearing
Petition of Tata Power Company Limited Review in Case No 265 of 2018 dated 12th September, 2018 in the matter of Revision of transmission Tariff determined in Order dated 22nd July, 2016 in Case No. 91 of 2016 in pursuance of Mid-term Review process.
361 of 2018
Reschedule
2560 Wed 28/11/2018 10:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Limited under Section 63 of the Electricity Act, 2003 for approval and determination of compensation on account of Change in Law for Solar Project.
276 of 2018
Reschedule with further notice
2561 Tue 27/11/2018 10:00:00 AM
Hearing
Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.
216 of 2018
Reschedule with further notice
2562 Tue 27/11/2018 10:00:00 AM
Hearing
Petition of Shri. Rajesh s/o Mahadeorao Babhulkar under Section 67 (2) (e) of Electricity Act 2003 r/w rule 13 (3) of Maharashtra Electricity work license rules 2012 for the determination of valuation and payment of compensation of neera of palm tree (sindi tree).
253 of 2018
Reschedule with further notice
2563 Tue 27/11/2018 10:00:00 AM
Hearing
Petition of CLC Global A division of CLC Industries Ltd (formerly known as Spentex Industries Limited) under Section 142 & 149 (2) of the Electricity Act, 2003 for non-compliance of the MERC direction by MSEDCL and to reconsideration of Interst Rate & Period of applicability for refund of SLC /ORC /Meter Cost Etc.
261 of 2018
Completed
2564 Mon 26/11/2018 10:00:00 AM
Hearing
Petition of M/s Fabtech Projects & Engineers Limited under Section 142 & 146 for Non-Comopliance of the DOA Regulations 2016 by MSEDCL and seeking directions for restoration of the Petitionerâ??s Contract Demand for the billing month August 2016 and consequential reliefs from the MSEDCL.
272 of 2018
Reschedule with further notice
2565 Mon 26/11/2018 10:00:00 AM
Hearing
Petition of Pudumjee Paper Products Ltd. under Section 62(6) of the Electricity Act, 2003 for Illegal levy of Voltage Surcharge from the Petitioner Company by the Respondent Distribution Licensee on power supplied through Express Feeder as well as on power supplied through Distribution Open Access.
271 of 2018
Reschedule with further notice
2566 Mon 26/11/2018 10:00:00 AM
Hearing
Petition of M/s Shree Cement Limited under section 86 (1) (E) of the Electricity Act, 2003 seeking amendment in Regulation 2(4) and 20.1 of MERC (DOA) Regulations, 2016 and clarification W.R.T simultaneous of Open Access facility and Banking of Power from Co-located RE Power Plant by an eligible Industrial Consumer.
269 of 2018
Reschedule with further notice
2567 Mon 26/11/2018 10:00:00 AM
Hearing
Petition of The President General Merchants Distributor's Co-operative market cum Housebuilding Society Ltd., for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 15/2018 order dated 28.05.2018
255 of 2018
Reschedule with further notice
2568 Mon 26/11/2018 10:00:00 AM
Hearing
Petition of M/s Maa Rajulde Agro Industries against MSEDCL for non-compliance of order passed by Hon'ble Akola CGRF in complaint No. 16/2018 order dated 28.05.2018.
254 of 2018
Reschedule with further notice
2569 Thu 15/11/2018 10:00:00 AM
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Reschedule
2570 Thu 15/11/2018 10:00:00 AM
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
Reschedule
2571 Wed 14/11/2018 10:00:00 AM
Hearing
Petition of Mrs. Geetha Pundaleeka under section 86 (1) (f) read with petition under Regulation 92, 93 and 94 of the MERC (Conduct of Business) Regulations, 2004 praying the Hon'ble Commission to exercise its inherent powers.
262 of 2018
Reschedule with further notice
2572 Wed 14/11/2018 10:00:00 AM
Hearing
Petition of M/s. Krishna Valley Power Private Limited and Sahyadri Renewable Energy Private Ltd for non compliance of the Order of Hon'ble Commission, Order dated 15.01.2018 passed in Case No. 137 of 2017.
260 of 2018
Reschedule
2573 Wed 14/11/2018 10:00:00 AM
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
Reschedule
2574 Wed 14/11/2018 10:00:00 AM
Hearing
Petition of Century Rayon seeking Review of the Order dated 25.04.2018 passed by this Hon'ble Commission in Case i.e. M.A. No.18 of 2017 filed in MERC Case No.99 of 2017 and by review seeking implementation of interim relief from retrospective effect i.e. from the date of MYT Order i.e. dated 03.11.2016 passed in Case No.48 of 2016.
246 of 2018
Reschedule
2575 Wed 14/11/2018 10:00:00 AM
Hearing
Petition of Mahati Hydro Power Projects Private Limited under Section 86(1)(f) of the Electricity Act, 2003 for seeking compliance of MSEDCL to meet start-up power requirement for its 2 X 2 MW Sonawade Small Hydro Electric Project through existing evacuation network and allow to continue the netting-off of start-up power against power supplied by Mahati Hydro Power Projects Private Limited from its Sonawade Small Hydro Electric Project according to the Energy Purchase Agreement and as per the MYT Order dated November 03, 2016 in Case No 48 of 2016 pronounced by this Hon'ble Commission.
244 of 2018
Reschedule
2576 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Green Infra Corporate Solar Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Corporate Solar Limited.
267 of 2018
Reschedule with further notice
2577 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Dr. Shri. Girish Dadasaheb Dhadwad, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.29/2017-18, Dt. of order: 02/02/2018.
241 of 2018
Reschedule
2578 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Dr. Shri. Hemant Janardan Kotwal, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.30/2017-18, Dt. of order: 02/02/2018.
240 of 2018
Reschedule
2579 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.
228 of 2018
Reschedule
2580 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Mutual Technologies Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately along with delayed payment charges and interest accrued thereupon and Petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
221 of 2018
Reschedule with further notice
2581 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreements executed on 19.08.2014 and 07.10.2014
259 of 2018
Reschedule with further notice
2582 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Green Infra Wind Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Limited under Energy Purchase Agreement executed on 19.07.2007.
258 of 2018
Reschedule with further notice
2583 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Green Infra Wind Energy Project Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra Wind Energy Project Limited under Energy Purchase Agreements executed on 03.03.2014, 11.03.2014 and 15.03.2014.
257 of 2018
Reschedule with further notice
2584 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Green Infra BTV Limited under section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute qua non-payment of outstanding amount by Maharashtra State Electricity Distribution Company Ltd. for supply of energy by M/s Green Infra BTV Limited under Energy Purchase Agreements executed on 06.11.2012 and 21.02.2013
243 of 2018
Reschedule with further notice
2585 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Dynamic Process Private Limited for seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
205 of 2018
Reschedule with further notice
2586 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Asahi India Glass Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (â??DOA Regulationsâ??), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
219 of 2018
Reschedule
2587 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2018
Reschedule
2588 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
Reschedule
2589 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of M/s Nagreeka Exports Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations (â??DOA Regulationsâ??), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
209 of 2018
Reschedule
2590 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Orient Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
206 of 2018
Reschedule
2591 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
Reschedule
2592 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Mahindra & Mahindra Limited against MSEDCL for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer, hence liable for action under section 142 & 146 of Electricity Act, 2003.
179 of 2018
Reschedule
2593 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Jindal Poly Films Limited under Section 86 (1) (K) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations, 2016 for clarification regarding the applicability of power factor incentive to the Open Access power consumption of HT Consumers.
173 of 2018
Reschedule
2594 Tue 13/11/2018 10:00:00 AM
Hearing
Petition of Praxair India Pvt. Limited under section 142, 146 & 149 of Electricity Act, 2003 for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action.
169 of 2018
Reschedule
2595 Mon 12/11/2018 10:00:00 AM
Hearing
Petition of M/s. Orange Maha Wind Energy Private Limited under Section 86(1) of the Electricity Act, 2003 for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the various Wind Energy Purchase Agreements entered into between the parties
268 of 2018
Reschedule with further notice
2596 Mon 12/11/2018 10:00:00 AM
Hearing
Petition of M/s. Paranjape Autocast Private Limited under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of order of the CGRF, Baramati Zone, constituted by the MERC Regulations and offence has been committed is attributable to most careless neglect on the part of officer of Company regarding the matter of non compliance of CGRF order and wrong application of the dedicated distribution facility by the MSEDCL and attempt of illegal recovery against existing infrastructure by the MSETCL.
234 of 2018
Reschedule
2597 Mon 12/11/2018 10:00:00 AM
Hearing
Petition of Jain Agriculture Equipment against Maharashtra State Electricity Distribution Co. Ltd under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of Orders dated 08/06/2018 passed by Hon'ble Appellate Authority in case No. 01/2018.
220 of 2018
Reschedule
2598 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Dr. Shri. Girish Dadasaheb Dhadwad, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.29/2017-18, Dt. of order: 02/02/2018.
241 of 2018
Reschedule with further notice
2599 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Dr. Shri. Hemant Janardan Kotwal, Sun Scan center (Hospital) against MSEDCL under Section 142 & 146 of the EA, 2003 for non-compliance of the GGRF Order, Nashik in Case No.30/2017-18, Dt. of order: 02/02/2018.
240 of 2018
Reschedule with further notice
2600 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Suzlon Energy Limited for seeking refund / compensation for erecting evacuation infrastructure installed for connecting renewable energy project to the grid.
228 of 2018
Reschedule with further notice
2601 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Asahi India Glass Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ('DOA Regulations'), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
219 of 2018
Reschedule with further notice
2602 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Ultratech Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
218 of 2018
Reschedule with further notice
2603 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
Reschedule with further notice
2604 Sat 03/11/2018 10:00:00 AM
Hearing
209 of 2018
Reschedule with further notice
2605 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Orient Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
206 of 2018
Reschedule with further notice
2606 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
Reschedule with further notice
2607 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Mahindra & Mahindra Limited against MSEDCL for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer, hence liable for action under section 142 & 146 of Electricity Act, 2003.
179 of 2018
Reschedule with further notice
2608 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Jindal Poly Films Limited under Section 86 (1) (K) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations, 2016 for clarification regarding the applicability of power factor incentive to the Open Access power consumption of HT Consumers.
173 of 2018
Reschedule with further notice
2609 Sat 03/11/2018 10:00:00 AM
Hearing
Petition of Praxair India Pvt. Limited under section 142, 146 & 149 of Electricity Act, 2003 for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action.
169 of 2018
Reschedule with further notice
2610 Fri 02/11/2018 10:00:00 AM
Hearing
Petition of Dodson-Lindblom Hydro Power Private Limited under Section 86 (1) read with Section 62, 142 and 146 of the Electricity Act, 2003 and MERC (Renewable Purchase Obligation, its compliance and implementation of REC Framework), Regulations, 2010 for adjudication of disputes between Petitioner and Respondent No. 1.
251 of 2018
Completed
2611 Fri 02/11/2018 10:00:00 AM
Hearing
Petition of Gateway Terminals India Private Limited under Section 62 (6) of the Electricity Act, 2003 for an unlawful Tariff charged from the Petitioner by the Respondent by way of a Levy of 20% service charge as per Article 8.19 of a License agreement executed between the Petitioner and Respondent.
247 of 2018
Reschedule with further notice
2612 Fri 02/11/2018 10:00:00 AM
Hearing
Petition of Ordnance Factory Ambajhari Seeking Intervention and Direction of this Hon'ble Commission U/s. 86 (1) (e) of the Electricity Act, 2003 in matter of 5 MW Ground Mounted Grid Connected PV Solar Power Plant installed by M/s. Azure Power Uranus Pvt. Ltd. at Ordnance Factory Ambajhari, Nagpur, under 300 MW Defence Scheme of Government of India.
211 of 2018
Reschedule with further notice
2613 Thu 01/11/2018 10:00:00 AM
Hearing
Petition of M/s. Krishna Valley Power Private Limited and Sahyadri Renewable Energy Private Ltd for non compliance of the Order of Hon'ble Commission, Order dated 15.01.2018 passed in Case No. 137 of 2017.
260 of 2018
Reschedule with further notice
2614 Thu 01/11/2018 10:00:00 AM
Hearing
Petition of Century Rayon seeking Review of the Order dated 25.04.2018 passed by this Hon'ble Commission in Case i.e. M.A. No.18 of 2017 filed in MERC Case No.99 of 2017 and by review seeking implementation of interim relief from retrospective effect i.e. from the date of MYT Order i.e. dated 03.11.2016 passed in Case No.48 of 2016.
246 of 2018
Reschedule with further notice
2615 Thu 01/11/2018 10:00:00 AM
Hearing
Petition of Mahati Hydro Power Projects Private Limited under Section 86(1)(f) of the Electricity Act, 2003 for seeking compliance of MSEDCL to meet start-up power requirement for its 2 X 2 MW Sonawade Small Hydro Electric Project through existing evacuation network and allow to continue the netting-off of start-up power against power supplied by Mahati Hydro Power Projects Private Limited from its Sonawade Small Hydro Electric Project according to the Energy Purchase Agreement and as per the MYT Order dated November 03, 2016 in Case No 48 of 2016 pronounced by this Hon'ble Commission.
244 of 2018
Reschedule with further notice
2616 Thu 01/11/2018 10:00:00 AM
Hearing
Petition of M/s. Paranjape Autocast Private Limited under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of order of the CGRF, Baramati Zone, constituted by the MERC Regulations and offence has been committed is attributable to most careless neglect on the part of officer of Company regarding the matter of non compliance of CGRF order and wrong application of the dedicated distribution facility by the MSEDCL and attempt of illegal recovery against existing infrastructure by the MSETCL.
234 of 2018
Reschedule with further notice
2617 Thu 01/11/2018 10:00:00 AM
Hearing
Petition of Jain Agriculture Equipment against Maharashtra State Electricity Distribution Co. Ltd under Section 142 & 146 of the Electricity Act, 2003 for Non compliance of Orders dated 08/06/2018 passed by Hon'ble Appellate Authority in case No. 01/2018.
220 of 2018
Reschedule with further notice
2618 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.
172 of 2018
Reschedule with further notice
2619 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
Reschedule
2620 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
231 of 2018
Reschedule
2621 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
230 of 2018
Reschedule
2622 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
229 of 2018
Reschedule
2623 Wed 31/10/2018 10:00:00 AM
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for clarification of Order dated 12th July, 2018 passed by Hon'ble Commission in MERC case No. 84 of 2015.
225 of 2018
Reschedule with further notice
2624 Tue 30/10/2018 10:00:00 AM
Hearing
Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)
148 of 2014
Reschedule with further notice
2625 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
Reschedule with further notice
2626 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Reschedule with further notice
2627 Tue 30/10/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule with further notice
2628 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Reschedule with further notice
2629 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Reschedule with further notice
2630 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.
245 of 2018
Reschedule
2631 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Honâ??ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)
237 of 2018
Reschedule
2632 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Honâ??ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge (â??LPSâ??) and interest accrued thereupon.
236 of 2018
Reschedule
2633 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.
235 of 2018
Reschedule
2634 Tue 30/10/2018 10:00:00 AM
Hearing
Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .
232 of 2018
Reschedule
2635 Sat 27/10/2018 10:00:00 AM
Hearing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Reschedule
2636 Sat 27/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.
172 of 2018
Reschedule
2637 Tue 23/10/2018 10:00:00 AM
Hearing
Petition of Laxmipati Balaji Supply Chain Management Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Laxmipati Balaji Supply Chain Management Limited ("LBSCML"/Co-Developer") for the Sector Specific SEZ and Information Technology (IT) SEZ being developed by Arshiya International Limited ("AIL"/"Developer") at Village Sai, Taluka Panvel, Dist. Raigad, Maharashtra, and for issuing the Specific Conditions of Distribution License, as may be made applicable to the Petitioner.
275 of 2018
Reschedule with further notice
2638 Tue 23/10/2018 10:00:00 AM
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
Reschedule with further notice
2639 Tue 23/10/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/ Objections on VIPL-Generation's Petition for Revised Truing up of ARR for FY 2014-15, Truing up of ARR for FY 2015-16 and FY 2016-17, Provisional Truing up of ARR for FY 2017-18, Revised ARR and Tariff for FY 2018-19 and FY 2019-20
199 of 2017
Reschedule with further notice
2640 Mon 22/10/2018 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
Reschedule
2641 Mon 22/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
Reschedule
2642 Mon 22/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
Reschedule
2643 Mon 22/10/2018 10:00:00 AM
Hearing
Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.
222 of 2018
Reschedule
2644 Sat 20/10/2018 10:00:00 AM
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
Reschedule
2645 Fri 19/10/2018 22:00:00 PM
Hearing
Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)
217 of 2018
Reschedule
2646 Fri 19/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval on adoption of Tariff for long term procurement of 235 MW solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' with 2 to 10 MW capacity projects connected to Distribution Network under Section 63 of the Electricity Act, 2003 for Meeting the Solar Renewable Purchase Obligations.
277 of 2018
Reschedule with further notice
2647 Fri 19/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) seeking direction of the Commission to Global Energy Private Limited (GEPL) to pay outstanding amount of the Standby Arrangement under the Standby Power Agreements dated 13 June, 2014, 29 August, 2015 and 30 June, 2016.
78 of 2018
Reschedule with further notice
2648 Fri 19/10/2018 10:00:00 AM
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
Reschedule with further notice
2649 Fri 19/10/2018 10:00:00 AM
Hearing
Suo moto proceeding in the matter of taking on record the Deemed Distribution Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.
149 of 2017
Reschedule with further notice
2650 Fri 19/10/2018 10:00:00 AM
Hearing
Petition of Shyam Indus Power Solutions Pvt. Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Petitioner and Global Energy Pvt Ltd.
274 of 2018
Reschedule with further notice
2651 Wed 17/10/2018 10:00:00 AM
Hearing
Petition of Shah Promoters & Developers under Section 86(1)(f), 86(1)(k), 142 and 146 of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters & Developers and Maharashtra State Electricity Distribution Company Limited.
245 of 2018
Reschedule with further notice
2652 Wed 17/10/2018 10:00:00 AM
Hearing
Petition of Baidyanath Power Private Limited against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 11.04 and 12.02 of the Energy Purchase Agreement entered between the Applicant and the Respondent. (Late Payment Surcharge)
237 of 2018
Reschedule with further notice
2653 Wed 17/10/2018 10:00:00 AM
Hearing
Petition of Neha Sharma against the MSEDCL seeking the kind indulgence of this Hon'ble Commission in directing MSEDCL to comply with Article 10.05 of the EPA dated 21.03.2017 and pay the outstanding amounts to the Applicants alongwith Late Payment Surcharge ("LPS") and interest accrued thereupon.
236 of 2018
Reschedule with further notice
2654 Wed 17/10/2018 10:00:00 AM
Hearing
Petition of M/s. Markdata Green Energy Private Limited under Section 86(1)(E)(K) of the Electricity Act, 2003 read with 93 and 94 of MERC(Conduct of Business) Regulations, 2004 praying the Commission to to exercise its inherent powers and requesting the Commission to issue necessary directions to MSEDCL to honor the terms and conditions of Article11.04 of the Energy Purchase Agreement dated 24.6.2014 & amended EPA dated 14.1.2016 entered between the Applicant and the Respondent.
235 of 2018
Reschedule with further notice
2655 Wed 17/10/2018 10:00:00 AM
Hearing
Petition of Jewelex India Private Limited under Section 86(1)(f) of the Electricity Act, 2003 seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and other remedies and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of article 12 of the Energy Purchase Agreement dated 24.04.2006 entered between the Petitioner and the Respondent .
232 of 2018
Reschedule with further notice
2656 Tue 16/10/2018 22:00:00 PM
Hearing
Petition of Bharat Electronics Limited under Regulation 15 R/W Regulation 85 of the MERC (Conduct of Business) Regulations, 2004 for Review of Order dated 15.06.2018 in case No. 160/2017 (Allocation of 3 MW Solar Power Project to Ammunition Factory Khadki, Pune, Under 300MW Defence Scheme of Govt. if India.)
217 of 2018
Reschedule with further notice
2657 Tue 16/10/2018 10:00:00 AM
Hearing
Petition of M/s Topworth Urja and Metals Ltd under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4 May, 2018 passed in Case No.5 of 2016.
174 of 2018
Reschedule with further notice
2658 Tue 16/10/2018 10:00:00 AM
Hearing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) of Electricity Act, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
249 of 2018
Reschedule with further notice
2659 Tue 16/10/2018 10:00:00 AM
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
Reschedule with further notice
2660 Tue 16/10/2018 10:00:00 AM
Hearing
Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
227 of 2018
Reschedule with further notice
2661 Tue 16/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra Krushak Hitwardhak Sanghatana for directions, the respondent company be directed not to disconnect the electricity supply of the agriculturists on the basis of non- payment of the electricity bills as such the State Government has already paid the said bills to respondent company. The Petition is filed in view of the directions given by the Hon'ble High Court.
250 of 2018
Reschedule with further notice
2662 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.
190 of 2018
Reschedule with further notice
2663 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Ltd. against MSEDCL's action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Baramati, Pune
187 of 2018
Reschedule with further notice
2664 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Ltd. against MSEDCLâ??s action of arbitrary levy of wheeling charges & losses for FY 2015-2016 and FY 2016-2017 to its plant located at Butibori, Nagpur.
159 of 2018
Reschedule with further notice
2665 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of Mrs. Aishwarya Rai Bachchan under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Mrs. Aishwarya Rai Bachchan and Maharashtra State Electricity Distribution Company Limited.
256 of 2018
Reschedule with further notice
2666 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s Silverline Investment Company Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Silverline Investment Company Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
231 of 2018
Reschedule with further notice
2667 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s Vostok (Fareast) Securities Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Vostok (Fareast) Securities Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
230 of 2018
Reschedule with further notice
2668 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s Bengal Cardboard Industries & Printers Pvt. Ltd. under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s Bengal Cardboard Industries & Printers Pvt. Ltd. and Maharashtra State Electricity Distribution Company Limited
229 of 2018
Reschedule with further notice
2669 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s. Bhilwara Green Energy Limited under section 86 (1) (f) of the Electricity Act, 2003 field on behalf of M/s. Bhilwara Green Energy Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provision of the various Wind Energy Purchase Agreements entered into between the parties.
222 of 2018
Reschedule with further notice
2670 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
Reschedule with further notice
2671 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
Reschedule with further notice
2672 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
Reschedule with further notice
2673 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of Rattan India Power Limited under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of PPAs dated 22.04.2010 and 05.06.2010 executed between Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Rattan India Power Limited (RPL) for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
227 of 2018
Reschedule
2674 Mon 15/10/2018 10:00:00 AM
Hearing
Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Section 142, 146 and 149 the Electricity Act, 2003 for non-compliance of Hon'ble CGRF, Baramati zone's Order dated 14 May, 2018 for Case No. 03 of 2018 and non resolution matter related to the connection by MSEDCL.
210 of 2018
Reschedule
2675 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.
223 of 2018
Reschedule
2676 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Shri Laxman Mahadev Galave against MSEDCL for non compliance of Electricity Ombudsman Order dated 7.3.2018 passed in Representation No. 23 of 2018 and CGRF Kolhapur Order dated 16.10.2017.ion vide Trading License bearing No. 01 of 2018 dated 27.04.2018.
216 of 2018
Reschedule
2677 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
Reschedule
2678 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Reschedule
2679 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon'ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.
175 of 2018
Reschedule
2680 Fri 12/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Reschedule
2681 Thu 11/10/2018 10:00:00 AM
Hearing
Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.
110 of 2018
Reschedule
2682 Thu 11/10/2018 10:00:00 AM
Hearing
Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.
111 of 2018
Reschedule
2683 Thu 11/10/2018 10:00:00 AM
Hearing
Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.
162 of 2018
Reschedule
2684 Thu 11/10/2018 10:00:00 AM
Hearing
Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.
107 of 2018
Reschedule
2685 Wed 10/10/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd for requesting the Honâ??ble Commission to review its order dated 12.07.2018 passed in Case No. 84 of 2015. (Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd. regarding compliance of direction given by the Commission in the Order dated 11 November, 2014 in Case No. 127 of 2014 and Discussion Paper regarding the treatment of similar cases post expiry of Energy Purchase Agreement).
264 of 2018
Reschedule
2686 Wed 10/10/2018 10:00:00 AM
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
Reschedule
2687 Wed 10/10/2018 10:00:00 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of MERC Order Case No. 115 of 2017 dated 03 May, 2018.
182 of 2018
Reschedule
2688 Wed 10/10/2018 10:00:00 AM
Hearing
Petition of Shri Haribhau Digambar Khapare under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC Order in Case No. 70 of 2005 dated 08.09.2006.
180 of 2018
Reschedule
2689 Wed 10/10/2018 10:00:00 AM
Hearing
Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.
61 of 2018
Reschedule
2690 Wed 10/10/2018 10:00:00 AM
Hearing
Petition of Shri Rahul Mohan Devmore under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC SoP Regulation, 2005.
181 of 2018
Reschedule
2691 Tue 09/10/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon'ble Commission to allow cumulative fulfilment of its Renewable Purchase Obligation Targets for Solar Power for FY 2017-18 and FY 2018-19.
108 of 2018
Reschedule
2692 Tue 09/10/2018 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited for Approval for fulfilling Solar RPO Targets of FY 2017-18.
114 of 2018
Reschedule
2693 Tue 09/10/2018 10:00:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval of the Commission to allow cumulative fulfillment of its Renewable Purchase Obligation targets for Solar Power for FY 2017-18 and FY 2018-19.
109 of 2018
Reschedule
2694 Tue 09/10/2018 10:00:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Regulation 7 and 16 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2016, in respect of cumulative fulfillment of Renewable Purchase Obligation (RPO) for FY 2016-17, FY 2017-18 and FY 2018-19.
94 of 2018
Reschedule
2695 Mon 08/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.
187 of 2018
Reschedule
2696 Mon 08/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.
123 of 2018
Reschedule
2697 Mon 08/10/2018 10:00:00 AM
Hearing
Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.
174 of 2018
Reschedule
2698 Mon 08/10/2018 10:00:00 AM
Hearing
Petition of Laxmi Organic Industries Limited under Section 142 of Electricity Act, 2003 for non compliance of order dated 02.04.2018 passed in Case No.97 of 2016.
168 of 2018
Reschedule
2699 Mon 08/10/2018 10:00:00 AM
Hearing
Petition of Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.
159 of 2018
Reschedule
2700 Mon 08/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order.
158 of 2018
Reschedule
2701 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.
223 of 2018
Reschedule
2702 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
Reschedule
2703 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Reschedule
2704 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon'ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.
175 of 2018
Reschedule
2705 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Reschedule
2706 Sun 07/10/2018 10:00:00 AM
Hearing
Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P.P.A. dated 18-12-2010, executed between petitioner and Respondent.
171 of 2018
Reschedule with further notice
2707 Sat 06/10/2018 10:00:00 AM
Hearing
Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Tata Power Co. Ltd. for levy of Tariff by arbitrarily subjecting the partial Open Access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.
148 of 2014
Completed
2708 Sat 06/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.
78 of 2018
Completed
2709 Sat 06/10/2018 10:00:00 AM
Hearing
Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.
174 of 2018
Completed
2710 Sat 06/10/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd for requesting the Hon'ble Commission to review its order dated 12.07.2018 passed in Case No. 84 of 2015. (Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd. regarding compliance of direction given by the Commission in the Order dated 11 November, 2014 in Case No. 127 of 2014 and Discussion Paper regarding the treatment of similar cases post expiry of Energy Purchase Agreement).
264 of 2018
Completed
2711 Sat 06/10/2018 10:00:00 AM
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
Reschedule
2712 Sat 06/10/2018 10:00:00 AM
Hearing
Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.
110 of 2018
Reschedule
2713 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Hon'ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.
175 of 2018
Completed
2714 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Mohite Industries Limited against Maharashtra State Electricity Distribution Company limited for non-compliance of Distribution Open Access Regulations, 2016 and to issue direction for releasing payments towards un utilised banked energy from 10 MW Small Hydro Power Project.
110 of 2018
Completed
2715 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Limited under Section 86 (1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Hindustan Petroleum Corporation Limited and MSEDCL.
223 of 2018
Reschedule with further notice
2716 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 requesting the Hon'ble Commission to review its order dated 04.05.2017 passed in Case No. 37 and 38 of 2017.
248 of 2018
Completed
2717 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.
190 of 2018
Completed
2718 Fri 05/10/2018 10:00:00 AM
Hearing
Implementation of the Appellate Tribunal for Electricity ( ATE)'s Judgment dated 07 August, 2018 in Appeal No. 77 of 2015 filed by Global Energy Private Ltd. (GEPL) challenging Commission's Order dated 19 December, 2014 in Case No. 148 of 2014, (Petition of M/s. Global Energy Limited for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.)
148 of 2014
Completed
2719 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited Petition against Global Energy Private Limited for non-compliance of Order dated 10.04.2018 in Case No. 83 of 2017 and M.A No. 16 of 2017 passed by the Hon'ble Commission.
142 of 2018
Completed
2720 Fri 05/10/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited review petition under regulation 85 of MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 and in the matter of review of part of Order dated 10.04.2018 in Case No. 83 of 2017 and M. A. No. 16 of 2017 passed by the Hon'ble Commission and in the matter of petition of Siddhayu Ayurvedic Research foundation Pvt. Ltd. regarding non-payment of dues by Global Energy Pvt. Ltd. under the EPA dated 20.09.2012.
141 of 2018
Completed
2721 Fri 05/10/2018 10:00:00 AM
Hearing
126 of 2018
Completed
2722 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited Review of MERC Order dated 18.10.2017 in case No.38 of 2016 under Regulations 85 of MERC Conduct of Business Regulations, 2004 in relation to change in law relief under PPAs dated 08.09.2008, 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML.
84 of 2018
Completed
2723 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
Completed
2724 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Wali Mohammed S/o Abdul Aziz under Section 67 (4) of Electricity Act, 2003 R/W Rule 13 of The Maharashtra Electricity Works of Licensee Rules 2012, seeking proper compensation towards the erection of Transmission Line Tower in the Petitioner's Land by MSETCL.
215 of 2018
Completed
2725 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
Reschedule
2726 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of the Order No. 15 of 2017 dated 01.03.2018 in the matter of reduction in the technical minimum of generating units in Maharashtra as per Central Electricity Regulatory Commission norms.
115 of 2018
Completed
2727 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
Reschedule
2728 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).
145 of 2018
Reschedule with further notice
2729 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
144 of 2018
Reschedule with further notice
2730 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
143 of 2018
Reschedule with further notice
2731 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
Reschedule
2732 Thu 04/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking review of the MERC'S Order dated 02.05.2018 (Case No. 111 of 2017) in the matter to regulate purchase and procurement process of Distribution Licensees, including the price at which electricity shall be procured from the Generating companies or from other sources through agreements for purchase of power for distribution and supply within the State.
186 of 2018
Completed
2733 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.
111 of 2018
Completed
2734 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.
162 of 2018
Completed
2735 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.
107 of 2018
Completed
2736 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.
123 of 2018
Completed
2737 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
Reschedule
2738 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of M/s. Marigold Pharmaceuticals Pvt. Limited under Section 142, 146 and 149 the Electricity Act, 2003 for non-compliance of Hon'ble CGRF, Baramati zone's Order dated 14 May, 2018 for Case No. 03 of 2018 and non resolution matter related to the connection by MSEDCL.
210 of 2018
Completed
2739 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of M/s. Pranavaditya Spinning Mills Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of CGRF dated 07.02.18 read with order dated 25.01.18.
213 of 2018
Completed
2740 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of M/s. Indo Count Industries Limited under Section 142 & 146 of the Electricity Act 2003 for violating the Order of CGRF dated 07.02.18 read with order dated 25.01.18.
212 of 2018
Completed
2741 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Ordnance Factory Ambajhari Seeking Intervention and Direction of this Hon'ble Commission U/s. 86 (1) (e) of the Electricity Act, 2003 in matter of 5 MW Ground Mounted Grid Connected PV Solar Power Plant installed by M/s. Azure Power Uranus Pvt. Ltd. at Ordnance Factory Ambajhari, Nagpur, under 300 MW Defence Scheme of Government of India.
211 of 2018
Reschedule
2742 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Ltd. for Power Purchase Agreement between RPL and MSEDCL for 1200 MW and for issue of directions to MSLDC to accept and schedule the declared capacity of up to 258 MW for all 5 units of Amravati TPS.
59 of 2018
Completed
2743 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
Reschedule
2744 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003 seeking compensation for penalty imposed by SECL on account of non-procurement of minimum quantity of fuel by RattanIndia under the FSA, due to low despatch by MSEDCL in accordance with Clause 4.5 of Schedule 4 of the PPA between RattanIndia and MSEDCL.
146 of 2018
Completed
2745 Wed 03/10/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule
2746 Wed 03/10/2018 10:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited Review of MERC Order dated 18.10.2017 in case No.38 of 2016 under Regulations 85 of MERC Conduct of Business Regulations, 2004 in relation to change in law relief under PPAs dated 08.09.2008, 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML.
84 of 2018
Completed
2747 Tue 02/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for deviation in standard bidding document for long term procurement of solar power under 'Mukhyamantri Sour Krishi Vahini Yojana' with 2 to 10 MW capacity projects connected to distribution network with total quantum of 1400 MW through competitive bidding.
270 of 2018
Completed
2748 Tue 02/10/2018 10:00:00 AM
Hearing
Petition of Sujan Industries Unit No.2 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone Order no. 1144/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
188 to 190 of 2017, 01 to 26 of 2018 and 30 to 44 of 2018
Completed
2749 Tue 02/10/2018 10:00:00 AM
Hearing
Petition of Vidhata Metals Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-Compliance of CGRF Kalyan Zone 4 Orders of consumer no.010519035310 under Section 142 read with 146 of the EA, 2003 for violating these Orders.
182 of 2017, 54 to 58 of 2018, 66 of 2018, 80 to 82 of 2018 & 87 to 88 of 2018
Completed
2750 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.
61 of 2018
Completed
2751 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Shri Rahul Mohan Devmore under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC SoP Regulation, 2005.
181 of 2018
Completed
2752 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Shri Haribhau Digambar Khapare under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC Order in Case No. 70 of 2005 dated 08.09.2006.
180 of 2018
Completed
2753 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of MERC Order Case No. 115 of 2017 dated 03 May, 2018.
182 of 2018
5
2754 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.
187 of 2018
Completed
2755 Mon 01/10/2018 10:00:00 AM
Hearing
Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.
174 of 2018
Reschedule
2756 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Laxmi Organic Industries Limited under Section 142 of Electricity Act, 2003 for non compliance of order dated 02.04.2018 passed in Case No.97 of 2016.
168 of 2018
Completed
2757 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.
159 of 2018
Completed
2758 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order.
158 of 2018
Completed
2759 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.
78 of 2018
Reschedule
2760 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Sun-N-Sand Hotels Pvt Limited under Section 86(1)(f) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent
188 of 2018
Completed
2761 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
Reschedule
2762 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of BLP Wind Project (Amberi) Private Limited against Maharashtra State Electricity Distribution Company Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 over disputes regarding non-payment of outstanding dues including late payment surcharge.
125 of 2018
Completed
2763 Mon 01/10/2018 10:00:00 AM
Hearing
Petition of Shah Lulla Estate Developers (SLED) Sangli under Section 86 (1) (f) of the Electricity Act, 2003 for recovery of petitioner's outstanding payments for sale of wind energy and interest on delayed payments due from MSEDCL under the appropriate provisions of Energy Purchase Agreement signed with them.
79 of 2018
Completed
2764 Sun 30/09/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon'ble Commission to allow cumulative fulfilment of its Renewable Purchase Obligation Targets for Solar Power for FY 2017-18 and FY 2018-19.
108 of 2018
5
2765 Sun 30/09/2018 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited for Approval for fulfilling Solar RPO Targets of FY 2017-18.
114 of 2018
5
2766 Sun 30/09/2018 10:00:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval of the Commission to allow cumulative fulfillment of its Renewable Purchase Obligation targets for Solar Power for FY 2017-18 and FY 2018-19.
109 of 2018
5
2767 Sun 30/09/2018 10:00:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Regulation 7 and 16 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2016, in respect of cumulative fulfillment of Renewable Purchase Obligation (RPO) for FY 2016-17, FY 2017-18 and FY 2018-19.
94 of 2018
5
2768 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of POSCO Maharashtra Steel Pvt. Ltd & Ors under Section 19 of the Electricity Act, 2003 for revocation of Trading Licence dated 27 April, 2018 issued to Global Energy Private Limited and in the matter of violation of the Trading Licence Conditions.
242 of 2018
Completed
2769 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of M/s. Sandeep Dwellers Pvt. Ltd. regarding non-compliance of the Electricity Ombudsman's Order dated 28 July, 2017 and 6 March, 2018 by Maharashtra State Electricity Distribution Company Ltd.
177 of 2018
5
2770 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of M/s. Addnode India Pvt. Ltd. regarding non-compliance of the Consumer Grievance Redressal Forum's Order No. 371 dated 13 March, 2018 in Case No. 63 of 2018 by Maharashtra State Electricity Distribution Company Ltd.
157 of 2018
5
2771 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of M/s. Navjeevan Hybrid Seeds Corporation regarding non-compliance of the Commission's Order dated 9 December, 2016 in Case No. 4 of 2015 by Maharashtra State Electricity Distribution Company Ltd.
139 of 2018
Completed
2772 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of Shri. Ramdas Shripati Chavan against the Electricity Ombudsman's Order dated 26 February, 2018 passed in Representation No. 18 of 2018.
118 of 2018
Completed
2773 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of Shri. Vishnu Ramdas Chavan regarding disconnection of electricity supply without notice as per section 56 (1) of the Electricity Act, 2003 by Maharashtra State Electricity Distribution Company Ltd.
117 of 2018
Completed
2774 Sat 29/09/2018 10:00:00 AM
Hearing
Petition of SDPL Paradise Apartment & 12 others regarding non-compliance of the Electricity Ombudsmanâ??s Order dated 4 November, 2017 by Maharashtra State Electricity Distribution Company Ltd.
97 of 2018
5
2775 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Jayesh Purushottam Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited.
195 of 2018
Reschedule
2776 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Jignesh Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
193 of 2018
Reschedule
2777 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Purushottam Laljibhai Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited.
196 of 2018
Reschedule
2778 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Vipul Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Vipul Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
192 of 2018
Reschedule
2779 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Dynamic Process Private Limited for seeking directions from the Hon'ble Commission to MSEDCL for payment of outstanding bills immediately alongwith delayed payment charges and interest accrued thereupon and petition requesting the Hon'ble Commission to issue necessary directions to MSEDCL to honor the terms and conditions of clause 12 of the Energy Purchase Agreement entered between the Petitioner and the Respondent.
205 of 2018
Reschedule
2780 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Chetan Purushottam Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited.
203 of 2018
Reschedule
2781 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Sahyadri Industries Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Sahyadri Industries Limited and Maharashtra State Electricity Distribution Company Limited.
199 of 2018
Reschedule
2782 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Satyen Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Satyen Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
198 of 2018
Reschedule
2783 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Vallabhbhai Lalajibhai Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Vallabhbhai Lalajibhai Patel and Maharashtra State Electricity Distribution Company Limited.
197 of 2018
Reschedule
2784 Fri 28/09/2018 10:00:00 AM
Hearing
Petition of Gold Corporation for grant of Intra-State Trading Licence, to undertake trading of electricity, for 50 MU for the first year and gradually increase to 100 MU over a period of next five years, in the State of Maharashtra.
174 of 2017
Reschedule
2785 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking review of the MERC'S Order dated 02.05.2018 (Case No. 111 of 2017) in the matter to regulate purchase and procurement process of Distribution Licensees, including the price at which electricity shall be procured from the Generating companies or from other sources through agreements for purchase of power for distribution and supply within the State.
186 of 2018
Reschedule
2786 Thu 27/09/2018 10:00:00 AM
Hearing
Petition filed by M/s. Olam Agro India Private Limited under Section 142 and 146 of the Electricity Act, 2003 R/w Sections 62, 64 and 86 (1) (a) of the Act and in terms of the Orders passed by the Hon'ble MERC.
233 of 2018
Reschedule
2787 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P.P.A. dated 18-12-2010, executed between petitioner and Respondent.
171 of 2018
Reschedule
2788 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Asian Hotel (West) Limited Review of Order dated 09.07.2018 passed in Case No. 166 of 2018 by the Hon'ble Commission.
208 of 2018
Reschedule
2789 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Pravin Mormukut Brijwasi, as partner Rajyog Group Venture & Others for regarding Violation by MSEDCL of Supply Code Regulations and in the matter of the Order of Assessment dated 30/05/2018.
202 of 2018
Reschedule
2790 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Purushottam Laljibhai Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited.
196 of 2018
Reschedule
2791 Thu 27/09/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. seeking review of the MERC Order dated 02.05.2018 passed in Case No. 112 of 2017, Petition filed by the M/S. Olam Agro India Private Limited.
201 of 2018
Reschedule
2792 Thu 27/09/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. seeking review of the MERC Order dated 10.4.2018 passed in case No. 52 of 2017, Petition filed by the Mahati Hydro Power Projects Private Limited.
200 of 2018
Reschedule
2793 Thu 27/09/2018 10:00:00 AM
Hearing
Petition of Mahati Hydro Power Projects Private Limited against non-compliance by Maharashtra State Electricity Transmission Company Limited of the Order dated April 10, 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 52 of 2017.
194 of 2018
Reschedule
2794 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Balaso Maruti Mote under Section 94 (1) (f) of the Electricity Act, 2003 regarding non-compliance of MERC Order in Case No. 143 of 2017 dated 14.03.2018.
140 of 2018
Reschedule
2795 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Dattatray Govind Mali regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
91 of 2018
Reschedule
2796 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Bhauso Nivruti Sawant regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
90 of 2018
Reschedule
2797 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Jayendra Ramu Mangaonkar regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 91/2017 by Maharashtra State Electricity Distribution Co. Ltd.
52 of 2018
Reschedule
2798 Wed 26/09/2018 10:00:00 AM
Hearing
50 of 2018
Reschedule
2799 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Sanjay Raghu Mote regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 8 December, 2017 in Case No. 39 of 2017-18 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
89 of 2018
Reschedule
2800 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Shivaji Kondiba Hatkar regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 November, 2017 in Case No. 38 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
51 of 2018
Reschedule
2801 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Shri. Chandrashekhar Ummanna Andavgol regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 6 June, 2017 in Case No. 1 to 3 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
49 of 2018
Reschedule
2802 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Vipul Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Vipul Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
192 of 2018
Reschedule
2803 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
Reschedule
2804 Wed 26/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited compliance to directives in the Order in Case No. 59 of 2017 dated 14.12.17 for approval of Capital Cost and Tariff of Koradi Generating Units 8, 9 & 10, Chandrapur Units 8 & 9 and Parli Unit 8.
172 of 2018
Reschedule
2805 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of the Order No. 15 of 2017 dated 01.03.2018 in the matter of reduction in the technical minimum of generating units in Maharashtra as per Central Electricity Regulatory Commission norms.
115 of 2018
Reschedule
2806 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 requesting the Hon'ble Commission to review its order dated 04.05.2017 passed in Case No. 37 and 38 of 2017.
248 of 2018
Reschedule
2807 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited Petition against Global Energy Private Limited for non-compliance of Order dated 10.04.2018 in Case No. 83 of 2017 and M.A No. 16 of 2017 passed by the Hon'ble Commission.
142 of 2018
Reschedule
2808 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited review petition under regulation 85 of MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 and in the matter of review of part of Order dated 10.04.2018 in Case No. 83 of 2017 and M. A. No. 16 of 2017 passed by the Hon'ble Commission and in the matter of petition of Siddhayu Ayurvedic Research foundation Pvt. Ltd. regarding non-payment of dues by Global Energy Pvt. Ltd. under the EPA dated 20.09.2012.
141 of 2018
Reschedule
2809 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Hemant Group & Others 3 under Section 86 (1) (e) and Section 86 (2) of the Electricity Act, 2003 read with the Clause 5.12 of the National Electricity Policy dated 12.02.2005 and Clause 6.4 of the Tariff Policy dated 06.01.2006 seeking clarification from the Honâ??ble Commission that Renewable Energy Sources also includes Solar Energy meaning thereby that the Renewable Energy Policy dated 14.10.2008 notified by the GoM is a comprehensive policy for all renewable energy including Solar Energy and benefits accruing thereof to projects commissioned under the said policy needs to be passed on to the project developers by the concerned distribution licensees.
126 of 2018
Reschedule
2810 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Central Railway under Section 62 and 86 (1)(b) (e) of the EA, 2003 seeking approval for erection of Solar Power equal to transformer capacity on rooftop/ground mounted proposed to be set up in the premises of existing Central Railway's substations to mitigate its RPO target given by the Commission.
105 of 2018
Reschedule
2811 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Jayesh Purushottam Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited.
195 of 2018
Reschedule
2812 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Jignesh Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
193 of 2018
Reschedule
2813 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of The Indian Hotels Company Limited under Sections 86 (1)(a) and 86 (1)(k) read with section 62 of the Electricity Act, 2003, seeking declaratory reliefs in respect of refund of the Transport Division Loss Recovery Charge illegally collected by the Respondent during the period FY 2012-13 to FY 2015-16.
190 of 2018
Reschedule
2814 Tue 25/09/2018 10:00:00 AM
Hearing
Petition of Sun-N-Sand Hotels Pvt Limited under Section 86(1)(f) for adjucation of dispute on the issue of outstanding payments, of delayed payment surcharge and of interest on delayed payment surcharge by the Respondent
188 of 2018
Reschedule
2815 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of The Supreme Industries Limited for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer and Section 45(1) of Elect. Act-2003; hence liable for action under section 142 & 146 of Electricity Act, 2003.
189 of 2018
Reschedule
2816 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Brihanmumbai Electric Supply and Transport Undertaking (BEST) under Section 86 (1) (b) of Electricity Act, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
249 of 2018
Reschedule with further notice
2817 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Cosmo Films Limited under Section 86 (1) (k) of the Electricity Act, 2003 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
214 of 2018
Reschedule
2818 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of M/s Nagreeka Exports Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ('DOA Regulations'), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
209 of 2018
Reschedule
2819 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Orient Cement Limited under Section 86 (1) (k) of the Electricity Act (EA), 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of Power Factor Incentive to the Open Access power consumption by HT consumers.
206 of 2018
Reschedule
2820 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of M/s. Bothe Windfarm Development Private Limited seeking remittance and release of the due and payable monthly invoices raised upon MSEDCL by M/s. Bothe Windfarm Development Private Limited towards power supplied till date under various Energy Power Purchase Agreements.
185 of 2018
Reschedule
2821 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited for Arbitrary Levy of Wheeling Charges & applicable Wheeling Loss for the FY 2015-2016 and FY 2016-2017 and for non-refund of Wheeling Charges & Wheeling Loss paid to erroneously levied by the Distribution Licensee MSEDCL.
187 of 2018
Reschedule
2822 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Shri Pandurang Babu Mhatugade under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of CGRF Order, Kolhapur in Case No. 25/2017-18 Letter No. 299 dated 26-10-2017.
184 of 2018
Reschedule
2823 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Shri Balu Janoba Burugale under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of CGRF Order, Kolhapur in Case No. 68/17-18 dated 26-04-2018.
183 of 2018
Reschedule
2824 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Mahindra & Mahindra Limited against MSEDCL for violation of Clause No. 16.3 of the MERC (Distribution Open Access) Regulations, 2016 related with Power factor Incentive on open access charges paid by HT consumer, hence liable for action under section 142 & 146 of Electricity Act, 2003.
179 of 2018
Reschedule
2825 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Jindal Poly Films Limited under Section 86 (1) (K) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations, 2016 for clarification regarding the applicability of power factor incentive to the Open Access power consumption of HT Consumers.
173 of 2018
Reschedule
2826 Mon 24/09/2018 10:00:00 AM
Hearing
Petition of Praxair India Pvt. Limited under section 142, 146 & 149 of Electricity Act, 2003 for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action.
169 of 2018
Reschedule
2827 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Dattatray Govind Mali regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
91 of 2018
Completed
2828 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Bhauso Nivruti Sawant regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
90 of 2018
Completed
2829 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Jayendra Ramu Mangaonkar regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 91/2017 by Maharashtra State Electricity Distribution Co. Ltd.
52 of 2018
Completed
2830 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Hussian Aappaso Mulla regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 90/2017 and MERC Order dated 1 June, 2006, in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
50 of 2018
Completed
2831 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Sanjay Raghu Mote regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 8 December, 2017 in Case No. 39 of 2017-18 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
89 of 2018
Completed
2832 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Shivaji Kondiba Hatkar regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 November, 2017 in Case No. 38 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
51 of 2018
Completed
2833 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Chandrashekhar Ummanna Andavgol regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 6 June, 2017 in Case No. 1 to 3 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
49 of 2018
Completed
2834 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri. Balaso Maruti Mote under Section 94 (1) (f) of the Electricity Act, 2003 regarding non-compliance of MERC Order in Case No. 143 of 2017 dated 14.03.2018.
140 of 2018
Completed
2835 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri Pandurang Babu Mhatugade under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of CGRF Order, Kolhapur in Case No. 25/2017-18 Letter No. 299 dated 26-10-2017.
184 of 2018
Completed
2836 Sat 22/09/2018 10:00:00 AM
Hearing
Petition of Shri Balu Janoba Burugale under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of CGRF Order, Kolhapur in Case No. 68/17-18 dated 26-04-2018.
183 of 2018
Completed
2837 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of PPA and adoption of tariff for for procurement of 3.5 MW Base Load Power for a period of two years and six months from October 1, 2018 to March 31, 2021.
266 of 2018
Completed
2838 Fri 21/09/2018 10:00:00 AM
Hearing
Petition filed by M/s. Olam Agro India Private Limited under Section 142 and 146 of the Electricity Act, 2003 R/w Sections 62, 64 and 86 (1) (a) of the Act and in terms of the Orders passed by the Hon'ble MERC.
233 of 2018
Completed
2839 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of Asian Hotel (West) Limited Review of Order dated 09.07.2018 passed in Case No. 166 of 2018 by the Hon'ble Commission.
208 of 2018
Completed
2840 Fri 21/09/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. seeking review of the MERC Order dated 02.05.2018 passed in Case No. 112 of 2017, Petition filed by the M/S. Olam Agro India Private Limited.
201 of 2018
Completed
2841 Fri 21/09/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Transmission Co. Ltd. seeking review of the MERC Order dated 10.4.2018 passed in case No. 52 of 2017, Petition filed by the Mahati Hydro Power Projects Private Limited.
200 of 2018
Completed
2842 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of Mahati Hydro Power Projects Private Limited against non-compliance by Maharashtra State Electricity Transmission Company Limited of the Order dated April 10, 2018 of the Hon'ble Commission read with relevant provisions of the Electricity Act, 2003 in Case No. 52 of 2017.
194 of 2018
Completed
2843 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of Bhadreshwar Vidyut Private Limited (formerly known as OPGS Power Gujarat Private Limited) in accordance with the Order passed by this Honâ??ble Commission in Case No. 23 of 2017 dated 17.01.2018 against unlawful action of MSEDCL in issuing the letter dated 29.05.2018 thereby making the captive users of the Petitioner liable to pay CSS and Additional Surcharge for the power procured for captive use in FY 2017-18.
175 of 2018
Reschedule
2844 Fri 21/09/2018 10:00:00 AM
Hearing
Review Petition of M/s Topworth Urja and Metals Limited under Sections 94 of the Electricity Act, 2003 Read With Regulation 85,92,93,94 and 95 of the MERC (Conduct of Business) Regulations, 2004 Review of the Order dated 4th May, 2018 passed in Case No.5 of 2016.
174 of 2018
Reschedule
2845 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 & 149 of the Electricity Act, 2003 against MSEDCL for non-compliance of MERC Order Case No. 115 of 2017 dated 03 May, 2018.
182 of 2018
Reschedule
2846 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of Shri Haribhau Digambar Khapare under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC Order in Case No. 70 of 2005 dated 08.09.2006.
180 of 2018
Reschedule
2847 Fri 21/09/2018 10:00:00 AM
Hearing
Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.
61 of 2018
Reschedule
2848 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Chetan Purushottam Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Chetan Purushottam Patel and Maharashtra State Electricity Distribution Company Limited.
203 of 2018
Completed
2849 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Sahyadri Industries Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Sahyadri Industries Limited and Maharashtra State Electricity Distribution Company Limited.
199 of 2018
Completed
2850 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Satyen Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Satyen Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
198 of 2018
Completed
2851 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Vallabhbhai Lalajibhai Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Vallabhbhai Lalajibhai Patel and Maharashtra State Electricity Distribution Company Limited.
197 of 2018
Completed
2852 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Purushottam Laljibhai Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Purushottam Laljibhai Patel and Maharashtra State Electricity Distribution Company Limited.
196 of 2018
Completed
2853 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Jayesh Purushottam Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jayesh Purushottam Patel and Maharashtra State Electricity Distribution Company Limited.
195 of 2018
Completed
2854 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Jignesh Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Jignesh Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
193 of 2018
Completed
2855 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Vipul Vallabh Patel under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Vipul Vallabh Patel and Maharashtra State Electricity Distribution Company Limited.
192 of 2018
Completed
2856 Thu 20/09/2018 10:00:00 AM
Hearing
Petition of Central Railway under Section 62 and 86 (1)(b) (e) of the EA, 2003 seeking approval for erection of Solar Power equal to transformer capacity on rooftop/ground mounted proposed to be set up in the premises of existing Central Railway's substations to mitigate its RPO target given by the Commission.
105 of 2018
Completed
2857 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd seeking approval for procurement of long term baggase based co-generation 200 MW power through competitive bidding under Regulation No. 5 of MERC (Terms and conditions for determination of renewable energy tariff) Regulations, 2015.
263 of 2018
Completed
2858 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Distribution Co. Ltd. (MSEDCL), for seeking approval on adoption of Tariff for long term procurement of 87 MW wind power under Section 63 of the Electricity Act, 2003 and for meeting the non-solar Renewable Purchase Obligations under Section 19 of MERC (RPO, its compliance and implementation of rec framework) Regulations, 2016.
252 of 2018
Completed
2859 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of POSCO Maharashtra Steel Pvt. Ltd & Ors under Section 19 of the Electricity Act for revocation of Trading License bearing No. 01 of 2018 dated 27.04.2018 issued to Global Energy Private Limited by this Hon'ble Commission and in the matter of Violation of the trading license condition issued by this Hon'ble Commission vide Trading License bearing No. 01 of 2018 dated 27.04.2018.
242 of 2018
Completed
2860 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Shri Rahul Mohan Devmore under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of MERC SoP Regulation, 2005.
181 of 2018
Reschedule
2861 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Mahalaxmi Vidyut Pvt. Limited for Refund of Evacuation charges and Maintenance charges and Breach of P.P.A. dated 18-12-2010, executed between petitioner and Respondent.
171 of 2018
Reschedule
2862 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited for seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2017-18.
170 of 2018
Reschedule
2863 Wed 19/09/2018 10:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited Review of MERC Order dated 18.10.2017 in case No.38 of 2016 under Regulations 85 of MERC Conduct of Business Regulations, 2004 in relation to change in law relief under PPAs dated 08.09.2008, 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML.
84 of 2018
Reschedule
2864 Tue 18/09/2018 10:00:00 AM
Hearing
Petition of Laxmi Organic Industries Limited under Section 142 of Electricity Act, 2003 for non compliance of order dated 02.04.2018 passed in Case No.97 of 2016.
168 of 2018
Reschedule
2865 Mon 17/09/2018 10:00:00 AM
Hearing
Petition of Petition of Spentex Industries Ltd. for Arbitrary Levy of Wheeling Charges & Applicable Loss for the Financial Year 2015-2016 and Financial Year 2016-2017 in contradistinction to provisions of Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2014 and Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations 2015.
159 of 2018
Reschedule
2866 Mon 17/09/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order.
158 of 2018
Reschedule
2867 Fri 14/09/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by K Balan for Impleadment in MA No. 4 of 2018 filed by VIPL-G to amend the Petition in Case No. 199 of 2017 MTR Petition.
MA No. 6 of 2018
Completed
2868 Fri 14/09/2018 10:00:00 AM
Hearing
Miscellaneous Applicationfiledby K Balan for Impleadment in MA No. 3 of 2018 filed by VIPL-Gto amend thepleadings in Case No. 91 of 2015 which is under consideration for passing Order as per APTEL Order dated 03.11.2016 in Appeal No. 192 of 2016.
MA No. 5 of 2018
Completed
2869 Fri 14/09/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 199 of 2017 to raised additional grounds and prayers.
MA No 04 of 2018 in Case No. 199 of 2017
Completed
2870 Fri 14/09/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 91 of 2015 to raised additional grounds and prayers.
MA No 03 of 2018 in Case No. 91 of 2015
Completed
2871 Fri 14/09/2018 10:00:00 AM
Hearing
Petition filed Vidarbha Industries Power Ltd under Section 86 (1)(b) of the Electricity Act, 2003 read with Regulations 92 to 94 of the Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004, seeking amendment of the Power Purchase Agreement dated 14.08.2013
224 of 2018
Completed
2872 Mon 10/09/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for approval of the Hon'ble Commission to allow cumulative fulfilment of its Renewable Purchase Obligation Targets for Solar Power for FY 2017-18 and FY 2018-19.
108 of 2018
Reschedule
2873 Mon 10/09/2018 10:00:00 AM
Hearing
Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.
162 of 2018
Reschedule
2874 Mon 10/09/2018 10:00:00 AM
Hearing
Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.
111 of 2018
Reschedule
2875 Mon 10/09/2018 10:00:00 AM
Hearing
Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.
107 of 2018
Reschedule
2876 Fri 07/09/2018 10:00:00 AM
Hearing
Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).
145 of 2018
Reschedule
2877 Fri 07/09/2018 10:00:00 AM
Hearing
Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
144 of 2018
Reschedule
2878 Fri 07/09/2018 10:00:00 AM
Hearing
Petition of Zaveri & Co Zaveri & Co. Private Limited seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs 45,94,975/00 (Rs forty five lakh ninety four thousand nine hundred seventy five only)
143 of 2018
Reschedule
2879 Thu 06/09/2018 10:00:00 AM
Hearing
Petition of Purshottam Lohia for seeking Order / Directing the Respondents to pay LPS (Late Payment Surcharge) for a sum total of Rs. 27,26,160/- (Rupees Twenty Seven Lakhs Twenty Six Thousand One Hundred Sixty Only).
145 of 2018
Reschedule
2880 Thu 06/09/2018 10:00:00 AM
Hearing
Petition of The Tata Power Company Limited for Approval for fulfilling Solar RPO Targets of FY 2017-18.
114 of 2018
Reschedule
2881 Thu 06/09/2018 10:00:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Private Limited (MBPPL) for approval of the Commission to allow cumulative fulfillment of its Renewable Purchase Obligation targets for Solar Power for FY 2017-18 and FY 2018-19.
109 of 2018
Reschedule
2882 Tue 04/09/2018 10:00:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 against the Order dated March 07, 2018 pronounced by the Hon'ble Commission in Case No. 189 of 2013 and Case No. 140 of 2014.
167 of 2018
Completed
2883 Tue 04/09/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd under Rule 3(3) of the Maharashtra Electricity Works of Licensees Rules, 2012 and in the matter of the order passed by the MERC in Misc Case No. 130 of 2016 with Case No. 129 of 2016 dated 16.02.2018 regarding the order passed by the uppar District Collector, Nashik in complaint 2214/ P.K. 69/5A dated 29.09.2014 and in the matter of the Order passed by the District Collector, Nashik in pol 1/ 2938/ 2018 dated 21.06.2018
226 of 2018
Completed
2884 Tue 04/09/2018 10:00:00 AM
Public Hearing
Inviting Comments on Application of Maharashtra State Power Generation Company Limited (MSPGCL) for grant of Intra-State Trading Licence within the State of Maharashtra under Section 15 of the Electricity Act, 2003.
104 of 2018
Completed
2885 Tue 04/09/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated March 21, 2017.
149 of 2018
Reschedule
2886 Tue 04/09/2018 10:00:00 AM
Hearing
Petition of M/s. Clean Wind Power (Satara) Private Limited for release of the total amount due and payable to it by MSEDCL for supply of wind energy as per the provisions of the Wind Energy Purchase Agreement dated October 10, 2014.
148 of 2018
Reschedule
2887 Tue 04/09/2018 10:00:00 AM
Hearing
Petition of BLP Wind Project (Amberi) Private Limited against Maharashtra State Electricity Distribution Company Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 over disputes regarding non-payment of outstanding dues including late payment surcharge.
125 of 2018
Reschedule
2888 Mon 03/09/2018 10:00:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Regulation 7 and 16 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2016, in respect of cumulative fulfillment of Renewable Purchase Obligation (RPO) for FY 2016-17, FY 2017-18 and FY 2018-19.
94 of 2018
Reschedule
2889 Mon 03/09/2018 10:00:00 AM
Hearing
Petition of Shah Lulla Estate Developers (SLED) Sangli under Section 86 (1) (f) of the Electricity Act, 2003 for recovery of petitioner's outstanding payments for sale of wind energy and interest on delayed payments due from MSEDCL under the appropriate provisions of Energy Purchase Agreement signed with them.
79 of 2018
Reschedule
2890 Fri 24/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by K Balan for Impleadment in MA No. 4 of 2018 filed by VIPL-G to amend the Petition in Case No. 199 of 2017 MTR Petition.
M.A 6 of 2018
Reschedule with further notice
2891 Fri 24/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by K Balan for Impleadment in MA No. 3 of 2018 filed by VIPL-G to amend the pleadings in original Case No. 91 of 2015 which is under consideration for passing Order as per APTEL Order dated 03.11.2016 in Appeal No. 192 of 2016.
M.A 5 of 2018
Reschedule with further notice
2892 Fri 24/08/2018 10:00:00 AM
Hearing
Petition filed by Vidarbha Industries Power Limited - Generation (VIPL-G) for amendment of the Power Purchase Agreement between Reliance Infrastructure Limited and Vidarbha Industries Power Limited dated August 14, 2013 with regard to payment security mechanism and related provisions.
224 of 2018
Reschedule with further notice
2893 Fri 24/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 199 of 2017 to raised additional grounds and prayers.
M. A. 04 of 2018 in Case No. 199 of 2017
Reschedule with further notice
2894 Fri 24/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 91 of 2015 to raised additional grounds and prayers.
M. A. 03 of 2018 in Case No. 91 of 2015
Reschedule with further notice
2895 Fri 24/08/2018 10:00:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 against the Order dated March 07, 2018 pronounced by the Hon'ble Commission in Case No. 189 of 2013 and Case No. 140 of 2014.
167 of 2018
Reschedule with further notice
2896 Tue 21/08/2018 10:00:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 against the Order dated March 07, 2018 pronounced by the Hon'ble Commission in Case No. 189 of 2013 and Case No. 140 of 2014.
167 of 2018
Reschedule
2897 Tue 21/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 199 of 2017 to raised additional grounds and prayers.
M. A. 04 of 2018 in Case No. 199 of 2017
Reschedule
2898 Tue 21/08/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 91 of 2015 to raised additional grounds and prayers.
M. A. 03 of 2018 in Case No. 91 of 2015
Reschedule
2899 Mon 20/08/2018 10:00:00 AM
Hearing
Petition of Maharashtra Airport Development Company Limited for consent of the Hon'ble Commission to select the single bidder under the Tender floated by MADC pursuant to the Order of this Hon'ble Commission passed under Case No. 191 of 2018 dated 19.07.2018 for procurement of the Short Term Power for the period of one year commencing from 01.09.2018 to 31.08.2019.
238 of 2018
Completed
2900 Mon 20/08/2018 10:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd for change in the approved load shedding protocol of Agriculture load management scheme in six Districts of Eastern Vidharbha viz. Nagpur, Wardha, Chandrapur, Bhandara, Gondia and Gadchiroli Districts
239 of 2018
Completed
2901 Thu 16/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2902 Mon 13/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2903 Sat 11/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2904 Thu 09/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2905 Tue 07/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2906 Mon 06/08/2018 10:00:00 AM
Public Hearing
Maharashtra State Electricity Distribution Company Limited's Mid Term Review Petition for Final True up of FY 2015-16 and FY 2016-17, Provisional True up for FY 2017-18 and Revised forecast for FY 2018-19 to FY 2019-20.
195 of 2017
Completed
2907 Fri 03/08/2018 10:00:00 AM
Public Hearing
Objections / comments on Tata Power-Distribution Business' (Tata Power-D) Mid-Term Review Petition, including True Up for FY 2015-16 as per MERC (Multi-Year Tariff) Regulations, 2011, True Up for FY 2016-17, Provisional True up for FY 2017-18, revised ARR and Tariff for FY 2018-19 and FY 2019-20 as per MERC (Multi-Year Tariff) Regulations, 2015 and its Amendments
69 of 2018
Completed
2908 Thu 02/08/2018 10:00:00 AM
Public Hearing
Inviting Objections / comments on RInfra-Distribution Business (RInfra-D) Mid Term Review Petition for the purpose of Truing-up of FY 2015-16 and FY 2016-17, Provisional Truing-up for FY 2017-18 and determination of revised Aggregate Revenue Requirement and Tariff for FY 2018-19 and FY 2019-20, i.e., for third and fourth year of current MYT Control Period
200 of 2017
Completed
2909 Wed 01/08/2018 10:00:00 AM
Public Hearing
Inviting Objections / comments on Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Mid-Term Review Petition, including True Up for FY 2015-16 as per MERC (Multi-Year Tariff) Regulations, 2011, True Up for FY 2016-17, Provisional True up for FY 2017-18, revised ARR and Tariff for FY 2018-19 and FY 2019-20 as per MERC (Multi-Year Tariff) Regulations, 2015 and its Amendments
203 of 2017
Completed
2910 Wed 01/08/2018 10:00:00 AM
Public Hearing
Suggestions/objections on Mindspace Business Parks Private Limited (MBPPL) Petition for approval of truing up of FY 2015-16, FY 2016-17, provisional truing up of FY 2017-18 and for approval of revised forecast of Aggregate Revenue Requirement and Tariff for FY 2018-19 and FY 2019-20
194 of 2017
Completed
2911 Tue 31/07/2018 10:01:00 AM
Hearing
Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.
160 of 2018
Completed
2912 Tue 31/07/2018 10:00:00 AM
Public Hearing
Inviting Objections/comments on Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) (TPC-D) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 and the Regulations made there under.
117 of 2017
Completed
2913 Tue 31/07/2018 10:00:00 AM
Public Hearing
Inviting Comments, Suggestions and/or Objections on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2018-19
204 of 2018
Completed
2914 Mon 30/07/2018 10:00:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94(1)(f) of the Electricity Act, 2003 read with Regulation 85 of the MERC (Conduct of Business Regulations), 2004 against the Order dated March 07, 2018 pronounced by the Hon'ble Commission in Case No. 189 of 2013 and Case No. 140 of 2014.
167 of 2018
Reschedule
2915 Mon 30/07/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 199 of 2017 to raised additional grounds and prayers.
M. A. 04 of 2018 in Case No. 199 of 2017
Reschedule
2916 Mon 30/07/2018 10:00:00 AM
Hearing
Miscellaneous Application filed by Vidarbha Industries Power Limited (Generation Business) seeking liberty to amend the existing Petition 91 of 2015 to raised additional grounds and prayers.
M. A. 03 of 2018 in Case No. 91 of 2015
Reschedule
2917 Thu 26/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final True-up for FY 2015-16 and FY 2016-17, provisional True-up for FY 2017-18 and Revised Aggregate Revenue Requirement for FY 2018-19 and FY 2019-20 and determination of Tariff
196 of 2017
Completed
2918 Thu 26/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Petition of The Tata Power Company Limited - Generation Business for Truing up for FY 2015-16 & FY 2016-17, Provisional Truing up for FY 2017-18 and Revised ARR forecast from FY 2018-19 to FY 2019-20.
65 of 2018
Completed
2919 Thu 26/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Vidarbha Industries Power Limited's Petition for approval of Truing-up for FY 2015-16 & FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirement (ARR) for FY 2018-19 & FY 2019-20 for its Transmission Business
198 of 2017
Completed
2920 Wed 25/07/2018 10:00:00 AM
Public Hearing
Inviting Comments on RInfra-Generation's Petition for True up of FY 2015-16 and FY 2016-17, Provisional True up of FY 2017-18, Revised Aggregate Revenue Requirement of FY 2018-19 and FY 2019-20 and determination of Tariff
202 of 2017
Completed
2921 Wed 25/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for approval of Truing-up for FY 2015-16 & FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirement (ARR) for FY 2018-19 & FY 2019-20
197 of 2017
Completed
2922 Wed 25/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Reliance Infrastructure Limited-Transmission (RInfra-T) Petition for approval of Truing up of Aggregate Revenue Requirement (ARR) for FY 2015-16 and FY 2016-17, Provisional Truing up of FY 2017-18 and approval of revised ARR from FY 2018-19 to FY 2019-20.
201 of 2017
Completed
2923 Tue 24/07/2018 10:00:00 AM
Public Hearing
Inviting Comments on Application of the Tata Power Company Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
137 of 2016
Completed
2924 Tue 24/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Petition of The Tata Power Company Limited - Transmission for Truing up for FY 2015-16 & FY 2016-17, Provisional Truing up for FY 2017-18 and Revised ARR forecast from FY 2018-19 to FY 2019-20.
204 of 2017
Completed
2925 Tue 24/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Adani Transmission (India) Limited's Petition for Truing Up of ARR for FY 2015-16 & FY 2016-17, Provisional Truing Up for FY 2017-18 and Revised ARR Forecast for FY 2018-19 and FY 2019-20
170 of 2017
Completed
2926 Tue 24/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Ltd.'s Petitionfor Truing Up of ARR for FY 2015-16 and FY 2016-17, Provisional truing-up for FY 2017-18 and revised ARR estimate for FY 2018-19 and FY 2019-20
169 of 2017
Completed
2927 Mon 23/07/2018 10:00:00 AM
Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Co. Ltd.'s Petition for Truing-up for FY 2015-16 and FY 2016-17, Provisional Truing-up for FY 2017-18 and revised estimates of Aggregate Revenue Requirements (ARR) for FY 2018-19 and FY 2019-20 along with Impact of Past Period Disallowed Capitalisation for FY 2010-11 to FY 2014-15
168 of 2017
Completed
2928 Mon 23/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for Truing up of FY 2015-16 and FY 2016-17, Provisional Truing-up of FY 2017-18, and revised estimates for Aggregate Revenue Requirement and Determination of Fees and Charges for FY 2018-19 and FY 2019-20
171 of 2017
Completed
2929 Mon 23/07/2018 10:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Jaigad Power Transco Ltd's Petition for approval of Truing up of FY 2015-16 and FY 2016-17, Provisional Truing up of FY 2017-18 and Revised Forecast of ARR for FY 2018-19 & FY 2019-20
167 of 2017
Completed
2930 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL), for approval of the Hon'ble Commission's to allow deviations from Ministry of Power's Model Bidding Documents for Medium Term Procurement of Power for its Licenced Area.
207 of 2018
Completed
2931 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of Maharashtra Airport Development Company Limited for approval and directions under Section 86 of the Electricity Act, 2003 read with 'Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees' dated 30th March 2016 issued by the Ministry of Power, Government of India.
191 of 2018
Completed
2932 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.
160 of 2018
Completed
2933 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
Completed
2934 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of M/s. Prithvi Ferro Alloys Pvt. Limited for disputes between the Petitioner and the Respondent pertaining to settlement/ netting of start-up power entirely consumed by the Petitioner, application for appropriate tariff category for start-up power and consequent relief of refund of charges to the Petitioner towards excess start up power charges paid during April 2014 to May 2015(13 months) is Rs.88,63,101.43/- and consequent reliefs.
161 of 2018
Completed
2935 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the PPA dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
124 of 2018
Completed
2936 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Limited under Section 86 (1) (f) read with Section 129 and 62 (6) and other applicable provisions of the EA,2003 for seeking directions of the Commission for change in consumer category from HT-II Commercial to HT-I Industrial for 12.5 MVA Start-up Power connection and refund / adjustment of additional tariff collected by MSEDCL under wrong category.
68 of 2018
Completed
2937 Mon 16/07/2018 10:00:00 AM
Hearing
Miscellaneous Petition of Dhariwal Infrastructure Limited under Section 86 (1) (a), (f) and 62 (6) of the Electricity Act, 2003 read with Regulations 32 of MERC (Conduct of Business) Regulations, 2004 seeking appropriate direction for refund of the excess amount recovered by MSEDCL on account of supply of Start-up Power to Unit 1 of the generating station of Dhariwal Infrastructure Limited located at Tadali, Chandrapur for the period from September 2013 to May 2015 under "HT-Commercial" category instead of "HT-Industrial" category.
67 of 2018
Completed
2938 Mon 16/07/2018 10:00:00 AM
Hearing
Petition of Ultra mega Power Private Limited (formerly known as R.S. India Power Limited) for seeking directions for Procurement of power from the wind power projects of the Petitioner by Respondent No. 1 under Section 62(1)(a) of the Electricity Act, 2003 read with the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016, to fulfil the RPO of the Respondent No. 1 based on the Government of Maharashtra Policy dated 20.7.2015 and 9.9.2015, and adjudication under Section 86(1)(f) of the 2003 Act.
121 of 2018
Completed
2939 Thu 12/07/2018 10:00:00 AM
Public Hearing
Inviting comments in proceedings for verification of Renewable Purchase Obligation compliance targets for FY 2016-17 by distribution Licensees in Maharashtra.
Case No. 207 of 2017, 208 of 2017, 209 of 2017, 210 of 2017, 211 of 2017, 212 of 2017 and 213 of 2017
Completed
2940 Wed 11/07/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Power Generation Company Limited (MSPGCL) under Section 94 of the Electricity Act, 2003 and Regulation 85 of MERC (Conduct of Business) Regulations, 2004 against order dated 14.12.2017 in Case No. 59 of 2017 on a Petition filed by MSPGCL seeking approval of Capital Cost and Tariff of Koradi generating Units 8, 9 & 10 Chandrapur Units 8 & 9 and Parli Unit 8.
77 of 2018
Reschedule
2941 Tue 10/07/2018 10:00:00 AM
Hearing
Petition of M/s. Prithvi Ferro Alloys Pvt. Limited for disputes between the Petitioner and the Respondent pertaining to settlement/ netting of start-up power entirely consumed by the Petitioner, application for appropriate tariff category for start-up power and consequent relief of refund of charges to the Petitioner towards excess start up power charges paid during April 2014 to May 2015(13 months) is Rs.88,63,101.43/- and consequent reliefs.
161 of 2018
Reschedule
2942 Tue 10/07/2018 10:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the PPA dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" which substantially affects cost and revenue of the project.
124 of 2018
Reschedule
2943 Tue 10/07/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Limited under Section 86 (1) (f) read with Section 129 and 62 (6) and other applicable provisions of the EA,2003 for seeking directions of the Commission for change in consumer category from HT-II Commercial to HT-I Industrial for 12.5 MVA Start-up Power connection and refund / adjustment of additional tariff collected by MSEDCL under wrong category.
68 of 2018
Reschedule
2944 Tue 10/07/2018 10:00:00 AM
Hearing
Miscellaneous Petition of Dhariwal Infrastructure Limited under Section 86 (1) (a), (f) and 62 (6) of the Electricity Act, 2003 read with Regulations 32 of MERC (Conduct of Business) Regulations, 2004 seeking appropriate direction for refund of the excess amount recovered by MSEDCL on account of supply of Start-up Power to Unit 1 of the generating station of Dhariwal Infrastructure Limited located at Tadali, Chandrapur for the period from September 2013 to May 2015 under "HT-Commercial" category instead of "HT-Industrial" category.
67 of 2018
Reschedule
2945 Tue 10/07/2018 10:00:00 AM
Hearing
Petition of Ultra mega Power Private Limited (formerly known as R.S. India Power Limited) for seeking directions for Procurement of power from the wind power projects of the Petitioner by Respondent No. 1 under Section 62(1)(a) of the Electricity Act, 2003 read with the MERC (RPO, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016, to fulfil the RPO of the Respondent No. 1 based on the Government of Maharashtra Policy dated 20.7.2015 and 9.9.2015, and adjudication under Section 86(1)(f) of the 2003 Act.
121 of 2018
Reschedule
2946 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of M/s Vinchurkar-Pawar Diagnostic Centre against MSEDCL for non-compliance of Judgement / Order dated 11.04.2017 passed by CGRF, Nashik Zone in Case No. 76/16- 17.
107 of 2018
Reschedule
2947 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Shri Ramdas Shripati Chavan against MSEDCL under Section 142 of Electricity Act, 2003 and under Regulation 22 of MERC (CGRF) Regulations, 2006 Petition against Electricity Ombudsman Order dated 26.02.2018 passed in Representation No. 18 of 2018
118 of 2018
Reschedule with further notice
2948 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Shri Vishnu Ramdas Chavan against MSEDCL under Section 142 of Electricity Act, 2003 and under Regulation 22 of MERC (CGRF) Regulations, 2006. Disconnection of Electricity supply without Notice as per Section 56(1) Electricity Act, of 2003.
117 of 2018
Reschedule with further notice
2949 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Shri Mangesh Madhukar Pandit against MSEDCL for Non Compliance of MERC Order in Case No. 44 of 2017 dated 16.02.2018.
111 of 2018
Reschedule
2950 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of M/s. Sandeep Dwellers Pvt. Ltd. for directing MSEDCL and/or its franchisee at Nagpur M/s. SND Limited, to Comply Hon. Ombudsmanâ??s Order No. 34/2017 passed on 28th July, 2017 and Review Petition Order No. 3/2017 passed on 6th Mar, 2018.
177 of 2018
Reschedule with further notice
2951 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Sagir Ahmed Munir Ahmed (Bhiwandi Electricity Users Welfare Association) against MSEDCL for non compliance of Order of the CGRF 11/2017 dated 11/07/2017 and Order of the Electricity Ombudsman 13/2018 dated 26/02/2018.
162 of 2018
Reschedule
2952 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Addnode India Private Limited for non-compliance by MSEDCL of CGRF Order, Mumbaiâ??s Order No.371 dated.13 March, 2018 in Case No. 63 of 2018.
157 of 2018
Reschedule with further notice
2953 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of M/s Navjeevan Hybrid Seeds Corporation under Section 142 & 146 of Electricity Act, 2003 for non compliance of Honâ??ble Commission Order dt. 09.12.2016 in Case No. 04/2015.
139 of 2018
Reschedule with further notice
2954 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of SDPL Paradise Apartment & 12 others for directing MSEDCL to comply Electricity Ombudsman Order No. 43 of 2017.
97 of 2018
Reschedule with further notice
2955 Sat 07/07/2018 10:00:00 AM
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
Reschedule with further notice
2956 Fri 06/07/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule with further notice
2957 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Spectrum Scan Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1473 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
44 of 2018
Reschedule with further notice
2958 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Mega Rubber Technologies Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1141 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
43 of 2018
Reschedule with further notice
2959 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Royal Garden Resort against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1332/1342/1360/1351 dated 10.08.17/16.08.17/23.08.17/14.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
42 of 2018
Reschedule with further notice
2960 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Siyesha Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1153 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
41 of 2018
Reschedule with further notice
2961 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Mega Rubber Technologies Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1142 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
40 of 2018
Reschedule with further notice
2962 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Barcom Industries Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1438/1440/1444/1442 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
39 of 2018
Reschedule with further notice
2963 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Maharashtra Packaging against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1439/1441/1445/1443 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
38 of 2018
Reschedule with further notice
2964 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Paradise Packaging Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1336/1345/1363/1354 dated 09.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
37 of 2018
Reschedule with further notice
2965 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Nakki Hospitality Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1330/1340/1358/1349 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
36 of 2018
Reschedule with further notice
2966 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Bharat Plastopack Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1371/1378/1392/1385 dated 09.09.17,17.09.17,22.09.17,13.10.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
35 of 2018
Reschedule with further notice
2967 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Vivek Polymer India against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1152 dated 01.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
34 of 2018
Reschedule with further notice
2968 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of U. V. Metallising India Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1334 / 1343 / 1361 / 1352 dated 23.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
33 of 2018
Reschedule with further notice
2969 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Infra Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1150 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
32 of 2018
Reschedule with further notice
2970 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Spectrum Scan Pvt. Ltd. Plot 31 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1474 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
31 of 2018
Reschedule with further notice
2971 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Bharat Rubber Works Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1370/1377/1391/1384 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
30 of 2018
Reschedule with further notice
2972 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Bhulani Steel against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1151/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
26 of 2018
Reschedule with further notice
2973 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Aditi Die Cast against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1159 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
25 of 2018
Reschedule with further notice
2974 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1145 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
24 of 2018
Reschedule with further notice
2975 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1154 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
23 of 2018
Reschedule with further notice
2976 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of J. D. Exports against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1140 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
22 of 2018
Reschedule with further notice
2977 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Shri Arjun L Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1155 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
21 of 2018
Reschedule with further notice
2978 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Shri Amit A. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1157 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
20 of 2018
Reschedule with further notice
2979 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Shri Arjun L. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1156 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
19 of 2018
Reschedule with further notice
2980 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Raychem RPG (P) Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order Nos 1401, 1403, 1407 & 1405 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
18 of 2018
Reschedule with further notice
2981 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Arlex Chemi Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1162 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
17 of 2018
Reschedule with further notice
2982 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Industrial Engineering Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No 1139 of 2015 dated 01.09.2017. and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
16 of 2018
Reschedule with further notice
2983 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of First Winner Lifestyles Ltd. Plot No.C-8/1 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan Order No. 1171 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
15 of 2018
Reschedule with further notice
2984 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of SSB Metal Work against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1143 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
14 of 2018
Reschedule with further notice
2985 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Shreenath Chemicals against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1161 of 2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
13 of 2018
Reschedule with further notice
2986 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Rajesh Plastics against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1333, 1339, 1357 & 1348 of 2015 dated 10.08.2017,18.08.2017, 23.08.2017 & 14.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
12 of 2018
Reschedule with further notice
2987 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of RLC Engineers Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1146/2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
11 of 2018
Reschedule with further notice
2988 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of First Winner Industries Ltd. Plot No.N-66 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1169 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
10 of 2018
Reschedule with further notice
2989 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of First Winner Industries Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 964/1170 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
9 of 2018
Reschedule with further notice
2990 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Vista packaging Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E 1) 1114//1335/, 2) 1123/1344 3) 1140/1362, 4) 1131/1353 dated 23.08.2017, 18.08.2017, 23.08.2017 & 14.09.2017 respectively , and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
8 of 2018
Reschedule with further notice
2991 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of MIRC Electronics Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, 4 Orders No. K/E 1)1146//1367/, 2) 1153/1374, 3) 1167/1388, 4) 1160/1381, dated 18.8.2017, 18.8.2017, 13.8.2017 and 14.9.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
7 of 2018
Reschedule with further notice
2992 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of A. B. Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/960/1166/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
6 of 2018
Reschedule with further notice
2993 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Savex Seal Pvt. Ltd. Now SVP Packing Industry Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/959/1165/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
5 of 2018
Reschedule with further notice
2994 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Ambernath Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/962/1168/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
4 of 2018
Reschedule with further notice
2995 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Agarwal Fasteners Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/943/ 1149/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
3 of 2018
Reschedule with further notice
2996 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of SVP Packing Industry Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/958/ 1164/2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
2 of 2018
Reschedule with further notice
2997 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of M/s. Sun Diapet against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF, Kalyan, and Order K/E/941/1147/2015-16 dated 1.9.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.
1 of 2018
Reschedule with further notice
2998 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Kundan Engineering Works against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone 4 Orders and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
190 of 2017
Reschedule with further notice
2999 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Royal Embroidary Threads P. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Baramati Zone Order and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
189 of 2017
Reschedule with further notice
3000 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Sujan Industries Unit No.2 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone Order no. 1144/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
188 of 2017
Reschedule with further notice
3001 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Vidhata Metals Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-Compliance of CGRF Kalyan Zone 4 Orders of consumer no.010519035310 under Section 142 read with 146 of the EA, 2003 for violating these Orders.
182 of 2017
Reschedule with further notice
3002 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of M/s Garware Polyester Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 637/2017 dt. 22.08.2017 and MERC Case No.78 of 2016, dated 13.07.2017.
88 of 2018
Reschedule with further notice
3003 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of M/s Garware Polyester Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 638/2017 dt. 22.08.2017 and MERC Case No.78 of 2016, dated 13.07.2017.
87 of 2018
Reschedule with further notice
3004 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of M/s Nirlep Appliances Private Limited against MSEDCL for non-compliance of CGRF Aurangabad (Urban) Order No. 642/2017 dated 29.08.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.
82 of 2018
Reschedule with further notice
3005 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Dr. Hedgewar Hospital against MSEDCL for non-compliance of CGRF Aurangabad Order No. 641/2017 dt 29.08.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.
81 of 2018
Reschedule with further notice
3006 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of M/s Nirlep Appliances Private Limited against MSEDCL for non-compliance of CGRF Aurangabad (Rural) Order No. 643/2017 dated 12.09.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.
80 of 2018
Reschedule with further notice
3007 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Uddhalik Steel Industry against MSEDCL under Section 142 of the Electricity Act, 2003 non-compliance of the CGRF, Latur, Order No.11/2015 dated 08.02.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
66 of 2018
Reschedule with further notice
3008 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Jigar Plast India against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1331, 1341, 1359 & 1350 dated 10.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
58 of 2018
Reschedule with further notice
3009 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Swasan Chemicals Pvt. Ltd. against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1402,1404,1408 & 1406 dated 16.08.17,18.08.17,23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
57 of 2018
Reschedule with further notice
3010 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Sridevi Tools Engineering Pvt. Ltd. against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1368, 1375,1389 & 1382 dated 18.08.17,18.08.17,23.08.17&14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
56 of 2018
Reschedule with further notice
3011 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Harman Plastic Industries against MSEDCL under Section 142 of EA 2003 for non-compliance of the CGRF, Kalyan, Order No.1148 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
55 of 2018
Reschedule with further notice
3012 Fri 06/07/2018 10:00:00 AM
Hearing
Petition of Taprath Polymers Pvt. Ltd. against MSEDCL under Section 142 of EA, 2003 for non-compliance of the CGRF, Kalyan, Order No.1415, 1416, 1417 & 1418 dated 16.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
54 of 2018
Reschedule with further notice
3013 Thu 05/07/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule
3014 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Commission.
123 of 2018
Reschedule with further notice
3015 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Limited under Section 86 of the Electricity Act, 2003 seeking compensation for penalty imposed by SECL on account of non-procurement of minimum quantity of fuel by RattanIndia under the FSA, due to low despatch by MSEDCL in accordance with Clause 4.5 of Schedule 4 of the PPA between RattanIndia and MSEDCL.
146 of 2018
Reschedule with further notice
3016 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of Hemant Group & Others 3 under Section 86 (1) (e) and Section 86 (2) of the Electricity Act, 2003 read with the Clause 5.12 of the National Electricity Policy dated 12.02.2005 and Clause 6.4 of the Tariff Policy dated 06.01.2006 seeking clarification from the Hon'ble Commission that Renewable Energy Sources also includes Solar Energy meaning thereby that the Renewable Energy Policy dated 14.10.2008 notified by the GoM is a comprehensive policy for all renewable energy including Solar Energy and benefits accruing thereof to projects commissioned under the said policy needs to be passed on to the project developers by the concerned distribution licensees.
126 of 2018
Reschedule with further notice
3017 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of RattanIndia Power Ltd. for Power Purchase Agreement between RPL and MSEDCL for 1200 MW and for issue of directions to MSLDC to accept and schedule the declared capacity of up to 258 MW for all 5 units of Amravati TPS.
59 of 2018
Reschedule with further notice
3018 Thu 05/07/2018 10:00:00 AM
Public Hearing
Inviting Objections/comments on Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) (TPC-D) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 and the Regulations made there under.
117 of 2017
Reschedule with further notice
3019 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited Petition against Global Energy Private Limited for non-compliance of Order dated 10.04.2018 in Case No. 83 of 2017 and M.A No. 16 of 2017 passed by the Hon'ble Commission.
142 of 2018
Reschedule with further notice
3020 Thu 05/07/2018 10:00:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Private Limited review petition under regulation 85 of MERC (Conduct of Business) Regulations, 2004 read with Section 94 (1) (f) of the Electricity Act, 2003 and in the matter of review of part of Order dated 10.04.2018 in Case No. 83 of 2017 and M. A. No. 16 of 2017 passed by the Hon'ble Commission and in the matter of petition of Siddhayu Ayurvedic Research foundation Pvt. Ltd. regarding non-payment of dues by Global Energy Pvt. Ltd. under the EPA dated 20.09.2012.
141 of 2018
Reschedule with further notice
3021 Wed 04/07/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule
3022 Wed 04/07/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of order dated 27.02.2018 in Case No. 19 of 2017 passed by the Honâ??ble Commission.
123 of 2018
Reschedule
3023 Wed 04/07/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of the Order No. 15 of 2017 dated 01.03.2018 in the matter of reduction in the technical minimum of generating units in Maharashtra as per Central Electricity Regulatory Commission norms.
115 of 2018
Reschedule with further notice
3024 Wed 04/07/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd.(MSEDCL) under Section 86 (1) (f), (k) and other applicable provisions of the EA, 2003 and in connection with the dispute and differences arising under the standby power agreements dated 13.06.2014, 29.08.2015, 30.06.16 executed between Global Energy Pvt. Ltd. and MSEDCL.
78 of 2018
Reschedule with further notice
3025 Wed 04/07/2018 10:00:00 AM
Hearing
Petition of Essar Steel India Limited (ESIL) against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking exemption from Cross Subsidy Surcharge as Essar Steel India Limited is a captive user in accordance with Section 42 of the EA, 2003 read with Rule 3 of the Electricity Rules 2005 along with Regulations framed by the Commission from time to time.
45 of 2018
Reschedule
3026 Wed 04/07/2018 10:00:00 AM
Hearing
Suo moto proceeding in the matter of taking on record the Deemed Distribution Licensee status of the Indian Railways and issuing Specific Conditions of Distribution Licence applicable to it.
149 of 2017
Reschedule with further notice
3027 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Dattatray Govind Mali regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
91 of 2018
Completed
3028 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Bhauso Nivruti Sawant regarding non-compliance of CGRF, Kolhapur Zone's Order dated 12 December, 2017 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
90 of 2018
Completed
3029 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Sanjay Raghu Mote regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 8 December, 2017 in Case No. 39 of 2017-18 and MERC Order dated 1 June, 2006 in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
89 of 2018
Completed
3030 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Shivaji Kondiba Hatkar regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 22 November, 2017 in Case No. 38 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
51 of 2018
Completed
3031 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Chandrashekhar Ummanna Andavgol regarding non-compliance of Consumer Grievance Redressal Forum, Kolhapur's Order dated 6 June, 2017 in Case No. 1 to 3 of 2017-18 by Maharashtra State Electricity Distribution Co. Ltd.
49 of 2018
Completed
3032 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Jayendra Ramu Mangaonkar regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 91/2017 by Maharashtra State Electricity Distribution Co. Ltd.
52 of 2018
Completed
3033 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Hussian Aappaso Mulla regarding non-compliance of the Electricity Ombudsman Mumbai's Order dated 6 October, 2017 in Representation No. 90/2017 and MERC Order dated 1 June, 2006, in Case No. 43 of 2005 by Maharashtra State Electricity Distribution Co. Ltd.
50 of 2018
Completed
3034 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri. Balaso Maruti Mote under Section 94 (1) (f) of the Electricity Act, 2003 regarding non-compliance of MERC Order in Case No. 143 of 2017 dated 14.03.2018.
140 of 2018
Completed
3035 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri Babaso Laxman Babaso Laxman Joundal against MSEDCL for non Compliance of Ombudsman Mumbai Order No.45/2017 dt. 30.06.2017.
93 of 2018
Completed
3036 Tue 03/07/2018 10:00:00 AM
Hearing
Petition of Shri Haribahu D. Khapare against MSEDCL under Section 142 & 149 of the Electricity Act, 2003 for non compliance of the Commission's Order passed in Case No 70 of 2005 Order dated 08.09.2006, Case No. 56 of 2007 dated 16.02.2008, Case No. 148 of 2011 dated Case No 05.01.2012, and Case No 36 of 2012 dated 23.11.2012.
92 of 2018
Completed
3037 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of Dr. Hiralal Ganpatrao Nimbalkar against MSETCL for non compliance and for breach of Order and contempt of lawful authority and proper implementation of the Order. (Case No. 140 of 2016, Order dated 01.03.2017 and Case No.84 of 2017 Order dated 26.9.2017).
100 of 2018
Completed
3038 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of Western Railway, Mumbai Central Division under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 13 of the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.
112 of 2018
Completed
3039 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of Central Railway under Section 62 and 86 (1)(b) (e) of the EA, 2003 seeking approval for erection of Solar Power equal to transformer capacity on rooftop/ground mounted proposed to be set up in the premises of existing Central Railway's substations to mitigate its RPO target given by the Commission.
105 of 2018
Completed
3040 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of M/s. Shivshakti Stone Crusher Borgaon regarding non-compliance of the Consumer Grievance Redressal Forum Akola's Order dated 14 July, 2017 in Case No. 28 of 2017 by Maharashtra State Electricity Distribution Co. Ltd.
96 of 2018
5
3041 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of M/s. Shree Shyam Agro Processors regarding non-compliance of the Consumer Grievance Redressal Forum Akola's Order dated 13 June, 2017 in Case No. 21 of 2017 by Maharashtra State Electricity Distribution Co. Ltd.
95 of 2018
5
3042 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of The Ruby Mills Limited Intervention application in Case No. 71 of 2009 MSEDCL's proposal for levy of Voltage surcharge on consumers who are supplied power at lower than prescribed voltage, as per SOP Regulations.
61 of 2018
Completed
3043 Mon 02/07/2018 10:00:00 AM
Hearing
Petition of Essam Gas Pvt. Ltd seeking clarifications as to the applicability of its Tariff Order dated 03.11.2016 in Case No. 48 of 2016 on the issue of exceeding Contract Demand during night hours and directing the Respondent MSEDCL to extend full benefits of Load Factor Incentives to the Petitioner.
60 of 2018
Reschedule
3044 Sun 01/07/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Power Generation Company Limited (MSPGCL) under Section 94 of the Electricity Act, 2003 and Regulation 85 of MERC (Conduct of Business) Regulations, 2004 against order dated 14.12.2017 in Case No. 59 of 2017 on a Petition filed by MSPGCL seeking approval of Capital Cost and Tariff of Koradi generating Units 8, 9 & 10 Chandrapur Units 8 & 9 and Parli Unit 8.
77 of 2018
Completed
3045 Sun 01/07/2018 10:00:00 AM
Hearing
Petition of Asian Hotel (West) Limited under Section 9 and 42 (2) of the Electricity Act, 2003 for adjudication of dispute arisen between the Petitioner and the Respondent on the issue of levy of Regulatory Asset Charges ("RAC") on the Petitioners captive consumption availed through open access and in the matter of Petition under Regulation 32 and 37 of the MERC (Distribution Open Access) Regulations, 2016 and in the matter of Order dated 21.03.2018, passed by this Hon'ble Commission in Case No. 45 of 2017 (M/s. Hindustan Petroleum Corporation Limited Versus Tata Power Company Limited (Distribution).
166 of 2018
Completed
3046 Sun 01/07/2018 10:00:00 AM
Hearing
Petition of Dhariwal Industries Limited & Anr under Section 86 (1) (d) and Section 86 (1) (k) seeking direction to Global Energy Private Limited (Trading Licensee) to honor the terms of the EPA entered between the Petitioners and Respondent and to release the admitted outstanding payments immediately alongwith interest.
160 of 2018
Reschedule
3047 Sat 30/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for in principle approval for supplying power during day time to AG consumers connected on AG Feeders of those substations where Solar Power projects gets Commissioned under "Mukhyamantri Sour Krishi Vahini Yojana."
178 of 2018
Completed
3048 Sat 30/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for in principle approval for short term power purchase at higher cost than the ceiling rate approved by Hon'ble Commission.
176 of 2018
Completed
3049 Sat 30/06/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited against MSEDCL for Arbitrary Levy of Wheeling Charges & Applicable Wheeling Loss for the Financial Year 2015-2016 and Financial Year 2016-2017.
159 of 2018
Completed
3050 Sat 30/06/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited to amend the provisions of Load Factor Incentive under the Tariff Order
158 of 2018
Completed
3051 Fri 29/06/2018 10:00:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited (GEPL) for review of order issued by Hon'ble Commission dated 12th March 2018 in Case No. 149 of 2016 in respect to GEPL's petition for determination of Aggregate Revenue Requirement (ARR) and Tariff for 3rd Control Period from FY 2016-17 to FY 2019-20.
127 of 2018
Completed
3052 Fri 29/06/2018 10:00:00 AM
Hearing
64 of 2018
Completed
3053 Fri 29/06/2018 10:00:00 AM
Hearing
Petition of Sunfresh Agro. Industries Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF order and violation of direction passed by this Commission in Case No. 88 of 2012 & 86 of 2015.
186 of 2017
Completed
3054 Thu 28/06/2018 10:00:00 AM
Hearing
Petition of M/s. Pudumjee Paper Products Limited under Section 42 and other applicable provisions of the Electricity Act, 2003 read with MERC (Distribution Open Access) Regulations, 2016 for directions to the Respondent with regard to the withdrawal of short term open access for the month of January 2017, refund of wrongly levied transmission and wheeling charges and adjustment of over injected conventional units
156 of 2018
Completed
3055 Thu 28/06/2018 10:00:00 AM
Hearing
Petition of Westin Mumbai Garden City & Other under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 20 of the MERC (Distribution Open Access) Regulations, 2016 for adjudication of dispute arisen between the Petitioners and the Respondent on the issue of non-settlement/non-adjustment of banked energy/units for the period December, 2017 to March, 2018.
153 of 2018
Completed
3056 Thu 28/06/2018 10:00:00 AM
Hearing
Petition of Shri Abaji Sopan Bansode and Others for against the Respondents for direction to pay compensation in respect of erection of Electricity tower in the agriculture land of the Petitioners.
138 of 2018
Completed
3057 Thu 28/06/2018 10:00:00 AM
Hearing
120 of 2018
Completed
3058 Thu 28/06/2018 10:00:00 AM
Hearing
Petition of Dr. Hiralal Ganpatrao Nimbalkar against MSETCL for non compliance and for breach of Order and contempt of lawful authority and proper implementation of the Order. (Case No. 140 of 2016, Order dated 01.03.2017 and Case No.84 of 2017 Order dated 26.9.2017).
100 of 2018
Completed
3059 Wed 27/06/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of Order dated 27.03.2018 passed by the Hon'ble Commission in Case No 85 of 2017.
147 of 2018
Completed
3060 Wed 27/06/2018 10:00:00 AM
Hearing
Petition of Shri. Mohd. Iqbal Ali Mohammed Wadia, Partner of M/s. Monarch Estate Developers under Section 94 and 128 of Electricity Act, 2003 against BEST for illegal permission of installation of meters over the plots of land C.T.S. No. 131 of Mazgaon Division Beveldered Hill Rd, Mazgaon, Mumbai- 400 010 under Work Order WO/309757.
162 of 2017
Completed
3061 Wed 27/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking review of Order dated 19.03.2018 in Case No. 159 of 2016 passed by the Commission in the matter of Petition of Sai Wardha Power Generation Ltd. for declaration of Captive Generating status of its Units 3 and 4 for FY 2015-16.
133 of 2018
Completed
3062 Wed 27/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking Review of Order dated 09.02.2018 and Corrigendum Order dated 12.03.2018 in Case No. 77 of 2015 passed by the Commission, in the matter of Petition of Sai Wardha Power Ltd. for declaration of the Captive Generation status of its Generating Units 3 and 4 for FY 2014-15.
132 of 2018
Completed
3063 Tue 26/06/2018 10:00:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Review of Order dated 03.04.2018 in Case No. 41 of 2017 passed by the Hon'ble Commission in the matter of Petition of Maharashtra State Electricity Distribution Co. Ltd. for revision in Wind Zone classification of Wind Energy Projects with consistently higher generation.
152 of 2018
Completed
3064 Tue 26/06/2018 10:00:00 AM
Hearing
Petition of Shri Giridhar J Solanke under Section 62 (4) of Electricity Act, 2003 R/w Works of Licensee Rules 2012.
98 of 2018
Completed
3065 Tue 26/06/2018 10:00:00 AM
Hearing
Petition of Shri Subhash Shivaji Patil regarding compensation for Transmission works on his land as per-Section 67(4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
74 of 2018
Completed
3066 Tue 26/06/2018 10:00:00 AM
Hearing
Petition of Shri Ramchandra Sopan Patil regarding compensation for Transmission works on his land as per-Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
73 of 2018
Completed
3067 Tue 26/06/2018 10:00:00 AM
Hearing
Petition of Shri Shivaji Sopan Narote regarding compensation for Transmission works on his land as per-Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
72 of 2018
Completed
3068 Mon 25/06/2018 10:00:00 AM
Hearing
Petition of ETCO Industries Pvt. Limited against MSEDCL for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under section 142, 146 & 149 of Electricity Act, 2003.
155 of 2018
Completed
3069 Mon 25/06/2018 10:00:00 AM
Hearing
Petition of Polygenta Technologies Limited against MSEDCL for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under section 142, 146 & 149 of Electricity Act, 2003.
151 of 2018
Completed
3070 Mon 25/06/2018 10:00:00 AM
Hearing
Petition of Sudarshan Chemical Industries Limited against MSEDCL for not allowing Power Factor Incentive on open access charges by the respondent, thereby violated Clause No. 16.3 of Distribution Open Access Regulations-2016 issued by MERC, hence liable for action under section 142, 146 & 149 of Electricity Act, 2003.
150 of 2018
Completed
3071 Mon 25/06/2018 10:00:00 AM
Hearing
Petition of IndoCount Industries Limited and Pranavaditya Spinning Mills for clarification regarding applicability of Power Factor Incentive to Open Access consumption.
137 of 2018
Completed
3072 Mon 25/06/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited and CIMMCO Spinners for clarification regarding applicability of Power Factor Incentive to Open Access consumption.
136 of 2018
Completed
3073 Wed 20/06/2018 10:00:00 AM
Hearing
Petition of IndoCount Industries Limited & Pranavaditya Spinning Mills for clarification regarding applicability of Power Factor Incentive to Open Access consumption.
137 of 2018
Completed
3074 Wed 20/06/2018 10:00:00 AM
Hearing
Petition of Spentex Industries Limited & CIMMCO Spinners for clarification regarding applicability of Power Factor Incentive to Open Access consumption.
136 of 2018
Completed
3075 Wed 20/06/2018 10:00:00 AM
Hearing
Petition of M/s Mohite Industries Limited seeking action against MSEDCL for non-compliance of the MERC(DOA) Regulations, 2016 and direction to MSEDCL for releasing payments towards unutilized banked energy from 10 MW Radhanagari Dam foot small Hydro Power Project under Regulations 2(4) and 20 of the MERC(DOA) Regulations, 2016.
110 of 2018
Completed
3076 Wed 20/06/2018 10:00:00 AM
Hearing
Petition of Mahindra Lifespace Developers Ltd., seeking compliance o the Order dated 31.01.2018 passed by the Appellate Authority under Section 127 of the EA, 2003 in Appeal No 183 of 2010.
106 of 2018
Completed
3077 Wed 20/06/2018 10:00:00 AM
Hearing
Petition of Shalimar Hotel Private Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute on the issue of payment of interest on delayed payment by the MSEDCL.
101 of 2018
Completed
3078 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking approval on adoption of tariff for long term procurement of 200 MW bagasse based co-generation power under Section 63 of the Electricity Act, 2003 for meeting the non-solar Renewable Purchase Obligations.
165 of 2018
Completed
3079 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking approval on adoption of tariff for long term procurement of 1000 MW solar power under Section 63 of the Electricity Act, 2003 for meeting the solar Renewable Purchase Obligations.
164 of 2018
Completed
3080 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking approval on adoption of tariff for long term procurement of 500 MW wind power from SECI under MNRE scheme under Section 63 of the Electricity Act, 2003 for meeting the Non-Solar Renewable Purchase Obligations.
163 of 2018
Completed
3081 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited (MSPGCL) for towards compliance to directives in Order dated 27.03.2018 in Case No. 42 of 2017 and seeking removal of difficulties under the provisions of Electricity Act, 2003.
154 of 2018
Completed
3082 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of M/s Shraddha Agro Foods against MSEDCL under Section 142 and 146 of the Electricity Act, 2003 for non - compliance Compliance of CGRF Kalyan Order No.1063/2015-16 dt. 14.12.2017.
85 of 2018
Completed
3083 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Grafica Flextronica against MSEDCL under Section 142 and 146 of the Electricity Act, 2003 for non compliance of the Appellate Authority Order dated 28.06.2017 passed in Appeal No 223 of 2014 under Section 127 of EA 2003.
64 of 2018
Completed
3084 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Shri Rajaram Shrirang Patil under Section 142 and 149 of EA, 2003 against MSEDCL for non compliance of the Electricity Ombudsman, Mumbai Order No. 92/2017 dated 11.10.2017.
63 of 2018
Completed
3085 Tue 19/06/2018 10:00:00 AM
Hearing
Petition of Shri Dattatray Vithal Patil under Section 142 and 149 of the Electricity Act, 2003 against MSEDCL for non compliance of the Electricity Ombudsman, Mumbai Order No. 93/2017 dated 11.10.2017.
62 of 2018
Completed
3086 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Western Railway, Mumbai Central Division Memorandum of Original Petition filed under Section 86 (1) (e) of the Electricity Act, 2003 read with Regulation 13 of the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.
112 of 2018
Completed
3087 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Central Railway removing difficulties for erection of PV Solar Plant in MERC.
105 of 2018
Completed
3088 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Shri Ramchandra Dayshankar Pandey Review Petition under Section 85 of MERC (Conduct of Business) Regulations, 2004, towards order passed by the Commission in Case No. 136 of 2017 dated 05.02.2018.
99 of 2018
Completed
3089 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Shivshakti Stone Crusher Borgaon against MSEDCL for non-compliance of order passed by Hon'ble CGRF in matter of order passed by AKOLA CGRF in complaint No. 28 of 2017 order dated 14.07.2017.
96 of 2018
Completed
3090 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Shyam Agro Processors against MSEDCL for non-compliance of order passed by Hon'ble CGRF in matter of order passed by AKOLA CGRF in complaint No. 21 of 2017 order dated 16.06.2017.
95 of 2018
Completed
3091 Mon 18/06/2018 10:00:00 AM
Hearing
Petition of Riddhi Siddhi Gluco Biols Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86(1)(f) of the EA, 2003 and in the matter of recurring non-payment and/or late payment of the principal amounts as well as non-payment of Late Payment Surcharge on the delayed payment under the Wind Energy Purchase Agreement Dated 17th June 2011.
28 of 2018
Completed
3092 Sun 17/06/2018 10:00:10 AM
Hearing
Petition of Shri Dattatray Govind Mali against MSEDCL under Section 142 and 149 of Electricity Act, 2003 for non-compliance of CGRF Kolhapur, Order No. Order No. 45 of 2017-18 dated 12.12.2017 and MERC Case No. 43 of 2005 Order dated 01.06.2006.
91 of 2018
Completed
3093 Sun 17/06/2018 10:00:09 AM
Hearing
Petition of Shri Bhauso Nivruti Sawant against MSEDCL under Section 142 and 149 of Electricity Act, 2003 for non-compliance of CGRF Kolhapur, Order No. Order No. 48 of 2017-18 dated 12.12.2017 and MERC Case No. 43 of 2005 Order dated 01.06.2006.
90 of 2018
Completed
3094 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of M/s. Relishah Export against Maharashtra State Electricity Distribution Company Limited under section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. Relishah Export and MSEDCL.
134 of 2018
Completed
3095 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of M/s. Classic Marble Company Private Limited against Maharashtra State Electricity Distribution Company Ltd. under section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between M/s. Classic Marble Company Pvt. Ltd. and MSEDCL.
128 of 2018
Completed
3096 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Shri Chandrashekhar Ummaanna Andavgol against MSEDCL under Section 142 & 149 of Electricity Act, 2003 for non-compliance of the CGRF, Kolhapur Case No. 01 to 03 of 2017-18 Order dated 06.06.2017.
49 of 2018
Completed
3097 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Shri Hussian Aappso Mulla against MSEDCL under Section 142 & 149 of EA 2003 for non-compliance of the Electricity Ombudsman Order No.90 of 2017 dated 06.10.2017 and Commission's Order in Case No. 43 of 2005 dated 01.06.2006.
50 of 2018
Completed
3098 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Shri Shivaji Kondiba Hatkar against MSEDCL under Section 142 & 149 of the Electricity Act, 2003 for non-compliance of the CGRF, Kolhapur Case No.38 of 2017-18 Order dated 22.11.2017.
51 of 2018
Completed
3099 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Shri Jayendra Ramu Mangaonkar against MSEDCL under Section 142 & 149 of the Electricity Act, 2003for non-compliance of the Ombudsman, Mumbai Order dated 06 October, 2017 passed in Representation no 91 of 2017.
52 of 2018
Completed
3100 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Shri Sanjay Raghu Mothe against MSEDCL under Section 142 and 149 of Electricity Act, 2003 for non-compliance of CGRF Kolhapur, Order No.39 of 2017-18 dated 08.12.2017 and MERC Case No. 43 of 2005 Order dated 01.06.2006.
89 of 2018
Completed
3101 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Amravati Power Transmission Company Limited (APTCL) for replacing the encumbrance created on the assets of APTCL in favour of PFC and REC with L&T Infrastructure Finance Co. Ltd, for the purpose of the licensed business under the provisions of Section 15.3 of MERC (Transmission Licence Conditions) Regulations, 2004 as amended in 2006 and 2017.
86 of 2018
Completed
3102 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Sinnar Power Transmission Company Limited for approval of the Hon'ble Commission for creating encumbrance on the assets of Sinnar Power Transmission Company Limited for the purpose of the licensed business under the provisions of Section 15.3 of MERC (Transmission Licence Conditions) Regulations, 2004 as amended in 2006 & 2017 ("Transmission Licence Conditions Regulations") for following transmission system:1)400 kV D/C Quad Moose Transmission Line from Sinnar TPP to existing MSETCL Babhaleshwar Sub-Station. 2)2 Nos.400 kV line bays at MSETCL Babhleshwar Sub-station.
53 of 2018
Completed
3103 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of Jaigad Power Transco Limited for approval for assignment of Transmission License by way of security in favour of Security Trustee on behalf of the Lenders under Section 17(3) of the Electricity Act, 2003 by the Transmission Licensee.
29 of 2018
Completed
3104 Sun 17/06/2018 10:00:00 AM
Hearing
Petition of M/s Sridevi Trading Company against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Breach of Distribution Open Access Regulations 2016 and Breach of Practice Directions dated 8 March 2016 and Excess levy and recovery of Wheeling Charges
206 of 2017
Completed
3105 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of M/s. INOX Air Products Private Limited against Maharashtra State Electricity Distribution Company Limited for under Section 86 (1) (k) of the Electricity Act, 2003 read with Regulation 37 of the MERC (Distribution Open Access) Regulations ("DOA Regulations"), 2016 for clarification regarding the applicability of power factor incentive to the Open Access Power Consumption Of HT Consumers.
135 of 2018
Completed
3106 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of Roha Dychem Private Limited against Maharashtra State Electricity Distribution Company Limited for directions to the Respondent in regard to the terms of Open Access granted and to be granted by the Respondent for the period.
119 of 2018
Completed
3107 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of Ghatge Patil Industries Limited under Section 42 of the Electricity Act, 2003 pertaining to denial of short term open access by MSEDCL.
83 of 2018
Completed
3108 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of Mahindra CIE Automotive Limited seeking action against Maharashtra State Electricity Distribution Company Limited for non-compliance of the Distribution Open Access Regulations, 2016 and Order dated 11 August, 2017 in Case No. 139 of 2016 , adoption of incorrect monthly billing methodology and to direction to revise incorrect monthly billing methodology.
71 of 2018
Completed
3109 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of Windmill Owners Welfare Association of India against non-Compliance by MSEDCL of the MERC Order dated May 16, 2017 in Case No.157 of 2016 read with relevant provisions of the EA, 2003
187 of 2017
Completed
3110 Sat 16/06/2018 10:00:00 AM
Hearing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of MERC (DOA) Regulations, 2016 and Open Access Practice directions dated 08.03.2016
173 of 2017
Completed
3111 Fri 15/06/2018 11:00:00 AM
Public Hearing
Inviting Comments on Petition in Case No 84 of 2015 filed by Jawahar Shetkari Sahakari Sakhar Karkhana Ltd. regarding compliance of direction given under the Commission's order in Case No 127 of 2014 and discussion paper regarding the treatment of similar cases post expiry of EPA tenure.
84 of 2015
Completed
3112 Thu 14/06/2018 11:00:00 AM
Public Hearing
Suggestions & Objections on Petition filed by Reliance Infrastructure Limited (RInfra) and Reliance Electric Generation and Supply Limited (REGSL) for assigning the Distribution Licence granted to RInfra and the transfer of assets of the distribution system of RInfra to REGSL, and sale of 100% shareholding of REGSL to Adani Transmission Limited under Section 17(3) of the Electricity Act, 2003. (Case No. 140 of 2017)
140 of 2017
Completed
3113 Thu 14/06/2018 11:00:00 AM
Public Hearing
Suggestions & Objections on Petition filed by Reliance Infrastructure Limited (RInfra) and Reliance Electric Generation and Supply Limited (REGSL) for assigning the Transmission Licence granted to RInfra and the transfer of assets of the transmission system of RInfra to REGSL, and sale of 100% shareholding of REGSL to Adani Transmission Limited under Section 17(3) of the Electricity Act, 2003 (Case No. 139 of 2017)
139 of 2017
Completed
3114 Tue 12/06/2018 10:00:03 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. (MSPGCL) for removal of difficulties in the matter of coal shortage and its adverse impact on MSPGCL'S stations under Section 86 (1) clause (a) and (b) of the EA, 2003 and Section 102 of the MERC (Multi Year Tariff) Regulations, 2015.
151 of 2017
Completed
3115 Tue 12/06/2018 10:00:02 AM
Hearing
Petition of Prayas (Energy Group) under Section 86 of the Electricity Act 2003 seeking analysis and examination of the reasons leading to sudden fall in availability of MSEDCL's contracted capacity during September 2017.
152 of 2017
Completed
3116 Tue 12/06/2018 10:00:01 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking approval on adoption of Tariff for Long Term Procurement of 100 MW Bagasse Based Co-generation Power under Section 63 of the Electricity Act, 2003 for meeting the non-solar renewable purchase obligations.
130 of 2018
Completed
3117 Mon 11/06/2018 10:00:09 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for review of Order dated 19.03.2018 in Case No. 159 of 2016 passed by the Hon'ble Commission in the matter of Petition of Sai Wardha Power Generation Ltd. for declaration of Captive Generating status of its Units 3 and 4 for FY 2015-16.
133 of 2018
Completed
3118 Mon 11/06/2018 10:00:08 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Review of Order dated 09.02.2018 and Corrigendum Order dated 12.03.2018 in Case No. 77 of 2015 passed by the Hon'ble Commission and in the matter of Petition of Sai Wardha Power Ltd. seeking declaration of the Captive Generation status of its Generating Units 3 and 4 for FY 2014-15.
132 of 2018
Completed
3119 Mon 11/06/2018 10:00:06 AM
Hearing
Petition of Sai Wardha Power Generation Limited for directions to the Respondent in regard to the terms of Open Access granted by the Respondent for the period from 01.04.2018.
116 of 2018
Completed
3120 Mon 11/06/2018 10:00:05 AM
Hearing
Petition of 1) M/s. Gadre Marine Export 2) M/s. Gadre Marine Export Private Limited under Section 86(1)(f) read with 86(1)(c) of the EA,2003 for adjudication of disputes between the Petitioner and the Respondent No.1 Maharashtra State Electricity Distribution Co. Ltd
193 of 2017
Completed
3121 Mon 11/06/2018 10:00:04 AM
Hearing
Petition of M/s. RattanIndia Nasik Power Limited under Section 142 and other applicable provisions of the EA, 2003 read with Regulation 22 of the MERC (CGRF & EO) Regulations, 2006 seeking enforcement of CGRF Order dated 31.01.2017 against MSEDCL.
184 of 2017
Completed
3122 Mon 11/06/2018 10:00:03 AM
Hearing
Petition of Cleanmax Enviro Energy Solutions Private Limited for clarification regarding the NET Metering arrangements for Open Access Consumers under the MERC (Net Metering for Roof-Top Solar Photo Voltaic Systems) Regulations, 2015 read with the MERC (DOA) Regulations, 2016 and Section 42 of the EA, 2003 and issues pertaining to connection of Roof Top Solar Power Plant.
163 of 2017
Completed
3123 Mon 11/06/2018 10:00:02 AM
Hearing
Petition of Shri. Mohd. Iqbal Ali Mohammed Wadia, Partner of M/s. Monarch Estate Developers under Section 94 and 128 of Electricity Act, 2003 against BEST for illegal permission of installation of meters over the plots of land C.T.S. No. 131 of Mazgaon Division Beveldered Hill Rd, Mazgaon, Mumbai- 400 010 under Work Order WO/309757.
162 of 2017
Completed
3124 Mon 11/06/2018 10:00:01 AM
Hearing
Petition of Bharat Electronics Limited under MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015 for the implementation of 3 MW of Grid Connected solar power project at Ordinance Ammunition Factory, Khadki (AFK), Pune with the facility of Net Metering.
160 of 2017
Completed
3125 Mon 11/06/2018 10:00:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Reschedule with further notice
3126 Sun 10/06/2018 10:00:06 AM
Hearing
Petition of Maharashtra State Distribution Co. Ltd. (MSEDCL), for seeking approval on adoption of tariff for long term procurement of 500 MW wind power for meeting the non-solar renewable purchase obligations.
129 of 2018
Completed
3127 Sun 10/06/2018 10:00:05 AM
Hearing
Petition of Maharashtra State Distribution Co. Ltd. (MSEDCL), for seeking approval for deviation in bidding document from MoP guidelines for long term procurement of 250MW wind power for meeting the non-solar RPO under section 19 of MERC (RPO, its compliance and implementation of REC framework) regulations, 2016.
122 of 2018
Completed
3128 Sun 10/06/2018 10:00:04 AM
Hearing
Petition of Jawaharlal Nehru Port Trust (JNPT) for taking on record the deemed Distribution Licensee status.
47 of 2018
Completed
3129 Sun 10/06/2018 10:00:03 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) approval for deviation in Standard Bidding document for long term procurement of 500MW Wind Power for meeting the Non-solar Renewable Purchase Obligations under Section 19 of MERC (RPO, its Compliance and implementation of REC Framework) Regulations, 2016.
192 of 2017
Completed
3130 Sun 10/06/2018 10:00:02 AM
Hearing
Petition of Orange Suvaan Energy Pvt. Ltd. under Section 86(1) (f) in connection with the disputes and differences arising under the PPA dated 11.04.2016 and with regard to wrongful and arbitrary invocation of the Performance Bank Guarantees, failure to make payments for the invoices raised and failure to release the VGF funds for the Solar PV project of the Petitioner of 2 x 50 MW capacity.
185 of 2017
Completed
3131 Sun 10/06/2018 10:00:01 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Amendment of MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 Practice Directions on Processing of Open Access Applications.
98 of 2017
Completed
3132 Sat 09/06/2018 22:00:09 PM
Hearing
Petition of OPGS Power Gujarat Private Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) against order dated 29.12.2017 passed by the MERC, in terms of the Order dated 09.01.2018 passed by the Appellate Tribunal in Appeal No. 03 of 2018.
48 of 2018
Completed
3133 Sat 09/06/2018 10:00:10 AM
Hearing
Review Petition of OPGS Power Gujarat Private Limited against the MERC Order dated 12.01.2018 in Case No. 27 of 2018, preferred in terms of the Order dated 23.01.2018 passed by the APTEL in Appeal No. 20 of 2018.
76 of 2018
Completed
3134 Sat 09/06/2018 10:00:08 AM
Hearing
Petition of M/s Avinash N. Bhosale Wind Mill Farm Division against Maharashtra State Electricity Distribution Company Ltd. under Section 86(1) (f) for adjucation of dispute on the issue of outstanding payments of power purchases, interest on delayed payment and overdue interest for delayed payment surcharge for wind power supplied by it to MSEDCL.
103 of 2018
Completed
3135 Sat 09/06/2018 10:00:07 AM
Hearing
Petition of Avinash Constructions against Maharashtra State Electricity Distribution Company Ltd. under Section 86 (1) (f) for adjucation of dispute on the issue of outstanding payments of power purchases, interest on delayed payment and overdue interest for delayed payment surcharge for wind power supplied by it to MSEDCL.
102 of 2018
Completed
3136 Sat 09/06/2018 10:00:06 AM
Hearing
Petition of M/s. Sun N Sand Hotels Private Limited under Section 142, and Read with Section 86(1) (f) of The Electricity Act 2003 seeking Compliance of the Order issued by Maharashtra Electricity Regulatory Commission in Petition No.62/2016 Dated 16/03/2017.
147 of 2017
Completed
3137 Sat 09/06/2018 10:00:05 AM
Hearing
Petition of M/s KRC Infrastructure & Projects Private Limited for taking on record deemed Distribution Licensee status of, M/s. KRC Infrastructure and Projects Pvt. Ltd., for the IT & ITeS SEZ at Survey No. 65 (p), Kharadi, Tal Haveli, Dist Pune, and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
75 of 2018
Completed
3138 Sat 09/06/2018 10:00:04 AM
Hearing
Petition of Gigaplex Estate Private Limited (GEPL) for obtaining the Hon'ble Commission's approval for the amendment of MERC (Specific Conditions of Distribution Licence applicable to M/s. Gigaplex Estate Pvt. Ltd., for IT & ITES SEZ at Airoli Knowledge Park, TTC Industrial Area, Dist. Thane) Regulations, 2015 due to increase in area specified in SEZ No. S.O. (E) dated October 30, 2017, leading to change in licence are of GEPL.
161 of 2017
Completed
3139 Sat 09/06/2018 10:00:03 AM
Hearing
Petition of Maharashtra State Distribution Co. Ltd. (MSEDCL), for deviation in bidding document from MoP guidelines for long term procurement of solar power under "Mudhyamantri Sour Krishi Vahini Yojana" with 2 to 10 MW capacity projects connected to distribution network with total quantum of 1000 MW through competitive bidding (E-reverse auction); under section 19 of MERC (RPO,its compliance and implementation of REC framework) Regulations, 2016
131 of 2018
Completed
3140 Sat 09/06/2018 10:00:02 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) approval for deviation in Standard Bidding document for Long Term Procurement of 1000MW solar power for meeting the solar Renewable Purchase Obligations under Section 19 of MERC (RPO, its Compliance and implementation of REC Framework) Regulations, 2016.
191 of 2017
Completed
3141 Sat 09/06/2018 10:00:01 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. (MSPGCL), for removal of difficulties in the matter of implementation of "Mukhyamantri Solar Agricultural Feeder Scheme" and approval of PPA & PSA being executed by Mahagenco with the developer and Mahadiscom respectively for AG Feeder Solar Power Projects in Maharashtra
172 of 2017
Completed
3142 Tue 27/03/2018 11:00:00 AM
Hearing
Petition of OPGS Power Gujarat Private Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) against order dated 29.12.2017 passed by the MERC, in terms of the Order dated 09.01.2018 passed by the Appellate Tribunal in Appeal No. 03 of 2018.
48 of 2018
Reschedule
3143 Fri 23/03/2018 11:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (b) read with Article 18.1 of 1320 MW PPA dated 08.09.2008 and Article 15.3 of 1200 MW dated 31.03.2010, 125 MW dated 09.08.2010 and 440 MW dated 16.02.2013 for approval of Supplementary Power Purchase Agreement ("SPPA") executed between MSEDCL with Adani Power Maharashtra Limited for passing on the discount in tariff for the balance period of the PPAs as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India (SHAKTI).
70 of 2018
Reschedule
3144 Wed 21/03/2018 11:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (b) read with Article 18.1 of 1320 MW PPA dated 08.09.2008 and Article 15.3 of 1200 MW dated 31.03.2010, 125 MW dated 09.08.2010 and 440 MW dated 16.02.2013 for approval of Supplementary Power Purchase Agreement ("SPPA") executed between MSEDCL with Adani Power Maharashtra Limited for passing on the discount in tariff for the balance period of the PPAs as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India (SHAKTI).
70 of 2018
Reschedule
3145 Tue 20/03/2018 11:00:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (b) read with Article 18.1 of 1320 MW PPA dated 08.09.2008 and Article 15.3 of 1200 MW dated 31.03.2010, 125 MW dated 09.08.2010 and 440 MW dated 16.02.2013 for approval of Supplementary Power Purchase Agreement ("SPPA") executed between MSEDCL with Adani Power Maharashtra Limited for passing on the discount in tariff for the balance period of the PPAs as per the "Scheme for Harnessing and Allocating Koyala (Coal) Transparently in India (SHAKTI).
70 of 2018
Completed
3146 Wed 14/03/2018 11:30:00 AM
Hearing
Petition filed by The Tata Power Company Limited seeking approval of the Power Procurement Plan of the Tata Power Company Limited- Distribution Business for FY 2018-19 to FY 2024-25 as per directions of the Honâ??ble Commission vide order dated 21.10.2016 in Case No. 47 of 2016 read with MERC (MYT) Regulations, 2015.
39 of 2017
Completed
3147 Tue 13/03/2018 11:00:00 AM
Hearing
Petition filed by The Tata Power Company Limited seeking approval of the Power Procurement Plan of the Tata Power Company Limited- Distribution Business for FY 2018-19 to FY 2024-25 as per directions of the Hon'ble Commission vide order dated 21.10.2016 in Case No. 47 of 2016 read with MERC (MYT) Regulations, 2015.
39 of 2017
Reschedule
3148 Tue 27/02/2018 11:00:00 AM
Public Hearing
Inviting Objections/comments on Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) (TPC-D) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 and the Regulations made there under.
117 of 2017
Reschedule with further notice
3149 Wed 07/02/2018 10:30:00 AM
Hearing
Petition of Jaigad Power Transco Limited for approval for assignment of Transmission License by way of security in favour of Security Trustee on behalf of the Lenders under Section 17(3) of the Electricity Act, 2003 by the Transmission Licensee.
29 of 2018
Reschedule with further notice
3150 Wed 07/02/2018 10:30:00 AM
Hearing
Petition of Riddhi Siddhi Gluco Biols Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86(1)(f) of the EA, 2003 and in the matter of recurring non-payment and/or late payment of the principal amounts as well as non-payment of Late Payment Surcharge on the delayed payment under the Wind Energy Purchase Agreement Dated 17th June 2011.
28 of 2018
Reschedule with further notice
3151 Tue 06/02/2018 10:30:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status of its Captive Generating Units ( III & IV) for the financial year 2016 -17.
175 of 2017
Reschedule with further notice
3152 Tue 06/02/2018 10:30:00 AM
Hearing
Petition of Serum Institute of India Pvt. Ltd seeking directions for compliance of MERC (DOA) Regulations, 2016 and Open Access Practice directions dated 08.03.2016
173 of 2017
Reschedule with further notice
3153 Mon 05/02/2018 10:30:00 AM
Hearing
Joint Petition of 1) Reliance Infrastructure Limited and 2) Reliance Electric Generation and Supply Limited seeking approval to assign the distribution licence granted to the 1st Petitioner and the transfer of assets of the transmission system of the 1st Petitioner to the 2nd Petitioner. And Addendum Petition to implead Adani Transmission Limited as Respondent in Case No 140 of 201, approve transfer of 100% stake of 1st Petitioner in 2nd Petitioner to Respondent
140 of 2017
Reschedule with further notice
3154 Mon 05/02/2018 10:30:00 AM
Hearing
Joint Petition of 1) Reliance Infrastructure Limited and 2) Reliance Electric Generation and Supply Limited seeking approval to assign the distribution licence granted to the 1st Petitioner and the transfer of assets of the transmission system of the 1st Petitioner to the 2nd Petitioner. And Addendum Petition to implead Adani Transmission Limited as Respondent in Case No 139 of 2017 approve transfer of 100% stake of 1st Petitioner in 2nd Petitioner to Respondent.
139 of 2017
Reschedule with further notice
3155 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Spectrum Scan Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1473 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
44 of 2018
Reschedule with further notice
3156 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Mega Rubber Technologies Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1141 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
43 of 2018
Reschedule with further notice
3157 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Royal Garden Resort against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1332/1342/1360/1351 dated 10.08.17/16.08.17/23.08.17/14.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
42 of 2018
Reschedule with further notice
3158 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Siyesha Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1153 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
41 of 2018
Reschedule with further notice
3159 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Mega Rubber Technologies Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1142 dated 01.09.17 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
40 of 2018
Reschedule with further notice
3160 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Barcom Industries Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1438/1440/1444/1442 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
39 of 2018
Reschedule with further notice
3161 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Maharashtra Packaging against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1439/1441/1445/1443 dated 10.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
38 of 2018
Reschedule with further notice
3162 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Paradise Packaging Pvt. Ltd., against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1336/1345/1363/1354 dated 09.08.17, 18.08.17, 23.08.17, 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
37 of 2018
Reschedule with further notice
3163 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Nakki Hospitality Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1330/1340/1358/1349 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
36 of 2018
Reschedule with further notice
3164 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Bharat Plastopack Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1371/1378/1392/1385 dated 09.09.17,17.09.17,22.09.17,13.10.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
35 of 2018
Reschedule with further notice
3165 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Vivek Polymer India against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1152 dated 01.09.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
34 of 2018
Reschedule with further notice
3166 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of U. V. Metallising India Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1334 / 1343 / 1361 / 1352 dated 23.08.17, 18.08.17, 23.08.17 & 14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
33 of 2018
Reschedule with further notice
3167 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Infra Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1150 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
32 of 2018
Reschedule with further notice
3168 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Spectrum Scan Pvt. Ltd. Plot 31 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1474 dated 01.11.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
31 of 2018
Reschedule with further notice
3169 Fri 02/02/2018 10:30:00 AM
Hearing
Petition of Bharat Rubber Works Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No.1370/1377/1391/1384 dated 10.08.17,18.08.17,23.08.17,14.09.17 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
30 of 2018
Reschedule with further notice
3170 Wed 31/01/2018 11:00:00 AM
Hearing
Inviting Suggestions/Objections on Jaigad Power Transco Ltd's Petition for approval of Truing up of FY 2015-16 and FY 2016-17, Provisional Truing up of FY 2017-18 and Revised Forecast of ARR for FY 2018-19 & FY 2019-20 (Case No. 167 of 2017)
167 of 2017
Reschedule with further notice
3171 Wed 31/01/2018 11:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for Truing up of FY 2015-16 and FY 2016-17, Provisional Truing-up of FY 2017-18, and revised estimates for Aggregate Revenue Requirement and Determination of Fees and Charges for FY 2018-19 and FY 2019-20
171 of 2017
Reschedule with further notice
3172 Wed 24/01/2018 11:00:00 AM
Hearing
Petition of M/s Sridevi Trading Company against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Breach of Distribution Open Access Regulations 2016 and Breach of Practice Directions dated 8 March 2016 and Excess levy and recovery of Wheeling Charges.
206 of 2017
Reschedule with further notice
3173 Tue 23/01/2018 12:00:00 PM
Hearing
Petition of OPGS Power Gujarat Private Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) against order dated 29.12.2017 passed by the MERC, in terms of the Order dated 09.01.2018 passed by the Appellate Tribunal in Appeal No. 03 of 2018.
48 of 2018
Reschedule with further notice
3174 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Bhulani Steel against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1151/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
26 of 2018
Reschedule with further notice
3175 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Aditi Die Cast against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1159 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
25 of 2018
Reschedule with further notice
3176 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1145 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
24 of 2018
Reschedule with further notice
3177 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of R. P. Industries against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1154 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
23 of 2018
Reschedule with further notice
3178 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of J. D. Exports against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order 1140 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
22 of 2018
Reschedule with further notice
3179 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Shri Arjun L Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1155 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
21 of 2018
Reschedule with further notice
3180 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Shri Amit A. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1157 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
20 of 2018
Reschedule with further notice
3181 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Shri Arjun L. Raheja against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1156 of 2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
19 of 2018
Reschedule with further notice
3182 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Raychem RPG (P) Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order Nos 1401, 1403, 1407 & 1405 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
18 of 2018
Reschedule with further notice
3183 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Arlex Chemi Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1162 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
17 of 2018
Reschedule with further notice
3184 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Industrial Engineering Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No 1139 of 2015 dated 01.09.2017. and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
16 of 2018
Reschedule with further notice
3185 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of First Winner Lifestyles Ltd. Plot No.C-8/1 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan Order No. 1171 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
15 of 2018
Reschedule with further notice
3186 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of SSB Metal Work against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1143 of 2015 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
14 of 2018
Reschedule with further notice
3187 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Shreenath Chemicals against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1161 of 2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
13 of 2018
Reschedule with further notice
3188 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Rajesh Plastics against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1333, 1339, 1357 & 1348 of 2015 dated 10.08.2017,18.08.2017, 23.08.2017 & 14.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
12 of 2018
Reschedule with further notice
3189 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of RLC Engineers Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1146/2015-16 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
11 of 2018
Reschedule with further notice
3190 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of First Winner Industries Ltd. Plot No.N-66 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 1169 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
10 of 2018
Reschedule with further notice
3191 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of First Winner Industries Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. 964/1170 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
9 of 2018
Reschedule with further notice
3192 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Vista packaging Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E 1) 1114//1335/, 2) 1123/1344 3) 1140/1362, 4) 1131/1353 dated 23.08.2017, 18.08.2017, 23.08.2017 & 14.09.2017 respectively , and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
8 of 2018
Reschedule with further notice
3193 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of MIRC Electronics Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, 4 Orders No. K/E 1)1146//1367/, 2) 1153/1374, 3) 1167/1388, 4) 1160/1381, dated 18.8.2017, 18.8.2017, 13.8.2017 and 14.9.2017 respectively and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
7 of 2018
Reschedule with further notice
3194 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of A. B. Corporation against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/960/1166/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
6 of 2018
Reschedule with further notice
3195 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Savex Seal Pvt. Ltd. Now SVP Packing Industry Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/959/1165/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
5 of 2018
Reschedule with further notice
3196 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Ambernath Paper Mills Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/962/1168/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
4 of 2018
Reschedule with further notice
3197 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Agarwal Fasteners Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/943/ 1149/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
3 of 2018
Reschedule with further notice
3198 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of SVP Packing Industry Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of the CGRF, Kalyan, Order No. K/E/958/ 1164/2015-16 dated 1.9.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
2 of 2018
Reschedule with further notice
3199 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of M/s. Sun Diapet against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF, Kalyan, and Order K/E/941/1147/2015-16 dated 1.9.2017 and MERC Case No. 78 of 2016 dated 13.07.2017.
1 of 2018
Reschedule with further notice
3200 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Windmill Owners Welfare Association of India against non-Compliance by MSEDCL of the MERC Order dated May 16, 2017 in Case No.157 of 2016 read with relevant provisions of the EA, 2003.
187 of 2017
Reschedule with further notice
3201 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Kundan Engineering Works against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone 4 Orders and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
190 of 2017
Reschedule with further notice
3202 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Royal Embroidary Threads P. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Baramati Zone Order and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
189 of 2017
Reschedule with further notice
3203 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Sujan Industries Unit No.2 against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Non-compliance of CGRF Kalyan Zone Order no. 1144/2015-16 dated 01.09.2017 and MERC Order in Case No. 78 of 2016 dated 13.07.2017.
188 of 2017
Reschedule with further notice
3204 Tue 23/01/2018 11:00:00 AM
Hearing
Petition of Sunfresh Agro. Industries Pvt. Ltd. against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-compliance of CGRF order and violation of direction passed by this Commission in Case No. 88 of 2012 & 86 of 2015.
186 of 2017
Reschedule with further notice
3205 Thu 18/01/2018 11:00:00 AM
Hearing
Miscellaneous Application filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Impleadment in Case No. 176 of 2017 Petition filed by BEST Undertaking U/S 86 (1) (b) of EA, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
MA No. 01 of 2018 in Case No. 176 of 2017
Completed
3206 Thu 18/01/2018 11:00:00 AM
Hearing
Petition filed by BEST Undertaking under Section 86 (1)(b) of the Electricity Act, 2003 to regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State.
176 of 2017
Completed
3207 Thu 18/01/2018 11:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2016-17.
175 of 2017
Completed
3208 Thu 18/01/2018 11:00:00 AM
Hearing
Petition filed by M/s. Gurera Synthetics Pvt. Ltd., under Sections 45(5), 50, 62(6), 86(1) and 94(1) (g) of the Electricity Act, 2003, for the alleged violation of the provisions of the said act, the rules and regulations framed thereunder and specially in violation of the Regulation No. 15.4 "Billing in the Event of Defective meters" of MERC (Electricity supply code and other conditions of Supply) Regulations, 2005.
134 of 2017
Completed
3209 Thu 18/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) approval for deviation in Standard Bidding document for long term procurement of 500MW Wind Power for meeting the Non-solar Renewable Purchase Obligations under Section 19 of MERC (RPO, its Compliance and implementation of REC Framework) Regulations, 2016.
192 of 2017
Reschedule
3210 Thu 18/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) approval for deviation in Standard Bidding document for Long Term Procurement of 1000MW solar power for meeting the solar Renewable Purchase Obligations under Section 19 of MERC (RPO, its Compliance and implementation of REC Framework) Regulations, 2016.
191 of 2017
Reschedule
3211 Wed 17/01/2018 11:00:00 AM
Hearing
Petition filed by M/s. Gurera Synthetics Pvt. Ltd., under Sections 45(5), 50, 62(6), 86(1) and 94(1) (g) of the Electricity Act, 2003, for the alleged violation of the provisions of the said act, the rules and regulations framed thereunder and specially in violation of the Regulation No. 15.4 "Billing in the Event of Defective meters" of MERC (Electricity supply code and other conditions of Supply) Regulations, 2005.
134 of 2017
Reschedule
3212 Wed 17/01/2018 11:00:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2016-17.
175 of 2017
Reschedule
3213 Tue 16/01/2018 11:00:00 AM
Hearing
Petition of Shri. Mohd. Iqbal Ali Mohammed Wadia, Partner of M/s. Monarch Estate Developers under Section 94 and 128 of Electricity Act, 2003 against BEST for illegal permission of installation of meters over the plots of land C.T.S. No. 131 of Mazgaon Division Beveldered Hill Rd, Mazgaon, Mumbai- 400 010 under Work Order WO/309757.
162 of 2017
Completed
3214 Tue 16/01/2018 11:00:00 AM
Hearing
Petition of 1) M/s. Gadre Marine Export 2) M/s. Gadre Marine Export Private Limited under Section 86(1)(f) read with 86(1)(c) of the EA,2003 for adjudication of disputes between the Petitioner and the Respondent No.1 Maharashtra State Electricity Distribution Co. Ltd
193 of 2017
Completed
3215 Tue 16/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for approval for deviation in standard bidding document for procurement of long term bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 19 of MERC (RPO, its Compliance and Implementation of REC Framework) Regulations, 2016.
183 of 2017
Reschedule
3216 Tue 16/01/2018 11:00:00 AM
Hearing
Petition of Serum Institute of India Pvt. Ltd Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking directions for compliance of MERC (DOA) Regulations, 2016, Open Access Practice directions dated 08.03.2016
173 of 2017
Completed
3217 Mon 15/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Additional District Collector, Nashik's Order dated 16.12.2015 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Completed
3218 Mon 15/01/2018 11:00:00 AM
Hearing
Petition of Shri Dattatraya Khanderao Khaire and Others under Rule 3(3) of the Maharashtra Electricity Works of Licensees Rules, 2012 for review of the Additional District Court, Nasik's Order dated 16.12.2015 for complaint about demolished & damaged to grapes crop & garden.
129 of 2017
Completed
3219 Wed 10/01/2018 11:00:00 AM
Hearing
Petition of OPGS Power Gujarat Private Limited against wrongful action of MSEDCL of granting the consent for open access under Section 10 of the Electricity Act 2003, mid-way in the FY 2017-18, for the purposes of supply of power by the Petitioner, which is a captive generating plant, to its captive users.
27 of 2018
Completed
3220 Wed 10/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) to review the Daily Order dated 14.12.2017 passed in Case No. 180 of 2017.
205 of 2017
Completed
3221 Wed 10/01/2018 11:00:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding for approval of proposal for discount in relation to the PPA dated 22.04.2010 and 05.06.2010 executed between RIPL and MSEDCL.
100 of 2017
Completed
3222 Wed 10/01/2018 11:00:00 AM
Hearing
Petition filed by RattanIndia Power Limited under Section 86 (1) (f) of the Electricity Act, 2003 read with Articles 4, 8 and 11 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 for adjudication of claims and seeking directions to MSEDCL to open Letter of Credit and to make payment of Rs.558 crore outstanding as on 17.10.2015 towards supply of electricity.
138 of 2015
Completed
3223 Tue 09/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for approval for deviation in standard bidding document for procurement of long term bagasse based co-generation power for meeting the non-solar renewable purchase obligations under Section 19 of MERC (RPO, its Compliance and Implementation of REC Framework) Regulations, 2016.
183 of 2017
Completed
3224 Tue 09/01/2018 11:00:00 AM
Hearing
Petition of M/s RattanIndia Nasik Power Limited under Section 142 and other applicable provisions of the Electricity Act, 2003 read with Regulation 22 of the MERC (CGRF & EO) Regulations, 2006 seeking enforcement of order dated 31.01.2017 of the CGRF and initiation of proceedings under Section 142 of the EA, 2003.
184 of 2017
Completed
3225 Tue 09/01/2018 11:00:00 AM
Hearing
Petition of Vidhata Metals Pvt. Ltd against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for non-Compliance of CGRF Kalyan Zone 4 Orders of consumer no.010519035310 under Section 142 read with 146 of the EA, 2003 for violating these Orders.
182 of 2017
Completed
3226 Tue 09/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of around 200 MW Solar power on long term basis from rooftop/ground mounted solar power projects proposed to be set up in the premises of existing MSEDCL's substations and approval for consideration of this solar power procured for fulfillment of RPO of MSEDCL.
164 of 2017
Reschedule
3227 Tue 09/01/2018 11:00:00 AM
Hearing
Petition of Cleanmax Enviro Energy Solutions Private Limited for clarification regarding the NET Metering arrangements for Open Access Consumers under the MERC (Net Metering for Roof-Top Solar Photo Voltaic Systems) Regulations, 2015 read with the MERC (DOA) Regulations, 2016 and Section 42 of the EA, 2003 and issues pertaining to connection of Roof Top Solar Power Plant.
163 of 2017
Completed
3228 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of Orange Suvaan Energy Pvt. Ltd. under Section 86(1) (f) in connection with the disputes and differences arising under the PPA dated 11.04.2016 and with regard to wrongful and arbitrary invocation of the Performance Bank Guarantees, failure to make payments for the invoices raised and failure to release the VGF funds for the Solar PV project of the Petitioner of 2 x 50 MW capacity.
185 of 2017
Completed
3229 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of Mohd, Iqbal Alimohammed Wadia, Partner of M/s. Monarch Estate Developers for of illegal permission of installation of meters over the plots of land C.T.S. No. 131 of Mazgaon Division Beveldered Hill Rd, Mazgaon, Mumbai- 400 010 under Work Order WO/309757.
162 of 2017
Completed
3230 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of Gigaplex Estate Private Limited (GEPL) for obtaining the Hon'ble Commission's approval for the amendment of MERC (Specific Conditions of Distribution Licence applicable to M/s. Gigaplex Estate Pvt. Ltd., for IT & ITES SEZ at Airoli Knowledge Park, TTC Industrial Area, Dist. Thane) Regulations, 2015 due to increase in area specified in SEZ No. S.O. (E) dated October 30, 2017, leading to change in licence are of GEPL.
161 of 2017
Completed
3231 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of Bharat Electronics Limited under MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015 for the implementation of 3 MW of Grid Connected solar power project at Ordinance Ammunition Factory, Khadki (AFK), Pune with the facility of Net Metering.
160 of 2017
Completed
3232 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of Shri Suresh Shivram Sawant under Section 142 & 146 of the Electricity Act 2003 for non-compliance of the Commission's order issued in Case No. 19 of 2012 dated 16.08.2012, Case No.118 of 2012 dated 16.07.2013 and Case No. 158 of 2016 dated 17.07.2017.
156 of 2017
5
3233 Mon 08/01/2018 11:00:00 AM
Hearing
Petition of RSR Mohota Spinning & Weaving Mills Ltd. Complaint against Licensee Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for non-compliance of the Electricity Ombudsman Nagpur Order dt. 26.08.2017, Case No. 25 of 2017.
154 of 2017
Completed
3234 Wed 03/01/2018 11:00:00 AM
Hearing
Petition of Shri Dattatraya Khanderao Khaire and Others under Rule 3(3) of the Maharashtra Electricity Works of Licensees Rules, 2012 for review of the Additional District Court, Nasik's Order dated 16.12.2015 for complaint about demolished & damaged to grapes crop & garden.
129 of 2017
Reschedule
3235 Wed 03/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Additional District Collector, Nashik's Order dated 16.12.2015 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Reschedule
3236 Wed 03/01/2018 11:00:00 AM
Hearing
Petition of New Natraj Industries for non compliance of CGRF's order of Nasik zone by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)
153 of 2017
5
3237 Wed 03/01/2018 11:00:00 AM
Hearing
Petition of Prayas (Energy Group) under Section 86 of the Electricity Act 2003 seeking analysis and examination of the reasons leading to sudden fall in availability of MSEDCL's contracted capacity during September 2017.
152 of 2017
Completed
3238 Wed 03/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. (MSPGCL) for removal of difficulties in the matter of coal shortage and its adverse impact on MSPGCL'S stations under Section 86 (1) clause (a) and (b) of the EA, 2003 and Section 102 of the MERC (Multi Year Tariff) Regulations, 2015.
151 of 2017
Completed
3239 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of Rajlakshmi Minerals against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for failure to comply with the MERC's Order dated 16.05.2016 in Case No. 166 of 2016.
177 of 2017
Completed
3240 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for In-Principle approval for Short Term Power Purchase at higher cost than the ceiling rate approved by Hon'ble Commission.
181 of 2017
Completed
3241 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of around 200 MW Solar power on long term basis from rooftop/ground mounted solar power projects proposed to be set up in the premises of existing MSEDCL's substations and approval for consideration of this solar power procured for fulfillment of RPO of MSEDCL.
164 of 2017
Completed
3242 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Ltd. (MSPGCL), for removal of difficulties in the matter of implementation of "Mukhyamantri Solar Agricultural Feeder Scheme" and approval of PPA & PSA being executed by Mahagenco with the developer and Mahadiscom respectively for AG Feeder Solar Power Projects in Maharashtra
172 of 2017
Completed
3243 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of Shri Namdeo Sukhdeo Choudhary for non-compliance of the CGRF, Akola, Order dated 07.06.2017 in Case No. 17 of 2017.
145 of 2017
Completed
3244 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of M/s. Sun N Sand Hotels Private Limited under Section 142, and Read with Section 86(1) (f) of The Electricity Act 2003 seeking Compliance of the Order issued by Maharashtra Electricity Regulatory Commission in Petition No.62/2016 Dated 16/03/2017.
147 of 2017
Completed
3245 Tue 02/01/2018 11:00:00 AM
Hearing
Petition of M/s. Omsairam Steel and Alloys Pvt. Limited and 4 Others Seeking Intervention and Direction of this Hon'ble Commission that calculation of Load Factor Incentive (L.F.I) by taking into consideration Planned Load Shedding hours as directed under the order dated 9th August, 2004 passed by this Hon'ble Commission in MERC Case No.6 of 2004 which is applicable to the Petitioners herein.
146 of 2017
Completed
3246 Fri 29/12/2017 11:00:00 AM
Public Hearing
Inviting Suggestions & Objections on Nagpur Solid Waste Processing and Management Pvt Ltd's Petition for determination of Tariff for sale of electricity generated from its 11.5 MW capacity Municipal Solid Waste based power project to be commissioned at Nagpur to the Distribution Licensees in Maharashtra
158 of 2017
Completed
3247 Wed 20/12/2017 11:00:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Ltd.) (RIPL) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RIPL and Maharashtra State Electricity Distribution Company Limited (MSEDCL) for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RIPL.
84 of 2016
Completed
3248 Wed 20/12/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Additional District Collector, Nashik's Order dated 16.12.2015 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Reschedule
3249 Wed 20/12/2017 11:00:00 AM
Hearing
129 of 2017
Reschedule
3250 Wed 20/12/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Regulate electricity purchase and procurement process of Distribution Licencees within the state.
111 of 2017
Completed
3251 Tue 19/12/2017 11:00:05 AM
Suo Motu Hearing
Suo-moto hearing to review the status of upcoming Generation projects of MSPGCL as per the PPA signed with MSEDCL, and Capital Cost and Tariff determination of New Units.
42 of 2017
Completed
3252 Tue 19/12/2017 11:00:03 AM
Hearing
Petition of M/s. Newfound Properties and Leasing Pvt. Ltd. for taking on record its deemed Distribution Licensee status, for the IT & ITES SEZ at Trans Thane Creek Industrial Area, MIDC, District - Thane, and for issuing the Specific Conditions of Distribution Licence applicable to it .
80 of 2017
Completed
3253 Tue 19/12/2017 11:00:02 AM
Hearing
Petition of Development Commissioner cum Chairperson, SEEPZ Special Economic Zone Authority for Specific Conditions of Distribution License for SEEPZ SEZ, Mumbai to undertake distribution of power within the SEZ area through network of existing Licensee till its own distribution network is developed
106 of 2016
Completed
3254 Tue 19/12/2017 11:00:00 AM
Hearing
Petition of M/s. REI Power Bazaar Private Limited for seeking permission for setting up and operation of intra-state power market in the State of Maharashtra under the sole jurisdiction of the MERC.
131 of 2015
Completed
3255 Thu 14/12/2017 12:30:00 PM
Hearing
Petition of OPGS Power Gujarat Private Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) wrongful imposition of CSS and Additional Surcharge on the captive users of OPGS availing Open Access for the FYs 2015-16 and 2016-17 & Quash the letter issued by MSEDCL dated 28.11.2017.
180 of 2017
Completed
3256 Thu 14/12/2017 12:30:00 PM
Hearing
Petition of Lupin Limited seeking directions against MSEDCL for unjustified, illegal and arbitrary levy of Cross Subsidy Surcharge and Additional Surcharge on the open access consumption of the Petitioner for FY 2016-17 which is a part of Group Captive Power Plant by way of supplementary bill dated 05.12.2017.
179 of 2017
Completed
3257 Thu 14/12/2017 12:30:00 PM
Hearing
Petition of INOX Air Products Private Limited seeking directions against MSEDCL for unjustified, illegal and arbitrary levy of Cross Subsidy Surcharge and Additional Surcharge on the open access consumption of the Petitioner for FY 2016-17 which is a part of Group Captive Power Plant by way of supplementary bill dated 05.12.2017.
178 of 2017
Completed
3258 Thu 14/12/2017 12:30:00 PM
Hearing
Petition of Sai Wardha Power Generation Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Generation Limited for the financial year 2016-17.
175 of 2017
Completed
3259 Thu 14/12/2017 12:00:00 PM
Public Hearing
Inviting Objections / Comments on the 'Tata Power Company Limited - Distribution Business' Petition for approval of Additional Surcharge.
79 of 2017
Completed
3260 Thu 14/12/2017 11:30:00 AM
Hearing
Petition of The Brihanmumbai Electric Supply and Transport Undertaking (BEST), for cancellation of competitive bidding process for 750 MW and rebidding.
176 of 2017
Completed
3261 Thu 14/12/2017 11:00:00 AM
Public Hearing
Inviting Suggestions / Objections on Petition filed by Reliance Infrastructure Ltd - Distribution (RInfra-D) and Reliance Infrastructure Ltd - Generation (RInfra-G) for approval of Power Procurement Plan and Power Purchase Arrangement
5 of 2017
Completed
3262 Wed 13/12/2017 11:00:00 AM
Hearing
Miscellaneous Application is filed by Adani Power Maharashtra Limited, in Case No 123 of 2017 Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 read with Article 13 "Change in Law" of Power Purchase Agreement.
MA No. 22 of 2017 in Case No. 123 of 2017
Completed
3263 Wed 13/12/2017 11:00:00 AM
Hearing
Addendum Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 read with Article 13 of the Power Purchase Agreement dated 23.02.2010.
123 of 2017
Completed
3264 Wed 13/12/2017 11:00:00 AM
Hearing
Petition filed by Shri B. R. Mantri against MSEDCL for deliberate False and intentionally misleading information submitted by MSEDCL in latest Case No. 78 of 2016 with reference to old Case No. 95 of 2013 and 184 of 2013 for refund of Additional Energy Charge prematurely levied by MSEDCL.
132 of 2017
Completed
3265 Wed 13/12/2017 11:00:00 AM
Admissibility Hearing
Petition filed by Shri Ramchandra Dayshankar Pandey against the Respondents under Section 142 and 149 of the Electricity Act 2003.
136 of 2017
Completed
3266 Wed 13/12/2017 11:00:00 AM
Hearing
Petition filed by M/s. Gurera Synthetics Pvt. Ltd., Seeking legal action against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) under Section 142 and 149 of EA, 2003, for the alleged violation of the Regulation No. 15.4 "Billing in the Event of Defective meters" of MERC (Electricity supply code and other conditions of Supply) Regulations, 2005.
134 of 2017
Completed
3267 Wed 13/12/2017 11:00:00 AM
Hearing
Petition filed by M/s. Nandan Textiles Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for contravention of Sec 154 (6) of Electricity Act 2003. (Direct MSEDCL to refund the amount deposited with MSEDCL by M/s Nandan Textiles Pvt Ltd against alleged theft (Prejudicial use of Energy) of Electricity along with interest as per sec 154(6) of EA 2003)
133 of 2017
Completed
3268 Tue 12/12/2017 11:00:08 AM
Hearing
Petition filed by Shri B. R. Mantri against MSEDCL for deliberate False and intentionally misleading information submitted by MSEDCL in latest Case No. 78 of 2016 with reference to old Case No. 95 of 2013 and 184 of 2013 for refund of Additional Energy Charge prematurely levied by MSEDCL.
132 of 2017
Reschedule
3269 Tue 12/12/2017 11:00:05 AM
Hearing
Review Petition filed by Shri Suresh Sancheti to Review Order dated 7 July, 2017 passed by the Hon'ble Commission in Case No. 101 of 2016 Petition of Maharashtra State Electricity Distribution Company Ltd. for discontinuing refund of Additional Supply Charges for applications received after 1st January 2016.
130 of 2017
Completed
3270 Tue 12/12/2017 11:00:04 AM
Hearing
Petition filed by Shri B. R. Mantri for Review of order dated 13/07/2017 in Case No. 78 of 2016 in the matter of Petition of Paul Strips and Tubes Pvt. Ltd. regarding violation of Orders in Case No. 95 of 2013 and MA No. 187 of 2014, and for refund of Additional Energy Charge prematurely levied by MSEDCL.
127 of 2017
Completed
3271 Tue 12/12/2017 11:00:03 AM
Hearing
Petition filed by Shri B. R. Mantri for Review of order dated 07/07/2017 in Case No. 101 of 2016 in the matter of Petition of Maharashtra State Electricity Distribution Company for discontinuing refund of Additional Supply Charges for application received after 01.01.2016.
126 of 2017
Completed
3272 Tue 12/12/2017 11:00:02 AM
Hearing
Miscellaneous Application is filed by Adani Power Maharashtra Limited, in Case No 123 of 2017 Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 read with Article 13 "Change in Law" of Power Purchase Agreement.
MA No. 22 of 2017 in Case No. 123 of 2017
Reschedule
3273 Tue 12/12/2017 11:00:01 AM
Hearing
Addendum Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 read with Article 13 of the Power Purchase Agreement dated 23.02.2010.
123 of 2017
Reschedule
3274 Wed 06/12/2017 11:00:04 AM
Hearing
Petition of Shri Balaso Maruti Mote against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 142 of EA 2003 for non-compliance of the CGRF, Kolhapur, Order dated 06.06.2017 in Case No. 1 to 3 of 2017-18.
143 of 2017
Completed
3275 Wed 06/12/2017 11:00:03 AM
Suo Motu Hearing
Suo moto proceeding in the matter of Show-Cause Notice issued in Order dated 8 February, 2017 in Case No. 89 of 2015 (Suo moto review of compliance of Trading Licence conditions by Intra-State Trading Licensees in Maharashtra)
142 of 2017
Completed
3276 Wed 06/12/2017 11:00:02 AM
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking review of the order dated 15.02.2017 passed by the Commission in Case No. 86 of 2015.
122 of 2017
Completed
3277 Wed 06/12/2017 11:00:01 AM
Hearing
Petition filed by M/s. Tulshi Casting and Machining Limited under Section 142 of EA 2003 for Non complying Directives in Case No. 94 of 2015 Order dated 19.08.2016 of MERC.
121 of 2017
Completed
3278 Wed 06/12/2017 11:00:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Limited against Tata Power Company Limited for Illegal and arbitrary levy of Cross Subsidy Surcharge (CSS) on the open access consumption of the Petitioner for FY 2016-17 which is a part of Group Captive Power Plant by the Respondent No.1 by way of a supplementary bill dated 23.11.2017.
165 of 2017
Completed
3279 Wed 06/12/2017 11:00:00 AM
Hearing
166 of 2017
Completed
3280 Tue 05/12/2017 11:00:00 AM
Hearing
Petition of M/s Sagar & Rohit Engineering Industries under Section 142 and 149 of EA 2003 for non-compliance of the CGRF, Jalgaon, Order dated 24.4.2017 in Case No. 23 of 2016-17.
141 of 2017
5
3281 Tue 05/12/2017 11:00:00 AM
Hearing
Joint Petition of 1) Reliance Infrastructure Limited and 2) Reliance Electric Generation and Supply Limited under Section 17 (3) of the Electricity Act, 2003; and In the matter of Regulation 8.3.10 of MERC (General Conditions of Distribution Licence) Regulations, 2006 for inter alia, seeking approval of this Honâ??ble Commission to assign the distribution licence granted to the 1st Petitioner and the transfer of assets of the transmission system of the 1st Petitioner to the 2nd Petitioner for reasons more particularly set out hereinafter.
140 of 2017
Reschedule with further notice
3282 Tue 05/12/2017 11:00:00 AM
Hearing
Joint Petition of 1) Reliance Infrastructure Limited and 2) Reliance Electric Generation and Supply Limited under Section 17 (3) of the Electricity Act, 2003; for, inter alia, seeking approval of this Hon'ble Commission to assign the transmission licence granted to the 1st Petitioner and the transfer of assets of the transmission system of the 1st Petitioner to the 2nd Petitioner for reasons more particularly set out hereinafter.
139 of 2017
Reschedule with further notice
3283 Tue 05/12/2017 11:00:00 AM
Hearing
Petition filed by Krishna Valley Power Private Limited (KVPPL) and Sahyadri Renewable Energy Private Ltd (SREPL) for 2 Hydro Power Projects under the MERC (Distribution Open Access) Regulation, 2016 for adjustment of Banked units in consumer bills.
137 of 2017
Completed
3284 Mon 04/12/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for Procurement of Long term Bagasse based Co-generation power through Competitive Bidding under Regulation No. 5 of Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015.
159 of 2017
Completed
3285 Mon 04/12/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of long/medium/short term Renewable Energy power through Competitive Bidding under Regulation No. 5 of Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015
157 of 2017
Completed
3286 Wed 29/11/2017 11:00:00 AM
Hearing
Miscellaneous Application filed by applicant Century Rayon seeking intervention in Case No. 99 of 2017 Petition filed by Guardian Casting in the matter of applicability of the Wheeling charges to the consumers on 33 kV power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 kV power line
MA No. 18 of 2017 in Case No. 99 of 2017
Completed
3287 Wed 29/11/2017 11:00:00 AM
Hearing
Miscellaneous Application filed by applicant Shri Suresh Sancheti seeking intervention in Case No. 99 of 2017 Petition filed by Guardian Casting in the matter of applicability of the Wheeling charges to the consumers on 33 kV power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 kV power line.
MA No. 17 of 2017 in Case No. 99 of 2017
Completed
3288 Wed 29/11/2017 11:00:00 AM
Hearing
Petition of M/s. Guardian Castings Pvt. Ltd. and 11 Others Seeking Intervention and Direction of this Hon'ble Commission that the Wheeling charges introduced in new Tariff order dated 03.11.2016 passed by this Hon'ble Commission in MERC Case No.48 of 2016 applicable for the consumers on 33 k.V. power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 k.V. power line.
99 of 2017
Completed
3289 Wed 29/11/2017 11:00:00 AM
Hearing
Petition of M/s. Shriniwas Engineering Auto Components Pvt. Ltd against Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Regulation No. 5.3 for violation of the MERC (SoP ) Regulations, 2014 in the matter of Quality of Supply and System of Supply for M/s. Shriniwas Engineering Auto Components Pvt. Ltd.
92 of 2017
Completed
3290 Wed 29/11/2017 11:00:00 AM
Admissibility Hearing
Petition filed by Shri Ramchandra Dayshankar Pandey against the Respondents under Section 142 and 149 of the Electricity Act 2003.
136 of 2017
Reschedule
3291 Wed 29/11/2017 11:00:00 AM
Hearing
Petition filed by M/s. Gurera Synthetics Pvt. Ltd., Seeking legal action against Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) under Section 142 and 149 of EA, 2003, for the alleged violation of the Regulation No. 15.4 "Billing in the Event of Defective meters" of MERC (Electricity supply code and other conditions of Supply) Regulations, 2005.
134 of 2017
Reschedule
3292 Wed 29/11/2017 11:00:00 AM
Hearing
Petition filed by M/s. Nandan Textiles Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for contravention of Sec 154 (6) of Electricity Act 2003. (Direct MSEDCL to refund the amount deposited with MSEDCL by M/s Nandan Textiles Pvt Ltd against alleged theft (Prejudicial use of Energy) of Electricity along with interest as per sec 154(6) of EA 2003)
133 of 2017
Reschedule
3293 Tue 28/11/2017 11:00:00 AM
Hearing
Petition of M/s. Sai Wardha Power Generation Limited for directions to Maharashtra State Electricity Distribution Co. Ltd. in regard to the terms of Open Access granted for the period after 01.04.2017 and in regard to retrospective cancellation of Short Term Open Access for the month of March, 2017.
76 of 2017
Completed
3294 Tue 28/11/2017 11:00:00 AM
Hearing
Petition of Shri Ashok Kulkarni for investigation of the books of accounts of Tata Power Company in respect of various contracts awarded for painting, dredging, coal handling, coal freight, shipping cost etc. from FY 2003-04.
16 of 2017
Completed
3295 Tue 28/11/2017 11:00:00 AM
Hearing
Petition of MSEDCL seeking directions for optimization of power generation in the State of Maharashtra by reducing the technical minimum limit of the Generating Units as per CERC defined norms.
15 of 2017
Completed
3296 Tue 28/11/2017 11:00:00 AM
Hearing
Petition of M/s. REI Power Bazaar Private Limited for seeking permission for setting up and operation of intra-state power market in the State of Maharashtra under the sole jurisdiction of the MERC.
131 of 2015
Reschedule with further notice
3297 Wed 22/11/2017 11:30:00 AM
Hearing
Petition of Adani Transmission (India) Ltd. against Maharashtra State Electricity Transmission Co. Ltd. seeking recovery of Delayed Payment Charges (DPC) and for initiation of proceedings for non-compliance of Commission's Order.
162 of 2016
Completed
3298 Wed 22/11/2017 11:00:00 AM
Hearing
Petition filed by Shri B. R. Mantri against MSEDCL for deliberate False and intentionally misleading information submitted by MSEDCL in latest Case No. 78 of 2016 with reference to old Case No. 95 of 2013 and 184 of 2013 for refund of Additional Energy Charge prematurely levied by MSEDCL.
132 of 2017
Reschedule
3299 Wed 22/11/2017 11:00:00 AM
Hearing
Review Petition filed by Shri Suresh Sancheti to Review Order dated 7 July, 2017 passed by the Hon'ble Commission in Case No. 101 of 2016 Petition of Maharashtra State Electricity Distribution Company Ltd. for discontinuing refund of Additional Supply Charges for applications received after 1st January 2016.
130 of 2017
Reschedule
3300 Wed 22/11/2017 11:00:00 AM
Hearing
Petition filed by Shri B. R. Mantri for Review of order dated 13/07/2017 in Case No. 78 of 2016 in the matter of Petition of Paul Strips and Tubes Pvt. Ltd. regarding violation of Orders in Case No. 95 of 2013 and MA No. 187 of 2014, and for refund of Additional Energy Charge prematurely levied by MSEDCL.
127 of 2017
Reschedule
3301 Wed 22/11/2017 11:00:00 AM
Hearing
Petition filed by Shri B. R. Mantri for Review of order dated 07/07/2017 in Case No. 101 of 2016 in the matter of Petition of Maharashtra State Electricity Distribution Company for discontinuing refund of Additional Supply Charges for application received after 01.01.2016.
126 of 2017
Reschedule
3302 Wed 22/11/2017 11:00:00 AM
Hearing
Addendum Petition filed by JSW Energy Limited under Section 86(1)(f) of the Electricity Act, 2003 read with Article 13 of the Power Purchase Agreement dated 23.02.2010.
123 of 2017
Reschedule
3303 Tue 21/11/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for Procurement of Long term Bagasse based Co-generation power through Competitive Bidding under Regulation No. 5 of Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015.
159 of 2017
Reschedule
3304 Tue 21/11/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. seeking approval for procurement of long/medium/short term Renewable Energy power through Competitive Bidding under Regulation No. 5 of Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015
157 of 2017
Reschedule
3305 Wed 15/11/2017 11:00:06 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86 (1) (f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with Clause 6 of the Order/Contract dated 13th February 2006 and in connection with the dispute and differences arising under the Order/Contract dated 13th February 2006 entered into between MSEDCL and Adani Enterprise Ltd.
143 of 2016
Completed
3306 Wed 15/11/2017 11:00:05 AM
Hearing
Miscellaneous Application is filed by GMR Warora Energy Limited, in Case No 46 of 2017 Petition of MSEDCL for review/modification of the directions issued by this Hon'ble Commission dated 01.12.2016, 10.01.2017 and 01.032017 for refund of FAC to the consumers for the period April, 2016 to October 2016 amounting to a sum of Rs. 369.54 Crs and consideration of the same at the time of truing up for FY 2016-17.
MA No. 21 of 2017 in Case No. 46 of 2017
Completed
3307 Wed 15/11/2017 11:00:04 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., for modification of the directives of the Commission dated 01.03.2017 for refund of FAC for the period April 16 to Oct 16 amounting to Rs.369.54 crore to the Consumers.
46 of 2017
Completed
3308 Wed 15/11/2017 11:00:03 AM
Hearing
Petition of Chamber of Marathwada Industries & Agriculture for non compliance of post facto approval of FAC Orders of the MERC for the months from April 2016 to October 2016.
40 of 2017
Completed
3309 Wed 15/11/2017 11:00:02 AM
Hearing
Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPA's dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Completed
3310 Wed 15/11/2017 11:00:01 AM
Hearing
Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
3311 Tue 14/11/2017 11:00:07 AM
Hearing
Petition filed by Maharashtra State Electricity Transmission Co. Ltd. (MSETCL) for Revision of the Order dated 29.03.2017 passed by the District Collector, Parbhani in the Application No.2016/ A-1/ MAG-II/ MaSaSanni-01.
131 of 2017
Completed
3312 Tue 14/11/2017 11:00:06 AM
Hearing
Petition filed by Rahul Oil Industries for non-compliance of MERC Directives for Refunding RLC and to initiate the action against the all responsible Officers under Section 142 of EA 2003.
120 of 2017
Completed
3313 Tue 14/11/2017 11:00:05 AM
Hearing
Petition filed by National Tyres, Nagpur against Maharashtra State Electricity Distribution Co. Ltd., (MSEDCL) for non - compliance of Order dated 18.06.2016 passed by CGRF Nagpur Zone in Case No. 67 of 2016.
119 of 2017
Completed
3314 Tue 14/11/2017 11:00:04 AM
Hearing
Miscellaneous Application filed by applicant Century Rayon seeking intervention in Case No. 99 of 2017 Petition filed by Guardian Casting in the matter of applicability of the Wheeling charges to the consumers on 33 kV power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 kV power line
MA No. 18 of 2017 in Case No. 99 of 2017
Completed
3315 Tue 14/11/2017 11:00:03 AM
Hearing
Miscellaneous Application filed by applicant Shri Suresh Sancheti seeking intervention in Case No. 99 of 2017 Petition filed by Guardian Casting in the matter of applicability of the Wheeling charges to the consumers on 33 kV power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 kV power line.
MA No. 17 of 2017 in Case No. 99 of 2017
Completed
3316 Tue 14/11/2017 11:00:02 AM
Hearing
Petition of M/s. Guardian Castings Pvt. Ltd. and 11 Others Seeking Intervention and Direction of this Hon'ble Commission that the Wheeling charges introduced in new Tariff order dated 03.11.2016 passed by this Hon'ble Commission in MERC Case No.48 of 2016 applicable for the consumers on 33 k.V. power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 k.V. power line.
99 of 2017
Completed
3317 Tue 14/11/2017 11:00:01 AM
Hearing
Petition of M/s. Shriniwas Engineering Auto Components Pvt. Ltd against Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Regulation No. 5.3 for violation of the MERC (SoP ) Regulations, 2014 in the matter of Quality of Supply and System of Supply for M/s. Shriniwas Engineering Auto Components Pvt. Ltd.
92 of 2017
Completed
3318 Thu 09/11/2017 11:30:00 AM
Hearing
Petition of M/s. Sai Wardha Power Generation Limited for directions to Maharashtra State Electricity Distribution Co. Ltd. in regard to the terms of Open Access granted for the period after 01.04.2017 and in regard to retrospective cancellation of Short Term Open Access for the month of March, 2017.
76 of 2017
Reschedule with further notice
3319 Thu 09/11/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Ltd.) (RIPL) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RIPL and Maharashtra State Electricity Distribution Company Limited (MSEDCL) for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RIPL.
84 of 2016
Reschedule with further notice
3320 Thu 09/11/2017 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking approval for Short Term Procurement of Wind and Solar Power through Competitive Bidding under Regulation No. 5 of MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015.
155 of 2017
Completed
3321 Tue 07/11/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited against Abhijeet MADC Nagpur Energy Pvt. Ltd. (AMNEPL) for restitution of monies / reversing unjust enrichment of AMNEPL arising out of the Concession Agreement executed between MADC and AMNEPL on 7 November, 2007.
111 of 2016
Reschedule with further notice
3322 Tue 07/11/2017 11:30:00 AM
Hearing
Petition of Shri Dattatraya Khanderao Khaire and Others under Rule 3(3) of the Maharashtra Electricity Works of Licensees Rules, 2012 for review of the Additional District Court, Nasik's Order dated 16.12.2015 for complaint about demolished & damaged to grapes crop & garden
129 of 2017
Reschedule with further notice
3323 Tue 07/11/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Additional District Collector, Nashik's Order dated 16.12.2015 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Reschedule with further notice
3324 Tue 07/11/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking revision in wind zone class allotted by MEDA in respect of wind power projects which are getting consistently higher generation on actual basis for last 3 years.
41 of 2017
Completed
3325 Thu 02/11/2017 11:30:00 AM
Hearing
Petition filed by Nidar Utilities Panvel LLP (NUPLLP) seeking approval of Power Purchase Agreement executed between NUPLLP and M/s The Tata Power Company Limited (Distribution Business) for procurement of power under the provisions of Section 86 (1) (b) of the Electricity Act, 2003 read with Regulation 3.1, Regulation 17 and Regulation 20 of the MERC (Multi-Year Tariff) Regulations, 2015 along with Regulation 8.3.3 of the MERC ( General Conditions of Distribution Licence ) Regulations, 2006
117 of 2017
Reschedule with further notice
3326 Thu 02/11/2017 11:00:00 AM
Hearing
Petition filed by RattanIndia Power Limited under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding for approval of proposal for discount in relation to the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Ltd.) and Maharashtra State Electricity Distribution Company Limited.
100 of 2017
Reschedule with further notice
3327 Tue 31/10/2017 11:30:00 AM
Hearing
Petition of Shri Ashok Kulkarni for investigation of the books of accounts of Tata Power Company in respect of various contracts awarded for painting, dredging, coal handling, coal freight, shipping cost etc. from FY 2003-04.
16 of 2017
Reschedule with further notice
3328 Tue 31/10/2017 11:30:00 AM
Hearing
Petition of Sanskar Agro Processors Pvt. Ltd. for action against MSEDCL for willful breach and violation of the Final Assessment Order issued by Assessment Authority under S. 126 of Electricity Act, 2003 and its enforcement under S. 142 of EA 2003
105 of 2016
Reschedule with further notice
3329 Tue 31/10/2017 11:30:00 AM
Hearing
Petition of M/s. REI Power Bazaar Private Limited for seeking permission for setting up and operation of intra-state power market in the State of Maharashtra under the sole jurisdiction of the MERC.
131 of 2015
Reschedule with further notice
3330 Tue 31/10/2017 11:30:00 AM
Hearing
Petition to allow Power Exchange India Limited to commence and operate intra-State power market in the State Maharashtra.
115 of 2015 & MA No. 09 of 2015 in Case No. 115 of 2015
Reschedule with further notice
3331 Fri 27/10/2017 11:00:00 AM
Hearing
Petition of The Tata Power Company Limited - Distribution Business invoking powers of the Hon'ble Commission under Section 86 (1)(b) and 86 (1)(k) seeking clarity in the matters related to the power procurement by Brihanmumbai Electric Supply & Transport Undertaking through medium-term competitive bidding for procurement of 750 MW
150 of 2017
Completed
3332 Fri 27/10/2017 11:00:00 AM
Hearing
Petition of The Tata Power Company Limited - Generation Business invoking powers of the Hon'ble Commission under Section 86 (1)(b) and 86 (1)(k) seeking suspension of medium-term competitive bidding for procurement of 750 MW by Brihanmumbai Electric Supply & Transport Undertaking.
148 of 2017
Completed
3333 Fri 27/10/2017 11:00:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for approval for Amendment in the Model Bidding Documents issued by Ministry of Power for Procurement of electricity for medium term from power stations set up on Finance, Own and Operate basis on January 16, 2017
144 of 2017
Completed
3334 Thu 26/10/2017 11:30:00 AM
Public Hearing
Inviting Comments on Maharashtra State Power Generation Company Limited's Petition for Capital Cost and Tariff determination of Koradi Units # 8, 9 & 10, Chandrapur Unitsa # 8 & 9, Parali Unit # 8
59 of 2017
Completed
3335 Wed 25/10/2017 11:30:02 AM
Hearing
Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Completed
3336 Wed 25/10/2017 11:30:01 AM
Hearing
Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
3337 Wed 25/10/2017 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent - MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Completed
3338 Mon 16/10/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for approval for Amendment in the Model Bidding Documents issued by Ministry of Power for Procurement of electricity for medium term from power stations set up on Finance, Own and Operate basis on January 16, 2017
144 of 2017
Completed
3339 Thu 12/10/2017 11:30:00 AM
Hearing
Review Petition filed by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) seeking review of the order dated 15.02.2017 passed by the Commission in Case No. 86 of 2015.
122 of 2017
Reschedule with further notice
3340 Thu 12/10/2017 11:30:00 AM
Hearing
Petition filed by M/s. Tulshi Casting and Machining Limited under Section 142 of EA 2003 for Non complying Directives in Case No. 94 of 2015 Order dated 19.08.2016 of MERC.
121 of 2017
Reschedule with further notice
3341 Thu 12/10/2017 11:30:00 AM
Hearing
Petition filed by Rahul Oil Industries for non-compliance of MERC Directives for Refunding RLC and to initiate the action against the all responsible Officers under Section 142 of EA 2003.
120 of 2017
Reschedule with further notice
3342 Tue 10/10/2017 11:30:00 AM
Hearing
Petition filed by National Tyres, Nagpur against Maharashtra State Electricity Distribution Co. Ltd., (MSEDCL) for non - compliance of Order dated 18.06.2016 passed by CGRF Nagpur Zone in Case No. 67 of 2016.
119 of 2017
Reschedule with further notice
3343 Tue 10/10/2017 11:30:00 AM
Hearing
Petition filed by M/s. TechNova Imagining System Private Limited against Maharashtra State Electricity Distribution Co. Ltd., (MSEDCL) for Violation of EA, 2003. Section 45(4) and Commission's direction in Case No. 43 of 2012 dated 15.06.2012. The matter of excess recovered amount more than approved time period and 95 of 2013 and M.A. No. 187 of 2014 dated 26.06.2015 in the matter of refund of excess collected amount due to premature billing.
118 of 2017
5
3344 Tue 10/10/2017 11:30:00 AM
Hearing
Petition filed by M/s. Trimurti Spinning Mills Private Limited under Section 142 of EA 2003 for non-compliance of the Commission Order dated 08.07.2016 in Case No. 147 of 2015.
115 of 2017
Completed
3345 Tue 10/10/2017 11:30:00 AM
Hearing
Petition filed by Shri Audumbar Dharmaraj Patil under Section 142 and 149 of EA, 2003 for non-compliance of the CGRF, Baramati, Order dated 26.08.2016 in Case No. 09 of 2016.
114 of 2017
Completed
3346 Thu 05/10/2017 11:30:07 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited (MSEDCL) for in principle approval for Short Term Power Purchase at higher cost than the ceiling rate approved by Hon'ble Commission in Case No 48 of 2017
135 of 2017
Completed
3347 Thu 05/10/2017 11:30:06 AM
Hearing
Petition filed by Maharashtra State Electricity Transmission Co. Ltd. (MSETCL) for Revision of the Order dated 29.03.2017 passed by the District Collector, Parbhani in the Application No.2016/ A-1/ MAG-II/ MaSaSanni-01.
131 of 2017
Reschedule with further notice
3348 Thu 05/10/2017 11:30:05 AM
Hearing
Petition filed by M/s. Gangotri Textiles under Section 142 of EA 2003 for non-compliance of the Commission Order dated 22.07.2016 in Case No. 85 of 2015.
113 of 2017
Completed
3349 Thu 05/10/2017 11:30:04 AM
Hearing
Petition filed by M/s. Olam Agro India Private Limited under Section 86 (1) (e) read with Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondents.
112 of 2017
Completed
3350 Thu 05/10/2017 11:30:03 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for Regulate electricity purchase and procurement process of Distribution Licencees within the state.
111 of 2017
Completed
3351 Thu 05/10/2017 11:30:02 AM
Hearing
Petition of Jai Corp Limited for Review of Order dated 14.02.2017 passed in Petition No. 89 of 2016 by this Hon'ble Commission.
109 of 2017
Completed
3352 Thu 05/10/2017 11:30:01 AM
Hearing
Petition of Hindustan Petroleum Corporation Ltd. for directions and refund of wheeling charges and losses wrongfully levied and collected by The Tata Power Co. Ltd.
58 of 2017
Completed
3353 Wed 04/10/2017 12:00:00 PM
Public Hearing
Inviting Comments on Application of M/s. Global Energy Pvt. Ltd. for grant of Trading Licence under Section 15 of the Electricity Act, 2003.
132 of 2015
Completed
3354 Wed 04/10/2017 11:30:00 AM
Public Hearing
Inviting Suggestions and Objections on BEST Undertaking's Petition for approval of revision of Service Connection Charges
86 of 2017
Completed
3355 Wed 04/10/2017 11:00:00 AM
Public Hearing
Inviting Suggestions / objections on The Tata Power Company Limited - Distribution Business' Petition for revision of Service Connection Charges.
82 of 2017
Completed
3356 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Balbir Alloys Private Limited against Maharashtra State Electricity Distribution Company Ltd., (MSEDCL) for Non-Compliance of Commission's direction in Case No. 95 of 2013 and M.A. No.187 of 2014 Order dated 26/06/2015. AND Miscellaneous Application filed by applicant M/s. Balbir Alloys Pvt. Ltd. for interim relief.
55 of 2017 AND MA No. 19 of 2017 in Case No. 55 of 2017
Completed
3357 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Shivkrupa Steel & Alloys Pvt Limited against MSEDCL for non-compliance of the order dated 13/01/2017 passed by CGRF Kalyan in Grievance No. K/E/1020/1231 of 2015-16.
108 of 2017
5
3358 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Alok Ingots against MSEDCL non-compliance of the order dated 13/01/2017 passed by CGRF Kalyan in Grievance No. K/E/1014/1225 of 2015-16.
107 of 2017
Completed
3359 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Solo Metals Pvt Limited against MSEDCL for non-compliance of the order dated 13/01/2017 passed by CGRF Kalyan in Grievance No. K/E/1015/1226 of 2015-16.
106 of 2017
5
3360 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Tuljabhawani Cold Storage Pvt. Ltd. for non-compliance by MSEDCL of Hon'ble CGRF BMTZ Baramati Order in Case No. 05 of 2017 dated 06.04.2017.
104 of 2017
Completed
3361 Tue 03/10/2017 11:30:00 AM
Hearing
Petition of M/s. Tuljabhawani Cold Storage for non-compliance by MSEDCL, of Hon'ble CGRF Baramati Order in Case No. 06 of 2017 dated 06.04.2017
103 of 2017
Completed
3362 Fri 29/09/2017 11:30:00 AM
Hearing
Petition filed by M/s. Gigaplex Estate Private Limited (GEPL) for approval of Power Purchase Agreement (PPA) and adoption of tariff determined through transparent process of bidding under Section 63 of the Electricity Act, 2003 and Guidelines for Short-term (i.e., for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process issued by Ministry of Power, Government of India, on March 30, 2016, for procurement of 4 MW RTC Power from 00:00 to 24:00 hours for a period of six months from October 1, 2017 to March 31, 2018
138 of 2017
Completed
3363 Tue 26/09/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Reschedule
3364 Tue 26/09/2017 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Reschedule
3365 Tue 26/09/2017 11:30:00 AM
Hearing
Joint Petition of 1) Runwal Developers Private Limited 2) R Mall Developers Private Limited under Section 86 (1) (f) read with 86 (1) (c) of the EA, 2003 for adjudication of disputes between the Petitioner and the Respondent No. 2 Maharashtra State Load Despatch Centre (MSLDC) and under section 86 (1) (k) read with section 42 (2) read with section 32 of the said act.
102 of 2017
Completed
3366 Tue 26/09/2017 11:30:00 AM
Hearing
Petition of Maharashtra Biomass Energy Developers Association seeking Review of the Order dated 28.04.2017 Passed in Case No. 33 of 2017.
95 of 2017
Completed
3367 Tue 26/09/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Ltd.) (RIPL) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RIPL and Maharashtra State Electricity Distribution Company Limited (MSEDCL) for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RIPL.
84 of 2016
Reschedule with further notice
3368 Tue 26/09/2017 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent - MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Completed
3369 Thu 21/09/2017 11:30:00 AM
Hearing
Revision petition of Shri Dattatraya Khanderao Khaire and Others against the order of Additional District Court, Nasik, being aggrieved by the order dt.16/12/2015 for complaint about demolished & damaged to grapes crop & garden.
129 of 2017
Completed
3370 Thu 21/09/2017 11:30:00 AM
Hearing
130 of 2016
Completed
3371 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for removal of difficulties in implementation of Distribution Open Access Regulations, 2016, related to the provisions of banking
85 of 2017
Completed
3372 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of M/s. Newfound Properties and Leasing Pvt. Ltd. for taking on record its deemed Distribution Licensee status, for the IT & ITES SEZ at Trans Thane Creek Industrial Area, MIDC, District - Thane, and for issuing the Specific Conditions of Distribution Licence applicable to it .
80 of 2017
Reschedule with further notice
3373 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Tatya alies Pandurang Maruti Dattu regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
72 of 2017
Completed
3374 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Yuvraj Mahadev Sakhare regarding compensation for Transmission works on his land as per - Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
71 of 2017
Completed
3375 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Tejaswini Gajanan Tad & 4 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
70 of 2017
Completed
3376 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Baby Mohan Teli & 3 Others regarding compensation for Transmission works on his land as per - Section 67 (4) of the EA, 2003 and Rule 3 (3) of Maharashtra Electricity Works of Licensees Rules, 2012.
69 of 2017
Completed
3377 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Nandkumar Sopan Jadhav regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
68 of 2017
Completed
3378 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Abhiman Eknat Nikam regarding compensation for Transmission works on his land as per - Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
67 of 2017
Completed
3379 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Santosh Pandurang Yadav & 1 Other regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
66 of 2017
Completed
3380 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Satish Bhavarlal Marda regarding compensation for Transmission works on his land as per - Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
65 of 2017
Completed
3381 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Satish Dagadu Shinde regarding compensation for Transmission works on his land as per - Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2017
Completed
3382 Thu 21/09/2017 11:30:00 AM
Hearing
Petition of Dattatray Dnyanoba Jasud & 2 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2017
Completed
3383 Tue 19/09/2017 11:30:00 AM
Hearing
Petition of Mumbai International Airport Private Limited for providing clarification regarding applicability of Power Factor Incentive/Rebate towards Open Access consumption by HT consumers.
110 of 2017
Completed
3384 Tue 19/09/2017 11:30:00 AM
Hearing
Petition seeking review of the existing Standby Arrangement provided by MSEDCL to the Mumbai Distribution area.
53 of 2017
Completed
3385 Tue 19/09/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Reschedule
3386 Tue 19/09/2017 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Reschedule
3387 Thu 14/09/2017 11:30:00 AM
Hearing
Petition of M/s. Asahi India Glass Limited for denial of Open Access permissions by Maharashtra State Electricity Distribution Co. Ltd
97 of 2017
Completed
3388 Thu 14/09/2017 11:30:00 AM
Hearing
Petition of M/s. Sai Wardha Power Generation Limited for directions to Maharashtra State Electricity Distribution Co. Ltd. in regard to the terms of Open Access granted for the period after 01.04.2017 and in regard to retrospective cancellation of Short Term Open Access for the month of March, 2017
76 of 2017
Completed
3389 Thu 14/09/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited under Section 42 and other applicable provisions of the EA, 2003 for directions to the Respondent in regard to the terms of Open Access granted by the Respondent MSEDCL for the period from 01.04.2017 to 30.04.2017. AND Miscellaneous Application of M/s Sai Wardha Power Generation Limited for Interim relief for directions to the Maharashtra State Electricity Distribution Co. Ltd in regard to the terms of Open Access granted by it for the period from 01.04.2017 to 30.04.2017.
62 of 2017 MA No. 9 of 2017 Case No. 62 of 2017
Completed
3390 Thu 14/09/2017 11:30:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Ltd. for directions and refund of wheeling charges and losses wrongfully levied and collected by The Tata Power Co. Ltd.
58 of 2017
Reschedule with further notice
3391 Tue 12/09/2017 11:30:00 AM
Hearing
Petition of M/s. Shrinivas Engg. Auto Components Pvt. Ltd. for violation of Regulation no. 5.3 in the matter of quality of supply and system of supply of the MERC (Standards of Performance of Distribution Licensees, Period of Giving Supply and Determination of Compensation) Regulations, 2014 dated 20/05/2014 by MSEDCL.
92 of 2017
Completed
3392 Tue 12/09/2017 11:30:00 AM
Hearing
Petition for intervention and Commission's direction regarding Wheeling Charges applicable for the consumers connected on 33 kV line introduced in the new Tariff Order dated 3.11.2016 in Case No. 48 of 2016 are applicable to the Petitioners herein and not as per the Wheeling Charges applicable to the consumers connected on 22 kV line.
99 of 2017
Completed
3393 Tue 12/09/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking revision in wind zone class allotted by MEDA in respect of wind power projects which are getting consistently higher generation on actual basis for last 3 years.
41 of 2017
Completed
3394 Tue 12/09/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86 (1) (f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with Clause 6 of the Order/Contract dated 13th February 2006 and in connection with the dispute and differences arising under the Order/Contract dated 13th February 2006 entered into between MSEDCL and Adani Enterprise Ltd.
143 of 2016
Reschedule with further notice
3395 Tue 12/09/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited against Abhijeet MADC Nagpur Energy Pvt. Ltd.(AMNEPL) for restitution of monies / reversing unjust enrichment of AMNEPL arising out of the Concession Agreement executed between MADC and AMNEPL on 7 November, 2007.
111 of 2016
Reschedule with further notice
3396 Thu 07/09/2017 11:30:00 AM
Hearing
Petition of Siddhayu Ayurvedic Research Foundation Pvt. Ltd. against Global Energy Pvt. Ltd. for adjudication of dispute w.r.t. payments of amounts due and payable under the Energy Purchase Agreement.
83 of 2017 & M.A. 16 of 2017 in Case No 83 of 2017
Completed
3397 Thu 07/09/2017 11:30:00 AM
Hearing
Petition of M/s. Bilt Graphic Paper Products Limited under Regulation No. 92 of the MERC (CoB) Regulations, 2004, and Regulation No.16 & 18 of the MERC (RPO Implementation of Renewable Energy Certificate Framework) Regulations, 2016
75 of 2017
Completed
3398 Thu 07/09/2017 11:30:00 AM
Hearing
Petition filed by M/s. Kisan Mouldings Ltd. under Sections 142, 146 & 149 of the Electricity Act, 2003 for non-compliance of Order dated 09.05.2013 passed by the Electricity Ombudsman (EO), Mumbai in Representation No.30 of 2013.
156 of 2016
Completed
3399 Thu 31/08/2017 12:00:00 PM
Hearing
Petition of Nidar Utilities Panvel LLP ( NUP LLP) seeking approval of Power Purchase Agreement (PPA) executed between NUP LLP and M/s Tata Power Company Limited (Distribution Business) TPC - D for procurement of power under the provisions of Section 86 (1) (b) of the EA, 2003 read with Regulation 3.1,Regulation 17 and Regulation 20 of the MERC (MYT) Regulations, 2015 along with Regulation 8.3.3 of the MERC (General Conditions of Distribution Licence) Regulations, 2006.
117 of 2017
Completed
3400 Wed 30/08/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company (MADC) for adoption of tariff and approval of PPA for 4-9 MW short term power purchase through competitive bidding process.
125 of 2017
Completed
3401 Wed 30/08/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited for approval of proposal for participating in a tariff based bidding process under Case-IV (Flexibility in utilization of coal in IPP Stations), instituted by Maharashtra State Power Generation Company Limited (MSPGCL), for procuring 400 MW power on Short Term basis (8 months).
124 of 2017
Completed
3402 Tue 22/08/2017 11:30:00 AM
Hearing
Petition of Smt. Fatimabi Abdul Sattar Shaikh against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance by MSEDCL, of Electricity Ombudsman Order dated 19.01.2017 in Case No. 166 of 2016.
94 of 2017
5
3403 Tue 22/08/2017 11:30:00 AM
Hearing
Petition of Shri Ramesh Patel & Viraji Narayan Patel against Maharashtra State Electricity Distribution Company Limited ( MSEDCL ) for non - compliance by MSEDCL, of Electricity Ombudsman Order dated 22.09.2016 in Case No. 82 of 2016.
93 of 2017
5
3404 Tue 22/08/2017 11:30:00 AM
Hearing
Petition of M/s. Shriniwas Engineering Auto Components Pvt. Ltd against Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Regulation No. 5.3 for violation of the MERC (SoP ) Regulations, 2014 in the matter of Quality of Supply and System of Supply for M/s. Shriniwas Engineering Auto Components Pvt. Ltd.
92 of 2017
Completed
3405 Tue 22/08/2017 11:30:00 AM
Hearing
Petition of Gurusamrudhi CHS against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance by MSEDCL of CGRF Order dated 16.03.2017 in Case No. 122 of 2016.
89 of 2017
5
3406 Fri 18/08/2017 11:30:00 AM
Hearing
Petition of Brihanmumbai Electric Supply & Transport Undertaking for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 under Regulation 19 & 20 of MERC (MYT) Regulations, 2015. AND Petition of Brihanmumbai Electric Supply & Transport Undertaking for approval of deviations in Standard Bidding Document for Procurement of 300 MW of Power on Long Term basis as per Guidelines issued by MoP, Govt. of India. AND Miscellaneous Application filed by RattanIndia Nasik Power Limited in Case No 25 of 2017. AND Miscellaneous Application is filed by Ideal Energy Projects Limited in Case No 25 of 2017
25 of 2017 AND 26 of 2017 AND MA No. 10 of 2017 in Case No. 25 of 2017 AND MA No. 10 of 2017 in Case No. 25 of 2017
Completed
3407 Thu 10/08/2017 11:30:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding for approval of proposal for discount in relation to the PPA dated 22.04.2010 and 05.06.2010 executed between RIPL and MSEDCL.
100 of 2017
Completed
3408 Thu 10/08/2017 11:30:00 AM
Hearing
Petition of M/s. Guardian Castings Pvt. Ltd. and 11 Others Seeking Intervention and Direction of this Hon'ble Commission that the Wheeling charges introduced in new Tariff order dated 03.11.2016 passed by this Hon'ble Commission in MERC Case No.48 of 2016 applicable for the consumers on 33 k.V. power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 k.V. power line.
99 of 2017
Reschedule
3409 Thu 10/08/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Amendment of MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016 Practice Directions on Processing of Open Access Applications.
98 of 2017
Completed
3410 Tue 08/08/2017 11:30:00 AM
Hearing
Petition of Smt. Fatimabi Abdul Sattar Shaikh against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance by MSEDCL, of Electricity Ombudsman Order dated 19.01.2017 in Case No. 166 of 2016.
94 of 2017
Reschedule
3411 Tue 08/08/2017 11:30:00 AM
Hearing
Petition of Shri Ramesh Patel & Viraji Narayan Patel against Maharashtra State Electricity Distribution Company Limited ( MSEDCL ) for non - compliance by MSEDCL, of Electricity Ombudsman Order dated 22.09.2016 in Case No. 82 of 2016.
93 of 2017
Reschedule
3412 Tue 08/08/2017 11:30:00 AM
Hearing
Petition of M/s. Shriniwas Engineering Auto Components Pvt. Ltd against Maharashtra State Electricity Distribution Company Limited (MSEDCL) under Regulation No. 5.3 for violation of the MERC (SoP ) Regulations, 2014 in the matter of Quality of Supply and System of Supply for M/s. Shriniwas Engineering Auto Components Pvt. Ltd.
92 of 2017
Reschedule
3413 Tue 08/08/2017 11:30:00 AM
Hearing
Petition of Gurusamrudhi CHS against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance by MSEDCL of CGRF Order dated 16.03.2017 in Case No. 122 of 2016.
89 of 2017
Reschedule
3414 Thu 03/08/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company (MADC) for approval and directions under Section 86 of the EA, 2003 read with 'Guidelines for short-term (i.e. for a period of more than one day to one year) Procurement of Power for the period of one year starting from 01.09.2017 to 31.08.2018.
116 of 2017
Completed
3415 Thu 03/08/2017 11:30:00 AM
Hearing
Miscellaneous Application is filed by Ideal Energy Projects Limited, in Case No 25 of 2017 Petition of BEST for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 for the BEST Undertaking under Regulations 19 and 20 of MERC (Multi Year Tariff) Regulations, 2015.
MA No. 15 of 2017 in Case No. 25 of 2017
Completed
3416 Thu 03/08/2017 11:30:00 AM
Hearing
Petition of Brihanmumbai Electric Supply & Transport Undertaking for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 under Regulation 19 & 20 of MERC (MYT) Regulations, 2015. AND Petition of Brihanmumbai Electric Supply & Transport Undertaking for approval of deviations in Standard Bidding Document for Procurement of 300 MW of Power on Long Term basis as per Guidelines issued by MoP, Govt. of India. AND Miscellaneous Application filed by RattanIndia Nasik Power Limited in Case No 25 of 2017.
25 of 2017 AND 26 of 2017 AND MA No. 10 of 2017 in Case No. 25 of 2017
Completed
3417 Thu 03/08/2017 11:30:00 AM
Hearing
88 of 2017
Completed
3418 Thu 03/08/2017 11:30:00 AM
Hearing
Petition of Maharashtra Biomass Energy Developers Association seeking Review of the Order dated 28.04.2017 Passed in Case No. 33 of 2017.
95 of 2017
Completed
3419 Thu 03/08/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for removal of difficulties in implementation of the Regulations 12 & 82 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015.
87 of 2017
Completed
3420 Wed 02/08/2017 11:30:00 AM
Public Hearing
Inviting comments on verification of compliance of Renewable Purchase Obligation by Captive Power Plant users and Open Access consumers in Maharashtra for FY 2010-11 to FY 2013-14
101 of 2017
Completed
3421 Tue 01/08/2017 11:00:00 AM
Public Hearing
Inviting Comments on verification of compliance of Renewable Purchase Obligation by Captive Power Plant users and Open Access Consumers in Maharashtra for FY 2010-11 to 2013-14
101 of 2017
Completed
3422 Thu 27/07/2017 11:30:00 AM
Hearing
Petition of SiddhayuAyurvedic Research Foundation Pvt. Ltd against Global Energy Private Limited for adjudication of dispute w.r.t payments of amounts due and payable under the Energy Purchase Agreement.
83 of 2017
Completed
3423 Thu 27/07/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for removal of difficulties in implementation of MERC (Distribution Open Access) Regulations, 2016, (Provision of Banking).
85 of 2017
Completed
3424 Thu 27/07/2017 11:30:00 AM
Hearing
Petition of Cosmo Films Limited under Section 42 of the Electricity Act, 2003 read with Regulations 32 & 35 of the Maharashtra Electricity Regulatory Commission Distribution Open Access Regulations, 2016.
131 of 2016
Completed
3425 Tue 25/07/2017 11:30:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Limited) and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RattanIndia Power Limited.
84 of 2016
Completed
3426 Tue 25/07/2017 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Completed
3427 Tue 25/07/2017 11:30:00 AM
Hearing
37 of 2016
Completed
3428 Thu 20/07/2017 11:30:00 AM
Hearing
Petition of M/s. Guardian Castings Pvt. Ltd. and 11 Others Seeking Intervention and Direction of this Hon'ble Commission that the Wheeling charges introduced in new Tariff order dated 03.11.2016 passed by this Hon'ble Commission in MERC Case No.48 of 2016 applicable for the consumers on 33 k.V. power line are applicable to the Petitioners herein and not the Wheeling charges applicable to the consumers on 22 k.V. power line.
99 of 2017
Completed
3429 Thu 20/07/2017 11:30:00 AM
Hearing
Petition seeking review of the existing Standby Arrangement provided by MSEDCL to the Mumbai Distribution area.
53 of 2017
Completed
3430 Thu 20/07/2017 11:30:00 AM
Hearing
Petition of M/s Gopani Iron & Power (India) Pvt. Limited for quashing the impugned letter No. CE / Comm/ CPP /EPA Termination/05609 dated 18.02.2016 issued by the MSEDCL qua the Petitioner and to direct the MSEDCL to enter into an EPA for a period of 5 years at the rates mentioned in the Order dated September 8, 2004.
86 of 2016
Completed
3431 Thu 20/07/2017 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) to issue directions to Tata Power Company under Section 128 of the Electricity Act, 2003. And Brihanmumbai Electric Supply and Transport Undertaking (BEST) have filed Miscellaneous Application to issue directions to Tata Power Company under Section 128 of the Electricity Act, 2003.
43 of 2016 and MA No. 06 of 2017 in Case No. 43 of 2016
Completed
3432 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of M/s. Daulat Agro (India) Pvt. Ltd., for non-compliance of the Commission's Order dated 08/09/2006 in Case No. 70 of 2006 in the matter of determines the schedule of charges for various services provided by MSEDCL in the matter of excess collected amount at the time of providing new connection from M/s. Daulat Agro (India) Pvt. Ltd., Sangamner.
30 of 2017
Completed
3433 Tue 18/07/2017 11:30:00 AM
Hearing
Revision petition of Maharashtra State Electricity Transmission Co. Ltd., (MSETCL) Latur to review Order of the Commission in MERC Case No. 140 of 2016 dated 01.03.2017.
84 of 2017
Completed
3434 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Upper District Collector, Nashik's Order dated 29.09.2014 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Completed
3435 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Tatya alies Pandurang Maruti Dattu regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
72 of 2017
Completed
3436 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Yuvraj Mahadev Sakhare regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
71 of 2017
Completed
3437 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Tejaswini Gajanan Tad & 4 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
70 of 2017
Completed
3438 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Baby Mohan Teli & 3 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
69 of 2017
Completed
3439 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Nandkumar Sopan Jadhav regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
68 of 2017
Completed
3440 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Abhiman Eknat Nikam regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
67 of 2017
Completed
3441 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Santosh Pandurang Yadav & 1 Other regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
66 of 2017
Completed
3442 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Satish Bhavarlal Marda regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
65 of 2017
Completed
3443 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Satish Dagadu Shinde regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2017
Completed
3444 Tue 18/07/2017 11:30:00 AM
Hearing
Petition of Dattatray Dnyanoba Jasud & 2 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2017
Completed
3445 Thu 13/07/2017 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for Approval of Additional Surcharge for Tata Power-D.
79 of 2017
Completed
3446 Thu 13/07/2017 11:30:00 AM
Hearing
Petition of M/s. Bilt Graphic Paper Products Limited under Regulation No. 92 of the MERC (CoB) Regulations, 2004, and Regulation No.16 & 18 of the MERC (RPO Implementation of Renewable Energy Certificate Framework) Regulations, 2016
75 of 2017
Completed
3447 Tue 11/07/2017 11:30:01 AM
Hearing
Petition of MSPL Limited under Section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between MSPL Limited and Maharashtra State Electricity Distribution Company Limited.
78 of 2017
Completed
3448 Tue 11/07/2017 11:30:01 AM
Hearing
Petition of Ghatge Patil Industries Limited against MSEDCL non-compliance of the Order dated 16.03.2017 passed by the Hon'ble Commission read with relevant provisions of the EA, 2003 in Case No. 68 of 2016.
77 of 2017
Completed
3449 Tue 11/07/2017 11:30:00 AM
Hearing
Miscellaneous Application of M/s Sai Wardha Power Generation Limited for Interim relief for directions to the Maharashtra State Electricity Distribution Co. Ltd in regard to the terms of Open Access granted by it for the period from 01.04.2017 to 30.04.2017.
MA No. 9 of 2017 in Case No. 62 of 2017
Completed
3450 Tue 11/07/2017 11:30:00 AM
Hearing
Petition filed by Asahi India Glass Limited against Maharashtra State Electricity Distribution Company Limited for Denial of Open Access Permission.
97 of 2017
Completed
3451 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited under Section 42 and other applicable provisions of the EA, 2003 for directions to the Respondent in regard to the terms of Open Access granted by the Respondent MSEDCL for the period from 01.04.2017 and in regards to retrospective cancellation of short term open access for the month on March, 2017.
76 of 2017
Completed
3452 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of M/s. Giriraj Enterprises against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non - compliance by MSEDCL of the Order dated 16.03.2017 of the Hon'ble Commission read with relevant provisions of the EA, 2003 in Case No.136 of 2016.
91 of 2017
Completed
3453 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of M/s. D. J. Malpani against Maharashtra State Electricity Distribution Company Limited (MSEDCL) for non-compliance by MSEDCL of the Order dated 16.03.2017 of the Hon'ble Commission read with relevant provisions of the EA, 2003 in Case No.135 of 2016.
90 of 2017
Completed
3454 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of Shah Promoters & Developers for non-compliance by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) of the Order dated 16.03.2017 in Case No.53 of 2016.
81 of 2017
Completed
3455 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of Kamal Engineering Corporation (A Div of KEC Industries Limited) under Section 86(1)(F) of the Electricity Act, 2003 pertaining to adjudication of disputes between Kamal Engineering Corporation {Div. of Kamal Encon Ind Ltd (Formerly Kec Ind Ltd) and MSEDCL.
74 of 2017
Completed
3456 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of Shah Promoters and Developers, under Section 86(1)(f) of the EA,2003 pertaining to adjudication of disputes between Shah Promoters & Developers and MSEDCL.
73 of 2017
Completed
3457 Tue 11/07/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited under Section 42 and other applicable provisions of the EA, 2003 for directions to the Respondent in regard to the terms of Open Access granted by the Respondent MSEDCL for the period from 01.04.2017 to 30.04.2017.
62 of 2017
Completed
3458 Thu 06/07/2017 11:30:00 AM
Hearing
Miscellaneous Application filed by applicant M/s. OPGS Power Gujarat Pvt. Ltd. in Case No. 23 of 2017 Petition filed by MSEDCL for in principal approval of the pre-condition of furnishing Bank Guarantee/Revolving Letter of Credit as a payment security mechanism .
MA No. 13 of 2017 in Case No. 23 of 2017
Completed
3459 Thu 06/07/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for in principal approval of the pre-condition of furnishing Bank Guarantee/Revolving Letter of Credit as a payment security mechanism which shall be equivalent to the CSS and additional surcharge applicable to an open access consumer to be furnished by an entity who claims itself to be a captive/group captive generator before grant of open access.
23 of 2017 and MA No. 7 of 2017 in Case No. 23 of 2017 and MA No. 8 of 2017 in Case No. 23 of 2017
Completed
3460 Thu 06/07/2017 11:30:00 AM
Hearing
Petition of Dhariwal Infrastructure Limited, under MERC (Conduct of Business) Regulations, 2004 seeking relief to idle State Grid-connected Unit 1 of 2x300MW Coal based thermal generating station located at Tadali, Chandrapur in the State of Maharashtra through short-term sale of power to any State Distribution Licensee for a period of 3 months in FY 2017-18.
61 of 2017
Reschedule
3461 Thu 06/07/2017 11:30:00 AM
Hearing
Petition of INOX Air Products Private Limited seeking clarification regarding Tariff Order pronounced by the Hon'ble Commission, dated 03.11.2016 in Case No 48 of 2016. (MSEDCL has misinterpreted the Tariff Order and reduced subsidy to the express category consumers.)
57 of 2017
Completed
3462 Thu 06/07/2017 11:30:00 AM
Hearing
Petition of M/s. Mahati Hydro Power Projects Private Limited, for seeking compliance by MSETCL of the order dated November 09, 2005 in Case No. 25 of 2004.
52 of 2017
Completed
3463 Tue 04/07/2017 11:30:00 AM
Hearing
Petition of M/s. Balbir Alloys Private Limited against Maharashtra State Electricity Distribution Company Ltd., (MSEDCL) for Non-Compliance of Commission's direction in Case No. 95 of 2013 and M.A. No.187 of 2014 Order dated 26/06/2015.
55 of 2017
Completed
3464 Tue 04/07/2017 11:30:00 AM
Hearing
Petition of Jawahara Shetkari Sahakari Soot Girni Limited complaint against Maharashtra State Electricity Distribution Company Ltd., (MSEDCL) for non-compliance of CGRF Jalgaon Orders dt.31.01.2017 in Case No. 15 to 18 of 2016.
54 of 2017
Completed
3465 Tue 04/07/2017 11:30:00 AM
Hearing
Petition of M/s. Shriniwas Engineering. Auto Comp. Pvt. Ltd for Non-Compliance of CGRF Pune Order in Case No. 29 /2016 and EO, Mumbai Order in Rep. No. 106 and 107 of 2016 in the matter of Refund of "Excess collected AEC and addl FAC", "Excess collected amount towards change of Tariff Category" and "Excess collected FAC for the period Dec 2013 to Dec 2014".
50 of 2017
5
3466 Thu 29/06/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Completed
3467 Thu 29/06/2017 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
3468 Thu 29/06/2017 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to its Generating Units of 2x135 MW for FY 2015-16.
159 of 2016
Completed
3469 Tue 27/06/2017 11:30:00 AM
Hearing
Miscellaneous Application filed by applicant INOX Air Products Pvt. Ltd. for seeking urgent directions from the Commission to direct MSEDCL to grant No Objection Certificate for Short Term Open Access for the month of June 2017 for supply of power from SWPGL and also release Medium Term Open Access from the month of July 2017 till March 31, 2018.
MA No. 12 of 2017 in Case No. 76 of 2017
Completed
3470 Tue 27/06/2017 11:30:00 AM
Hearing
Intervention Application filed by applicant Maharashtra Airport Development Company Ltd. in Case No. 35 of 2016 Petition filed by Abhijeet MADC Nagpur Energy Pvt. Ltd. against RInfra in the matter of a dispute between a Generating Company and the Distribution Licensee as a result of the deliberate and willful failure of the distribution licensee to make payments, on account of the Change in Law, as per the terms of the PPA dated 04.08.2010.
MA No. 11 of 2017 in Case No. 35 of 2016
Completed
3471 Tue 27/06/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited under Section 86 (1) of the Electricity Act, by Maharashtra Airport Development Company Limited, a Distribution Licensee against Abhijeet MADC Nagpur Energy Pvt. Ltd., a Generating Company for restitution of monies / reversing unjust enrichment of Abhijeet MADC Nagpur Energy Pvt. Ltd. arising out of the Concession Agreement executed between MADC and AMNEPL on 07.11.2007.
111 of 2016
Completed
3472 Tue 27/06/2017 11:30:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Limited under Section 42(2), 86 and other applicable provision of the EA, 2003 and the Regulations thereto framed by this Hon'ble Commission for directions and refund of wheeling charges and the wheeling losses wrongfully levied and collected by the Respondent No.1, Tata Power Company Limited.
58 of 2017
Completed
3473 Tue 27/06/2017 11:30:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Ltd., under Sections 9 read with 42(2), 49, 61, 62,66 86(3) and (4) of the Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations, 2016.
45 of 2017
Completed
3474 Thu 22/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., for modification of the directives of the Commission dated 01.03.2017 for refund of FAC for the period April 16 to Oct 16 amounting to Rs.369.54 crore to the Consumers.
46 of 2017
Completed
3475 Thu 22/06/2017 11:30:00 AM
Hearing
Petition of Chamber of Marathwada Industries & Agriculture for non compliance of post facto approval of FAC Orders of the MERC for the months from April 2016 to October 2016.
40 of 2017
Completed
3476 Tue 20/06/2017 11:30:00 AM
Hearing
Petition of Shri Ashok Kulkarni under Section 128 of the EA, 2003 for investigation of the books of accounts of Tata Power Company Limited in respect of various contracts awarded in respect of painting, dredging, coal handling, coal freight, shipping cost etc from FY 2003-04.
16 of 2017
Completed
3477 Tue 20/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited seeking directions for optimization of power generation in the state of Maharashtra by reducing the technical minimum operation of the generating power plant as per CERC defined norms and also applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
15 of 2017
Completed
3478 Thu 15/06/2017 11:30:00 AM
Hearing
Petition of Aurangabad Municipal Corporation for providing clarification regarding applicability of tariff for Public Water Supply (HT-IV) an (LT-III) in Tariff Order dated 03.11.2016 passed by Hon'ble Commission, in Case No. 48/2016.
6 of 2017
Completed
3479 Thu 15/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for Review of Multi-Year Tariff Order dated 03.11.2016 in Case No. 48 of 2016. AND Maharashtra Veej Grahak Sanghatana (MVGS)'s request for Intervention in Case No. 176 of 2016. (Petition filed by Maharashtra State Electricity Distribution Co. Limited to review Order dated 03.11.2016 in Case No. 48 of 2016 of MSEDCL in the matter for Truing up for FY 2014-15, provisional truing-up for FY 2015-16 and Multi Year Tariff for 3rd control period FY 2016-17 to FY2019-20.)
Case No 176 of 2016 AND MA No. 5 of 2017 in Case No. 176 of 2016
Completed
3480 Tue 13/06/2017 11:30:00 AM
Hearing
Petition of Dhariwal Infrastructure Limited, under MERC (Conduct of Business) Regulations, 2004 seeking relief to idle State Grid-connected Unit 1 of 2x300MW Coal based thermal generating station located at Tadali, Chandrapur in the State of Maharashtra through short-term sale of power to any State Distribution Licensee for a period of 3 months in FY 2017-18.
61 of 2017
Completed
3481 Tue 13/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for in principal approval of the pre-condition of furnishing Bank Guarantee/Revolving Letter of Credit as a payment security mechanism which shall be equivalent to the CSS and additional surcharge applicable to an open access consumer to be furnished by an entity who claims itself to be a captive/group captive generator before grant of open access.
23 of 2017 and MA No. 7 of 2017 in Case No. 23 of 2017 and MA No. 8 of 2017 in Case No. 23 of 2017
Reschedule
3482 Tue 13/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86 (1) (f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with Clause 6 of the Order/Contract dated 13th February 2006 and in connection with the dispute and differences arising under the Order/Contract dated 13th February 2006 entered into between MSEDCL and Adani Enterprise Ltd.
143 of 2016
Completed
3483 Tue 13/06/2017 11:30:00 AM
Hearing
Petition of Cosmo Films Limited under Section 42 of the Electricity Act, 2003 read with Regulations 32 & 35 of the Maharashtra Electricity Regulatory Commission Distribution Open Access Regulations, 2016.
131 of 2016
Completed
3484 Tue 13/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Upper District Collector, Nashik's Order dated 29.09.2014 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Reschedule with further notice
3485 Thu 08/06/2017 11:30:00 AM
Suo Motu Hearing
Suo-moto hearing for compliance of ATE Judgment dated 26.02.2016 in Appeal No 210 of 2014 filed by Indian Wind Power Association (Maharashtra State Council) challenging the Commission's Order dated 20.06.2014 in Case No 93 of 2013
93 of 2013
Completed
3486 Thu 08/06/2017 11:30:00 AM
Suo Motu Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking revision in wind zone class allotted by MEDA in respect of wind power projects which are getting consistently higher generation on actual basis for last 3 years.
41 of 2017
Completed
3487 Thu 08/06/2017 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited-(D) under Regulation 101 (Power to amend) r/w Regulation 102 (Power to remove difficulties) of the MERC (MYT) Regulations, 2015 seeking this Hon'ble Commission to reconsider and suitably clarify / relax / modify the i) methodology for computation of Base Operation and Maintenance Expenses for Distribution Supply Business for the 3rd Control Period and ii) the methodology for computation of Escalation Rate for determining the Distribution Wires and Supply Business specified under the MERC (MYT) Regulations, 2015.
49 of 2017
Completed
3488 Tue 06/06/2017 11:30:00 AM
Suo Motu Hearing
Suo-moto hearing for compliance of ATE Judgment dated 26.02.2016 in Appeal No 210 of 2014 filed by Indian Wind Power Association (Maharashtra State Council) challenging the Commissionâ??s Order dated 20.06.2014 in Case No 93 of 2013
93 of 2013
Reschedule
3489 Tue 06/06/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for seeking revision in wind zone class allotted by MEDA in respect of wind power projects which are getting consistently higher generation on actual basis for last 3 years.
41 of 2017
Reschedule
3490 Thu 01/06/2017 11:30:00 AM
Hearing
Petition filed by Lanco Vidarbha Thermal Power Ltd. under Sections 86(1)(f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between it and MSEDCL.
136 of 2015
Completed
3491 Thu 01/06/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited under inter-alia Section 86 (1) (f), of the EA, 2003, for adjudication of the disputes and claims arising under the PPA dated 25.09.2008 executed between Lanco and MSEDCL.
85 of 2016
Completed
3492 Thu 01/06/2017 11:30:00 AM
Hearing
Petition of Shri Mangesh Madhukar Pandit afor Non providing of new electricity connection for Residence at Agrewadi P.O.Kotapur, Tal- Rajapur, Dist- Ratnagiri, Since-14/08/2012. Although the order was given by the Electricity Ombudsman(Mumbai) to provide new electricity connection immediately.
44 of 2017
Completed
3493 Thu 01/06/2017 11:30:00 AM
Hearing
Petition of Tulshi Casting & Machining Ltd., against Maharashtra State ElectricityDistribution Co Ltd., (MSEDCL) for non-compliance of Electricity Ombudsman Order No. 161 of 2016 dated 06.01.2017.
43 of 2017
Completed
3494 Thu 01/06/2017 11:30:00 AM
Hearing
Petition of M/s. Daulat Agro (India) Pvt. Ltd., under Section 142 and 146 of EA, 2003 against MSEDCL for violating the Commission's directions issued in various Orders in the matter of recovery of schedule of Charges
30 of 2017
Reschedule with further notice
3495 Tue 30/05/2017 11:30:00 AM
Hearing
Petition of M/s. Ankur Seed Pvt Ltd., under Section 86, 94 of the EA, 2003 against MSEDCL, disparity in implementing Tariff orders by MSEDCL & under Section 142, 146 of EA, 2003 deliberate non compliance of Hon Electricity Ombudsman, order dtd 30.11.2016 & 30.12.2016. Clarification for applicability of the Tariff Orders in case of HT-V:HT-AG Consumers.
29 of 2017
Completed
3496 Tue 30/05/2017 11:30:00 AM
Hearing
Petition of M/s. Balaji Amines Ltd., under Section 142 & 146 against MSEDCL for Non-compliance of the Order of the Electricity Ombudsman, Nagpur dt. 21/08/2015 in Representation No. 73 of 2015 regarding Refund of Tariff Difference.
28 of 2017
Completed
3497 Tue 30/05/2017 11:30:00 AM
Hearing
Petition of Mrs. Mumtaj Amrut Mane petition against MSEDCL for non compliance of Ombudsman's Order dated 24.10.2016.
27 of 2017
Completed
3498 Tue 30/05/2017 11:00:00 AM
Public Hearing
Application of M/s Reliance Infrastructure Ltd. for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
94 of 2016
Completed
3499 Thu 25/05/2017 11:30:00 AM
Hearing
Petition of Hindustan Petroleum Corporation Ltd., under Sections 9 read with 42(2), 49, 61, 62,66 86(3) and (4) of the Electricity Act, 2003 read with Regulation 32 of MERC (Distribution Open Access) Regulations, 2016.
45 of 2017
Reschedule
3500 Thu 25/05/2017 11:30:00 AM
Hearing
Petition of M/s Cooper Corporation Pvt. Ltd., against MSEDCL seeking directions for compliance of MERC (Distribution Open Access) Regulations, 2016.
38 of 2017
Completed
3501 Thu 25/05/2017 11:30:00 AM
Hearing
Petition of M/s Kores (India) Ltd. against MSEDCL seeking directions for compliance of MERC (Distribution Open Access) Regulations, 2016.
37 of 2017
Completed
3502 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Tatya alies Pandurang Maruti Dattu regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
72 of 2017
Completed
3503 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Yuvraj Mahadev Sakhare regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
71 of 2017
Completed
3504 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Tejaswini Gajanan Tad & 4 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
70 of 2017
Completed
3505 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Baby Mohan Teli & 3 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
69 of 2017
Completed
3506 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Nandkumar Sopan Jadhav regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
68 of 2017
Completed
3507 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Abhiman Eknat Nikam regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
67 of 2017
Completed
3508 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Santosh Pandurang Yadav & 1 Other regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
66 of 2017
Completed
3509 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Satish Bhavarlal Marda regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
65 of 2017
Completed
3510 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Satish Dagadu Shinde regarding compensation for Transmission works on his land as per- Section 67 (4) of the Electricity Act, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2017
Completed
3511 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Dattatray Dnyanoba Jasud & 2 Others regarding compensation for Transmission works on his land as per-Section 67 (4) of the EA, 2003 and Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2017
Completed
3512 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of M/s. Classic Citi Investment Pvt. Ltd. under Section 42 (2) of the EA, 2003 read with Regulation 32 of the MERC (DOA) Regulations, 2016 challenging the validity of Circular dated 31.12.2016 by MSEDCL and the consequent bills and the wrongful rejection of application for Medium-Term Open Access.
36 of 2017
Completed
3513 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Shah Promoters & Developers against MSEDCL for Non-Compliance of the Order dated 31 May, 2016 in Case No. 55 of 2015 of the Commission read with relevant provisions of the Electricity Act, 2003.
34 of 2017
Completed
3514 Tue 23/05/2017 11:30:00 AM
Hearing
Petition of Green Energy Association Pertaining to withholding/denial of Short Term Open Access and Medium Term Open Access applications Under Section 42 of the Electricity Act, 2003 Read with the provisions of the MERC (Distribution Open Access) Regulations, 2016.
32 of 2017
Completed
3515 Fri 19/05/2017 11:30:00 AM
Hearing
Miscellaneous Application is filed by RattanIndia Nasik Power Limited, in Case No 25 of 2017 Petition of BEST for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 for the BEST Undertaking under Regulations 19 and 20 of MERC (Multi Year Tariff) Regulations, 2015.
MA No. 10 of 2017 in Case No. 25 of 2017
Completed
3516 Fri 19/05/2017 11:30:00 AM
Hearing
Petition of Brihanmumbai Electric Supply & Transport Undertaking for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 under Regulation 19 & 20 of MERC (MYT) Regulations, 2015. And Petition of Brihanmumbai Electric Supply & Transport Undertaking for approval of deviations in Standard Bidding Document for Procurement of 300 MW of Power on Long Term basis as per Guidelines issued by MoP, Govt. of India.
25 of 2017 And 26 of 2017
Completed
3517 Thu 18/05/2017 11:30:00 AM
Hearing
Petition of Bindu Vayu Urja Private Limited against Non-Compliance by MSEDCL of the Order dated 16.03.2017 of the Hon'ble Commission read with relevant provisions of the EA, 2003 in Case No. 79 of 2016.
60 of 2017
Completed
3518 Thu 18/05/2017 11:30:00 AM
Hearing
Petition filed by Smt. Prabha Shankarrao Dhote in the matter of Order Passed by the Honorable District Magistrate, Wardha on 17th December 2016 in Case No 64 of 2016 and rejection of application for review.
56 of 2017
Completed
3519 Thu 18/05/2017 11:30:00 AM
Hearing
Petition of Adani Transmission (India) Limited under Section 86 (1) (f) read with Section 142 of the Electricity Act 2003 against Maharashtra State Electricity Transmission Co. Ltd. seeking recovery of Delayed Payment Charges (DPC) and for initiation of proceedings for non-compliance of Commission's Order.
162 of 2016
Completed
3520 Thu 18/05/2017 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to its Generating Units of 2x135 MW for FY 2015-16.
159 of 2016
Reschedule
3521 Tue 16/05/2017 11:30:00 AM
Hearing
Miscellaneous Application filed by applicant Sai Wardha Power Generation Limited for Interim relief in Case No. 62 of 2017 for stay and restrain MSEDCL from revising the permission of MTOA granted under Section (9) of EA, 2003
MA No. 9 of 2017 in Case No. 62 of 2017
Completed
3522 Tue 16/05/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Generation Limited under Section 42 and other applicable provisions of the EA, 2003 for directions to the Respondent in regard to the terms of Open Access granted by the Respondent MSEDCL for the period from 01.04.2017 and in regards to retrospective cancellation of short term open access for the month on March, 2017.
76 of 2017
Completed
3523 Tue 16/05/2017 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited seeking review of the existing Standby Arrangement provided by MSEDCL to the Mumbai Distribution area.
53 of 2017
Completed
3524 Tue 16/05/2017 11:30:00 AM
Hearing
Petition filed by M/s. Kisan Mouldings Ltd. under Sections 142, 146 & 149 of the Electricity Act, 2003 for non-compliance of Order dated 09.05.2013 passed by the Electricity Ombudsman (EO), Mumbai in Representation No.30 of 2013.
156 of 2016
Completed
3525 Tue 16/05/2017 11:30:00 AM
Hearing
Petition of Sanskar Agro Processors Pvt. Ltd. for action against MSEDCL for willful breach and violation of the Final Assessment Order issued by Assessment Authority under S. 126 of Electricity Act, 2003 and its enforcement under S. 142 of EA 2003.
105 of 2016
Completed
3526 Tue 16/05/2017 11:30:00 AM
Hearing
Petition of M/s Harman Finochem Limited under Sections 142 & 146 of the Electricity Act, 2003 for Non-Compliance of CGRF, Aurangabad's Order dated 20 May, 2016.
98 of 2016
Completed
3527 Tue 16/05/2017 11:30:00 AM
Hearing
Petition filed by Reliance Infrastructure Limited (Distribution) for determination of Standby Charges payable by Reliance Infrastructure Limited to Maharashtra State Electricity Distribution Company Limited.
72 of 2016
Completed
3528 Tue 16/05/2017 11:30:00 AM
Hearing
Petition of Karamtara Engineering Pvt. Limited against MSEDCL grant of appropriate directions/orders and punishment to the respondents for violation of orders passed by Hon'ble Ombudsman.
12 of 2017
Completed
3529 Thu 11/05/2017 11:30:00 AM
Hearing
51 of 2017
Completed
3530 Thu 11/05/2017 11:30:00 AM
Hearing
Petition of M/s Topworth Urja and Metals Ltd. for seeking appropriate directions / Orders to MSEDCL in relation to Orders / directions issued by the Commission's Order dated 8 September 2004 in Case No. 55 of 2003 & 56 of 2003 and for its enforcement of Energy Purchase Agreement signed with MSEDCL.
5 of 2016
Completed
3531 Thu 11/05/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Limited under inter-alia Section 86(1)(f), of the EA,2003, for adjudication of the disputes and claims arising under the PPA dated 25.09.2008 executed between Lanco Vidarbha Thermal Power Limited (LVPTL) and Maharashtra State Electricity Distribution Company Limited (MSEDCL).
85 of 2016
Reschedule with further notice
3532 Thu 11/05/2017 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Reschedule with further notice
3533 Thu 11/05/2017 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86 (1) (b) and 86 (1) (f) of the EA 2003 in the matter of a dispute between a Generating Company and the Distribution Licensee as a result of the deliberate and willful failure of the distribution licensee to make payments, on account of the Change in Law, as per the terms of the Power Purchase Agreement dated 04.08.2010 (PPA).
35 of 2016
Completed
3534 Thu 11/05/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited under Section 86 (1) of the Electricity Act, by Maharashtra Airport Development Company Limited, a Distribution Licensee against Abhijeet MADC Nagpur Energy Pvt. Ltd., a Generating Company for restitution of monies / reversing unjust enrichment of Abhijeet MADC Nagpur Energy Pvt. Ltd. arising out of the Concession Agreement executed between MADC and AMNEPL on 07.11.2007.
111 of 2016
Reschedule with further notice
3535 Tue 09/05/2017 11:30:00 AM
Hearing
Review Petition of Alloy Steel Producers Association of India for Review of Tariff Order dated 03.11.2016 issued in Case No. 48 of 2016.
3 of 2017
Completed
3536 Tue 09/05/2017 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Ltd. regarding non-compliance of the Commission's Orders in Case No. 73 of 2014 and 80 of 2015 and for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule. AND Miscellaneous Application filed by Petitioner Wat-ere-source Technologies P Limited for Ad-interim Relief(s) against Respondent- No. 2 and requested for Expeditious hearing of the application before Case 23 of 2016.
Case No 23 of 2016 AND MA No 12 of 2016 in Case No. 23 of 2016
Completed
3537 Tue 09/05/2017 11:30:00 AM
Hearing
Review Petition of The Tata Power Company Limited-Distribution seeking review of Order dated 22 July, 2016 in Case No. 91 of 2016 for determination of Transmission Tariff of Intra-State Transmission System for Third Control Period FY 2016-17 to FY 2019-20.
142 of 2016
Completed
3538 Thu 04/05/2017 11:30:00 AM
Hearing
Petition of Nidar Utilities Panvel LLP (NUP LLP ) under the 2nd proviso to Regulation 5.1 of the MERC (Multi-Year Tariff) Regulations, 2015 for approval of a provisional tariff for the operation to be commenced in the SEZ area to be co-developed by Nidar Utilities Panvel LLP (NUP LLP/ Co-Developer) at Panvel, District Raigarh, Maharashtra.
47 of 2017
Completed
3539 Thu 04/05/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Company Ltd. under Rule 3(3) of the works of Licensee Rules, 2006 in compliance of the order dated 10/10/2016 passed by the Hon'ble High Court at Nagpur Bench in Writ Petition No. 3075 of 2015.
51 of 2017
Reschedule
3540 Thu 04/05/2017 11:30:00 AM
Hearing
Petition of Development Commissioner cum Chairperson, SEEPZ Special Economic Zone Authority for Specific Conditions of Distribution License for SEEPZ SEZ, Mumbai to undertake distribution of power within the SEZ area through network of existing Licensee till its own distribution network is developed
106 of 2016
Completed
3541 Thu 04/05/2017 11:30:00 AM
Hearing
Petition of Ideal Energy Projects Ltd. In the matter of Transmission License Application under Section 14 read with Section 15 of the Electricity Act, 2003 for grant of Transmission License to IEPL, for 400 KV D/C Line of IEPL.
123 of 2015
Completed
3542 Tue 02/05/2017 11:30:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Limited) and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RattanIndia Power Limited.
84 of 2016
Completed
3543 Tue 02/05/2017 11:30:00 AM
Hearing
Joint Petition filed by Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for advancement of supply of power by M/s. APML to MSEDCL against 440 MW PPA dated 16.02.2013.
66 of 2016
Completed
3544 Tue 02/05/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited under section 86 of Electricity Act 2003 read with Article 13 (Change in Law) of PPAs under Case 1 stage 1 and Article 10 (Change in Law) of PPAs under case 1 stage 2.
24 of 2017
Completed
3545 Thu 27/04/2017 11:30:00 AM
Hearing
Petition of Nagpur Metro Rail Corporation Ltd. under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act, 2003 for relaxing the applicability of definition of Eligible Consumer under Regulation 2.1(g) and Regulation 5 of MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.
133 of 2016
Completed
3546 Thu 27/04/2017 11:30:00 AM
Hearing
Petition of Shri Taraprakash Prabhakar Vartak under Section 61 (h), 62(1) (a) and 86(1)(e) of EA 2003 for determination of generic Capital cost for Mini and Micro Hydro power projects for sale of electricity to Distribution Licensees of Maharashtra under BOT Policy of Water Resources Department, GoM.
119 of 2016
Completed
3547 Thu 27/04/2017 11:30:00 AM
Hearing
Petition of M/s Gopani Iron & Power (India) Pvt. Limited for quashing the impugned letter No. CE / Comm/ CPP /EPA Termination/05609 dated 18.02.2016 issued by the MSEDCL qua the Petitioner and to direct the MSEDCL to enter into an EPA for a period of 5 years at the rates mentioned in the Order dated September 8, 2004.
86 of 2016
Completed
3548 Thu 27/04/2017 11:30:00 AM
Hearing
Petition of M/s Topworth Urja and Metals Ltd. for seeking appropriate directions / Orders to MSEDCL in relation to Orders / directions issued by the Commission's Order dated 8 September 2004 in Case No. 55 of 2003 & 56 of 2003 and for its enforcement of Energy Purchase Agreement signed with MSEDCL.
5 of 2016
Reschedule
3549 Tue 25/04/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL), for in respect modification of the directives of Hon'ble Commission dtd 01.03.2017 for refund of FAC for the period April 16 to Oct 16 amounting to Rs.369.54 Crs. to the Consumers and consideration of the same at the time of truing up for FY 2016-17.
46 of 2017
Completed
3550 Tue 25/04/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd for review of the Upper District Collector, Nashik's Order dated 29.09.2014 directing MSETCL for payment of compensation to the Respondents.
130 of 2016
Completed
3551 Thu 20/04/2017 11:30:00 AM
Suo Motu Hearing
Suo-moto hearing to review the status of upcoming Generation projects of MSPGCL as per the PPA signed with MSEDCL, and Capital Cost and Tariff determination of New Units.
42 of 2017
Completed
3552 Thu 20/04/2017 11:30:00 AM
Hearing
Petition of M/s. OPGS Power Gujarat Pvt. Ltd. under Section 86 (1) (f) of the EA, 2003 and Regulation 32 of the MERC (DOA) Regulations, 2016 qua disputes with MSEDCL over its arbitrary and wrongful delay in granting the Petitioner Distribution Open Access. AND Miscellaneous Application file by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) on behalf of the Respondent/Applicant (MSEDCL) seeking clarification of daily/interim order dated 10.11.2016 passed by this Hon'ble Commission
141 of 2016 AND M.A. No. 26 of 2016 in Case No. 141 of 2016
Completed
3553 Tue 18/04/2017 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent-MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Completed
3554 Tue 18/04/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for in principal approval of the pre-condition of furnishing Bank Guarantee/Revolving Letter of Credit as a payment security mechanism which shall be equivalent to the CSS and additional surcharge applicable to an open access consumer to be furnished by an entity who claims itself to be a captive/group captive generator before grant of open access.
23 of 2017
Completed
3555 Tue 18/04/2017 11:30:00 AM
Hearing
Petition of Pragati Agencies for Non - Issuance of Medium Term Open Access permission.
22 of 2017
5
3556 Tue 18/04/2017 11:30:00 AM
Hearing
Petition of Shri Subhash Keshavrao Deshmukh for non-compliance by the Respondent i.e. MSEDCL for not supplying power of proper voltage for agriculture connection to the petitioner along with other farmers, in accordance with the IEEE recommended practices and Requirements for Harmonic control in electric power systems and SoP.
21 of 2017
Completed
3557 Thu 13/04/2017 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for approval of PPA and adoption of tariff for procurement of 2 MW RTC Power and 1 MW Power from 08:00 to 23:00 hours for a period of six months from April 19, 2017 to September 30, 2017.
48 of 2017
Completed
3558 Thu 13/04/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 seeking a declaration for sale of un-availed capacity to third parties in terms of Article 4.5.3 of the PPAs of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Ltd.) and Maharashtra State Electricity Distribution Company Limited.
19 of 2017
Completed
3559 Thu 13/04/2017 11:30:00 AM
Hearing
Petition of M/s. Laxmi Organics Industries Limited under Section 142 read with Regulation 25 of MERC (CGRF) 2006 for non compliance of order dated 03.06.2016 passed in Case No. 59 of 2015 and in the matter of non-compliance of MERC order 3rd June 2016 by Respondent for not following the directions of MERC and MERC (Consumer Redressal Grievance Forum) 2006.
20 of 2017
Completed
3560 Thu 13/04/2017 11:30:00 AM
Hearing
Petition of Shri Ashok Kulkarni under Section 128 of the EA, 2003 for investigation of the books of accounts of Tata Power Company Limited in respect of various contracts awarded in respect of painting, dredging, coal handling, coal freight, shipping cost etc from FY 2003-04.
16 of 2017
Completed
3561 Thu 13/04/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited seeking directions for optimization of power generation in the state of Maharashtra by reducing the technical minimum operation of the generating power plant as per CERC defined norms and also applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
15 of 2017
Reschedule with further notice
3562 Tue 11/04/2017 11:30:00 AM
Hearing
Petition of Om Shree Agro-Tech Limited Complaint against Licensee (MSEDCL) for non-compliance of Electricity Ombudsman's order dt.14.10.2016, case No. 70 of 2016 matter of defective meter & billing issue. Action under Section 142 & 146 of Electricity Act 2003 proposed against MSEDCL for non-implementation of Ombudsman's order
14 of 2017
Completed
3563 Tue 11/04/2017 11:30:00 AM
Hearing
Petition of M/s D. J. Malpani for non-compliance of CGRF, MSEDCL and Nashik Order dated 27.10.2016 in Case No. 148 of 2016 M/s. D. J. Malpani, Sangamner in the matter of refund of penal charges levied for exceeding the Contract Demand.
13 of 2017
Completed
3564 Tue 11/04/2017 11:30:00 AM
Hearing
Petition of Karamtara Engineering Pvt. Limited against MSEDCL grant of appropriate directions/orders and punishment to the respondents for violation of orders passed by Honâ??ble Ombudsman.
12 of 2017
Reschedule
3565 Tue 11/04/2017 11:30:00 AM
Hearing
Petition of Sudarshan Tyres Pvt. Limited against MSEDCL for non Compliance of CGRF Nasik Order dated 08.07.2016 and Electricity Ombudsman, Mumbai order in representation No. 97 of 2016 dated 25.10.2016 of M/s. Sudarshan Tyres Pvt. Ltd., Ahmednagar in the matter of arrears after change of tariff category.
10 of 2017
Completed
3566 Thu 06/04/2017 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited for amendment of and removal of difficulty in implementing Regulation 72 and 81 of MERC (MYT) Regulations, 2015 filed under Regulation 101 and 102 respectively of the said Regulations.
9 of 2017
Completed
3567 Thu 06/04/2017 11:30:00 AM
Hearing
Petition of Aurangabad Municipal Corporation for providing clarification regarding applicability of tariff for Public Water Supply (HT-IV) an (LT-III) in Tariff Order dated 03.11.2016 passed by Hon'ble Commission, in Case No. 48/2016.
6 of 2017
Completed
3568 Thu 30/03/2017 11:30:00 AM
Hearing
Petition of Shri Uttam Dnyanu Gaikwad seeking this Hon'ble Commission to review the Order dated 28.10.2016 r/w corrigendum Order dated 17.11.2016 passed in Case No. 33 of 2016 relating in the Petition of BEST for Truing up of ARR and MYT for 3rd Control Period.
11 of 2017
Completed
3569 Thu 30/03/2017 11:30:00 AM
Hearing
Petition of Ms. Anila Gupta seeking clarification of the Order dated 28.10.2016 in Case No. 33 of 2016, being BEST Petition for Truing up of the ARR for FY 2012-13 to FY 2014-15, Provisional Truing Up of FY 2015-16 and Approval of ARR and determination of MYT for the 3rd Control Period FY 2016-17 to FY 2019-20.
7 of 2017
Completed
3570 Thu 30/03/2017 11:30:00 AM
Hearing
Review Petition of Brihanmumbai Electric Supply & Transport Undertaking (BEST) to review Order dated 28.10.2016 in Case No. 33 of 2016 issued by the Commission in the matter filed by BEST for approval of Truing up of the ARR for FY 2012-13 to FY 2014-15, Provisional Truing Up of FY 2015-16 and Approval of ARR and determination of MYT for the third Control Period FY 2016-17 to FY 2019-20.
4 of 2017
Completed
3571 Thu 23/03/2017 11:30:00 AM
Hearing
Maharashtra Veej Grahak Sanghatana (MVGS)'s request for Intervention in Case No. 176 of 2016. (Petition filed by Maharashtra State Electricity Distribution Co. Limited to review Order dated 03.11.2016 in Case No. 48 of 2016 of MSEDCL in the matter for Truing up for FY 2014-15, provisional truing-up for FY 2015-16 and Multi Year Tariff for 3rd control period FY 2016-17 to FY2019-20.)
MA No. 5 of 2017 in Case No. 176 of 2016
Completed
3572 Thu 23/03/2017 11:30:00 AM
Hearing
Review Petition of Alloy Steel Producers Association of India to review MERC Order in Case No. 48 of 2016 dated 03.11.2016, in the matter of Petition of MSEDCL for the MYT 3rd Control Period from FY 2016-17 to FY 2019-20.
3 of 2017
Completed
3573 Thu 23/03/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra Veej Grahak Sanghatana to review MERC Tariff Order Case No. 48 of 2016 date 03.11.2016 Request for Review of PP expenses efficiency loss etc. due to error apparent from the face of the record.
2 of 2017
Completed
3574 Thu 23/03/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) to review Order dated 03.11.2016 in Case No. 48 of 2016 of MSEDCL in the matter for Truing up for FY 2014-15, provisional truing-up for FY 2015-16 and Multi Year Tariff for 3rd control period FY 2016-17 to FY2019-20.
176 of 2016
Completed
3575 Thu 23/03/2017 11:30:00 AM
Hearing
Petition of Maha Cold Storage Association to review order dated 03.11.2016 in Case No. 48 of 2016, application of tariff to "Pre-cooling and Cold Storage units for Agricultural Products-Processed or Otherwise" vi-a-vis Hon'ble MERC's approved tariff schedule w.e.f. 01.11.2016
167 of 2016
Completed
3576 Wed 22/03/2017 11:00:00 AM
Public Hearing
Inviting Comments on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2017-18
33 of 2017
Completed
3577 Tue 21/03/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 seeking a declaration for sale of un-availed capacity to third parties in terms of Article 4.5.3 of the PPAs of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Ltd.) and Maharashtra State Electricity Distribution Company Limited.
19 of 2017
Reschedule
3578 Tue 21/03/2017 11:30:00 AM
Hearing
Petition of RattanIndia Nasik Power Ltd. (RNPL) under Section 86(1)(c) of the Electricity Act, 2003 read with Regulations 9 and 35 of the MERC (Transmission Open Access) Regulations, 2016. AND Miscellaneous Application filed by applicant RattanIndia Nasik Power Ltd. (RNPL) formerly known as Indiabulls Realtech Limited. (IRL) under Section 94 (2) for directions for supply of power from Sinnar TPP, using the transmission network of Respondent No .2 Sinnar Power Transmission Company Limited.
Case No 153 of 2016 AND MA No 01 of 2017 in Case No. 153 of 2016
Completed
3579 Tue 21/03/2017 11:30:00 AM
Hearing
Petition of ASN Power Projects (P) Limited for adjudication of dispute and for return of Performance Guarantee amount pursuant to the withdrawal of proposal for setting up of Biomass Power Project and cancellation of final consent agreement by Maharashtra Energy Development Agency (MEDA).
1 of 2017
Completed
3580 Tue 21/03/2017 11:30:00 AM
Hearing
Petition of Mindspace Business Parks Pvt. Ltd. (MBPPL) for review of order issued by Commission in Case No. 10 of 2016 dated 26.10.2016 in respect to MBPPL's petition for truing up for FY 2015-16 and determination of ARR and Tariff from FY 2016-17 to FY 2019-20.
168 of 2016
Completed
3581 Tue 21/03/2017 11:30:00 AM
Hearing
Review Petition of The Tata Power Company Limited seeking review of the Tariff Order issued on 21st October, 2016 by the Hon'ble Commission in Case No. 47 of 2016 for approval of Truing up for FY 2014-15, Provisional Truing Up for FY 2015-16 and Aggregate Revenue Requirement for the 3rd Control Period from FY 2016-17 to FY 2019-20.
165 of 2016
Completed
3582 Tue 21/03/2017 11:30:00 AM
Hearing
Petition of Adani Transmission (India) Limited under Section 86 (1) (f) read with Section 142 of The Electricity Act 2003 against Maharashtra State Electricity Transmission Company Limited seeking recovery of Late Payment Surcharge (LPS) and for initiation of proceedings in respect of non-compliance of directions issued by this Hon'ble Commission.
162 of 2016
Completed
3583 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Regulation 7 and 16 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2016, in respect of cumulative fulfillment of Renewable Purchase Obligation (RPO) for FY2016-17 and FY2017-18.
35 of 2017
Completed
3584 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of Petition in reference to Order No 73 of 2014 dated 27th October 2014 and Order No. 80 of 2015 dated 6th January, 2016 FOR in respect of Complaint filed under Section 142 and 146 of Electricity Act, 2003 for non-compliance of MERC Order (in Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule. And Miscellaneous Application filed by Petitioner Wat-ere-source Technologies P Limited for Ad-interim Relief(s) against Respondent- No. 2 and requested for Expeditious hearing of the application before Case 23 of 2016
23 of 2016 and MA No 12 of 2016 in Case No. 23 of 2016
Completed
3585 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of M/s. Dhanji Developers under Section 86(1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. Dhanji Developers and MSEDCL.
18 of 2017
Completed
3586 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of Rajlakshmi Minerals for amounts due and payable by MSEDCL to Rajlakshmi Minerals for electricity supplied under the Wind Energy Purchase Agreement (WEPA) dated 20.08.2014.
166 of 2016
Completed
3587 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of Brihanmumbai Electric Supply & Transport Undertaking (BEST) for approval of EPA dated 01.10.2009 for procurement of Biomass based Power between Mumbai Municipal Corporation and M/s. Spark Green Energy (Ahmednagar) Pvt. Ltd., and M/s. Spark Green Energy (Satara) Ltd.
164 of 2016
Completed
3588 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of M/s. Paris Ispat Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd non-Compliance of Nasik CGRF Order in grievance Nos. 150, 151 and 152 of 2016 of M/s. Paris Ispat Pvt. Ltd., Sangamner in the matter of refund of excess collected AEC and Additional FAC, Excess collected FAC for the period Dec2013 to Dec 2014, Excess Recovery of Additional FAC.
163 of 2016
Completed
3589 Thu 16/03/2017 11:30:00 AM
Hearing
Review Petition of Kolhapur Green Energy Pvt. Ltd under Section 94 (f) of the Electricity Act 2003 and Regulation 85 (a) of the MERC (Conduct of Business) Regulations 2004 to review order dated 10.10.2016 passed in Case No 87 of 2015
160 of 2016
Completed
3590 Thu 16/03/2017 11:30:00 AM
Hearing
Petition of Windmill Owners Welfare Association of India under Section 86 (1) (f) of The Electricity Act, 2003 pertaining to adjudication of disputes be.tween Windmill Owners Welfare Association of India and Maharashtra State Electricity Distribution Company Limited
157 of 2016
Completed
3591 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of M/s. M. R. Scion Agro under Sections u/s 142 of the Electricity Act, 2003 for non - compliance of Order dated 28.11.2013 passed by CGRF, Kolhapur in Consumer Complaint No.14/18/19/2013-14.
32 of 2015
Completed
3592 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of Mahindra Lifespace Developers Limited seeking compliance of the Order dated 24.06.2016 passed by the Appellate Authority Under Section 127 of the EA, 2003 in Appeal No 183 of 2010.
177 of 2016
Completed
3593 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of M/s. Paris Ispat Pvt. Limited against Maharashtra State Electricity Distribution Co. Ltd non-Compliance of Nasik CGRF Order in grievance Nos. 150, 151 and 152 of 2016 of M/s. Paris Ispat Pvt. Ltd., Sangamner in the matter of refund of excess collected AEC and Additional FAC, Excess collected FAC for the period Dec 2013 to Dec 2014, Excess Recovery of Additional FAC.
163 of 2016
5
3594 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of M/s. Lastra Niraj Pvt. Limited for non-compliance of CGRF Nasik Order dated 01.07.2016 & 18.10.2016 in grievance no. 92 of 2016 & 0147 of 2016 in the matter of refund of excess AEC Charges and Addl. FAC, and refund of excess charged FAC.
161 of 2016
5
3595 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of Shri Suresh Shivram Sawant under Section 142 of the EA, 2003 for non-compliance of directions given by CGRF, Kolhapur in the Order dated 05.08.2016 in Case No. 07/2016-17.
158 of 2016
Completed
3596 Tue 14/03/2017 11:30:00 AM
Hearing
Petition of M/s. Kisan Mouldings Ltd. under Section 142,146 and 149 of the EA, 2003 against MSEDCL for non-compliance of Order dated 09.05.2013 passed by the Electricity Ombudsman, Mumbai.
156 of 2016
Completed
3597 Thu 09/03/2017 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for approval of deviations in standard Bidding Document for Procurement of 300 MW of Power on Long Term basis for BEST Undertaking as per guidelines issued by MoP, Govt. of India.
26 of 2017
Completed
3598 Thu 09/03/2017 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for Approval of Power Procurement Plan for FY 2018-19 to FY 2027-28 for the BEST Undertaking under Regulation 19 & 20 of MERC (MYT) Regulations, 2015.
25 of 2017
Completed
3599 Thu 09/03/2017 11:30:00 AM
Hearing
Review Petition of The Tata Power Company Limited-Distribution seeking review of Order dated 22nd July, 2016 in Case No. 91 of 2016 for determination of Transmission Tariff of Intra-State Transmission System for Third Control Period FY 2016-17 to FY 2019-20.
142 of 2016
Completed
3600 Thu 09/03/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for providing mechanism for recovery of charges incurred on account of over-drawal of Indian Railways from the Grid.
114 of 2016
Completed
3601 Thu 09/03/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co Ltd., for review and merging of Solar & non Solar RPO targets and to specify a composite RPO target by clubbing both Solar & non Solar RPO targets and other relevant issue.
108 of 2016
Completed
3602 Tue 07/03/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Limited under inter-alia Section 86(1)(f), of the EA,2003, for adjudication of the disputes and claims arising under the PPA dated 25.09.2008 executed between Lanco Vidharbha Thermal Power Limited (LVPTL) and MSEDCL.
85 of 2016
Reschedule with further notice
3603 Tue 07/03/2017 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of Petition in reference to Order No 73 of 2014 dated 27th October 2014 and Order No. 80 of 2015 dated 6th January, 2016 FOR in respect of Complaint filed under Section 142 and 146 of Electricity Act, 2003 for non-compliance of MERC Order (in Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule. And Miscellaneous Application filed by Petitioner Wat-ere-source Technologies P Limited for Ad-interim Relief(s) against Respondent- No. 2 and requested for Expeditious hearing of the application before Case 23 of 2016
23 of 2016 and MA No 12 of 2016 in Case No. 23 of 2016
Reschedule
3604 Tue 07/03/2017 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent â?? MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Reschedule
3605 Tue 07/03/2017 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Reschedule with further notice
3606 Thu 02/03/2017 11:30:00 AM
Hearing
Petition of M/s. OPGS Power Gujarat Pvt. Ltd. under Section 86 (1) (f) of the EA, 2003 and Regulation 32 of the MERC (DOA) Regulations, 2016 qua disputes with MSEDCL over its arbitrary and wrongful delay in granting the Petitioner Distribution Open Access. AND Miscellaneous Application file by Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) on behalf of the Respondent/Applicant (MSEDCL) seeking clarification of daily/interim order dated 10.11.2016 passed by this Hon'ble Commission
141 of 2016 and M.A. No. 26 of 2016 in Case No. 141 of 2016
Completed
3607 Thu 02/03/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Order dated 10th May 2016 passed by the Hon'ble Commission in Case No.43 of 2015 under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004. And Miscellaneous Application of The Tata Power Company Limited seeking that the Review Petition be dismissed as non-maintainable Case No 93 of 2016 review Petition filed by MSEDCL seeking review of the Order dated 10.05.2016 passed by this Commission in Case No. 43 of 2015.
93 of 2016 and M.A. No. 25 of 2016 in Case No. 93 of 2016
Completed
3608 Thu 02/03/2017 11:30:00 AM
Hearing
92 of 2016
Completed
3609 Thu 02/03/2017 11:30:00 AM
Hearing
Petition for Reliance Infrastructure Limited (Distribution) for determination of Standby Charges payable by Reliance Infrastructure Limited to Maharashtra State Electricity Distribution Company Limited.
72 of 2016
Completed
3610 Tue 28/02/2017 11:30:00 AM
Hearing
Intervention Application filed by Shri Suresh Sancheti in Case No. 101 of 2016 Petition of MSEDCL under Regulations 35, 81 and 91 read with 96 of MERC (Conduct of Business) Regulations, 2004 for allowing MSEDCL to discontinue payment of any further claims of industrial consumers towards refund of ASC for applications received after 01st April 2016.
MA No 03 of 2017 in Case No. 101 of 2016
Completed
3611 Tue 28/02/2017 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Generation) (RInfra-G) and Reliance Infrastructure Limited-Distribution (RInfra-D) under Section 86 (1) (a), 86(1) (b) of EA 2003 and Regulation 20.1 of MERC MYT Regulations, 2015 for approval of Power Purchase Arrangement between Reliance Infrastructure Limited "Generation (RInfra-G) and Reliance Infrastructure Limited" Distribution (RInfra-D)
5 of 2017
Completed
3612 Tue 28/02/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited under Section 86 (1) of the Electricity Act, by Maharashtra Airport Development Company Limited, a Distribution Licensee against Abhijeet MADC Nagpur Energy Pvt. Ltd., a Generating Company for restitution of monies / reversing unjust enrichment of Abhijeet MADC Nagpur Energy Pvt. Ltd. arising out of the Concession Agreement executed between MADC and AMNEPL on 07.11.2007.
111 of 2016
Reschedule with further notice
3613 Tue 28/02/2017 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86 (1) (b) and 86 (1) (f) of the EA 2003 in the matter of a dispute between a Generating Company and the Distribution Licensee as a result of the deliberate and willful failure of the distribution licensee to make payments, on account of the Change in Law, as per the terms of the Power Purchase Agreement dated 04.08.2010 (PPA).
35 of 2016
Reschedule with further notice
3614 Tue 28/02/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute relating to appropriate adjustment in tariff due to deviation from the approved norms for Station Heat Rate as determined by this Hon'ble Commission in order dated 05.05.2014 in Case No. 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station
27 of 2015
5
3615 Thu 23/02/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company under section 63 of the Electricity Act, 2003, read with the order of this Hon'ble Commission dated 27/12/2016 issued in Case no. 175 of 2016, for adoption of tariff for 3-7 MW short term power purchase, for the period commencing 01.03.2017 to 31.08. 2017.
31 of 2017
Completed
3616 Thu 23/02/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for directions under the MERC (Distribution Open Access) Regulations 2016.
8 of 2017
Completed
3617 Thu 23/02/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited (Known as Sai Wardha Power Generation Limited) seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Limited for the financial year 2015-16.
159 of 2016
Completed
3618 Thu 23/02/2017 11:30:00 AM
Hearing
Petition filed by Sai Wardha Power Company Limited under Section 42(2), 86(1)(c) and other applicable provisions of the Electricity Act, 2003 and Regulation 32 of the Open Access Regulations, 2016 for directions and refund of excess transmission charges levied and collected by Maharashtra State Transmission Company Limited. And Interlocutory Application of M/s Sai Wardha Power Limited seeking direction to maintain status quo with regard to the invocation of Letter of Credit
107 of 2016 and MA No 10 of 2016 in Case No. 107 of 2016
Completed
3619 Thu 23/02/2017 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited under section 42(2), 86 (1) (c) and other applicable provisions of the EA,2003 and Regulation 39 of the Open Access Regulations, 2015 for directions and refund of excess transmission charges levied and collected by MSETCL.
54 of 2016
Completed
3620 Thu 23/02/2017 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Limited for the financial year 2014-15. And Miscellaneous Application of The Tata Power Company Limited for impleadment / Intervention on behalf of The Tata Power Company Limited as a Party to the present petition filed by M/s. Sai Wardha Power Limited as the Applicant.
77 of 2015 and M.A. No 02 of 2016 in Case No. 77 of 2015
Completed
3621 Thu 16/02/2017 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86 (1) (f) of the Electricity Act, 2003 against MSEDCL.
127 of 2016
Completed
3622 Thu 16/02/2017 11:30:00 AM
Hearing
Petition of M/s Ultra Tech Cement Ltd. regarding non-compliance of Dist. Open Access Regulation-2016 by MSEDCL and incorrect monthly billing methodology adopted in absence of approved procedure for Dist. Open Access-2016.
139 of 2016
Completed
3623 Thu 16/02/2017 11:30:00 AM
Hearing
Petition of M/s. Arvind Cotsyn (India) Limited complaining against the Respondent, MSEDCL for not complying the Commission's Order dated 21.04.2016 in Case No. 14 of 2015 and seeking action under Section 142 of Electricity Act, 2003 against MSEDCL.
132 of 2016
Completed
3624 Thu 16/02/2017 11:30:00 AM
Hearing
Petition of Cosmo Films Limited under Section 42 of the Electricity Act, 2003 read with Regulations 32 & 35 of the Maharashtra Electricity Regulatory Commission Distribution Open Access Regulations, 2016.
131 of 2016
Completed
3625 Tue 14/02/2017 11:30:00 AM
Hearing
Petition of M/s. Ulka Seafoods Pvt. Ltd. against MSEDCL for non-compliance of the order dated 21.07.2016 passed by CGRF, Mumbai.
134 of 2016
Completed
3626 Tue 14/02/2017 11:30:00 AM
Hearing
Petition of Shri Balkrishna Bhiku Patil regarding Penal Action under Section 142 of EA, 2003 of Rs.1 lakhs and per day Rs. 6000/-for Non-Compliance of CGRF-Kolhapur Order dated 29.06.2016.
154 of 2016
5
3627 Tue 14/02/2017 11:30:00 AM
Hearing
Petition of M/s. Gurera Synthetics Pvt. Ltd. for non-Compliance of Electricity Ombudsman, Mumbai Order Dated 02.08.2016 in Representation No. 33 of 2016.
148 of 2016
Completed
3628 Tue 14/02/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking to review the Order dated 16.09.2016 passed by this Commission in Case No. 74 of 2015.
146 of 2016
Completed
3629 Tue 14/02/2017 11:30:00 AM
Hearing
Petition of J. J. Fine Spun Pvt. Ltd. for non-compliance of Order dated 04.08.2016 passed by CGRF, Akola in complaint No. 12 of 2016.
145 of 2016
Reschedule with further notice
3630 Tue 14/02/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86 (1) (f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with Clause 6 of the Order/Contract dated 13th February 2006 and in connection with the dispute and differences arising under the Order/Contract dated 13th February 2006 entered into between MSEDCL and Adani Enterprise Ltd.
143 of 2016
Completed
3631 Thu 09/02/2017 11:30:00 AM
Hearing
Petition of Nagpur Metro Rail Corporation Ltd. (NMRCL) under Section 62 (1) (a) and 86 (1) (e) of EA 2003 for relaxing the applicability of Definition of Eligible Consumer under 2.1(g) and Regulation 5 of MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.
133 of 2016
Completed
3632 Tue 07/02/2017 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 seeking a declaration for sale of un-availed capacity to third parties in terms of Article 4.5.3 of the PPAs of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Ltd.) and Maharashtra State Electricity Distribution Company Limited.
19 of 2017
Completed
3633 Tue 07/02/2017 11:30:00 AM
Hearing
Intervention Application filed by Applicant Dhariwal Industries Pvt. Limited in Case No. 147 of 2016 Petition filed by M/s. S.K.Shivaraj and Others against MSEDCL.
MA No. 02 of 2017 in Cae No. 147 of 2016
Completed
3634 Tue 07/02/2017 11:30:00 AM
Hearing
Petition of M/s. S. K. Shivaraj and Others against MSEDCL for Breach of Distribution Open Access Regulations, 2016, Breach of the provisions of Citizen Charter & Breach of Hon'ble Commission Practice Directions.
147 of 2016
5
3635 Tue 07/02/2017 11:30:00 AM
Hearing
Petition of M/s Ultra Tech Cement Ltd. regarding non-compliance of Dist. Open Access Regulation-2016 by MSEDCL and incorrect monthly billing methodology adopted in absence of approved procedure for Dist. Open Access-2016.
139 of 2016
Reschedule
3636 Tue 07/02/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Power Generation Company Ltd. (MSPGCL) against Order dated 30.08.2016 in Case no. 46 of 2016 on a petition filed by MSPGCL for final true up FY2014-15, provisions true up for FY2015-16 and multiyear tariff for FY 2016-17 to FY 2019-20.
138 of 2016
Completed
3637 Tue 07/02/2017 11:30:00 AM
Hearing
Petition of M/s. Arvind Cotsyn (India) Limited complaining against the Respondent, MSEDCL for not complying the Commission's Order dated 21.04.2016 in Case No. 14 of 2015 and seeking action under Section 142 of Electricity Act, 2003 against MSEDCL.
132 of 2016
Reschedule
3638 Tue 07/02/2017 11:30:00 AM
Hearing
Petition of Cosmo Films Limited under Section 42 of the Electricity Act, 2003 read with Regulations 32 & 35 of the Maharashtra Electricity Regulatory Commission Distribution Open Access Regulations, 2016.
131 of 2016
Reschedule
3639 Thu 02/02/2017 11:30:00 AM
Public Hearing
Inviting comments in proceedings for verification of Renewable Purchase Obligation compliance targets for FY 2015-16 by distribution Licensees in Maharashtra.
Case No. 169 of 2016, 170 of 2016, 171 of 2016, 172 of 2016 , 173 of 2016 and 174 of 2016
Completed
3640 Thu 02/02/2017 11:30:00 AM
Public Hearing
Petition of Gigaplex Estate Private Limited for approval of Aggregate Revenue Requirement and Tariff for the Multi-Year Tariff period from FY 2016-17 to FY 2019-20 for its Distribution Business as per MERC (MYT) Regulations, 2015.
149 of 2016
Completed
3641 Tue 31/01/2017 11:30:00 AM
Hearing
Miscellaneous Application filed by applicant RattanIndia Nasik Power Ltd. (RNPL) formerly known as Indiabulls Realtech Limited. (IRL) under Section 94 (2) for directions for supply of power from Sinnar TPP, using the transmission network of Respondent No .2 Sinnar Power Transmission Company Limited.
MA No 01 of 2017 in Case No. 153 of 2016
Completed
3642 Tue 31/01/2017 11:30:00 AM
Hearing
Petition of RattanIndia Nasik Power Ltd. (RNPL) under Section 86(1)(c) of the Electricity Act, 2003 read with Regulations 9 and 35 of the MERC (Transmission Open Access) Regulations, 2016.
153 of 2016
Completed
3643 Tue 31/01/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Amendment in the Regulation 82 of the MERC (MYT) Regulations, 2015 and also in the matter of Regulations 101 & 102 of the MERC (MYT) Regulations, 2015.
152 of 2016
Completed
3644 Tue 31/01/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) Review of Order dated 16.05.2016 Case No. 09 of 2016, Petition of MSEDCL for enhancement of Connected Load outside Municipal Corporations under the Standards of Performance Regulations, 2014.
151 of 2016
Completed
3645 Tue 31/01/2017 11:30:00 AM
Hearing
Review Petition of The Tata Power Company Limited - Generation seeking review of the Tariff Order issued on date 08.08.2016 passed by the Commission in Case No. 32 of 2016 MYT Petition for the Truing Up of FY 2014-15, Provisional Truing Up of FY 2015-16 and Annual Revenue Requirement (ARR) for the 3rd Control Period FY 2016-17 to FY 2019-20.
150 of 2016
5
3646 Tue 24/01/2017 11:30:00 AM
Hearing
Petition of Shri Balkrishna Bhiku Patil regarding Penal Action under Section 142 of EA, 2003 of Rs.1 lakhs and per day Rs. 6000/-for Non-Compliance of CGRF-Kolhapur Order dated 29.06.2016.
154 of 2016
Reschedule
3647 Tue 24/01/2017 11:30:00 AM
Hearing
Petition of M/s. Gurera Synthetics Pvt. Ltd. for non-Compliance of Electricity Ombudsman, Mumbai Order Dated 02.08.2016 in Representation No. 33 of 2016.
148 of 2016
Reschedule
3648 Tue 24/01/2017 11:30:00 AM
Hearing
Petition of M/s. S. K. Shivaraj and Others against MSEDCL for Breach of Distribution Open Access Regulations, 2016, Breach of the provisions of Citizen Charter & Breach of Honâ??ble Commission Practice Directions.
147 of 2016
Reschedule
3649 Tue 24/01/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) seeking to review the Order dated 16.09.2016 passed by this Commission in Case No. 74 of 2015.
146 of 2016
Reschedule
3650 Tue 24/01/2017 11:30:00 AM
Hearing
Petition of J. J. Fine Spun Pvt. Ltd. for non-compliance of Order dated 04.08.2016 passed by CGRF, Akola in complaint No. 12 of 2016.
145 of 2016
Reschedule
3651 Thu 19/01/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under Section 86 (1) (f), 86(1)(k) and other applicable provisions of the Electricity Act, 2003 read with Clause 6 of the Order/Contract dated 13th February 2006 and in connection with the dispute and differences arising under the Order/Contract dated 13th February 2006 entered into between MSEDCL and Adani Enterprise Ltd.
143 of 2016
Reschedule
3652 Thu 19/01/2017 11:30:00 AM
Hearing
Petition of M/s Ultra Tech Cement Ltd. regarding non-compliance of Dist. Open Access Regulation-2016 by MSEDCL and incorrect monthly billing methodology adopted in absence of approved procedure for Dist. Open Access-2016.
139 of 2016
Reschedule
3653 Thu 19/01/2017 11:30:00 AM
Hearing
Review Petition of Maharashtra State Power Generation Company Ltd. (MSPGCL) against Order dated 30.08.2016 in Case no. 46 of 2016 on a petition filed by MSPGCL for final true up FY2014-15, provisions true up for FY2015-16 and multiyear tariff for FY 2016-17 to FY 2019-20.
138 of 2016
Reschedule
3654 Tue 17/01/2017 11:30:00 AM
Hearing
Petition of M/s. Ulka Seafoods Pvt. Ltd. against MSEDCL for non-compliance of the order dated 21.07.2016 passed by CGRF, Mumbai.
134 of 2016
Reschedule
3655 Tue 17/01/2017 11:30:00 AM
Hearing
Petition of Nagpur Metro Rail Corporation Ltd. (NMRCL) under Section 62 (1) (a) and 86 (1) (e) of EA 2003 for relaxing the applicability of Definition of Eligible Consumer under 2.1(g) and Regulation 5 of MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015.
133 of 2016
Reschedule
3656 Tue 17/01/2017 11:30:00 AM
Hearing
Petition of M/s. Arvind Cotsyn (India) Limited complaining against the Respondent, MSEDCL for not complying the Commission's Order dated 21.04.2016 in Case No. 14 of 2015 and seeking action under Section 142 of Electricity Act, 2003 against MSEDCL.
132 of 2016
Reschedule
3657 Tue 17/01/2017 11:30:00 AM
Hearing
Petition of Cosmo Films Limited under Section 42 of the Electricity Act, 2003 read with Regulations 32 & 35 of the Maharashtra Electricity Regulatory Commission Distribution Open Access Regulations, 2016.
131 of 2016
Reschedule
3658 Thu 12/01/2017 11:30:00 AM
Hearing
Petition of Mrs. Gangubai V. Patil against Maharashtra Electricity Distribution Co. Ltd., for non-compliance of Electricity Ombudsman, Mumbai's Order dated 20.01.2016 (Case No. 95 of 2015)
129 of 2016
Completed
3659 Thu 12/01/2017 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86 (1) (f) of the Electricity Act, 2003 against MSEDCL.
127 of 2016
Completed
3660 Thu 12/01/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) for Amendment / Modification in FAC Regulations of MERC (MYT) Regulations, 2015.
124 of 2016
Completed
3661 Thu 12/01/2017 11:30:00 AM
Hearing
Miscellaneous Application filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) in its Petition for final true up of FY 14-15, Provisional true up of FY15-16 & Multi Year Tariff for FY 16-17 to FY 19-20 (Case No. 48 of 2016).
123 of 2016
Completed
3662 Tue 10/01/2017 11:30:00 AM
Hearing
Petition of Shri Taraprakash Prabhakar Vartak under Section 61 (h), 62(1) (a) and 86(1)(e) of EA 2003 for determination of generic Capital cost for Mini and Micro Hydro power projects for sale of electricity to Distribution Licensees of Maharashtra under BOT Policy of Water Resources Department, GoM.
119 of 2016
Completed
3663 Tue 10/01/2017 11:30:00 AM
Hearing
Petition of Shri Sanjay A Gawade against MSEDCL under Section 142 and 94 (2) of EA 2003 for Violation of Section 42, EA 2003 by MSEDCL.
118 of 2016
Completed
3664 Tue 10/01/2017 11:30:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Pvt Ltd (formerly known as M/s Serene Properties Pvt Ltd) for adoption of tariff for Peak Load of 10 MW under Medium Term Procurement of Power for a period of five years discovered through Competitive Bidding.
116 of 2016
Completed
3665 Tue 10/01/2017 11:30:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Private Limited (formerly known as M/s Serene Properties Private Limited) for adoption of tariff for Base Load of 10 MW under Medium Term Procurement of Power for a period of five years discovered through Competitive Bidding
115 of 2016
Completed
3666 Thu 05/01/2017 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for providing Mechanism for recovery of charges incured on Account of over-drawl of Indian Railways from the Grid.
114 of 2016
Completed
3667 Thu 05/01/2017 11:30:00 AM
Hearing
Petition of VVC Pharma & Speciality Chemical Pvt. Ltd. under Section 142 & 146 of the EA 2003 for violating the Order in Appeal No. 207 of 2013 dated 29.05.2013 passed by the Appellate Authority U/S 127 of EA, 2003, Mumbai.
113 of 2016
Completed
3668 Thu 05/01/2017 11:30:00 AM
Hearing
Petition filed by Shri Vishwanath Ramchandra Patil against MSEDCL under Section 142 of the EA, 2003 for Non-Compliance of Order in Case No. 25 to 46 of 2015-16 letter No. 210, dated 15.01.2016 passed by CGRF, Kolhapur.
112 of 2016
Completed
3669 Thu 05/01/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company Limited under Section 86 (1) of the Electricity Act, by Maharashtra Airport Development Company Limited, a Distribution Licensee against Abhijeet MADC Nagpur Energy Pvt. Ltd., a Generating Company for restitution of monies / reversing unjust enrichment of Abhijeet MADC Nagpur Energy Pvt. Ltd. arising out of the Concession Agreement executed between MADC and AMNEPL on 07.11.2007.
111 of 2016
Reschedule with further notice
3670 Tue 03/01/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited (APML) filed under Section 86 of EA, 2003 read with Article 13 "Change in Law" under the PPA dated 08.09.2008 for supply of 1320 MW of power executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" for the 800 MW portion of contracted capacity linked to Lohara Coal Block which substantially affected cost and revenues of the project.
102 of 2016
Completed
3671 Tue 03/01/2017 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the Power Purchase Agreements (PPAs") dated 31.10.2010, 09.08.2010 and16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for appropriate adjustment in tariff due to "Change in Law" which substantially affected cost and revenues of the project.
38 of 2016
Completed
3672 Tue 03/01/2017 11:30:00 AM
Hearing
Review Petition of The Tata Power Company Limited-Distribution seeking review of Order dated 22nd July, 2016 in Case No. 91 of 2016 for determination of Transmission Tariff of Intra-State Transmission System for Third Control Period FY 2016-17 to FY 2019-20.
142 of 2016
Reschedule with further notice
3673 Tue 03/01/2017 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Limited for change in the Approved Load Shedding Protocol.
120 of 2016
Completed
3674 Tue 03/01/2017 11:30:00 AM
Hearing
Review Petition filed by The Tata Power Company Limited (Transmission) for seeking review of the Tariff Order dated 30.06.2016 passed by the Hon'ble Commission in Case No. 22 of 2016 for approval of Truing up for FY 2014-15, Provisional Truing Up for FY 2015-16 and Aggregate Revenue Requirement for Control Period from FY 2016-17 to FY 2019-20.
110 of 2016
Reschedule
3675 Tue 27/12/2016 11:30:00 AM
Hearing
110 of 2016
Completed
3676 Tue 27/12/2016 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86(1)(b) and 86(1)(f) and other applicable provisions of the Electricity Act, 2003 Change in Law (in the nature of change in cess and taxes during FY 2015-16 and FY 2016-17) in terms of the Power Purchase Agreement dated February 23, 2010 between JSW Energy Limited & MSEDCL.
117 of 2016
Completed
3677 Tue 27/12/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited (APML) filed under Section 86 of EA, 2003 read with Article 13 "Change in Law" under the PPA dated 08.09.2008 for supply of 1320 MW of power executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" for the 800 MW portion of contracted capacity linked to Lohara Coal Block which substantially affected cost and revenues of the project.
102 of 2016
Completed
3678 Tue 27/12/2016 11:30:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Limited) and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RattanIndia Power Limited.
84 of 2016
Reschedule with further notice
3679 Tue 27/12/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the Power Purchase Agreements (PPAs") dated 31.10.2010, 09.08.2010 and16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for appropriate adjustment in tariff due to "Change in Law" which substantially affected cost and revenues of the project.
38 of 2016
Completed
3680 Thu 22/12/2016 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86 (1) (f) of the EA, 2003 against MSEDCL
90 of 2016
Completed
3681 Thu 22/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Limited under inter-alia Section 86(1)(f), of the EA,2003, for adjudication of the disputes and claims arising under the PPA dated 25.09.2008 executed between Lanco Vidharbha Thermal Power Limited (LVPTL) and MSEDCL.
85 of 2016
Completed
3682 Thu 22/12/2016 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Completed
3683 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Indian Wind Power Association (Northern Regional Council) in Case No 70 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
M. A. No. 30 of 2016 in Case No. 70 of 2016
Completed
3684 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Wind Independent Power Producers Association ("WIPPA") in Case No 70 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
M. A. No. 30 of 2016 in Case No. 70 of 2016
Completed
3685 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Indian Wind Power Association in Case No 44 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
M. A. No. 32 of 2016 in Case No. 44 of 2016
Completed
3686 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Wind Independent Power Producers Association ("WIPPA") in Case No 44 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
M. A. No. 29 of 2016 in Case No. 44 of 2016
Completed
3687 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Green Energy Association in Case No 44 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
M. A. No. 27 of 2016 in Case No. 44 of 2016
Completed
3688 Tue 20/12/2016 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co Ltd., for seeking clarification regarding Regulation 7.2 for Renewable Purchase Obligation target in implementation of MERC (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016; & under Regulation 19 of it.
109 of 2016
Completed
3689 Tue 20/12/2016 11:30:00 AM
Hearing
Intervention Application filed by Green Energy Association in Case No 70 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
MA No 19 of 2016 in Case No. 70 of 2016
Completed
3690 Tue 20/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
70 of 2016
Completed
3691 Tue 20/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
44 of 2016
Completed
3692 Tue 20/12/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking abeyance of Power Purchase Agreement between Tata Power Company Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) approved in-principle by Hon'ble Commission.
37 of 2016
Reschedule with further notice
3693 Thu 15/12/2016 11:30:00 AM
Hearing
Petition for M/s. Reliance Infrastructure Limited under Section 86 (1) (f) of the Electricity Act, 2003 for claiming compensation from the generating company for breach of Letter of Intent dated 08th March 2010 issued by the Petitioner for supply of 37 MW for the Period 1st April 2010 to 30th June 2010.
15 of 2016
Completed
3694 Thu 15/12/2016 11:30:00 AM
Hearing
Petition of Indo Rama Synthetic Limited under Section 86 (1) (f) of the Electricity Act, 2003 for willful neglect / default in payment of the License fee by the Distribution Licensee to the Generating Company in accordance with the agreed terms under the proposal dated 08.03.2010 made by the Generating Company and the Letter of Intent (LOI) dated 08.03.2010 issued by the Distribution Licensee.
125 of 2015
Completed
3695 Thu 15/12/2016 11:30:00 AM
Hearing
Petition of MSEDCL in the matter of Petition for seeking amendment in the PPA signed under Case I Stage 1 project in relation to ambiguity in definition of contracted capacity and installed capacity.
122 of 2015
Completed
3696 Thu 08/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2015
Completed
3697 Thu 08/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2015
Completed
3698 Thu 08/12/2016 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of Petition in reference to Order No 73 of 2014 dated 27th October 2014 and Order No. 80 of 2015 dated 6th January, 2016 FOR in respect of Complaint filed under Section 142 and 146 of Electricity Act, 2003 for non-compliance of MERC Order (in Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule. AND Miscellaneous Application filed by Petitioner Wat-ere-source Technologies P Limited for Ad-interim Relief(s) against Respondent- No. 2 and requested for Expeditious hearing of the application before Case 23 of 2016.
23 of 2016 AND MA No 12 of 2016 in Case No. 23 of 2016
Completed
3699 Thu 08/12/2016 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Reschedule with further notice
3700 Thu 08/12/2016 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Completed
3701 Tue 06/12/2016 11:30:00 AM
Hearing
Revision petition of MSETCL, Under Clause 13(2) Maharashtra Works of Licensee Rules, 2012 read with section 67 of Electricity Act, 2003.
140 of 2016
Completed
3702 Tue 06/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd under Rule 3(3) of the Maharashtra Electricity Works of Licensees Rules, 2012 and in the matter of the Order dated 16.12.2015 passed by the Upper District Collector, Nashik in compliant 2214/P.K.69/5A dated 29.09.2014.
130 of 2016
Completed
3703 Tue 06/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2015
Reschedule
3704 Tue 06/12/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2015
Reschedule
3705 Thu 01/12/2016 11:30:00 AM
Hearing
Petition of Nidar Utilities Panvel LLP under Section 14, 16, 181 of the EA,2003 and Regulation 8.16.2 of the MERC (General Conditions of Distribution Licence) Regulations, 2006 for taking on record the deemed Distribution Licensee status.
128 of 2016
Completed
3706 Thu 01/12/2016 11:30:00 AM
Hearing
Petition of M/s Flagship Developers Private Limited for taking on record the deemed distribution licensee status of the petitioner, M/s. Flagship Developers Private Limited for Blue Ridge IT Park at village Hinjewadi, Taluka Mulshi, Dist: Pune, Maharashtra on an area of 10.1766 hectares and for issuing the Specific Conditions of Distribution Licence applicable to the petitioner.
30 of 2015
Completed
3707 Tue 29/11/2016 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co Ltd., for review and merging of Solar & non Solar RPO targets and to specify a composite RPO target by clubbing both Solar & non Solar RPO targets and other relevant issue. AND Interlocutory Application of M/s Sai Wardha Power Limited seeking direction to maintain status quo with regard to the invocation of Letter of Credit.
108 of 2016
Completed
3708 Tue 29/11/2016 11:30:00 AM
Hearing
Petition filed by Sai Wardha Power Company Limited under Section 42(2), 86(1)(c) and other applicable provisions of the Electricity Act, 2003 and Regulation 32 of the Open Access Regulations, 2016 for directions and refund of excess transmission charges levied and collected by Maharashtra State Transmission Company Limited. AND Interlocutory Application of M/s Sai Wardha Power Limited seeking direction to maintain status quo with regard to the invocation of Letter of Credit
107 of 2016 and MA No 10 of 2016 in Case No. 107 of 2016
Reschedule with further notice
3709 Thu 24/11/2016 11:30:00 AM
Hearing
Petition filed by Development Commissioner cum Chairperson, SEEPZ-SEZ for Specific Condition of Distribution License under Section 16 of the EA, 2003 in SEEPZ Special Economic Zone (SEZ) in Andheri East, Mumbai to undertake distribution of power within SEEPZ SEZ area through existing network of existing Licensee, under the provisions of Act 2003, till its own distribution network is developed.
106 of 2016
Completed
3710 Thu 24/11/2016 11:30:00 AM
Hearing
Petition filed by Sanskar Agro Processors Pvt. Ltd., for seeking appropriate directions/orders and punishment to the Respondents and powers and functions of appropriate commission as contemplated under Section 82,86,92,94,95,142,146 of EA,2003. And in the matter of Willful breach and violation of the Final Assessment Order issued by "Assessment Authority" u/s 126 of EA, 2003 and its enforcement u/s. 142 of EA 2003.
105 of 2016
Completed
3711 Thu 24/11/2016 11:30:00 AM
Hearing
Petition filed by Lupin Limited (Biotech Division) for Non Compliance of Hon. CGRF, Pune Zone's decision Order passed in Case No. 15 /2016 & circulated vide Member Secretary CGRF Pune Zone's letter No. EE/CGRF/PZ/Case No. 15 of 2016/131 dated 20.06.2016.
104 of 2016
Completed
3712 Thu 24/11/2016 11:30:00 AM
Hearing
Petition filed by Lupin Limited (Research Park) for Non Compliance of Hon. CGRF, Pune Zone's decision Order passed in Case No. 12 /2016 & circulated vide Member Secretary CGRF Pune Zone's letter No. EE/CGRF/PZ/Case No. 12 of 2016/134 dated 22.06.2016.
103 of 2016
Completed
3713 Thu 24/11/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., under Regulations 35, 81 and 91 read with 96 of MERC (Conduct of Business) Regulations, 2004 for allowing MSEDCL to discontinue payment of any further claims of industrial consumers' towards refund of ASC for applications received after 01st April 2016.
101 of 2016
Completed
3714 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of M/s. L. B. Kunjir under Section 86(1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. L. B. Kunjir and MSEDCL.
144 of 2016
Completed
3715 Tue 22/11/2016 11:30:00 AM
Hearing
Intervention Application filed by Kamal Engineering Corporation {Div. of Kamal Encon Ind Ltd (Formerly Kec Ind Ltd ) on the pending of M/s. Shah Promoters & Developers in Case No. 53 of 2016 which is now pending for 22.11.2016 under Section 86(1)(f) of the EA,2003 pertaining to adjudication of disputes between Shah Promoters & Developers and MSEDCL.
M.A. NO. 22 of 2016 in Case No. 53 of 2016
Completed
3716 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of M/s. Giriraj Enterprises under Section 86 (1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. Giriraj Enterprises and MSEDCL.
136 of 2016
Completed
3717 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of M/s. D. J. Malpani under Section 86 (1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. D. J. Malpani and MSEDCL .
135 of 2016
Completed
3718 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of Bindu Vayu Urja Private Limited Under Section 86(1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Bindu Vayu Urja Private Limited And Maharashtra State Electricity Distribution Company Limited.
79 of 2016
Completed
3719 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of CLP Wind Farms (India) Pvt. Limited under section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Limited.
75 of 2015
Completed
3720 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Pvt. Limited under section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Limited.
74 of 2016
Completed
3721 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of Ghatge Patil Industries Ltd. in the matter of Breach of Hon'ble Commission's Order dated 24.11.2003 and Breach of Clause 12.02 of PPA dated 31.12.2005, 13.12.2006, 18.02.20006 and 02.05.2006.
68 of 2016
Completed
3722 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited under section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Sun N Sand Hotels Private Limited and Maharashtra State Electricity Distribution Limited on the issue of payment of Interest on delayed payment .
62 of 2016
Completed
3723 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of Shah Promoters & Developers under section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters& Developers and Maharashtra State Electricity Distribution Limited.
53 of 2016
Completed
3724 Tue 22/11/2016 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company for approval and directions under Section 86 of the EA,2003 read with Guidelines for short-term(i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees date 30th March 2016 issued by the Ministry of Power, Government of India.
100 of 2016
Reschedule
3725 Tue 22/11/2016 11:30:00 AM
Hearing
Petition of Classic Citi Investments Pvt. Ltd. under Section 94 (g) of the EA 2003, read with Regulations 92 & 94 of the MERC (conduct of Business) Regulations, 2004 to Direct MSEDCL to comply with the findings and directions given by the Hon'ble Commission in order dated 30.03.2016 in Case No. 23 of 2015.
99 of 2016
Completed
3726 Tue 22/11/2016 11:30:00 AM
Hearing
Petition filed by Harman Finochem Ltd. for Non-Compliance of CGRF, Aurangabad Order dated 20.05.2016 in Case No. CGRF/AZ/AUR/R/577/2016/08, U/S 142 & 146 of the EA, 2003.
98 of 2016
Completed
3727 Thu 17/11/2016 11:30:00 AM
Hearing
Review Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Order dated 10th May 2016 passed by the Hon'ble Commission in Case No.43 of 2015 under Regulation 85 of the MERC (Conduct of Business) Regulations, 2004.
93 of 2016
Reschedule with further notice
3728 Thu 17/11/2016 11:30:00 AM
Hearing
Petition of Grace Industries Limited for Grant of Appropriate directions/ Orders under Section 82, 86, 92, 94, 95 of EA 2003 Read with Section 2(1), Section 2(8), 2(28), 2(32), 2(47), 2(64), 9, 128, 129, 142, 176, 181 of EA 2003, Orders/Directions issued by this Hon'ble Commission in Case No. 55/2003 & 56/2003 in consonance with NEP framed by Central Government under Section 3 of EA, 2003 & under Clause 8.6 of MERC (Transmission and Open Access) Regulation 2014.
92 of 2016
Completed
3729 Thu 17/11/2016 11:30:00 AM
Hearing
Petition of Jai Corp Limited for non-compliance of the final order dated 06.11.2015 passed by CGRF, Nanded Zone, Nanded in Case No.01/2015.
89 of 2016
Completed
3730 Thu 17/11/2016 11:30:00 AM
Hearing
Petition of Tata Motors Limited against non-compliance by MSEDCL of the MERC (Distribution Open Access) Regulations, 2005 & 2014 and Order dated January 3, 2013 of the Hon'ble Commission in Case No. 8, 18, 20 & 33 of 2012 read with relevant provisions of the EA, 2003.
88 of 2016
Completed
3731 Thu 17/11/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. for issues of LBT on electricity paid by consumers of Aurangabad and Amravati Municipal Corporation amount as per the directives of the Hon'ble Commission in MYT Order in Case No. 121 of 2014 dated 26.06.2015.
87 of 2016
Completed
3732 Tue 15/11/2016 11:30:00 AM
Hearing
Application filed by Petitioner M/s. Arvind Cotsyn (India) Limited and two other to allow the Petitioner to amend the Petition in Case No. 80 of 2016 and take the amended Petition on record.
MA No. 23 of 2016 in Case No. 80 of 2016
Completed
3733 Tue 15/11/2016 11:30:00 AM
Hearing
Petition of Gopani Iron & Power (India) Pvt. Limited for quashing the impugned letter No.CE/Comm/CPP/EPA Termination/05609 dated 18.02.2016 issued by the MSEDCL qua the Petitioner and to direct the MSEDCL to enter into an EPA for a period of 5 years at the rates mentioned in the Order dated September 8, 2004.
86 of 2016
Completed
3734 Tue 15/11/2016 11:30:00 AM
Hearing
Petition of Mrs Faimunissa Gaffar Khan Prop . K.B.Ice Factory for violation of various provisions of Supply Code 2005, provisions of section 126 of EA 2003 and non-compliance of order passed by Hon'ble SE Electrical, Govt. of Maharashtra, appellate authority under section 127 of EA 2003 on date 23.02.2016 in case no. 01/2014 seeking directives for compliance & imposition of penalty and prosecution as per the provisions of section 142, 146 and 149 of EA 2003.
82 of 2016
Completed
3735 Tue 15/11/2016 11:30:00 AM
Hearing
Petition of Chamber of Marathwada Industries And Agriculture for seeking Review and amendment of present ceiling for Levy of Fuel Adjustment Cost by Distribution Licensees in the State of Maharashtra on account of changed circumstances, allocation of Z Factor Charge equally on all the consumers and change in the method post Facto Approval to previously adopted vetting of Z Factor. AND Intervention Application of Balaji Electro Smelters Limited in the Petition of Chamber of Marathwada Industries And Agriculture for seeking Review and amendment of present ceiling for Levy of Fuel Adjustment Cost by Distribution Licensees in the State of Maharashtra on account of changed circumstances, allocation of Z Factor Charge equally on all the consumers and change in the method post Facto Approval to previously adopted vetting of Z Factor.
AND No 11 of 2016 in Case No. 81 of 2016 81 of 2016
Completed
3736 Tue 15/11/2016 11:30:00 AM
Hearing
Petition of M/s. Arvind Cotsyn (India) Limited and two other for Violations of Rules under MERC (Distribution Open Access) Regulation 2016.
80 of 2016
Completed
3737 Tue 15/11/2016 11:30:00 AM
Hearing
Petition of Paul Strips & Tubes Pvt. Limited under Section 142 of the EA, 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
78 of 2016
Completed
3738 Thu 10/11/2016 11:30:00 AM
Hearing
Petition of M/s. OPGS Power Gujarat Pvt. Ltd. under Section 86 (1) (f) of the EA, 2003 and Regulation 32 of the MERC (DOA) Regulations, 2016 qua disputes with MSEDCL over its arbitrary and wrongful delay in granting the Petitioner Distribution Open Access.
141 of 2016
Completed
3739 Thu 10/11/2016 11:30:00 AM
Hearing
Petition of M/s. Khodashi Power Private Limited under Section 142 read with Section 23 of the Electricity Act, 2003 challenging the illegal tariff imposed under Power Purchase Agreement dated 18.03.2014 entered between Petitioner and MSEDCL.
49 of 2016
Completed
3740 Thu 10/11/2016 11:30:00 AM
Hearing
76 of 2016
Completed
3741 Thu 10/11/2016 11:30:00 AM
Hearing
Petition for M/s. Uttam Galva Steels Limited under Regulation 85 of Maharashtra Electricity Regulatory Commission (Conduct of Business) Regulations, 2004 and under Regulation 18 of Maharashtra Electricity Regulatory Commission RPO Regulations 2016 seeking review and suitably modify the Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 (hereinafter referred to as the "RPO Regulations"), for exempting captive users consuming power from fossil fuel based co-generation plants from applicability of RPO targets in the circumstances stated hereinafter.
73 of 2016
Completed
3742 Thu 10/11/2016 11:30:00 AM
Hearing
Petition of Captive Power Producers Association Review of the provisions of the MERC (RPO its Compliance and implementation of REC Framework), Regulation, 2016.
71 of 2016
Completed
3743 Thu 10/11/2016 11:30:00 AM
Hearing
Petition of M/s Century Rayon under Regulation 92 of MERC (Conduct of Business) Regulation, 2004 seeking reconsideration of the MERC (RPO), Regulation, 2016 to the extent fossile fuel co-generators are required to procure electricity generated from eligible Renewable energy sources.
69 of 2016
Completed
3744 Tue 08/11/2016 11:30:00 AM
Hearing
Petition for non compliance of Order in the matter of M/s. Radhika Rice Industries and six others passed by SE Electrical Govt. of Maharashtra Appellate Authority under Section 127 of Electricity Act, 2003 in Appeal Case No. 12 / 2012-13, 13 / 2012-13, 14 / 2013-14, 15 / 2012-13, 16 / 2012-13, 17 / 2012-13 & 1 / 2013-14 seeking directives for compliance & imposition of penalty and prosecution as per the provisions of Section 142, 146 & 149 of Electricity Act, 2003.
52 of 2016
Completed
3745 Tue 08/11/2016 11:30:00 AM
Hearing
Petition of M/s. Manjeet Cotton Private Limited against MSEDCL for non-Compliance of CGRF, Nanded order dated 06.11.2015 in Case No. 02/2015 under Section 142 &146 of Electricity Act 2003.
51 of 2016
Completed
3746 Tue 08/11/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL). for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
44 of 2016
Reschedule with further notice
3747 Tue 08/11/2016 11:30:00 AM
Hearing
Petition for Reliance Infrastructure Limited (Distribution) for determination of Standby Charges payable by Reliance Infrastructure Limited to Maharashtra State Electricity Distribution Company Limited.
72 of 2016
Completed
3748 Tue 08/11/2016 11:30:00 AM
Hearing
Intervention Application filed by Green Energy Association in Case No 70 of 2016 Petition filed by Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
MA No 19 of 2016 in Case No. 70 of 2016
Reschedule with further notice
3749 Tue 08/11/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) for seeking extension for time for meeting RPO shortfall on cumulative basis in respect of Non Compliance of RPO Targets by MSEDCL for FY 2014-15.
70 of 2016
Reschedule with further notice
3750 Tue 08/11/2016 11:30:00 AM
Hearing
Petition of Shinde Purushottam Madhwaraj u/s.42 of EA, 2003, Regulation 25, 27, proposing amendment to Regulation 4.1(a) of the MERC (CGRF and Electricity Ombudsman), Regulations, 2006, related to appointment of Chairperson of CGRF, for bringing it in line with other State Electricity Regulations and clarification on Eligibility for the post of Chairman CGRF.
67 of 2016
Completed
3751 Tue 08/11/2016 11:30:00 AM
Hearing
Joint Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) Adani Power Maharashtra Limited (APML) for advancement of supply of power by M/s. APML to MSEDCL against 440 MW PPA dated 16.02.2013.
66 of 2016
Completed
3752 Thu 03/11/2016 11:30:00 AM
Hearing
Petition of M/s. Gigaplex Estate Private Limited for obtaining the Hon'ble Commission's approval for the amendment of MERC (Specific Conditions of Distribution Licence applicable to M/s. Gigaplex Estate Private Limited for IT & ITES SEZ at Airoli Knowledge Park, TTC Industrial Area, Dist. Thane) Regulations, 2015 due to increase in area specified in SEZ S.O. 1695 (E) dated June 11, 2013, leading to change in licence area of GEPL.
64 of 2016
Completed
3753 Thu 03/11/2016 11:30:00 AM
Hearing
Petition of M/s Siddhant Dyeing Pvt. Limited for Non-Compliance of MERC Tariff Order directives both by MSEDCL and Torrent Power Ltd., under Section 142, 146 and 149 of EA, 2003.
63 of 2016
Completed
3754 Thu 03/11/2016 11:30:00 AM
Hearing
Petition of Amtek Auto Limited Revision of Technical Sanction with reference to our application for Reduction in Contract Demand.
59 of 2016
Completed
3755 Thu 03/11/2016 11:30:00 AM
Hearing
Petition of Shah Promoters & Developers seeking direction against MSEDCL for banked units of energy from the Petitioners plant within the purview of the EA, 2003 and Rules thereof read with MERC (RPO, its compliance and implementation of REC framework) Regulations, 2010 and the letter dated 07.09.2015 of MSEDCL.
56 of 2016
Completed
3756 Thu 03/11/2016 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited in the matter of Section 17 (3) of the Electricity Act, 2003; and In the matter of Regulation 8.3.10 of Maharashtra Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2006.
55 of 2016
Reschedule with further notice
3757 Thu 27/10/2016 11:30:00 AM
Hearing
Application for Impleadment on behalf of M/s Adani Power Maharashtra Limited for Impleadment in the Case No. 125 of 2016 Petition filed by RattanIndia Power Limited under Sections 33 read with 86 of the Electricity Act, 2003 and applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
MA No. 18 of 2016 in Case No. 125 of 2016
Completed
3758 Thu 27/10/2016 11:30:00 AM
Hearing
Miscellaneous Application filed by RattanIndia Power Limited under Section 86 Read with Sections 142 & 146 of the EA, 2003, seeking compliance of order dated 04.10.2016 passed by this Hon'ble Commission and necessary directions.
M.A. NO. 21 of 2016 in Case No. 125 of 2016
Completed
3759 Thu 27/10/2016 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited under Sections 33 read with 86 of the Electricity Act, 2003 and applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
125 of 2016
Completed
3760 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of M/s. Giriraj Enterprises under Section 86 (1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. Giriraj Enterprises and MSEDCL.
136 of 2016
Reschedule with further notice
3761 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of M/s. D. J. Malpani under Section 86 (1) (f) of the EA, 2003 pertaining to adjudication of disputes between M/s. D. J. Malpani and MSEDCL .
135 of 2016
Reschedule with further notice
3762 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of Bindu Vayu Urja Private Limited Under Section 86(1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Bindu Vayu Urja Private Limited And Maharashtra State Electricity Distribution Company Limited.
79 of 2016
Reschedule with further notice
3763 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of CLP Wind Farms (India) Pvt. Limited under section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between CLP Wind Farms (India) Private Limited and Maharashtra State Electricity Distribution Limited.
75 of 2016
Reschedule with further notice
3764 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of CLP Wind Farms (Khandke) Pvt. Limited under section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between CLP Wind Farms (Khandke) Private Limited and Maharashtra State Electricity Distribution Limited.
74 of 2016
Reschedule with further notice
3765 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of Ghatge Patil Industries Ltd. in the matter of Breach of Hon'ble Commissionâ??s Order dated 24.11.2003 and Breach of Clause 12.02 of PPA dated 31.12.2005, 13.12.2006, 18.02.20006 and 02.05.2006.
68 of 2016
Reschedule with further notice
3766 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited under section 86(1)(f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Sun N Sand Hotels Private Limited and Maharashtra State Electricity Distribution Limited on the issue of payment of Interest on delayed payment .
62 of 2016
Reschedule with further notice
3767 Thu 27/10/2016 11:30:00 AM
Hearing
Petition of Shah Promoters & Developers under section 86 (1) (f) of the Electricity Act, 2003 pertaining to adjudication of disputes between Shah Promoters& Developers and Maharashtra State Electricity Distribution Limited.
53 of 2016
Reschedule with further notice
3768 Tue 25/10/2016 11:30:00 AM
Hearing
Petition of M/s. Khodashi Power Private Limited under Section 142 read with Section 23 of the Electricity Act, 2003 challenging the illegal tariff imposed under Power Purchase Agreement dated 18.03.2014 entered between Petitioner and MSEDCL.
49 of 2016
Reschedule with further notice
3769 Tue 25/10/2016 11:30:00 AM
Hearing
Petition for non compliance of Order in the matter of M/s. Radhika Rice Industries and six others passed by SE Electrical Govt. of Maharashtra Appellate Authority under Section 127 of Electricity Act, 2003 in Appeal Case No. 12 / 2012-13, 13 / 2012-13, 14 / 2013-14, 15 / 2012-13, 16 / 2012-13, 17 / 2012-13 & 1 / 2013-14 seeking directives for compliance & imposition of penalty and prosecution as per the provisions of Section 142, 146 & 149 of Electricity Act, 2003.
52 of 2016
Reschedule with further notice
3770 Tue 25/10/2016 11:30:00 AM
Hearing
Petition of M/s. Manjeet Cotton Private Limited against MSEDCL for non-Compliance of CGRF, Nanded order dated 06.11.2015 in Case No. 02/2015 under Section 142 &146 of Electricity Act 2003.
51 of 2016
Reschedule with further notice
3771 Tue 25/10/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL). for removal of difficulties in implementation of MERC Order dated 04.08.2015 in Case No. 190 of 2014 in the matter of Verification of Compliance of RPO targets by MSEDCL for FY 2013-14.
44 of 2016
Reschedule with further notice
3772 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86(1)(b) and 86(1)(f) and other applicable provisions of the Electricity Act, 2003 Change in Law (in the nature of change in cess and taxes during FY 2015-16 and FY 2016-17) in terms of the Power Purchase Agreement dated February 23, 2010 between JSW Energy Limited & MSEDCL.
117 of 2016
Reschedule with further notice
3773 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited (APML) filed under Section 86 of EA, 2003 read with Article 13 "Change in Law" under the PPA dated 08.09.2008 for supply of 1320 MW of power executed between MSEDCL and APML for appropriate adjustment in tariff due to "Change in Law" for the 800 MW portion of contracted capacity linked to Lohara Coal Block which substantially affected cost and revenues of the project.
102 of 2016
Reschedule with further notice
3774 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of RattanIndia Power Limited (formerly Indiabulls Power Limited) under Section 86 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding and Article 10 of the Power Purchase Agreements dated 22.04.2010 and 05.06.2010 executed between RattanIndia Power Limited (formerly Indiabulls Power Limited) and Maharashtra State Electricity Distribution Company Limited for compensation due to Change in Law impacting revenues and costs during the period from the date of commencement of supply of power by RattanIndia Power Limited.
84 of 2016
Reschedule with further notice
3775 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of Shri Mahadev Chandonda Patil for Non-Compliance of CGRF, Kolhapur Order No. 20, 21, 22, 23/2015-16 dated 2.12.2015 under Section 142 & 149 of the Electricity Act, 2003.
42 of 2016
Completed
3776 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of M/s. Katare Spinning Mill Pvt. Ltd. for Non-Compliance of CGRF, Latur Order No.374/09/2013 dated 20.9.2013 under Section 142 of Electricity Act 2003.
41 of 2016
Completed
3777 Thu 20/10/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 of the Electricity Act, 2003 read with Article 13 ("Change in Law") of PPA dated 08.09.2008 and Article 10 ("Change in Law") under the Power Purchase Agreements (PPAs") dated 31.10.2010, 09.08.2010 and16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for appropriate adjustment in tariff due to "Change in Law" which substantially affected cost and revenues of the project.
38 of 2016
Reschedule with further notice
3778 Tue 18/10/2016 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Completed
3779 Tue 18/10/2016 11:30:00 AM
Hearing
Petition of JSW Energy Limited under Section 86 (1) (f) of the EA, 2003 against MSEDCL
90 of 2016
Reschedule with further notice
3780 Tue 18/10/2016 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited for directions to the Respondent in regard to the application for Open Access by the Petitioner for the period effective from 01.04.2016.
58 of 2016
Completed
3781 Tue 18/10/2016 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited under section 42(2), 86 (1) (c) and other applicable provisions of the EA,2003 and Regulation 39 of the Open Access Regulations, 2015 for directions and refund of excess transmission charges levied and collected by MSETCL.
54 of 2016
Completed
3782 Tue 18/10/2016 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86 (1) (b) and 86 (1) (f) of the EA 2003 in the matter of a dispute between a Generating Company and the Distribution Licensee as a result of the deliberate and willful failure of the distribution licensee to make payments, on account of the Change in Law, as per the terms of the Power Purchase Agreement dated 04.08.2010 (PPA).
35 of 2016
Reschedule with further notice
3783 Thu 13/10/2016 11:30:00 AM
Hearing
Petition filed by Maharashtra Airport Development Company for approval and directions under Section 86 of the EA,2003 read with â??Guidelines for short-term(i.e. for a period of more than one day to one year) Procurement of Power by Distribution Licensees date 30th March 2016 issued by the Ministry of Power, Government of India.
100 of 2016
Completed
3784 Thu 13/10/2016 11:30:00 AM
Hearing
Petition filed by Shri Subhash Ananda Tambe & 3 Others, in the matter of the Order passed by the Sub-Divisional Officer Pune, (under the powers delegated by District Collector), on 27th June 2016 under the provisions of Sec. 16 of Indian Telegraph Act 1885. in the terms of the Order of the Honorable High Court of Bombay in Writ Petition No. 7985 of 2016 Dated 14.09.2016 & Revision under Rule 3(3) of Maharashtra Electricity Works of Licensees Rules, 2012.
126 of 2016
Completed
3785 Thu 13/10/2016 11:30:00 AM
Hearing
Petition filed by Jsons Foundry Private Limited pertaining to denial of short term open access under section 42 of the electricity act, 2003.
122 of 2016
Completed
3786 Thu 13/10/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking abeyance of Power Purchase Agreement between Tata Power Company Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) approved in-principle by Hon'ble Commission. AND Application for Impleadment of PTC India Ltd as a party Respondent under Section 151 of the code of civil procedure read along-with Order I Rule 10(2) and 10(4) of the code of civil procedure read along-with Regulation 92 and 94 of the MERC (Conduct of Business) Regulations, 2004 as amended from time to time.
Case No 37 of 2016 AND M.A. No. 05 of 2016 in Case No. 37 of 2016
Completed
3787 Thu 13/10/2016 11:30:00 AM
Hearing
Petition of M/s Topworth Urja and Metals Limited Grant of Appropriate Directions / Orders and powers and functions of appropriate commission as contemplated under Sections 82, 86, 92, 94, 95 of the Electricity Act, 2003 Read with Sections 2 (1), 2 (8), 2 (28), 2 (32), 2 (47), 2 (64), 9, 128, 129, 142, 176, 181 of Electricity Act 2003
5 of 2016
Completed
3788 Thu 13/10/2016 11:30:00 AM
Hearing
Petition of M/s. Navjeevan Hybrid Seeds Corporation under Sections 142 & 146 of the Electricity Act, 2003 non-compliance of Order dated 25.08.2015 passed by CGRF Aurangabad in Case No. CGRF / AZ / AUR / JLN / 558 / 2015 / 21.
4 of 2016
Completed
3789 Thu 06/10/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Limited under inter-alia Section 86(1)(f), of the EA,2003, for adjudication of the disputes and claims arising under the PPA dated 25.09.2008 executed between Lanco Vidharbha Thermal Power Limited (LVPTL) and MSEDCL.
85 of 2016
Completed
3790 Thu 06/10/2016 11:30:00 AM
Hearing
Miscellaneous Application filed by Petitioner Wat-ere-source Technologies P Limited for Ad-interim Relief(s) against Respondent- No. 2 and requested for Expeditious hearing of the application before Case 23 of 2016.
M.A No 12 of 2016 in Case No. 23 of 2016
Reschedule with further notice
3791 Thu 06/10/2016 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of Petition in reference to Order No 73 of 2014 dated 27th October 2014 and Order No. 80 of 2015 dated 6th January, 2016 FOR in respect of Complaint filed under Section 142 and 146 of Electricity Act, 2003 for non-compliance of MERC Order (in Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule.
23 of 2016
Reschedule with further notice
3792 Thu 06/10/2016 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Completed
3793 Tue 04/10/2016 11:30:00 AM
Hearing
Application for Impleadment on behalf of M/s Adani Power Maharashtra Limited for Impleadment in the Case No. 125 of 2016 Petition filed by RattanIndia Power Limited under Sections 33 read with 86 of the Electricity Act, 2003 and applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
MA No. 18 of 2016 in Case No. 125 of 2016
Completed
3794 Tue 04/10/2016 11:30:00 AM
Hearing
Petition filed by RattanIndia Power Limited under Sections 33 read with 86 of the Electricity Act, 2003 and applicable provisions of the Maharashtra State Grid Code and the Maharashtra Scheduling and Dispatch Code.
125 of 2016
Completed
3795 Tue 04/10/2016 11:30:00 AM
Hearing
Petition for M/s. Reliance Infrastructure Limited under Section 86 (1) (f) of the Electricity Act, 2003 for claiming compensation from the generating company for breach of Letter of Intent dated 08th March 2010 issued by the Petitioner for supply of 37 MW for the Period 1st April 2010 to 30th June 2010.
15 of 2016
Completed
3796 Tue 04/10/2016 11:30:00 AM
Hearing
Petition of Indo Rama Synthetic Limited under Section 86 (1) (f) of the Electricity Act, 2003 for willful neglect / default in payment of the License fee by the Distribution Licensee to the Generating Company in accordance with the agreed terms under the proposal dated 08.03.2010 made by the Generating Company and the Letter of Intent (LOI) dated 08.03.2010 issued by the Distribution Licensee.
125 of 2015
Completed
3797 Tue 04/10/2016 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
3798 Thu 29/09/2016 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Reschedule with further notice
3799 Thu 29/09/2016 11:30:00 AM
Hearing
Petition of MSEDCL in the matter of Petition for seeking amendment in the PPA signed under Case I Stage 1 project in relation to ambiguity in definition of contracted capacity and installed capacity.
122 of 2015
Reschedule with further notice
3800 Thu 29/09/2016 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Completed
3801 Tue 27/09/2016 11:30:00 AM
Suo Motu Hearing
Suo-moto Review of compliance of Trading Licence Conditions for various Trading Licensees.
89 of 2015
Completed
3802 Tue 27/09/2016 11:30:00 AM
Hearing
Petition of M/s. M. R. Scion Agro under Sections u/s 142 of the Electricity Act, 2003 for non - compliance of Order dated 28.11.2013 passed by CGRF, Kolhapur in Consumer Complaint No.14/18/19/2013-14.
32 of 2015
Reschedule with further notice
3803 Tue 27/09/2016 11:30:00 AM
Hearing
Petition of M/s Flagship Developers Private Limited for taking on record the deemed distribution licensee status of the petitioner, M/s. Flagship Developers Private Limited for Blue Ridge IT Park at village Hinjewadi, Taluka Mulshi, Dist: Pune, Maharashtra on an area of 10.1766 hectares and for issuing the Specific Conditions of Distribution Licence applicable to the petitioner.
30 of 2015
Completed
3804 Tue 27/09/2016 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution), in the matter of Section 39 (2) (b & c), 86 (1) (c) of Electricity Act, 2003 and Regulation 36.3 of the MERC (State Grid Code) Regulations, 2006 framed under Section 181 of Electricity Act, 2003.
3 of 2015
Completed
3805 Thu 22/09/2016 11:30:00 AM
Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Limited for change in the Approved Load Shedding Protocol.
120 of 2016
Completed
3806 Thu 22/09/2016 11:30:00 AM
Hearing
Petition of Manish Purushottam Gupta & 4 others in the matter of The Hon'ble Collector, Akola who has not determined the amount of compensation for granting permission to erect tower and overhead lines in the field of the petitioners. Thus permission has been granted without determination of compensation himself. Said order dated 07.04.2016 is challenged in this Revision petition.
96 of 2016
Completed
3807 Thu 22/09/2016 11:30:00 AM
Hearing
95 of 2016
Completed
3808 Thu 22/09/2016 11:30:00 AM
Hearing
Petition of Western Precicast Private Limited pertaining to denial of Short Term Open Access under Section 42 of the Electricity Act, 2003.
83 of 2016
Completed
3809 Thu 22/09/2016 11:30:00 AM
Hearing
Petition of Shri Badrinath S/o Maroti Pathade under Section 142,146 & under Section 67 (5) of the Electricity Act, 2003 and Works of Licensees Rules 2006 challenging the Order passed by the District Collector Jalna and also seeking determination of compensation towards diminution of value of property and fruit trees.
77 of 2016
Reschedule
3810 Thu 22/09/2016 11:30:00 AM
Hearing
Petition of Kalyan Appa Wagh under Section 142, 146 & under Section 67 (5) of the Electricity Act, 2003 & Maharashtra Works of Licensees Rules 2012 seeking non compliance of the order passed by the MERC in Case No. 96 of 2012 and also seeking determination of compensation towards diminution of value of property.
65 of 2016
Reschedule
3811 Thu 22/09/2016 11:30:00 AM
Hearing
Petition of Shri Dilip Bhikaji Dete under Rule 13(2) Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 of the Electricity Act, 2003 for not giving expected compensation and for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
60 of 2016
Completed
3812 Tue 20/09/2016 11:30:00 AM
Hearing
Application filed by Smt Jyotibai N Deshmukh against MSEDCL for non-compliance of CGRF, Nagpur Order dated 3 March, 2015 in Complaint No. CGRF (NUZ) 017/2015.
145 of 2015
Completed
3813 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2015
Completed
3814 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2015
Completed
3815 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Arun Shamrao Pardeshi under Sections 142, 146, 67 (4) (5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3 (3) and 13 (2) of Maharashtra Works of Licensees Rules 2012.
45 of 2015
Completed
3816 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Shri Badrinath S/o Maroti Pathade under Section 142,146 & under Section 67 (5) of the Electricity Act, 2003 and Works of Licensees Rules 2006 challenging the Order passed by the District Collector Jalna and also seeking determination of compensation towards diminution of value of property and fruit trees.
77 of 2016
Completed
3817 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Kalyan Appa Wagh under Section 142, 146 & under Section 67 (5) of the Electricity Act, 2003 & Maharashtra Works of Licensees Rules 2012 seeking non compliance of the order passed by the MERC in Case No. 96 of 2012 and also seeking determination of compensation towards diminution of value of property.
65 of 2016
Completed
3818 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Shri Baburao Tukaram Patil & 05 Others under Sections 142, 146, 67(4) (5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13 (2) of Maharashtra Works of Licensees Rules 2012.
28 of 2016
Completed
3819 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Shri Suhas Narhar Wani & 05 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
27 of 2016
Completed
3820 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Shri Sanjay Ramsing Pardeshi & 14 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
26 of 2016
Completed
3821 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Smt Draupadabai Prabhakar Patil & 13 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
25 of 2016
Completed
3822 Tue 20/09/2016 11:30:00 AM
Hearing
Petition of Shri Ashok Julal Patil & 11 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
24 of 2016
Completed
3823 Fri 16/09/2016 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) to issue directions to Tata Power Company under Section 128 of the Electricity Act, 2003.
43 of 2016
Completed
3824 Fri 16/09/2016 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) for directions under Section 142 and 146 and other applicable provisions of the Electricity Act, 2003.
151 of 2015
Completed
3825 Fri 16/09/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of commissioning and capitalizing of ongoing work on Distribution Network Development for feeding consumers where considerable investment had been made till November, 2014.
50 of 2015
Completed
3826 Fri 16/09/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Completed
3827 Thu 08/09/2016 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86 (1) (b), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Completed
3828 Thu 08/09/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited (APML) filed under Section 86 of EA, 2003 read with Article 13 "Change in Law" under the PPA dated 08.09.2008 for supply of 1320 MW of power executed between MSEDCL and APML for appropriate adjustment in tariff due to â??Change in Lawâ?? for the 800 MW portion of contracted capacity linked to Lohara Coal Block which substantially affected cost and revenues of the project.
102 of 2016
Completed
3829 Thu 08/09/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of commissioning and capitalizing of ongoing work on Distribution Network Development for feeding consumers where considerable investment had been made till November, 2014.
50 of 2015
Reschedule with further notice
3830 Thu 08/09/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Reschedule with further notice
3831 Thu 01/09/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2015
Reschedule
3832 Thu 01/09/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2015
Reschedule
3833 Thu 01/09/2016 11:30:00 AM
Hearing
Petition of Arun Shamrao Pardeshi under Sections 142, 146, 67 (4) (5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3 (3) and 13 (2) of Maharashtra Works of Licensees Rules 2012.
45 of 2015
Reschedule
3834 Thu 18/08/2016 11:30:00 AM
Hearing
Miscellaneous Application filed by Petitioner Laxmi Organic Industries Limited for stay of operation, implementation and execution of the Order in Case No. 59 of 2015 In Review Petition filed by the Petitioner Case No. 97 of 2016 under Regulation 85(a) of the MERC (Conduct of Business) Regulations 2004, Read with Order 47 Rule 1 of the CPC for review of the Judgment dated 03.06.2016 passed in Case No. 59 /2015 by the Hon'ble MERC.
M. A. No. 9 of 2016 in Case No. 97 of 2016
Completed
3835 Thu 18/08/2016 11:30:00 AM
Hearing
Interlocutory Application seeking urgent Directions from Honorable Commission in Relation to the Invocation of Letter of Credit by the Respondent No. 1 MSETCL.
M.A. No 10 of 2016 in Case No. 107 of 2016
Completed
3836 Thu 28/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3837 Mon 25/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3838 Fri 22/07/2016 12:30:00 PM
Hearing
Petition of JSW Energy Limited under Section 86 (1) (f) of the EA, 2003 against MSEDCL.
90 of 2016
Completed
3839 Wed 20/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3840 Mon 18/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3841 Wed 13/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3842 Mon 11/07/2016 10:00:00 AM
Public Hearing
Inviting Suggestions and Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for Final True up of FY 2014-15, Provisional True up for FY 2015-16 and Multi Year Tariff for FY 2016-17 to FY 2019-20. And Inviting Suggestions/Objections on Maharashtra State Electricity Distribution Co. Ltd's Petition for determination of Cross Subsidy Surcharge for the Period of 1 September, 2013 to 28 February, 2014.
48 of 2016 and 17 of 2015
Completed
3843 Thu 30/06/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the EA, 2003 for netting - off start - up power supplied by MSEDCL to APML against the power supplied by APML to MSEDCL and related issues.
57 of 2016
Reschedule
3844 Tue 21/06/2016 11:00:00 AM
Public Hearing
Inviting Comments on Network Rollout Plan of Tata Power Co. Ltd. and Committee Report
182 of 2014
Completed
3845 Thu 16/06/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the EA, 2003 for netting - off start - up power supplied by MSEDCL to APML against the power supplied by APML to MSEDCL and related issues.
57 of 2016
Completed
3846 Fri 10/06/2016 11:00:00 AM
Public Hearing
Inviting Suggestions & Objections on Kolhapur Green Energy Pvt. Ltd's Petition for determination of Tariff for sale of electricity generated from its 1.8 MW capacity Municipal Solid Waste based power project to be commissioned at Kolhapur to the Distribution Licensees in Maharashtra.
87 of 2015
Completed
3847 Tue 31/05/2016 11:30:00 AM
Hearing
Petition of MSEDCL under Sections 42 (2) & 86 (1) of the Electricity Act, 2003 & Regulation 13 of MERC (Distribution Open Access) Regulations, 2005 for seeking re-determination of Cross Subsidy Surcharge. AND Intervention Application filed by Sterlite Technologies Limited in Case No. 17 of 2015 of MSEDCL for redetermination of CSS for the period from September 2013 to February 2014 (6 months) under section 42 (2) & 86 (1) of E. A. 2003 and Regulations specified thereunder: AND Intervention Application filed by U.P.Twiga Fibreglass Limited in Case No. 17 of 2015 of MSEDCL for redetermination of CSS for the period from September 2013 to February 2014 (6 months) under section 42 (2) & 86 (1) of E. A. 2003 and Regulations specified thereunder: AND Intervention Application filed by Sudarshan Chemical Industries Limited, Roha Plant in Case No. 17 of 2015 of MSEDCL for redetermination of CSS for the period from September 2013 to February 2014 (6 months) under section 42 (2) & 86 (1) of E. A. 2003 and Regulations specified thereunder: AND Intervention Application filed by Sudarshan Chemical Industries Limited, Mahad Plant in Case No. 17 of 2015 of MSEDCL for redetermination of CSS for the period from September 2013 to February 2014 (6 months) under section 42 (2) & 86 (1) of E. A. 2003 and Regulations specified thereunder
Case No. 17 of 2015 AND M.A. No. 04 of 2016 in Case No.17 of 2015, AND M.A. No. 06 of 2016 in Case No.17 of 2015, AND M.A. No. 07 of 2016 in Case No.17 of 2015, AND M.A. No. 08 of 2016 in Case No.17 of 2015 17 of 2015
Completed
3848 Tue 31/05/2016 11:00:00 AM
Public Hearing
Suggestions/Objections on Amravati Power Transmission Company Limited's Petition for Truing-up for FY 2013-14 & FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast FY 2016-17 to FY 2019-20.
61 of 2016
Completed
3849 Wed 25/05/2016 11:00:00 AM
Public Hearing
Suggestions & Objections on the Brihanmumbai Electric Supply & Transport Undertaking (BEST)'s Petition for Truing- up of ARR for FY 2012-13 to FY 2014-15, Provisional Truing- up of FY 2015-16 and approval of ARR and determination of Tariff for third MYT Control Period from FY 2016-17 to FY 2019-20.
33 of 2016
Completed
3850 Tue 24/05/2016 11:00:00 AM
Public Hearing
Suggestions & Objections on The Tata Power Company Limited (Distribution Business)'s Petition for Truing-up of ARR for FY 2014-15, Provisional Truing-up of ARR for FY 2015-16 and approval of ARR and determination of Tariff for third MYT Control Period from FY 2016-17 to FY 2019-20.
47 of 2016
Completed
3851 Tue 17/05/2016 11:00:00 AM
Public Hearing
Suggestions/Objections on Maharashtra State Electricity Transmission Company Limited's Petition for Truing-up for FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast for FY 2016-17 to FY 2019-20 along with impact of Past Period Disallowed Capitalisation for FY 2010-11 to FY 2013-14.
31 of 2016
Completed
3852 Fri 06/05/2016 11:30:00 AM
Public Hearing
Suggestions/Objections on Maharashtra Eastern Grid Power Transmission Company Limited's Petition for determination of Capital Cost, Truing-up for FY 2013-14 & FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast FY 2016-17 to FY 2019-20.
50 of 2016
Completed
3853 Fri 06/05/2016 11:00:00 AM
Public Hearing
Inviting Comments on Application of M/s Maharashtra Eastern Grid Power Transmission Company Limited for amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
112 of 2015
Completed
3854 Thu 28/04/2016 10:30:00 AM
Public Hearing
Suggestions and objections on Petition filed by Reliance Infrastructure Limited (Distribution Business)for truing-up of ARR for FY 2014-15,Provisional true up of ARR for FY 2015-16 and approval of ARR and determination of tariff for third MYT Control Period from FY 2016-17 to FY 2019-20 as per MERC (Multy Year Tariff) Regulations, 2015.
34 of 2016
Completed
3855 Tue 26/04/2016 12:30:00 PM
Public Hearing
Inviting Suggestions/Objections on The Tata Power Company Limited (Generation)'s Petition Truing-up for FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast for FY 2016-17 to FY 2019-20.
32 of 2016
Completed
3856 Tue 26/04/2016 11:00:00 AM
Public Hearing
Inviting Suggestions/Objections on Maharashtra State Power Generation Company Limited Petition for approval of final true-up for FY 2014-15, provisional true-up for FY 2015-16 and Multi Year Tariff for Third Control Period from FY 2016-17 to FY 2019-20.
46 of 2016
Completed
3857 Mon 25/04/2016 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the EA, 2003 for netting - off start - up power supplied by MSEDCL to APML against the power supplied by APML to MSEDCL and related issues.
57 of 2016
Completed
3858 Mon 25/04/2016 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 13 March, 2015 in Appeal No. 221 of 2014 filed by Mula Pravara Challenging the Commission's Order in MERC Case No.24 of 2012 Order Dated 18 June, 2014 (Determination of compensation/ charges payable pursuant to Hon'ble APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.)
24 of 2012
Completed
3859 Wed 20/04/2016 11:30:00 AM
Public Hearing
Inviting Suggestions / Objections on Tata Power Company Limited (Transmission)'s Petition for Truing-up for FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast for FY 2016-17 to FY 2019-20.
22 of 2016
Completed
3860 Wed 20/04/2016 11:00:00 AM
Public Hearing
Suggestions/objections on Adani Transmission (India) Limited's Petition for truing-up for FY 2012-13,FY 2013-14 & FY 2014-15, Provisional truing-up for FY 2015-16 and ARR forecast FY 2016-17 to FY 2019-20.
7 of 2016
Completed
3861 Mon 18/04/2016 11:30:00 AM
Public Hearing
Suggestions/objections on Mindspace Business Parks Private Limited (MBPPL) petition for approval of provisional truing up of FY 2015-16 and for approval of Aggregate Revenue Requirement and Tariff for the Multi-Year Tariff period from FY 2016-17 to FY 2019-20.
10 of 2016
Completed
3862 Wed 13/04/2016 12:30:00 PM
Public Hearing
Suggestions/objections on Jaigad Power Transco Limited's Petition for Truing up for FY 2014-15, Provisional Truing-up for FY 2015-16, and ARR forecast for FY 2016-17 to FY 2019-20.
12 of 2016
Completed
3863 Wed 13/04/2016 11:30:00 AM
Public Hearing
Suggestions/objections on Petition of Reliance Infrastructure Limited-Transmission for Truing up of ARR for FY 2014-15, provisional Truing up of FY 2015-16 and approval of ARR for the MYT Third Control Period from FY 2016-17 to FY 2019-20.
13 of 2016
Completed
3864 Wed 13/04/2016 11:00:00 AM
Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited's petition for Truing-up for FY 2014-15, Provisional Truing-up for FY 2015-16 and ARR forecast to FY 2016-17 to FY 2019-20 for its Transmission Business.
21 of 2016
Completed
3865 Tue 12/04/2016 12:30:00 PM
Public Hearing
Suggestions/objections on Maharashtra State Load Despatch Centre's Petition for Truing up of Budget Cost of Operations for FY 2014-15, Provisional truing-up for FY 2015-16, and ARR forecast and determination of Fees and Charges for FY 2016-17 to FY 2019-20.
20 of 2016
Completed
3866 Tue 12/04/2016 11:30:00 AM
Public Hearing
Suggestions / objections on the Petition filed by Reliance Infrastructure Ltd.-Generation Business (RInfra-G) for True up of ARR for FY 2014-15, Provisional True up of ARR for FY 2015-16 and determination of ARR and MYT for the Third Control Period from FY 2016-17 to FY 2019-20.
14 of 2016
Completed
3867 Tue 12/04/2016 11:00:00 AM
Public Hearing
Suggestions/objections on Petition filed by Vidarbha Industries Power Limited for truing up of ARR for FY 2014-15, Provisional True up of ARR for FY 2015-16 and approval of ARR and determination of Tariff for MYT Third Control Period from FY 2016-17 to FY 2019-20.
91 of 2015
Completed
3868 Thu 31/03/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking abeyance of Power Purchase Agreement between Tata Power Company Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) approved in-principle by Hon'ble Commission.
37 of 2016
Reschedule
3869 Thu 31/03/2016 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for approval of PPA and adoption of tariff determined through transparent process of bidding under Section 63 of the EA 2003 and Guidelines for Short-term (i.e. for a period less than or equal to one year) Procurement of Power by Distribution Licensees through Tariff Based Bidding Process, for procurement of 4 MW power for a period of one year from April 1, 2016 to March 31, 2017.
36 of 2016
Completed
3870 Thu 31/03/2016 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Private Limited under Section 86 (1) (b) and 86 (1) (f) of the EA 2003 in the matter of a dispute between a Generating Company and the Distribution Licensee as a result of the deliberate and willful failure of the distribution licensee to make payments, on account of the Change in Law, as per the terms of the Power Purchase Agreement dated 04.08.2010 (PPA).
35 of 2016
Completed
3871 Thu 31/03/2016 11:30:00 AM
Hearing
Petition of Maha Co-Gen Green Power Producers Association under Regulation Nos. 79, 81 and 82 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015 Read with Regulation No.95 of the MERC (Conduct of Business) Regulations, 2004.
29 of 2016
Completed
3872 Tue 29/03/2016 11:30:00 AM
Hearing
Petition for non-compliance of CGRF Orders in the matter of M/s Balaji Sahakari Soot Girni Limited Complaint No. 24 of 2015 Order passed by CGRF MSEDCL Amravati Zone now known as Akola Zone) & with prayer seeking directives for compliance & imposition of penalty as per the provisions of MERC CGRF Regulations 2006 read with Sections 142, 146 & 149 of the of the Electricity Act, 2003.
11 of 2016
5
3873 Tue 29/03/2016 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd for approval of extension of limit of connected load from 107 HP (80 KW) to 201 HP (150 KW) in the areas other than municipal corporation wherever infrastructure is available & there is demand from consumer for sanctioning of higher load.
9 of 2016
Completed
3874 Tue 29/03/2016 11:30:00 AM
Hearing
Petition of M/s Topworth Urja and Metals Limited Grant of Appropriate Directions / Orders and powers and functions of appropriate commission as contemplated under Sections 82, 86, 92, 94, 95 of the Electricity Act, 2003 Read with Sections 2 (1), 2 (8), 2 (28), 2 (32), 2 (47), 2 (64), 9, 128, 129, 142, 176, 181 of Electricity Act 2003.
5 of 2016
Reschedule with further notice
3875 Tue 29/03/2016 11:30:00 AM
Hearing
Petition of M/s. Navjeevan Hybrid Seeds Corporation under Sections 142 & 146 of the Electricity Act, 2003 non-compliance of Order dated 25.08.2015 passed by CGRF Aurangabad in Case No. CGRF / AZ / AUR / JLN / 558 / 2015 / 21.
4 of 2016
Completed
3876 Tue 29/03/2016 11:30:00 AM
Hearing
Petition of Shri Audumbar Dharmaraj Patil under Sections 142 & 149 of the Electricity Act, 2003 for non-compliance of Section 56 (1) of the Electricity Act, 2003 and Regulation 14.4.3 of MERC(Electricity Supply Code and Other Conditions of Supply) Regulations, 2005.
3 of 2016
Completed
3877 Mon 28/03/2016 11:30:00 AM
Public Hearing
Inviting Comments on Draft Generic Tariff Order for Renewable Energy Technologies for FY 2016-17.
45 of 2016
Completed
3878 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for seeking abeyance of Power Purchase Agreement between Tata Power Company Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) approved in-principle by Hon'ble Commission.
37 of 2016
Completed
3879 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Shri Mahadu Dhondiba Fartare under Sections 68 & 164 of the Electricity Act, 2003 & Sections 10 & 16(1) of the Indian Telegraph Act, 1885 for revision of the order dated 01.12.2015 passed by District Collector, Ahmednagar and for seeking appropriate compensation.
40 of 2016
Completed
3880 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Shri Baburao Tukaram Patil & 05 Others under Sections 142, 146, 67(4) (5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13 (2) of Maharashtra Works of Licensees Rules 2012.
28 of 2016
Completed
3881 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Shri Suhas Narhar Wani & 05 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
27 of 2016
Completed
3882 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Shri Sanjay Ramsing Pardeshi & 14 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
26 of 2016
Completed
3883 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Smt Draupadabai Prabhakar Patil & 13 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
25 of 2016
Completed
3884 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Shri Ashok Julal Patil & 11 Others under Sections 142, 146, 67(4)(5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
24 of 2016
Completed
3885 Tue 22/03/2016 11:30:00 AM
Hearing
Petition of Gulabhusen Nurmahamad Mujawar and 3 others under Section 3 (3) of Works of Licensees Rules, 2006 for revision of Order passed by sub-divisional Officer,Miraj in Case No. MAG/Kavi/1120/2014.
6 of 2016
Completed
3886 Thu 17/03/2016 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of Petition in reference to Order No 73 of 2014 dated 27th October 2014 and Order No. 80 of 2015 dated 6th January, 2016 FOR in respect of Complaint filed under Section 142 and 146 of Electricity Act, 2003 for non-compliance of MERC Order (in Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement of Karwand Small Hydro Power Plant in Dist. Dhule.
23 of 2016
Completed
3887 Thu 17/03/2016 11:30:00 AM
Hearing
Petition of Wind World (India) Limited in the matter of implementation of MERC (Dist.OA) Regulations,2014 Read with provisions of the CERC (Terms & Conditions for recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and the MERC (RPO) its compliance and implementation of REC Regulations, 2010.
142 of 2015
5
3888 Thu 17/03/2016 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Completed
3889 Thu 17/03/2016 11:30:00 AM
Hearing
Petition of Tembhu Power private limited under Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Terms and Conditions of Determination of RE Tariff), Regulations and allowing Compensatory Tariff to Tembhu Power Pvt. Ltd. for their small Hydropower Project at Krishna River near Kolegaon Village Karad.
79 of 2015
Completed
3890 Tue 15/03/2016 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Limited for the financial year 2014-15. AND Miscellaneous Application of The Tata Power Company Limited for impleadment / Intervention on behalf of The Tata Power Company Limited as a Party to the present petition filed by M/s. Sai Wardha Power Limited as the Applicant.
Case No. 77 of 2015 AND M.A. No 02 of 2016 in Case No. 77 of 2015
Reschedule with further notice
3891 Tue 15/03/2016 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Completed
3892 Tue 15/03/2016 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
3893 Tue 15/03/2016 11:30:00 AM
Hearing
Petition for M/s. Gujarat Ambuja Exports Limited for punishment under Section 146 of Electricity Act 2003, for non - compliance of Order dated 16.09.2015 passed by CGRF, Amravati Zone, Akola in complaint No. 67 of 2009.
2 of 2016
Completed
3894 Thu 10/03/2016 11:30:00 AM
Hearing
Petition for M/s Ozone Research & Applications (I) Private Limited for non-compliance of order passed under Section 127 of EA 2003, violation of supply code 2005 & provisions of Electricity Act 2003, Violation of MERC's orders and imposition of penalty thereof upon respondent under Section 142, 146, 149 and 150 of EA 2003.
1 of 2016
Completed
3895 Thu 10/03/2016 11:30:00 AM
Hearing
Petition for M/s. Shri Tradco India Private Limited of breach of Hon'ble Commission's Distribution Open Access Regulations 2014.
153 of 2015
5
3896 Thu 10/03/2016 11:30:00 AM
Hearing
Petition of M/s. Mindspace Business Parks Private Limited (formerly known as Serene Properties Private Limited) for obtaining the Hon'ble Commission's approval for the amendment of MERC (Specific Conditions of Distribution Licence applicable to Serene Properties Pvt. Ltd. for the SEZ at Airoli, Thane ) Regulations, 2013 due to change in name of the Distribution Licensee, viz., Serene Properties Pvt. Limited to Mindspace Business Parks Private Limited.
152 of 2015
Completed
3897 Tue 08/03/2016 11:30:00 AM
Hearing
Petition of Green Energy Association under Section 86 (1) (e) read with Sections 42, 129, 142 and 149 of the Electricity Act, 2003; Regulation 4 of the MERC (Distribution Open Access Regulation), 2005 and Regulation 92 and 94 of the MERC (Conduct of Business) Regulation, 2004 and order dated January 3, 2013 Pronounced by the Hon'ble MERC in Case No. 8, 18 and 20 of 2013 for appropriate directions to the MSEDCL to Comply with applicable laws and orders pronounced by Hon'ble Commission.
139 of 2015
Completed
3898 Tue 08/03/2016 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) for directions under Section 142 and 146 and other applicable provisions of the Electricity Act, 2003.
151 of 2015
Completed
3899 Tue 08/03/2016 11:30:00 AM
Hearing
Petition of M/s. Hindustan Zinc Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute on the issue of payment of interest on delayed payment by the Respondent.
150 of 2015
Completed
3900 Tue 08/03/2016 11:30:00 AM
Hearing
Petition of Shri Vinod Sadashiv Bhagwat under Regulation 92 of MERC (conduct of business) Regulations, 2004 for seeking interest on the extra Service Line Charges recovered by MSEDCL along with expenses incurred by the Applicant till date.
149 of 2015
Completed
3901 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Trimurti Spinning Mills Private Limited under Section 142 of EA 2003 for non-compliance of the Ombudsman, Mumbai Order dated 11.09.2015 in Case No 62 of 2015.
147 of 2015
Completed
3902 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Mahalaxmi Co-Op Yarn Processor. (through Shri Haribhau Digambar Khapare) under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 02.03.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.139 of 2014. (Common Order in Case No. 139 & 140 of 2014)
100 of 2015
Completed
3903 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Prerana Magasvargiya Co-Op. Industries Ltd. (through Shri Haribhau Digambar Khapare) under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 27.02.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.136 of 2014. (Common Order in Case No. 135 to 138 of 2014.)
99 of 2015
Completed
3904 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Pratibimb Magasvargiya Co-Op. Industries Ltd. (through Shri Haribhau Digambar Khapare) under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 27.02.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.135 of 2014. (Common Order in Case No. 135 to 138 of 2014.)
98 of 2015
Completed
3905 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Satyasai Co-Op. Industries Ltd. (through Shri Haribhau Digambar Khapare) under Sections u/s 142 of the Electricity Act, 2003 for non-compliance of Order dated 27.02.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.137 of 2014. (Common Order in Case No. 135 to 138 of 2014.)
97 of 2015
Completed
3906 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Shetkari Vinakari Sahakari Soot Girani Ltd.(through Shri Haribhau Digambar Khapare) under Sections u/s 142 of the Electricity Act, 2003 for non-compliance of Order dated 27.02.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.138 of 2014. (Common Order in Case No. 135 to 138 of 2014.)
96 of 2015
Completed
3907 Thu 03/03/2016 11:30:00 AM
Hearing
Petition of M/s. Bhimshakti Magasvargiya Audyogik Sanstha Maryadit (through Shri Haribhau Digambar Khapare) under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 02.03.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.140 of 2014. (Common Order in Case No. 139 & 140 of 2014.)
95 of 2015
Completed
3908 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s. Kolhapur Oxygen & Acetylene Pvt. Ltd. under Sections 142 & 146 of the Electricity Act, 2003 for non-compliance of the Order dated 03.03.2015 passed by Electricity Ombudsman, Mumbai in Representation No. 01 of 2015 regarding Refund of Tariff Difference.
113 of 2015
Completed
3909 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s Director, Gangotri Textiles (through Shri Haribhau Digambar Khapare) under Sections u/s 142 of the Electricity Act, 2003 for non-compliance of Order dated 02.03.2015 passed by Electricity Ombudsman, Mumbai, in Consumer Complaint No.141 of 2014.
85 of 2015
Completed
3910 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of Cosmo Films Limited (SEZ Unit), Complaint against Licensee (MSEDCL) for non compliance of Electricity Ombudsman, Nagpur, order dated 13.02.2015, Case No. 115 of 2014 for change of tariff category. Action under Section 142 & 146 of the Electricity Act, 2003 proposed against MSEDCL for non implementation of Ombudsman's order.
83 of 2015
Completed
3911 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s. Shilp Enterprises under Section 142 & 146 for for non-compliance of the directions by MSEDCL. Non-compliance of the Order of CGRF Kolhapur dated 29.11.2014 in Case No. 44 of 2014-15 regarding refund of Tariff Difference.
75 of 2015
Completed
3912 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s. Caspro Metal Industries Pvt. Limited under Section 142 & 146 for non-compliance of the directions by MSEDCL. Non-compliance of the Order of CGRF Kolhapur dated 26.11.2014 in Case No. 43 of 2014-15 regarding refund of Tariff Difference.
74 of 2015
Completed
3913 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s. Aditek and 3 others under Section 142 & 146 for non-compliance of the directions by MSEDCL. Non-compliance of the Order of the CGRF Kolhapur dated 31.12.2014 in Case Nos. 65 to 68 of 2014-15 regarding refund of Tariff Difference.
73 of 2015
Completed
3914 Tue 01/03/2016 11:30:00 AM
Hearing
Petition of M/s. Shri Ganesh Foundry Pvt. Limited and 34 others under Section 142 & 146 for non-compliance of the directions by MSEDCL. Non-compliance of the Order of Honorable Electricity Ombudsman, Mumbai dated 02.12.2014 in Representation Nos. 66 to 100 of 2014 regarding refund of Tariff Difference.
72 of 2015
Completed
3915 Mon 29/02/2016 12:30:00 PM
Hearing
Petition of Green Energy Association in the matter of Non-Compliance of Solar RPO for the FY 2014-15 by the MSEDCL specified in Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its Compliance and Implementation of REC Framework) Regulations, 2010 in the matter of an application under Section 142 of the EA 2003 and Section 146 of the EA 2003, and Regulation 12.1 of the MERC (Renewable Purchase Obligation, Its Compliance and Implementation of REC Framework) Regulations, 2010.
93 of 2015
Completed
3916 Mon 29/02/2016 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (RInfra- D), under Regulation 7, 18 and 20 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework ) Regulations 2010, in respect of waiver of Mini / Micro hydro Renewable Purchase Obligation target for the Control Period FY 2010-11 to FY 2015-2016.
30 of 2016
Completed
3917 Mon 29/02/2016 11:30:00 AM
Public Hearing
Inviting comments in proceedings for verification of Renewable Purchase Obligation compliance targets for FY 2014-15 by distribution Licensees in Maharashtra.
Case No. 16, 17, 18 & 19 of 2016
Completed
3918 Thu 25/02/2016 11:30:00 AM
Hearing
Petition of Green Energy Association under Section 86 (1) (e) read with Sections 42, 129, 142 and 149 of the Electricity Act, 2003; Regulation 4 of the MERC (Distribution Open Access Regulation), 2005 and Regulation 92 and 94 of the MERC (Conduct of Business) Regulation, 2004 and order dated January 3, 2013 Pronounced by the Honâ??ble MERC in Case No. 8, 18 and 20 of 2013 for appropriate directions to the MSEDCL to Comply with applicable laws and orders pronounced by Honâ??ble Commission.
139 of 2015
Completed
3919 Thu 25/02/2016 11:30:00 AM
Hearing
Petition for M/s. Reliance Infrastructure Limited under Section 86 (1) (f) of the Electricity Act, 2003 for claiming compensation from the generating company for breach of Letter of Intent dated 08th March 2010 issued by the Petitioner for supply of 37 MW for the Period 1st April 2010 to 30th June 2010.
15 of 2016
Completed
3920 Thu 25/02/2016 11:30:00 AM
Hearing
Petition of Indo Rama Synthetic Limited under Section 86 (1) (f) of the Electricity Act, 2003 for willful neglect / default in payment of the License fee by the Distribution Licensee to the Generating Company in accordance with the agreed terms under the proposal dated 08.03.2010 made by the Generating Company and the Letter of Intent (LOI) dated 08.03.2010 issued by the Distribution Licensee.
125 of 2015
Completed
3921 Thu 25/02/2016 11:30:00 AM
Hearing
Petition of Tata Power Company Limited in the matter of Recovery of Annual Fixed Charges of Bhira Generating Station towards release of 30 MCM Water for drought affected areas.
144 of 2015
Completed
3922 Tue 23/02/2016 11:30:00 AM
Hearing
Review Petition of Navi Mumbai Cold Storage Owners Welfare Association in the matter of application of tariff to Pre-cooling plant and Cold Storage units vis-a-vis Honorable MERCâ??s approved tariff schedule w.e.f. 01.06.2015 in the tariff order in the Case no. 121 of 2014 dated 26.06.2014.
119 of 2015
Completed
3923 Tue 23/02/2016 11:30:00 AM
Hearing
Review Petition of Tuljabhawani Cold Storage (D-37, MIDC - Baramati) in the matter of application of tariff to Pre-cooling and Cold Storage units vis-a-vis MERCâ??s approved tariff schedule w.e.f. 01.08.2009 in the tariff order in Case No. 116 of 2008 / Case No. 19 of 2012 & Case No. 121 of 2014 date 26.06.2015.
118 of 2015
Completed
3924 Tue 23/02/2016 11:30:00 AM
Hearing
Petition of Tuljabhawani Cold Storage Pvt. Ltd. (D-19, MIDC - Baramati) in the matter of application of tariff to Pre-cooling and Cold Storage units vis-a-vis MERCâ??s approved tariff schedule w.e.f. 01.08.2009 in the tariff order in Case No. 116 of 2008 / Case No. 19 of 2012 & Case No. 121 of 2014 date 26.06.2015.
117 of 2015
Completed
3925 Tue 23/02/2016 11:30:00 AM
Hearing
Petition of Maha Cold Storage Association review Petition in Case No. 121 of 2014 Order dated 26.06.2015 and in the matter of application of tariff to Pre-cooling and Cold Storage units vis-a-vis Honorable MERCâ??s approved tariff schedule w.e.f. 01.06.2015.
114 of 2015
Completed
3926 Tue 23/02/2016 11:30:00 AM
Hearing
Petition of M/s Alps Ice and cold Storage Pvt. Limited for Review of the Order dated 26 June 2015 passed by the Honorable Commission in Case No. 121 of 2014 and in the matter of applicability of Tariff to Pre Cooling and Cold Storage (Ice & Cold Storage) for manufacturing of Ice, chilling, processing, freezing and storage of frozen fish and fish products.
111 of 2015
Completed
3927 Tue 23/02/2016 11:30:00 AM
Hearing
Petition of The Seafood Exporters Association under Section 94 of the Electricity Act, 2003 & Regulation 85 of MERC (Conduct of Business) Regulations, 2004 for Review of the Order dated 26 June 2015 passed in Case No. 121 of 2014 and in the matter of the ambit and scope of the MYT framework under the Electricity Act, 2003.
109 of 2015
Completed
3928 Thu 18/02/2016 11:30:00 AM
Hearing
Review Petition of PTC India Limited (formerly known as Power Trading Corporation of India Limited) under Section 94 of the Electricity Act 2003 read alongwith Regulation 85 of MERC (Conduct of Business) Regulations, 2004 for seeking review of Order dated 06.11.2015 passed in Case No. 65 of 2015.
8 of 2016
Completed
3929 Thu 18/02/2016 11:30:00 AM
Hearing
Petition of Rattan India Power Limited under Sections 142 / 146 of the Electricity Act, 2003 for directions to the Respondent to comply with the order dated 15.07.2014 passed in Case No. 154 of 2013, and order dated 20.08.2014 passed in Case No. 147 of 2014 and consequential reliefs.
148 of 2015
Completed
3930 Thu 18/02/2016 11:30:00 AM
Hearing
Petition for Rattan India Power Limited under Section 61, 62 read with 86 (1) (a), (b) and (f) of the Electricity Act, 2003 and in the matter of Disputes between the Petitioner and the Respondent MSEDCL pertaining to Settlement /Netting of Start-up Power consumed by the Petitioner with the power supplied as per the PPAs dated 22.04.2010 & 05.06.2010.
141 of 2015
Completed
3931 Thu 18/02/2016 11:30:00 AM
Hearing
Petition of Rattan India Power Limited, under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4, 8 and 11 of the Power Purchase Agreement (PPA) dated 22.04.2010 and 05.06.2010 for adjudication of claims of the Petitioner and seeking directions to the Respondent â?? MSEDCL to open Letter of Credit in terms of the PPA and to make payment of Rs. 558 crores outstanding and due to the Petitioner as on 17.10.2015 towards sale and supply of electricity as per the said PPA's.
138 of 2015
Completed
3932 Tue 16/02/2016 11:30:00 AM
Hearing
Petition of REI Power Bazar Private Limited in the matter of Petition under Section 86 (1) (k) r/w Section 66 of the Electricity Act, 2003 for seeking permission for setting up and operation of intra-state power market in the State of Maharashtra under the sole jurisdiction of the Hon'ble MERC.
131 of 2015
Completed
3933 Tue 16/02/2016 11:30:00 AM
Hearing
Petition of M/s. Lanco Vidarbha Thermal Power Limited, under Sections 86 (1) (f), 86 (1) (k) and other applicable provisions of the Electricity Act, 2003 in connection with the disputes and differences arising under the Power Purchase Agreement dated 25.09.2008 entered between Lanco Vidarbha Thermal Power Ltd. (LVTPL), formerly named Lanco Mahanadi Power Ltd. and MSEDCL.
136 of 2015
Reschedule with further notice
3934 Thu 11/02/2016 11:30:00 AM
Hearing
Petition of Indo Rama Synthetic Limited under Section 86 (1) (f) of the Electricity Act, 2003 for willful neglect / default in payment of the License fee by the Distribution Licensee to the Generating Company in accordance with the agreed terms under the proposal dated 08.03.2010 made by the Generating Company and the Letter of Intent (LOI) dated 08.03.2010 issued by the Distribution Licensee.
125 of 2015
Reschedule
3935 Thu 11/02/2016 11:30:00 AM
Hearing
Petition of MSEDCL in the matter of Petition for seeking amendment in the PPA signed under Case I Stage 1 project in relation to ambiguity in definition of contracted capacity and installed capacity.
122 of 2015
Completed
3936 Thu 11/02/2016 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited under section 42 and 86 of EA, 2003 Read with Regulation 21, 22 of The MERC Distribution Open Access Regulation 2005 and Regulations 7.2,18 and 20 of The MERC RPO REC Frame work Regulations 2010.
104 of 2015
Completed
3937 Tue 09/02/2016 11:30:00 AM
Suo Motu Hearing
Suo-moto Review of compliance of Trading Licence Conditions for various Trading Licensees
89 of 2015
Completed
3938 Thu 04/02/2016 11:30:00 AM
Hearing
Petition of Tembhu Power private limited under Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Terms and Conditions of Determination of RE Tariff), Regulations and allowing Compensatory Tariff to Tembhu Power Pvt. Ltd. for their small Hydropower Project at Krishna River near Kolegaon Village Karad.
79 of 2015
Reschedule
3939 Thu 04/02/2016 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Limited for the financial year 2014-15.
77 of 2015
Reschedule
3940 Thu 04/02/2016 11:30:00 AM
Hearing
Petition in the matter of M/s Ascent Hotels Pvt. Limited under Sections 42 (3), 86 (c) and (e), 142 and 146 of the Electricity Act, 2003 Regulation 3.1, 21 and 22 of Maharashtra Electricity Regulatory Commission (Distribution Open Access ) Regulations, 2005 and Regulations 92-94 of MERC (conduct of business) Regulations, 2004 for directing MSEDCL to issue open access approval in accordance with MERC (Distribution Open Access ) Regulations, 2005 as amended and modified for Renewable Energy from time to time, Directives of MERC vide order dated 24th November 2003 and various orders of the Hon. Commission from time to time on wind energy open access.
70 of 2015
Reschedule
3941 Wed 03/02/2016 11:30:00 AM
Hearing
Petition of Tembhu Power private limited under Section 86 of the Electricity Act, 2003 and Maharashtra Electricity Regulatory Commission (Terms and Conditions of Determination of RE Tariff), Regulations and allowing Compensatory Tariff to Tembhu Power Pvt. Ltd. for their small Hydropower Project at Krishna River near Kolegaon Village Karad.
79 of 2015
Reschedule with further notice
3942 Wed 03/02/2016 11:30:00 AM
Hearing
Petition of M/s Sai Wardha Power Limited seeking declaration of compliance of captive status with respect to the generating units of 2x135 MW of the Petitioner, Sai Wardha Power Limited for the financial year 2014-15.
77 of 2015
Completed
3943 Wed 03/02/2016 11:30:00 AM
Hearing
Petition in the matter of M/s Ascent Hotels Pvt. Limited under Sections 42 (3), 86 (c) and (e), 142 and 146 of the Electricity Act, 2003 Regulation 3.1, 21 and 22 of Maharashtra Electricity Regulatory Commission (Distribution Open Access ) Regulations, 2005 and Regulations 92-94 of MERC (conduct of business) Regulations, 2004 for directing MSEDCL to issue open access approval in accordance with MERC (Distribution Open Access ) Regulations, 2005 as amended and modified for Renewable Energy from time to time, Directives of MERC vide order dated 24th November 2003 and various orders of the Hon. Commission from time to time on wind energy open access.
70 of 2015
Completed
3944 Wed 03/02/2016 11:30:00 AM
Public Hearing
Application filed by Reliance Infrastructure Ltd. for amendment of its Transmission Licence.
24 of 2015
Completed
3945 Tue 02/02/2016 11:30:00 AM
Hearing
Petition of M/s. Balaji Electro Smelters Limited for non compliance of CGRF Order in Complaint No.11 of 2015 Order passed by CGRF MSEDCL Amravati Zone.
146 of 2015
Completed
3946 Tue 02/02/2016 11:30:00 AM
Hearing
Petition of Raksh Pal Uday Pal Aboral under Regulations 95 & 96 of MERC (Conduct of Business) Regulations, 2004. Regulation 18 of MERC (Electricity Supply Code and Other Conditions of supply) Regulations, 2005, Regulation 5.3 of MERC(Standard of Performance of Distribution Licensees Giving Supply and Determination of Compensation) Regulations, 2005 dated 20.01.2005.
116 of 2015
Completed
3947 Tue 02/02/2016 11:30:00 AM
Hearing
Petition of P. K. Pasta under Sections 43 (1), 43 (2) & 142 of the Electricity Act, 2003 against the personnel's of BEST A ward, for having sanctioned an additional meter for a single premises already having power, under the same tariff violating provisions as stated in the Electricity Act 2003.
120 of 2015
Completed
3948 Thu 28/01/2016 11:30:00 AM
Hearing
Petition of Ghodawat Energy Private Limited, in the matter of removal of difficulties in MERC (Distribution of Open Access) Regulation, 2014. under Section 42 of the Electricity Act, 2003 and Regulations 15, 16, 19, 22.3, 26.8 and 43 of the MERC (Distribution Open Access) Regulations, 2014.
137 of 2015
Completed
3949 Thu 28/01/2016 11:30:00 AM
Hearing
Petition of Wind World (India) Limited in the matter of implementation of MERC (Dist.OA) Regulations,2014 Read with provisions of the CERC (Terms & Conditions for recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and the MERC (RPO) its compliance and implementation of REC Regulations, 2010.
142 of 2015
Reschedule with further notice
3950 Thu 28/01/2016 11:30:00 AM
Hearing
Petition of Green Energy Association under Section 86 (1) (e) read with Sections 42, 129, 142 and 149 of the Electricity Act, 2003; Regulation 4 of the MERC (Distribution Open Access Regulation), 2005 and Regulation 92 and 94 of the MERC (Conduct of Business) Regulation, 2004 and order dated January 3, 2013 Pronounced by the Hon'ble MERC in Case No. 8, 18 and 20 of 2013 for appropriate directions to the MSEDCL to Comply with applicable laws and orders pronounced by Honâ??ble Commission.
139 of 2015
Completed
3951 Thu 28/01/2016 11:30:00 AM
Hearing
Petition of Rattan India Power Limited for under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4.7.1 of the PPA dated 05.06.2010 seeking quashing of the notice dated 07.05.2015 of the respondent-MSEDCL seeking Liquidated Damages.
54 of 2015
Completed
3952 Thu 21/01/2016 11:30:00 AM
Suo Motu Hearing
Suo motu proceeding on Committee Report submitted by CE (STU) in compliance to directives given in Order in Case No 172 of 2014 for recommendation and a protocol on idle capacity and apportionment and commercial settlement of Tata Powerâ??s Trombay Unit 6.
133 of 2015
Completed
3953 Tue 19/01/2016 11:30:00 AM
Hearing
Complaint filed by Shri Gajanan Wamanrao Chatare to take against MSEDCL for Non-compliance of CGRF order dated 28.10.2014 in Complaint No. 142 of 2014.
126 of 2015
Completed
3954 Tue 19/01/2016 11:30:00 AM
Hearing
Petition for Shri Ankush Natha Garje for non-compliance of the CGRF Order 491/22-15/152 dt.25.08.2015 Nashik
143 of 2015
Completed
3955 Tue 19/01/2016 11:30:00 AM
Hearing
Petition of Spentex Industries Limited in the matter under Sections 142 & 146 of the Electricity Act, 2003 for non-compliance of the Order dated 06.04.2015 in Case No. 17 of 2015 passed by the Electricity Ombudsman, Nagpur regarding correcting of Energy Bill for the month of April 2012 and refund damages with interest.
130 of 2015
Completed
3956 Tue 19/01/2016 11:30:00 AM
Hearing
Petition of Vishvanath Ramchandra Patil under Regulation 26 (Issue of Order and Practice Directions) of the MERC (CGRF & Electricity Ombudsman) Regulations, 2006.
129 of 2015
5
3957 Tue 19/01/2016 11:30:00 AM
Hearing
Petition of JDS Ginning & Oil Mills and 2 others (through Shri Ashish Subhash Chandrana) for initiating action against Nodal Officer, Exe Engineer (Achalpur) MSEDCL, Achalpur, Dist. Amravati, for not complying with Order of Hon'ble CGRF Amaravati Zone, Akola in Complaint No. 91, 93 & 94 of 2013 Order dated 16.12.2013 under Sections 142 & 149 of the Electricity Act, 2003.
82 of 2015
5
3958 Tue 19/01/2016 11:30:00 AM
Hearing
Petition of Jaya Kamalesh Patel and 6 others (through Shri Ashish Subhash Chandrana) for initiating action against Nodal Officer, Exe Engineer (Achalpur) MSEDCL, Achalpur, Dist. Amravati, for not complying with Order of Hon'ble CGRF Amaravati Zone, Akola in Complaint No. 48, 49, 50, 51, 52, 53 & 54 of 2013 dated 12.06.2013 under Sections 142 & 149 of the Electricity Act, 2003.
81 of 2015
5
3959 Thu 14/01/2016 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86 (1) (b), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Completed
3960 Thu 14/01/2016 11:30:00 AM
Hearing
Petition M/s JSW Energy Limited for adjudication of disputes that have arisen between JSW Energy Limited and Maharashtra State Electricity Distribution Company under the PPA dated 23.2.2010.
9 of 2011
Completed
3961 Thu 14/01/2016 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Completed
3962 Thu 14/01/2016 11:30:00 AM
Hearing
Petition for allowing Tata Power - D to continue power supply to six consumers who are outside the Licence Area of Tata Power - D.
43 of 2015
Completed
3963 Tue 12/01/2016 11:30:00 AM
Hearing
Petition of Nesco Limited by erstwhile consumer of a Distribution Licensee seeking directions under Section 23 read with 163 of the Electricity Act, 2003 and allied provisions of the MERC(Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 and the MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2013 issued by the MERC.
124 of 2015
Completed
3964 Tue 12/01/2016 11:30:00 AM
Hearing
Petition of Awade Industries Private Limited breach of Hon'ble Commission's orders dated 24.11.2003, 03.01.2013 & provisions of Citizen Charter & Provisions of Distribution Open Access Regulations 2014.
44 of 2015
Completed
3965 Tue 12/01/2016 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Completed
3966 Tue 12/01/2016 11:30:00 AM
Hearing
Petition of Laxmi Organic Industries Limited for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
Case No. 59 of 2015 & MA No 8 of 2015
Completed
3967 Thu 07/01/2016 11:30:00 AM
Hearing
Miscellaneous Application filed by The Seafood Exporters Association of India under Section 142 & 146 of the Electricity Act, 2003 read with sections 62, 64 and 86 (1) (A) of the Electricity Act, 2003 and in terms of the Orders passed by the Honâ??ble MERC.
M.A. No. 13 of 2015 in Case No. 42 of 2015
Completed
3968 Thu 07/01/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of commissioning and capitalizing of ongoing work on Distribution Network Development for feeding consumers where considerable investment had been made till November, 2014.
50 of 2015
Completed
3969 Thu 07/01/2016 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 13 March, 2015 in Appeal No. 221 of 2014 filed by Mula Pravara Challenging the Commission's Order in MERC Case No. 24 of 2012 Order Dated 18 June, 2014 (Determination of compensation/ charges payable pursuant to Hon'ble APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.)
24 of 2012
Reschedule with further notice
3970 Tue 05/01/2016 11:30:00 AM
Hearing
Petition of The Ruby Mills Limited Review under sub-section 1 (f) of Section 94 and Section 142 of the Electricity Act, 2003 in the context of Order dated 27.02.2015 delivered by the Consumer Grievance Redressal Forum, Kalyan Zone, Kalyan in respect of MSEDCL's levying of 2% Voltage surcharge to the consumer who was never supplied power at prescribed voltage, during the entire currency of SOP Regulation 2005.
61 of 2015
Completed
3971 Tue 05/01/2016 11:30:00 AM
Hearing
Petition of M/s. Harish Dhirajlal Ondhiya for initiating action against Dy. Executive Engineer flying squad, Aurangabad under Section 142, of the Electricity Act 2003 for violating provisions of Supply Code 2005 notified by MERC in compliance of Section 50 of the Electricity Act 2003 and against Nodal Officer, Executive Engineer, MSEDCL, Washim for not complying with order of Honorable CGRF Amravati Zone, Akola in complaint no 12 of 2013 under Section 142, 146 & 149 of the Electricity Act 2003.
60 of 2015
Completed
3972 Tue 05/01/2016 11:30:00 AM
Hearing
Petition in the matter of M/s Shah Promoters and Developers for non issuance of No Objection Certificate for the period 01.04.2012 to 30.04.2012.
55 of 2015
Completed
3973 Tue 05/01/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of additional norm for Hydro Auxiliary Consumption for FY 2015-16.
52 of 2015
Completed
3974 Tue 05/01/2016 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of revised O & M expenses norms for FY 2015-16 for Tata Power- D for retail supply business.
51 of 2015
Completed
3975 Wed 23/12/2015 11:30:00 AM
Public Hearing
(SUO MOTO) Inviting comments on draft Generic Tariff Order for Renewable Energy Technologies for FY 2015-16
135 of 2015
Completed
3976 Tue 22/12/2015 11:30:00 AM
Hearing
Petition of Maharashtra Airport Development Company for extension of time in filing its plan to meet its obligation as Distribution Licensee in view of the directions contained in the Order dated 20.01.2015 passed in Case No. 149 of 2014 by the Honâ??ble Commission.
62 of 2015
Completed
3977 Tue 22/12/2015 11:30:00 AM
Hearing
Petition of Serene Properties private limited for obtaining Hon'ble Commission's approval of plan for procurement of power by the Petitioner to procure power for 7 years from April, 2016 through Case - I Competitive Bidding Process in accordance with the 'Guidelines for Determination of Tariff by Bidding Process for procurement of power by Distribution Licensees' issued by Ministry of Power, Government of India, on January 19, 2005 and amended from time to time.
49 of 2015
Completed
3978 Tue 22/12/2015 11:30:00 AM
Hearing
Petition of M/s Alps Ice and cold Storage Pvt. Limited illegal application of HT-II N Commercial Tariff instead of HT-I N Industrial Tariff to SSI Unit of pre cooling and cold storage (Ice & Cold Storage) for manufacturing of Ice, chilling, processing, freezing and storage of frozen fish & fish products.
48 of 2015
Completed
3979 Tue 22/12/2015 11:30:00 AM
Hearing
Petition of Maharashtra Airport Development Company for approval of provisional tariff in pursuance of the Order dated 20.01.2015 passed by this Hon'ble Commission in Case No. 149 of 2014.
47 of 2015
Completed
3980 Tue 22/12/2015 11:30:00 AM
Hearing
Petition of Awade Industries Private Limited breach of Honorable Commission's orders dated 24.11.2003, 03.01.2013 & provisions of Citizen Charter & Provisions of Distribution Open Access Regulations 2014.
44 of 2015
Reschedule with further notice
3981 Thu 17/12/2015 11:30:00 AM
Admissibility Hearing
Petition of Rameshwar Sukhdev Wayal under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for not giving expected compensation and for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
68 of 2015
Completed
3982 Thu 17/12/2015 11:30:00 AM
Admissibility Hearing
Petition of Uttam Baburao Cheke under Rule 13 (2) Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for not giving expected compensation and for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
67 of 2015
Completed
3983 Thu 17/12/2015 11:30:00 AM
Admissibility Hearing
Petition of Gajanan Rambhau Shelake under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67(4) of the Electricity Act, 2003 for granting of compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
66 of 2015
Completed
3984 Thu 17/12/2015 11:30:00 AM
Admissibility Hearing
Petition of Sarjerao Ramrao Wayal under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
53 of 2015
Completed
3985 Thu 17/12/2015 11:30:00 AM
Hearing
Petition for allowing Tata Power - D to continue power supply to six consumers who are outside the Licence Area of Tata Power - D.
43 of 2015
Reschedule
3986 Thu 17/12/2015 11:30:00 AM
Admissibility Hearing
Petition of Reliance Infrastructure Ltd. (Distribution), In the matter of Sections 61 (h), 66 and 86 (1) (e) of the Electricity Act, 2003 and Regulation 7 of the MERC (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010 framed under Section 181 of the Electricity Act, 2003 and Regulation 7 of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 framed under Section 178 of the Electricity Act, 2003.
39 of 2015
Completed
3987 Tue 15/12/2015 11:30:00 AM
Hearing
Petition of Shri Madhukar Tryambak Deshmukh under affidavit in Petition (MERC Case No. 202 of 2014) filed by Sanjay Murlidhar Mahale.
21 of 2015
Completed
3988 Tue 15/12/2015 11:30:00 AM
Hearing
Petition of MSEDCL under Sections 42 (2) & 86 (1) of the Electricity Act, 2003 & Regulation 13 of MERC (Distribution Open Access) Regulations, 2005 for seeking re-determination of Cross Subsidy Surcharge.
17 of 2015
Completed
3989 Tue 15/12/2015 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Completed
3990 Tue 15/12/2015 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Reschedule
3991 Thu 10/12/2015 11:30:00 AM
Hearing
Petition of Laxmi Organic Industries Limited for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
59 of 2015 and MA NO 8 of 2015
Reschedule
3992 Thu 10/12/2015 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution), in the matter of Section 39 (2) (b & c), 86 (1) (c) of Electricity Act, 2003 and Regulation 36.3 of the MERC (State Grid Code) Regulations, 2006 framed under Section 181 of Electricity Act,2003.
3 of 2015
Reschedule with further notice
3993 Thu 10/12/2015 11:30:00 AM
Hearing
Petition of Ravi Girdharlalji Sharma for non-compliance by Executive Engineer Urban MSEDCL Akola of an Order No. CGRF / AKOLA / AMZ / 563, dated 11.09.2014 / 12.09.2014 passed by the CGRF MSEDCL , Akola Zone Read with Regulation 8.7 & 22 of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006 under Section 142, 146 and 149 of Electricity Act, 2003.
1 of 2015
Completed
3994 Thu 10/12/2015 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Reschedule
3995 Wed 09/12/2015 11:30:00 AM
Hearing
Petition of M/s 1) Arvind Cotsyn (India) Limited, 2) Arvind Dyeing & Bleaching Mills Pvt. Ltd. & 3) Arvind Finlease Pvt. Ltd. (Through Udhistir Varma Authorised Representative for all the Petitioners) under affidavit on 08.01.2015, under Sections 42, 142 and 146 of the Electricity Act, 2003, for improper reduction of Period of Open Access & regarding purchase of Surplus Units & for Re Assessment of Credit of Units given by MSEDCL.
14 of 2015
Completed
3996 Wed 09/12/2015 11:30:00 AM
Hearing
Petition filed by Power Exchange India Limited under Sections 30, 42, 66, 86 (1) (c) & (k) of the Electricity Act, 2003 & Regulation 32 of MERC (Conduct of Business) Regulations, 2004 & Regulation 42, 43 & 44.5 of MERC (Distribution Open Access) Regulations, 2014 for allowing Power Exchange India Limited to commence and operate intra-state power market in the State of Maharashtra.
Case No. 115 of 2015- & MA No. 09 of 2015 in Case No. 115 of 2015
Completed
3997 Wed 09/12/2015 11:30:00 AM
Hearing
Application of MSEDCL for Grant of Distribution Licence in the Mumbai City and Part of Mumbai Suburban Area
87 of 2014
Completed
3998 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of S. K. Shivaraj & 08 Others for breach of Commission's Order dated 20.08.2014 passed in Case No. 95 of 2014 and provisions of Citizen Charter.
223 of 2014
Completed
3999 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of Sai Service Pvt. Limited under Sections 42, 142 of the Electricity Act, 2003 for seeking appropriate directions to MSEDCL for non compliance of MERC's Order dated January 3, 2013 in Case Nos. 8, 18, 20 and 33 of 2012.
199 of 2014
Completed
4000 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Completed
4001 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honorable Commission read with the relevant provisions of the Electricity Act, 2003.
9 of 2015
Completed
4002 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Section 94 (1) (f) of the Electricity Act, 2003 for Review of Order dated 26.06.2015 passed by the Hon'ble Commission in Case No. 04 of 2015 filed by M/s RInfra- Distribution for Mid Term Review of MYT Second Control Period including truing up of FY 2012 -13 and FY 2013-14, provisional truing up of FY 2014-15 and revised ARR and tariff for FY 2015-16.
106 of 2015
Completed
4003 Thu 03/12/2015 11:30:00 AM
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., In the matter of Petition / application in compliance with the directions given by Honorable Commission in Order dated 11.11.2014 in MERC Case No. 127 of 2014.
84 of 2015
Completed
4004 Tue 01/12/2015 11:30:00 AM
Admissibility Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015 MA. No. 05 of 2015 in Case No. 94 of 2015 MA. No. 06 of 2015 in Case No. 94 of 2015 MA. No. 07 of 2015 in Case No. 94 of 2015
Completed
4005 Tue 01/12/2015 11:30:00 AM
Hearing
Petition M/s JSW Energy Limited for adjudication of disputes that have arisen between JSW Energy Limited and Maharashtra State Electricity Distribution Company under the PPA dated 23.2.2010.
9 of 2011
Reschedule with further notice
4006 Tue 01/12/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking direction against the Respondents for supplying electricity to the petitioner and not to impose costs of Transmission Network on the Petitioner which is not within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Electricity Supply Code and Other Conditions of Supply) Regulation, 2005 and the Circular No. 182 dated August 8, 2013 issued by the MSEDCL.
Case No. 143 of 2014 & MA No 9 of 2014 in Case No. 143 of 2014
Completed
4007 Tue 01/12/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86 (1) (b), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Reschedule with further notice
4008 Tue 01/12/2015 11:30:00 AM
Hearing
54 of 2015
Reschedule with further notice
4009 Tue 01/12/2015 11:30:00 AM
Hearing
Petition of M/s SNB Infrastructure Pvt. Limited under sections 142, 146 and 149 of the Electricity Act, 2003 (EA.2003).
22 of 2015
Completed
4010 Tue 01/12/2015 11:30:00 AM
Public Hearing
Case No 17 of 2014: Suggestions/Objections on Amravati Power Transmission Co. Ltd.'s Petition for approval of Aggregate Revenue Requirement (ARR) and determination of Multi Year Tariff for the Second Control Period from FY 2013-14 to FY 2015-16.
17 of 2014
Completed
4011 Thu 26/11/2015 11:30:00 AM
Hearing
Petition of Nesco Limited by erstwhile consumer of a Distribution Licensee seeking directions under Section 23 read with 163 of the Electricity Act, 2003 and allied provisions of the MERC(Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 and the MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2013 issued by the MERC.
124 of 2015
Reschedule with further notice
4012 Thu 26/11/2015 11:30:00 AM
Hearing
Petition of Balu Namdevrao Bhaltilak under Sections 142, 146, 67 (4) (5) of the Electricity Act, 2003 seeking determination of compensation and Maharashtra Works of Licensees Rules 2012 and also seeking enhancement of compensation awarded by District Collector, Akola under Rule 3 (3) and 13 (2) of Maharashtra Works of Licensees Rules 2012 and challenging the Order Passed by the District Collector, Akola dated 30.08.2013.
90 of 2015
Completed
4013 Thu 26/11/2015 11:30:00 AM
Admissibility Hearing
Petition of Rameshwar Sukhdev Wayal under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for not giving expected compensation and for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
68 of 2015
Reschedule with further notice
4014 Thu 26/11/2015 11:30:00 AM
Admissibility Hearing
Petition of Uttam Baburao Cheke under Rule 13 (2) Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for not giving expected compensation and for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
67 of 2015
Reschedule with further notice
4015 Thu 26/11/2015 11:30:00 AM
Admissibility Hearing
Petition of Gajanan Rambhau Shelake under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67(4) of the Electricity Act, 2003 for granting of compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
66 of 2015
Reschedule with further notice
4016 Tue 24/11/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon for refund of continuous charges levied in our Energy bills from June 2008 to February 2013, on the basis of the directions to MSEDCL to follow the order passed in case 105 of 2013 dated 12.07.2014 that the continuous Charges levied by MSEDCL to M/S Kalika steel & others shall be refunded without interest. The same is applicable to this petitioner also but MSEDCL has denied our application. In view of I.E. Act 2003, there being clear cut infringement of the order dt. 12.07.2014.
86 of 2015
Completed
4017 Tue 24/11/2015 11:30:00 AM
Admissibility Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015 MA. No. 05 of 2015 in Case No. 94 of 2015 MA. No. 06 of 2015 in Case No. 94 of 2015 MA. No. 07 of 2015 in Case No. 94 of 2015
Completed
4018 Tue 24/11/2015 11:30:00 AM
Hearing
Petition filed by The Seafood Exporters Association of India under Section 142 & 146 of the Electricity Act, 2003 read with sections 62, 64 and 86(1)(a) of the Act in terms of the Orders passed by the Honorable MERC.
M.A. No. 3 of 2015 in Case No. 42 of 2015 (Intervention Application) M.A. No. 4 of 2015 in Case No. 42 of 2015 (Interim Application) 42 of 2015
Completed
4019 Tue 24/11/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
64 of 2015
Completed
4020 Tue 24/11/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Limited under Rule 3 (3) of the Maharashtra Electricity Works of Licensees Rules, 2012.
63 of 2015
Completed
4021 Tue 24/11/2015 11:30:00 AM
Admissibility Hearing
Petition of Sarjerao Ramrao Wayal under Maharashtra Works of Licensees Rules 2012 & Works of Licensees Rules 2006 & Sections 67 (4) of the Electricity Act, 2003 for granting of enhanced compensation for erecting Electricity Tower in the agricultural land of the Petitioner.
53 of 2015
Reschedule with further notice
4022 Tue 24/11/2015 11:30:00 AM
Hearing
Petition of Arun Shamrao Pardeshi under Sections 142, 146, 67 (4) (5) of the Electricity Act, 2003 and Maharashtra Works of Licensees Rules 2012 seeking non-compliance of the Order Passed by the District Collector, Jalgaon dated 16.10.2014 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Jalgaon under Rule 3 (3) and 13 (2) of Maharashtra Works of Licensees Rules 2012.
45 of 2015
Completed
4023 Thu 19/11/2015 23:30:00 PM
Hearing
Petition of M/s. M. R. Scion Agro under Sections u/s 142 of the Electricity Act, 2003 for non - compliance of Order dated 28.11.2013 passed by CGRF, Kolhapur in Consumer Complaint No.14/18/19/2013-14.
32 of 2015
Completed
4024 Thu 19/11/2015 11:30:00 AM
Hearing
Petition of M/s. Shri Sant Gadgebaba Sahakari Sut Girni Ltd., non-compliance by Superintending Engineer, MSEDCL, Akola of an Order No. CGRF / Akola / AMZ / 426 dt. 13.03.2014 in complaint No. 105 / 2013 passed by CGRF, MSEDCL, Amravati Zone, Akola read with Regulation 22 and 8.7 of MERC CGRF Ombudsman Regulation 2006 under Sections 142, 146 and 149 of the Electricity Act, 2003.
33 of 2015
Completed
4025 Thu 19/11/2015 11:30:00 AM
Hearing
Petition of M/s. Arihant Universal Realty Pvt. Ltd. for Review Petition regarding MERC order dated 03.12.2014 in MERC case No. 134 of 2014.
31 of 2015
Completed
4026 Thu 19/11/2015 11:30:00 AM
Public Hearing
Suggestions/Objections on Petition filed by Celerity Power for determination of Tariff for supply of electricity from 6 MW capacity Small Hydro Power Project at Tal. Bhor Dist. Pune for sale of electricity to Distribution Licensees in Maharashtra
69 of 2015
Completed
4027 Wed 18/11/2015 11:30:00 AM
Hearing
Intervention Application filed by Maharashtra Veej Grahak Sanghatna in the matter of Review Petition filed by MSEDCL to review Order dated 26.06.2015 in Case No. 121 of 2014 relating to Power Purchase, MOD and Other Issues.
MA No 11 of 2015 in Case No. 121 of 2015
Completed
4028 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Limited seeking Review of Order dated 26 June 2015 in Case No. 121 of 2014 in the matter of Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of Multi Year Tariff for Second Control Period FY 2013-14 to FY 2015-16.
121 of 2015
Completed
4029 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
Petition of MSPGCL in regard to Review of Order dated 26 June 2015 in Case No. 15 of 2015 on a Petition filed by MSPGCL for Mid Term Performance Review for the MYT Second Control Period FY 2013-14 to FY 2015-16.
108 of 2015
Completed
4030 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
Review Petition of Shri. Pratap Ganpatrao Hogade in Tariff Order Case No. 121 of 2014. Request for the review, reconsideration and reduction in the O & M expenses approved by the Honorable Commission for FY 2013-14 to FY 2015-16 in its Tariff Order dated 26.06.2015.
107 of 2015
Completed
4031 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015 MA. No. 05 of 2015 in Case No. 94 of 2015 MA. No. 06 of 2015 in Case No. 94 of 2015 MA. No. 07 of 2015 in Case No. 94 of 2015
Reschedule
4032 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
MSPGCL Review petition against order dated 20.04.2015 in case no. 201 of 2014 on a petition filed by Maharashtra State Power Generation Company Limited seeking approval of capital cost and determination of the tariff of Bhusawal TPS unit 4 & 5 for the period from FY 2012-13 to 2015-16, along with true up for FY 2012-13 and 2013-14.
76 of 2015
Completed
4033 Wed 18/11/2015 11:30:00 AM
Admissibility Hearing
Petition of MSETCL in regard to Review of Order in Case No. 207 of 2014 dated 26 June 2015 in the matter of Petition of Maharashtra State Electricity Transmission Company Ltd. (MSETCL) for Mid Term Performance Review for the MYT Second Control Period from FY 2012-13 to FY 2015-16.
105 of 2015
Completed
4034 Tue 17/11/2015 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 13 March, 2015 in Appeal No. 221 of 2014 filed by Mula Pravara Challenging the Commission's Order in MERC Case No. 24 of 2012 Order Dated 18 June, 2014 (Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.)
24 of 2012
Completed
4035 Tue 17/11/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon for refund of continuous charges levied in our Energy bills from June 2008 to February 2013, on the basis of the directions to MSEDCL to follow the order passed in case 105 of 2013 dated 12.07.2014 that the continuous Charges levied by MSEDCL to M/S Kalika steel & others shall be refunded without interest. The same is applicable to this petitioner also but MSEDCL has denied our application. In view of I.E. Act 2003, there being clear cut infringement of the order dt. 12.07.2014.
86 of 2015
Reschedule
4036 Tue 17/11/2015 11:30:00 AM
Hearing
Petition of Shri Madhukar Tryambak Deshmukh under affidavit in Petition (MERC Case No. 202 of 2014) filed by Sanjay Murlidhar Mahale.
21 of 2015
Reschedule with further notice
4037 Tue 17/11/2015 11:30:00 AM
Hearing
Petition of MSEDCL under Sections 42 (2) & 86 (1) of the Electricity Act, 2003 & Regulation 13 of MERC (Distribution Open Access) Regulations, 2005 for seeking re-determination of Cross Subsidy Surcharge.
17 of 2015
Completed
4038 Tue 17/11/2015 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
4039 Thu 05/11/2015 11:30:00 AM
Hearing
Petition of Laxmi Organic Industries Limited for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
59 of 2015 and M.A No. 8 of 2015
Reschedule with further notice
4040 Thu 05/11/2015 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Reschedule with further notice
4041 Thu 05/11/2015 11:30:00 AM
Hearing
Petition of M/s 1) Arvind Cotsyn (India) Limited, 2) Arvind Dyeing & Bleaching Mills Pvt. Ltd. & 3) Arvind Finlease Pvt. Ltd. (Through Udhistir Varma â?? Authorised Representative for all the Petitioners) under affidavit on 08.01.2015, under Sections 42, 142 and 146 of the Electricity Act, 2003, for improper reduction of Period of Open Access & regarding purchase of Surplus Units & for Re â?? Assessment of Credit of Units given by MSEDCL.
14 of 2015
Reschedule with further notice
4042 Thu 05/11/2015 11:30:00 AM
Hearing
Application of MSEDCL for Grant of Distribution Licence in the Mumbai City and Part of Mumbai Suburban Area
87 of 2014
Reschedule with further notice
4043 Tue 03/11/2015 12:00:00 PM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Completed
4044 Tue 03/11/2015 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k),of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondent with respect to the grant of Open Access / NOC for adjustment of wind energy credit notes in the monthly bills of the end â??consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honâ??ble Commission.
186 of 2014
Completed
4045 Tue 03/11/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Steel Limited under Section 61, 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 read with MERC(Renewable Purchase Obligations,Its Compliance and Implementation of REC Framework), Regulations 2010.
134 of 2013
Completed
4046 Tue 03/11/2015 11:30:00 AM
Hearing
Petition of M/s Lloyds Metal & Engineers Ltd. for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation power plant of capacity 30 MW at Ghugus, Dist. Chandrapur.
56 of 2011
Completed
4047 Tue 03/11/2015 11:30:00 AM
Suo Motu Hearing
Suo Motu Hearing in the matter of Order dated 22nd February, 2010 in Case No. 60, 81, 83, 84, 85, 86 of 2009 for seeking changeover from BEST Undertaking to Tata Power Company Limited.
30 of 2011
Completed
4048 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Dicitex Home Furnishing Pvt. Ltd. under Section 142 of the Electricity Act, 2003 to direct the Respondent, MSEDCL for allowing option to exercise choice between continuous and non - continuous type of supply by consumer connected on express feeder.
25 of 2015
Completed
4049 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 to direct the respondent, MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply by consumer connected on express feeder.
13 of 2015
Completed
4050 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 to direct the respondent, MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply by consumer connected on express feeder.
12 of 2015
Completed
4051 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Everest Kanto Cylinder Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
11 of 2015
Completed
4052 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 againstMSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
10 of 2015
Completed
4053 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Manan Cotysn Pvt. Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
8 of 2015
Completed
4054 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of M/s Samrudh Pharmaceuticals Pvt. Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
7 of 2015
Completed
4055 Thu 29/10/2015 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution), in the matter of Section 39 (2) (b & c), 86 (1) (c) of Electricity Act, 2003 and Regulation 36.3 of the MERC (State Grid Code) Regulations, 2006 framed under Section 181 of Electricity Act, 2003.
3 of 2015
Completed
4056 Wed 28/10/2015 11:30:00 AM
Admissibility Hearing
Petition filed by Maharashtra State Electricity Distribution Co. Limited seeking Review of Order dated 26 June 2015 in Case No. 121 of 2014 in the matter of Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of Multi Year Tariff for Second Control Period FY 2013-14 to FY 2015-16.
121 of 2015
Reschedule with further notice
4057 Wed 28/10/2015 11:30:00 AM
Admissibility Hearing
Petition of MSPGCL in regard to Review of Order dated 26 June 2015 in Case No. 15 of 2015 on a Petition filed by MSPGCL for Mid Term Performance Review for the MYT Second Control Period FY 2013-14 to FY 2015-16.
108 of 2015
Reschedule with further notice
4058 Wed 28/10/2015 11:30:00 AM
Admissibility Hearing
Review Petition of Shri. Pratap Ganpatrao Hogade in Tariff Order Case No. 121 of 2014. Request for the review, reconsideration and reduction in the O & M expenses approved by the Honorable Commission for FY 2013-14 to FY 2015-16 in its Tariff Order dated 26.06.2015.
107 of 2015
Reschedule with further notice
4059 Wed 28/10/2015 11:30:00 AM
Admissibility Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015
Reschedule with further notice
4060 Wed 28/10/2015 11:30:00 AM
Admissibility Hearing
MSPGCL Review petition against order dated 20.04.2015 in case no. 201 of 2014 on a petition filed by Maharashtra State Power Generation Company Limited seeking approval of capital cost and determination of the tariff of Bhusawal TPS unit 4 & 5 for the period from FY 2012-13 to 2015-16, along with true up for FY 2012-13 and 2013-14.
76 of 2015
Reschedule with further notice
4061 Tue 27/10/2015 11:30:00 AM
Hearing
Petition of M/s Shree Balaji Builder and Developers for under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 19.07.2014 passed by CGRF,Bhandup (Case No. 541, 542, 543 of 2014)
213 of 2014
Completed
4062 Tue 27/10/2015 11:30:00 AM
Hearing
Petition of Shri Eknath Pandhari Varkhede for taking penal action under Sections 42 (1), 86 (1) (i & k), 128 (1) (6), 129, 142 & 150 (1) (2) against Respondent No. 1, 2 & 3 for not including Petitioner's Institution in determined time frame in Gavthan feeder separation scheme / Single Phase Scheme and thereby not complying Commission's directions & for immediate implementation of the Commission's directions.
203 of 2014
Completed
4063 Tue 27/10/2015 11:30:00 AM
Hearing
Petition of Ravi Girdharlalji Sharma for non-compliance by Executive Engineer Urban MSEDCL Akola of an Order No. CGRF / AKOLA / AMZ / 563, dated 11.09.2014 /12.09.2014 passed by the CGRF MSEDCL , Akola Zone Read with Regulation 8.7 & 22 of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman)Regulations, 2006 under Section 142, 146 and 149 of Electricity Act, 2003.
1 of 2015
Completed
4064 Mon 26/10/2015 11:30:00 AM
Public Hearing
Suggestions/Objections on Vidarbha Industries Power Limited's Petition for approval of Capital Cost and determination of Aggregate Revenue Requirement for FY 2014-15 and FY 2015-16 for its Transmission Business
36 of 2015
Completed
4065 Wed 21/10/2015 11:30:00 AM
Admissibility Hearing
Petition filed by The Tata Power Company Limited (Distribution), seeking review of the Mid Term Review Order dated 26.06.2015 passed by the Honâ??ble Commission in Case No. 18 of 2015 for revised Truing up for FY 2011 -12, Truing up of FY 2012-13 and FY 2013-14 provisional True â?? Up of ARR for FY 2014 -15, and revised ARR and Tariff for FY 2015-16.
110 of 2015
Completed
4066 Wed 21/10/2015 11:30:00 AM
Admissibility Hearing
Petition of Reliance Infrastructure Limited (Distribution) under Section 94 (1) (f) of the Electricity Act, 2003 for Review of Order dated 26.06.2015 passed by the Hon'ble Commission in Case No. 04 of 2015 filed by M/s RInfra- Distribution for Mid -Term Review of MYT Second Control Period including truing up of FY 2012 -13 and FY 2013-14, provisional truing up of FY 2014-15 and revised ARR and tariff for FY 2015-16.
106 of 2015
Completed
4067 Wed 21/10/2015 11:30:00 AM
Admissibility Hearing
Petition of Tata Power Renewable Energy Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 and 92 of MERC (conduct of business) Regulations, 2004 for seeking review of the Order dated 13.04.2015 passed by this Hon'ble Commission in Case No. 141 of 2014.
71 of 2015
Completed
4068 Wed 21/10/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited (Distribution) for approval of Power Purchase Agreement between Tata Power Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) for purchase of 270 MW from IEPL's coal based thermal power project in village Bela in Nagpur district of Maharashtra.
65 of 2015
Completed
4069 Tue 20/10/2015 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 13 March, 2015 in Appeal No. 221 of 2014 filed by Mula Pravara Challenging the Commission's Order in MERC Case No. 24 of 2012 Order Dated 18 June, 2014 (Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.)
24 of 2012
Completed
4070 Thu 15/10/2015 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited for directions to the Respondent in regard to the application for Open Access by the Petitioner for the period effective from 01.04.2015.
41 of 2015
Completed
4071 Thu 15/10/2015 11:30:00 AM
Hearing
Petition of M/s. Classic Citi Investments Pvt. Ltd. under Sections 42 (3), 86 (c & e), 142 & 146 of the Electricity Act, 2003 & Regulations 3.1, 21 and 22 of MERC (Distribution Open Access) Regulations, 2005 & Regulations 92-94 of MERC (Conduct Business) Regulations, 2004 for directing MSEDCL to issue open access approval in accordance with MERC(Distribution Open Access) Regulations, 2005 as amended and modified for Renewable Energy from time to time & Directives of MERC vide order dated 24th November 2003 and various orders of the Hon. Commission from time to time on wind energy and open access.
23 of 2015
Completed
4072 Thu 15/10/2015 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited for seeking relief under clauses 21(Power to remove difficulties), 22 (Savings) of the Distribution Open Access Regulations 2005 and 44.4 of the Distribution Open Access Regulations 2014 the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
197 of 2014
Completed
4073 Thu 15/10/2015 11:30:00 AM
Hearing
Petition of Vidarbha Industries Power Limited for Miscellaneous Petition for removal of difficulty in treatment of FERV / HEDGING COST on foreign borrowings, post COD of the generating station under Section 61, 62 of Electricity Act 2003; Regulation 100 of MERC (MYT) Regulations 2011 and Regulation 96 of MERC (conduct of business) Regulations, 2004.
150 of 2014
Completed
4074 Tue 13/10/2015 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies Pvt. Limited in the matter of complaint under Section 142 and 146 of Electricity Act, 2003 of Non-compliance of MERC Order (Case no. 73 of 2014 dated 27.10.2014) for relief in respect of provision of power evacuation arrangement Karwand Small Hydro Power Plant in Dist. Dhule.
80 of 2015
Completed
4075 Tue 13/10/2015 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Completed
4076 Tue 13/10/2015 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k), of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondent with respect to the grant of Open Access / NOC for adjustment of wind energy credit notes in the monthly bills of the end consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honorable Commission.
186 of 2014
Completed
4077 Tue 13/10/2015 11:30:00 AM
Hearing
Petition of BEST for appropriate order, directives or permission by MERC for inclusion and allowance in favour of BEST the deficit of the Transport business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 and the Carrying Cost
80 of 2012
Completed
4078 Thu 08/10/2015 11:30:00 AM
Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015
Completed
4079 Tue 06/10/2015 11:30:00 AM
Hearing
Petition filed by Maharashtra State Power Generation Company Limited under Regulation 12 and 100 of the Maharashtra Electricity Regulatory Commission (Multi Year Tariff ) Regulations, 2011 as applicable from FY-2011-2012 onwards, seeking clarifications regarding deviations in Power Generation Target approved to MSPGCL and Power Purchase approved to MSEDCL for FY 2015-16 and revision in target ailability for Parli TPS for FY 15-16.
127 of 2015
Completed
4080 Tue 06/10/2015 11:30:00 AM
Hearing
Petition filed by Power Exchange India Limited under Sections 30, 42, 66, 86 (1) (c) & (k) of the Electricity Act, 2003 & Regulation 32 of MERC (Conduct of Business) Regulations, 2004 & Regulation 42, 43 & 44.5 of MERC (Distribution Open Access) Regulations, 2014 for allowing Power Exchange India Limited to commence and operate intra-state power market in the State of Maharashtra.
115 of 2015
Completed
4081 Thu 24/09/2015 11:30:00 AM
Suo Motu Hearing
Suo Motu Hearing in the matter of Order dated 22nd February, 2010 in Case No. 60, 81, 83, 84, 85, 86 of 2009 for seeking changeover from BEST Undertaking to Tata Power Company Limited.
30 of 2011
Reschedule with further notice
4082 Thu 24/09/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon for refund of continuous charges levied in our Energy bills from June 2008 to February 2013, on the basis of the directions to MSEDCL to follow the order passed in case 105 of 2013 dated 12.07.2014 that the continuous Charges levied by MSEDCL to M/S Kalika steel & others shall be refunded without interest. The same is applicable to this petitioner also but MSEDCL has denied our application. In view of I.E. Act 2003, there being clear cut infringement of the order dt. 12.07.2014.
86 of 2015
Completed
4083 Thu 24/09/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon Limited Grievance No. K / E / 827 / 1004 of M/s. Century Rayon Ltd., Murbad Road, Shahad, Dist. Thane registered with the CGRF Kalyan Zone, Kalyan about non-compliance of Commission's directions regarding levy of Voltage Surcharge Excess charging of 2% extra as voltage surcharge and refund thereof.
58 of 2015
Completed
4084 Wed 23/09/2015 11:30:00 AM
Hearing
Review petition of Maharashtra Eastern Grid Power Transmission Limited in the matter of Application under Regulation 85 of MERC ( Conduct of Business )Regulations, 2004; seeking Review of the Honorable Commission's Order dated June 26, 2015 in Case No. 57 of 2015 in respect of Mid term review of Intra State Transmission Tariff determined in Order dated August 14, 2014 in Case No. 123 of 2014.
88 of 2015
Completed
4085 Wed 23/09/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for the hardship being faced due to non consideration of separate tariff stream for coal being received from captive coal block of Lohara for 800 MW and from linkage for balance 520 MW in the order dated 05.05.2014 in Case No 63 of 2014.
29 of 2015
Completed
4086 Wed 23/09/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86, 94 (1) (f) and (g) of the Electricity Act, 2003 read with Regulation 92, 93,94 and 95 of the MERC (Conduct Of Business) Regulations, 2004 in regard to clarification on netting of entire 520 MW in each block instead of allowing compensation for 800 MW from Lohara coal block by this Honorable Commission in order dated 05.05.2014 in Case No 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station.
28 of 2015
Completed
4087 Tue 22/09/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited for submission of Revised Network Rollout Plan in compliance to the direction of the Honorable Commission in Case No. 90 of 2014
182 of 2014
Completed
4088 Tue 22/09/2015 11:30:00 AM
Hearing
Petition of Laxmi Organic Industries Limited for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
59 of 2015
Completed
4089 Tue 22/09/2015 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Completed
4090 Tue 22/09/2015 11:30:00 AM
Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014.
94 of 2015
Reschedule with further notice
4091 Tue 22/09/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon for refund of continuous charges levied in our Energy bills from June 2008 to February 2013, on the basis of the directions to MSEDCL to follow the order passed in case 105 of 2013 dated 12.07.2014 that the continuous Charges levied by MSEDCL to M/S Kalika steel & others shall be refunded without interest. The same is applicable to this petitioner also but MSEDCL has denied our application. In view of I.E. Act 2003, there being clear cut infringement of the order dt. 12.07.2014.
86 of 2015
Reschedule
4092 Tue 22/09/2015 11:30:00 AM
Hearing
Petition of M/s. Century Rayon Limited Grievance No. K / E / 827 / 1004 of M/s. Century Rayon Ltd., Murbad Road, Shahad, Dist. Thane registered with the CGRF Kalyan Zone, Kalyan about non-compliance of Commission's directions regarding levy of Voltage Surcharge Excess charging of 2% extra as voltage surcharge and refund thereof.
58 of 2015
Reschedule
4093 Tue 22/09/2015 11:30:00 AM
Hearing
Petition of Rattan India Power Limited for under Section 86 (1) (f) of the Electricity Act,2003 read with Article 4.7.1 of the PPA dated 05.06.2010 seeking quashing of the notice dated 07.05.2015 of the respondent MSEDCL seeking Liquidated Damages.
54 of 2015
Completed
4094 Wed 09/09/2015 11:30:00 AM
Hearing
Interim Application of Laxmi Organic Industries Ltd, against MSEDCL in Case No. 59 of 2015 In the matter of Petition for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
M.A. No. 08 in Case No. 59 of 2015
Completed
4095 Wed 09/09/2015 11:30:00 AM
Hearing
Petition of Laxmi Organic Industries Limited for arbitrary levy of Wheeling Charges & Applicable Loss from the Financial Year 2014-2015 in contradistinction to Open Access Permission granted to the Petitioner for FY 2013-2014 and 2012-2013 and Petition for erroneous and illegal Temporary Tariff charged to the Petitioner for FY 2013-2014 pursuant to Open Access Permission granted to the Petitioner for FY 2013-2014.
59 of 2015
Completed
4096 Wed 09/09/2015 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Pvt Limited Review Petition under Section 94 (1) (f) of the Electricity Act and Regulations 85 (a) of MERC (Conduct of Business) Regulations, 2004.
46 of 2015
Completed
4097 Wed 09/09/2015 11:30:00 AM
Hearing
Petition of M/s. Uttam Galva Steels Ltd. seeking relief due to non-compliance of the Order dated August 05, 2010 & September 06, 2011 passed by the Honorable APTEL.
224 of 2014
Completed
4098 Wed 09/09/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86 (1) (b), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Completed
4099 Wed 09/09/2015 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 10 February, 2015 in Appeal No. 70 of 2013 filed by Wardha power company Limited against MERC Case No 53 of 2012 Order dated 27.12.2012. (Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.)
53 of 2012
Completed
4100 Wed 09/09/2015 11:30:00 AM
Suo Motu Hearing
Suo Motu Hearing in the matter of Order dated 22nd February, 2010 in Case No. 60, 81, 83, 84, 85, 86 of 2009 for seeking changeover from BEST Undertaking to Tata Power Company Limited.
30 of 2011
Completed
4101 Tue 08/09/2015 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Completed
4102 Tue 08/09/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited for submission of Revised Network Rollout Plan in compliance to the direction of the Honorable Commission in Case No. 90 of 2014
182 of 2014
Completed
4103 Thu 03/09/2015 11:30:00 AM
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., In the matter of Petition / application in compliance with the directions given by Honorable Commission in Order dated 11.11.2014 in MERC Case No. 127 of 2014.
84 of 2015
Completed
4104 Thu 03/09/2015 11:30:00 AM
Hearing
Petition of M/s Flagship Developers Private Limited for taking on record the deemed distribution licensee status of the petitioner, M/s. Flagship Developers Private Limited for Blue Ridge IT Park at village Hinjewadi, Taluka Mulshi, Dist: Pune, Maharashtra on an area of 10.1766 hectares and for issuing the Specific Conditions of Distribution Licence applicable to the petitioner.
30 of 2015
Completed
4105 Thu 03/09/2015 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86(1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Completed
4106 Thu 03/09/2015 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Gigaplex Estate Private Limited (GEPL) for the IT & ITES SEZ at Plot No. IT-5, Airoli Knowledge Park, TTC Industrial Area,Villages Airoli, District: Thane; and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
198 of 2014
Completed
4107 Thu 03/09/2015 11:30:00 AM
Hearing
Implementation of the ATE's Judgment dated 29 May, 2015 in Appeal No. 241 of 2014 filed by M/s. Classic City Investments Pvt. Ltd Challenging the Commission's Order in MERC Case No. 80 of 2013 Order Dated 7 August, 2014 (Petition filed by Classic Citi Investment Pvt. Ltd against MSEDCL for reimbursement of excess voltage surcharge collected by MSEDCL.)
80 of 2013
Completed
4108 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of S. K. Shivaraj & 08 Others for breach of Commissionâ??s Order dated 20.08.2014 passed in Case No. 95 of 2014 and provisions of Citizen Charter.
223 of 2014
Completed
4109 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Gigaplex Estate Private Limited (GEPL) for the IT & ITES SEZ at Plot No. IT-5, Airoli Knowledge Park, TTC Industrial Area,Villages Airoli, District Thane; and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
198 of 2014
Completed
4110 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of MSEDCL under Sections 42 (2) & 86 (1) of the Electricity Act, 2003 & Regulation 13 of MERC (Distribution Open Access) Regulations, 2005 for seeking re-determination of Cross Subsidy Surcharge.
17 of 2015
Reschedule with further notice
4111 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of M/s Flagship Developers Private Limited for taking on record the deemed distribution licensee status of the petitioner, M/s. Flagship Developers Private Limited for Blue Ridge IT Park at village Hinjewadi, Taluka Mulshi, Dist: Pune, Maharashtra on an area of 10.1766 hectares and for issuing the Specific Conditions of Distribution Licence applicable to the petitioner.
30 of 2015
Reschedule
4112 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Reschedule
4113 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Gigaplex Estate Private Limited (GEPL) for the IT & ITES SEZ at Plot No. IT-5, Airoli Knowledge Park, TTC Industrial Area,Villages Airoli, District Thane; and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
198 of 2014
Reschedule
4114 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of Green Energy Association for Petition under Section 86 (1) (E) read with sections 42, 129, 142 and 149 of the Electricity Act,2003; Regulation No. 4 of MERC( Distribution Open Access ) Regulations, 2005 & Regulation 92 & 94 of MERC( Conduct of Business ) Regulations, 2004 & Order dated January 3, 2013 pronounced by the Honorable in Case Nos. 8, 18 & 20 of 2013 for appropriate directions to the MSEDCL to comply with provisions herein and grant to open access permissions to the members of the Petitioners pursuant to their respective Applications.
44 of 2014
Completed
4115 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Completed
4116 Thu 27/08/2015 11:30:00 AM
Hearing
Review Petition of Mumbai International Airport Pvt. Limited under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 85 (a) of the MERC (conduct of business) Regulations, 2004 on behalf of the Mumbai International Airport Pvt. Ltd. against the order dated 26th June 2015 passed in Case No. 18 of 2015.
103 of 2015
Completed
4117 Thu 27/08/2015 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honorable Commission read with the relevant provisions of the Electricity Act, 2003.
9 of 2015
Completed
4118 Wed 12/08/2015 11:30:00 AM
Hearing
Interim Application of Shri Ashish Subhas Chandrana in Review Petition of MSEDCL, in the matter of To review Order dated 26.06.2015 passed by the Honorable Commission in Case No 121 of 2014 registered as Case No 94 of 2015.
MA No 05 of 2015 in Case No. 94 of 2015
Completed
4119 Wed 12/08/2015 11:30:00 AM
Hearing
Review Petition of MSEDCL, in the matter of Order dated 26.06.2015 passed by the Hon'ble Commission in Case No 121 of 2014.
94 of 2015
Completed
4120 Wed 12/08/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited for submission of Revised Network Rollout Plan in compliance to the direction of the Honorable Commission in Case No. 90 of 2014
182 of 2014
Completed
4121 Wed 12/08/2015 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Completed
4122 Tue 11/08/2015 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k),of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondentwith respect to the grant of Open Access / NOC for adjustment of wind energy creditnotes in the monthly bills of the end consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honorable Commission.
186 of 2014
Reschedule with further notice
4123 Tue 11/08/2015 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited for seeking relief under clauses 21(Power to remove difficulties), 22 (Savings) of the Distribution Open Access Regulations 2005 and 44.4 of the Distribution Open Access Regulations 2014 the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
197 of 2014
Completed
4124 Tue 11/08/2015 11:30:00 AM
Hearing
Petition of M/s 1) Arvind Cotsyn (India) Limited, 2) Arvind Dyeing & Bleaching Mills Pvt. Ltd. & 3) Arvind Finlease Pvt. Ltd. (Through Udhistir Varma Authorised Representative for all the Petitioners) under affidavit on 08.01.2015, under Sections 42, 142 and 146 of the Electricity Act, 2003, for improper reduction of Period of Open Access & regarding purchase of Surplus Units & for Re Assessment of Credit of Units given by MSEDCL.
14 of 2015
Completed
4125 Tue 11/08/2015 11:30:00 AM
Hearing
Petition of M/s. Classic Citi Investments Pvt. Ltd. under Sections 42 (3), 86 (c & e), 142 & 146 of the Electricity Act, 2003 & Regulations 3.1, 21 and 22 of MERC (Distribution Open Access) Regulations, 2005 & Regulations 92-94 of MERC (Conduct Business) Regulations, 2004 for directing MSEDCL to issue open access approval in accordance with MERC(Distribution Open Access) Regulations, 2005 as amended and modified for Renewable Energy from time to time & Directives of MERC vide order dated 24th November 2003 and various orders of the Hon. Commission from time to time on wind energy and open access
23 of 2015
Completed
4126 Tue 11/08/2015 11:30:00 AM
Hearing
Petition of M/s Shopping Centers Association of India (SCAI) under Regulation 43 (Powers to Remove Difficulties) of MERC (Distribution Open Access) Regulations, 2014 & Sections 42(3) &43 of the Electricity Act, 2003 for seeking amendment of the clause 3.1 of MERC (Distribution Open Access) Regulations, 2014 and seeking clarification that "franchisees" as defined in Section 2(27) of the Electricity Act, 2003.
20 of 2015
Completed
4127 Thu 06/08/2015 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honorable Commission read with the relevant provisions of the Electricity Act, 2003.
9 of 2015
Completed
4128 Thu 06/08/2015 11:30:00 AM
Hearing
Petition of Green Energy Association for Petition under Section 86(1) (E) read with sections 42, 129, 142 and 149 of the Electricity Act,2003; Regulation No. 4 of MERC (Distribution Open Access) Regulations, 2005 & Regulation 92 & 94 of MERC (Conduct of Business) Regulations, 2004 & Order dated January 3, 2013 pronounced by the Hon'ble in Case Nos. 8, 18 & 20 of 2013 for appropriate directions to the MSEDCL to comply with provisions herein and grant to open access permissions to the members of the Petitioners pursuant to their respective Applications.
44 of 2014
Completed
4129 Thu 06/08/2015 11:30:00 AM
Hearing
Petition of Jsons Foundry Private Limited for pertaining to adjudication of issues relating to Power Purchase Agreement between Jsons Foundry Pvt. Ltd. & MSEDCL.
200 of 2014
Completed
4130 Thu 06/08/2015 11:30:00 AM
Hearing
Petition of Sai Service Pvt. Limited under Sections 42, 142 of the Electricity Act, 2003 for seeking appropriate directions to MSEDCL for non compliance of MERC's Order dated January 3, 2013 in Case Nos. 8, 18, 20 and 33 of 2012.
199 of 2014
Completed
4131 Thu 06/08/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Completed
4132 Tue 04/08/2015 11:30:00 AM
Hearing
Petition of M/s Celerity Power filed on 22.05.2015 under Sections 86 (1) (a) & 86 (1) (e) of the Electricity Act, 2003 & Regulation 7.1 (c), 75 & 77 of MERC (RE Tariff Regulations ), 2010 for increasein Tariff of 6 MW of the Petitioner Firm's small hydro plant at Bhor.
69 of 2015
Completed
4133 Tue 04/08/2015 11:30:00 AM
Hearing
Petition of Rattan India Power Limited for under Section 86 (1) (f) of the Electricity Act, 2003 read with Article 4.7.1 of the PPA dated 05.06.2010 seeking quashing of the notice dated 07.05.2015 of the respondent MSEDCL seeking Liquidated Damages.
54 of 2015
Completed
4134 Tue 04/08/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Steel Limited under Section 61, 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 read with MERC(Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010.
134 of 2013
Completed
4135 Tue 04/08/2015 11:30:00 AM
Hearing
Petition of BEST for appropriate order, directives or permission by MERC for inclusion and allowance in favour of BEST the deficit of the Transport business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 and the Carrying Cost
80 of 2012
Completed
4136 Thu 30/07/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited for submission of Revised Network Rollout Plan in compliance to the direction of the Honorable Commission in Case No. 90 of 2014
182 of 2014
Completed
4137 Thu 30/07/2015 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Completed
4138 Thu 23/07/2015 11:30:00 AM
Hearing
Case No 182 of 2014 : Petition of Tata Power Company Limited for submission of Revised Network Rollout Plan in compliance to the direction of the Honorable Commission in Case No. 90 of 2014
182 of 2014
Reschedule
4139 Thu 23/07/2015 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of commissioning and capitalizing of ongoing work on Distribution Network Development for feeding consumers where considerable investment had been made till November, 2014.
50 of 2015
Reschedule with further notice
4140 Thu 23/07/2015 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for approval of protocol to enable consumer to select to any Electricity Distribution network in Mumbai as per judgement of the Appellate Tribunal for Electricity dated 28 November, 2014.
40 of 2015
Reschedule
4141 Thu 23/07/2015 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited for directions to the Respondent in regard to the application for Open Access by the Petitioner for the period effective from 01.04.2015.
41 of 2015
Reschedule with further notice
4142 Thu 23/07/2015 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS"). for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
4143 Thu 02/07/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for the hardship being faced due to non consideration of separate tariff stream for coal being received from captive coal block of Lohara for 800 MW and from linkage for balance 520 MW in the order dated 05.05.2014 in Case No 63 of 2014.
29 of 2015
Completed
4144 Thu 02/07/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for the hardship being faced due to netting of entire 520 MW in each block instead of allowing compensation for 800 MW from Lohara coal block by this Hon'ble Commission in order dated 05.05.2014 in Case No 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station.
28 of 2015
Completed
4145 Thu 02/07/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute relating to appropriate adjustment in tariff due to deviation from the approved norms for Station Heat Rate as determined by this Hon'ble Commission in order dated 05.05.2014 in Case No. 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station.
27 of 2015
Completed
4146 Tue 30/06/2015 11:30:00 AM
Hearing
Petition of Tata Power Company Limited (Distribution) for approval of Power Purchase Agreement between Tata Power Limited - Mumbai Distribution and Ideal Energy Projects Limited (IEPL) for purchase of 270 MW from IEPL's coal based thermal power project in village Bela in Nagpur district of Maharashtra.
65 of 2015
Completed
4147 Tue 30/06/2015 11:30:00 AM
Hearing
Petition of Abhijeet MADC Nagpur Energy Pvt Limited Review Petition under Section 94 (1) (f) of the Electricity Act and Regulations 85 (a) of MERC (Conduct of Business) Regulations, 2004.
46 of 2015
Completed
4148 Tue 30/06/2015 11:30:00 AM
Hearing
Petition of M/s SNB Infrastructure Pvt. Limited under sections 142, 146 and 149 of the Electricity Act, 2003 (EA.2003).
22 of 2015
Completed
4149 Thu 18/06/2015 11:30:00 AM
Public Hearing
Case No 218 of 2014 : Suggestions/Objections on Maharashtra State Load Despatch Centre's Petition for approval of Budget of Cost of Operations for FY 2015-16 (Case No. 218 of 2014)
218 of 2014
Completed
4150 Thu 04/06/2015 11:30:00 AM
Hearing
Petition of Shri Eknath Pandhari Varkhede for taking penal action under Sections 42 (1), 86 (1) (i & k), 128 (1) (6), 129, 142 & 150 (1) (2) against Respondent No. 1, 2 & 3 for not including Petitioner's Institution in determined time frame in Gavthan feeder separation scheme / Single Phase Scheme and thereby not complying Commission's directions & for immediate implementation of the Commission's directions.
203 of 2014
Reschedule with further notice
4151 Thu 04/06/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86 (1) (b), 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Reschedule with further notice
4152 Thu 04/06/2015 11:30:00 AM
Hearing
Petition of Vidarbha Industries Power Limited for Miscellaneous Petition for removal of difficulty in treatment of FERV / HEDGING COST on foreign borrowings, post COD of the generating station under Section 61, 62 of Electricity Act 2003; Regulation 100 of MERC (MYT) Regulations 2011 and Regulation 96 of MERC (conduct of business) Regulations, 2004.
150 of 2014
Reschedule with further notice
4153 Tue 02/06/2015 11:30:00 AM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the "EPA") and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the "CSS") for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
4154 Tue 02/06/2015 11:30:00 AM
Hearing
Petition of Jsons Foundry Private Limited for pertaining to adjudication of issues relating to Power Purchase agreement between Jsons Foundry Pvt. Ltd. & MSEDCL.
200 of 2014
Reschedule with further notice
4155 Tue 02/06/2015 11:30:00 AM
Hearing
Petition of Sai Service Pvt. Limited under Sections 42, 142 of the Electricity Act, 2003 for seeking appropriate directions to MSEDCL for non compliance of MERC's Order dated January 3, 2013 in Case Nos. 8, 18, 20 and 33 of 2012.
199 of 2014
Reschedule with further notice
4156 Tue 02/06/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd. in the matter of Petition in regard to Review of In STS Tariff Order in Case No. 123 of 2014 dated 14.08.2014 in the matter of Suo Motu amendment of Intra State Transmission Tariff determined by the Commission in Order dated 13.05.2013 in Case No. 56 of 2013.
188 of 2014
Reschedule with further notice
4157 Thu 28/05/2015 11:30:00 AM
Hearing
Petition of M/s. Shri Sant Gadgebaba Sahakari Sut Girni Ltd., non-compliance by Superintending Engineer, MSEDCL, Akola of an Order No. CGRF / Akola / AMZ / 426 dt. 13.03.2014 in complaint No. 105 / 2013 passed by CGRF, MSEDCL,Amravati Zone, Akola read with Regulation 22 and 8.7 of MERC CGRF Ombudsman Regulation 2006 under Sections 142, 146 and 149 of the Electricity Act, 2003.
33 of 2015
Reschedule with further notice
4158 Thu 28/05/2015 11:30:00 AM
Hearing
Petition of M/s. M. R. Scion Agro under Sections u/s 142 of the Electricity Act, 2003 for non - compliance of Order dated 28.11.2013 passed by CGRF, Kolhapur in Consumer Complaint No.14/18/19/2013-14.
32 of 2015
Reschedule with further notice
4159 Thu 28/05/2015 11:30:00 AM
Hearing
Petition of M/s. Arihant Universal Realty Pvt. Ltd. for Review Petition regarding MERC order dated 03.12.2014 in MERC case No. 134 of 2014.
31 of 2015
Reschedule with further notice
4160 Tue 26/05/2015 11:30:00 AM
Hearing
Case No 21 of 2015:Petition of Shri Madhukar Tryambak Deshmukh under affidavit in Petition (MERC Case No. 202 of 2014) filed by Sanjay Murlidhar Mahale.
21 of 2015
Reschedule with further notice
4161 Tue 26/05/2015 11:30:00 AM
Hearing
Petition of M/s Shopping Centers Association of India (SCAI) under Regulation 43 (Powers to Remove Difficulties) of MERC (Distribution Open Access) Regulations, 2014 & Sections 42(3) &43 of the Electricity Act, 2003 for seeking amendment of the clause 3.1 of MERC (Distribution Open Access) Regulations, 2014 and seeking clarification that franchisees as defined in Section 2(27) of the Electricity Act, 2003.
20 of 2015
Reschedule with further notice
4162 Tue 26/05/2015 11:30:00 AM
Hearing
Petition of M/s SNB Infrastructure Pvt. Limited under sections 142, 146 and 149 of the Electricity Act, 2003 (EA.2003).
22 of 2015
Reschedule with further notice
4163 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Dicitex Home Furnishing Pvt. Ltd. under Section 142 of the Electricity Act, 2003 to direct the Respondent, MSEDCL for allowing option to exercise choice between continuous and non - continuous type of supply by consumer connected on express feeder.
25 of 2015
Reschedule with further notice
4164 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 to direct the respondent, MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply by consumer connected on express feeder.
13 of 2015
Reschedule with further notice
4165 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 to direct the respondent, MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply by consumer connected on express feeder.
12 of 2015
Reschedule with further notice
4166 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Everest Kanto Cylinder Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
11 of 2015
Reschedule with further notice
4167 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Aarti Drugs Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
10 of 2015
Reschedule with further notice
4168 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Manan Cotysn Pvt. Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
8 of 2015
Reschedule with further notice
4169 Thu 21/05/2015 11:30:00 AM
Hearing
Petition of M/s Samrudh Pharmaceuticals Pvt. Ltd. under Section 142 of the Electricity Act, 2003 against MSEDCL for allowing option to exercise choice between continuous and non-continuous type of supply to the Petitioner connected on express feeder.
7 of 2015
Reschedule with further notice
4170 Tue 19/05/2015 11:30:00 AM
Hearing
Petition of MSEDCL under Sections 42 (2) & 86 (1) of the Electricity Act, 2003 & Regulation 13 of MERC (Distribution Open Access) Regulations, 2005 for seeking re-determination of Cross Subsidy Surcharge.
17 of 2015
Reschedule with further notice
4171 Tue 19/05/2015 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for Application under Regulation 71 of MERC (Conduct of Business) Regulations, 2004 for setting aside the Dismissal Order dated 29th December 2014.
16 of 2015
Reschedule with further notice
4172 Tue 19/05/2015 11:30:00 AM
Hearing
Petition of Reliance Infrastructure Limited (Distribution), in the matter of Section 39 (2) (b & c), 86 (1) (c) of Electricity Act, 2003 and Regulation 36.3 of the MERC (State Grid Code) Regulations, 2006 framed under Section 181 of Electricity Act, 2003.
3 of 2015
Reschedule with further notice
4173 Tue 19/05/2015 11:30:00 AM
Hearing
Petition of M/s Shree Balaji Builder and Developers for non - compliance of Commission's direction in the matter of providing individual connection in the premises of single point of H.T. supply at commercial complex / mall for Consumer No. H.T. 000019026690.
2 of 2015
Reschedule with further notice
4174 Tue 19/05/2015 11:30:00 AM
Hearing
Petition of Ravi Girdharlalji Sharma for non-compliance by Executive Engineer Urban MSEDCL Akola of an Order No. CGRF / AKOLA / AMZ / 563, dated 11.09.2014 / 12.09.2014 passed by the CGRF MSEDCL , Akola Zone Read with Regulation 8.7 & 22 of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006 under Section 142, 146 and 149 of Electricity Act, 2003.
1 of 2015
Reschedule with further notice
4175 Fri 15/05/2015 11:30:00 AM
Hearing
Petition of Rattan India Power Limited for under Section 86 (1) (f) of the Electricity Act,2003 read with Article 4.7.1 of the PPA dated 05.06.2010 seeking quashing of the notice dated 07.05.2015 of the respondent MSEDCL seeking Liquidated Damages.
54 of 2015
Completed
4176 Thu 14/05/2015 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Gigaplex Estate Private Limited (GEPL) for the IT & ITES SEZ at Plot No. IT-5, Airoli Knowledge Park, TTC Industrial Area, Villages Airoli, District Thane; and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
198 of 2014
Reschedule with further notice
4177 Thu 14/05/2015 11:30:00 AM
Hearing
Petition of M/s. Uttam Galva Steels Ltd. seeking relief due to non-compliance of the Order dated August 05, 2010 & September 06, 2011 passed by the Honerable APTEL.
224 of 2014
Reschedule with further notice
4178 Thu 14/05/2015 11:30:00 AM
Hearing
Petition of S. K. Shivaraj & 08 Others for breach of Commission's Order dated 20.08.2014 passed in Case No. 95 of 2014 and provisions of Citizen Charter.
223 of 2014
Reschedule with further notice
4179 Thu 14/05/2015 11:30:00 AM
Hearing
Petition of M/s Shree Balaji Builder and Developers for under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 19.07.2014 passed by CGRF,Bhandup (Case No. 541, 542, 543 of 2014)
213 of 2014
Reschedule with further notice
4180 Thu 14/05/2015 11:30:00 AM
Hearing
Petition of M/s Ceat Tyres Limited for under Sections u/s 142 of the Electricity Act, 2003, against MSEDCL for non-compliance of Order dated 19.07.2014 passed by CGRF, Bhandup in grievance Case No. 544 of 2014.
212 of 2014
Reschedule with further notice
4181 Tue 12/05/2015 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited for seeking relief under clauses 21(Power to remove difficulties), 22 (Savings) of the Distribution Open Access Regulations 2005 and 44.4 of the Distribution Open Access Regulations 2014 the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
197 of 2014
Reschedule with further notice
4182 Tue 12/05/2015 11:30:00 AM
Suo Motu Hearing
Suo Motu Hearing in the matter of Order dated 22nd February, 2010 in Case No. 60, 81, 83, 84, 85, 86 of 2009 for seeking changeover from BEST Undertaking to Tata Power Company Limited.
30 of 2011
Reschedule with further notice
4183 Tue 12/05/2015 11:30:00 AM
Hearing
Petition of Abhay kamalkishor Nagori for non-compliance of the Order of CGRF Aurangabad dated 31.7.2014.
196 of 2014
Reschedule with further notice
4184 Tue 12/05/2015 11:30:00 AM
Hearing
Petition of M/s Amarpreet Hotel for non-compliance of the Order of CGRF Aurangabad in Case no. CGRF / AZ / AUR / U / 496 / 2014 dated 11.7.2014.
195 of 2014
Reschedule with further notice
4185 Tue 12/05/2015 11:30:00 AM
Hearing
Petition of Shri Prakash Baburao Kale for non-compliance of the Order dated 31.08.2013 passed by CGRF Aurangabad in case No. CGRF / AZ / AUR/R/447/ 2013 dt. 09.07.2013 u/s 142 & 146 of Electricity Act 2003.
185 of 2014
Reschedule with further notice
4186 Thu 07/05/2015 11:30:00 AM
Hearing
Petition of M/s Flagship Developers Private Limited for taking on record the deemed distribution licensee status of the petitioner, M/s. Flagship Developers Private Limited for Blue Ridge IT Park at village Hinjewadi, Taluka Mulshi, Dist: Pune, Maharashtra on an area of 10.1766 hectares and for issuing the Specific Conditions of Distribution Licence applicable to the petitioner.
30 of 2015
Reschedule with further notice
4187 Thu 07/05/2015 11:30:00 AM
Public Hearing
Case No. 136 of 2014 : Application of M/s Adani Transmission (India) Limited for Amendment of Transmission Licence under Section 18 of the Electricity Act, 2003.
136 of 2014
Completed
4188 Thu 07/05/2015 11:30:00 AM
Hearing
Petition of M/s. Classic Citi Investments Pvt. Ltd. under Sections 42 (3), 86 (c & e), 142 & 146 of the Electricity Act, 2003 & Regulations 3.1, 21 and 22 of MERC (Distribution Open Access) Regulations, 2005 & Regulations 92-94 of MERC (Conduct Business) Regulations, 2004 for directing MSEDCL to issue open access approval in accordance with MERC(Distribution Open Access) Regulations, 2005 as amended and modified for Renewable Energy from time to time & Directives of MERC vide order dated 24th November 2003 and various orders of the Hon. Commission from time to time on wind energy and open access.
23 of 2015
Reschedule with further notice
4189 Tue 05/05/2015 11:30:00 AM
Hearing
Petition of M/s 1) Arvind Cotsyn (India) Limited, 2) Arvind Dyeing & Bleaching Mills Pvt. Ltd. & 3) Arvind Finlease Pvt. Ltd. (Through Udhistir Varma Authorised Representative for all the Petitioners) under affidavit on 08.01.2015, under Sections 42, 142 and 146 of the Electricity Act, 2003, for improper reduction of Period of Open Access & regarding purchase of Surplus Units & for Re Assessment of Credit of Units given by MSEDCL.
14 of 2015
Reschedule with further notice
4190 Tue 05/05/2015 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Reschedule with further notice
4191 Tue 05/05/2015 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k), of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondent with respect to the grant of Open Access / NOC for adjustment of wind energy credit notes in the monthly bills of the end consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honerable Commission.
186 of 2014
Reschedule with further notice
4192 Tue 05/05/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09,2013 issued by the MSEDCL.
129 of 2014
Reschedule with further notice
4193 Thu 16/04/2015 11:30:00 AM
Hearing
Petition filed by The Seafood Exporters Association of India under Section 142 & 146 of the Electricity Act, 2003 read with sections 62, 64 and 86(1)(a) of the Act in terms of the Orders passed by the Hon'ble MERC.
42 of 2015
Reschedule with further notice
4194 Fri 10/04/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Council Hall, Office of The Divisional Commissioner, Pune District- Pune.)
121 of 2014
Completed
4195 Thu 09/04/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Meeting Hall, Office of the Divisional Commissioner, Aurangabad, District- Aurangabad.)
121 of 2014
Completed
4196 Tue 07/04/2015 11:30:00 AM
Public Hearing
Case No 15 of 2015: Inviting objections / suggestions on MSPGCL's Petition for final True-up for FY 2013-14, APR for FY14-15 and Revised ARR for FY 2015-16 under the provisions of MERC (Multi Year Tariff) Regulations, 2011
15 of 2015
Completed
4197 Wed 01/04/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Niyojan Bhavan, Collector Office Campus, Old Agra Road, Nasik.)
121 of 2014
Completed
4198 Fri 27/03/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Vanamati Hall, V.I.P. Road, Dharampeth, Nagpur, District-Nagpur.)
121 of 2014
Completed
4199 Thu 26/03/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Hall No.1,Divisional Commissioner's Office Camp, Amravati, District - Amravati.)
121 of 2014
Completed
4200 Tue 24/03/2015 11:30:00 AM
Hearing
MA No 01 of 2015 in Case No. 181 of 2014:Petition of M/s. Global Energy Limited under Sections 142 and 146 of the Electricity Act, 2003 for issuance of appropriate directions in terms of the Order dated 02.06.2014, R/W Regulation 92 of the MERC (Conduct of Business) Regulations 2004 (Case No 181 of 2014)
MA No 01 of 2015 in Case No. 181 of 2014
Completed
4201 Tue 24/03/2015 11:30:00 AM
Hearing
Case No. 38 of 2015 & MA No 02 of 2015 in Case No. 38 of 2015 : Petition of Global Energy Private Limited under Sections 86 (1) (f), 86 (1) (k) & Regulations 92 and 93 of MERC (Conduct of Business) Regulations 2005 for seeking issuance of appropriate directions for implementation of the agreement dated 13.06.2014 read with letters dated 08.07.2014, 19.12.2014 and 22.12.2014, in line with the Commission's the order dated 02.06.2014
38 of 2015 & MA No 02 of 2015 in Case No. 38 of 2015
Completed
4202 Tue 24/03/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute relating to appropriate adjustment in tariff due to deviation from the approved norms for Station Heat Rate as determined by this Hon'ble Commission in order dated 05.05.2014 in Case No. 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station.
27 of 2015
Completed
4203 Tue 24/03/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for the hardship being faced due to non consideration of separate tariff stream for coal being received from captive coal block of Lohara for 800 MW and from linkage for balance 520 MW in the order dated 05.05.2014 in Case No 63 of 2014.
29 of 2015
Completed
4204 Tue 24/03/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of the Electricity Act, 2003 for the hardship being faced due to netting of entire 520 MW in each block instead of allowing compensation for 800 MW from Lohara coal block by this Hon'ble Commission in order dated 05.05.2014 in Case No 63 of 2014 for supply of 800 MW from Tiroda Thermal Power Station.
28 of 2015
Completed
4205 Mon 23/03/2015 11:30:00 AM
Hearing
MA No 01 of 2015 in Case No. 181 of 2014:Petition of M/s. Global Energy Limited under Sections 142 and 146 of the Electricity Act,2003 for issuance of appropriate directions in terms of the Order dated 02.06.2014, R/W Regulation 92 of the MERC (Conduct of Business) Regulations 2004 (Case No 181 of 2014)
MA No 01 of 2015 in Case No. 181 of 2014
Reschedule
4206 Mon 23/03/2015 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honâ??ble Commission read with the relevant provisions of the Electricity Act, 2003.
9 of 2015
Completed
4207 Mon 23/03/2015 11:30:00 AM
Public Hearing
Case No 193 of 2014: Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of RInfra-D for FY 2013-14, as specified under MERC(Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
193 of 2014
Completed
4208 Mon 23/03/2015 11:30:00 AM
Public Hearing
Case No 192 of 2014: Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of TPC-D for FY 2013-14 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
192 of 2014
Completed
4209 Mon 23/03/2015 11:30:00 AM
Public Hearing
Case No 191 of 2014: Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of BEST for FY 2013-14 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010.
191 of 2014
Completed
4210 Mon 23/03/2015 11:30:00 AM
Public Hearing
Case No 190 of 2014: Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of MSEDCL cumulatively by FY 2013-14, as specified under MERC( Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
190 of 2014
Completed
4211 Fri 20/03/2015 11:30:00 AM
Public Hearing
Case No 18 of 2015: Suggestions & Objections on Tata Power-Distribution Business Petition for approval of Mid Term Review for Multi Year Tariff (MYT) Second Control Period including revised true-up for FY 2011-12, Truing up for FY 2012-13 and FY 2013-14, Annual Performance Review for FY 2014-15, and Annual Revenue Requirement and determination of Tariff for FY 2015-16 as per MERC (Multi Year Tariff) Regulations, 2011
18 of 2015
Completed
4212 Fri 20/03/2015 11:30:00 AM
Public Hearing
Case No 5 of 205: Suggestions / Objections on Tata Power-Transmission Business Petition for Mid Term Review for MYT Second Control Period (Truing up for FY 2012-13 & FY 2013-14, Annual Performance Review of FY 2014-15, Revised estimates for FY 2015-16 along with Impact of various Appellate Tribunal (ATE) judgments. Venue :Centrum Hall, First Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005
5 of 2015
Completed
4213 Fri 20/03/2015 11:30:00 AM
Public Hearing
Case No 6 of 2015 : Suggestions & Objections on Tata Power - Generation Petition for Mid-Term Review for MYT Second Control Period (Truing up for FY 2012-13, FY 2013-14, Annual Performance Review for FY 2014-15 and Revised estimates for FY 2015-16 along with Impact of ATE judgments)
6 of 2015
Completed
4214 Wed 18/03/2015 11:00:00 AM
Public Hearing
Case No. 121 of 2014 : Suggestions and Objections on Maharashtra State Electricity Distribution Company Limited's Petition for Multi Year Tariff for FY 2013-14 to FY 2015-16 & Case No 95 of 2013 : Suggestions and Objections in the matter of supplemental charges of Maharashtra State Electricity Distribution Company Limited's (MSEDCL) to give effect of other Orders. (Venue : Conference Hall, 7th Floor, CIDCO Bhavan, CBD, Belapur, Navi Mumbai.)
121 of 2014
Completed
4215 Mon 16/03/2015 11:30:00 AM
Public Hearing
Suggestions & Objections on RInfra-Distribution Business' Petition for approval of Mid Term Review for Multi Year Tariff (MYT) second Control Period including Truing up for FY 2012-13 and FY 2013-14, Annual Performance Review for FY 2014-15, and Annual Revenue Requirement and determination of Tariff for FY 2015-16 as per MERC (Multi Year Tariff) Regulations, 2011 (Case No. 4 of 2015) Public Hearing Venue: Centrum Hall, 1st floor, Centre No.1, World Trade Centre, Cuffe Parade, Colaba, Mumbai-400005.
4 of 2015
Completed
4216 Mon 16/03/2015 11:30:00 AM
Public Hearing
Case No 221 of 2014 : Suggestions /Objections on Reliance Infrastructure Ltd.-Transmission Business (RInfra-T) Petition for Mid Term Review for MYT Second Control Period (Truing up for FY 2012-13 and FY 2013-14, Annual Performance Review of FY 2014-15 and determination of Annual Revenue Requirement for FY 2015-16.
221 of 2014
Completed
4217 Mon 16/03/2015 11:30:00 AM
Public Hearing
Case No 222 of 2014 : Objections/Suggestions on Petition of Reliance Infrastructure Ltd.-Generation Business for Mid Term Review for MYT Second Control Period (Truing up for FY 2012-13 and FY 2013-14, Annual Performance Review of FY 2014-15 and determination of Annual Revenue Requirement & Tariff for FY 2015-16).
222 of 2014
Completed
4218 Fri 13/03/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for Annual Performance Review of FY 2013-14 for Adani Power Maharashtra Limited Transmission.
217 of 2014
Completed
4219 Fri 13/03/2015 11:30:00 AM
Public Hearing
Case No 208 of 2014 : Suggestions and Objections on Jaigad PowerTransco Limited's (JPTL) Petition for Mid-Term Performance Review for the MYT Second Control Period FY 2012-13 to FY 2015-16 (truing up of ARR for FY 2012-13 and FY 2013-14, approval of estimated ARR projections for FY 2014-15 and revised ARR projections for FY 2015-16)
208 of 2014
Completed
4220 Thu 12/03/2015 11:30:00 AM
Hearing
Petition of Sun N Sand Hotels Private Limited for seeking relief under clauses 21(Power to remove difficulties), 22 (Savings) of the Distribution Open Access Regulations 2005 and 44.4 of the Distribution Open Access Regulations 2014 the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
197 of 2014
Completed
4221 Wed 11/03/2015 12:00:00 PM
Public Hearing
Case No 207 of 2014 : Suggestions/Objections on Maharashtra State Electricity Transmission Company Limited's Petition for approval of Truing up of Aggregate Revenue Requirement (ARR) for FY 2012-13, Provisional True up for FY 2013-14 and Revised Estimates of ARR for FY 2014-15 & FY 2015-16 along with the Impact of past period Disallowed Capitalization for FY 2007-08, FY 2008-09, FY 2009-10, FY 2010-11 & FY 2011-12. (Case No. 207 of 2014)
207 of 2014
Completed
4222 Wed 11/03/2015 11:30:00 AM
Public Hearing
Case No. 201 of 2014 :Objections / suggestions on Maharashtra State Power Generation Company Limited Petition for Capital Cost and Tariff Determination of Bhusawal Unit # 4 and Unit # 5 for FY 2012-13 to FY 2015-16
201 of 2014
Completed
4223 Thu 26/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
184 of 2014
Completed
4224 Thu 26/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 147 of 2014.
183 of 2014
Completed
4225 Thu 26/02/2015 11:30:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
159 of 2014
Completed
4226 Thu 26/02/2015 11:30:00 AM
Hearing
Review Petition of Indiabulls Power Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC ( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 147 of 2014.
158 of 2014
Completed
4227 Tue 24/02/2015 11:30:00 AM
Hearing
Petition of Bajaj Finserv Limited Complaint against MSEDCL for non compliance of MERC's Order in Case No. 106 of 2014, Wind Power Tariff Order 2003 and Case No. 59 of 2012 and allegedly holding OA permissions to generator Bajaj Finserve Ltd.(BFS) to wheel wind energy to third party for the period earlier to the date of DOA 2014 and indirect disposal of banked energy to other consumers on chargeable basis and not passing proceeds to generator and causing financially serious losses to BFS.
205 of 2014
Completed
4228 Tue 24/02/2015 11:30:00 AM
Hearing
Petition of Shri Eknath Pandhari Varkhede for taking penal action under Sections 42 (1), 86 (1) (i & k), 128 (1) (6), 129, 142 & 150 (1) (2) against Respondent No. 1, 2 & 3 for not including Petitioner's Institution in determined time frame in Gavthan feeder separation scheme / Single Phase Scheme and thereby not complying Commission's directions & for immediate implementation of the Commission's directions.
203 of 2014
Reschedule with further notice
4229 Tue 24/02/2015 11:30:00 AM
Hearing
Petition of Prayas (Energy Group) seeking review of the Order dated 15th July in case Nos 154 of 2013, 189 of 2013 and 118 of 2013.
167 of 2014
Completed
4230 Thu 12/02/2015 11:30:00 AM
Suo Motu Hearing
Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of RInfra-D for FY 2013-14, as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
193 of 2014
Reschedule with further notice
4231 Thu 12/02/2015 11:30:00 AM
Suo Motu Hearing
Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of TPC-D for FY 2013-14 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
192 of 2014
Reschedule with further notice
4232 Thu 12/02/2015 11:30:00 AM
Suo Motu Hearing
Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of BEST for FY 2013-14 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010.
191 of 2014
Reschedule with further notice
4233 Thu 12/02/2015 11:30:00 AM
Suo Motu Hearing
Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of MSEDCL cumulatively by FY 2013-14, as specified under MERC ( Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
190 of 2014
Reschedule with further notice
4234 Thu 12/02/2015 11:30:00 AM
Hearing
Review Petition of Indiabulls Power Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC ( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 147 of 2014.
158 of 2014
Reschedule
4235 Tue 10/02/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86(1) (b), 86(1)(f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Completed
4236 Tue 10/02/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Completed
4237 Tue 10/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd (MSEDCL), merging sub-category under HT-Industrial Tariff category i.e. Continuous and Non continuous in only one HT-Industrial category and deferment of all pending cases of conversion of tariff from Continuous and Non continuous till the decision of the Honorable Commission in the matter.
219 of 2014
Completed
4238 Tue 10/02/2015 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honorable Commission read with the relevant provisions of the Electricity Act, 2003.
9 of 2015
Completed
4239 Tue 10/02/2015 11:30:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
159 of 2014
Reschedule
4240 Tue 10/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for approval of agreement between MSPGCL & MSEDCL for supply of energy generated from Ghatghar pumped storage hydro power station and energy used for Ghatghar pumped storage hydro power station, operated and maintained by MSPGCL and owned by Government of Maharashtra.
111 of 2014
Completed
4241 Fri 06/02/2015 11:30:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
159 of 2014
Reschedule with further notice
4242 Fri 06/02/2015 11:30:00 AM
Hearing
Review Petition of Indiabulls Power Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC ( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 147 of 2014.
158 of 2014
Reschedule with further notice
4243 Fri 06/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
184 of 2014
Reschedule with further notice
4244 Fri 06/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 147 of 2014.
183 of 2014
Reschedule with further notice
4245 Thu 05/02/2015 11:30:00 AM
Hearing
Petition of Mihan Industries Association for under Regulation 71 of MERC (conduct of business) Regulations, 2004 for setting aside the dismissal Order dated 27.10.2014 for non appearance.
216 of 2014
Reschedule with further notice
4246 Thu 05/02/2015 11:30:00 AM
Hearing
Petition of Bajaj Finserv Limited Complaint against MSEDCL for non compliance of MERC's Order in Case No. 106 of 2014, Wind Power Tariff Order 2003 and Case No. 59 of 2012 and allegedly holding OA permissions to generator Bajaj Finserve Ltd.(BFS) to wheel wind energy to third party for the period earlier to the date of DOA 2014 and indirect disposal of banked energy to other consumers on chargeable basis and not passing proceeds to generator and causing financially serious losses to BFS.
205 of 2014
Reschedule with further notice
4247 Thu 05/02/2015 11:30:00 AM
Hearing
Petition of Shri Eknath Pandhari Varkhede for taking penal action under Sections 42 (1), 86 (1) (i & k), 128 (1) (6), 129, 142 & 150 (1) (2) against Respondent No. 1, 2 & 3 for not including Petitioner's Institution in determined time frame in Gavthan feeder separation scheme / Single Phase Scheme and thereby not complying Commission's directions & for immediate implementation of the Commission's directions.
203 of 2014
Reschedule with further notice
4248 Thu 05/02/2015 11:30:00 AM
Hearing
Petition of Prayas (Energy Group) seeking review of the Order dated 15th July in case No.s 154 of 2013, 189 of 2013 and 118 of 2013.
167 of 2014
Reschedule with further notice
4249 Tue 03/02/2015 11:30:00 AM
Hearing
Petition of M/s. Lloyds Metals & Energy Limited for Addendum Petition with revised prayers to the Petition filed in Case No. 56 of 2011, under Section 62 (1) (a) and 86 (1) (e) of the Electricity Act 2003 for determination of tariff for supply of electricity from Industrial waste heat recovery co-generation Power plant of 30 MW capacity at Ghugus, Dist Chandrapur of Maharashtra to the Distribution licensee in Maharashtra and fixation of purchase obligation for electricity produced from waste heat recovery based Co-generation plants.
220 of 2014
Reschedule with further notice
4250 Tue 03/02/2015 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k), of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondent with respect to the grant of Open Access/ NOC for adjustment of wind energy credit notes in the monthly bills of the end consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honorable Commission.
186 of 2014
Reschedule with further notice
4251 Tue 03/02/2015 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86(1)(b), 86(1)(f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Reschedule with further notice
4252 Tue 03/02/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Reschedule with further notice
4253 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of Ali Akbar Adamji Peerbhoy had provided electricity with own expenses for Matheran Hill Station in 1915 during British rules, as proved under government documents of 1914 and 1915, then the report of development of Matheran is drafted, under Ref. No. 283-B dt.12.05.2015 and in the matter of petition for seeking Royalty-Compensation and Subsidy (Ele.Connection No.026510353748 and 0265100139004).
210 of 2014
Completed
4254 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking direction against the Respondents for supplying electricity to the petitioner and not to impose costs of Transmission Network on the Petitioner which is not within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Electricity Supply Code and Other Conditions of Supply) Regulation, 2005 and the Circular No. 182 dated August 8, 2013 issued by the MSEDCL.
143 of 2014 & MA No 9 of 2014 in Case No. 143 of 2014
Completed
4255 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
184 of 2014
Reschedule
4256 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 147 of 2014.
183 of 2014
Reschedule
4257 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Reschedule
4258 Thu 29/01/2015 11:30:00 AM
Hearing
Petition of ISMT Limited for Application to implead as party in Case no 16 of 2014 petition filed by MSEDCL for Power Purchase and other Dispensation in respect of fossile fule based Captive Power Plant.
MA No 1 of 2014 in Case No. 16 of 2014
Completed
4259 Thu 29/01/2015 01:30:00 AM
Hearing
Petition of M/s. Ruhatiya Spinners Pvt. Limited for non compliance by Superintending Engineer, MSEDCL, Akola, of an Order No. CGRF /AKOLA /185, Dated. 26.06.2013, Passed by the CGRF, MSEDCL, Akola Zone read with Regulation 22 & 8.7 of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006, under Sections 142, 146 and 149 of Electricity Act, 2003 and liberty given by the Honorable Commission, to approach Commission in Case No. 161 of 2013.
211 of 2014
Completed
4260 Tue 27/01/2015 11:30:00 AM
Admissibility Hearing
Case No 138 of 2014 : Petition of Maharashtra State Electricity Distribution Co Ltd. for removal of difficulties in implementation of MERC (Standards of Performance of Distribution Licensees, Period for giving supply and Determination of Compensation) Regulations, 2014.
138 of 2014
Completed
4261 Tue 27/01/2015 11:30:00 AM
Hearing
Petition of M/s. Shri Shrihari Textiles for under Sections 142 of the Electricity Act, 2003 for non-compliance of Interim Order dated 25.07.2013 passed by CGRF, Kolhapur (Consumer Complaint No.21 of 13-14)
215 of 2014
Completed
4262 Tue 27/01/2015 11:30:00 AM
Hearing
Petition of M/s. Pragati Enterprises for under Sections 142 of the Electricity Act, 2003 for non - compliance of Order dated 12.08.2014 passed by IGRC, & Order dated 08.10.2014 passed by CGRF Kalyan in Case No. K / N / 0131 / 989 / 2014-15.
214 of 2014
Completed
4263 Tue 27/01/2015 11:30:00 AM
Hearing
Petition of Tata Power Renewable Energy Limited for seeking applicability of the generic tariff to Solar Plant at Palaswadi as determined under the Order in Case No.06 of 2013 for plants commissioned in FY 2013-14 but where the PPA is signed prior to 31st March 2013.
141 of 2014
Completed
4264 Tue 27/01/2015 11:30:00 AM
Hearing
Petition of Vidarbha Industries Power Limited for Miscellaneous Petition for removal of difficulty in treatment of FERV / HEDGING COST on foreign borrowings, post COD of the generating station under Section 61, 62 of Electricity Act 2003; Regulation 100 of MERC (MYT) Regulations 2011 and Regulation 96 of MERC (conduct of business) Regulations, 2004.
150 of 2014
Completed
4265 Thu 22/01/2015 11:30:00 AM
Hearing
Petition of M/s Shree Balaji Builder and Developers for under Sections 142 of the Electricity Act, 2003 for non-compliance of Order dated 19.07.2014 passed by CGRF, Bhandup (Case No. 541, 542, 543 of 2014)
213 of 2014
Reschedule with further notice
4266 Thu 22/01/2015 11:30:00 AM
Hearing
Petition of M/s Ceat Tyres Limited for under Sections u/s 142 of the Electricity Act, 2003, against MSEDCL for non-compliance of Order dated 19.07.2014 passed by CGRF, Bhandup in grievance Case No. 544 of 2014.
212 of 2014
Reschedule with further notice
4267 Thu 22/01/2015 11:30:00 AM
Hearing
Petition of M/s. Ruhatiya Spinners Pvt. Limited for non compliance by Superintending Engineer, MSEDCL, Akola, of an Order No. CGRF /AKOLA /185, Dated. 26.06.2013, Passed by the CGRF, MSEDCL, Akola Zone read with Regulation 22 & 8.7 of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006, under Sections 142, 146 and 149 of Electricity Act, 2003 and liberty given by the Hon'ble Commission, to approach Commission in Case No. 161 of 2013.
211 of 2014
Reschedule with further notice
4268 Thu 22/01/2015 11:30:00 AM
Admissibility Hearing
Petition of Ali Akbar Adamji Peerbhoy had provided electricity with own expenses for Matheran Hill Station in 1915 during British rules, as proved under government documents of 1914 and 1915, then the report of development of Matheran is drafted, under Ref. No. 283-B dt.12.05.2015 and in the matter of petition for seeking Royalty-Compensation and Subsidy (Ele.Connection No.026510353748 and 0265100139004).
210 of 2014
Reschedule with further notice
4269 Thu 22/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Transmission Co. Ltd. in the matter of Petition in regard to Review of In STS Tariff Order in Case No. 123 of 2014 dated 14.08.2014 in the matter of Suo Motu amendment of Intra State Transmission Tariff determined by the Commission in Order dated 13.05.2013 in Case No. 56 of 2013
188 of 2014
Reschedule with further notice
4270 Tue 20/01/2015 11:30:00 AM
Hearing
Petition of Shri S. K. Shivaraj & 09 others for payment in respect of Excess units delivered into the grid of the Respondent.
209 of 2014
Completed
4271 Tue 20/01/2015 11:30:00 AM
Hearing
Petition of The Maharashtra Krushak Hitwardhak Sanghatana for seeking directions against the MSEDCL, not to disconnect electricity supply of the agricultural consumers within the state of Maharashtra, in view of direction given by the Honorable High Court as per Order dated 08.02.2013 in Public Interest Litigation No. 44/2012.
204 of 2014
Completed
4272 Tue 20/01/2015 11:30:00 AM
Hearing
Petition of Sanjay Murlidhar Mahale for under Sections 42(1), 86(1)(i), 128, 129 & 142 against Respondent No. 1 Dy. Executive Engineer, Muktainagar Divisional Office, Muktainagar, Jalgaon & Respondent No. 2 Executive Engineer, Bhusaval Divisional Office, Bhusaval, Tal-Bhusaval, Jalgaon for non complying performance standards & recommendations set by IEEE for regulating harmonics in electricity system and thereby not supplying electricity with proper voltage.
202 of 2014
Completed
4273 Tue 20/01/2015 11:30:00 AM
Hearing
Petition of Jsons Foundry Private Limited for pertaining to adjudication of issues relating to Power Purchase Agreement between Jsons Foundry Pvt. Ltd. & MSEDCL.
200 of 2014
Completed
4274 Tue 20/01/2015 11:30:00 AM
Hearing
Petition of BEST for appropriate order, directives or permission by MERC for inclusion and allowance in favour of BEST the deficit of the Transport business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 and the Carrying Cost
80 of 2012
Completed
4275 Thu 15/01/2015 12:00:00 PM
Hearing
Petition of Sun N Sand Hotels Private Limited for seeking relief under clauses 21(Power to remove difficulties), 22 (Savings) of the Distribution Open Access Regulations 2005 and 44.4 of the Distribution Open Access Regulations 2014 the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
197 of 2014
Reschedule with further notice
4276 Thu 15/01/2015 11:30:00 AM
Hearing
Petition of Gigaplex Estate Private Limited for taking on record the deemed Distribution Licensee status of the Petitioner, Gigaplex Estate Private Limited(GEPL) for the IT & ITES SEZ at Plot No. IT-5, Airoli Knowledge Park, TTC Industrial Area,Villages Airoli, District Thane; and for issuing the Specific Conditions of Distribution Licence applicable to the Petitioner.
198 of 2014
Reschedule with further notice
4277 Thu 15/01/2015 11:30:00 AM
Hearing
Petition of Abhay kamalkishor Nagori for non-compliance of the Order of CGRF Aurangabad dated 31.7.2014.
196 of 2014
Reschedule with further notice
4278 Thu 15/01/2015 11:30:00 AM
Hearing
Petition of M/s Amarpreet Hotel for non-compliance of the Order of CGRF Aurangabad in Case no. CGRF / AZ / AUR / U / 496 / 2014 dated 11.7.2014.
195 of 2014
Reschedule with further notice
4279 Thu 15/01/2015 11:30:00 AM
Hearing
Petition of Shri Prakash Baburao Kale for non-compliance of the Order dated 31.08.2013 passed by CGRF Aurangabad in case No. CGRF / AZ / AUR/R/447/ 2013 dt. 09.07.2013 u/s 142 & 146 of Electricity Act 2003.
185 of 2014
Reschedule with further notice
4280 Tue 13/01/2015 11:30:00 AM
Admissibility Hearing
Petition of Goradia Special Steels Limited for Miscellaneous Application against the MSEDCL.
166 of 2014
Completed
4281 Tue 13/01/2015 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for seeking relief on account of certain issues that may affect BEST Undertaking and its financial sustainability
118 of 2014
Completed
4282 Tue 13/01/2015 11:30:00 AM
Hearing
Petition of Sai Service Pvt. Limited under Sections 42, 142 of the Electricity Act, 2003 for seeking appropriate directions to MSEDCL for non compliance of MERC's Order dated January 3, 2013 in Case Nos. 8, 18, 20 and 33 of 2012.
199 of 2014
Completed
4283 Tue 06/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Hon'ble Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Hon'ble Commission in Case No. 140 of 2014.
184 of 2014
Reschedule with further notice
4284 Tue 06/01/2015 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited (MSEDCL) for Review of Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 147 of 2014.
183 of 2014
Reschedule with further notice
4285 Tue 06/01/2015 11:30:00 AM
Hearing
Petition of Prayas (Energy Group) seeking review of the Order dated 15th July in case No.s 154 of 2013, 189 of 2013 and 118 of 2013.
167 of 2014
Reschedule with further notice
4286 Tue 06/01/2015 11:30:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 140 of 2014.
159 of 2014
Reschedule with further notice
4287 Tue 06/01/2015 11:30:00 AM
Hearing
Review Petition of Indiabulls Power Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC ( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 147 of 2014.
158 of 2014
Reschedule with further notice
4288 Tue 30/12/2014 11:30:00 AM
Hearing
Petition of Shri Prakash Baburao Kale for non-compliance of the Order dated 31.08.2013 passed by CGRF Aurangabad in case No. CGRF / AZ / AUR/R/447/ 2013 dt. 09.07.2013 u/s 142 & 146 of Electricity Act 2003.
185 of 2014
Reschedule with further notice
4289 Tue 23/12/2014 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Reschedule with further notice
4290 Tue 23/12/2014 11:30:00 AM
Hearing
Petition of Development Commissioner, SEEPZ SEZ, Mumbai for Clarification on the issue whether the SEEPZ - SEZ will be considered as separate licensed area for the deemed distribution licensee (Developer / Co developer) of SEEPZ-SEZ in light of the amendment dated 3rd March, 2010 under Section 14 of the Electricity Act, 2003 and whether the deemed distribution licensee can undertake power distribution by developing own dedicated distribution network for SEEPZ - SEZ area and a tariff determined by Hon. MERC separately for SEEPZ-SEZ.
126 of 2014
Completed
4291 Tue 23/12/2014 11:30:00 AM
Hearing
Petition of Amit N. Gandhi for under Section 142 of the Electricity Act, 2003 for non-compliance of MERC Order dated August 20.08. 2014 in Case No. 72 of 2014
180 of 2014
Completed
4292 Tue 23/12/2014 11:30:00 AM
Hearing
Petition of Indian Wind Power Association against non-compliance by MSEDCL of the Order dated August 20, 2014 in Case No. 72 of 2014 of the Honorable Commission read with the relevant provisions of the Electricity Act, 2003.
179 of 2014
Completed
4293 Thu 18/12/2014 11:30:00 AM
Hearing
Petition of Energy Department, Government of Maharashtra for Implementation of rationalised tariff for residential consumers of MSEDCL, Rinfra-D, and BEST consuming 0-300 units per month.
54 of 2014
Reschedule
4294 Thu 18/12/2014 11:30:00 AM
Hearing
Petition of Serene Properties private Limited for approval of Power Purchase Agreement (PPA) and adoption of tariff determined through transparent process of bidding under section 63 of the Electricity Act, 2003 and Guidelines for Short-term (i.e. for a period less than or equal to one year) Procurement of Power by Distribution Licensees Through Tariff Based Bidding Process, for procurement of 12 MW power for a period of one year from November 1, 2014 to October 31, 2015.
178 of 2014
Completed
4295 Thu 18/12/2014 11:30:00 AM
Hearing
Petition of Vikas J Electricals for under section 43 & 142 of the Electricity Act, 2003 & Regulation 4 & 5 of MERC (Electricity Supply Code & Other conditions of supply) Regulations 2005 & Regulation 4 of MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations 2005.
177 of 2014
Reschedule with further notice
4296 Thu 18/12/2014 11:30:00 AM
Admissibility Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for Power disturbance experienced on 02.09.2014 in area of supply of BEST Undertaking, serious grid constraint issues and abuse of dominant position by TPC therein.
176 of 2014
Completed
4297 Tue 16/12/2014 11:30:00 AM
Admissibility Hearing
Petition of Central Railway as deemed Licensee u/s 14 Electricity Act, 2003 & non applicability of cross subsidy charges etc.
194 of 2014
Completed
4298 Tue 16/12/2014 11:30:00 AM
Hearing
Petition of Sai Wardha Power Limited for under section 86 (1) (f) for adjudication of disputes between the Petitioner and the Respondent in relation to the Power Purchase Agreement dated 04.06.2010 entered into between the Petitioner and the Respondent.
174 of 2014
Completed
4299 Tue 16/12/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co Limited for Miscellaneous Application in Case No 123 of 2014 for approval of recovery of Additional Transmission charges payable to MSETCL (STU).
171 of 2014
Completed
4300 Tue 16/12/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for redetermination of Cross Subsidy Surcharge.
169 of 2014
Completed
4301 Tue 16/12/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for approval of agreement between MSPGCL & MSEDCL for supply of energy generated from Ghatghar pumped storage hydro power station and energy used for Ghatghar pumped storage hydro power station, operated and maintained by MSPGCL and owned by Government of Maharashtra.
111 of 2014
Completed
4302 Thu 11/12/2014 11:30:00 AM
Hearing
Case No 168 of 2014 and MA No. 10 of 2014 in Case No. 168 of 2014 : Petition of New Ushanagar Co-operative Housing Society Limited for under Rule 3 (3) of The Works of Licensees Rules, 2006 for Revision of the Order dated 11th September, 2014 made by The Commissioner of Police, Mumbai and for urgent Interim Relief. And MA No. 10 of 2014 in Case No. 168 of 2014 : Tata Power Company Limited Miscellaneous application under Regulation 92 read with Regulation 94 of the MERC (Conduct of Business) Regulation, 2004 seeking that no ex-parte Orders / directions be passed against the applicant.
168 of 2014 & MA No. 10 of 2014 in Case No. 168 of 2014
Completed
4303 Thu 11/12/2014 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for recovery of variable charges of Tata Power G Unit -6 from RInfra D, under adjudication of dispute under Section 33(4) and Section 86(1)(f) of EA 2003, pursuant to MSLDC's directions to operate Unit-6 to manage congestion on Mumbai tie lines forming part of Intra State transmission system (In STS) during summer 2014 (from April 2014 to July 2014).
172 of 2014
Completed
4304 Thu 11/12/2014 11:30:00 AM
Admissibility Hearing
Petition of Goradia Special Steels Limited for Miscellaneous Application against the MSEDCL.
166 of 2014
Reschedule with further notice
4305 Thu 11/12/2014 11:30:00 AM
Hearing
Petition of Shriniwas Yadgiri Sudhamani for non-compliance of the Order dated 23.04.2014 of CGRF Bhandup in Case No. 527.
165 of 2014
Completed
4306 Thu 11/12/2014 11:30:00 AM
Hearing
Petition of M/s. Gupta Energy Private Limited for under Section 86(1) (f) read with 86 (1) (c) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondent No. 1 and under Section 86(1)(k) read with section 42 (2) read with section 32 of the said Act.
109 of 2014
Completed
4307 Thu 11/12/2014 11:30:00 AM
Hearing
Review petition for Maharashtra State Electricity Distribution Co. Ltd, re-determination of cross subsidy surcharge. ( Reference - 1) MERC Order dated 29.10.2013 in Case No. 107 of 2013. 2) MERC Order dated 27.03.2014 in Case No. 185 of 2013.
108 of 2014
Completed
4308 Tue 09/12/2014 13:00:00 PM
Hearing
Petition of MSEDCL against M/s Sai Wardha Power Ltd seeking payment/ adjustment of (i) Rs. 50.44 Crores towards the refund of the amount paid by the Petitioner in pursuance of tripartite energy purchase agreement (the EPA) and (ii) Rs. 8.42 Crores towards balance cross subsidy surcharge (the CSS). for the FY 2012 - 13.
206 of 2014
Reschedule with further notice
4309 Tue 09/12/2014 12:30:00 PM
Public Hearing
Public Hearing on the Petition filed by Maharashtra State Power Generation Company(MSPGCL) for final true up for FY 2012-13 in accordance with MERC(Terms and Conditions of tariff) Regulations,2005 before the Maharashtra Electricity Regulatory Commission(MERC) Under section 61 and 62 of the Electricity Act,2003(The Act).
122 of 2013
Completed
4310 Tue 09/12/2014 12:00:00 PM
Public Hearing
Public Hearing on the Petition filed by Vidarbha Industries Power Limited for determination of Capital cost and Final Tariff for FY 2014-15 and FY 2015-16 for 2x300 MW Generating station at Butibori
115 of 2014
Completed
4311 Tue 09/12/2014 11:30:00 AM
Public Hearing
Case No 60 of 2014 : Public Hearing on the application filed by Vidarbh Industries Power Limited for Grant of Transmission Licence under the Section 14 read with Section 15 of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Transmission Licence Conditions) Regulations, 2004.
60 of 2014
Completed
4312 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 42, 86 (1) (f), 86 (1) (e), 86 (k), of the Electricity Act, 2003 seeking issuance of appropriate directions on the Respondent with respect to the grant of Open Access/ NOC for adjustment of wind energy credit notes in the monthly bills of the end consumers and Petition under Section 57 read with section 60 of the Electricity Act, 2003 seeking relief on the ground of abuse of dominant position for denial / delay in grant of Open Access / NOC by the Respondent resulting in commercial losses to the Petitioner and Complaint against the Respondent under Section 142, 146 and 149 of the Electricity Act, 2003 for non-compliance of orders, rules regulations framed by the Honorable Commission.
186 of 2014
Completed
4313 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of Crompton Greaves Ltd for under Sections 142 and 146 of the Electricity Act 2003; for non-compliance of orders/directions given by this Honorable Commission in the Order dated 05.02.2014 passed in Case No. 83 of 2012.
173 of 2014
Completed
4314 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of M/s Neel Sidhi Developers for non-compliance of the Order dated 24.07.2014 passed by CGRF, Bhandup under the provisions of Section 142 and Section 146 of the Electricity Act, 2003.
162 of 2014
Completed
4315 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of Jalgaon Energy Private Limited for Review of Order dated 05.02.2014 passed by the Honorable Commission in Case No. 83 of 2012.
94 of 2014
Completed
4316 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of RInfra-Distribution for Regulation 25 and 26 of MERC (Multi Year Tariff) Regulations, 2011, in respect of power purchase agreement;
89 of 2014
Completed
4317 Thu 04/12/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Power Purchase and other Dispensation in respect of fossil fuel based Captive Power Plants.
16 of 2014
Completed
4318 Tue 02/12/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Completed
4319 Tue 02/12/2014 11:30:00 AM
Hearing
Petition of Nath Pulp and Paper Mills Limited for non- compliance of Order passed by Honorable CGRF Aurangabad u/s 142 of the Electricity Act, 2003
161 of 2014
Completed
4320 Tue 02/12/2014 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for under Section 61, 86(1)(b), 86(1)(f) and other applicable provisions of the Electricity Act, 2003.
160 of 2014
Completed
4321 Tue 02/12/2014 11:30:00 AM
Hearing
Case No. 143 of 2014 & MA No. 9 of 2014 in 143 of 2014 : Petition of Maharashtra Seamless Limited for seeking direction against the Respondents for supplying electricity to the petitioner and not to impose costs of Transmission Network on the Petitioner which is not within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Electricity Supply Code and Other Conditions of Supply) Regulation, 2005 and the Circular No. 182 dated August 8, 2013 issued by the MSEDCL.
143 of 2014 & MA No. 9 of 2014 in 143 of 2014
Completed
4322 Wed 26/11/2014 11:30:00 AM
Hearing
MA No 13 of 2014 in Case No. 173 of 2013 : Petition of Indiabulls Power Limited for under Section 86 (1) (b) of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 22.4.2010 and 05.06.2010. executed between Maharashtra State Electricity Distribution Company Limited and Indiabulls Power Ltd.
173 of 2013
Completed
4323 Wed 26/11/2014 11:30:00 AM
Hearing
MA No 12 of 2014 in Case No. 02 of 2014 : Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
MA No 12 of 2014 in Case No. 2 of 2014
Completed
4324 Wed 26/11/2014 11:30:00 AM
Hearing
MA NO. 11 of 2014 in Case No. 163 of 2014 : Petition of Adani Power Maharashtra Limited for under section 86 of the Electricity Act, 2003("the Act") read with Article 13 "Change in Law" under the Power Purchase Agreement (PPA) dated 08.09.2008 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for appropriate adjustment in tariff due to "Change in Law" which substantially affected cost and the revenues of the project.
163 of 2014
Completed
4325 Wed 26/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under section 86 of the Electricity Act, 2003 ("the Act") read with Article 13 "Change in Law" under the Power Purchase Agreement ("PPA") dated 08.09.2008 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for appropriate adjustment in tariff due to "Change in Law" which substantially affected cost and the revenues of the project.
MA No. 11 of 2014 in Case No. 163 of 2014
Completed
4326 Wed 26/11/2014 11:30:00 AM
Hearing
MA No. 1 of 2014 in Case No 16 of 2014 : Petition of ISMT Limited for Application to implead as party in Case no 16 of 2014 petition filed by MSEDCL for Power Purchase and other Dispensation in respect of fossile fule based Captive Power Plant.
MA No 1 of 2014 in Case No. 16 of 2014
Reschedule with further notice
4327 Wed 26/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Completed
4328 Wed 26/11/2014 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
MA No 13 of 2014 in Case No. 173 of 2013
Completed
4329 Wed 26/11/2014 11:30:00 AM
Hearing
Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 (Solapur Bioenergy Systems Pvt Ltd v/s others)
132 of 2011
Completed
4330 Tue 25/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for assignment of "Transmission License of Adani Power Maharashtra Limited (License No. 2 of 2009)" granted u/s 14 of the Electricity Act, 2003 and MERC ( Transmission License Conditions ) Regulations, 2004.
189 of 2014
Completed
4331 Tue 25/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86 (1) (f) of Electricity Act, 2003 for netting off power consumed for start â?? up activities of the generating station against the power supplied to the Respondent under the PPAs & In the matter of Case No. 51 of 2013 for seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
139 of 2014
Completed
4332 Tue 25/11/2014 11:30:00 AM
Hearing
Petition of Prayas (Energy Group) seeking review of the Order dated 15th July in case No.s 154 of 2013, 189 of 2013 and 118 of 2013.
167 of 2014
Reschedule with further notice
4333 Tue 25/11/2014 11:30:00 AM
Hearing
Review Petition of Adani Power Maharashtra Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 189 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 140 of 2014.
159 of 2014
Reschedule with further notice
4334 Tue 25/11/2014 11:30:00 AM
Hearing
Review Petition of Indiabulls Power Limited under Section 94 (1) (f) of the Electricity Act, 2003 & Regulation 85 of MERC ( Conduct of Business) Regulations, 2004 of Final Orders dated 15.07.2014 passed by the Honorable Commission in Case No. 154 of 2013 and Order dated 20.08.2014 passed by the Honorable Commission in Case No. 147 of 2014.
158 of 2014
Reschedule with further notice
4335 Tue 25/11/2014 11:30:00 AM
Admissibility Hearing
Petition of Tata Power Company Limited for Review of Case No. 99 of 2013 with regards to disallowance of capitalisation.
157 of 2014
Completed
4336 Tue 25/11/2014 11:30:00 AM
Hearing
Petition of Shri Sudhakar Rajaram Ambiye (Through authorised representative Mrs. Sonal Sudhakar Ambiye) for u/s 142 & 146 of the Electricity Act, 2003 against MSEDCL for non- compliance of Order dated 16.07.2013 passed by CGRF, Ratnagiri.
155 of 2014
Completed
4337 Tue 25/11/2014 11:30:00 AM
Hearing
Petition of M/s. Shubhashree Auto Parts Sales & Service for non-compliance of the Order of CGRF Ratnagiri dated 18.02.2014.
154 of 2014
Completed
4338 Thu 20/11/2014 11:30:00 AM
Hearing
Petition of Tata Power Renewable Energy Limited for seeking applicability of the generic tariff to Solar Plant at Palaswadi as determined under the Order in Case No. 06 of 2013 for plants commissioned in FY 2013-14 but where the PPA is signed prior to 31st March 2013.
141 of 2014
Completed
4339 Thu 20/11/2014 11:30:00 AM
Hearing
Case No 168 of 2014 and MA No. 10 of 2014 in Case No. 168 of 2014 : Petition of New Ushanagar Co-operative Housing Society Limited for under Rule 3 (3) of The Works of Licensees Rules, 2006 for Revision of the Order dated 11th September, 2014 made by The Commissioner of Police, Mumbai and for urgent Interim Relief. And MA No. 10 of 2014 in Case No. 168 of 2014 : Tata Power Company Limited Miscellaneous application under Regulation 92 read with Regulation 94 of the MERC (Conduct of Business) Regulation, 2004 seeking that no ex-parte Orders / directions be passed against the applicant.
168 of 2014 & MA No. 10 of 2014 in Case No. 168 of 2014
Reschedule with further notice
4340 Thu 20/11/2014 11:30:00 AM
Admissibility Hearing
Petition of Shri Nathu Gangadhar Rambhad for directions to the Respondents under Section 86 (1) (i) of the Electricity Act, 2003 for refund of bill amount fraudulently and under duress collected on the pretext of application of commercial to transformer repairing industries.
153 of 2014
Completed
4341 Thu 20/11/2014 11:30:00 AM
Admissibility Hearing
Petition of Shri Gopal Shankar Dhote for under Section 142, 146, 149 of the Electricity Act,2003 for seeking action against Respondents for Non-compliance of the Regulation 5.4.1 of MERC (General Conditions of Distribution Licensee) Regulations, 2004.
152 of 2014
Completed
4342 Thu 20/11/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for waiver of delayed payment surcharge (DPS) on the Transmission Charges approved by MERC in Case 56 of 2013, Intra State Transmission Tariff Order dated 13.05.2013.
151 of 2014
Completed
4343 Thu 20/11/2014 11:30:00 AM
Hearing
Petition of Vidarbha Industries Power Limited for Miscellaneous Petition for removal of difficulty in treatment of FERV / HEDGING COST on foreign borrowings, post COD of the generating station under Section 61, 62 of Electricity Act 2003; Regulation 100 of MERC (MYT) Regulations 2011 and Regulation 96 of MERC (conduct of business) Regulations, 2004.
150 of 2014
Completed
4344 Tue 18/11/2014 11:30:00 AM
Hearing
Petition of Maharashtra Airport Development Company for approval and directions under 60, the Provision to Section 61 (1) (d), Section 86 (1) (b), (f) & ( k), of the Electricity Act, 2003 r/w the â??Guidelines for short term (i.e. for a period less than or equal to one year) procurement of power by Distribution Licensees through Tariff based bidding processâ?? dated 15.05.2012 issued by the Ministry of Power Govt. of India.
149 of 2014
Completed
4345 Tue 18/11/2014 11:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Section 86 (1), (f), (i), (k), 142, 146 & 149 of Electricity Act, 2003 for seeking issuance of appropriate directions upon the Respondent for levy of Tariff by arbitrarily subjecting the partial open access consumers to a different tariff category which is contrary to the provisions of the Electricity Act, 2003.
148 of 2014
Completed
4346 Tue 18/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Reschedule
4347 Tue 18/11/2014 00:30:00 AM
Hearing
Petition of M/s. Global Energy Limited under Sections 142 and 146 of the Electricity Act, 2003 for issuance of appropriate directions in terms of the order dated 02.06.2014, read with Regulation 92 of MERC (Conduct of Business) Regulations, 2004.
181 of 2014
Completed
4348 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Maharashtra Airport Development Company for approval and directions under 60, the Provision to Section 61 (1) (d), Section 86 (1) (b), (f) & ( k), of the Electricity Act, 2003 r/w the 'Guidelines for short term (i.e. for a period less than or equal to one year) procurement of power by Distribution Licensees through Tariff based bidding process' dated 15.05.2012 issued by the Ministry of Power Govt. of India.
149 of 2014
Completed
4349 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Westin Garden City Mumbai. (A Unit of Oberoi Realty Limited.) for seeking relief under clause 44.4 of the Distribution Open Access Regulations 2014 and the relevant rulings / clauses of Electricity Act, 2003 (with amendments).
175 of 2014
Completed
4350 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Ajanta Private Limited for seeking relief under clause 44.4 of the Distribution Open Access Regulations 2014.
170 of 2014
Completed
4351 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Tata Power Renewable Energy Limited for seeking applicability of the generic tariff to Solar Plant at Palaswadi as determined under the Order in Case No. 06 of 2013 for plants commissioned in FY 2013-14 but where the PPA is signed prior to 31st March 2013.
141 of 2014
Reschedule with further notice
4352 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited under Section 86(1) (f) of Electricity Act, 2003 for netting off power consumed for start up activities of the generating station against the power supplied to the Respondent under the PPA's & In the matter of Case No. 51 of 2013 for seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
139 of 2014
Reschedule with further notice
4353 Thu 13/11/2014 11:30:00 AM
Admissibility Hearing
Petition of Maharashtra State Electricity Distribution Co Ltd. for removal of difficulties in implementation of MERC (Standards of Performance of Distribution Licensees, Period for giving supply and Determination of Compensation) Regulations, 2014.
138 of 2014
Reschedule with further notice
4354 Thu 13/11/2014 11:30:00 AM
Hearing
Petition of Bajaj Finserv Limited in the matter of MERC's Distribution Open Access Regulation - 2014 and request of Bajaj Finserv to Honorable Commission to exempt non-firm wind energy from applicability of incompatible regulations for captive use / third party sale under open access and continue to promote their sell of RE to any person as per section 86 (1) (e) of Electricity Act 2003 and MSEDCL started implementation of Regulations w.e.f. 1st April 2014, prior to the notification of DOA- 2014 and stopped the business of existing wind energy projects, established only for captive use / third party sale.
137 of 2014
Completed
4355 Tue 11/11/2014 11:30:00 AM
Hearing
156 of 2014
Completed
4356 Tue 11/11/2014 11:30:00 AM
Hearing
Petition of M/s. Arihant Universal Realty Pvt. Ltd. for under Section 142 of the Electricity Act 2003 for Non-compliance of the Order passed by CGRF, Bhandup Zone (Order No. 329 dated 09.07.2010).
134 of 2014
Completed
4357 Tue 11/11/2014 11:30:00 AM
Hearing
Petition of M/s. Shrinivas Engineering Auto Component Pvt. Ltd. under section 142 of Electricity Act 2003 for non-compliance of CGRF, Pune Order (in grievance Case No. 20 of 2013) dated 31.01.2014.
133 of 2014
Completed
4358 Tue 11/11/2014 11:30:00 AM
Hearing
Petition of The Supreme Industries Ltd.(Unit No. III) against MSEDCL under Section 142 & 149 of the Electricity Act 2003 for Non-compliance of the Order passed by Electricity Ombudasman Mumbai dated 06.03.2013 in Representation No. 10 / 2013.
132 of 2014
Completed
4359 Thu 30/10/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Completed
4360 Thu 30/10/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for Review of Order dated 05.05.2014 in Case No. 63 of 2014 in the matter of suo motu proceedings on the Report submitted by the Committee on compensatory Tariff for Tiroda power plant of Adani Power Maharashtra Limited in Case No. 68 of 2012.
131 of 2014
Completed
4361 Thu 30/10/2014 11:30:00 AM
Hearing
Petition of Maharashtra Seamless Limited for seeking the adjustment of banked units of energy from the plant of the Petitioner towards the other unit of the Petitioner within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Distribution Open Access) Regulation, 2005 and the Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
129 of 2014
Completed
4362 Thu 30/10/2014 11:30:00 AM
Hearing
Petition of Indian Wind Power Association - Maharashtra State Council for seeking Clarification of the Order dated 20.06.2014 in Case No. 93 of 2013 pronounced by the Honorable MERC read with the Order dated 07.04.2014 in Case No. 92 of 2012 pronounced by the Honorable MERC and the revised Energy Purchase Agreement of the MSEDCL.
130 of 2014
Completed
4363 Thu 30/10/2014 11:30:00 AM
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for fixation of tariff for non fossil fuel based cogen projects completing the tenure of 13 years of EPA with the distribution licensee and in process of renewal of EPA.
127 of 2014
Completed
4364 Tue 28/10/2014 11:30:00 AM
Hearing
Case No 168 of 2014 and MA No. 10 of 2014 in Case No. 168 of 2014 : Petition of New Ushanagar Co-operative Housing Society Limited for under Rule 3 (3) of The Works of Licensees Rules, 2006 for Revision of the Order dated 11th September, 2014 made by The Commissioner of Police, Mumbai and for urgent Interim Relief. And MA No. 10 of 2014 in Case No. 168 of 2014 : Tata Power Company Limited Miscellaneous application under Regulation 92 read with Regulation 94 of the MERC (Conduct of Business) Regulation, 2004 seeking that no ex-parte Orders / directions be passed against the applicant.
168 of 2014 & MA No. 10 of 2014 in Case No. 168 of 2014
Completed
4365 Tue 28/10/2014 11:30:00 AM
Hearing
Petition of Development Commissioner, SEEPZ SEZ, Mumbai for Clarification on the issue whether the SEEPZ - SEZ will be considered as separate licensed area for the deemed distribution licensee (Developer / Co developer) of SEEPZ-SEZ in light of the amendment dated 3rd March, 2010 under Section 14 of the Electricity Act, 2003 and whether the deemed distribution licensee can undertake power distribution by developing own dedicated distribution network for SEEPZ-SEZ area and a tariff determined by Hon. MERC separately for SEEPZ-SEZ.
126 of 2014
Reschedule with further notice
4366 Tue 28/10/2014 11:30:00 AM
Hearing
Petition of M/s. Shree Chatrapati Shahu Sahakari Sakhar Karkhana Ltd., for clarification and benefit of Order dated 28.09.2007 in Case No. 63 of 2006.
125 of 2014
Completed
4367 Tue 28/10/2014 11:30:00 AM
Hearing
Petition of Krishna Valley Power Private Limited for under Sections 42, 86 (c, e), 142 & 146 of E. A. 2003 & Regulations No. 3.1 of MERC (Distribution Open Access) Regulations, 2005 & Regulations 92-94 of MERC (conduct of business) Regulations, 2004 for Refusal of Open Access permission.
124 of 2014
Completed
4368 Tue 28/10/2014 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for seeking relief on account of certain issues that may affect BEST Undertaking and its financial sustainability.
118 of 2014
Reschedule with further notice
4369 Tue 14/10/2014 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for determination of compensation as per Honorable ATE judgment payable to Tata Power for non scheduling of 198 MW of power in the months February 2011 and March 2011 by Maharashtra State Load Dispatch Centre (MSLDC).
117 of 2014
Completed
4370 Tue 14/10/2014 11:30:00 AM
Hearing
Petition of M/s Mittal Electricals for non - compliance of Standard of Performance for period of giving supply by the Tata Power Company Limited as per MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations 2005.
116 of 2014
Completed
4371 Tue 14/10/2014 11:30:00 AM
Hearing
Petition of Bharat Forge Limited for seeking clarification of Order dated 16.08.2012 in Case No. 19 of 2012 pronounced by the Honorable MERC read with the Commercial Circular No. 175 dated 05.09.2012 issued by the MSEDCL and the Order dated 26.07.2012 in Appeal No. 198 of 2010 and Appeal No. 42 of 2011 pronounced by the Honorable APTEL.
113 of 2014
Completed
4372 Tue 14/10/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for approval of agreement between MSPGCL & MSEDCL for supply of energy generated from Ghatghar pumped storage hydro power station and energy used for Ghatghar pumped storage hydro power station, operated and maintained by MSPGCL and owned by Government of Maharashtra.
111 of 2014
Completed
4373 Thu 09/10/2014 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for invoking jurisdiction under Section 86 (1) (f) read with 86 (1) (c) of the Electricity Act, 2003 for non compliance by Rinfra- Transmission of this Honorable Commissionâ??s Order dated 23rd August, 2013 in Case No. 120 of 2012.
110 of 2014
Completed
4374 Thu 09/10/2014 11:30:00 AM
Hearing
Petition of M/s. Gupta Energy Private Limited for under Section 86(1) (f) read with 86 (1) (c) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondent No. 1 and under Section 86(1) (k) read with section 42 (2) read with section 32 of the said Act.
109 of 2014
Reschedule with further notice
4375 Thu 09/10/2014 11:30:00 AM
Hearing
Review petition for Maharashtra State Electricity Distribution Co. Ltd, re-determination of cross subsidy surcharge. (Reference - 1) MERC Order dated 29.10.2013 in Case No. 107 of 2013. 2) MERC Order dated 27.03.2014 in Case No. 185 of 2013.
108 of 2014
Reschedule with further notice
4376 Thu 09/10/2014 11:30:00 AM
Hearing
Petition of Mihan Industries Association for grant of directions under sections 23, 24, 42, 43, read with clause 4.1, 4.3, 4.7, 5.1, 6.1, 6.2, 6.3, 8.1, 8.2, 8.3, 10.1, 10.2, 10.3, 10.4, 12.1, 12.2, 13.1, 13.2 of MERC ( Standard of Performance of Distribution Licenses, Period for Giving Supply and determination of compensation ) Regulations 2005, and regulation 3.1, 3.2, 3.3, 4, 6.1, 6.2 10 of MERC ( CGRF / IGRC / OMBUASMAN ) Regulations 2006, and u/s 56, 59, u / s 86 (1) (b), (c), (i), (k), 92, 94 (2), 95, read with 8.2.1, 8.2.2, 8.3.1, 8.3.2, 8.15.2 of MERC ( GENERAL CONDITIONS OF DISTRIBUTION LICENSE) Regulations 2006, read with clause 73, 92 of MERC ( CONDUCT OF BUSINESS ) Regulations 2004, and u/s 86 (1), 129, 128, 142, 146, 149 EA Act 2003.
107 of 2014
Completed
4377 Tue 07/10/2014 11:30:00 AM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna, under section 142 and 146 of the Electricity Act 2003 for punishment to MSEDCL and it's responsible Officers for violating Electricity Act 2003, Regulations and Orders given by Honorable Commission while giving new electricity connection to Agriculturist Consumers.
105 of 2014
Completed
4378 Tue 07/10/2014 11:30:00 AM
Hearing
Petition of Vishwanath Narayan Mankar for under Section 142, 146 & 149 of the Electricity Act 2003 for Non-compliance of the Order passed by CGRF in Case No. 55 of 2013 Order No. CGRF/AMZ/220 dated 18.07.2013.
104 of 2014
Completed
4379 Tue 07/10/2014 11:30:00 AM
Hearing
Review Petition of MSPGCL against Order dated 03.03.2014 and corrigendum Order dated 19.03.2014 in Case No. 54 of 2013 on a Petition filed by MSPGCL for Approval of Final True-Up for FY 2011-12, Annual Performance Review for the year FY 2012-13 and Multi Year Tariff for FY 2013-14 To FY 2015-16.
103 of 2014
Completed
4380 Tue 07/10/2014 11:30:00 AM
Hearing
Petition of M/s. JSW Energy Limited for directing the State Load Dispatch Centre to accept the declared capacity of upto 300 MW of the 4 units as declared by the Petitioner from time to time and directing the State Load Dispatch Centre to schedule dispatch in accordance with the capacity as declared by the Petitioner from time to time.
102 of 2014
Completed
4381 Tue 30/09/2014 11:30:00 AM
Hearing
Petition of Jalgaon Energy Private Limited for Review of Order dated 05.02.2014 passed by the Honorable Commission in Case No. 83 of 2012.
94 of 2014
Completed
4382 Tue 30/09/2014 11:30:00 AM
Hearing
Petition of Cosmo Films Limited (SEZ Unit). Complaint against Licensee (MSEDCL) in the matter of illegal recovery of additional amount against the order dt. 03.09.2013 in Case No. 28 / 2013, dt. 04.09.2013 in Case No. 44/2013, dt. 05.09.2013 in case No. 95/2013 passed by Commissions. Action under Section 142 & 146 of Elect. Act 2003 proposed against MSEDCL for violation of MERC's orders.
92 of 2014
Completed
4383 Tue 30/09/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for approval for supplying power to consumers in Mihan SEZ Area at MERC approved rates.
91 of 2014
Completed
4384 Tue 30/09/2014 11:30:00 AM
Hearing
Petition of RInfra-Distribution for Regulation 25 and 26 of MERC (Multi Year Tariff) Regulations, 2011, in respect of power purchase agreement
89 of 2014
Completed
4385 Tue 23/09/2014 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) in the matter of Refund of Fuel Adjustment Charges (FAC) to BEST's consumers during Second MYT Control Period FY 2013-14 to FY 2015-16.
88 of 2014
Completed
4386 Tue 23/09/2014 11:30:00 AM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna for clarification relating to Additional Energy Charge (AEC1, AEC2, AEC3, and AEC4) and Additional Fuel Adjustment Cost ( Additional FAC ) as per Honorable Commission' Order of September 2013, which is charged in the energy bills of new Low Tension & High Tension Industrial consumers of MSEDCL who become consumers of MSEDCL after January 2013.
86 of 2014
Completed
4387 Tue 23/09/2014 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies P Limited for Providing power evacuation arrangement Karwand SHP in Dist. Dhule.
73 of 2014
Completed
4388 Tue 23/09/2014 11:30:00 AM
Hearing
Petition of Sinnar Power Transmission Company Limited for approval of the Honorable Commission for creating encumbrance on the assets of licensed business of Sinnar Power Transmission Company Ltd.(SPTCL) under the provisions of section 15.3 of MERC ( Transmission License Conditions ) Regulations, 2004 as amended in 2006 ("Transmission License Conditions Regulations").
70 of 2014
Completed
4389 Thu 18/09/2014 11:30:00 AM
Hearing
Petition of Smt. Dhanraji Indradev Mishra for revision Petition under Sections 3(2, 3,4) of the Maharashtra Works of Licensees Rules 2012 for illegal and unwarranted Order dated 03.08.2013 passed by the Additional Collector, Thane, Jawhar and illegal attempted trespass for erection of tower No. 9/4 by MSETCL in the Petitioner' land bearing Survey No. 157, Gut No. 146/2 of village Mahagaon, Taluka Palghar, Boisar District Thane.
120 of 2014
Completed
4390 Thu 18/09/2014 11:30:00 AM
Hearing
Petition of Shendra Green Energy Limited under sections 62 (1), 62 (4), 86 (1) (a), 86 (1) (b), 86 (1) (c), 86 (1) (e), 86 (1) (f) of the Electricity Act, 2003, read with Regulations 8, 75 and 77 of the MERC (Terms and Conditions for determination of RE Tariff ) Regulations, 2010.
69 of 2014
Completed
4391 Thu 18/09/2014 11:30:00 AM
Hearing
Petition of M/s Wardha Power Company Limited, for Review Petition of Order dated 17.01.2014 in Case No. 91 of 2013, under Section 94(1) (f) of the Elect. Act 2003.
61 of 2014
Completed
4392 Thu 18/09/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Power Purchase and other Dispensation in respect of fossil fuel based Captive Power Plants.
16 of 2014
Completed
4393 Tue 16/09/2014 11:30:00 AM
Admissibility Hearing
Case No 143 of 2014 & MA No. 9 of 2014 in Case No. 143 of 2014 : Petition of Maharashtra Seamless Limited for seeking direction against the Respondents for supplying electricity to the petitioner and not to impose costs of Transmission Network on the Petitioner which is not within the purview of the Electricity Act, 2003 and rules thereof read with the MERC (Electricity Supply Code and Other Conditions of Supply) Regulation, 2005 and the Circular No. 182 dated August 8, 2013 issued by the MSEDCL.
143 of 2014 & MA No. 9 of 2014 in Case No. 143 of 2014
Completed
4394 Tue 16/09/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Completed
4395 Tue 16/09/2014 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Completed
4396 Tue 16/09/2014 11:30:00 AM
Hearing
Petition M/s JSW Energy Limited for adjudication of disputes that have arisen between JSW Energy Limited and Maharashtra State Electricity Distribution Company under the PPA dated 23.2.2010.
9 of 2011
Completed
4397 Tue 16/09/2014 11:30:00 AM
Hearing
Petition of Mula Pravara Electric Co.op Society Ltd. for violation of provisions relating to grant of Open Access.
46 of 2010
Completed
4398 Tue 26/08/2014 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Reschedule with further notice
4399 Tue 26/08/2014 11:30:00 AM
Hearing
Case No Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Reschedule with further notice
4400 Tue 19/08/2014 11:30:00 AM
Hearing
Petition of Jawahar Shetkari Sahakari Sakhar Karkhana Ltd., for fixation of tariff for non fossil fuel based cogen projects completing the tenure of 13 years of EPA with the distribution licensee and in process of renewal of EPA.
127 of 2014
Reschedule with further notice
4401 Tue 19/08/2014 11:30:00 AM
Hearing
Petition of Development Commissioner, SEEPZ SEZ, Mumbai for Clarification on the issue whether the SEEPZ - SEZ will be considered as separate licensed area for the deemed distribution licensee (Developer / Co developer) of SEEPZ-SEZ in light of the amendment dated 3rd March, 2010 under Section 14 of the Electricity Act, 2003 and whether the deemed distribution licensee can undertake power distribution by developing own dedicated distribution network for SEEPZ-SEZ area and a tariff determined by Hon. MERC separately for SEEPZ-SEZ.
126 of 2014
Reschedule with further notice
4402 Tue 19/08/2014 11:30:00 AM
Hearing
Petition of M/s. Shree Chatrapati Shahu Sahakari Sakhar Karkhana Ltd., for clarification and benefit of Order dated 28.09.2007 in Case No. 63 of 2006.
125 of 2014
Reschedule with further notice
4403 Tue 19/08/2014 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) for seeking relief on account of certain issues that may affect BEST Undertaking and its financial sustainability.
118 of 2014
Reschedule with further notice
4404 Thu 14/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for under Sections 61, 86 & 181of Electricity Act, 2003 & MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010 & Regulation 92 of MERC ( conduct of business ) Regulations, 2004 seeking the directives of Honorable Commission in resolution of dispute between MSPGCL and MSEDCL on Tariff matters for its Solar Power Projects situated at Sakri, Maharashtra.
128 of 2014
Reschedule
4405 Thu 14/08/2014 11:30:00 AM
Hearing
78 of 2014
Reschedule
4406 Thu 14/08/2014 11:30:00 AM
Hearing
Petition of M/s Wardha Power Company Limited, for Review Petition of Order dated 17.01.2014 in Case No. 91 of 2013, under Section 94(1) (f) of the Elect. Act 2003. Case No. 61 of 2014
61 of 2014
Reschedule with further notice
4407 Thu 14/08/2014 11:30:00 AM
Hearing
Petition of The Tata Power Company Limited for determination of compensation as per Honorable ATE judgment payable to Tata Power D for non scheduling of 198 MW of power in the months February 2011 and March 2011 by Maharashtra State Load Dispatch Centre (MSLDC).
117 of 2014
Reschedule with further notice
4408 Thu 14/08/2014 11:30:00 AM
Hearing
Petition of Krishna Valley Power Private Limited for under Sections 42, 86 (c, e), 142 & 146 of E. A. 2003 & Regulations No. 3.1 of MERC (Distribution Open Access) Regulations, 2005 & Regulations 92-94 of MERC (conduct of business) Regulations, 2004 for Refusal of Open Access permission.
124 of 2014
Reschedule with further notice
4409 Thu 14/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Power Purchase and other Dispensation in respect of fossil fuel based Captive Power Plants.
16 of 2014
Reschedule with further notice
4410 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. under Section 86 of the Electricity Act, 2003 for adjustment in tariff under the Power Purchase Agreements (PPA's) dated 22.04.2010 and 05.06.2010 executed between MSEDCL and India Bulls Power Limited pursuant to impact on tariff due to shortage in domestic coal availability and consequent changes in New Coal Distribution Policy dated 18.10.2007 which reduced the assured quantum of domestic coal ensured under the New Coal Distribution Policy dated 26.07.2013 read with relevant Articles of the PPA's, recommendations of the Cabinet Committee on Economic Affairs dated 21.06.2013 and communication of Ministry of Power dated 31.07.2013 to the State Governments and Regulatory Commissions.
147 of 2014
Completed
4411 Tue 12/08/2014 11:30:00 AM
Hearing
Review petition for Maharashtra State Electricity Distribution Co. Ltd, re-determination of cross subsidy surcharge. ( Reference- 1) MERC Order dated 29.10.2013 in Case No. 107 of 2013. 2) MERC Order dated 27.03.2014 in Case No. 185 of 2013.
108 of 2014
Reschedule with further notice
4412 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for approval of agreement between MSPGCL & MSEDCL for supply of energy generated from Ghatghar pumped storage hydro power station and energy used for Ghatghar pumped storage hydro power station, operated and maintained by MSPGCL and owned by Government of Maharashtra.
111 of 2014
Reschedule with further notice
4413 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 for adjustment in tariff under the Power Purchase Agreements(PPAâ??s) dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013
140 of 2014
Completed
4414 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra Industrial Development Corporation for seeking clarification in respect of Orders of Case No. 19 of 2012 dated 16.08.2012 and Case No. 38 of 2014 dated 11.06.2014 regarding date of applicability of PWW Tariff for MIDCâ??s Water Works & Sewage Treatment Plants.
146 of 2014
Completed
4415 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of M/s. Gupta Energy Private Limited for under Section 86(1) (f) read with 86 (1) (c) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondent No. 1 and under Section 86(1)(k) read with section 42 (2) read with section 32 of the said Act.
109 of 2014
Completed
4416 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 (1) (f) of Electricity Act, 2003 seeking extension of Sheduled Commercial Operation Date for actual delay or 11 months, and further seeking refund of the Liquidated Damages, wrongfully deducted from the March 2014 Monthly Invoice, by the Respondent.
144 of 2014
Completed
4417 Tue 12/08/2014 11:30:00 AM
Hearing
110 of 2014
Reschedule with further notice
4418 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of M/s Mittal Electricals for non - compliance of Standard of Performance for period of giving supply by the Tata Power Company Limited as per MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations 2005.
116 of 2014
Reschedule with further notice
4419 Tue 12/08/2014 11:30:00 AM
Hearing
Petition of Bharat Forge Limited for seeking clarification of Order dated 16.08.2012 in Case No. 19 of 2012 pronounced by the Honorable MERC read with the Commercial Circular No. 175 dated 05.09.2012 issued by the MSEDCL and the Order dated 26.07.2012 in Appeal No. 198 of 2010 and Appeal No. 42 of 2011 pronounced by the Honorable APTEL.
113 of 2014
Reschedule with further notice
4420 Tue 12/08/2014 11:00:00 AM
Public Hearing
Application filed by Tata Power Company for Grant of Transmission Licence under the Section 14 read with Section 15 of the Electricity Act, 2003 read with Maharashtra Electricity Regulatory Commission (Transmission Licence Conditions) Regulations, 2004.
112 of 2014
Completed
4421 Thu 07/08/2014 12:30:00 PM
Hearing
Petition of M/s. Gupta Energy Private Limited for under Section 86(1)(f) read with 86 (1) (c) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondent No. 1 and under Section 86(1)(k) read with section 42 (2) read with section 32 of the said Act.
109 of 2014
Reschedule with further notice
4422 Thu 07/08/2014 12:30:00 PM
Hearing
Review petition for Maharashtra State Electricity Distribution Co. Ltd, re-determination of cross subsidy surcharge. ( Reference- 1) MERC Order dated 29.10.2013 in Case No. 107 of 2013. 2) MERC Order dated 27.03.2014 in Case No. 185 of 2013.
108 of 2014
Reschedule
4423 Thu 07/08/2014 12:30:00 PM
Hearing
Petition of Mihan Industries Association for grant of directions under sections 23, 24, 42, 43, read with clause 4.1, 4.3, 4.7, 5.1, 6.1, 6.2, 6.3, 8.1, 8.2, 8.3, 10.1, 10.2, 10.3, 10.4, 12.1, 12.2, 13.1, 13.2 of MERC (Standard of Performance of Distribution Licenses, Period for Giving Supply and determination of compensation ) Regulations 2005, and regulation 3.1, 3.2, 3.3, 4, 6.1, 6.2 10 of MERC (CGRF / IGRC/ OMBUASMAN) Regulations 2006, and u/s 56, 59, u / s 86 (1) (b), (c), (i), (k), 92, 94 (2), 95, read with 8.2.1, 8.2.2, 8.3.1, 8.3.2, 8.15.2 of MERC (GENERAL CONDITIONS OF DISTRIBUTION LICENSE) Regulations 2006, read with clause 73, 92 of MERC (CONDUCT OF BUSINESS ) Regulations 2004, and u/s 86 (1), 129, 128, 142, 146, 149 EA Act 2003.
107 of 2014
Reschedule with further notice
4424 Thu 07/08/2014 12:30:00 PM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna, under section 142 and 146 of the Electricity Act 2003 for punishment to MSEDCL and it's responsible Officers for violating Electricity Act 2003, Regulations and Orders given by Honorable Commission while giving new electricity connection to Agriculturist Consumers.
105 of 2014
Reschedule with further notice
4425 Thu 07/08/2014 11:30:00 AM
Hearing
Case No. 145 of 2014 : Petition of M/s. JSW Energy Limited for application under Petition under Regulations 92 and 94 of MERC (conduct of business) Regulations, 2004 read with Sections 86 (1) (b) and 86 (1) (f) of the Electricity Act, 2003 for certain clarifications and grant of additional time to comply with the Order dated 15.07.2014 in Case No. 118 of 2013.
145 of 2014
Completed
4426 Thu 07/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for under Sections 61, 86 & 181of Electricity Act, 2003 & MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010 & Regulation 92 of MERC ( conduct of business ) Regulations, 2004 seeking the directives of Hon'ble Commission in resolution of dispute between MSPGCL and MSEDCL on Tariff matters for its Solar Power Projects situated at Sakri, Maharashtra.
128 of 2014
Completed
4427 Thu 07/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Limited for approval of agreement between MSPGCL & MSEDCL for supply of energy generated from Ghatghar pumped storage hydro power station and energy used for Ghatghar pumped storage hydro power station, operated and maintained by MSPGCL and owned by Government of Maharashtra.
111 of 2014
Reschedule
4428 Thu 07/08/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for Submission of Petition regarding economical shut down of five units of MSPGCL to optimize resources and to achieve economy in coal based plants operations and for removal of difficulty under Sections 61 of the Electricity Act, 2003 and Regulation 100 of the MERC ( Multi Year Tariff ) Regulations, 2011 framed under Section 181 of the Electricity Act, 2003.
78 of 2014
Completed
4429 Thu 07/08/2014 11:30:00 AM
Hearing
Case No 140 of 2014 : Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 for adjustment in tariff under the Power Purchase Agreements(PPA's) dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013
140 of 2014
Completed
4430 Thu 07/08/2014 11:30:00 AM
Hearing
Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Completed
4431 Thu 07/08/2014 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Completed
4432 Tue 05/08/2014 12:00:00 PM
Hearing
Petition of Vishwanath Narayan Mankar for under Section 142, 146 & 149 of the Electricity Act 2003 for Non-compliance of the Order passed by CGRF in Case No. 55 of 2013 Order No. CGRF/AMZ/220 dated 18.07.2013.
104 of 2014
Reschedule with further notice
4433 Tue 05/08/2014 12:00:00 PM
Hearing
Review Petition of MSPGCL against Order dated 03.03.2014 and corrigendum Order dated 19.03.2014 in Case No. 54 of 2013 on a Petition filed by MSPGCL for Approval of Final True-Up for FY 2011-12, Annual Performance Review for the year FY 2012-13 and Multi Year Tariff for FY 2013-14 To FY 2015-16.
103 of 2014
Reschedule with further notice
4434 Tue 05/08/2014 12:00:00 PM
Hearing
Petition of M/s. JSW Energy Limited for directing the State Load Dispatch Centre to accept the declared capacity of upto 300 MW of the 4 units as declared by the Petitioner from time to time and directing the State Load Dispatch Centre to schedule dispatch in accordance with the capacity as declared by the Petitioner from time to time.
102 of 2014
Reschedule with further notice
4435 Tue 05/08/2014 12:00:00 PM
Hearing
Petition of Cosmo Films Limited (SEZ Unit). Complaint against Licensee (MSEDCL) in the matter of illegal recovery of additional amount against the order dt. 03.09.2013 in Case No. 28 / 2013, dt. 04.09.2013 in Case No. 44/2013, dt. 05.09.2013 in case No. 95/2013 passed by Commissions. Action under Section 142 & 146 of Elect. Act 2003 proposed against MSEDCL for violation of MERCs orders.
92 of 2014
Reschedule with further notice
4436 Tue 05/08/2014 12:00:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Co. Limited for approval for supplying power to consumers in Mihan SEZ Area at MERC approved rates.
91 of 2014
Reschedule with further notice
4437 Tue 05/08/2014 11:30:00 AM
Hearing
Case No 140 of 2014 : Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 for adjustment in tariff under the Power Purchase Agreements(PPA's) dated 08.09.2008, 31.03.2010, 09.08.2010 and 16.02.2013.
140 of 2014
Reschedule
4438 Thu 31/07/2014 11:30:00 AM
Hearing
Petition of RInfra-Distribution for Regulation 25 and 26 of MERC (Multi Year Tariff) Regulations, 2011, in respect of power purchase agreement;
89 of 2014
Reschedule with further notice
4439 Thu 31/07/2014 11:30:00 AM
Hearing
Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) in the matter of Refund of Fuel Adjustment Charges (FAC) to BEST's consumers during Second MYT Control Period FY 2013-14 to FY 2015-16.
88 of 2014
Reschedule with further notice
4440 Thu 31/07/2014 11:30:00 AM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna for clarification relating to Additional Energy Charge (AEC1, AEC2, AEC3, and AEC4) and Additional Fuel Adjustment Cost ( Additional FAC ) as per Honorable Commission's Order of September 2013, which is charged in the energy bills of new Low Tension & High Tension Industrial consumers of MSEDCL who become consumers of MSEDCL after January 2013.
86 of 2014
Reschedule with further notice
4441 Thu 31/07/2014 11:30:00 AM
Hearing
Petition of Wat-ere-source Technologies P Limited for Providing power evacuation arrangement Karwand SHP in Dist. Dhule.
73 of 2014
Reschedule with further notice
4442 Thu 31/07/2014 11:30:00 AM
Hearing
Petition of Sinnar Power Transmission Company Limited for approval of the Honorable Commission for creating encumbrance on the assets of licensed business of Sinnar Power Transmission Company Ltd.(SPTCL) under the provisions of section 15.3 of MERC ( Transmission License Conditions ) Regulations, 2004 as amended in 2006 ("Transmission License Conditions Regulations").
70 of 2014
Reschedule with further notice
4443 Thu 24/07/2014 11:30:00 AM
Hearing
Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 ( Solapur Bioenergy Systems Pvt Ltd v/s Others).
132 of 2011
Completed
4444 Thu 24/07/2014 11:30:00 AM
Hearing
Petition M/s JSW Energy Limited for adjudication of disputes that have arisen between JSW Energy Limited and Maharashtra State Electricity Distribution Company under the PPA dated 23.2.2010.
9 of 2011
Completed
4445 Tue 22/07/2014 12:00:00 PM
Hearing
Case No 78 of 2014 : Petition of Maharashtra State Power Generation Co. Limited for Submission of Petition regarding economical shut down of five units of MSPGCL to optimize resources and to achieve economy in coal based plantsâ?? operations and for removal of difficulty under Sections 61 of the Electricity Act, 2003 and Regulation 100 of the MERC ( Multi Year Tariff ) Regulations, 2011 framed under Section 181 of the Electricity Act, 2003.
78 of 2014
Completed
4446 Tue 22/07/2014 11:30:00 AM
Public Hearing
Case No 67 of 2014 : Application filed by M/s Amravati Power Transmission Company Limited for amendment of Transmission Licence No. 3 of 2010 granted to it by Maharashtra Electricity Regulatory Commission
67 of 2014
Completed
4447 Thu 17/07/2014 11:30:00 AM
Hearing
Case No 120 of 2014 : Petition of Smt. Dhanraji Indradev Mishra for revision Petition under Sections 3(2, 3,4) of the Maharashtra Works of Licensees Rules 2012 for illegal and unwarranted Order dated 03.08.2013 passed by the Additional Collector, Thane, Jawhar and illegal attempted trespass for erection of tower No. 9/4 by MSETCL in the Petitioner's land bearing Survey No. 157, Gut No. 146/2 of village Mahagaon, Taluka Palghar, Boisar District Thane.
120 of 2014
Reschedule with further notice
4448 Thu 17/07/2014 11:30:00 AM
Hearing
Case No. 94 of 2014 : Petition of Jalgaon Energy Private Limited for Review of Order dated 05.02.2014 passed by the Honorable Commission in Case No. 83 of 2012.
94 of 2014
Completed
4449 Thu 17/07/2014 11:30:00 AM
Hearing
Case No. 69 of 2014 : Petition of Shendra Green Energy Limited under sections 62 (1), 62 (4), 86 (1) (a), 86(1)(b), 86(1)(c), 86(1)(e), 86(1)(f) of the Electricity Act, 2003, read with Regulations 8, 75 and 77 of the MERC(Tems and Conditions for determination of RE Tariff) Regulations, 2010.
69 of 2014
Completed
4450 Thu 17/07/2014 11:30:00 AM
Hearing
Case No. 68 of 2014 : Petition of MSEDCL for Review of the Order dated 05.02.2014, passed by Honble Commission in Case No. 83 of 2012.
68 of 2014
Completed
4451 Tue 15/07/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for under Sections 61, 86 & 181of Electricity Act, 2003 & MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010 & Regulation 92 of MERC ( conduct of business ) Regulations, 2004 seeking the directives of Honorable Commission in resolution of dispute between MSPGCL and MSEDCL on Tariff matters for its Solar Power Projects situated at Sakri, Maharashtra.
128 of 2014
Completed
4452 Tue 15/07/2014 11:30:00 AM
Hearing
Case No. 61 of 2014 : Petition of M/s Wardha Power Company Limited, for Review Petition of Order dated 17.01.2014 in Case No. 91 of 2013, under Section 94(1) (f) of the Elect. Act 2003.
61 of 2014
Completed
4453 Tue 15/07/2014 11:30:00 AM
Hearing
Case No. 59 of 2014 : Petition of Sudarshan Chemical Industries Limited ( MIDC Estate, Mahad Plant ) Complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
59 of 2014
Completed
4454 Tue 15/07/2014 11:30:00 AM
Hearing
Case No. 58 of 2014 :Petition of Sudarshan Chemical Industries Limited (MIDC Estate, Dhatav Plant) Complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
58 of 2014
Completed
4455 Tue 15/07/2014 11:30:00 AM
Hearing
Case No. 56 of 2014 : Petition of M/s. Galaxy Auto Axel Pvt. Limited for Petition under Section 142 of the Electricity Act, 2003 for Non - compliance of the Order passed by Electricity Ombudsman, Mumbai, in representation No. 71 of 2013, dated 01.10.2013.
56 of 2014
Completed
4456 Tue 15/07/2014 11:30:00 AM
Hearing
Case No. 55 of 2014 : Petition of M/s. Bilt Graphic Paper Products Limited for directing State Agency to accriditate Petitioner's renewable energy based power project under the Renewable Energy Certificate (REC) framework and also for approving methodology for measurement of generation from such project by the State Load Despatch Centre (SLDC) for the consideration for the issuance of the RECs.
55 of 2014
Completed
4457 Thu 10/07/2014 11:30:00 AM
Public Hearing
Case No 90 of 2014 : Application filed by Tata Power Company Ltd. for grant of Distribution Licence for distribution in Mumbai City and Part of Mumbai Suburban Area, areas of Mira Bhayandar Municipal Corporation including area covered under Chene and Varsave
90 of 2014
Completed
4458 Tue 08/07/2014 11:30:00 AM
Hearing
Petition of Maharashtra State Power Generation Co. Limited for under Sections 61, 86 & 181of Electricity Act, 2003 & MERC (Terms and Conditions for Determination of RE Tariff) Regulations, 2010 & Regulation 92 of MERC ( conduct of business ) Regulations, 2004 seeking the directives of Honorable Commission in resolution of dispute between MSPGCL and MSEDCL on Tariff matters for its Solar Power Projects situated at Sakri, Maharashtra.
128 of 2014
Reschedule with further notice
4459 Tue 08/07/2014 11:30:00 AM
Hearing
Petition of Mula Pravara Electric Co.op Society Ltd. for violation of provisions relating to grant of Open Access.
46 of 2010
Reschedule with further notice
4460 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 37 of 2014 : Petition of BEST Undertaking, for challenge to grant of distribution license in the area of supply of the Brihanmumbai Electric Supply & Transport Undertaking of the Municipal Corporation of Greater Mumbai, to any person other than the Brihanmumbai Electric Supply and Transport Undertaking of the Municipal Corporation of Greater Mumbai.
37 of 2014
Completed
4461 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 53 of 2014 : Petition of Shri Rakesh Ganpat Shirodkar for Non-compliance of the Order passed by CGRF, Bhandup, in case No. 508.
53 of 2014
Completed
4462 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 51 of 2014 : Petition of Aurangabad District Co-operative Milk Producers Union Limited for Punishment to MSEDCL under Section 142 and 146 of the Electricity Act 2003 for Non- compliance of the Order passed by CGRF, Aurangabad in case No. CGRF/AZ/ AUR / R / 447 / 2013 dated 09/07/2013.
51 of 2014
Completed
4463 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 50 of 2014 : Petition of M/s Sumer Kendra Premises Co-op. Society Limited for Non-compliance by the BEST Undertaking of the Order dated 11.09.2013 passed by the Electricity Ombudsman, under Regulation 22 and 17.18 of MERC( Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006 and under section 142, 146 and 149 of the E.A. 2003.
50 of 2014
Completed
4464 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 02 of 2014 : Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Completed
4465 Tue 08/07/2014 11:30:00 AM
Hearing
Case No. 173 of 2013 : Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Completed
4466 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 83 of 2014 : Petition of The Tata Power Company Limited (TPC-D) for Regarding Schedule of charges.
83 of 2014
Completed
4467 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 42 of 2014 : Petition of Jindal Poly Films Limited complaint against Licensee ( MSEDCL) for violation of Section 62(6) of Elect. Act 2003 and MERCâ??s order dt. 03.01.2013 for Case Nos.8, 18, 20, 33 all of 2012 for non payment of interest on the amount retained for 12 months period by MSEDCL.
42 of 2014
Completed
4468 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 179 of 2013 : Petition of Tata Power Company Limited for seeking amendment in the MYT Regulations to provide for RoE on capitalization carried out during the year in case of Generation Business.
179 of 2013
Completed
4469 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Completed
4470 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 79 of 2013 : Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Completed
4471 Thu 03/07/2014 11:30:00 AM
Hearing
Case No. 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86 (1) (b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4472 Thu 03/07/2014 11:30:00 AM
Hearing
Case No 77 of 2013 : Petition of (i) Yashawant Sahakari Glucose Karkhana Ltd. (ii) Shri Tradco Dessan Pvt. Ltd. (iii) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Completed
4473 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 9 of 2011 : Petition M/s JSW Energy Limited for adjudication of disputes that have arisen between JSW Energy Limited and Maharashtra State Electricity Distribution Company under the PPA dated 23.2.2010.
9 of 2011
Completed
4474 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 101 of 2014 & MA No. 07 of 2014 in Case No. 101 of 2014: Case No. 101 of 2014 :Petition of Wardha Power Company Limited for seeking declaration of captive status of the generating units of 2 x 135 MW of the Petitioner Wardha Power Company Limited for the financial year 2013-14. And MA No. 07 of 2014 in Case No. 101 of 2014 : Petition of Wardha Power Company Limited for interim orders in regard to the unilateral claim for cross - subsidy surcharge by the Respondent, Maharashtra Electricity Distribution Company Limited.
101 of 2014 & MA No. 07 of 2014 in Case No. 101 of 2014
Completed
4475 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 96 of 2013 : Petition of MSEDCL in the matter Compliance of Renewable Purchase Obligation for the FY 2012-13 by MSEDCL.
96 of 2013
Completed
4476 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 22 of 2014 : Petition of M/s. Global Energy Limited under Sections 15(8) and 86(1)(k) of the Electricity Act, 2003 read with Regulations 92 & 93 of MERC (Conduct of Business) Regulations, 2004 & Regulation 15 of MERC ( Trading License Conditions ) Regulations, 2004 for rectifying / amending an Order dated 28.09.2007 passed in Case No. 28 of 2006. and MA No 2 of 2014 in Case No. 22 of 2014 : M/s Usdev International Limited Intervening Application for impleadment as a party in the MERC Case No. 22 of 2014.
22 of 2014 & MA No. 02 of 2014 in Case No. 22 of 2014
Completed
4477 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 187 of 2013 : Petition of M/S. Ghatge Patil Industries Limited & two others for Punishment to MSEDCL's concerned Officers under Section 142 and 146 of the Electricity Act 2003, for contravention of the MERC (Standard of Performance)Regulations 2005 & Orders of Honorable Commission relating to Continuous Tariff and Non-Continuous Tariff.
187 of 2013
Completed
4478 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 145 of 2013 : MSEDCL Review Petition arising out of Order dated 28.08.2013 in Case No. 117 of 2012 passed in petition filed by Wardha Power Company Limited seeking inter alia quashing of invoices raised by the Respondent No.1 therein MSEDCL levying cross subsidy surcharge.
145 of 2013
Completed
4479 Tue 01/07/2014 11:30:00 AM
Hearing
Case No. 80 of 2013 : Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Completed
4480 Thu 26/06/2014 11:30:00 AM
Hearing
Case No. 42 of 2014 : Petition of Jindal Poly Films Limited complaint against Licensee ( MSEDCL) for violation of Section 62(6) of Elect. Act 2003 and MERC's order dt. 03.01.2013 for Case Nos.8, 18, 20,33 all of 2012 for non payment of interest on the amount retained for 12 months period by MSEDCL.
42 of 2014
Reschedule with further notice
4481 Thu 26/06/2014 11:30:00 AM
Hearing
Case No. 179 of 2013 : Petition of Tata Power Company Limited for seeking amendment in the MYT Regulations to provide for RoE on capitalization carried out during the year in case of Generation Business.
179 of 2013
Reschedule with further notice
4482 Thu 26/06/2014 11:30:00 AM
Hearing
Case No. 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Reschedule with further notice
4483 Thu 26/06/2014 11:30:00 AM
Hearing
Case No. 79 of 2013 : Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Reschedule with further notice
4484 Thu 26/06/2014 11:30:00 AM
Hearing
Case No. 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Reschedule with further notice
4485 Tue 24/06/2014 11:30:00 AM
Hearing
Case No. 16 of 2014 : Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Power Purchase and other Dispensation in respect of fossil fuel based Captive Power Plants.
16 of 2014
Completed
4486 Tue 24/06/2014 11:30:00 AM
Hearing
Case No. 134 of 2013 : Petition of M/s. JSW Steel Limited under Section 61, 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 read with MERC(Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010.
134 of 2013
Completed
4487 Tue 24/06/2014 11:30:00 AM
Hearing
Case No. 100 of 2013 : Hitesh Mukundrai Dani Petition for non compliance of Order dated 08.04.2013, passed by the CGRF Bhandup Urban Zone, Bhandup.
100 of 2013
Completed
4488 Tue 24/06/2014 11:30:00 AM
Hearing
Case No. 132 of 2011 : Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 ( Solapur Bioenergy Systems Pvt Ltd v/s Others).
132 of 2011
Completed
4489 Thu 19/06/2014 12:00:00 PM
Hearing
Case No. 99 of 2014 : Petition of M/s. Jay Plastic under Section 142 & 146 of the Electricity Act 2003 for Non - compliance of the Order passed by Ombudsman Mumbai Order No. 96 of 2012 dated 08.01.2013
99 of 2014
Completed
4490 Thu 19/06/2014 12:00:00 PM
Hearing
Case No. 98 of 2014 : Petition of M/s. K. T. Vision & Sons for under Section 142 & 146 of the Electricity Act 2003 for part Non-compliance of the Order passed by CGRF, Kalyan, Order No. 664 / 783 dated 19.08.2013.
98 of 2014
Completed
4491 Thu 19/06/2014 12:00:00 PM
Hearing
Case No. 97 of 2014 : Petition of Smt. Tarabai Madhukar Dahake for under Section 142, 146,149 of the Electricity Act 2003 for Non-compliance of the Order passed by CGRF, Akola,in Case No. 86 of 2013, No.CGRF/AMZ/343 dated 16.11.2013.
97 of 2014
Completed
4492 Thu 19/06/2014 12:00:00 PM
Hearing
Case No. 96 of 2014 : Petition of Piaggio Vehicles Private Limited for not providing renewal permission by MSEDCL for availing open access through Indian Energy Exchange (IEX) for F.Y. 2014 - 15. Although there is provision of non-discriminatory open access under sub-section (47) of Section 2 read with sub-section (2),(3) and (4) of Section 42 of Elect. Act 2003 and regulations specified thereunder. I
96 of 2014
Completed
4493 Thu 19/06/2014 12:00:00 PM
Hearing
Case No. 93 of 2014 : Petition of Avinash Appa Gadge under Section 67, 68 & 86 of the Electricity Act, 2003 and Section 3 (3) of Works of Licensees Rules 2006 for Revision of order passed by the District Magistrate, Kolhapur bearing No. DESK-VII-HOME / RR / POL / 195 / 2014 dated 26.02.2014.
93 of 2014
Completed
4494 Thu 19/06/2014 11:30:00 AM
Hearing
Case No. 106 of 2014 : Petition of Bajaj Finserv Limited for Clarification in case MERC's Wind power tariff Order 2003 [ WPTO ], Distribution open access regulations 2005 [DOA], Order in case No. 8,18,20 & 33 of 2012, in respect of wheeling of wind energy in MSEDCL's area for captive use / third party sale. And compelling Generator / Consumers unnecessarily installation of costly ABT type SEM's & metering equipments by MSEDCL in place of existing ToD meters. Till then they have held continuation of annual open access permissions for existing Generators / Consumers of wind energy for FY 2014-15 and forcing Generators to sell electricity to them at unaffordable price otherwise laps.
106 of 2014
Completed
4495 Thu 19/06/2014 11:30:00 AM
Hearing
Case No 95 of 2014 : Petition of S.K.Shivaraj & 13 others against revised procedure for Wind Open Access, issued by MSEDCL.
95 of 2014
Completed
4496 Thu 19/06/2014 11:30:00 AM
Hearing
Case No. 72 of 2014 & MA NO. 06 of 2014 in Case No. 72 of 2014 : Petition & Miscellaneous Application of Indian Wind Power Association against revised procedure for wind open access as announced by MSEDCL read with MERC(Distribution Open Access) Regulations, 2005 read with Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
72 of 2014
Completed
4497 Thu 19/06/2014 11:30:00 AM
Hearing
Case No. 101 of 2014 & MA No. 07 of 2014 in Case No. 101 of 2014: Case No. 101 of 2014 :Petition of Wardha Power Company Limited for seeking declaration of captive status of the generating units of 2 x 135 MW of the Petitioner Wardha Power Company Limited for the financial year 2013-14. And MA No. 07 of 2014 in Case No. 101 of 2014 : Petition of Wardha Power Company Limited for interim orders in regard to the unilateral claim for cross - subsidy surcharge by the Respondent, Maharashtra Electricity Distribution Company Limited.
101 of 2014
Completed
4498 Thu 19/06/2014 11:30:00 AM
Hearing
Case No 78 of 2014 : Petition of Maharashtra State Power Generation Co. Limited for Submission of Petition regarding economical shut down of five units of MSPGCL to optimize resources and to achieve economy in coal based plants operations and for removal of difficulty under Sections 61 of the Electricity Act, 2003 and Regulation 100 of the MERC ( Multi Year Tariff ) Regulations, 2011 framed under Section 181 of the Electricity Act, 2003.
78 of 2014
Completed
4499 Tue 17/06/2014 12:00:00 PM
Hearing
Case No 54 of 2014 : Petition of Energy Department, Government of Maharashtra for Implementation of rationalised tariff for residential consumers of MSEDCL, Rinfra-D, and BEST consuming 0-300 units per month.
54 of 2014
Reschedule
4500 Tue 17/06/2014 12:00:00 PM
Hearing
Case No 37 of 2014 : Petition of BEST Undertaking, for challenge to grant of distribution license in the area of supply of the Brihanmumbai Electric Supply & Transport Undertaking of the Municipal Corporation of Greater Mumbai, to any person other than the Brihanmumbai Electric Supply and Transport Undertaking of the Municipal Corporation of Greater Mumbai.
37 of 2014
Completed
4501 Tue 17/06/2014 12:00:00 PM
Hearing
Case No 36 of 2014 : Petition of Maharashtra State Electricity Distribution Co. Ltd., for implementation of Government Resolution dated 29th January 2014 for approval of support of Rs. 100 Crs per month from MSPGCL and MSETCL.
36 of 2014
Completed
4502 Tue 17/06/2014 11:30:00 AM
Public Hearing
Case No 66 of 2014 : Suggestions /Objections on Maharashtra Eastern Grid Power Transmission Company Limitedâ??s (MEGPTCL) Petition for approval of Aggregate Revenue Requirement and determination of Multi-Year Tariff for Second Control Period from FY 2013-14 to FY 2015-16
66 of 2014
Completed
4503 Fri 13/06/2014 11:30:00 AM
Public Hearing
Case No 100 of 2014 : HEARING ON SUO- MOTU DRAFT ORDER ON RENEWABLE ENERGY TARIFF FOR FY 2014-15
100 of 2014
Completed
4504 Fri 13/06/2014 11:00:00 AM
Hearing
Case No. 189 of 2013 : Petition of Adani Power Maharashtra Limited for compensation in tariff on account of â??Change in Lawâ?? under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Completed
4505 Fri 13/06/2014 11:00:00 AM
Hearing
Case No. 154 of 2013 : Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
4506 Fri 13/06/2014 11:00:00 AM
Hearing
Case No. 118 of 2013 : JSW Energy Limited for petition under Section 61, 86(1) (b) and other applicable provisions of the Electricity Act, 2003.
118 of 2013
Completed
4507 Thu 12/06/2014 11:30:00 AM
Hearing
Case No 93 of 2014 : Petition of Avinash Appa Gadge under Section 67, 68 & 86 of the Electricity Act, 2003 and Section 3 (3) of Works of Licensees Rules 2006 for Revision of order passed by the District Magistrate, Kolhapur bearing No. DESK-VII-HOME / RR / POL / 195 / 2014 dated 26.02.2014.
93 of 2014
Reschedule
4508 Thu 12/06/2014 11:30:00 AM
Hearing
Case No 99 of 2014 : Petition of M/s. Jay Plastic under Section 142 & 146 of the Electricity Act 2003 for Non - compliance of the Order passed by Ombudsman Mumbai Order No. 96 of 2012 dated 08.01.2013
99 of 2014
Reschedule
4509 Thu 12/06/2014 11:30:00 AM
Hearing
Case No 98 of 2014 : Petition of M/s. K. T. Vision & Sons for under Section 142 & 146 of the Electricity Act 2003 for part Non-compliance of the Order passed by CGRF, Kalyan, Order No. 664 / 783 dated 19.08.2013.
98 of 2014
Reschedule
4510 Thu 12/06/2014 11:30:00 AM
Hearing
Case No 97 of 2014 : Petition of Smt. Tarabai Madhukar Dahake for under Section 142, 146,149 of the Electricity Act 2003 for Non-compliance of the Order passed by CGRF, Akola,in Case No. 86 of 2013, No.CGRF/AMZ/343 dated 16.11.2013.
97 of 2014
Reschedule
4511 Thu 12/06/2014 11:30:00 AM
Hearing
Case No 96 of 2014 : Petition of Piaggio Vehicles Private Limited for not providing renewal permission by MSEDCL for availing open access through Indian Energy Exchange (IEX) for F.Y. 2014 - 15. Although there is provision of non-discriminatory open access under sub- section (47) of Section 2 read with sub-section (2),(3) and (4) of Section 42 of Elect. Act 2003 and regulations specified thereunder.
96 of 2014
Reschedule
4512 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 89 of 2014 : Petition of RInfra-Distribution for Regulation 25 and 26 of MERC (Multi Year Tariff) Regulations, 2011, in respect of power purchase agreement
89 of 2014
Reschedule with further notice
4513 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 88 of 2014 : Petition of The Brihan Mumbai Electric Supply & Transport Undertaking (BEST) in the matter of Refund of Fuel Adjustment Charges (FAC) to BEST's consumers during Second MYT Control Period FY 2013-14 to FY 2015-16.
88 of 2014
Reschedule with further notice
4514 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 93 of 2014 : Petition of Avinash Appa Gadge under Section 67, 68 & 86 of the Electricity Act, 2003 and Section 3 (3) of Works of Licensees Rules 2006 for Revision of order passed by the District Magistrate, Kolhapur bearing No. DESK-VII-HOME / RR / POL / 195 / 2014 dated 26.02.2014.
93 of 2014
Reschedule
4515 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 93 of 2014 : Petition of Cosmo Films Limited (SEZ Unit). Complaint against Licensee (MSEDCL) in the matter of illegal recovery of additional amount against the order dt. 03.09.2013 in Case No. 28 / 2013, dt. 04.09.2013 in Case No. 44/2013, dt. 05.09.2013 in case No. 95/2013 passed by Commissions. Action under Section 142 & 146 of Elect. Act 2003 proposed against MSEDCL for violation of MERCs orders.
92 of 2014
Reschedule with further notice
4516 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 91 of 2014 : Petition of Maharashtra State Electricity Distribution Co. Limited for approval for supplying power to consumers in Mihan SEZ Area at MERC approved rates.
91 of 2014
Reschedule with further notice
4517 Tue 10/06/2014 11:30:00 AM
Hearing
Case No 86 of 2014 : Petition of Maharashtra Veej Grahak Sanghatna for clarification relating to Additional Energy Charge (AEC1, AEC2, AEC3, and AEC4) and Additional Fuel Adjustment Cost ( Additional FAC ) as per Honorable Commission's Order of September 2013, which is charged in the energy bills of new Low Tension & High Tension Industrial consumers of MSEDCL who become consumers of MSEDCL after January 2013.
86 of 2014
Reschedule with further notice
4518 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 85 of 2014 : Petition of Mr. Israr Ahamad Khan for violation of MERC ( Procedure for filing appeal before the Appealate Authority) Regulations, 2004.
85 of 2014
Completed
4519 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 84 of 2014 : Petition of Sneha R Chavan Industries for violation of MERC ( Procedure for filing appeal before the Appealate Authority) Regulations, 2004.
84 of 2014
Completed
4520 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 83 of 2014 : Petition of The Tata Power Company Limited (TPC-D) for Regarding Schedule of charges.
83 of 2014
Completed
4521 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 82 of 20014 : Petition of Pidilite Industries Limited for Redressal against MSEDCL denying the open access for purchase of electricity through Indian Energy Exchange (IEX).
82 of 2014
Completed
4522 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 81 of 2014 : Petition of U. P. Twiga Fiberglass Limited not providing renewal permission by MSEDCL for availing open access through Indian Energy Exchange (IEX) for F.Y. 2014- 15. Although there is provision of non-discriminatory open access under sub- section (47) of Section 2 read with sub-section (2), (3) and (4) of Section 42 of Elect. Act 2003 and regulations specified thereunder.
81 of 2014
Completed
4523 Thu 05/06/2014 11:30:00 AM
Hearing
Case No 80 of 2014 : Petition of Videocon Industries Limited for not providing renewal permission by MSEDCL for availing open access through Indian Energy Exchange (IEX) for F.Y. 2014- 15. Although there is provision of non-discriminatory open access under sub- section (47) of Section 2 read with sub-section (2),(3) and (4) of Section 42 of Elect. Act 2003 and regulations specified thereunder.
80 of 2014
Completed
4524 Tue 03/06/2014 12:00:00 PM
Hearing
Case No 79 of 2014 : Petition of Maharashtra State Electricity Transmission Co. Ltd., in regard to Review of Order in Case No. 39 of 2013 dated 13.02.2014 in the matter of Truing up of FY 2011- 12, Annual Performance Review of FY 2012-13 and Aggregate Revenue Requirement for the MYT Second Control Period from FY 2013-14 to FY 2015-16.
79 of 2014
Completed
4525 Tue 03/06/2014 12:00:00 PM
Hearing
Case No 76 of 2014 :Petition of Ramshankar Gupta for contempt of Order of Honorable Ombudsman for Case No. 47 of 2013 (BEST).
76 of 2014
Completed
4526 Tue 03/06/2014 11:30:00 AM
Hearing
Case No 75 of 2014 : Petition of Shrinivas Engineering Auto Component Pvt. Ltd. Complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
75 of 2014
Completed
4527 Thu 29/05/2014 12:30:00 PM
Hearing
MA No 07 of 2014 in Case No 101 of 2014 : Petition of Wardha Power Company Limited for interim orders in regard to the unilateral claim for cross - subsidy surcharge by the Respondent, Maharashtra Electricity Distribution Company Limited.
101 of 2014
Completed
4528 Thu 29/05/2014 12:30:00 PM
Public Hearing
Case No 77 of 2014 : Suggestion / objection on Petition filed by Rochem Green Energy Pvt. Ltd for determination of Tariff for supply of electricity from 8.97 MW capacity Municipal Solid Waste based power project being commissioned at Pune for sale of electricity to the distribution licensees in Maharashtra(Case No 77 of 2014).
77 of 2014
Completed
4529 Thu 29/05/2014 11:30:00 AM
Public Hearing
190 of 2013
Completed
4530 Tue 27/05/2014 12:30:00 PM
Hearing
Case No 77 of 2013 : Petition of (i) Yashawant Sahakari Glucose Karkhana Ltd. (ii) Shri Tradco Dessan Pvt. Ltd. (iii) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Reschedule with further notice
4531 Tue 27/05/2014 11:30:00 AM
Hearing
Case No 95 of 2014 : Petition of S.K.Shivaraj & 13 others against revised procedure for Wind Open Access, issued by MSEDCL.
95 of 2014
Reschedule with further notice
4532 Tue 27/05/2014 11:30:00 AM
Hearing
Case No 73 of 2014 : Petition of Wat-ere-source Technologies P Limited for Providing power evacuation arrangement Karwand SHP in Dist. Dhule.
73 of 2014
Reschedule with further notice
4533 Tue 27/05/2014 11:30:00 AM
Hearing
Case No. 72 of 2014 & MA NO. 06 of 2014 : Petition & Miscellaneous Application of Indian Wind Power Association against revised procedure for wind open access as announced by MSEDCL read with MERC(Distribution Open Access) Regulations, 2005 read with Commercial Circular No. 194 dated April 09, 2013 issued by the MSEDCL.
72 of 2014
Reschedule with further notice
4534 Thu 22/05/2014 12:00:00 PM
Hearing
Case No 69 of 2014 : Petition of Shendra Green Energy Limited under sections 62(1), 62(4), 86(1)(a), 86(1)(b), 86(1)(c), 86(1)(e), 86(1)(f) of the Electricity Act, 2003, read with Regulations 8, 75 and 77 of the MERC(Tems and Conditions for determination of RE Tariff) Regulations, 2010.
69 of 2014
Reschedule with further notice
4535 Thu 22/05/2014 12:00:00 PM
Hearing
70 of 2014
Reschedule with further notice
4536 Thu 22/05/2014 11:30:00 AM
Hearing
Case No 94 of 2014 : Petition of Jalgaon Energy Private Limited for Review of Order dated 05.02.2014 passed by the Honorable Commission in Case No. 83 of 2012.
94 of 2014
Reschedule with further notice
4537 Thu 22/05/2014 11:30:00 AM
Hearing
Case No 68 of 2014 : Petition of MSEDCL for Review of the Order dated 05.02.2014, passed by Honorable Commission in Case No. 83 of 2012.
68 of 2014
Reschedule with further notice
4538 Tue 20/05/2014 12:00:00 PM
Hearing
Case No 65 of 2014 : Petition of M/s. Laxmi Board & Paper Mills Limited under section 42(2) (3) & (4), 47 (2), 142, 146 of the E.A. 2003 and Open Access Regulations, 2005. The Petition seeking relief for providing permission by MSEDCL for availing open access through IEX.
65 of 2014
Reschedule with further notice
4539 Tue 20/05/2014 12:00:00 PM
Hearing
Case No 22 of 2014 : Petition of M/s. Global Energy Limited under Sections 15(8) and 86(1)(k) of the Electricity Act, 2003 read with Regulations 92 & 93 of MERC (Conduct of Business) Regulations, 2004 & Regulation 15 of MERC ( Trading License Conditions ) Regulations, 2004 for rectifying / amending an Order dated 28.09.2007 passed in Case No. 28 of 2006.
22 of 2014
Reschedule with further notice
4540 Tue 20/05/2014 11:30:00 AM
Hearing
Case No 145 of 2013 : MSEDCL Review Petition arising out of Order dated 28.08.2013 in Case No. 117 of 2012 passed in petition filed by Wardha Power Company Limited seeking inter alia quashing of invoices raised by the Respondent No.1 therein MSEDCL levying cross subsidy surcharge.
145 of 2013
Reschedule with further notice
4541 Tue 20/05/2014 11:30:00 AM
Hearing
Case No 79 of 2013 : Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Reschedule with further notice
4542 Thu 15/05/2014 12:00:00 PM
Hearing
Case No 64 of 2014 : Petition of Dinkar Janardanji Pathak for under Section 128, 142, 146 & 149 of the Electricity Act, 2003 against S. Jambkeshwaran, Senior Manager, Maharashtra Eastern Grid Power Transmission Company Amravati & District Collector, Akola for erecting electricity tower and line forcefully and illegally by not giving compensation or executing lease agreement and for Non-compliance of the Order passed by MERC.
64 of 2014
Reschedule with further notice
4543 Thu 15/05/2014 12:00:00 PM
Admissibility Hearing
Case No 61 of 2014 : Petition of M/s Wardha Power Company Limited, for Review Petition of Order dated 17.01.2014 in Case No. 91 of 2013, under Section 94(1) (f) of the Elect. Act 2003.
61 of 2014
Reschedule with further notice
4544 Thu 15/05/2014 12:00:00 PM
Hearing
2 of 2014
Reschedule with further notice
4545 Thu 15/05/2014 12:00:00 PM
Hearing
Case No 173 of 2013 : Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Reschedule with further notice
4546 Thu 15/05/2014 11:30:00 AM
Hearing
Case No 96 of 2013 : Petition of MSEDCL in the matter Compliance of Renewable Purchase Obligation for the FY 2012-13 by MSEDCL.
96 of 2013
Reschedule with further notice
4547 Thu 15/05/2014 11:30:00 AM
Hearing
Case No 80 of 2013 : Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Reschedule with further notice
4548 Tue 13/05/2014 12:00:00 PM
Hearing
Case No 59 of 2014 : Petition of Sudarshan Chemical Industries Limited (MIDC Estate, Mahad Plant) Complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
59 of 2014
Reschedule with further notice
4549 Tue 13/05/2014 12:00:00 PM
Hearing
Case No 58 of 2014 : Petition of Sudarshan Chemical Industries Limited (MIDC Estate, Dhatav Plant) Complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
58 of 2014
Reschedule with further notice
4550 Tue 13/05/2014 12:00:00 PM
Hearing
Case No 57 of 2014 : Petition of M/s. Welspun Syntex Limited, complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Electricity Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
57 of 2014
Reschedule with further notice
4551 Tue 13/05/2014 11:30:00 AM
Hearing
Case No 56 of 2014 : Petition of M/s. Galaxy Auto Axel Pvt. Limited for Petition under Section 142 of the Electricity Act, 2003 for Non - compliance of the Order passed by Electricity Ombudsman, Mumbai, in representation No. 71 of 2013, dated 01.10.2013.
56 of 2014
Reschedule with further notice
4552 Tue 13/05/2014 11:30:00 AM
Hearing
55 of 2014
Reschedule with further notice
4553 Thu 08/05/2014 12:00:00 PM
Hearing
Case No 54 of 2014 : Petition of Energy Department, Government of Maharashtra for Implementation of rationalised tariff for residential consumers of MSEDCL, Rinfra-D, and BEST consuming 0-300 units per month.
54 of 2014
Reschedule with further notice
4554 Thu 08/05/2014 12:00:00 PM
Hearing
162 of 2013
Reschedule
4555 Thu 08/05/2014 12:00:00 PM
Hearing
Case No 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Reschedule with further notice
4556 Thu 08/05/2014 11:30:00 AM
Hearing
CAse No 53 of 2014 : Petition of Shri Rakesh Ganpat Shirodkar for Non-compliance of the Order passed by CGRF, Bhandup, in case No. 508.
53 of 2014
Reschedule with further notice
4557 Thu 08/05/2014 11:30:00 AM
Hearing
Case No 51 of 2014 : Petition of Aurangabad District Co-operative Milk Producers Union Limited for Punishment to MSEDCL under Section 142 and 146 of the Electricity Act 2003 for Non- compliance of the Order passed by CGRF, Aurangabad in case No. CGRF / AZ / AUR / R / 447 / 2013 dated 09/07/2013.
51 of 2014
Reschedule with further notice
4558 Thu 08/05/2014 11:30:00 AM
Hearing
Case No 50 of 2014 : Petition of M/s Sumer Kendra Premises Co-op. Society Limited for Non-compliance by the BEST Undertaking of the Order dated 11.09.2013 passed by the Electricity Ombudsman, under Regulation 22 and 17.18 of MERC( Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006 and under section 142, 146 and 149 of the E.A. 2003.
50 of 2014
Reschedule with further notice
4559 Tue 06/05/2014 12:00:00 PM
Hearing
Case No 188 of 2013 : Petition of M/s. Nagareeka Exports Limited, Complaint against Licensee (MSEDCL) for violation of Section 9.2 of SOP Regulations, 2005 of MERC for change of tariff category and initiate action u/s 142,146 & 149 of Electricity Act 2003.
188 of 2013
Completed
4560 Tue 06/05/2014 12:00:00 PM
Hearing
Case No 187 of 2013 : Petition of M/S. Ghatge Patil Industries Limited & two others for Punishment to MSEDCLâ??s concerned Officers under Section 142 and 146 of the Electricity Act 2003, for contravention of the MERC (Standard of Performance)Regulations 2005 & Orders of Honorable Commission relating to Continuous Tariff and Non-Continuous Tariff.
187 of 2013
Completed
4561 Tue 06/05/2014 12:00:00 PM
Hearing
Case No 18 of 2014 : Petition of Shri Bandu Vyankatesh Joshi to take action against MSEDCL officer for knowingly not supplying copies of reply to the petitioner by RPAD and not obtaining acknowledgement, thereby violating the orders of the Baramati CGRF.
18 of 2014
Completed
4562 Tue 06/05/2014 11:30:00 AM
Hearing
Case No 162 of 2013 : Petition of Reliance Infrastructure Ltd (Distribution) for postponing the implementation of the Order dated 30th October 2013 in Case No.85 of 2013 passed by this Honorable Commission till disposal of APTEL Appeal No.278 of 2013.
162 of 2013
Completed
4563 Tue 06/05/2014 11:30:00 AM
Hearing
Case No 24 of 2014 : Petition of M/s. Global Energy Limited under Sections 86 (1) (f) and 86 (1) (k) of the Electricity Act, 2003 against breach for Energy Supply Agreement dated 31.03.2011.
24 of 2014
Reschedule
4564 Tue 06/05/2014 11:30:00 AM
Hearing
Case No 15 of 2014 : Petition of Serene Properties private Limited for allowing SPPL to charge consumers in its licence area, i.e., the IT & ITES SEZ area at Kalwa Trans Thane Creek Industrial Area, MIDC, District Thane, the same tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, and for approving the proposed tariff schedule.
15 of 2014
Completed
4565 Wed 30/04/2014 11:30:00 AM
Hearing
Case No 62 of 2014 : Petition of Maharashtra Airport Development Company for directions under Section 23, 86 (1) (b) (k) of the Electricity Act, 2003 r/w Regulation 92 of MERC (Code of Business) Regulations, 2004 and Regulation 8.6.8 of MERC (General Conditions of Distribution License) Regulations, 2006.
62 of 2014
Completed
4566 Wed 30/04/2014 11:30:00 AM
Hearing
Case No 93 of 2014 : Petition of Avinash Appa Gadge under Section 67, 68 & 86 of the Electricity Act, 2003 and Section 3 (3) of Works of Licensees Rules 2006 for Revision of order passed by the District Magistrate, Kolhapur bearing No. DESK-VII-HOME / RR / POL / 195 / 2014 dated 26.02.2014.
93 of 2014
Completed
4567 Wed 30/04/2014 11:30:00 AM
Hearing
Case No 71 of 2014 : Petition of M/s. Global Energy Limited under Sections 86 (1) (f) & 86 (1) (k) read with Sections 142 and 146 of the Electricity Act, 2003 against refusal of grant of open Access permission dated 05.03.2014.
71 of 2014
Completed
4568 Wed 30/04/2014 11:30:00 AM
Hearing
Case No 78 of 2014 : Petition of Maharashtra State Power Generation Co. Limited for Submission of Petition regarding economical shut down of five units of MSPGCL to optimize resources and to achieve economy in coal based plants operations and for removal of difficulty under Sections 61 of the Electricity Act, 2003 and Regulation 100 of the MERC ( Multi Year Tariff ) Regulations, 2011 framed under Section 181 of the Electricity Act, 2003.
78 of 2014
Completed
4569 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 193 of 2013 : Petition of Water Resources Department, GoM with a prayer to condone the delay for not submitting review petition within stipulated time frame of forty five (45) days of Order with reference to provisions as per Conduct of Business Regulations (CBR) Clause 85(a) as regards to Review the Arithmatical Computation of rate of interest of loan and methodology adopted for calculations of recovery of lease amount till Q-2 of 2012- 13, noticed in the Order dated 27.12.2012 in the Case No. 2 of 2012 passed by Honorable Commission, for approval of lease rent for Ghatghar Pumped Storage Hydro Power Station operated and maintained by MSPGCL and owened by GoMWRD. (Government of Maharashtra).
193 of 2013
Completed
4570 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 179 of 2013 : Petition of Tata Power Company Limited for seeking amendment in the MYT Regulations to provide for RoE on capitalization carried out during the year in case of Generation Business.
179 of 2013
Completed
4571 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 174 of 2013 : Petition of Tata Power Company Limited under Regulations 92 and 93 of MERC (Conduct of Business) Regulations, 2004 read with Section 86 of the Electricity Act, 2003 seeking approval of Return on Equity on the cost of the Project Land.
174 of 2013
Completed
4572 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 27 of 2014 : Petition of Shri Dayaram Dhukdu Gangurde & 16 others, under section 67 (4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012.
27 of 2014
Completed
4573 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 26 of 2014 : Petition of Poonam Narayanrao Deshmukh & 11 others under section 67(4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012.
26 of 2014
Completed
4574 Tue 29/04/2014 11:30:00 AM
Hearing
MA No. 15 of 2013 in Case No. 46 of 2013 : Miscellaneous Application of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
4575 Tue 29/04/2014 11:30:00 AM
Hearing
Case No 46 of 2013 & MA No 6 of 2013 in Case No. 46 of 2013 : Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
4576 Wed 23/04/2014 12:00:00 PM
Hearing
Case No 74 of 2014 : Petition of M/s Wardha Power Company Limited for under Section 86(1) (c), (f) and other applicable provisions of the Electricity Act, 2003 for directions to the Respondent in regard to the application for open access by the Petitioner for the period from 01.04.2014.
74 of 2014
Completed
4577 Tue 22/04/2014 12:00:00 PM
Hearing
Case No 44 of 2014 : Petition of Green Energy Association for Petition under Section 86(1) (E) read with sections 42, 129, 142 and 149 of the Electricity Act,2003; Regulation No. 4 of MERC (Distribution Open Access) Regulations, 2005 & Regulation 92 & 94 of MERC (Conduct of Business) Regulations, 2004 & Order dated January 3, 2013 pronounced by the Honorable in Case Nos. 8, 18 & 20 of 2013 for appropriate directions to the MSEDCL to comply with provisions herein and grant to open access permissions to the members of the Petitioners pursuant to their respective Applications.
44 of 2014
Completed
4578 Tue 22/04/2014 12:00:00 PM
Hearing
Case No 42 of 2014 : Petition of Jindal Poly Films Limited complaint against Licensee (MSEDCL) for violation of Section 62(6) of Elect. Act 2003 and MERCâ??s order dt. 03.01.2013 for Case Nos.8, 18, 20,33 all of 2012 for non payment of interest on the amount retained for 12 months period by MSEDCL.
42 of 2014
Completed
4579 Tue 22/04/2014 12:00:00 PM
Hearing
Case No 32 of 2014 : Petition of Shri Rajesh Shah @ Dedhia for Enquiry against unfair trade practices of withholding refund to consumer even when final claim is less than the amount deposited at the time of raid.
32 of 2014
Completed
4580 Tue 22/04/2014 11:30:00 AM
Hearing
Case No 29 of 2014 : Petition of S Kumarsundaram for Petition u/s 87, 88, 139, 140, 142, 146, 149,150 and 151 of Electricity Act 2003, CEA ( Installation and Operation Of Meters) Regulations, 2006 (National Electricity Policy)
29 of 2014
Completed
4581 Tue 22/04/2014 11:30:00 AM
Hearing
Case No 25 of 2014 : Petition of Green Energy Association for Review Petition against the Order dated 20.12.2013, in Petition No. 159 / 2013 passed by Honorable MERC under MERC ( Renewable Purchase Obligation, its Compliance and Implementation of REC Framework) Regulations, 2010 for relaxes / waiver of the Solar RPO target for TPC-D for FY 2010 - 11, FY 2011 - 12 and FY 2012 - 13 to fulfill the Solar RPO target on a Cumulative basis by FY 2015-16.
25 of 2014
Completed
4582 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 177 of 2013 : Petition of The Mula Pravara Electric Cooperative Society Ltd., for amendment / review / rectification of the Order dated 3rd September 2013 passed by the Honorable MERC dismissing, rejecting and disposing of Review Petition / Case No. 121 of 2012 which was filed by MSEDCL for review of Honorable MERC's Order dated 15th October 2012 in Case No. 24 of 2012, ordering and directing payment of compensation charges by MSEDCL to MPECS for use of MPECS's distribution network, equipment and assets, pursuant to the Order and Judgment dated 16th December 2011 of the Honorable APTEL in Appeal No. 39 of 2011.
177 of 2013
Completed
4583 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 120 of 2013 : Petition of MSEDCL in the matter of Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 directing MPECSL to submit its assets register to MSEDCL.
120 of 2013
Completed
4584 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 119 of 2013 : Petition of MSEDCL for seeking Clarification of the Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 under Regulation 92 & 93 of the MERC (Conduct of Business) Regulations 2004.
119 of 2013
Completed
4585 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 24 of 2012 : Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
4586 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 87 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 and Mula Pravara's Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
4587 Mon 21/04/2014 11:30:00 AM
Hearing
Case No 85 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
4588 Wed 16/04/2014 11:30:00 AM
Hearing
Case No 78 of 2014 : Petition of Maharashtra State Power Generation Co. Limited for Submission of Petition regarding economical shut down of five units of MSPGCL to optimize resources and to achieve economy in coal based plants operations and for removal of difficulty under Sections 61 of the Electricity Act, 2003 and Regulation 100 of the MERC ( Multi Year Tariff ) Regulations, 2011 framed under Section 181 of the Electricity Act, 2003.
78 of 2014
Reschedule
4589 Wed 16/04/2014 11:30:00 AM
Hearing
Case No 71 of 2014 : Petition of M/s. Global Energy Limited under Sections 86 (1) (f) & 86 (1) (k) read with Sections 142 and 146 of the Electricity Act, 2003 against refusal of grant of open Access permission dated 05.03.2014.
71 of 2014
Completed
4590 Wed 16/04/2014 11:30:00 AM
Suo Motu Hearing
Case No 63 of 2014 : Suo motu proceedings on the Report submitted by the Committee on Compensatory Tariff for Tiroda power plant of Adani Power Maharashtra Limited in Case 68 of 2012.
63 of 2014
Completed
4591 Wed 16/04/2014 11:30:00 AM
Hearing
Case No 150 of 2013 : Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012.
150 of 2013
Completed
4592 Tue 15/04/2014 12:00:00 PM
Hearing
Case No 179 of 2013 : Petition of Tata Power Company Limited for seeking amendment in the MYT Regulations to provide for RoE on capitalization carried out during the year in case of Generation Business.
179 of 2013
Reschedule
4593 Tue 15/04/2014 12:00:00 PM
Hearing
Case No 27 of 2014 : Petition of Shri Dayaram Dhukdu Gangurde & 16 others, under section 67 (4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012.
27 of 2014
Reschedule
4594 Tue 15/04/2014 12:00:00 PM
Hearing
Case No 26 of 2014 : Petition of Poonam Narayanrao Deshmukh & 11 others under section 67(4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012.
26 of 2014
Reschedule
4595 Tue 15/04/2014 11:30:00 AM
Hearing
Case No 193 of 2013 : Petition of Water Resources Department, GoM with a prayer to condone the delay for not submitting review petition within stipulated time frame of forty five (45) days of Order with reference to provisions as per Conduct of Business Regulations (CBR) Clause 85(a) as regards to Review the Arithmatical Computation of rate of interest of loan and methodology adopted for calculations of recovery of lease amount till Q-2 of 2012- 13, noticed in the Order dated 27.12.2012 in the Case No. 2 of 2012 passed by Honorable Commission, for approval of lease rent for Ghatghar Pumped Storage Hydro Power Station operated and maintained by MSPGCL and owened by GoMWRD. (Government of Maharashtra).
193 of 2013
Reschedule
4596 Tue 15/04/2014 11:30:00 AM
Hearing
Case No 174 of 2013 : Petition of Tata Power Company Limited under Regulations 92 and 93 of MERC (Conduct of Business) Regulations, 2004 read with Section 86 of the Electricity Act, 2003 seeking approval of Return on Equity on the cost of the Project Land.
174 of 2013
Reschedule
4597 Fri 11/04/2014 11:30:00 AM
Hearing
Case No 62 of 2014 : Petition of Maharashtra Airport Development Company for directions under Section 23, 86 (1) (b) (k) of the Electricity Act, 2003 r/w Regulation 92 of MERC (Code of Business) Regulations, 2004 and Regulation 8.6.8 of MERC (General Conditions of Distribution License) Regulations, 2006.
62 of 2014
Completed
4598 Thu 03/04/2014 12:30:00 PM
Hearing
Case No 71 of 2014 : Petition of M/s. Global Energy Limited under Sections 86 (1) (f) & 86 (1) (k) read with Sections 142 and 146 of the Electricity Act, 2003 against refusal of grant of open Access permission dated 05.03.2014.
71 of 2014
Reschedule with further notice
4599 Thu 27/03/2014 12:00:00 PM
Hearing
Case Number 49 of 2014 :Petition of Reliance Infrastructure Limited for adjudication of dispute under section 86 (1) (f) of the Electricity Act, 2003 arising out of issues pertaining to obligation of seller to supply Contracted capacity under provisions of Article 5 (Sub- Article 5.1.1) of the Power Purchase Agreement dated 04th June 2010 entered between Reliance Infrastructure Limited and Wardha Power Company Limited.
49 of 2014
Completed
4600 Thu 27/03/2014 12:00:00 PM
Hearing
Case Number 52 of 2014 :Petition of M/s Wardha Power Company Limited, for directions under sections 142, 146 read with section 86 (1) (f) and other applicable provisions of the Electricity Act, 2003.
52 of 2014
Completed
4601 Thu 27/03/2014 11:30:00 AM
Hearing
Case No. 105 of 2012 :Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4602 Thu 27/03/2014 11:30:00 AM
Suo Motu Hearing
Case No 63 of 2014 : Suo motu proceedings on the Report submitted by the Committee on Compensatory Tariff for Tiroda power plant of Adani Power Maharashtra Limited in Case 68 of 2012.
63 of 2014
Completed
4603 Thu 27/03/2014 11:30:00 AM
Hearing
Case No. 150 of 2013 : Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012.
150 of 2013
Completed
4604 Tue 25/03/2014 12:30:00 PM
Hearing
Case No. 62 of 2014 :Petition of Maharashtra Airport Development Company for directions under Section 23, 86 (1) (b) (k) of the Electricity Act, 2003 r/w Regulation 92 of MERC (Code of Business) Regulations, 2004 and Regulation 8.6.8 of MERC (General Conditions of Distribution License) Regulations, 2006.
62 of 2014
Completed
4605 Tue 25/03/2014 12:30:00 PM
Hearing
Case No 177 of 2013 : Petition of The Mula Pravara Electric Cooperative Society Ltd., for amendment / review / rectification of the Order dated 3rd September 2013 passed by the Honorable MERC dismissing, rejecting and disposing of Review Petition / Case No. 121 of 2012 which was filed by MSEDCL for review of Honorable MERCâ??s Order dated 15th October 2012 in Case No. 24 of 2012, ordering and directing payment of compensation charges by MSEDCL to MPECS for use of MPECSâ??s distribution network, equipment and assets, pursuant to the Order and Judgment dated 16th December 2011 of the Honorable APTEL in Appeal No. 39 of 2011.
177 of 2013
Completed
4606 Tue 25/03/2014 12:30:00 PM
Hearing
Case No. 24 of 2012 : Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
4607 Tue 25/03/2014 12:00:00 PM
Hearing
Case No 120 of 2013 : Petition of MSEDCL in the matter of Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 directing MPECSL to submit its assets register to MSEDCL.
120 of 2013
Completed
4608 Tue 25/03/2014 12:00:00 PM
Hearing
Case No 119 of 2013 : Petition of MSEDCL for seeking Clarification of the Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 under Regulation 92 & 93 of the MERC (Conduct of Business) Regulations 2004.
119 of 2013
Completed
4609 Tue 25/03/2014 11:30:00 AM
Hearing
Case No. 85 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
4610 Thu 20/03/2014 12:00:00 PM
Hearing
Case No 24 of 2014 : Petition of M/s. Global Energy Limited under Sections 86 (1) (f) and 86 (1)(k) of the Electricity Act, 2003 against breach for Energy Supply Agreement dated 31.03.2011.
24 of 2014
Reschedule with further notice
4611 Thu 20/03/2014 12:00:00 PM
Hearing
Case No 22 of 2014 : Petition of M/s. Global Energy Limited under Sections 15(8) and 86(1)(k) of the Electricity Act, 2003 read with Regulations 92 & 93 of MERC (Conduct of Business) Regulations, 2004 & Regulation 15 of MERC ( Trading License Conditions ) Regulations, 2004 for rectifying / amending an Order dated 28.09.2007 passed in Case No. 28 of 2006.
22 of 2014
Reschedule
4612 Thu 20/03/2014 11:30:00 AM
Hearing
Case No 15 of 2014 : Petition of Serene Properties private Limited for allowing SPPL to charge consumers in its licence area, i.e., the IT & ITES SEZ area at Kalwa Trans Thane Creek Industrial Area, MIDC, District Thane, the same tariff that is applicable for the respective category of consumers in the MSEDCL area of supply, as modified from time to time, and for approving the proposed tariff schedule.
15 of 2014
Reschedule with further notice
4613 Wed 19/03/2014 12:00:00 PM
Hearing
Case No 188 of 2013 : Petition of M/s. Nagareeka Exports Limited, Complaint against Licensee (MSEDCL) for violation of Section 9.2 of SOP Regulations, 2005 of MERC for change of tariff category and initiate action u/s 142,146 & 149 of Electricity Act 2003.
188 of 2013
Reschedule with further notice
4614 Wed 19/03/2014 12:00:00 PM
Hearing
187 of 2013
Reschedule with further notice
4615 Wed 19/03/2014 11:30:00 AM
Hearing
Case No 18 of 2014 : Petition of Shri Bandu Vyankatesh Joshi to take action against MSEDCL officer for knowingly not supplying copies of reply to the petitioner by RPAD and not obtaining acknowledgement, thereby violating the orders of the Baramati CGRF.
18 of 2014
Reschedule with further notice
4616 Tue 18/03/2014 12:30:00 PM
Hearing
Case No 37 of 2014 : Petition of BEST Undertaking, for challenge to grant of distribution license in the area of supply of the Brihanmumbai Electric Supply & Transport Undertaking of the Municipal Corporation of Greater Mumbai, to any person other than the Brihanmumbai Electric Supply and Transport Undertaking of the Municipal Corporation of Greater Mumbai.
37 of 2014
Completed
4617 Tue 18/03/2014 11:30:00 AM
Admissibility Hearing
Case No 36 of 2014 : Petition of Maharashtra State Electricity Distribution Co. Ltd., for implementation of Government Resolution dated 29th January 2014 for approval of support of Rs. 100 Crs per month from MSPGCL and MSETCL.
36 of 2014
Completed
4618 Tue 18/03/2014 11:30:00 AM
Hearing
Case No 16 of 2014 : Petition of Maharashtra State Electricity Distribution Co. Ltd., in the matter of Power Purchase and other Dispensation in respect of fossil fuel based Captive Power Plants.
16 of 2014
Completed
4619 Thu 13/03/2014 12:00:00 PM
Admissibility Hearing
Case No 179 of 2013 : Petition of Tata Power Company Limited for seeking amendment in the MYT Regulations to provide for RoE on capitalization carried out during the year in case of Generation Business.
179 of 2013
Reschedule with further notice
4620 Thu 13/03/2014 12:00:00 PM
Admissibility Hearing
Case No 174 of 2013 : Petition of Tata Power Company Limited under Regulations 92 and 93 of MERC (Conduct of Business) Regulations, 2004 read with Section 86 of the Electricity Act, 2003 seeking approval of Return on Equity on the cost of the Project Land.
174 of 2013
Reschedule with further notice
4621 Thu 13/03/2014 11:30:00 AM
Admissibility Hearing
Case No 193 of 2013 : Petition of Water Resources Department, GoM with a prayer to condone the delay for not submitting review petition within stipulated time frame of forty five (45) days of Order with reference to provisions as per Conduct of Business Regulations (CBR) Clause 85(a) as regards to Review the Arithmatical Computation of rate of interest of loan and methodology adopted for calculations of recovery of lease amount till Q-2 of 2012- 13, noticed in the Order dated 27.12.2012 in the Case No. 2 of 2012 passed by Honorable Commission, for approval of lease rent for Ghatghar Pumped Storage Hydro Power Station operated and maintained by MSPGCL and owened by GoMWRD. (Government of Maharashtra).
193 of 2013
Reschedule with further notice
4622 Wed 12/03/2014 12:00:00 PM
Hearing
Case No 4 of 2014 : Petition of M/s. NRC Limited for Non-Compliance of Order of CGRF dated 29.10.2013 in Case No. K/E/732/867 of 2013.
4 of 2014
Completed
4623 Wed 12/03/2014 11:30:00 AM
Hearing
Case No 3 of 2014 : Petition of M/s. Uttam Galva Steels Limited for Reimbursement of transmission charges levied by the Maharashtra State Electricity Transmission Company Ltd. acting / officiating as the State Load Dispatch Centre on the sale of power since January 2011 to May 2012 on the Petitioner.
3 of 2014
Completed
4624 Wed 12/03/2014 11:30:00 AM
Hearing
Case No 138 of 2013 : Petition of The Maharashtra Krushak Hitwardhak Sanghatana for seeking directions against the MSEDCL, not to disconnect electricity supply of the agricultural consumers within the state of Maharashtra, in view of direction given by the Honorable High Court as per Order dated 08.02.2013 in Public Interest Litigation No. 44/2012.
138 of 2013
Completed
4625 Tue 11/03/2014 13:00:00 PM
Hearing
Case No 22 of 2014 : Petition of M/s. Global Energy Limited under Sections 15(8) and 86(1)(k) of the Electricity Act, 2003 read with Regulations 92 & 93 of MERC (Conduct of Business) Regulations, 2004 & Regulation 15 of MERC ( Trading License Conditions ) Regulations, 2004 for rectifying / amending an Order dated 28.09.2007 passed in Case No. 28 of 2006.
22 of 2014
Completed
4626 Tue 11/03/2014 12:30:00 PM
Hearing
Case No 56 of 2012 : Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order in Case No. 42 of 2006.
56 of 2012
Completed
4627 Tue 11/03/2014 12:00:00 PM
Hearing
Case No 155 of 2013 : Petition of Vidarbha Industries Association for Review of Decisions, Directions and Order dated 26.08.2013 in Case No.134 of 2012 under section 94(f) of E A 2003 & Regulation 15,85,92,93,94 & 95 of MERC ( Conduct of Business) Regulations, 2004.
155 of 2013
Completed
4628 Tue 11/03/2014 12:00:00 PM
Hearing
139 of 2013
Completed
4629 Tue 11/03/2014 11:30:00 AM
Hearing
Case No 105 of 2013 : Petition of MSEDCL for Review of MERC Order dated 16.07.2013 in Case No. 88 of 2012 passed in Petition filed by M/s Kalika Steel & Alloys Pvt Ltd & 16 others seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous supply) category consumers in billing cycles wherein there had been load shedding in electricity supplied by MSEDCL.
105 of 2013
Completed
4630 Tue 11/03/2014 11:30:00 AM
Suo Motu Hearing
Case No 92 of 2012 : SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Completed
4631 Thu 06/03/2014 12:30:00 PM
Hearing
Case No 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4632 Thu 06/03/2014 12:00:00 PM
Hearing
Case No 43 of 2014 : Petition of Polygenta Technologies Limited, Complaint against Licensee ( MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
43 of 2014
Completed
4633 Thu 06/03/2014 12:00:00 PM
Hearing
Case No 41 of 2014 : Petition of M/s. Balmer Lawrie â?? Van Leer Limited, Petition under section 42(2) (3) & (4), 47(2), 142,146 of the E.A. 2003 and Open Access Regulations, 2005. The Petition seeking relief for providing permission by MSEDCL for availing open access through IEX.
41 of 2014
Completed
4634 Thu 06/03/2014 11:30:00 AM
Hearing
Case No 40 of 2013 : Petition of Shri Ashok Pandharinath Shinde & Shri Sudam Devrao Shinde under section 67, 68, 142, 146 and 149 of the Electricity Act 2003 and Works of Licensees Rules 2012. The petition for non compliance of regulation while laying down transmission line and the petition challenging the order passed by the District Collector, Jalana being aggrieved by the non determination of amount of compensation under the Works of Licensees Rules 2012 and non compliance by MSETCL by not paying amount of compensation to the District Collector, Jalana and Revision of Order dt. 24.01.2013 passed by the District Collector Jalana.
40 of 2014
Completed
4635 Thu 06/03/2014 11:30:00 AM
Hearing
Case No 39 of 2014 : Petition of Shri Tukaram Shankar Narwade, Application for compensation of losses suffered due to installation of high tension transmission line under section 12 (2) and 12 (3) of the EA 1910 and under Section 67 of the Electricity Act 2003 read with Works of Licensees Rules 2006 and the Maharashtra Works of Licensees Rules 2012.
39 of 2014
Completed
4636 Wed 05/03/2014 12:30:00 PM
Hearing
Case No 173 of 2013 : Petition of Indiabulls Power Ltd. for revision of tariff on account of increase in fuel cost and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
173 of 2013
Reschedule with further notice
4637 Wed 05/03/2014 12:30:00 PM
Hearing
Case No. 2 of 2014 : Petition of Adani Power Maharashtra Limited for under Section 86 of the Electricity Act, 2003 read with Article 10 ("Change in Law") of the Power Purchase Agreements dated 31.10.2010, 09.08.2010 and 16.02.2013 executed between Maharashtra State Electricity Distribution Company Limited and Adani Power Maharashtra Limited for the appropriate adjustment in Tariff.
2 of 2014
Reschedule with further notice
4638 Wed 05/03/2014 12:00:00 PM
Hearing
Case No 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Reschedule with further notice
4639 Wed 05/03/2014 11:30:00 AM
Hearing
Case No 165 of 2013 : Petition of Nikita Transphase Adducts Pvt. Ltd. for Non compliance of CGRF Kalyan Order No. K/ E/ 678/ 799 Dated.17.05.2013.
165 of 2013
Reschedule with further notice
4640 Wed 05/03/2014 11:30:00 AM
Hearing
Case No 162 of 2013 : Petition of Reliance Infrastructure Ltd (Distribution) for postponing the implementation of the Order dated 30th October 2013 in Case No.85 of 2013 passed by this Honorable Commission till disposal of APTEL Appeal No.278 of 2013.
162 of 2013
Reschedule with further notice
4641 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 184 of 2013 :Petition filed by M/s M/S. Eurotex Industries and Exports Ltd. for Punishment to MSEDCL for Non-compliance of the Directions under Section 142 and 146 of the Electricity Act 2003 for contravention of the Orders of the Honourable Commission in Case Nos. 95, 28 and 44 of 2013.
184 of 2013
Completed
4642 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 144 of 2013 Petition of Vidarbha Industries Association for Penalizing MSEDCL under section 142, 146 of the Electricity Act 2003 for contravening section 45, section 62(3), of E.A. 2003, Commissions order in case No.95, 28 & 44 of 2013 and clause 3.4 of Supply Code Regulations.
144 of 2013
Completed
4643 Tue 04/03/2014 11:30:00 AM
Hearing
158 of 2013
Completed
4644 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 171 of 2013 :Petition of Thane Belapur Industries Association for Reviewing of MERC Order dated 05.09.2013 in Case No.95 of 2013 and seeking clarifications on the Order and other Orders and directions including the MSEDCL commercial circular No.209 of 07.09.2013.
171 of 2013
Completed
4645 Tue 04/03/2014 11:30:00 AM
Hearing
148 of 2013
Completed
4646 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 147 of 2013 : M/s. Shree Sushma Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
147 of 2013
Completed
4647 Tue 04/03/2014 11:30:00 AM
Hearing
Case no 112 of 2013 : M/s. Sun Metallics & Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
112 of 2013
Completed
4648 Tue 04/03/2014 11:30:00 AM
Hearing
146 of 2013
Completed
4649 Tue 04/03/2014 11:30:00 AM
Hearing
125 of 2013
Completed
4650 Tue 04/03/2014 11:30:00 AM
Hearing
137 of 2013
Completed
4651 Tue 04/03/2014 11:30:00 AM
Hearing
136 of 2013
Completed
4652 Tue 04/03/2014 11:30:00 AM
Hearing
127 of 2013
Completed
4653 Tue 04/03/2014 11:30:00 AM
Hearing
126 of 2013
Completed
4654 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 124 of 2013 : M/s. Bholaram Metal Industries Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
124 of 2013
Completed
4655 Tue 04/03/2014 11:30:00 AM
Hearing
123 of 2013
Completed
4656 Tue 04/03/2014 11:30:00 AM
Hearing
122 of 2013
Completed
4657 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 115 of 2013 : M/s. Solo Metals Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
115 of 2013
Completed
4658 Tue 04/03/2014 11:30:00 AM
Hearing
Case No. 114 of 2013 : M/s. Guardian Steel Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
114 of 2013
Completed
4659 Tue 04/03/2014 11:30:00 AM
Hearing
Case No. 113 of 2013 : M/s. Guardian Casting Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
113 of 2013
Completed
4660 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 111 of 2013 : M/s. Thane Steel Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
111 of 2013
Completed
4661 Tue 04/03/2014 11:30:00 AM
Hearing
110 of 2013
Completed
4662 Tue 04/03/2014 11:30:00 AM
Hearing
CLUBBED HEARING Case Nos. 110 to 115 of 2013, 122 to 127 of 2013 & Case No 131 of 2013: M/s. Nasik Strips Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
131 of 2013
Completed
4663 Tue 04/03/2014 11:30:00 AM
Hearing
Case NO 19 of 2014 : Petition of Cosmo Films Limited (SEZ Unit). Complaint against Licensee (MSEDCL) in the matter of illegal recovery of additional amount against the order dt. 03.09.2013 in case No. 28/2013, date 04.09.2013 in case No. 44/2013, date 05.09.2013 in case No. 95/2013 passed by Commissions. Action under Section 142 & 146 of Elect. Act 2003 proposed against MSEDCL for violation of MERCs orders.
19 of 2014
Completed
4664 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 5 of 2014 : Petition of Jawahar Shetkari Sahakari Soot Girni Limited. Intervening petition against Licensee (MSEDCL) in the matter of protest for recovery of additional amount in energy bill as per order dt. 03.09.2013 in case No. 28/2013, dt. 04.09.2013 in case No. 44/2013, dt. 05.09.2013 in case No. 95/2013 passed by Commissions. Intervention to be taken with MERC case Nos. 110 to 115, 122 to 127, 131,136,137, 144, 146 to 149, 171 of 2013.
5 of 2014
Completed
4665 Tue 04/03/2014 11:30:00 AM
Hearing
Case No 149 of 2013 : M/s. Surya Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
149 of 2013
Completed
4666 Mon 03/03/2014 11:30:00 AM
Hearing
MA No. 15 of 2013 in Case No. 46 of 2013 : Miscellaneous Application of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Reschedule with further notice
4667 Mon 03/03/2014 11:30:00 AM
Hearing
Case No 46 of 2013 & MA No 6 of 2013 : Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Reschedule with further notice
4668 Fri 28/02/2014 11:30:00 AM
Public Hearing
Case No 38 of 2014 : Petition of MSEDCL for Final true up for FY 2011-12 and FY 2012-13, allowing carrying cost on deferred approvals, and interim relief.
38 of 2014
Completed
4669 Wed 26/02/2014 12:30:00 PM
Hearing
Case No 27 of 2014 : Petition of Shri Dayaram Dhukdu Gangurde & 16 others, under section 67 (4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012.
27 of 2014
Completed
4670 Wed 26/02/2014 12:30:00 PM
Hearing
Case No 26 of 2014 : Petition of Poonam Narayanrao Deshmukh & 11 others under section 67(4) of Electricity Act 2003 against 1) Director Projects (MSETCL), Mumbai & 2) Executive Engineer, High tension construction Division, MSETCL, Jalgaon for non compliance of provisions of Electricity Act 2003 & Maharashtra Works of Licensees Rules, 2012 .
26 of 2014
Completed
4671 Wed 26/02/2014 12:00:00 PM
Hearing
Case No. 80 of 2013 : Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Completed
4672 Wed 26/02/2014 12:00:00 PM
Hearing
Case No. 59 of 2013 : Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No. 08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Completed
4673 Wed 26/02/2014 11:30:00 AM
Hearing
Case No. 132 of 2011 : Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 (Solapur Bioenergy Systems Pvt Ltd v/s Others).
132 of 2011
Completed
4674 Wed 26/02/2014 11:30:00 AM
Hearing
Case No. 151 of 2013 : Petition of Balbir Alloys Private Limited for non compliance of Order dated 29/07/2013, passed by the CGRF Kalyan Zone Kalyan in Grievance No. K/E/713/843/ OF 2013-14.
151 of 2013
Completed
4675 Tue 25/02/2014 12:30:00 PM
Hearing
Case No. 150 of 2013 : Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012.
150 of 2013
Completed
4676 Tue 25/02/2014 12:00:00 PM
Hearing
Case No. 145 of 2013 : MSEDCL Review Petition arising out of Order dated 28.08.2013 in Case No. 117 of 2012 passed in petition filed by Wardha Power Company Limited seeking inter alia quashing of invoices raised by the Respondent No.1 therein MSEDCL levying cross subsidy surcharge.
145 of 2013
Reschedule with further notice
4677 Tue 25/02/2014 11:30:00 AM
Hearing
Case No. 25 of 2013 : Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation.
25 of 2013
Completed
4678 Tue 25/02/2014 11:00:00 AM
Public Hearing
Case No 178 of 2013 : Petition filed by Maharashtra State Load Despatch Centre (MSLDC) for approval of budget for cost of operation for the FY 2014-15, true-up for FY 2012-13 and Annual Performance Review for FY 2013-14.
178 of 2013
Completed
4679 Thu 20/02/2014 12:00:00 PM
Hearing
Case No. 134 of 2013 : Petition of M/s. JSW Steel Limited under Section 61, 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 read with MERC(Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010.
134 of 2013
Completed
4680 Thu 20/02/2014 12:00:00 PM
Hearing
Case No. 140 of 2013 : Petition of Shri Charbhuja Sales Corporation, complaint u/s. 142 read with sec.42 of the Electricity Act 2003.
140 of 2013
Completed
4681 Thu 20/02/2014 11:30:00 AM
Hearing
Case No. 93 of 2013 : Petition seeking Direction against Respondent No 1 to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Completed
4682 Tue 18/02/2014 12:00:00 PM
Hearing
Case No. 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Completed
4683 Tue 18/02/2014 12:00:00 PM
Hearing
Case No. 79 of 2013 : Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Completed
4684 Tue 18/02/2014 11:30:00 AM
Hearing
Case No. 189 of 2013 : Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Completed
4685 Tue 18/02/2014 11:30:00 AM
Hearing
Case No. 118 of 2013 : JSW Energy Limited for petition under Section 61, 86(1) (b) and other applicable provisions of the Electricity Act, 2003.
118 of 2013
Completed
4686 Tue 18/02/2014 11:30:00 AM
Hearing
Case No. 154 of 2013 : Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
4687 Thu 13/02/2014 12:30:00 PM
Hearing
Case No. 185 of 2013 : Petition of MSEDCL for determination of cross subsidy surcharge in accordance with the Section 42 (2) and 86 (1) of Electricity Act 2003 and Regulation 13 of MERC (Distribution Open Access) Regulations, 2005.
185 of 2013
Completed
4688 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 33 of 2014 : Petition of Alkyl Amines Chemicals Limited, Complaint against Licensee( MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
33 of 2014
Completed
4689 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 31 of 2014 : Petition of Mandhana Industries Limited, (Unit: Mandhana Weaving House) Complaint against Licensee ( MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non-discriminatory open access for availing power through Indian Energy Exchange (IEX).
31 of 2014
Completed
4690 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 30 of 2014 : Petition of Mandhana Industries Limited, Complaint against Licensee ( MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O.A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
30 of 2014
Completed
4691 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 28 of 2014 : Petition of M/s. Precision Camshafts Ltd under section 42(2) (3) & (4), 142,146 of the E.A. 2003 and Open Access Regulations, 2005. The Petition seeking relief for providing permission by MSEDCL for availing open access through IEX.
28 of 2014
Completed
4692 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 23 of 2014 : Petition of Praxair India private Limited, Complaint against Licensee( MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A. Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
23 of 2014
Completed
4693 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 21 of 2014 : Petition of M/s. Jamshree Ranjitsinghaji Spg. Wvg. Mills Co. Limited for not providing permission by MSEDCL for availing open access through IEX.
21 of 2014
Completed
4694 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 14 of 2014 : Petition of Mantri Metallics Pvt. Limited, under subsection (47) of Section 2 read with 42 (2)(3) and (4), 142, 146 of the Electricity Act, 2003 and Open Access Regulations, 2005.The Petition seeking relief for providing permission by MSEDCL for availing open access through IEX.
14 of 2014
Completed
4695 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 01 of 2014: Petition of Linde India Limited, complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
1 of 2014
Completed
4696 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 186 of 2013 : Petition of Cosmo Films Limited(SEZ Unit) for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
186 of 2013
Completed
4697 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 176 of 2013 : Namco Industries Pvt. Limited petition for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
176 of 2013
Completed
4698 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 175 of 2013 : Asahi India Glass Limited petition for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O.A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
175 of 2013
Completed
4699 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 172 of 2013 : Petition of Pepsico India Holdings Pvt. Limited for not providing permission by MSEDCL for availing open access through IEX.
172 of 2013
Completed
4700 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 163 of 2013 : Petition of Jawahar Shetkari Sahakari Soot Girni Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
163 of 2013
Completed
4701 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 160 of 2013 : Petition of U.P.Twiga Fiberglass Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
160 of 2013
Completed
4702 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 157 of 2013 : Petition of Value Industries Limited for not providing permission by MSEDCL for availing open access through IEX.
157 of 2013
Completed
4703 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 156 of 2013 : Petition of Trend Electronics Limited for not providing permission by MSEDCL for availing open access through IEX.
156 of 2013
Completed
4704 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 143 of 2013 : Vinati Organics Limited petition for not providing permission by MSEDCL for availing open access through IEX.
143 of 2013
Completed
4705 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 142 of 2013 : Petition of Garg Inox Limited for not providing permission by MSEDCL for availing open access through IEX.
142 of 2013
Completed
4706 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 133 of 2013 : Petition of Jawahar Shetkari Sahakari Soot Girni Limited for not providing permission by MSEDCL for availing open access through IEX.
133 of 2013
Completed
4707 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 130 of 2013 : Petition of M/s Nath Pulp and Paper Mills Limited for seeking directions to MSEDCL to give permission for availing open access through IEX.
130 of 2013
Completed
4708 Thu 13/02/2014 11:30:00 AM
Hearing
Case No 129 of 2013 : Petition of Jindal Poly Films Limited for not providing permission by MSEDCL for availing open access through IEX.
129 of 2013
Completed
4709 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 121 of 2013 : Petition of M/s Balkrishna Paper Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
121 of 2013
Completed
4710 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 117 of 2013 : Petition of Nagreeka Exports Limited for not providing permission by MSEDCL for availing open access through IEX.
117 of 2013
Completed
4711 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 104 of 2013 : Petition of Cosmo Films Limited for not providing permission by MSEDCL for availing open access through IEX.
104 of 2013
Completed
4712 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 103 of 2013 : Petition of Global Softech Pvt. Limited for not providing permission by MSEDCL for availing open access through IEX.
103 of 2013
Completed
4713 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 102 of 2013 : Petition of Pulgaon Cotton Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
102 of 2013
Completed
4714 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 101 of 2013 : Petition of KSL & Industries Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
101 of 2013
Completed
4715 Thu 13/02/2014 11:30:00 AM
Hearing
Case No 98 of 2013 : Petition of Clariant Chemicals (India) Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
98 of 2013
Completed
4716 Thu 13/02/2014 11:30:00 AM
Hearing
Case No. 97 of 2013 : Petition of Indoworth India Ltd. for not providing permission by MSEDCL for availing open access through IEX.
97 of 2013
Completed
4717 Wed 12/02/2014 12:30:00 PM
Hearing
Case No. 177 of 2013 : Petition of The Mula Pravara Electric Cooperative Society Ltd., for amendment / review / rectification of the Order dated 3rd September 2013 passed by the Honorable MERC dismissing, rejecting and disposing of Review Petition / Case No. 121 of 2012 which was filed by MSEDCL for review of Honorable MERC's Order dated 15th October 2012 in Case No. 24 of 2012, ordering and directing payment of compensation charges by MSEDCL to MPECS for use of MPECS's distribution network, equipment and assets, pursuant to the Order and Judgment dated 16th December 2011 of the Honorable APTEL in Appeal No. 39 of 2011.
177 of 2013
Completed
4718 Wed 12/02/2014 12:30:00 PM
Hearing
Case No. 24 of 2012 : Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
4719 Wed 12/02/2014 12:00:00 PM
Hearing
Case No. 120 of 2013 : Petition of MSEDCL in the matter of Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 directing MPECSL to submit its assets register to MSEDCL.
120 of 2013
Completed
4720 Wed 12/02/2014 12:00:00 PM
Hearing
Case No. 119 of 2013 : Petition of MSEDCL for seeking Clarification of the Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 under Regulation 92 & 93 of the MERC (Conduct of Business) Regulations 2004.
119 of 2013
Completed
4721 Wed 12/02/2014 11:30:00 AM
Hearing
Case No. 85 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
4722 Tue 11/02/2014 12:30:00 PM
Hearing
Case No. 35 of 2014 : Petition of Wardha Power Company Limited, for clarification of the Order dated 15.01.2014 in Case No. 08 of 2013.
35 of 2014
Completed
4723 Tue 11/02/2014 12:30:00 PM
Hearing
Case No 34 of 2014 : Review Petition of Wardha Power company Limited, against Order dated 17.01.2014 in Case No. 164 of 2013.
34 of 2014
Completed
4724 Tue 11/02/2014 12:30:00 PM
Hearing
Case No. 56 of 2012 : Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order in Case No. 42 of 2006.
56 of 2012
Completed
4725 Tue 11/02/2014 12:00:00 PM
Hearing
Case No. 189 of 2013 : Petition of Adani Power Maharashtra Limited for compensation in tariff on account of "Change in Law" under the PPAs dated 31.03.2010, 19.08.2010 and 16.02.2013.
189 of 2013
Reschedule
4726 Tue 11/02/2014 11:30:00 AM
Public Hearing
Case No. 178 of 2013 : Petition filed by Maharashtra State Load Despatch Centre (MSLDC) for approval of budget for cost of operation for the FY 2014-15, true-up for FY 2012-13 and Annual Performance Review for FY 2013-14.
178 of 2013
Completed
4727 Thu 06/02/2014 12:00:00 PM
Hearing
Case No. 36 of 2013 : Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Completed
4728 Thu 06/02/2014 12:00:00 PM
Hearing
Case No. 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4729 Wed 05/02/2014 11:30:00 AM
Hearing
CAse No. 8 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R. No.0210 /pk.29/ Urja 4 Dt.01.11.2010. against the order No.56 Dt.12.08.2013 passed by the Honorable Collector Aurangabad.
8 of 2014
Completed
4730 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 12 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R.No.0210 / pk.29/Urja 4 Dt.01.11.2010. against the order No.88 Dt.03.09.2013 passed by the Honorable Collector Aurangabad.
12 of 2014
Completed
4731 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 11 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R.No.0210/pk.29/Urja 4 Dt.01.11.2010. against the order No.91 Dt.03.09.2013 passed by the Honorable CollectorAurangabad.
11 of 2014
Completed
4732 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 10 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R.No.0210/pk.29/Urja 4 Dt.01.11.2010. against the order No.92 Dt.03.09.2013 passed by the Honorable Collector Aurangabad.
10 of 2014
Completed
4733 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 9 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R.No.0210/pk.29/Urja 4 Dt.01.11.2010. against the order No.87 Dt.03.09.2013 passed by the Honorable Collector Aurangabad.
9 of 2014
Completed
4734 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 7 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G.R.No.0210/pk.29/Urja 4 Dt.01.11.2010. against the order No.90 Dt.03.09.2013 passed by the Honorable Collector Aurangabad.
7 of 2014
Completed
4735 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 6 of 2014 : Petition of MSETCL for Revision under Rule 13(2) of the Maharashtra Electricity Work Licenses Rules 2012 read with Govt. of Maharashtra G. R. No. 0210/ pk. 29 / Urja 4 Dt.01.11.2010. against the order No.89 Dt.03.09.2013 passed by the Honorable Collector Aurangabad.
6 of 2014
Completed
4736 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 192 of 2013 : Petition of Kisan Lala Bramhanath & ten others for under section 142 and 146 & under Section 67(5) of the Electricity Act 2003 and Maharashtra Works of Licensees Rules 2012 seeking non compliance of the Order No 89 passed by the District Collector, Aurangabad dated 03.09.2013by MSETCL and also seeking enhancement of compensation awarded by District Collector, Aurangabad under rule 3 (3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
192 of 2013
Completed
4737 Wed 05/02/2014 11:30:00 AM
Hearing
Case No. 191 pf 2013 : Petition of Ramchandra Asaram Jinwal & two others for seeking penalty under section 142 and 146 & under Section 67(5) of the Electricity Act 2003 and Maharashtra Works of Licensees Rules 2012 seeking non compliance of the Order No.87 passed by the District Collector, Aurangabad dated 03.09.2013 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Aurangabad under rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
191 of 2013
Completed
4738 Tue 04/02/2014 12:30:00 PM
Hearing
Case No. 96 of 2013 : Petition of MSEDCL in the matter Compliance of Renewable Purchase Obligation for the FY 2012-13 by MSEDCL.
96 of 2013
Completed
4739 Tue 04/02/2014 12:30:00 PM
Suo Motu Hearing
Case No. 183 of 2013 : Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of RInfra-D cumulatively for three years i.e. FY 2010-11, FY 2011-12 & FY 2012-13, as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 - Case No. 183 of 2013.
183 of 2013
Completed
4740 Tue 04/02/2014 12:30:00 PM
Suo Motu Hearing
Case No 182 of 2013 : Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of TPC-D cumulatively for three years i.e. FY 2010-11, FY 2011-12 & FY 2012-13, as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 Case No. 182 of 2013.
182 of 2013
Completed
4741 Tue 04/02/2014 11:30:00 AM
Suo Motu Hearing
Case No 181 of 2013 : Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of BEST cumulatively for three years i.e. FY 2010-11, FY 2011-12 & FY 2012-13, as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 Case No. 181of 2013.
181 of 2013
Completed
4742 Tue 04/02/2014 11:30:00 AM
Suo Motu Hearing
Case no 180 of 2013 : Suo-motu proceeding for Verification and Compliance of Renewable Purchase Obligation targets of MSEDCL for FY 2012-13, as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 Case No. 180 of 2013.
180 of 2013
Completed
4743 Tue 21/01/2014 11:30:00 AM
Hearing
Case No. 192 of 2013 : Petition of Kisan Lala Bramhanath & ten others for under section 142 and 146 & under Section 67(5) of the Electricity Act 2003 and Maharashtra Works of Licensees Rules 2012 seeking non compliance of the Order No 89 passed by the District Collector, Aurangabad dated 03.09.2013by MSETCL and also seeking enhancement of compensation awarded by District Collector, Aurangabad under rule 3 (3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
192 of 2013
Reschedule
4744 Tue 21/01/2014 11:30:00 AM
Hearing
Case No. 191 of 2013 : Petition of Ramchandra Asaram Jinwal & two others for seeking penalty under section 142 and 146 & under Section 67(5) of the Electricity Act 2003 and Maharashtra Works of Licensees Rules 2012 seeking non compliance of the Order No.87 passed by the District Collector, Aurangabad dated 03.09.2013 by MSETCL and also seeking enhancement of compensation awarded by District Collector, Aurangabad under rule 3(3) and 13(2) of Maharashtra Works of Licensees Rules 2012.
191 of 2013
Reschedule
4745 Thu 16/01/2014 12:30:00 PM
Hearing
177 of 2013
Reschedule with further notice
4746 Thu 16/01/2014 12:30:00 PM
Hearing
Case No. 24 of 2012 : Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Reschedule with further notice
4747 Thu 16/01/2014 12:00:00 PM
Hearing
Case No. 120 of 2013 : Petition of MSEDCL in the matter of Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 directing MPECSL to submit its assets register to MSEDCL.
120 of 2013
Reschedule with further notice
4748 Thu 16/01/2014 12:00:00 PM
Hearing
119 of 2013
Reschedule with further notice
4749 Thu 16/01/2014 11:30:00 AM
Hearing
Case No. 85 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Reschedule with further notice
4750 Wed 15/01/2014 12:30:00 PM
Hearing
Case No. 185 of 2013 : Petition for MSEDCL for determination of cross subsidy surcharge in accordance with the Section 42(2) and 86(1) of Electricity Act 2003 and Regulation 13 of MERC (Distribution Open Access ) Regulations,2005.
185 of 2013
Reschedule with further notice
4751 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 133 of 2013 : Petition of Jawahar Shetkari Sahakari Soot Girni Limited for not providing permission by MSEDCL for availing open access through IEX.
133 of 2013
Reschedule with further notice
4752 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 130 of 2013 : Petition of M/s Nath Pulp and Paper Mills Limited for seeking directions to MSEDCL to give permission for availing open access through IEX.
130 of 2013
Reschedule with further notice
4753 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 129 of 2013 : Petition of Jindal Poly Films Limited for not providing permission by MSEDCL for availing open access through IEX.
129 of 2013
Reschedule with further notice
4754 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 121 of 2013 : Petition of M/s Balkrishna Paper Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
121 of 2013
Reschedule with further notice
4755 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 117 of 2013 : Petition of Nagreeka Exports Limited for not providing permission by MSEDCL for availing open access through IEX.
117 of 2013
Reschedule with further notice
4756 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 104 of 2013 : Petition of Cosmo Films Limited for not providing permission by MSEDCL for availing open access through IEX.
104 of 2013
Reschedule with further notice
4757 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 103 of 2013 : Petition of Global Softech Pvt. Limited for not providing permission by MSEDCL for availing open access through IEX.
103 of 2013
Reschedule with further notice
4758 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 102 of 2013 : Petition of Pulgaon Cotton Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
102 of 2013
Reschedule with further notice
4759 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 101 of 2013 : Petition of KSL & Industries Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
101 of 2013
Reschedule with further notice
4760 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 98 of 2013 : Petition of Clariant Chemicals (India) Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
98 of 2013
Reschedule with further notice
4761 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 97 of 2013 : Petition of Indoworth India Ltd. for not providing permission by MSEDCL for availing open access through IEX.
97 of 2013
Reschedule with further notice
4762 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 163 of 2013 : Petition of Jawahar Shetkari Sahakari Soot Girni Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
163 of 2013
Reschedule with further notice
4763 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 160 of 2013 : Petition of U.P.Twiga Fiberglass Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
160 of 2013
Reschedule with further notice
4764 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 186 of 2013 : Cosmo Films Limited(SEZ Unit) petition for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
186 of 2013
Reschedule with further notice
4765 Wed 15/01/2014 11:30:00 AM
Hearing
Case No. 176 of 2013 : Namco Industries Pvt. Limited petition for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O. A . Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
176 of 2013
Reschedule with further notice
4766 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 175 of 2013 :Asahi India Glass Limited petition for complaint against Licensee (MSEDCL) for violation of Section 38 & 42 of Elect. Act 2003 and O.A .Regulation 2005 by not providing non discriminatory open access for availing power through Indian Energy Exchange (IEX).
175 of 2013
Reschedule with further notice
4767 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 172 of 2013 : Pepsico India Holdings Pvt. Limited petition for not providing permission by MSEDCL for availing open access through IEX.
172 of 2013
Reschedule with further notice
4768 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 157 of 2013 :Petition filed by Value Industries Limited for not providing permission by MSEDCL for availing open access through IEX.
157 of 2013
Reschedule with further notice
4769 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 156 of 2013 : Petition filed by Trend Electronics Limited for not providing permission by MSEDCL for availing open access through IEX.
156 of 2013
Reschedule with further notice
4770 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 143 of 2013 :Petition filed by Vinati Organics Limited for not providing permission by MSEDCL for availing open access through IEX.
143 of 2013
Reschedule with further notice
4771 Wed 15/01/2014 11:30:00 AM
Hearing
Case No 142 of 2013 :Petition filed by Garg Inox Limited for not providing permission by MSEDCL for availing open access through IEX.
142 of 2013
Reschedule with further notice
4772 Thu 09/01/2014 12:30:00 PM
Hearing
Case No. 150 of 2013 : Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012.
150 of 2013
Completed
4773 Thu 09/01/2014 12:00:00 PM
Hearing
Case No. 153 of 2013 : Petition of RInfra-Distribution for Seeking clarification on certain tariff related issues pursuant to the MERC Order dated 22.08.2013 passed in Case No. 9 of 2013 pertaining to Multi Year Tariff for Second Control Period of (FY 2012-13 to FY 2015-16) of RInfra-D business.
153 of 2013
Completed
4774 Thu 09/01/2014 12:00:00 PM
Hearing
Case No. 99 of 2013 : Petition of Tata Power Company Limited for Review of MERC Order dated 28.06.2013 in Case No. 179 of 2011 in the matter of Tata Power-D true-up Petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16.
99 of 2013
Completed
4775 Thu 09/01/2014 11:30:00 AM
Hearing
Case No. 51 of 2013 : Petition of M/s. Adani Power Maharashtra Limited under Section 86(1) (f) of EA 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
4776 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 184 of 2013 :Petition filed by M/s M/S. Eurotex Industries and Exports Ltd. for Punishment to MSEDCL for Non-compliance of the Directions under Section 142 and 146 of the Electricity Act 2003 for contravention of the Orders of the Honourable Commission in Case Nos. 95, 28 and 44 of 2013.
184 of 2013
Completed
4777 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 144 of 2013 Petition of Vidarbha Industries Association for Penalizing MSEDCL under section 142, 146 of the Electricity Act 2003 for contravening section 45, section 62(3), of E.A. 2003, Commissions order in case No.95, 28 & 44 of 2013 and clause 3.4 of Supply Code Regulations.
144 of 2013
Completed
4778 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 158 of 2013 : Petition of M/s Pudumjee Pulp & Paper Mills Ltd. for seeking clarification of MERC Order dated 05.09.2013 in Case No. 95 of 2013 placed on MSEDCL with respect to approval of expenses of MSPGCL including earlier expenses approved vide MERC's other orders for recovery from consumers of MSEDCL and directions including the MSEDCL Commercial Circular No. 209 dated 07.09.2013.
158 of 2013
Completed
4779 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 171 of 2013 :Petition of Thane Belapur Industries Association for Reviewing of MERC Order dated 05.09.2013 in Case No.95 of 2013 and seeking clarifications on the Order and other Orders and directions including the MSEDCL commercial circular No.209 of 07.09.2013.
171 of 2013
Completed
4780 Wed 08/01/2014 11:30:00 AM
Hearing
Case N o 148 of 2013 : M/s. Surya Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
148 of 2013
Completed
4781 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 147 of 2013 : M/s. Shree Sushma Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
147 of 2013
Completed
4782 Wed 08/01/2014 11:30:00 AM
Hearing
CAse N o 137 of 2013 : M/s. Mundra Steel & Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
137 of 2013
Completed
4783 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 136 of 2013 : Shree Krishna Ingots Biloshi India Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
136 of 2013
Completed
4784 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 127 of 2013 : M/s. Wada Ingots Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
127 of 2013
Completed
4785 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 126 of 2013 : M/s. Bhagawandas Ispat Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
126 of 2013
Completed
4786 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 125 of 2013 : M/s. Shree Salsar Ferro Metal Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
125 of 2013
Completed
4787 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 124 of 2013 : M/s. Bholaram Metal Industries Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
124 of 2013
Completed
4788 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 123 of 2013 : M/s. Vidhata Metals Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
123 of 2013
Completed
4789 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 122 of 2013 : M/s. New Steel Trading Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
122 of 2013
Completed
4790 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 115 of 2013 : M/s. Solo Metals Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
115 of 2013
Completed
4791 Wed 08/01/2014 11:30:00 AM
Hearing
Case No. 114 of 2013 : M/s. Guardian Steel Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
114 of 2013
Completed
4792 Wed 08/01/2014 11:30:00 AM
Hearing
Case No. 113 of 2013 : M/s. Guardian Casting Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
113 of 2013
Completed
4793 Wed 08/01/2014 11:30:00 AM
Hearing
Case no 112 of 2013 : M/s. Sun Metallics & Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
112 of 2013
Completed
4794 Wed 08/01/2014 11:30:00 AM
Hearing
Case No 111 of 2013 : M/s. Thane Steel Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
111 of 2013
Completed
4795 Wed 08/01/2014 11:30:00 AM
Hearing
Case NO. 110 of 2013 : Petittion filed by M/s. Balbir Alloys Private Limited. for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
110 of 2013
Completed
4796 Wed 08/01/2014 11:30:00 AM
Hearing
CLUBBED HEARING Case No's. 110 to 115 of 2013, 122 to 127 of 2013 & Case No 131 of 2013: M/s. Nasik Strips Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Hon'ble MERC dated 5th September 2013.
131 of 2013
Completed
4797 Tue 07/01/2014 12:30:00 PM
Hearing
Case No. 77 of 2013 : Petition of (i) Yashawant Sahakari Glucose Karkhana Ltd. (ii) Shri Tradco Dessan Pvt. Ltd. (iii) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Completed
4798 Tue 07/01/2014 12:00:00 PM
Admissibility Hearing
Case No. 164 of 2013 : Petition of Wardha Power company Ltd., under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of orders/directions given by this Hon'ble Commission in the order dated 28.08.2013 passed in Case No. 117 of 2012.
164 of 2013
Completed
4799 Tue 07/01/2014 12:00:00 PM
Hearing
Case No. 145 of 2013 : MSEDCL Review Petition arising out of Order dated 28.08.2013 in Case No. 117 of 2012 passed in petition filed by Wardha Power Company Limited seeking inter alia quashing of invoices raised by the Respondent No.1 therein MSEDCL levying cross subsidy surcharge.
145 of 2013
Completed
4800 Tue 07/01/2014 11:30:00 AM
Hearing
Case No. 93 of 2013 : Petition seeking Direction against Respondent No 1 to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Completed
4801 Tue 24/12/2013 12:00:00 PM
Hearing
Case No. 79 of 2013 : Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Completed
4802 Tue 24/12/2013 12:00:00 PM
Hearing
Case No. 87 of 2013 : Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Completed
4803 Tue 24/12/2013 11:30:00 AM
Hearing
Case No. 25 of 2013 Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation.
25 of 2013
Completed
4804 Thu 19/12/2013 12:30:00 PM
Public Hearing
Case No. 128 of 2013 : Petition filed by Maharashtra Eastern Grid Power Transmission Company Limited (MEGPTCL) in the matter of approval of Bussiness Plan for second control period from FY 2013-14 to FY 2015-16(Case No. 128 of 2013)
128 of 2013
Completed
4805 Thu 19/12/2013 12:00:00 PM
Hearing
Case No. 154 of 2013 : Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
4806 Thu 19/12/2013 12:00:00 PM
Hearing
Case No 118 of 2013 : JSW Energy Limited for petition under Section 61, 86(1) (b) and other applicable provisions of the Electricity Act, 2003.
118 of 2013
Completed
4807 Thu 19/12/2013 12:00:00 PM
Hearing
Case No. 170 of 2013 : Petition of Maharashtra Veej Grahak Sanghtana, punishment to MSEDCL for non- compliance of directions under Section 142 and 146 of the Electricity Act, 2003 for contravention of FAC regulations and Application of Excess FAC on all the Consumers in the State.
170 of 2013
Completed
4808 Thu 19/12/2013 11:30:00 AM
Hearing
Case No. 169 of 2013 : Petition of Sayagi U BA KHIN Memorial Trust Seeking reclassification of Tariff Category under HT- VI Residential for part of load related residential purpose and rest of load under HT IX (Public Service).
169 of 2013
Completed
4809 Wed 18/12/2013 12:00:00 PM
Hearing
Case No. 135 of 2013: 1) B. S. Channabassappa & sons. 2) Sridevi Trading Company Petition for Refusal of Open Access Permission.
135 of 2013
Reschedule
4810 Wed 18/12/2013 12:00:00 PM
Hearing
Case No 36 of 2013 : Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Reschedule with further notice
4811 Wed 18/12/2013 11:30:00 AM
Hearing
Case No. 166 of 2013 : Petition of BEST for Review of the Order dated 28.08.2013 in Case No.26 of 2013 issued by Honorable Commission in the matter of petition filed by BEST Undertaking's for approval of Truing Up of the Aggregate Revenue Requirement for FY 2010-11 and FY 2011-12 and Multi Year Tariff for the second Control Period 2012-13 to FY 2015-16.
166 of 2013
Completed
4812 Wed 18/12/2013 11:30:00 AM
Hearing
Case No 133 of 2013 : Jawahar Shetkari Sahakari Soot Girni Limited for not providing permission by MSEDCL for availing open access through IEX.
133 of 2013
Reschedule
4813 Tue 17/12/2013 12:30:00 PM
Hearing
Case No 164 of 2013 : Petition of Wardha Power company Ltd., under Sections 142 and 146 of the Electricity Act, 2003 for non-compliance of orders/directions given by this Honorable Commission in the order dated 28.08.2013 passed in Case No. 117 of 2012.
164 of 2013
Reschedule
4814 Tue 17/12/2013 12:00:00 PM
Hearing
Case No 145 of 2013 : MSEDCL Review Petition arising out of Order dated 28.08.2013 in Case No. 117 of 2012 passed in petition filed by Wardha Power Company Limited seeking inter alia quashing of invoices raised by the Respondent No.1 therein MSEDCL levying cross subsidy surcharge.
145 of 2013
Reschedule
4815 Tue 17/12/2013 12:00:00 PM
Hearing
Case No 93 of 2013 :Petition seeking Direction against Respondent No 1 to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Reschedule
4816 Tue 17/12/2013 11:30:00 AM
Hearing
Case No 105 of 2013 Petition of MSEDCL for Review of MERC Order dated 16.07.2013 in Case No. 88 of 2012 passed in Petition filed by M/s Kalika Steel & Alloys Pvt Ltd & 16 others seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous supply) category consumers in billing cycles wherein there had been load shedding in electricity supplied by MSEDCL.
105 of 2013
Reschedule with further notice
4817 Thu 12/12/2013 12:00:00 PM
Hearing
Case No. 168 of 2013 : Petition of Tukaram Babu Mali under Section 142 of Electricity Act, 2003, for non compliance of provisions of Section 56(1) of Electricity Act,2003
168 of 2013
Completed
4818 Thu 12/12/2013 12:00:00 PM
Hearing
Case No. 167 of 2013 : Petition of Vilasrao Narayanrao Jagtap under Section 142 of Electricity Act, 2003, for non compliance of provisions of Regulation No. 15 of MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005
167 of 2013
Completed
4819 Thu 12/12/2013 11:30:00 AM
Hearing
Case No 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4820 Wed 11/12/2013 12:00:00 PM
Hearing
Case No 135 of 2013 : 1) B. S. Channabassappa & sons. 2) Sridevi Trading Company Petition for Refusal of Open Access Permission.
135 of 2013
Completed
4821 Wed 11/12/2013 12:00:00 PM
Hearing
Case No 152 of 2013 : Petition of Ajanta Limited for Refusal of Open Access permission by MSEDCL.
152 of 2013
Completed
4822 Wed 11/12/2013 12:00:00 PM
Hearing
Case No 130 of 2013 : M/s Nath Pulp and Paper Mills Limited for seeking directions to MSEDCL to give permission for availing open access through IEX.
130 of 2013
Reschedule
4823 Wed 11/12/2013 12:00:00 PM
Hearing
Case No. 129 of 2013 : Jindal Poly Films Limited for not providing permission by MSEDCL for availing open access through IEX.
129 of 2013
Reschedule
4824 Wed 11/12/2013 11:30:00 AM
Hearing
Case No. 161 of 2013 : Petition of M/s. Ruhatiya Spinners Pvt. Ltd for non compliance by Superintending Engineer, MSEDCL, Akola, of an Order No. CGRF/AKOLA/185, Dated.28.06.2013, Passed by the CGRF, MSEDCL, Akola Zone read with Regulation 22 & 8.7of MERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2006, under Sections 142,146 and 149 of Electricity Act, 2003.
161 of 2013
Completed
4825 Wed 11/12/2013 11:30:00 AM
Hearing
Petition of M/s Balkrishna Paper Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
121 of 2013
Reschedule
4826 Wed 11/12/2013 11:00:00 AM
Hearing
Case No 132 of 2013 : Petition of Amaravati Power Transmission Company Limited for approval for creating encumbrance on the assets of licensed business of APTCL for the purpose of licensed business for following transmission system:-1) 400KV D/C Quad Moose Amaravati TPP- Akola S/S Transmission line.2) LILO of 400KV S/C Akola to Koradi Transmission line at Amravati TPP. 3) 2 Nos. 400 KV line bays at MSETCL Akola-I Sub- station.
132 of 2013
Completed
4827 Tue 10/12/2013 12:30:00 PM
Hearing
Case No. 155 of 2013 : Petition of Vidarbha Industries Association for Review of Decisions, Directions and Order dated 26.08.2013 in Case No.134 of 2012 under section 94(f) of E A 2003 & Regulation 15,85,92,93,94 & 95 of MERC ( Conduct of Business) Regulations, 2004.
155 of 2013
Reschedule with further notice
4828 Tue 10/12/2013 12:00:00 PM
Hearing
139 of 2013
Reschedule with further notice
4829 Tue 10/12/2013 11:30:00 AM
Hearing
Case No. 80 of 2013 : Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Reschedule with further notice
4830 Tue 10/12/2013 11:00:00 AM
Hearing
Case No. 162 of 2013: Petition of Reliance Infrastructure Ltd (Distribution) for postponing the implementation of the Order dated 30th October 2013 in Case No.85 of 2013 passed by this Honorable Commission till disposal of APTEL Appeal No.278 of 2013.
162 of 2013
Reschedule with further notice
4831 Thu 05/12/2013 12:00:00 PM
Admissibility Hearing
Case No 134 of 2013 :Petition of M/s. JSW Steel Limited under Section 61, 86 (1) (e) and other applicable provisions of the Electricity Act, 2003 read with MERC(Renewable Purchase Obligations, Its Compliance and Implementation of REC Framework), Regulations 2010.
134 of 2013
Reschedule with further notice
4832 Wed 04/12/2013 12:00:00 PM
Hearing
Case No. 159 of 2013 : Petition of Tata Power Company Ltd for Cumulative fulfillment of Solar RPO target by FY 2015-16.
159 of 2013
Completed
4833 Wed 04/12/2013 12:00:00 PM
Hearing
Nagreeka Exports Limited for not providing permission by MSEDCL for availing open access through IEX.
117 of 2013
Reschedule
4834 Wed 04/12/2013 12:00:00 PM
Hearing
Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Completed
4835 Wed 04/12/2013 11:30:00 AM
Hearing
Case No. 152 of 2013 : Petition of Ajanta Limited for Refusal of Open Access permission by MSEDCL.
152 of 2013
Reschedule
4836 Wed 04/12/2013 11:30:00 AM
Hearing
Case No 104 of 2013 :Petition of Cosmo Films Limited for not providing permission by MSEDCL for availing open access through IEX.
104 of 2013
Reschedule
4837 Tue 03/12/2013 11:30:00 AM
Hearing
MA No. 15 of 2013 in Case No 46 of 2013 : Miscellaneous Application of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
4838 Tue 03/12/2013 11:30:00 AM
Hearing
Case No 46 of 2013 & MA No. 6 of 2013 : Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
4839 Thu 28/11/2013 12:30:00 PM
Hearing
Case No. 171 of 2013 : Petition of Thane Belapur Industries Association for Reviewing of MERC Order dated 05.09.2013 in Case No.95 of 2013 and seeking clarifications on the Order and other Orders and directions including the MSEDCL commercial circular No.209 of 07.09.2013.
171 of 2013
Reschedule
4840 Thu 28/11/2013 12:30:00 PM
Hearing
158 of 2013
Reschedule
4841 Thu 28/11/2013 12:30:00 PM
Hearing
Case No 144 of 2013 : Petition of Vidarbha Industries Association for Penalizing MSEDCL under section 142, 146 of the Electricity Act 2003 for contravening section 45, section 62(3), of E.A. 2003, Commissions order in case No.95, 28 & 44 of 2013 and clause 3.4 of Supply Code Regulations.
144 of 2013
Reschedule
4842 Thu 28/11/2013 12:30:00 PM
Hearing
149 of 2013
Reschedule
4843 Thu 28/11/2013 12:30:00 PM
Hearing
148 of 2013
Reschedule
4844 Thu 28/11/2013 12:30:00 PM
Hearing
147 of 2013
Reschedule
4845 Thu 28/11/2013 12:30:00 PM
Hearing
146 of 2013
Reschedule
4846 Thu 28/11/2013 12:30:00 PM
Hearing
137 of 2013
Reschedule
4847 Thu 28/11/2013 12:30:00 PM
Hearing
136 of 2013
Reschedule
4848 Thu 28/11/2013 12:30:00 PM
Hearing
127 of 2013
Reschedule
4849 Thu 28/11/2013 12:30:00 PM
Hearing
126 of 2013
Reschedule
4850 Thu 28/11/2013 12:30:00 PM
Hearing
Case No 125 of 2013 : M/s. Shree Salsar Ferro Metal Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
125 of 2013
Reschedule
4851 Thu 28/11/2013 12:30:00 PM
Hearing
Case No 124 of 2013 : M/s. Bholaram Metal Industries Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
124 of 2013
Reschedule
4852 Thu 28/11/2013 12:30:00 PM
Hearing
123 of 2013
Reschedule
4853 Thu 28/11/2013 12:30:00 PM
Hearing
122 of 2013
Reschedule
4854 Thu 28/11/2013 12:30:00 PM
Hearing
115 of 2013
Reschedule
4855 Thu 28/11/2013 12:30:00 PM
Hearing
114 of 2013
Reschedule
4856 Thu 28/11/2013 12:30:00 PM
Hearing
113 of 2013
Reschedule
4857 Thu 28/11/2013 12:30:00 PM
Hearing
112 of 2013
Reschedule
4858 Thu 28/11/2013 12:30:00 PM
Hearing
111 of 2013
Reschedule
4859 Thu 28/11/2013 12:30:00 PM
Hearing
110 of 2013
Reschedule
4860 Thu 28/11/2013 12:30:00 PM
Hearing
131 of 2013
Reschedule
4861 Thu 28/11/2013 12:00:00 PM
Hearing
Case No. 132 of 2011: Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 (Solapur Bioenergy Systems Pvt Ltd v/s Others).
132 of 2011
Reschedule with further notice
4862 Thu 28/11/2013 11:30:00 AM
Hearing
Case No. 153 of 2013 :Petition of RInfra-Distribution for Seeking clarification on certain tariff related issues pursuant to the MERC Order dated 22.08.2013 passed in Case No. 9 of 2013 pertaining to Multi Year Tariff for Second Control Period of (FY 2012-13 to FY 2015-16) of RInfra-D business.
153 of 2013
Reschedule with further notice
4863 Wed 27/11/2013 12:00:00 PM
Hearing
Case No. 151 of 2013 :Petition filed by Balbir Alloys Private Limited for non compliance of Order dated 29/07/2013,passed by the CGRF Kalyan Zone Kalyan in Grievance No. K/E/713/843/ OF 2013-14.
151 of 2013
Reschedule with further notice
4864 Wed 27/11/2013 12:00:00 PM
Hearing
Case No. 141 of 2013 :Petition filed by M/s Urjankur Shree Datta Power company Limited for dispute between a generating company and a distribution licensee and seeking clarification /modification of the final Order dated 23.08.2013 passed in Case No. 89 of 2012 from the Honorable Commission.
141 of 2013
Reschedule with further notice
4865 Wed 27/11/2013 11:30:00 AM
Hearing
Case No. 140 of 2013 :Petition of Shri Charbhuja Sales Corporation, complaint u/s. 142 read with sec.42 of the Electricity Act 2003.
140 of 2013
Reschedule with further notice
4866 Wed 27/11/2013 11:30:00 AM
Hearing
Case No 103 of 2013 :Petition of Global Softech Pvt. Limited for not providing permission by MSEDCL for availing open access through IEX.
103 of 2013
Reschedule
4867 Wed 27/11/2013 11:30:00 AM
Hearing
Case No 102 of 2013 :Petition of Pulgaon Cotton Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
102 of 2013
Reschedule
4868 Wed 27/11/2013 11:30:00 AM
Hearing
Case No 101 of 2013 :Petition filed by KSL & Industries Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
101 of 2013
Reschedule
4869 Tue 26/11/2013 14:30:00 PM
Hearing
Case No. 56 of 2012 : Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order in Case No. 42 of 2006.
56 of 2012
Reschedule with further notice
4870 Tue 26/11/2013 12:00:00 PM
Hearing
Case No. 92 of 2012 : SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Reschedule with further notice
4871 Tue 26/11/2013 11:30:00 AM
Hearing
85 of 2010
Reschedule with further notice
4872 Thu 21/11/2013 12:30:00 PM
Hearing
Petition of Amaravati Power Transmission Company Limited for approval for creating encumbrance on the assets of licensed business of APTCL for the purpose of licensed business for following transmission system:-1) 400KV D/C Quad Moose Amaravati TPP- Akola S/S Transmission line.2) LILO of 400KV S/C Akola to Koradi Transmission line at Amravati TPP. 3) 2 Nos. 400 KV line bays at MSETC Akola-I Sub- station.
132 of 2013
Completed
4873 Thu 21/11/2013 12:00:00 PM
Hearing
JSW Energy Limited for petition under Section 61, 86(1) (b) and other applicable provisions of the Electricity Act, 2003.
118 of 2013
Completed
4874 Thu 21/11/2013 11:30:00 AM
Hearing
Case No 99 of 2013 :Petition of Tata Power Company Limited for Review of MERC Order dated 28.06.2013 in Case No. 179 of 2011 in the matter of Tata Power-D true-up Petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16.
99 of 2013
Completed
4875 Wed 20/11/2013 12:30:00 PM
Hearing
Case No. 150 of 2013: Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012.
150 of 2013
Completed
4876 Wed 20/11/2013 11:30:00 AM
Hearing
Petition filed by Shri Balkrishna Malhari Ghadage for non compliance of Interim Order dated 23.05.2013, passed by the CGRF Kolhapur, in Case No. 2/2013-14/173.
109 of 2013
Completed
4877 Wed 20/11/2013 11:30:00 AM
Hearing
Petition of Shri Gurunath Siddappa Bijjaragi for Non compliance of Interim Order dated 23.05.2013, passed by the CGRF Kolhapur, in Case No. 9/2013-14/240.
108 of 2013
Completed
4878 Wed 20/11/2013 11:30:00 AM
Hearing
Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Completed
4879 Wed 20/11/2013 11:00:00 AM
Hearing
Case No. 154 of 2013 :Petition of Indiabulls Power Ltd. for compensation in tariff on account of increase in fuel and other incidental costs and dispute between a Generating Company and the Distribution Licensee, relating to the provisions of the Power Purchase Agreements (PPA) dated 22nd April 2010 and 5th June 2010.
154 of 2013
Completed
4880 Tue 19/11/2013 12:30:00 PM
Hearing
Case No. 24 of 2012 : Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
4881 Tue 19/11/2013 12:30:00 PM
Hearing
Petition of MSEDCL in the matter of Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 directing MPECSL to submit its assets register to MSEDCL.
120 of 2013
Completed
4882 Tue 19/11/2013 12:30:00 PM
Hearing
Petition of MSEDCL for seeking Clarification of the Order dated 03.09.2013 passed by the Honorable MERC in Case No.121 of 2012 under Regulation 92 & 93 of the MERC (Conduct of Business) Regulations 2004.
119 of 2013
Completed
4883 Tue 19/11/2013 12:00:00 PM
Hearing
Case No 51 of 2013 :Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
4884 Tue 19/11/2013 11:30:00 AM
Hearing
Case No 96 of 2013 :Petition of MSEDCL in the matter Compliance of Renewable Purchase Obligation for the FY 2012-13 by MSEDCL.
96 of 2013
Completed
4885 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 158 of 2013 : Petition of M/s Pudumjee Pulp & Paper Mills Ltd. for seeking clarification of MERC Order dated 05.09.2013 in Case No. 95 of 2013 placed on MSEDCL with respect to approval of expenses of MSPGCL including earlier expenses approved vide MERCâ??s other orders for recovery from consumers of MSEDCL and directions including the MSEDCL Commercial Circular No. 209 dated 07.09.2013.
158 of 2013
Reschedule with further notice
4886 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 144 of 2013 : Petition of Vidarbha Industries Association for Penalizing MSEDCL under section 142, 146 of the Electricity Act 2003 for contravening section 45, section 62(3), of E.A. 2003, Commissions order in case No.95, 28 & 44 of 2013 and clause 3.4 of Supply Code Regulations.
144 of 2013
Reschedule with further notice
4887 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 149 of 2013 : M/s. Surya Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
149 of 2013
Reschedule with further notice
4888 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 148 of 2013 : M/s. Surya Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
148 of 2013
Reschedule with further notice
4889 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 147 of 2013M/s. Shree Sushma Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
147 of 2013
Reschedule with further notice
4890 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 146 of 2013 : M/s. Surya Ferrous Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
146 of 2013
Reschedule with further notice
4891 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 137 of 2013 : M/s. Mundra Steel & Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
137 of 2013
Reschedule with further notice
4892 Wed 13/11/2013 14:30:00 PM
Hearing
Case No. 136 of 2013 : Shree Krishna Ingots Biloshi India Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
136 of 2013
Reschedule with further notice
4893 Wed 13/11/2013 14:30:00 PM
Hearing
CLUBBED HEARING Case Nos. 110 to 115 of 2013, 122 to 127 of 2013 & Case No 131 of 2013: M/s. Nasik Strips Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
131 of 2013
Reschedule with further notice
4894 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Bhagawandas Ispat Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
126 of 2013
Reschedule with further notice
4895 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Shree Salsar Ferro Metal Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
125 of 2013
Reschedule with further notice
4896 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Bholaram Metal Industries Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
124 of 2013
Reschedule with further notice
4897 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Vidhata Metals Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
123 of 2013
Reschedule with further notice
4898 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. New Steel Trading Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
122 of 2013
Reschedule with further notice
4899 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Solo Metals Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
115 of 2013
Reschedule with further notice
4900 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Wada Ingots Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
127 of 2013
Reschedule with further notice
4901 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Guardian Casting Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
113 of 2013
Reschedule with further notice
4902 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Guardian Steel Private Limited for petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
114 of 2013
Reschedule with further notice
4903 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Sun Metallics & Alloys Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
112 of 2013
Reschedule with further notice
4904 Wed 13/11/2013 14:30:00 PM
Hearing
M/s. Thane Steel Private Limited for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
111 of 2013
Reschedule with further notice
4905 Wed 13/11/2013 14:30:00 PM
Hearing
Petittion filed by M/s. Balbir Alloys Private Limited. for Petition under section 142 of the Electricity Act 2003 for violating the Order of Honorable MERC dated 5th September 2013.
110 of 2013
Reschedule with further notice
4906 Wed 13/11/2013 12:30:00 PM
Hearing
Case No 98 of 2013 :Clariant Chemicals (India) Ltd. Petition for not providing permission by MSEDCL for availing partial open access through IEX.
98 of 2013
Reschedule
4907 Wed 13/11/2013 12:00:00 PM
Hearing
Case No 97 of 2013 :Indoworth India Ltd. Petition for not providing permission by MSEDCL for availing open access through IEX.
97 of 2013
Reschedule
4908 Wed 13/11/2013 11:30:00 AM
Hearing
Case No 100 of 2013 :Petition filed by Hitesh Mukundrai Dani for non compliance of Order dated 08.04.2013, passed by the CGRF Bhandup Urban Zone, Bhandup.
100 of 2013
Completed
4909 Tue 12/11/2013 15:00:00 PM
Hearing
Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Completed
4910 Tue 12/11/2013 14:30:00 PM
Hearing
Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Completed
4911 Tue 12/11/2013 12:30:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Reschedule
4912 Tue 12/11/2013 11:30:00 AM
Hearing
Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation.
25 of 2013
Completed
4913 Fri 08/11/2013 12:30:00 PM
Hearing
Case No. 133 of 2013 : Jawahar Shetkari Sahakari Soot Girni Limited for not providing permission by MSEDCL for availing open access through IEX.
133 of 2013
Completed
4914 Fri 08/11/2013 12:30:00 PM
Hearing
Case No. 130 of 2013 : M/s Nath Pulp and Paper Mills Limited for seeking directions to MSEDCL to give permission for availing open access through IEX.
130 of 2013
Completed
4915 Fri 08/11/2013 12:30:00 PM
Hearing
Case No. 129 of 2013 : Jindal Poly Films Limited for not providing permission by MSEDCL for availing open access through IEX.
129 of 2013
Completed
4916 Fri 08/11/2013 12:30:00 PM
Hearing
Case No. 135 of 2013 : 1) B. S. Channabassappa & sons. 2) Sridevi Trading Company Petition for Refusal of Open Access Permission.
135 of 2013
Completed
4917 Fri 08/11/2013 12:00:00 PM
Hearing
Case No. 104 of 2013 : Petition of Cosmo Films Limited for not providing permission by MSEDCL for availing open access through IEX.
104 of 2013
Completed
4918 Fri 08/11/2013 12:00:00 PM
Hearing
Case No. 117 of 2013 : Nagreeka Exports Limited for not providing permission by MSEDCL for availing open access through IEX.
117 of 2013
Completed
4919 Fri 08/11/2013 12:00:00 PM
Hearing
Case No. 121 of 2013 : Petition of M/s Balkrishna Paper Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
121 of 2013
Completed
4920 Fri 08/11/2013 12:00:00 PM
Hearing
Case No. 103 of 2013 : Petition of Global Softech Pvt. Limited for not providing permission by MSEDCL for availing open access through IEX.
103 of 2013
Completed
4921 Fri 08/11/2013 11:30:00 AM
Hearing
Case No. 102 of 2013 : Petition of Pulgaon Cotton Mills Limited for not providing permission by MSEDCL for availing open access through IEX.
102 of 2013
Completed
4922 Fri 08/11/2013 11:30:00 AM
Hearing
Case No. 101 of 2013 : Petition of KSL & Industries Ltd. for not providing permission by MSEDCL for availing partial open access through IEX.
101 of 2013
Completed
4923 Fri 08/11/2013 11:30:00 AM
Hearing
Case No. 98 of 2013 : Clariant Chemicals (India) Ltd. Petition for not providing permission by MSEDCL for availing partial open access through IEX.
98 of 2013
Completed
4924 Fri 08/11/2013 11:30:00 AM
Hearing
Case No. 97 of 2013 : Indoworth India Ltd. Petition for not providing permission by MSEDCL for availing open access through IEX.
97 of 2013
Completed
4925 Fri 08/11/2013 11:00:00 AM
Hearing
162 of 2013
Completed
4926 Thu 31/10/2013 11:30:00 AM
Public Hearing
Public Hearing :Case No 52 of 2013 :An application for grant of licence for intra-state trading of electricity in the whole of Maharashtra has been made by M/s. D.M.Corporation Pvt. Ltd.(Case No 52 of 2013)
52 of 2013
Completed
4927 Wed 30/10/2013 12:30:00 PM
Hearing
Petitions of M/s Basant Agro Tech (I) Ltd., for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of the Maharashtra Works Of Licensee Rules, 2012.
72 of 2013
Completed
4928 Wed 30/10/2013 12:30:00 PM
Hearing
Petitions of Shashikant Chimanlalji Bharatia & Deepakkumar Chimanlalji Bharatia for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of Maharashtra Works Of Licensee Rules, 2012.
71 of 2013
Completed
4929 Wed 30/10/2013 12:00:00 PM
Hearing
Petition of (i) Yashawant Sahakari Glucose Karkhana Ltd. (ii) Shri Tradco Dessan Pvt. Ltd. (iii) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Completed
4930 Wed 30/10/2013 11:30:00 AM
Hearing
Petition of Shri Sudhir Budhay seeking guidelines for connectivity to solar generators below 1 MW.
86 of 2013
Completed
4931 Tue 29/10/2013 11:30:00 AM
Public Hearing
Case No 39 of 2013 :MYT Petition filed by Maharashtra State Electricity Transmission Company Limited (MSETCL) in the matter of approval of True up of FY 2011-12, Provisional True up of FY 2012-13 and Multi Year Tariff Determination from FY 2013-14 to FY 2015-16.(Case No. 39 of 2013) Public Hearing Venue: MERC, 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Colaba, Mumbai-400005
39 of 2013
Completed
4932 Thu 24/10/2013 11:00:00 AM
Hearing
Case No. 150 of 2013 : Petition of Maharashtra State Electricity Distribution Company Ltd. for Review of Order dated 21.08.2013 passed by MERC in Case No. 68 of 2012
150 of 2013
Completed
4933 Thu 17/10/2013 11:30:00 AM
Public Hearing
91 of 2013
Completed
4934 Tue 15/10/2013 14:30:00 PM
Hearing
87 of 2010
Reschedule with further notice
4935 Tue 15/10/2013 12:30:00 PM
Hearing
Case No. 83 of 2013 : Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner.
83 of 2012
Completed
4936 Tue 15/10/2013 11:30:00 AM
Hearing
Case No. 105 of 2012 : Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
4937 Wed 09/10/2013 12:30:00 PM
Hearing
Case No. 36 of 2013 : Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Reschedule with further notice
4938 Wed 09/10/2013 11:30:00 AM
Hearing
Case No. 80 of 2013 : Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Completed
4939 Wed 09/10/2013 11:30:00 AM
Hearing
Case No. 59 of 2013 : Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Reschedule
4940 Tue 08/10/2013 14:30:00 PM
Hearing
Case No. 92 of 2013 :Petition of BEST Undertaking for approval of Power Purchase Agreement of 20 MW Solar Power between BEST & M/s Welspun Energy Maharashtra Pvt. Ltd.
92 of 2013
Reschedule
4941 Tue 08/10/2013 12:30:00 PM
Hearing
Case No. 56 of 2012 : Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order in Case No. 42 of 2006.
56 of 2012
Reschedule
4942 Tue 08/10/2013 12:00:00 PM
Hearing
78 of 2013
Completed
4943 Tue 08/10/2013 11:30:00 AM
Hearing
Case No. 92 of 2013 :Petition of BEST Undertaking for approval of Power Purchase Agreement of 20 MW Solar Power between BEST & M/s Welspun Energy Maharashtra Pvt. Ltd.
92 of 2013
Completed
4944 Tue 08/10/2013 11:30:00 AM
Suo Motu Hearing
Case No. 92 of 2012 : SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Reschedule
4945 Thu 03/10/2013 14:30:00 PM
Hearing
Case No. 132 of 2011 : Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 (Solapur Bioenergy Systems Pvt Ltd v/s Others).
132 of 2011
Completed
4946 Thu 03/10/2013 12:30:00 PM
Hearing
Case No. 75 of 2013 : Petition of Tata Power Company Limited for Separate Tariff Category for auxiliary Power consumed by wind generators.
75 of 2013
Completed
4947 Thu 03/10/2013 11:30:00 AM
Hearing
Case No. 38 of 2013 : Petition of M/s Quadron Business Park Ltd formerly DLF Ackruti infor parks (Pune) Ltd for taking on record deemed distribution licensee status.
38 of 2013
Completed
4948 Tue 01/10/2013 14:30:00 PM
Hearing
Case No. 93 of 2013 : Petition seeking Direction against Respondent No 1 to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Completed
4949 Tue 01/10/2013 14:30:00 PM
Hearing
65 of 2013 & MA No 13 of 2013 in Case No 65 of 2013 : Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
4950 Tue 01/10/2013 12:30:00 PM
Hearing
Case No. 17 of 2013 : Petition of MSEDCL in the matter of determination of Passing on the cost of Renewable Energy Purchase to the Industries responsible for Pollution and climate change in accordance with the Section 61, 62, 66, 86 and 181 of Electricity Act 2003.
17 of 2013
Completed
4951 Tue 01/10/2013 11:30:00 AM
Hearing
MA No. 9 of 2013 in Case No 46 of 2013 : Interlocutory application filed by the Maharashtra State Electricity Distribution Company Limited in Case No 46 of 2013 seeking determination of the preliminary issue of jurisdiction.
46 of 2013
Completed
4952 Tue 01/10/2013 11:30:00 AM
Hearing
Case No 46 of 2013 & MA No 6 of 2013 : Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
4953 Fri 27/09/2013 12:30:00 PM
Hearing
Case No 105 of 2013 :Petition for Review of MERC Order dated 16.07.2013 in Case No. 88 of 2012 passed in Petition filed by M/s Kalika Steel & Alloys Pvt Ltd & 16 others seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder( Continuous supply) category consumers in billing cycles wherein there had been load shedding in electricity supplied by MSEDCL.
105 of 2013
Completed
4954 Fri 27/09/2013 11:30:00 AM
Hearing
Petition filed by Shri Buland Iqbal Nihal Ahmed for Seeking extension of TOD Rebate, 250 Paise/ Unit permanently to all the Low Tension and High Tension industrial consumers in the state during 10 p.m to 6 a.m and giving extension to the existing Order dated 02.04.2013 till the further Order be passed.
116 of 2013
Completed
4955 Fri 27/09/2013 11:30:00 AM
Hearing
Case No 107 of 2013 :Petition for MSEDCL for determination of cross subsidy surcharge in accordance with the Section 42(2) and 86(1) of Electricity Act 2003 and Regulation 13 of MERC (Distribution Open Access ) Regulations,2005.
107 of 2013
Completed
4956 Fri 27/09/2013 11:30:00 AM
Hearing
Case No 106 of 2013 :Petition of MSEDCL for seeking continuation of increased TOD Rebate for MSEDCL beyond 30th September 2013
106 of 2013
Completed
4957 Thu 26/09/2013 14:30:00 PM
Hearing
Case No. 90 of 2013 : Petition of Tata Power Company Limited- Generation for Review of MERC Order dated 05.06.2013 in Case No. 177 of 2011 in the matter of Tata Power-G true-up Petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16.
90 of 2013
Reschedule
4958 Thu 26/09/2013 12:00:00 PM
Hearing
Case No. 85 of 2013 : Suo-motu Hearing on Review of Quarterly Progress Report in Case No. 151 of 2011 submitted by TPC-D and RInfra-D.
85 of 2013
Completed
4959 Thu 26/09/2013 11:30:00 AM
Hearing
Case No. 90 of 2013 : Petition of Tata Power Company Limited- Generation for Review of MERC Order dated 05.06.2013 in Case No. 177 of 2011 in the matter of Tata Power-G true-up Petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16.
90 of 2013
Completed
4960 Thu 26/09/2013 11:30:00 AM
Hearing
Case No. 8 of 2013 : Petition of Reliance Infrastructure Ltd. under Section 86 (1) (f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Completed
4961 Wed 25/09/2013 12:30:00 PM
Hearing
Case No. 68 of 2013 : Petition of Western Coalfields Limited Elimination of 66 KV voltage level at Matardevi, Sasti and Majri sub stations of Western Coalfields Limited, Nagpur and Order of MSEDCL for imposing penalty of electricity charges to be additionally paid as per Order of Honorable Commission.
68 of 2013
Completed
4962 Wed 25/09/2013 11:30:00 AM
Hearing
Case No 94 of 2013 :Petition of M/s. Balbir Alloys Private Limited.for Non compliance of Order dated 6/5/2013, passed by the CGRF Kalyan Zone, Kalyan in Grievance No. K/E/688/812/of 2012-13.
94 of 2013
Completed
4963 Wed 25/09/2013 11:30:00 AM
Hearing
Case No. 58 of 2013 : Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Reschedule with further notice
4964 Tue 24/09/2013 14:30:00 PM
Hearing
Case No. 92 of 2013 : Petition of BEST Undertaking for approval of Power Purchase Agreement of 20 MW Solar Power between BEST & M/s Welspun Energy Maharashtra Pvt. Ltd.
92 of 2013
Completed
4965 Tue 24/09/2013 11:30:00 AM
Hearing
Case No. 85 of 2010 : Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
4966 Tue 17/09/2013 12:30:00 PM
Hearing
Case No. 51 of 2013 : Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
4967 Tue 17/09/2013 11:30:00 AM
Hearing
Case No. 78 of 2013 : Petition of MSPGCL for Approval of Addendum No.2 to PPA between MSPGCL and MSEDCL dated 01.04.2009 under the provisions of Electricity Act 2003, MERC (terms and conditions of tariff) Regulation, 2005 and MERC (Multi Year Tariff) Regulation, 2011
78 of 2013
Completed
4968 Fri 13/09/2013 11:00:00 AM
Hearing
Case No. 17 of 2013 Petition of MSEDCL in the matter of determination of Passing on the cost of Renewable Energy Purchase to the Industries responsible for Pollution and climate change in accordance with the Section 61, 62, 66, 86 and 181 of Electricity Act 2003.
17 of 2013
Reschedule
4969 Mon 02/09/2013 11:00:00 AM
Hearing
Case No. 105 of 2012 Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Reschedule
4970 Tue 27/08/2013 11:00:00 AM
Public Hearing
Case No. 54 of 2013 : Petition of MSPGCL for (i) final True-up for FY 2011-12 and APR for FY 2012-13 in accordance with MERC (Terms and Conditions of Tariff) Regulations, 2005 (ii) MYT Petition for FY 2013-14 to FY 2015-16 in accordance with MERC (Multi Year Tariff) Regulations, 2011 (Case No. 54 of 2013)
54 of 2013
Completed
4971 Mon 26/08/2013 16:00:00 PM
Hearing
Case No. 75 of 2013 : Petition of Tata Power Company Limited for Separate Tariff Category for auxiliary Power consumed by wind generators.
75 of 2013
Reschedule
4972 Mon 26/08/2013 15:00:00 PM
Hearing
Case No. 36 of 2013 Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Reschedule
4973 Mon 26/08/2013 12:30:00 PM
Hearing
Case No. 92 of 2013 Petition of BEST Undertaking for approval of Power Purchase Agreement of 20 MW Solar Power between BEST & M/s Welspun Energy Maharashtra Pvt Ltd.
92 of 2013
Reschedule
4974 Mon 26/08/2013 11:00:00 AM
Hearing
Case No. 08 of 2013 Petition of Reliance Infrastructure Ltd. under Section 86 (1) (f) of the Electricity Act,2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Reschedule
4975 Tue 20/08/2013 16:00:00 PM
Hearing
Case No. 93 of 2013 Petition seeking Direction against Respondent No 1 to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Completed
4976 Tue 20/08/2013 16:00:00 PM
Hearing
Miscellaneous Application No. 13 of 2013 in Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
4977 Tue 20/08/2013 16:00:00 PM
Hearing
Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
4978 Tue 20/08/2013 15:00:00 PM
Hearing
Case No. 51 of 2013 Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
4979 Tue 20/08/2013 11:00:00 AM
Hearing
87 of 2010
Completed
4980 Tue 20/08/2013 11:00:00 AM
Hearing
Case No. 85 of 2010 Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commissionâ??s Order dated 27.01.2011.
85 of 2010
Completed
4981 Mon 19/08/2013 11:00:00 AM
Public Hearing
Case No. 54 of 2013 : Petition filed by MSPGCL for (i) final True-up for FY 2011-12 and APR for FY 2012-13 in accordance with MERC (Terms and Conditions of Tariff) Regulations, 2005 (ii) MYT Petition for FY 2013-14 to FY 2015-16 in accordance with MERC (Multi Year Tariff) Regulations, 2011
54 of 2013
Reschedule
4982 Fri 16/08/2013 16:00:00 PM
Hearing
Case No. 58 of 2013 Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Reschedule
4983 Fri 16/08/2013 15:00:00 PM
Hearing
Case No. 25 of 2013 Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation.
25 of 2013
Reschedule
4984 Fri 16/08/2013 12:30:00 PM
Hearing
Case No. 90 of 2013 Petition of Tata Power Company Limited- Generation for Review of MERC Order dated 05.06.2013 in Case No. 177 of 2011 in the matter of Tata Power-G true-up Petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16.
90 of 2013
Reschedule
4985 Fri 16/08/2013 11:00:00 AM
Hearing
MA No. 9 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Reschedule
4986 Fri 16/08/2013 11:00:00 AM
Hearing
MA No. 6 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Reschedule
4987 Fri 16/08/2013 11:00:00 AM
Hearing
Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL. Case No. 46 of 2013
46 of 2013
Reschedule
4988 Tue 13/08/2013 16:00:00 PM
Hearing
Case No. 85 of 2013 Suo-motu Hearing on Review of Quarterly Progress Report in Case No. 151 of 2011 submitted by TPC-D and RInfra-D.
85 of 2013
Reschedule
4989 Tue 13/08/2013 15:00:00 PM
Hearing
Case No. 78 of 2013 Petition of MSPGCL for Approval of Addendum No.2 to PPA between MSPGCL and MSEDCL dated 01.04.2009 under the provisions of Electricity Act 2003, MERC (terms and conditions of tariff) Regulation, 2005 and MERC (Multi Year Tariff) Regulation, 2011
78 of 2013
Reschedule
4990 Tue 13/08/2013 12:30:00 PM
Hearing
Case No. 79 of 2013 Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Reschedule
4991 Tue 13/08/2013 11:00:00 AM
Hearing
Case No. 87 of 2013 Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Reschedule
4992 Tue 06/08/2013 17:00:00 PM
Hearing
Case No. 89 of 2013 Shriniwas Engineering Auto Component Pvt. Ltd. of not providing permission by MSEDCL for availing open access through IEX.
89 of 2013
Completed
4993 Tue 06/08/2013 16:00:00 PM
Hearing
Case No 88 of 2013 Rice Millers Association & 2) Hari Shellac Industries of petition for extension of limit of connected load to 201 HP to Rice mill industrial connection on L.T.3 phase 4 wire system in Gondia District.
88 of 2013
Completed
4994 Tue 06/08/2013 15:30:00 PM
Hearing
Case No. 62 of 2013 Petition of Murlidhar Tukaram Daundkar & 6 other for Revision Petition along with Stay application against the impugned order passed by the Sub Divisional Magistrate under section 68 of EA 2003, section 10 & 16 of Indian Telegraphs Act 1885 & Section 3 of Works of License Rule -2006 and application under section 94(1) (b) of EA 2003 for discovery and demand of all relevant documents.
62 of 2013
Completed
4995 Tue 06/08/2013 15:00:00 PM
Hearing
Case No. 36 of 2013 Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Reschedule
4996 Tue 06/08/2013 12:30:00 PM
Admissibility Hearing
Case No. 80 of 2013 Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2013
Completed
4997 Tue 06/08/2013 11:00:00 AM
Hearing
Case No. 92 of 2012 SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Reschedule
4998 Mon 05/08/2013 17:30:00 PM
Hearing
Case No. 83 of 2013 Madhukar Sheshrao Kale Petition against the decision of Electricity Ombudsman, Nagpur in Representation No. 71/2012 order dated 6.12.2012.
83 of 2013
Completed
4999 Mon 05/08/2013 17:00:00 PM
Hearing
Case No. 77 of 2013 Petition of 1) Yashawant Sahakari Glucose Karkhana Ltd. 2) Shri Tradco Dessan Pvt. Ltd. 3) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Completed
5000 Mon 05/08/2013 16:00:00 PM
Admissibility Hearing
Case No. 59 of 2013 Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Completed
5001 Mon 05/08/2013 15:00:00 PM
Hearing
Case No. 75 of 2013 Petition of Tata Power Company Limited for Separate Tariff Category for auxiliary Power consumed by wind generators.
75 of 2013
Completed
5002 Mon 05/08/2013 12:30:00 PM
Hearing
Case No. 86 of 2013 Petition of Shri Sudhir Budhay seeking guidelines for connectivity to solar generators below 1 MW.
86 of 2013
Completed
5003 Mon 05/08/2013 11:00:00 AM
Hearing
Case No. 83 of 2012 Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner.
83 of 2012
Completed
5004 Fri 02/08/2013 12:30:00 PM
Hearing
68 of 2013
Reschedule
5005 Wed 31/07/2013 16:00:00 PM
Hearing
Case No. 08 of 2013 Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Completed
5006 Wed 31/07/2013 11:00:00 AM
Hearing
Petition filed by Indian Wind Power Association seeking Direction against MSEDCL (Respondent No 1) to enter in to PPA at the Tariff approved for FY 2013-14 as per the MERC Order dated 22 .03.2013 in Case No 6 of 2013
93 of 2013
Completed
5007 Wed 31/07/2013 11:00:00 AM
Hearing
Miscellaneous Application No. 13 of 2013 in Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
5008 Wed 31/07/2013 11:00:00 AM
Hearing
Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
5009 Tue 30/07/2013 17:00:00 PM
Hearing
Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Reschedule
5010 Tue 30/07/2013 16:00:00 PM
Hearing
Case No. 51 of 2013 Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
5011 Tue 30/07/2013 12:30:00 PM
Hearing
Case No. 105 of 2012 Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
5012 Tue 30/07/2013 11:00:00 AM
Hearing
Case No. 17 of 2013 Petition of MSEDCL in the matter of determination of Passing on the cost of Renewable Energy Purchase to the Industries responsible for Pollution and climate change in accordance with the Section 61, 62, 66, 86 and 181 of Electricity Act 2003.
17 of 2013
Reschedule
5013 Mon 29/07/2013 16:00:00 PM
Hearing
Petition of Reliance Infrastructure Ltd. in the matter of Regulation 7, 18 and 20 of MERC (Renewable Purchase Obligations, its Compliance and Implementation of REC Framework) Regulations 2010, in respect of Renewable Purchase Obligation (RPO) target.
84 of 2013
Completed
5014 Mon 29/07/2013 15:00:00 PM
Hearing
Case No. 83 of 2013 Madhukar Sheshrao Kale Petition against the decision of Electricity Ombudsman, Nagpur in Representation No. 71/2012 order dated 6.12.2012.
83 of 2013
Completed
5015 Mon 29/07/2013 12:30:00 PM
Suo Motu Hearing
Case No. 85 of 2013 Suo-motu Hearing on Review of Quarterly Progress Report in Case No. 151 of 2011 submitted by TPC-D and RInfra-D.
85 of 2013
Completed
5016 Mon 29/07/2013 11:00:00 AM
Hearing
Case No. 85 of 2010 Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commissionâ??s Order dated 27.01.2011.
85 of 2010
Completed
5017 Mon 29/07/2013 11:00:00 AM
Hearing
Case Nos. 87 of 2010 Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd.
87 of 2010
Completed
5018 Mon 29/07/2013 10:30:00 AM
Hearing
Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5019 Fri 26/07/2013 15:00:00 PM
Hearing
Case No. 62 of 2013 Petition of Murlidhar Tukaram Daundkar & 6 other for Revision Petition along with Stay application against the impugned order passed by the Sub Divisional Magistrate under section 68 of EA 2003, section 10 & 16 of Indian Telegraphs Act 1885 & Section 3 of Works of License Rule -2006 and application under section 94(1) (b) of EA 2003 for discovery and demand of all relevant documents.
62 of 2013
Completed
5020 Fri 26/07/2013 12:30:00 PM
Admissibility Hearing
Case No. 80 of 2013 Classic Citi Investment Pvt. Ltd. Petition for reimbursement of excess voltage surcharge collected by MSEDCL.
80 of 2008
Completed
5021 Fri 26/07/2013 11:00:00 AM
Hearing
Case No. 79 of 2013 Indiabulls Realtech Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
79 of 2013
Completed
5022 Tue 23/07/2013 15:00:00 PM
Hearing
Case No. 87 of 2013 Indiabulls Power Ltd. Petition against MSEDCL under section 86(1) (f) of EA 2003.
87 of 2013
Completed
5023 Tue 23/07/2013 11:00:00 AM
Admissibility Hearing
Case No. 23 of 2013 Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd.
23 of 2013
Completed
5024 Tue 23/07/2013 11:00:00 AM
Hearing
Misc. Application No. 10 of 2013 in Case No 23 of 2013 Application of Abhijeet MADC Nagpur Energy Private Limited in the matter of Determination of Interim Tariff for sale of firm power generated from one Unit of 61.5 MW of the power plant of Abhijeet MADC Nagpur Energy Pvt. Ltd. (AMNEPL)
23 of 2013
Completed
5025 Mon 22/07/2013 17:00:00 PM
Hearing
Case No. 89 of 2012 - Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003.
89 of 2012
Completed
5026 Mon 22/07/2013 16:00:00 PM
Hearing
Case No Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003
8 of 2013
Completed
5027 Mon 22/07/2013 15:00:00 PM
Hearing
Case No. 82 of 2013 M/s Maharashtra Industrial Development Corporation (MIDC) Petition under Section 61,62 & 86 of E.A. 2003 in the matter of MERC Tariff Regulations, 2011 and 2) Tariff Order dated 16.08.2012 in Case No.19 of 2012, seeking certain Clarification and for issuing certain directions to Respondent - MSEDCL
82 of 2013
Completed
5028 Mon 22/07/2013 12:30:00 PM
Hearing
Case No. 19 of 2013 Petition of Asahi India Glass Ltd. for not providing permission by MSEDC availing open access through power Exchange (IEX).
19 of 2013
Completed
5029 Mon 22/07/2013 11:00:00 AM
Hearing
Case No. 92 of 2012 SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Completed
5030 Mon 22/07/2013 11:00:00 AM
Hearing
Case No. 126 of 2012 Petition for approval of 40 MW Lodhivali Station as Stand by Support for Tata Power-D
126 of 2012
Completed
5031 Mon 22/07/2013 10:30:00 AM
Hearing
Case No. 34 of 2013 - Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5032 Fri 19/07/2013 15:00:00 PM
Hearing
Case No. 72 of 2013 Petitions of M/s Basant Agro Tech (I) Ltd., for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of the Maharashtra Works Of Licensee Rules, 2012.
72 of 2013
Completed
5033 Fri 19/07/2013 15:00:00 PM
Hearing
Case No. 71 of 2013 Petitions of Shashikant Chimanlalji Bharatia & Deepakkumar Chimanlalji Bharatia for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of Maharashtra Works Of Licensee Rules, 2012.
71 of 2013
Completed
5034 Fri 19/07/2013 12:30:00 PM
Hearing
Case No. 67 of 2013 Petition of Shaligram Yadav Satav for Non compliance of Directions of Honorable MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2005 by MSEDCL Nandura & Secretary CGRF Amravati
67 of 2013
Completed
5035 Fri 19/07/2013 11:00:00 AM
Hearing
Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
5036 Thu 18/07/2013 11:00:00 AM
Hearing
Misc. Application No. 9 of 2013 in Case No 46 of 2013 Interlocutory application filed by the Maharashtra State Electricity Distribution Company Limited in Case No 46 of 2013 seeking determination of the preliminary issue of jurisdiction.
46 of 2013
Completed
5037 Thu 18/07/2013 11:00:00 AM
Hearing
Case No. 46 of 2013 & MA No. 6 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5038 Tue 16/07/2013 16:30:00 PM
Hearing
Case No. 31 of 2013 Petition for non compliance and violation of Act, Rules, Regulations and Commission's as well as IGR's directives.
31 of 2013
Completed
5039 Tue 16/07/2013 15:00:00 PM
Hearing
Case No. 77 of 2013 Petition of 1) Yashawant Sahakari Glucose Karkhana Ltd. 2) Shri Tradco Dessan Pvt. Ltd.3) Honest Derivatives Pvt. Ltd. for Grid connectivity of a captive power generation plant and authentication of generated units by MSEDCL for obtaining REC benefits.
77 of 2013
Completed
5040 Tue 16/07/2013 12:30:00 PM
Hearing
Case No. 78 of 2013 Petition of MSPGCL for Approval of â??Addendum No.2 to PPA between MSPGCL and MSEDCL dated 01.04.2009â?? under the provisions of Electricity Act 2003, MERC (terms and conditions of tariff) Regulation, 2005 and MERC (Multi Year Tariff) Regulation, 2011
78 of 2013
Completed
5041 Tue 16/07/2013 12:00:00 PM
Hearing
Case No. 28 of 2013 Implementation of Judgments ATE, in Appeal Nos. 34 & 47 of 2012 filed by MSPGCL challenging the Commissionâ??s Orders passed in MERC Case No. 69 of 2011 & 107 of 2011
28 of 2013
Completed
5042 Tue 16/07/2013 11:00:00 AM
Public Hearing
Case no 44 of 2013 Public Hearing for Comments / suggestions on Maharashtra State Power Generation Company Limited (MSPGCL) Petition for Capital Cost and Tariff Determination of Khaperkheda Unit #5 for FY 2012-13 (Case No. 44 of 2013) 1.
44 of 2013
Completed
5043 Mon 15/07/2013 16:00:00 PM
Hearing
Case No. 89 of 2012 Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003.
89 of 2012
Completed
5044 Mon 15/07/2013 15:00:00 PM
Hearing
Case No. 16 of 2013 Petition of Kulkarni Power Tools Ltd.for Grant of Open Access for self-use by amending / relaxing clause 3.1 of MERC (Distribution Open Access) Regulations, 2005.
16 of 2013
Completed
5045 Mon 15/07/2013 12:30:00 PM
Admissibility Hearing
Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Reschedule
5046 Mon 15/07/2013 11:00:00 AM
Hearing
Case No. 34 of 2013 Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5047 Fri 12/07/2013 15:00:00 PM
Hearing
Case No 58 of 2013 : Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Completed
5048 Fri 12/07/2013 12:30:00 PM
Hearing
Case No. 39 of 2012 Petition of Wardha Power Company Limited under Section 86 (1) (b) and 86(1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Completed
5049 Fri 12/07/2013 12:30:00 PM
Hearing
Case No. 08 of 2013Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Completed
5050 Fri 12/07/2013 11:00:00 AM
Hearing
Case No. 51 of 2013 Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
5051 Thu 11/07/2013 11:00:00 AM
Suo Motu Hearing
Suo-motu Hearing on Review of Quarterly Progress Report in Case No. 151 of 2011 submitted by TPC-D and RInfra-D.
85 of 2013
Completed
5052 Fri 05/07/2013 16:00:00 PM
Hearing
Case No. 75 of 2013 Petition of Tata Power Company Limited for Separate Tariff Category for auxiliary Power consumed by wind generators.
75 of 2013
Completed
5053 Fri 05/07/2013 15:00:00 PM
Hearing
Case No. 74 of 2013 Tata Power Company Ltd., Review Petition of MERC Order dated 01.11.2012 in Case No.40 of 2012 in the matter of Petition filed by The Tata Power Company Limited seeking approval of revised norm for Unit 6.
74 of 2013
Completed
5054 Fri 05/07/2013 11:00:00 AM
Hearing
Case No. 83 of 2012 Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and the Petitioner.
83 of 2012
Completed
5055 Wed 03/07/2013 16:00:00 PM
Hearing
Misc. Application No. 12 of 2013 in Case No 117 of 2012 Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Completed
5056 Wed 03/07/2013 11:00:00 AM
Hearing
Misc Application No 04 of 2013 in Case No. 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011. .
68 of 2012
Completed
5057 Wed 03/07/2013 11:00:00 AM
Hearing
Case No. 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5058 Wed 03/07/2013 11:00:00 AM
Hearing
Case No. 24 of 2013 Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5059 Tue 02/07/2013 15:00:00 PM
Hearing
Case No. 31 of 2013 Petition for non compliance and violation of Act, Rules, Regulations and Commission's as well as IGR's directives.
31 of 2013
Completed
5060 Tue 02/07/2013 12:30:00 PM
Hearing
Case No. 67 of 2013 Petition of Shaligram Yadav Satav for Non compliance of Directions of Honorable MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2005 by MSEDCL Nandura & Secretary CGRF Amravati
67 of 2013
Completed
5061 Tue 02/07/2013 11:00:00 AM
Hearing
Case No. 105 of 2012 Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
5062 Mon 01/07/2013 15:00:00 PM
Hearing
Case No. 12 of 2013 Petition of Government of India, Department of Atomic Energy, Heavy Water Board seeking permission by MSEDCL for Long Term Open Access through ISTS instead of Short Term Open Access and consent to wheel the 17 MW Power from KAPS to Heavy Water Plant, Thal for captive use with banking provision.
12 of 2013
Completed
5063 Mon 01/07/2013 12:30:00 PM
Hearing
Case No. 68 of 2013 Petition of Western Coalfields Limited Elimination of 66 KV voltage level at Matardevi, Sasti and Majri sub stations of Western Coalfields Limited, Nagpur and Order of MSEDCL for imposing penalty of electricity charges to be additionally paid as per Order of Honorable Commission.
68 of 2013
Completed
5064 Mon 01/07/2013 11:00:00 AM
Hearing
Petition for Review of MERC Order dated 30 March 2013 in Case No 178 of 2011 in the matter of M/s Tata Power Co Ltd (Transmission) true-up petition for FY 2011-12 and the Multi Year Tariff Petition for the period FY 2012-13 to FY 2015-16. Case No. 70 of 2013
70 of 2013
Completed
5065 Thu 27/06/2013 16:30:00 PM
Hearing
Case No. 79 of 2012 Petition for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India.
79 of 2012
Completed
5066 Thu 27/06/2013 16:00:00 PM
Hearing
Misc. Application No. 12 of 2013 in Case No 117 of 2012 - Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Reschedule
5067 Thu 27/06/2013 15:00:00 PM
Hearing
Case No. 15 of 2012 Petition of Water Resources Department, (GoM) for approval of completion of first Stage of Bidding Process undertaken by the Petitioner for Private Sector Participation for Development of Kodali Pumped Storage Scheme for electricity generation of Build , operate and Transfer (BOT) basis and procurement of power for long term basis, and initiation of second Stage of Bidding Process under Case-1 bidding procedure through Tariff based competitive bidding process (as per bidding guidelines, issued by the Ministry of Power , Govt of India vide notification No. 23 /11 2004/R&R (Vol II) ) dated 19.01.2005
15 of 2012
Completed
5068 Thu 27/06/2013 14:00:00 PM
Hearing
Misc. Application No. 10 of 2013 in Case No 23 of 2013 Application of Abhijeet MADC Nagpur Energy Private Limited in the matter of Determination of Interim Tariff for sale of firm power generated from one Unit of 61.5 MW of the power plant of Abhijeet MADC Nagpur Energy Pvt. Ltd. (AMNEPL)
23 of 2013
Completed
5069 Thu 27/06/2013 14:00:00 PM
Admissibility Hearing
Case No. 23 of 2013 Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd.
23 of 2013
Completed
5070 Thu 27/06/2013 12:30:00 PM
Hearing
Case No. 121 of 2012 Petition of Maharashtra State Electricity Distribution Company Ltd., for review of Commissionâ??s Order dated 15th October, 2012 in Case No. 24 of 2012, filed by Mula Pravara Electric Cooperative Society Ltd., for claiming compensation/ charges for use of assets by MSEDCL.
121 of 2012
Completed
5071 Thu 27/06/2013 12:30:00 PM
Hearing
Case No. 24 of 2012 Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5072 Thu 27/06/2013 12:30:00 PM
Hearing
Case Nos. 87 of 2010 Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commissionâ??s Order dated 27.01.2011 and Mula Pravaraâ??s Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5073 Thu 27/06/2013 12:30:00 PM
Hearing
Misc. Application No. 3 of 2013 in Case No 85 of 2010 Application of Mula Pravara Electric Co.operative Society Limited in the matter of Order dated 15 October, 2012 in MERC Case No. 24 of 2012 for determination of compensation/ charges payable pursuant to Honorable APTEL's Order and Judgment dated 16 December, 2011 in Appeal No. 39 of 2011 in Case No. 85 of 2010.
85 of 2010
Completed
5074 Thu 27/06/2013 12:30:00 PM
Hearing
Case No. 85 of 2010. Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commissionâ??s Order dated 27.01.2011.
85 of 2010
Completed
5075 Thu 27/06/2013 11:00:00 AM
Hearing
Case No. 19 of 2013 Petition of Asahi India Glass Ltd. for not providing permission by MSEDC availing open access through power Exchange (IEX).
19 of 2013
Completed
5076 Wed 26/06/2013 11:00:00 AM
Hearing
Case No 76 of 2013 Petition of Vidarbha Industries Power Limited (Applicant) & Reliance Infrastructure Limited (Co-Applicant) for approval of power purchase agreement of 300 MW from Unit -1
76 of 2013
Completed
5077 Tue 25/06/2013 15:00:00 PM
Admissibility Hearing
Case No. 23 of 2013 Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd.
23 of 2013
Reschedule
5078 Tue 25/06/2013 15:00:00 PM
Hearing
Misc. Application No. 10 of 2013 in Case No 23 of 20Application of Abhijeet MADC Nagpur Energy Private Limited in the matter of Determination of Interim Tariff for sale of firm power generated from one Unit of 61.5 MW of the power plant of Abhijeet MADC Nagpur Energy Pvt. Ltd. (AMNEPL)
23 of 2013
Reschedule
5079 Tue 25/06/2013 12:30:00 PM
Hearing
Misc. Application No. 12 of 2013 in Case No 117 of 2012 Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Reschedule
5080 Tue 25/06/2013 12:30:00 PM
Hearing
Case No. 85 of 2010. Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commissionâ??s Order dated 27.01.2011.
85 of 2010
Reschedule
5081 Tue 25/06/2013 12:30:00 PM
Hearing
Misc. Application No. 3 of 2013 Application of Mula Pravara Electric Co.operative Society Limited in the matter of Order dated 15 October, 2012 in MERC Case No. 24 of 2012 for determination of compensation/ charges payable pursuant to Honorable APTEL's Order and Judgment dated 16 December, 2011 in Appeal No. 39 of 2011 in Case No. 85 of 2010.
85 of 2010
Reschedule
5082 Tue 25/06/2013 12:30:00 PM
Hearing
Case Nos. 87 of 2010 Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 and Mula Pravara's Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Reschedule
5083 Tue 25/06/2013 12:30:00 PM
Hearing
Case No. 121 of 2012 Petition of Maharashtra State Electricity Distribution Company Ltd., for review of Commission's Order dated 15th October, 2012 in Case No. 24 of 2012, filed by Mula Pravara Electric Cooperative Society Ltd., for claiming compensation/ charges for use of assets by MSEDCL.
121 of 2012
Reschedule
5084 Tue 25/06/2013 12:30:00 PM
Hearing
Case No. 24 of 2012 Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Reschedule
5085 Tue 25/06/2013 11:00:00 AM
Hearing
Case No. 39 of 2012 Petition of Wardha Power Company Limited under Section 86 (1) (b) and 86(1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Reschedule
5086 Tue 25/06/2013 11:00:00 AM
Hearing
Case No. 08 of 2013 Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Reschedule
5087 Mon 24/06/2013 16:00:00 PM
Hearing
Case No. 72 of 2013 Petitions of M/s Basant Agro Tech (I) Ltd., for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of the Maharashtra Works Of Licensee Rules, 2012.
72 of 2013
Completed
5088 Mon 24/06/2013 16:00:00 PM
Hearing
Case No. 71 of 2013 Petitions of Shashikant Chimanlalji Bharatia & Deepakkumar Chimanlalji Bharatia for determination and payment of compensation under section 67(4) of E.A. 2003 read with rule 3(2) and rule 13 of Maharashtra Works Of Licensee Rules, 2012.
71 of 2013
Completed
5089 Mon 24/06/2013 15:00:00 PM
Hearing
Case No. 73 of 2013 Petition of MSPGCL for issuing appropriate directives to MSEDCL regarding payment of outstanding bills / recovery of dues form MSEDCL to MSPGCL under Section 62, Section 86 clause 1 (f) and Section 181 of the Electricity Act 2003.
73 of 2013
Completed
5090 Mon 24/06/2013 12:30:00 PM
Hearing
Case No. 28 of 2013 Implementation of Judgments ATE, in Appeal Nos. 34 & 47 of 2012 filed by MSPGCL challenging the Commissionâ??s Orders passed in MERC Case No. 69 of 2011 & 107 of 2011
28 of 2013
Completed
5091 Mon 24/06/2013 11:00:00 AM
Hearing
Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
5092 Wed 19/06/2013 16:00:00 PM
Hearing
Case No. 120 of 2012 Petition of Tata Power Company Limited (Distribution) for requirement of Transmission Outlets from RInfra Transmission System.
120 of 2012
Completed
5093 Wed 19/06/2013 15:00:00 PM
Hearing
Petition of Venkateshwara Hatcheries Pvt. Ltd. for Proper Tariff Categorization of the units
57 of 2013
Completed
5094 Wed 19/06/2013 12:30:00 PM
Hearing
Case No. 69 of 2013 Petition for Review of MERC Order dated 04.04.2013 in the matter of Rinfra-D truing up of FY 2010-11 and FY 2011-12 (Case No. 124 of 2012).
69 of 2013
Completed
5095 Wed 19/06/2013 11:00:00 AM
Admissibility Hearing
Case No. 55 of 2013 Prof. Dr. N.D. Patil. Chairman Maharashtra State Irrigation Federation petition for Rectification of MERC Order dated 16.08.2012 in Case No.19/2012
55 of 2013
Completed
5096 Mon 17/06/2013 16:00:00 PM
Hearing
Case 136 of 2012 Implementation of Judgment dated 19th December, 2012 given by the ATE in Appeal No. 225 of 2012 (M/s Nhava Sheva International Container Terminal Pvt. Ltd., Appeal No. 226 of 2012 (M/s Indian Private Ports & Terminals Association, Appeal No. 230 of 2012 (M/s Gateway Terminals India Pvt. Ltd. & Appeal No. 264 of 2012 (M/s. Jawaharlal Nehru Port Trust challenging the Commission's Order dated 16.08.2012 in Case No. 19 of 2012.
136 of 2012
Completed
5097 Mon 17/06/2013 15:00:00 PM
Hearing
Case No. 58 of 2013 Petition of Shri Mahendra J. Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Reschedule
5098 Mon 17/06/2013 11:00:00 AM
Hearing
Case No. 12 of 2013 Petition of Government of India, Department of Atomic Energy, Heavy Water Board seeking permission by MSEDCL for Long Term Open Access through ISTS instead of Short Term Open Access and consent to wheel the 17 MW Power from KAPS to Heavy Water Plant, Thal for captive use with banking provision.
12 of 2013
Completed
5099 Fri 14/06/2013 16:00:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for Approval of Final true up for the Financial Year FY 2011-12, and Provisional True Up for the Financial Year 2012-13
64 of 2013
Reschedule
5100 Fri 14/06/2013 16:00:00 PM
Hearing
MA No 11 of 2013 in Case No 64 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited ,Miscellaneous Application for Interim Relief in the matter of petition for approval of Final true up for the Financial Year FY 2011-12, and Provisional True Up for the Financial Year 2012-13.
64 of 2013
Reschedule
5101 Fri 14/06/2013 15:00:00 PM
Hearing
Misc. Application No. 11 of 2013 in Case No 64 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Miscellaneous Application for Interim Relief in the matter of petition for approval of Final true up for the Financial Year FY 2011-12, and Provisional True Up for the Financial Year 2012-13.
64 of 2013
Completed
5102 Fri 14/06/2013 15:00:00 PM
Hearing
Case No. 64 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Approval of Final true up for the Financial Year FY 2011-12, and Provisional True Up for the Financial Year 2012-13
64 of 2013
Completed
5103 Fri 14/06/2013 11:00:00 AM
Public Hearing
Case No. 26 of 2013 : True-up Petition for FY 2010-11 & FY 2011-12 under MERC (Terms & Conditions of Tariff) Regulations, 2005 AND MYT Petition for Second Control Period for FY 2012-13 to FY 2015-16 under MERC (MYT) Regulations, 2011
26 of 2013
Completed
5104 Thu 13/06/2013 16:30:00 PM
Hearing
Case No. 63 of 2013 Petition of Maharashtra Biomass Energy Association. for Review of the Order dated 22.03.2013 in Case No. 6 of 2013.
63 of 2013
Completed
5105 Thu 13/06/2013 12:30:00 PM
Hearing
Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5106 Thu 13/06/2013 12:00:00 PM
Hearing
Misc. Application No. 9 of 2013 in Case No 46 of 2013Interlocutory application filed by the Maharashtra State Electricity Distribution Company Limited in Case No 46 of 2013 seeking determination of the preliminary issue of jurisdiction.
46 of 2013
Completed
5107 Thu 13/06/2013 12:00:00 PM
Hearing
MA No. 6 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5108 Thu 13/06/2013 11:00:00 AM
Hearing
Case No. 17 of 2013 Petition of MSEDCL in the matter of determination of Passing on the cost of Renewable Energy Purchase to the Industries responsible for Pollution and climate change in accordance with the Section 61, 62, 66,86 and 181 of Electricity Act 2003.
17 of 2013
Completed
5109 Wed 12/06/2013 17:00:00 PM
Hearing
Case No. 66 of 2013 Petition of M/s. SharadaShree Ispat Ltd for not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX).
66 of 2013
Completed
5110 Wed 12/06/2013 16:00:00 PM
Hearing
Case No. 89 of 2012 Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003.
89 of 2012
Completed
5111 Wed 12/06/2013 15:00:00 PM
Hearing
Case No. 16 of 2013 Petition of Kulkarni Power Tools Ltd.for Grant of Open Access for self-use by amending / relaxing clause 3.1 of MERC (Distribution Open Access) Regulations, 2005.
16 of 2013
Completed
5112 Wed 12/06/2013 12:30:00 PM
Hearing
Case No. 34 of 2013 Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5113 Wed 12/06/2013 11:00:00 AM
Hearing
Case No. 51 of 2013 Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of EA 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances. -
51 of 2013
Completed
5114 Tue 11/06/2013 11:00:00 AM
Hearing
Misc Application No 04 of 2013 in Case No. 68 of 2012. Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5115 Tue 11/06/2013 11:00:00 AM
Hearing
Case No. 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5116 Tue 11/06/2013 11:00:00 AM
Hearing
Case No. 24 of 2013 Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5117 Mon 10/06/2013 11:00:00 AM
Hearing
Misc Application No 04 of 2013 in Case No. 68 of 2012. Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5118 Mon 10/06/2013 11:00:00 AM
Hearing
Case No 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5119 Mon 10/06/2013 11:00:00 AM
Hearing
Case No. 24 of 2013 Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5120 Fri 07/06/2013 15:00:00 PM
Admissibility Hearing
Case No. 23 of 2013 Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd.
23 of 2013
Reschedule
5121 Fri 07/06/2013 12:00:00 PM
Hearing
: Petition for adjudication of dispute u/s 86(1) (f) of the E.A. 2003 arising out of issues pertaining to obligation of seller to supply contracted capacity under provisions of Article 5 (sub Article 5.1.1) of PPA dated 4th June 2010 entered between RInfra & Wardha Power Co. Ltd.
8 of 2013
Reschedule
5122 Fri 07/06/2013 12:00:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments on account of change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Reschedule
5123 Thu 06/06/2013 16:00:00 PM
Hearing
Case No. 120 of 2012 Petition of Tata Power Company Limited (Distribution) for requirement of Transmission Outlets from RInfra Transmission System.
120 of 2012
Reschedule
5124 Thu 06/06/2013 15:00:00 PM
Hearing
Petition of Venkateshwara Hatcheries Pvt. Ltd. for Proper Tariff Categorization of the units which are involved in Research & Development in relation to Poultry / Hatchery and to apply LT/HT Agricultural Category and to stop improper Industrial and / or Commercial Tariff application by MSEDCL
57 of 2013
Reschedule
5125 Thu 06/06/2013 11:00:00 AM
Admissibility Hearing
Case No. 55 of 2013 Prof. Dr. N.D. Patil. Chairman Maharashtra State Irrigation Federation petition for Rectification of MERC Order dated 16.08.2012 in
55 of 2013
Reschedule
5126 Wed 05/06/2013 17:00:00 PM
Hearing
Petition filed by Sharada shree Ispat Ltd. for seeking relief for not providing permission by MSEDCL for availing open access through IEX.
66 of 2013
Completed
5127 Wed 05/06/2013 16:00:00 PM
Hearing
Case No. 105 of 2012 Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
5128 Wed 05/06/2013 15:00:00 PM
Hearing
Case No. 25 of 2013 Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation.
25 of 2013
Completed
5129 Wed 05/06/2013 12:30:00 PM
Admissibility Hearing
Case No. 59 of 2013 Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Completed
5130 Wed 05/06/2013 11:00:00 AM
Hearing
Case No. 126 of 2012 Petition for approval of 40 MW Lodhivali Station as Stand by Support for Tata Power-D.
126 of 2012
Completed
5131 Wed 05/06/2013 11:00:00 AM
Hearing
Case No. 92 of 2012 SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Completed
5132 Fri 31/05/2013 17:00:00 PM
Admissibility Hearing
Case No. 67 of 2013 Petition of Shaligram Yadav Satav for Non compliance of Directions of Honorable MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2005 by MSEDCL Nandura & Secretary CGRF Amravati
67 of 2013
Completed
5133 Fri 31/05/2013 16:00:00 PM
Hearing
Case No. 63 of 2013Petition of Maharashtra Biomass Energy Association. for Review of the Order dated 22.03.2013 in Case No. 6 of 2013.
63 of 2013
Reschedule
5134 Fri 31/05/2013 11:30:00 AM
Hearing
Case No 24 of 2013 - Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5135 Fri 31/05/2013 11:30:00 AM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5136 Fri 31/05/2013 11:30:00 AM
Hearing
MA No 4 of 2013 in case no 68 of 2012 :Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5137 Thu 30/05/2013 12:30:00 PM
Hearing
Case No. 68 of 2013 Petition of Western Coalfields Limited Elimination of 66 KV voltage level at Matardevi ,Sasti and Majri sub stations of Western Coalfields Limited, Nagpur and Order of MSEDCL for imposing penalty of electricity charges to be additionally paid as per Order of Honorable Commission. -
68 of 2013
Completed
5138 Thu 30/05/2013 11:00:00 AM
Public Hearing
Case No. 27 of 2013 : Objections/Suggestions on Jaigad Power Transco Limited's (JPTL) Petition for approval of truing up of Aggregate Revenue Requirement (ARR) for FY 2011-12 and approval of ARR for MYT Control Period from FY 2012-13 to FY 2015-16
27 of 2013
Completed
5139 Wed 29/05/2013 16:00:00 PM
Hearing
Case No. 53 of 2013 Petition of Piaggo Vehicles Pvt. Ltd. for not providing permission by MSEDCL for availing open access through IEX.
53 of 2013
Completed
5140 Wed 29/05/2013 16:00:00 PM
Hearing
Case No. 61 of 2013 Petition of U.P.Twiga Fiberglass Limited for For not providing permission by MSEDCL for availing open access through IEX.
61 of 2013
Completed
5141 Wed 29/05/2013 15:00:00 PM
Hearing
Case No. 66 of 2013 Petition of M/s. SharadaShree Ispat Ltd for not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX).
66 of 2013
Completed
5142 Wed 29/05/2013 11:00:00 AM
Hearing
Case No. 65 of 2013 Petition of Maharashtra State Electricity Distribution Company Limited for Determination of Tariff by Bidding Process for Procurement of Power by Distribution Licensee (MSEDCL) in the matter of Wind (Renewable) Energy for FY2013-14 within Maharashtra.
65 of 2013
Completed
5143 Tue 28/05/2013 15:00:00 PM
Hearing
Clarification of MERC' RPO-REC Regulations, 2010 and CERC' REC Regulations 2010, in the matter of reduced recommendation of quantum of Renewable Energy (RE) to Central Agency-Delhi by MSLDC, for issuing Renewable Energy Certificate (REC) to accredited entity, Bajaj Finserv Ltd than their actual injected RE in Discom' system. Thus MSLDC is creating losses in eligible RECs of accredited and registered wind energy projects installed in Maharashtra.
35 of 2013
Completed
5144 Tue 28/05/2013 12:30:00 PM
Hearing
Case No. 60 of 2013 Petition of Sou. Arunabai Shivsing Pardeshi Non compliance of provisions of Electricty Act & regulation while laying down transmission line and non payment of compensation for the same and in view of liberty granted to the Petitioner in MERC Case No.11 of 2012.
60 of 2013
Completed
5145 Tue 28/05/2013 11:00:00 AM
Admissibility Hearing
Case No. 62 of 2013 Petition of Murlidhar Tukaram Daundkar & 6 other for Revision Petition along with Stay application against the impugned order passed by the Sub Divisional Magistrate under section 68 of EA 2003, section 10 & 16 of Indian Telegraphs Act 1885 & Section 3 of Works of License Rule -2006 and application under section 94(1)(b) of EA 2003 for discovery and demand of all relevant documents.
62 of 2013
Completed
5146 Mon 27/05/2013 15:00:00 PM
Hearing
Case No. 34 of 2013 Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5147 Fri 24/05/2013 15:00:00 PM
Hearing
Case No. 58 of 2013 Petition of Shri Mahendra J Tardeja (Prop. Prerana Stone Crusher). for Non compliance of Interim Order passed by CGRF & Interim Order passed by Honorable Electricity Ombudsman.
58 of 2013
Completed
5148 Fri 24/05/2013 12:30:00 PM
Hearing
Case No. 121 of 2012 Petition of Maharashtra State Electricity Distribution Company Ltd., for review of Commission's Order dated 15th October, 2012 in Case No. 24 of 2012, filed by Mula Pravara Electric Cooperative Society Ltd., for claiming compensation/ charges for use of assets by MSEDCL.
121 of 2012
Completed
5149 Fri 24/05/2013 11:00:00 AM
Hearing
Case No. 117 of 2012 Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Completed
5150 Fri 24/05/2013 11:00:00 AM
Hearing
Case No. 161 of 2011 Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access) Regulations,2005 Regulation 3 of MERC (Distribution open access) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Completed
5151 Thu 23/05/2013 17:00:00 PM
Hearing
Case No. 53 of 2013 Petition of Piaggo Vehicles Pvt. Ltd. for not providing permission by MSEDCL for availing open access through IEX.
53 of 2013
Completed
5152 Thu 23/05/2013 11:00:00 AM
Admissibility Hearing
Case No. 59 of 2013 Petition of M/s Yash Agro Energy Ltd. for 1) Clarification / Review of Order dated 03.01.2013 in Case No.08 of 2012, 18 of 2012, 20 of 2012 & 33 of 2012 and for 2) Appropriate directions to the Respondent MSEDCL.
59 of 2013
Reschedule
5153 Wed 22/05/2013 17:00:00 PM
Hearing
Case No. 16 of 2013 Petition of Kulkarni Power Tools Ltd.for Grant of Open Access for self-use by amending / relaxing clause 3.1 of MERC (Distribution Open Access) Regulations, 2005.
16 of 2013
Completed
5154 Wed 22/05/2013 16:30:00 PM
Hearing
Case No. 61 of 2013 Petition of U.P.Twiga Fiberglass Limited for For not providing permission by MSEDCL for availing open access through IEX.
61 of 2013
Completed
5155 Wed 22/05/2013 16:00:00 PM
Hearing
Case No. 19 of 2013 Petition of Asahi India Glass Ltd. for not providing permission by MSEDC availing open access through power Exchange (IEX).
19 of 2013
Completed
5156 Wed 22/05/2013 15:00:00 PM
Hearing
Case No. 79 of 2012 Petition for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India. -
79 of 2012
Completed
5157 Wed 22/05/2013 12:30:00 PM
Suo Motu Hearing
Case No. 49 of 2013 Suo-Motu Proceeding for Verification and Compliance of Renewable Purchase Obligation targets for F.Y 2010-11 and F.Y 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010
49 of 2013
Completed
5158 Wed 22/05/2013 11:00:00 AM
Hearing
Case No. 12 of 2013 Petition of Government of India, Department of Atomic Energy, Heavy Water Board seeking permission by MSEDCL for Long Term Open Access through ISTS instead of Short Term Open Access and consent to wheel the 17 MW Power from KAPS to Heavy Water Plant, Thal for captive use with banking provision.
12 of 2013
Completed
5159 Thu 16/05/2013 16:30:00 PM
Hearing
Case No. 121 of 2012 Petition of Maharashtra State Electricity Distribution Company Ltd., for review of Commission's Order dated 15th October, 2012 in Case No. 24 of 2012, filed by Mula Pravara Electric Cooperative Society Ltd., for claiming compensation/ charges for use of assets by MSEDCL.
121 of 2012
Completed
5160 Thu 16/05/2013 15:00:00 PM
Hearing
Case No. 47 of 2013 Duty to be levied and paid to the State Government on the consumption charges per units of energy consumed by a consumer; under The Bombay Electricity Duty Act 1958, & The two letters of the respondents calling upon the petitioner to provide explanation /response with respect to the payment of additional Electricity Duty on the premise that the Electricity Duty is also inherited in Delayed Payment Charges & Interest on Arrears. -
47 of 2013
Completed
5161 Thu 16/05/2013 12:00:00 PM
Hearing
Case No. 21 of 2013 Petition of Shri. Dayanand Shetty for Review of MERC Order dated 26.12.2012 in Case No. 80 of 2012, in the matter of BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09.
21 of 2013
Completed
5162 Thu 16/05/2013 12:00:00 PM
Hearing
Case No. 20 of 2013 Petition of Shri. Balkrishna Shetty for Review of MERC Order dated 26.12.2012 in Case No.80 of 2012, in the matter of BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09.
20 of 2013
Completed
5163 Thu 16/05/2013 11:00:00 AM
Hearing
Case No. 45 of 2013 Petition of Callus Biotech Pvt. Ltd. & Seema Biotech for non compliance of directions of CGRF Kolhapur in complaint Nos. 161 & 162 of 2012-13 by MSEDCL & for non compliance of the directions given by Honorable Commission & complaints for offences by companies & to add biotechnology (tissue culture) companies in load shading free category. -
45 of 2013
Completed
5164 Wed 15/05/2013 17:00:00 PM
Hearing
Case No. 41 of 2013 M/s. Nagreeka Exports Ltd Not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX). -
41 of 2013
Completed
5165 Wed 15/05/2013 15:00:00 PM
Hearing
Case No 15 of 2012Petition of Water Resources Department, (GoM)
15 of 2012
Completed
5166 Wed 15/05/2013 11:00:00 AM
Hearing
Case No 35 of 2013 Petition of Bajaj Finserv Ltd for Clarification of MERCs RPO-REC Regulations, 2010 and CERC's REC Regulations 2010, in the matter of reduced recommendation of quantum of Renewable Energy (RE)
35 of 2013
Completed
5167 Mon 13/05/2013 16:00:00 PM
Hearing
Case No. 34 of 2013 Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5168 Mon 13/05/2013 12:30:00 PM
Hearing
MA No 8 of 2013 in Case No. 50 of 2013Petition of Order dated 21.02.2013 in case No.138 of 2012 pronounced by the Honorable MERC read with commercial circular No. 190 dated 14.03.2013 issued by the MSEDCL and the order dated 09.09.2011 in case No.43 of 2010 issued by the Honorable MERC..
50 of 2013
Completed
5169 Mon 13/05/2013 12:30:00 PM
Hearing
50 of 2013
Completed
5170 Mon 13/05/2013 12:30:00 PM
Hearing
48 of 2013
Completed
5171 Mon 13/05/2013 12:30:00 PM
Hearing
48 of 2013
Completed
5172 Mon 13/05/2013 11:00:00 AM
Admissibility Hearing
Case No. 23 of 2013 Petition of Abhijeet MADC Nagpur Energy Pvt Ltd. for Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd.
23 of 2013
Completed
5173 Mon 13/05/2013 10:00:00 AM
Hearing
MA No. 6 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5174 Mon 13/05/2013 10:00:00 AM
Hearing
Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5175 Sat 11/05/2013 11:00:00 AM
Suo Motu Hearing
Case 136 of 2012 Implementation of Judgment dated 19th December, 2012 given by the ATE in Appeal No. 225 of 2012 (M/s Nhava Sheva International Container Terminal Pvt. Ltd., Appeal No. 226 of 2012 (M/s Indian Private Ports & Terminals Association, Appeal No. 230 of 2012 (M/s Gateway Terminals India Pvt. Ltd. & Appeal No. 264 of 2012 (M/s. Jawaharlal Nehru Port Trust challenging the Commission's Order dated 16.08.2012 in Case No. 19 of 2012.
136 of 2012
Completed
5176 Fri 10/05/2013 11:00:00 AM
Public Hearing
Petition for approval of MYT Business Plan of MSEDCL for the period of FY 2013-14 to FY 2015-16
134 of 2012
Completed
5177 Thu 09/05/2013 17:00:00 PM
Hearing
Case No. 53 of 2013 Petition of Piaggo Vehicles Pvt. Ltd. For not providing permission by MSEDCL for availing open access through IEX.
53 of 2013
Completed
5178 Thu 09/05/2013 11:00:00 AM
Hearing
Case No 24 of 2013 Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5179 Thu 09/05/2013 11:00:00 AM
Hearing
MA No 04 of 2013 in Case No 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011
68 of 2012
Completed
5180 Thu 09/05/2013 11:00:00 AM
Hearing
Case No 68 of 2012 Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011
68 of 2012
Completed
5181 Fri 03/05/2013 17:00:00 PM
Hearing
Case No.29 of 2013 Petition of Gharda Chemicals Ltd. for non-compliance of the order dated 15/12/12 passed by CGRF, Kalyan in grievance no. K/E/656/775 of 2012-13.
29 of 2013
Completed
5182 Fri 03/05/2013 16:30:00 PM
Hearing
Case No. 36 of 2013 Petition of Challenging the Order passed by the Dist Collector Jalna denying of the Jurisdiction for removal of proposed transmission tower through the field of Petitioner.
36 of 2013
Completed
5183 Fri 03/05/2013 15:00:00 PM
Hearing
Case No. 83 of 2012 Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner.
83 of 2012
Completed
5184 Fri 03/05/2013 12:30:00 PM
Hearing
MA No 6 of 2013 Case No. 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5185 Fri 03/05/2013 12:30:00 PM
Hearing
Case No 46 of 2013 Petition of ISMT Limited to direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5186 Fri 03/05/2013 11:00:00 AM
Hearing
Case No. 08 of 2013 Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd.
8 of 2013
Completed
5187 Fri 03/05/2013 11:00:00 AM
Hearing
Case No 39 of 2012 Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003
39 of 2012
Completed
5188 Thu 02/05/2013 15:00:00 PM
Hearing
Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003.
105 of 2012
Completed
5189 Thu 02/05/2013 12:30:00 PM
Hearing
Case No. 118 of 2012 Petition of Maharashtra Veej Grahak Sanghatna for action under Sections 142 & 146 of EA 2003, against the officers of Mahavitaran (MSEDCL) for non-compliance of the Commission's directions in regards to the Electricity Consumers who consumes the electricity less than 300 Units per Month.
118 of 2012
Completed
5190 Thu 02/05/2013 11:00:00 AM
Hearing
Case No 17 of 2013 Indian Wind Power Association have submitted a Petition under affidavit on 05.04.2013, for seeking clarification of the order pronounced by the Honorable MERC dated 21.02.2013 in case No.138 of 2012 read with commercial circular No. 190 dated 14.03.2013 issued by the MSEDCL in view of the order dated 09.09.2011 in case No.43 of 2010 under regulation 85 of MERC (conduct of business regulation), 2004.
17 of 2013
Completed
5191 Tue 30/04/2013 15:00:00 PM
Hearing
Case No. 45 of 2013 Petition of Callus Biotech Pvt. Ltd. & Seema Biotech for non compliance of directions of CGRF Kolhapur in complaint Nos. 161&162 of 2012-13 by MSEDCL & For non compliance of the directions given by Honorable commission, & complaints for offences by companies & to add biotechnology (tissue culture) companies in load shading free category.
45 of 2013
Completed
5192 Tue 30/04/2013 11:00:00 AM
Suo Motu Hearing
Suo-Motu proceedings for Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010.
49 of 2013
Reschedule
5193 Mon 29/04/2013 17:00:00 PM
Hearing
Case No 10 of 2013 Petition of M/s BOC India Ltd. for not providing permission by MSEDCL for availing open access on bilateral basis from coal based generator.
10 of 2013
Completed
5194 Mon 29/04/2013 16:30:00 PM
Hearing
Case No. 41 of 2013 Petition of M/s Nagreeka exports Ltd for not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX).
41 of 2013
Completed
5195 Mon 29/04/2013 15:00:00 PM
Hearing
Case No. 51 of 2013 Petition of M/s. Adani Power Maharashtra Limited under Section 86(1)(f) of E.A 2003 seeking relief from MSEDCL for alleged threat of disconnection of power supply along with other grievances.
51 of 2013
Completed
5196 Mon 29/04/2013 14:00:00 PM
Hearing
43 of 2013 Review Petition of Maharashtra State Power Generation Company Limited against review of Order dated 08.02.2013, in Case No 77 of 2012 filed against Order dated 21.06.2012 in Case No 6 of 2012 passed by the MERC on the petition for final True-Up for FY 2010-11 and ARR and Tariff for FY 2011-12, FY 2012-13.
43 of 2013
Completed
5197 Mon 29/04/2013 12:30:00 PM
Hearing
Case No. 119 of 2012 Petition of Mayuresh Engineering Pvt Ltd. for non-compliance of Order dated 23.08.2012 in Case No. 51/2012 passed by Honorable Electricity Ombudsman, Mumbai.
119 of 2012
Completed
5198 Mon 29/04/2013 11:00:00 AM
Admissibility Hearing
Case No. 31 of 2013 Petition for non compliance and violation of Act, Rules, Regulations and Commission's as well as IGR's directives.
31 of 2013
Completed
5199 Fri 26/04/2013 11:00:00 AM
Hearing
Case No 161 of 2011 Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003
161 of 2011
Completed
5200 Fri 26/04/2013 11:00:00 AM
Hearing
Case No 117 of 2012 Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Completed
5201 Thu 25/04/2013 11:00:00 AM
Hearing
Misc Application No 05 of 2013 in Case No. 117 of 2012 Petition of Wardha Power Company Ltd.for wrongful imposition of Cross Subsidy
117 of 2012
Completed
5202 Thu 25/04/2013 11:00:00 AM
Hearing
Case No 161 of 2011Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Completed
5203 Thu 25/04/2013 11:00:00 AM
Hearing
Case No 117 of 2012 Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access
117 of 2012
Completed
5204 Thu 18/04/2013 15:00:00 PM
Hearing
Case No 119 of 2012 Petition of Mayuresh Engineering Pvt Ltd. for non-compliance of Order dated 23.08.2012 in Case No. 51/2012 passed by Honorable Electricity Ombudsman Mumbai
119 of 2012
Reschedule
5205 Wed 17/04/2013 15:00:00 PM
Suo Motu Hearing
Case No 7 of 2013 - Suo-Motu Proceeding for Non--Compliance of CGRF Amravati zone, Akola Order dated 04-08-2012 in Complaint No 17 of 2012 in respect of M/s Vijay Oil Industries, Akola
7 of 2013
Completed
5206 Wed 17/04/2013 14:00:00 PM
Hearing
Case No. 14 of 2013 Petition of Ideal Hatchery and Farm for Non compliance of CGRF Kalyan Order No. K/E/586/694 dt. 19.03.2012.
14 of 2013
Completed
5207 Wed 17/04/2013 14:00:00 PM
Hearing
Case No. 13 of 2013Petition of Adarsh Hatchery and Farm for Non compliance of CGRF Kalyan Order No. K/E/585/693 dt. 19.03.2012.
13 of 2013
Completed
5208 Wed 17/04/2013 12:30:00 PM
Hearing
MA No. 6 of 2013 in Case No. 46 of 2013 Petition of ISMT Limited To direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL. -
46 of 2013
Completed
5209 Wed 17/04/2013 12:30:00 PM
Hearing
Case No 46 of 2013 Subject:Petition of ISMT Limited To direct the MSEDCL to comply with the order dated 08.09.2004 passed by the Honorable Commission, to fulfill the obligation arising from energy banking agreement dated 07.05.2010 and to set aside Commercial Circular No. 170 dated 13.06.2012 issued by the MSEDCL.
46 of 2013
Completed
5210 Tue 16/04/2013 16:30:00 PM
Hearing
Case No 37 of 2013 : Petition of Smt. Tarabai Dahake for action against the respondent for not providing agricultural connection.
37 of 2013
Completed
5211 Tue 16/04/2013 16:00:00 PM
Hearing
Case No. 41 of 2013 Petition of M/s Nagreeka exports Ltd for not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX).
41 of 2013
Completed
5212 Tue 16/04/2013 15:00:00 PM
Hearing
Case No 22 of 2013 Petition of BEST Undertaking for Review of Order dated 28.12.2012 in Case No. 90 of 2012, in the matter of approval of BEST Undertaking's "Schedule of Charges" pertaining to charges for Service disconnection on the request of consumer and Service shifting on the request of consumer in the category of Miscellaneous and General Charges
22 of 2013
Completed
5213 Tue 16/04/2013 12:30:00 PM
Hearing
Petition for action under Section 55(3) & 142 of EA 2003, against (MSEDCL) for non-compliance of the Commission's Tariff Order and Regulations in regards to the Electricity Consumers.
40 of 2013
Completed
5214 Tue 16/04/2013 11:00:00 AM
Hearing
Case No. 12 of 2013 Petition of Government of India, Department of Atomic Energy, Heavy Water Board seeking permission by MSEDCL for Long Term Open Access through ISTS instead of Short Term Open Access and consent to wheel the 17 MW Power from KAPS to Heavy Water Plant, Thal for captive use with banking provision.
12 of 2013
Completed
5215 Mon 15/04/2013 23:00:00 PM
Hearing
Case No 126 of 2012 Petition for approval of 40 MW Lodhivali Station as Stand by Support for Tata Power-D.
126 of 2012
Completed
5216 Mon 15/04/2013 17:00:00 PM
Hearing
Case No. 38 of 2013 Petition of M/s Quadron Business Park Ltd formerly DLF Ackruti infor parks (Pune) Ltd for taking on record deemed distribution licensee status.
38 of 2013
Completed
5217 Mon 15/04/2013 16:30:00 PM
Hearing
Case NO 36 OF 2013 Petition of Smt. Jyoti Divekar for challenging the Order passed by the District Collector Aurangabad denying of the Jurisdiction for removal of proposed transmission tower through the filed of petitioner.
36 of 2013
Completed
5218 Mon 15/04/2013 15:00:00 PM
Hearing
Case No. 25 of 2013 Petition of MSEDCL for Recovery of amount equivalent to local Body Tax paid /that would be paid to Aurangabad Municipal Corporation from the consumers situated within the geographical limits of Aurangabad Municipal Corporation -
25 of 2013
Completed
5219 Mon 15/04/2013 11:00:00 AM
Hearing
Case No 92 of 2012 SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA
92 of 2012
Completed
5220 Fri 12/04/2013 16:30:00 PM
Hearing
Case No. 32 of 2013 Petition of MSEDCL.for Additional amount payable to MSPGCL and in the matter of Order dt 8.02.2013 in Case No. 77 of 2012, Petition filed by MSPGCL seeking review of Order dt 21.06.2012 in Case No. 6 of 2012.
32 of 2013
Completed
5221 Fri 12/04/2013 15:00:00 PM
Hearing
Case No. 34 of 2013 Petition of MSEDCL for directing MSETCL (STU) to grant Grid Connectivity to 200 MW power evacuation from Warora Project of EMCO Energy Ltd. directly through STU only.
34 of 2013
Completed
5222 Fri 12/04/2013 12:30:00 PM
Admissibility Hearing
Case No. 23 of 2013Petition of Abhijeet MADC Nagpur Energy Pvt Ltd. for Approval of Capital Expenditure and Determination of Tariff for Sale of Firm Power Plant of Abhijeet MADC Nagpur Energy Pvt. Ltd. -
23 of 2013
Completed
5223 Fri 12/04/2013 11:00:00 AM
Hearing
Case No 35 of 2013 Petition of Bajaj Finserv Ltd for Clarification of MERC's RPO-REC Regulations, 2010
35 of 2013
Completed
5224 Sat 06/04/2013 10:00:00 AM
Public Hearing
Reliance Infrastructure Limited-Distribution Business (RInfra-D) Petition for approval of Multi-Year Tariff for the period FY 2012-13 to FY 2015-16.
9 of 2013
Completed
5225 Sat 06/04/2013 10:00:00 AM
Public Hearing
Reliance Infrastructure Limited-Distribution Business (RInfra-D) Petition for approval of Multi-Year Tariff for the period FY 2012-13 to FY 2015-16
9 of 2013
Completed
5226 Fri 05/04/2013 11:00:00 AM
Public Hearing
Reliance Infrastructure Limited-Transmission Business (RInfra-T) MYT Petition for approval of Annual Revenue Requirement (ARR) for Second Control Period of FY 2012-13 to FY 2015-16
141 of 2012
Completed
5227 Fri 05/04/2013 11:00:00 AM
Public Hearing
RInfra-G Petition for Approval of Aggregate Revenue Requirement (ARR) and Determination of Tariff for MYT Second Control Period from FY 2012-13 to FY 2015-16
1 of 2013
Completed
5228 Thu 04/04/2013 15:00:00 PM
Hearing
Implementation of Judgment dated 19th December, 2012 given by the ATE in Appeal No. 225 of 2012 (M/s Nhava Sheva International Container Terminal Pvt. Ltd., Appeal No. 226 of 2012 (M/s Indian Private Ports & Terminals Association, Appeal No. 230 of 2012 (M/s Gateway Terminals India Pvt. Ltd. & Appeal No. 264 of 2012 (M/s. Jawaharlal Nehru Port Trust challenging the Commission's Order dated 16.08.2012 in Case No. 19 of 2012
136 of 2012
Completed
5229 Thu 04/04/2013 12:30:00 PM
Hearing
Case NO 20 OF 2013 Petition of Shri. Balkrishna Shetty for Review of MERC Order dated 26.12.2012 in Case No. 80 of 2012, in the matter of BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09.
20 of 2013
Completed
5230 Thu 04/04/2013 12:30:00 PM
Hearing
Case No 21 of 2013 Petition of Shri. Dayanand Shetty for Review of MERC Order dated 26.12.2012 in Case No. 80 of 2012, in the matter of BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09. [ 21 of 2013]
21 of 2013
Completed
5231 Thu 04/04/2013 11:00:00 AM
Hearing
Case No 118 of 2012 Petition of Maharashtra Veej Grahak Sanghatna for action under Sections 142 & 146 of EA 2003, against the officers of Mahavitaran (MSEDCL) for non-compliance of the Commission's directions in regards to the Electricity Consumers who consumes the electricity less than 300 Units per Month
118 of 2012
Completed
5232 Wed 03/04/2013 15:00:00 PM
Hearing
Case No 135 of 2012 Petition of M/s. Excel Industries. for non-compliance of the order dt. 31.10.12 in Rep. No. 72/202 passed by Electricity Ombudsman, Mumbai.
135 of 2012
Completed
5233 Wed 03/04/2013 12:30:00 PM
Hearing
Case No 58 of 2012 Petition of Shri. Shivaji Vitthal Saste under Section 67(4) of EA, 2003 challenging the alleged unlawful acts of the MSETCL for laying down and placing extra-high voltage double circuit 400 KV electric power lines and erecting Tower No. 32 on the Petitioner's land, without issuing notice to the Petitioner and paying any compensation to him . [ 58 of 2012]
58 of 2012
Completed
5234 Wed 03/04/2013 11:00:00 AM
Hearing
MA No 4 of 2013 in Case No 68 of 2012 -Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011
68 of 2012
Completed
5235 Wed 03/04/2013 11:00:00 AM
Hearing
Case No 68 of 2012 - Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011
68 of 2012
Completed
5236 Wed 03/04/2013 10:30:00 AM
Hearing
Case No 24 of 2013 Petition of MSEDCL for Submission of the Power Purchase Agreements (PPA) for the adoption of Tariff along with other Certificate and documents.
24 of 2013
Completed
5237 Tue 02/04/2013 23:00:00 PM
Hearing
Case No 83 of 2012 Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner. [
83 of 2012
Completed
5238 Tue 02/04/2013 16:00:00 PM
Hearing
Case No. 14 of 2013 Petition of Ideal Hatchery and Farm for Non compliance of CGRF Kalyan Order No. K/E/586/694 dt. 19.03.2012. -
14 of 2013
Completed
5239 Tue 02/04/2013 16:00:00 PM
Hearing
Case No. 13 of 2013 Petition of Adarsh Hatchery and Farm for Non compliance of CGRF Kalyan Order No. K/E/585/693 dt. 19.03.2012. -
13 of 2013
Completed
5240 Tue 02/04/2013 15:00:00 PM
Hearing
Case No 89 of 2012Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003.
89 of 2012
Completed
5241 Mon 01/04/2013 23:00:00 PM
Hearing
Case No 39 of 2012 Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Completed
5242 Mon 01/04/2013 23:00:00 PM
Hearing
Case No 38 of 2012 Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
38 of 2012
Completed
5243 Mon 01/04/2013 15:00:00 PM
Suo Motu Hearing
Case No 7 of 2013 : SUO-MOTU PROCEEDING FOR NON-COMPLIANCE OF CGRF AMRAVATI ZONE,AKOLA ORDER DATED 04-08-2012 IN COMPLAINT NO 17 OF 2012 IN RESPECT OF M/S VIJAY OIL INDUSTRIES, AKOLA
7 of 2013
Completed
5244 Mon 01/04/2013 11:00:00 AM
Hearing
Case No. 08 of 2013 Petition of Reliance Infrastructure Ltd. under Section 86 (1)(f) of the Electricity Act, 2003 for adjudication of dispute arising out of issues pertaining to obligation of Seller to supply Contracted Capacity under provisions of Article 5 (Sub Article 5.1.1) of the Power Purchase Agreement dated 04.06.2010 between Reliance Infrastructure Ltd. and Wardha Power Company Ltd. -
8 of 2013
Completed
5245 Mon 01/04/2013 10:30:00 AM
Hearing
Case No. 42 of 2013 Petition of MSEDCL for for extending the applicability of TOD rebate beyond March 2013
42 of 2013
Completed
5246 Mon 18/03/2013 15:00:00 PM
Hearing
Case No 29 of 2013 Petition of Gharda Chemicals Ltd. for non-compliance of the order dated 15/12/12 passed by CGRF, Kalyan in grievance no. K/E/656/775 of 2012-13.
29 of 2013
Completed
5247 Mon 18/03/2013 14:30:00 PM
Hearing
Petition of BEST Undertaking for allowing cumulative fulfillment of non solar RPO by FY 2013-14 and Solar RPO by FY 2015-16.
30 of 2013
Completed
5248 Mon 18/03/2013 12:00:00 PM
Hearing
Case No 33 of 2013 Petition of MSEDCL for post-facto approval to withdrawal of load shedding during period18.30 to 22.00 hrs during HSC/SSC examinations from dated 21.02.2013 to 28.03.2013.
33 of 2013
Completed
5249 Wed 06/03/2013 17:00:00 PM
Hearing
Case No. 16 of 2013 Petition of Kulkarni Power Tools Ltd.for Grant of Open Access for self-use by amending / relaxing clause 3.1 of MERC (Distribution Open Access) Regulations, 2005.
16 of 2013
Completed
5250 Wed 06/03/2013 16:00:00 PM
Hearing
Case No. 18 of 2013 Petition of Reliance Infrastructure Ltd for Review of MERC Order dated 28.12.2012 in the matter of Petition of Reliance Infrastructure Limited (Distribution) for revision of Schedule of Charges (Case No. 73 of 2012)
18 of 2012
Completed
5251 Wed 06/03/2013 15:00:00 PM
Hearing
Case No 19 of 2013 Petition of Asahi India Glass Ltd. for Not providing permission by MSEDC availing open access through power Exchange (IEX)
19 of 2013
Completed
5252 Wed 06/03/2013 14:30:00 PM
Hearing
Case No 22 of 2013Petition of BEST Undertaking for Review of Order dated 28.12.2012 in Case No. 90 of 2012, in the matter of approval of BEST Undertaking's "Schedule of Charges" pertaining to charges for " Service disconnection on the request of consumer" and "Service shifting on the request of consumer" in the category of "Miscellaneous and General Charge
22 of 2013
Completed
5253 Tue 05/03/2013 16:00:00 PM
Hearing
Case No. 18 of 2013 : Petition of Reliance Infrastructure Ltd for Review of MERC Order dated 28.12.2012 in the matter of Petition of Reliance Infrastructure Limited (Distribution) for revision of Schedule of Charges (Case No. 73 of 2012)
18 of 2013
Reschedule
5254 Tue 05/03/2013 15:00:00 PM
Hearing
Case No. 19 of 2013 : Petition of Asahi India Glass Ltd. for Not providing permission by MSEDC availing open access through power Exchange (IEX).
19 of 2013
Reschedule
5255 Mon 04/03/2013 15:00:00 PM
Hearing
22 of 2013
Reschedule
5256 Thu 21/02/2013 11:00:00 AM
Hearing
Petition of Government of India, Department of Atomic Energy, Heavy Water Board seeking permission by MSEDCL for Long Term Open Access through ISTS instead of Short Term Open Access and consent to wheel the 17 MW Power from KAPS to Heavy Water Plant, Thal for captive use with banking provision.
12 of 2013
Completed
5257 Wed 20/02/2013 17:00:00 PM
Hearing
Case No 88 of 2012 : Petition of M/s Kalika Steel & Alloys Pvt. Ltd. seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous Supply) category consumers in billing cycles.
88 of 2012
Completed
5258 Wed 20/02/2013 16:30:00 PM
Hearing
Case No 15 of 2013 : Petition of M/s Jindal Poly Films Ltd. for not providing permission by MSEDCL for availing open access through Indian Energy Exchange (IEX).
15 of 2013
Completed
5259 Wed 20/02/2013 11:00:00 AM
Public Hearing
case No 123 of 2012 : Petition of M/s Reliance Infrastructure Ltd (Transmission) for Final Truing up for FY 2010-11 and FY 2011-12.
123 of 2012
Completed
5260 Wed 20/02/2013 11:00:00 AM
Public Hearing
Reliance Infra-Generation Tariff Petition for Truing Up for FY 2010-11 and FY2011-12
122 of 2012
Completed
5261 Mon 18/02/2013 10:30:00 AM
Public Hearing
Objections / Comments on Tata Power-Distribution Business' (Tata Power-D) Petition for approval of (i) ARR for FY 2011-12 as per MERC (Terms and Conditions of Tariff) Regulations, 2005, and (ii) MYT Petition for the Second Control Period (FY 2012-13 to FY 2015-16) as per MERC (Multi Year Tariff) Regulations, 2011. Public Hearing Venue: Rangsharda Natya Mandir, Bandra Reclamation, Bandra (W), Mumbai- 400050
179 of 2011
Completed
5262 Mon 18/02/2013 10:30:00 AM
Public Hearing
Public Hearing (Case No. 177 of 2011) in the matter of Petition filed by TPC-G for approval of ARR for FY 2011-12 under MERC Tariff Regulations 2005 and approval of MYT for FY 2012-13 to 2015-16 under MERC MYT Regulations, 2011
177 of 2011
Completed
5263 Wed 13/02/2013 15:00:00 PM
Hearing
Case No. 161 of 2011 : Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2012
Completed
5264 Wed 13/02/2013 15:00:00 PM
Hearing
Case No. 117 of 2012 : Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Completed
5265 Tue 12/02/2013 23:30:00 PM
Public Hearing
Determination of Generic Tariff for the fourth year of the first Control Period under Regulation 8 of the Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010 (Draft (Suo motu) Order_Case No 6 of 2013).
6 of 2013
Completed
5266 Mon 11/02/2013 11:00:00 AM
Public Hearing
Objections /Suggestions on Maharashtra State Load Despatch Centre' (MSLDC) Petition for approval of Annual Budget for FY 2013-14 (Case No.133 of 2012)
133 of 2012
Completed
5267 Fri 08/02/2013 14:00:00 PM
Hearing
Case No. 10 of 2013 Petition of M/s BOC India Ltd. for not providing permission by MSEDCL for availing open access on bilateral basis from coal based generator.
10 of 2013
Completed
5268 Thu 31/01/2013 11:00:00 AM
Suo Motu Hearing
SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Completed
5269 Wed 30/01/2013 11:00:00 AM
Hearing
Petition of M/s. Renewable Energy Developers Association of Maharashtra for non-compliance of Order dated 20.11.2007 in Case No. 33 of 2007
85 of 2007
Completed
5270 Tue 29/01/2013 12:00:00 PM
Hearing
Petition of Videocon Industries Ltd for Not providing permission by MSEDCL for availing open access through power Exchange (IEX).
4 of 2013
Completed
5271 Tue 29/01/2013 11:00:00 AM
Public Hearing
Objections/comments on The Tata Power Company Limited - Distribution Business' Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005 [Case No. 47 of 2012 ]
47 of 2012
Completed
5272 Thu 24/01/2013 16:30:00 PM
Hearing
110 of 2012: Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012.
110 of 2012
Completed
5273 Wed 23/01/2013 16:00:00 PM
Suo Motu Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 [Case No. 99 of 2012 ]
99 of 2012
Completed
5274 Tue 22/01/2013 16:30:00 PM
Hearing
Petition for not providing permission by MSEDCL for availing open access through power exchange (IEX) although there is provision of non-discriminatory open access under sub section (47) of Section 2 with sub-section (2), (3) & (4) of Section 42 of the EA,2003 & Regulation specified there under - Case No. 61 of 2012 [Case No. 61 of 2012 ]
61 of 2012
Completed
5275 Tue 22/01/2013 16:00:00 PM
Hearing
Notice - Case No 137 of 2012 -Petition of M/s Tiwari Enterprises under Section 142 of the EA, 2003, against MSEDCL for non-compliance of the order dated 22.10.2012 passed by CGRF, Kalyan Zone. Case No. 137 of 2012.
137 of 2012
Completed
5276 Tue 22/01/2013 14:30:00 PM
Hearing
Petition of M/s. Dodson Lindblom Hydro Power Private Ltd. for directions to the Respondent for compliance of the decision and directions of the Commission in its order dated 21.05.2012 passed in Case No. 142 of 2011. [Case No. 116 of 2012 ]
116 of 2012
Completed
5277 Fri 11/01/2013 14:30:00 PM
Hearing
Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003. [Case No. 89 of 2012 ]
89 of 2012
Reschedule
5278 Fri 11/01/2013 11:00:00 AM
Hearing
SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA.
92 of 2012
Completed
5279 Fri 04/01/2013 16:00:00 PM
Hearing
Petition of M/s Tiwari Enterprises under Section 142 of the EA, 2003, against MSEDCL for non-compliance of the order dated 22nd October, 2012 passed by CGRF, Kalyan Zone.
137 of 2012
Completed
5280 Mon 31/12/2012 10:30:00 AM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011. [Case No. 68 of 2012 ]
68 of 2012
Completed
5281 Mon 24/12/2012 16:00:00 PM
Hearing
Petition for non-compliance of the directions of the CGRF Forum, Ratanagiri Zone, in the Petitioner's Complaint Nos. 111 of 2011 dated 7th December, 2012. for not permanently disconnecting electricity connection. [Case No. 132 of 2012 ]
132 of 2012
Completed
5282 Mon 24/12/2012 16:00:00 PM
Hearing
Petition for non-compliance of the directions of the CGRF Forum, Ratanagiri Zone, in the Petitioner's Complaint Nos. 111 of 2011 dated 7th December, 2012. for not permanently disconnecting electricity connection
132 of 2012
Completed
5283 Mon 24/12/2012 11:00:00 AM
Hearing
Petition for approval of 40 MW Lodhivali Station as Stand by Support for Tata Power-D. [Case No. 126 of 2012 ]
126 of 2012
Completed
5284 Mon 24/12/2012 10:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process. [Case No. 53 of 2012 ]
53 of 2012
Completed
5285 Fri 21/12/2012 11:00:00 AM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011. [Case No. 68 of 2012 ]
68 of 2012
Completed
5286 Thu 20/12/2012 16:30:00 PM
Hearing
Shri Vijay Omkarrao Malokar, Akola for initiating the legal action under Sections 142, 146 and 149 of the EA 2003 against the Managing Director and Chairman of Maharashtra State Electricity Board Holding Company (MSEBHC) for violation of various MERC's Orders, and set aside the MSEDCL's Circular No. 35 of dated 05.10.2011 and seeking electricity power supply to Farmers in day hours. [Case No. 154 of 2011 ]
154 of 2011
Completed
5287 Thu 20/12/2012 15:00:00 PM
Hearing
Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012. [Case No. 110 of 2012 ]
110 of 2012
Completed
5288 Thu 20/12/2012 15:00:00 PM
Hearing
110 of 2012 Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012.
110 of 2012
Completed
5289 Thu 20/12/2012 11:00:00 AM
Public Hearing
PUBLIC HEARING of Case No. 91 of 2012 Petition filed by Maharashtra State Power Generation Company Limited (MSPGCL) for approval of MYT Business Plan for the period from FY 2013-14 to FY 2015-16 in Case No. 91 of 2012.
91 of 2012
Completed
5290 Wed 19/12/2012 16:30:00 PM
Hearing
Petition of Shri. Manoj Kanji Hariya for non-compliance of directions of CGRF order dated 23/11/2011 by MSEDCL office of Bhiwandi city in Case No. 386. [Case No. 111 of 2012 ]
11 of 2012
Completed
5291 Wed 19/12/2012 15:00:00 PM
Hearing
Petition for non-compliance of the CGRF Kolhapur's directions in Complaint Nos. 2 to 6 of 2012-13 dated 4th June, 2012 for refund of excess tariff charges. [Case No. 131 of 2012 ]
131 of 2012
Completed
5292 Wed 19/12/2012 15:00:00 PM
Hearing
Petition for non-compliance of the CGRF Kolhapur's directions in Complaint Nos. 2 to 6 of 2012-13 dated 4th June, 2012 for refund of excess tariff charges. [Case No. 130 of 2012 ]
130 of 2012
Completed
5293 Wed 19/12/2012 15:00:00 PM
Hearing
Petition for non-compliance of the CGRF Kolhapur' directions in Complaint Nos. 2 to 6 of 2012-13 dated 4th June, 2012 for refund of excess tariff charges. [Case No. 129 of 2012 ]
129 of 2012
Completed
5294 Wed 19/12/2012 15:00:00 PM
Hearing
Petition for non-compliance of the CGRF Kolhapur' directions in Complaint Nos. 2 to 6 of 2012-13 dated 4th June, 2012 for refund of excess tariff charges. [Case No. 128 of 2012 ]
128 of 2012
Completed
5295 Wed 19/12/2012 15:00:00 PM
Hearing
Petition for non-compliance of the CGRF Kolhapur's directions in Complaint Nos. 2 to 6 of 2012-13 dated 4th June, 2012 for refund of excess tariff charges. [Case No. 127 of 2012 ]
127 of 2012
Completed
5296 Thu 13/12/2012 16:30:00 PM
Hearing
Seeking a time frame for availing the Grid Connectivity by the Open Access Applicants and approval of " Cancellation of Grid Connectivity" granted to various Open Access (OA) Applicants against failure to establish / implement the same within the time frame for availing the grid connectivity and thereof determination of compensation to be payable by such Open Access Applicant. [Case No. 125 of 2012 ]
125 of 2012
Completed
5297 Thu 13/12/2012 15:00:00 PM
Hearing
Petition by RInfra for Clarification regarding RPO for meeting Non-Solar RPO targets through Solar power procurement [Case No. 109 of 2012 ]
109 of 2012
Completed
5298 Thu 13/12/2012 12:30:00 PM
Hearing
Petition of Shri. Shivaji Vitthal Saste under Section 67(4) of EA, 2003 challenging the alleged unlawful acts of the MSETCL for laying down and placing extra-high voltage double circuit 400 KV electric power lines and erecting Tower No. 32 on Petitioner's land, without issuing notice to the Petitioner and paying any compensation to him. [Case No. 58 of 2012 ]
58 of 2012
Completed
5299 Thu 13/12/2012 11:00:00 AM
Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 - Case No. 102 of 2012. [Case No. 102 of 2012 ]
102 of 2012
Completed
5300 Thu 13/12/2012 11:00:00 AM
Hearing
Suo-motu hearing on Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010. [Case No. 100 of 2012 ]
100 of 2012
Completed
5301 Thu 13/12/2012 11:00:00 AM
Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 - Case No. 102 of 2012.
102 of 2012
Completed
5302 Thu 13/12/2012 11:00:00 AM
Hearing
Case No. 100 of 2012 Suo-motu hearing on Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010.
100 of 2012
Completed
5303 Wed 12/12/2012 12:30:00 PM
Hearing
Petition of Mayuresh Engineering Pvt Ltd. for non-compliance of Order dated 23.08.2012 in Case No. 51/2012 passed by Honorable Electricity Ombudsman Mumbai. [Case No. 119 of 2012 ]
119 of 2012
Completed
5304 Wed 12/12/2012 11:00:00 AM
Hearing
Appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner. [Case No. 83 of 2012 ]
83 of 2012
Completed
5305 Tue 11/12/2012 11:00:00 AM
Hearing
Petition filed by Maha Co-Gen Green Power Producers Association for Review Petition of MERC's Suo Moto order dated March 30, 2012 in Case No. 10 of 2012, on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010. [Case No. 46 of 2012 ]
46 of 2012
Completed
5306 Tue 11/12/2012 11:00:00 AM
Hearing
Petition filed by Co-Generation Association of India for Review of the tariff rate and tariff structure for Non-fossil fuel based Co-generation power plants in the State of Maharashtra. [Case No. 66 of 2012 ]
66 of 2012
Completed
5307 Tue 11/12/2012 11:00:00 AM
Hearing
Petition filed by Maharashtra Rajaya Sahkari Sakhar Karkhana Sangh Ltd. for Review Petition of MERC's Suo Moto order dated March 30, 2012 in Case No. 10 of 2012, on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010. [Case No. 49 of 2012 ]
49 of 2012
Completed
5308 Mon 10/12/2012 17:00:00 PM
Hearing
Petition of M/s Kalika Steel & Alloys Pvt. Ltd. Seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous Supply) category consumers in billing cycles. [Case No. 88 of 2012 ]
88 of 2012
Completed
5309 Mon 10/12/2012 16:30:00 PM
Hearing
Petition of Sou. Jayashri Sidheshwar Dumbali for non compliance of Order dated 15.02.2012 passed by Electricity Ombudsman, Mumbai. [Case No. 98 of 2012 ]
98 of 2012
Completed
5310 Mon 10/12/2012 16:30:00 PM
Hearing
Case No. 98 of 2012 Petition of Sou. Jayashri Sidheshwar Dumbali for non compliance of Order dated 15.02.2012 passed by Electricity Ombudsman, Mumbai.
98 of 2012
Completed
5311 Mon 10/12/2012 11:00:00 AM
Hearing
Suo-Motu proceeding on the Policy Review in matters related to Wind Power in Maharashtra. [Case No. 92 of 2012 ]
92 of 2012
Completed
5312 Mon 10/12/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010. [Case No. 39 of 2012 ]
39 of 2012
Completed
5313 Mon 10/12/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1)(b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010. [Case No. 38 of 2012 ]
38 of 2012
Completed
5314 Wed 05/12/2012 14:30:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd., for review of Commission's Order dated 15th October, 2012 in Case No. 24 of 2012, filed by Mula Pravara Electric Cooperative Society Ltd., for claiming compensation/ charges for use of assets by MSEDCL. [Case No. 121 of 2012 ]
121 of 2012
Completed
5315 Wed 05/12/2012 12:30:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process. [Case No. 53 of 2012 ]
53 of 2012
Completed
5316 Thu 29/11/2012 14:00:00 PM
Public Hearing
Objections/comments on BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005 [Case No. 80 of 2012 ]
80 of 2012
Completed
5317 Thu 29/11/2012 14:00:00 PM
Public Hearing
PUBLIC HEARING of Case No. 124 of 2011 - Objections/Comments on BEST's Petition for approval of MYT Business Plan for the second Control Period from FY 2012-13 to FY 2015-16 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005
124 of 2012
Completed
5318 Thu 29/11/2012 14:00:00 PM
Public Hearing
PUBLIC HEARING of Case No. 80 of 2012 - Objections/comments on BEST's Petition for inclusion and allowance in favour of BEST the deficit of Transport Business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005
80 of 2012
Completed
5319 Thu 29/11/2012 11:00:00 AM
Public Hearing
Objections/comments on Reliance Infrastructure Limited - Distribution Business' Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005 [Case No. 73 of 2012 ]
73 of 2012
Completed
5320 Thu 29/11/2012 11:00:00 AM
Public Hearing
Objections/comments on BEST's Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005 [Case No. 90 of 2012 ]
90 of 2012
Completed
5321 Thu 29/11/2012 11:00:00 AM
Public Hearing
PUBLIC HEARING of Case No. 73 of 2012 - Objections/comments on Reliance Infrastructure Limited - Distribution Business' Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005
73 of 2012
Completed
5322 Thu 29/11/2012 11:00:00 AM
Public Hearing
PUBLIC HEARING of Case No. 47 of 2012 - Objections/comments on The Tata Power Company Limited - Distribution Business' Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005
47 of 2012
Completed
5323 Thu 29/11/2012 11:00:00 AM
Public Hearing
PUBLIC HEARING of Case No. 90 of 2012 - Objections/comments on BEST's Petition for approval of Schedule of Charges as per Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 Public Hearing to be held at Venue Centrum Hall, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai-400 005
90 of 2012
Completed
5324 Tue 27/11/2012 17:00:00 PM
Hearing
Petition of Kaygaon Paper Mills Ltd.for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India [Case No. 79 of 2012 ]
79 of 2012
Completed
5325 Tue 27/11/2012 17:00:00 PM
Hearing
[Case No. 79 of 2012 ] Petition of Kaygaon Paper Mills Ltd.for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India
79 of 2012
Completed
5326 Tue 27/11/2012 16:30:00 PM
Hearing
Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012 [Case No. 110 of 2012 ]
110 of 2012
Completed
5327 Tue 27/11/2012 16:30:00 PM
Hearing
[Case No. 110 of 2012 ] Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012
110 of 2012
Completed
5328 Tue 27/11/2012 15:00:00 PM
Hearing
Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003 [Case No. 105 of 2012 ]
105 of 2012
Completed
5329 Tue 27/11/2012 14:30:00 PM
Hearing
Petition of M/s. Divyansh Steel Pvt. Ltd.. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 115 of 2012 ]
115 of
Completed
5330 Tue 27/11/2012 14:30:00 PM
Hearing
Petition of Shiva Steel Industries (Nagpur) Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 114 of 2012 ]
114 of 2012
Completed
5331 Tue 27/11/2012 14:30:00 PM
Hearing
Petition of M/s. Orange City Steel Industries Pvt Ltd. for contravening the Provisions of MERC (CGRF & EO) Regulations 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 113 of 2012 ]
113 of 2012
Completed
5332 Tue 27/11/2012 14:30:00 PM
Hearing
Petition of M/s. Orange City Alloys Pvt. Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 112 of 2012 ]
112 of 2012
Completed
5333 Tue 27/11/2012 14:30:00 PM
Hearing
[Case No. 115 of 2012 ] Petition of M/s. Divyansh Steel Pvt. Ltd.. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time.
115 of 2012
Completed
5334 Tue 27/11/2012 14:30:00 PM
Hearing
[Case No. 114 of 2012 ] Petition of Shiva Steel Industries (Nagpur) Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time.
114 of 2012
Completed
5335 Tue 27/11/2012 14:30:00 PM
Hearing
[Case No. 113 of 2012 ] Petition of M/s. Orange City Steel Industries Pvt Ltd. for contravening the Provisions of MERC (CGRF & EO) Regulations 2006 by not implementing the order of Ombudsman within the stipulated time.
113 of 2012
Completed
5336 Tue 27/11/2012 14:30:00 PM
Hearing
[Case No. 112 of 2012 ] Petition of M/s. Orange City Alloys Pvt. Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time.
112 of 2012
Completed
5337 Tue 27/11/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1)(b) and 86(1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010. [Case No. 39 of 2012 ]
39 of 2012
Completed
5338 Tue 27/11/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1)(b) and 86(1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010 [Case No. 38 of 2012 ]
38 of 2012
Completed
5339 Tue 27/11/2012 10:00:00 AM
Hearing
[Case No. 39 of 2012 ] Petition of Wardha Power Company Limited under Section 86 (1)(b) and 86(1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Completed
5340 Tue 27/11/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1)(b) and 86(1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating [Case No. 38 of 2012 ] Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010
38 of 2012
Completed
5341 Mon 26/11/2012 17:00:00 PM
Hearing
Petition of Mayuresh Engineering Pvt Ltd. for non-compliance of Order dated 23.08.2012 in Case No. 51/2012 passed by Honorable Electricity Ombudsman, Mumbai [Case No. 119 of 2012 ]
119 of 2012
Reschedule
5342 Mon 26/11/2012 17:00:00 PM
Hearing
[Case No. 119 of 2012 ] Petition of Mayuresh Engineering Pvt Ltd. for non-compliance of Order dated 23.08.2012 in Case No. 51/2012 passed by Honorable Electricity Ombudsman, Mumbai
119 of 2012
Reschedule
5343 Mon 26/11/2012 16:00:00 PM
Hearing
Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003 [Case No. 89 of 2012 ]
89 of 2012
Reschedule
5344 Mon 26/11/2012 16:00:00 PM
Hearing
[Case No. 89 of 2012] Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003
89 of 2012
Reschedule
5345 Mon 26/11/2012 15:00:00 PM
Hearing
Petition of M/s Kalika Steel & Alloys Pvt. Ltd. seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous Supply) category consumers in billing cycles [Case No. 88 of 2012 ]
88 of 2012
Reschedule
5346 Mon 26/11/2012 15:00:00 PM
Hearing
[Case No. 88 of 2012 ] Petition of M/s Kalika Steel & Alloys Pvt. Ltd. seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous Supply) category consumers in billing cycles
88 of 2012
Reschedule
5347 Mon 26/11/2012 12:30:00 PM
Hearing
In the matter of Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011 and Mula Pravara' Application for grant of Distribution Licence for MPECS area of supply [Case No. 87 of 2010 ]
87 of 2010
Reschedule
5348 Mon 26/11/2012 12:30:00 PM
Hearing
Subject: Implementation of the Judgment dated December 16, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 [Case No. 85 of 2010 ]
85 of 2010
Reschedule
5349 Mon 26/11/2012 12:30:00 PM
Hearing
[Case No. 87 of 2010]Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 and Mula Pravara's Application for grant of Distribution Licence for MPECS area of supply
87 of 2010
Reschedule
5350 Mon 26/11/2012 12:30:00 PM
Hearing
Implementation of the Judgment dated December 16, 2011 given by the Honorable [Case No. 85 of 2010 ] Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011
85 of 2010
Reschedule
5351 Mon 26/11/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access. [Case No. 117 of 2012 ]
117 of 2012
Reschedule
5352 Mon 26/11/2012 11:00:00 AM
Hearing
[Case No. 117 of 2012 ] Petition of Wardha Power Company Ltd. against wrongful imposition of Cross Subsidy Surcharges (CSS) by the MSEDCL on the captive consumers of Wardha Power Company Ltd availing Open Access.
117 of 2012
Reschedule
5353 Mon 26/11/2012 11:00:00 AM
Hearing
[Case No. 161 of 2011 ] Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access) Regulations, 2005 Regulation 3 of MERC (Distribution open access) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003
161 of 2012
Reschedule
5354 Fri 23/11/2012 12:30:00 PM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna for action under Sections 142 & 146 of EA 2003, against the Officers of Mahavitaran (MSEDCL) for non-compliance of the Commission's directions in regards to the Electricity Consumers who consumes the electricity less than 300 Units per Month. [Case No. 118 of 2012 ]
118 of 2012
Completed
5355 Fri 23/11/2012 11:00:00 AM
Hearing
Petition of Tata Power Company Limited (Distribution) for requirement of Transmission Outlets from RInfra Transmission System. [Case No. 120 of 2012 ]
120 of 2012
Completed
5356 Wed 21/11/2012 12:30:00 PM
Hearing
Petition of Maharashtra Rajaya Sahkari Sakhar Karkhana Sangh Ltd. Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on Determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010. [Case No. 49 of 2012 ]
49 of 2012
Completed
5357 Wed 21/11/2012 12:30:00 PM
Hearing
Petition of Maharashtra Co-gen Green Power Producers Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010. [Case No. 46 of 2012 ]
46 of 2012
Completed
5358 Wed 21/11/2012 12:30:00 PM
Hearing
Petition of Cogeneration Association of India for review of the tariff rate and tariff structure for Non Fossil Fuel based Co-gen Power Plants in the State of Maharashtrar. [Case No. 66 of 2012 ]
66 of 2012
Completed
5359 Wed 21/11/2012 11:00:00 AM
Hearing
Petition of Crompton Greaves Ltd for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner. [Case No. 83 of 2012 ]
83 of 2012
Completed
5360 Fri 09/11/2012 16:30:00 PM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna for action under Sections 142 & 146 of EA 2003, against the Officers of Mahavitaran (MSEDCL) for non-compliance of the Commission's directions in regards to the Electricity Consumers who consumes the electricity less than 300 Units per Month. [Case No. 118 of 2012 ]
118 of 2012
Completed
5361 Fri 09/11/2012 15:00:00 PM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011. [Case No. 68 of 2012 ]
68 of 2012
Completed
5362 Fri 09/11/2012 12:30:00 PM
Public Hearing
Objections / suggestions on Maharashtra Electricity Transmission Company Limited's petition for approval of Business Plan for MYT control period FY 2011-12 to FY 2015-16. [Case No. 137 of 2011 ]
137 of 2012
Completed
5363 Fri 09/11/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. seeking review of the decisions, directions and order of Honorable Commission in respect of Order dated 16th August 2012 in Case No. 19 of 2012- Petition of MSEDCL for Final Truing Up for FY 2010-11, ARR for FY 2011-12 and FY 2012-12, Tariff determination for FY 2012- 13 and Revision in Schedule of Charges. [Case No. 107 of 2012 ]
107 of 2012
Completed
5364 Fri 02/11/2012 16:00:00 PM
Hearing
Petition of Sou. Jayashri Sidheshwar Dumbali for non compliance of Order dated 15.02.2012 passed by Electricity Ombudsman, Mumbai. [Case No. 98 of 2012 ]
98 of 2012
Completed
5365 Fri 02/11/2012 15:00:00 PM
Hearing
Petition of Kaygaon Paper Mills Ltd.for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India. [Case No. 79 of 2012 ]
79 of 2012
Completed
5366 Fri 02/11/2012 14:30:00 PM
Hearing
Petition of MSETCL for review of Order dated May 18, 2011 in Case No. 169 of 2011 in the matter of Petition for Truing up of FY 2010-11 and Approval of ARR for FY 2011-12 & FY 2012-13 under the provisions of MERC (Terms and Conditions of Tariff) Regulations, 2005. [Case No. 106 of 2012 ]
106 of
Completed
5367 Fri 02/11/2012 12:30:00 PM
Hearing
Determination of tariff for Procurement of Power by Distribution Company/ Licenses from Biomass based power Generating Company in the State of Maharashtra using the Gasification route (Otto Cycle) and Exemption from the zoning/overlapping policy for Power Plants of upto 2- MW size. [Case No. 104 of 2010 ]
104 of 2010
Completed
5368 Fri 02/11/2012 11:00:00 AM
Hearing
Petition of Shri. Shivaji Vitthal Saste under Section 67(4) of EA, 2003 challenging the alleged unlawful acts of the MSETCL for laying down and placing extra-high voltage double circuit 400 KV electric power lines and erecting Tower No. 32 on the Petitioner�s land, without issuing notice to the Petitioner and paying any compensation to him [Case No. 58 of 2012 ]
58 of 2012
Completed
5369 Fri 02/11/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2011 [Case No. 39 of 2012 ]
39 of 2012
Completed
5370 Fri 02/11/2012 10:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010 [Case No. 38 of 2012 ]
38 of 2012
Completed
5371 Thu 01/11/2012 16:30:00 PM
Hearing
Petition of M/s. Divyansh Steel Pvt. Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of the Ombudsman within the stipulated time. [Case No. 115 of 2012 ]
115 of
Completed
5372 Thu 01/11/2012 16:30:00 PM
Hearing
Petition of Shiva Steel Industries (Nagpur) Ltd. for contravening the provisions of MERC (CGRF & EO) Regulations, 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 114 of 2012 ]
114 of 2012
Completed
5373 Thu 01/11/2012 16:30:00 PM
Hearing
Petition of M/s. Orange City Steel Industries Pvt Ltd. for contravening the Provisions of MERC (CGRF & EO) Regulations 2006 by not implementing the order of Ombudsman within the stipulated time. [Case No. 113 of 2012 ]
113 of 2012
Completed
5374 Thu 01/11/2012 16:00:00 PM
Hearing
Petition of Sahara City Homes for non-compliance of Honorable Electricity Ombudsman Nagpur Order dated 05.07.2012 in Representation No. 33/ 2012. [Case No. 110 of 2012 ]
110 of 2012
Completed
5375 Thu 01/11/2012 15:00:00 PM
Hearing
Petition of Shri. Manoj Hariya for non-compliance of directions of CGRF order dated 23/11/2011 by MSEDCL office of Bhiwandi city in Case No. 386. [Case No. 111 of 2012 ]
of
Completed
5376 Thu 01/11/2012 10:00:00 AM
Hearing
Petition of M/s. Dodson Lindblom Hydro Power Private Ltd. for directions to the Respondent for compliance of the decision and directions of the Commission in its Order dated 21.05.2012 passed in Case No. 142 of 2011 [Case No. 116 of 2012 ]
116 of 2012
Completed
5377 Thu 25/10/2012 17:00:00 PM
Hearing
Petition of M/s Rajrani Steel Casting Pvt. Ltd. for not providing permission by MSEDCL for availing Open Access through Power Exchange (IEX). [Case No. 84 of 2012 ]
84 of 2012
Completed
5378 Thu 25/10/2012 16:00:00 PM
Hearing
Petition of Tata Power Company Ltd.-G for clarification on applicability of temporary tariff as decided in Case No. 78 of 2011 [Case No. 78 of 2012 ]
78 of 2012
Completed
5379 Thu 25/10/2012 15:00:00 PM
Hearing
Petition of MSETCL for review of Order dated December 29, 2011 in Case No. 102 of 2011 in the matter of Petition of MSETCL for Truing up of FY 2009-10 and approval of Annual Performance Review for FY 2010-11 under provisions of MERC (Terms and Conditions of Tariff) Regulations, 2005. [Case No. 17 of 2012 ]
17 of 2012
Completed
5380 Thu 25/10/2012 12:30:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010 [Case No. 39 of 2012 ]
39 of 2012
Completed
5381 Thu 25/10/2012 12:30:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010 [Case No. 38 of 2012 ]
38 of 2012
Completed
5382 Thu 25/10/2012 11:00:00 AM
Suo Motu Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 [Case No. 102 of 2012 ]
102 of 2012
Completed
5383 Tue 23/10/2012 16:00:00 PM
Suo Motu Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 [Case No. 101 of 2012 ]
101 of 2012
Completed
5384 Tue 23/10/2012 16:00:00 PM
Hearing
Petition of Reliance Infrastructure Ltd.-D. for Clarification on Renewable Purchase Obligation (RPO) as per the MERC (Renewable Purchase Obligation), its compliance and REC Framework Implementation) Regulations, 2010 [Case No. 109 of 2012 ]
109 of 2012
Completed
5385 Tue 23/10/2012 12:30:00 PM
Hearing
Subject: Petition of BEST Undertaking for approval of bid documents for Long Term Power Procurement from Renewable Sources [Case No. 101 of 2009 ]
101 of 2012
Completed
5386 Tue 23/10/2012 11:00:00 AM
Suo Motu Hearing
Verification and Compliance of Renewable Purchase Obligation targets for FY 2010-11 and FY 2011-12 as specified under MERC (Renewable Purchase Obligation, its compliance and Implementation of REC framework) Regulations, 2010 [Case No. 100 of 2012 ]
100 of 2012
Completed
5387 Mon 22/10/2012 15:00:00 PM
Hearing
Petition of M/s. Lanco Teesta Hydro Power Private Ltd. under Section 86(1)(b) and Section 86 (1) (f) of the Electricity Act, 2003 [Case No. 105 of 2012 ]
105 of 2012
Completed
5388 Mon 22/10/2012 12:30:00 PM
Hearing
Petition of Maharashtra Airport Development Company Ltd, for adoption of Tariff and approval for modification in the Concession Agreement dated 7.11.2007 between MADC and AMNEPL [Case No. 65 of 2012 ]
65 of 2012
Completed
5389 Mon 22/10/2012 11:00:00 AM
Hearing
Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003 [Case No. 89 of 2012 ]
89 of 2012
Completed
5390 Fri 19/10/2012 16:00:00 PM
Hearing
Petition of M/s Rajrani Steel Casting Pvt. Ltd. for not providing permission by MSEDCL for availing Open Access through Power Exchange (IEX). [Case No. 84 of 2012 ]
84 of 2012
Completed
5391 Fri 19/10/2012 11:00:00 AM
Hearing
SUO-MOTU PROCEEDING ON THE POLICY REVIEW IN MATTERS RELATED TO WIND POWER IN MAHARASHRTRA. Letter ref no. MD/MERC/Wind/8954 dated April 4, 2012, sent by Managing Director (MSEDCL) on the policy review related matters of Wind Power [Case No. 92 of 2012 ]
92 of 2012
Completed
5392 Thu 18/10/2012 11:00:00 AM
Hearing
Petition of Maharashtra Rajya Sahakari Sakhar Karkhana Sangh Ltd. seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on Determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010 [Case No. 49 of 2012 ]
49 of 2012
Completed
5393 Thu 18/10/2012 11:00:00 AM
Hearing
Petition of Maharashtra Co-gen Green Power Producers Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010 [Case No. 46 of 2012 ]
46 of 2012
Completed
5394 Wed 17/10/2012 16:00:00 PM
Hearing
Petition of Harishchand Mahar and Ors for challenging the Order passed by the District Collector Aurangabad being aggrieved by the insufficient amount of compensation under Rule 13(2) of the Works of Licensees Rules, 2012 [Case No. 97 of 2012 ]
97 of 2012
Completed
5395 Wed 17/10/2012 16:00:00 PM
Hearing
Petition of Kalyan Wagh. for challenging the Order passed by the District Collector Aurangabad being aggrieved by the insufficient amount of compensation under Rule 13(2) of the Works of Licensees Rules, 2012. [Case No. 96 of 2012 ]
96 of 2012
Completed
5396 Wed 17/10/2012 16:00:00 PM
Hearing
Petition of Shri. Hiralal Gusinghe & Ors for challenging the Order passed by the District Collector Aurangabad being aggrieved by the insufficient amount of compensation under Rule 13(2) of the Works of Licensees Rules, 2012. [Case No. 95 of 2012 ]
95 of 2012
Completed
5397 Wed 17/10/2012 16:00:00 PM
Hearing
Petition of Shri. Dattatray Yevale & Ors.for challenging the Order passed by the District Collector Aurangabad being aggrieved by the insufficient amount of compensation under Rule 13(2) of the Works of Licensees Rules, 2012 [Case No. 94 of 2012 ]
94 of 2012
Completed
5398 Wed 17/10/2012 12:30:00 PM
Hearing
Application of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 2.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010.) [Misc. Application No. 4 of 2012]
4 of 2012
Completed
5399 Wed 17/10/2012 12:30:00 PM
Hearing
Application of Indian Wind Power Association Maharashtra State Council directing MSEDCL to issue open access approval in accordance with MERC (Distribution Open Access) Regulation,2005 as amended & modified for RE from time to time, Directives of MERC during hearing held on 02/12/2010 and Order dated 20/10/2011 in Case No. 41 of 2010. Miscellaneous Application in Case No. 8 of 2012 (Miscellaneous Application No. 1 of 2012 - in Case No. 8 of 2012 ) [Misc. Application No. 1 of 2012]
1 of 2012
Completed
5400 Wed 17/10/2012 12:30:00 PM
Hearing
Petition of Serum Institute of India Ltd. for set aside Commercial circular No. 155 dated January 23,2012 and internal Circular dated September 13,2012 issued by MSEDCL providing tariff terms and conditions without the approval of Honorable Commission
108 of 2012
Completed
5401 Wed 17/10/2012 12:30:00 PM
Hearing
Petition of M/s. Arvind Costsyn (India) Ltd for breach of Commission's Order dated 27.04.2012 in Case Nos. 8, 18, 20 & 33 of 2012.Case No.103 of 2012
103 of 2012
Completed
5402 Wed 17/10/2012 12:30:00 PM
Hearing
Petition of Bajaj Finserv Ltd. for revoking supply contract of OA consumers of Bajaj Finserv and ignoring the Commission's Stay Order dated 27th April, 2012. - Case No. 86 of 2012.
86 of 2012
Completed
5403 Wed 17/10/2012 12:30:00 PM
Hearing
Petition of Bajaj Auto Ltd. for unilaterally revoking supply contract and reducing contract demand of the Petitioner by ignoring the Stay Order dated 27th April, 2012 of the Commission in Case No. 8, 18, 20 and 33 of 2012
85 of 2012
Completed
5404 Wed 17/10/2012 12:30:00 PM
Hearing
Petition of M/s MSEDCL for seeking review of a Daily Order dated 27th April 2012 (Case No. 8, 18, 20, 33 of 2012) of the Commission in the matter of open access transactions regarding Non-Conventional Energy i.e. wind
59 of 2012
Completed
5405 Wed 17/10/2012 11:00:00 AM
Hearing
Subject: Petition of Cogeneration Association of India for review of the tariff rate and tariff structure for Non Fossil Fuel based Co-gen Power Plants in the State of Maharashtra [Case No. 66 of 2012 ]
66 of 2012
Completed
5406 Wed 17/10/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process
53 of 2012
Completed
5407 Tue 16/10/2012 16:30:00 PM
Hearing
Petition of Maharashtra State Electricity Transmission Company Ltd. seeking review of Order in Case No. 169 of 2011.
106 of 2012
Completed
5408 Tue 16/10/2012 15:00:00 PM
Hearing
Petition of BEST for amendment in MERC (Electricity Supply Code and Other Conditions of Supply) Regulations,2005
87 of 2012
Completed
5409 Tue 16/10/2012 11:00:00 AM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 and Mula Pravara's Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5410 Tue 16/10/2012 11:00:00 AM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011
85 of 2010
Completed
5411 Mon 15/10/2012 12:30:00 PM
Hearing
Petition of BEST for appropriate order, directives or permission by MERC for inclusion and allowance in favour of BEST the deficit of the Transport business of BEST, in the determination of ARR and Tariff for FY 2004-05 to FY 2008-09 and the Carrying Cost
80 of 2012
Completed
5412 Mon 15/10/2012 11:00:00 AM
Public Hearing
Objections / suggestions on Adani Power Maharashtra Limited's (APML) Transmission Business Petition for approval of Aggregate Revenue Requirement (ARR) as per Multi Year Tariff (MYT) Principles for Second Control Period from FY 2012-13 to FY 2015-16
44 of 2012
Completed
5413 Thu 11/10/2012 17:00:00 PM
Hearing
Petition of Nashik Ispat Pvt. Ltd. for Non implementation of the CGRF order dated 22.05.2012 of Nashik Zone by MSEDCL for change of tariff category from Continuous HT-I C to Non continuous HT-1 NC
74 of 2012
Completed
5414 Thu 11/10/2012 16:00:00 PM
Hearing
Petition of M/s Kalika Steel & Alloys Pvt. Ltd. seeking clarification in respect of levy of additional electricity charges for HT-1 Express Feeder (Continuous Supply) category consumers in billing cycles
88 of 2012
Completed
5415 Thu 11/10/2012 15:00:00 PM
Hearing
Petition of M/s Rajrani Steel Casting Pvt. Ltd. for not providing permission by MSEDCL for availing Open Access through Power Exchange (IEX).
84 of 2012
Completed
5416 Thu 11/10/2012 12:30:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of medium term power procurement from M/s Adani-475 MW from 13.11.2012 and from M/s JSW-300 MW from 1.12.2012 for the period of one year under competitive bidding
of
Completed
5417 Thu 11/10/2012 11:00:00 AM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5418 Wed 10/10/2012 16:30:00 PM
Hearing
Petition of Shri. Dinkar Pathak for Review of Order dated 18.06.2012 passed in the matter of M. R. C. 81-Kothari/No. 04/2012, passed by District Collector of Akola.
93 of 2012
Completed
5419 Wed 10/10/2012 15:00:00 PM
Hearing
Petition of Crompton Greaves Ltd.for appointment of distribution franchisee for Jalgoan Urban Cum Rural division under the Jalgaon Circle and execution of distribution franchisee agreement dated 01.06.2011, by and between MSEDCL and Petitioner
83 of 2012
Completed
5420 Wed 10/10/2012 12:30:00 PM
Hearing
Petition of Maharashtra Biomass Energy Developers Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010
45 of 2012
Completed
5421 Wed 10/10/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Power Generation Company Ltd. seeking review of Order in Case No. 6 of 2012 for Final Truing up for the FY 2010-11 and Approval of ARR and Tariff for FY 2011-12, FY 2012-13 under the provisions of Regulation 85 of the MERC (Conduct of Business) Regulations 2004
77 of 2011
Completed
5422 Fri 05/10/2012 11:00:00 AM
Hearing
Petition of BEST Undertaking for approval of bid documents for Long Term Power Procurement from Renewable Sources
101 of 2009
Reschedule
5423 Thu 04/10/2012 16:00:00 PM
Hearing
Petition of Tata Power Company Ltd.-G for clarification on applicability of temporary tariff as decided in Case No. 78 of 2011.
78 of 2012
Reschedule
5424 Thu 04/10/2012 15:00:00 PM
Hearing
Petition of MSETCL for review of Order dated December 29, 2011 in Case No. 102 of 2011 in the matter of Petition of MSETCL for Truing up of FY 2009-10 and approval of Annual Performance Review for FY 2010-11 under provisions of MERC (Terms and Conditions of Tariff) Regulations, 2005.
17 of 2012
Reschedule
5425 Thu 04/10/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010
38 of 2012
Reschedule
5426 Thu 04/10/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010.
39 of 2012
Reschedule
5427 Wed 03/10/2012 15:00:00 PM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access) Regulations, 2005 Regulation 3 of MERC (Distribution open access) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Completed
5428 Wed 03/10/2012 12:30:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. seeking review in Case No. 19 of 2010 for imposition of Reactive charges penalty to M/s Shalivahana Green Energy Ltd. for its biomass plant at Village Chanaka, Taluka Wani, Dist. Yavatmal.
76 of 2012
Completed
5429 Wed 03/10/2012 11:00:00 AM
Hearing
Petition of M/s Hitech Carbon (Unit of Aditya Birla Nuvo Ltd) for determination of Tariff for supply of electricity from industrial waste heat recovery Cogeneration power plant of 23 MW capacity at Village Lohop / Talvali, Patalganga, District Raigad to Distribution Licensee in Maharashtra and fixation of Purchase obligation for electricity produced from waste heat recovery based co-generation plants.
175 of 2011
Completed
5430 Wed 03/10/2012 10:00:00 AM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5431 Mon 01/10/2012 16:00:00 PM
Hearing
Petition of Nashik Ispat Pvt. Ltd. for Non implementation of the CGRF order dated 22.05.2012 of Nashik Zone by MSEDCL for change of tariff category from Continuous HT-I C to Non continuous HT-1 NC .
74 of 2012
Completed
5432 Mon 01/10/2012 15:00:00 PM
Hearing
Petition of Kayegaon Paper Mills Ltd.for seeking action under Section 142 and 149 of EA, 2003, for violation of the MERC's Order dated 8th September, 2006 in Case No. 70 of 2005 and violation of pending Writ Petition 20340 of 2007, pending before the Supreme Court of India .
79 of 2012
Completed
5433 Mon 01/10/2012 12:30:00 PM
Hearing
Application of Indian Wind Power Association Maharashtra State Council directing MSEDCL to issue open access approval in accordance with MERC ( Distribution Open Access) Regulation,2005 as amended & modified for RE from time to time, Directives of MERC during hearing held on 02/12/2010 and Order dated 20/10/2011 in Case No. 41 of 2010. Miscellaneous Application in Case No. 8 of 2012 (Miscellaneous Application No. 1 of 2012 - in Case No. 8 of 2012 )
8 of 2012
Completed
5434 Mon 01/10/2012 12:30:00 PM
Hearing
Petition of M/s MSEDCL for seeking review of a Daily Order dated 27th April 2012 (Case No. 8, 18, 20, 33 of 2012) of the Commission in the matter of open access transactions regarding Non-Conventional Energy i.e. wind
59 of 2012
Completed
5435 Mon 01/10/2012 12:30:00 PM
Hearing
Petition of Tata Motors Ltd to set aside Commercial Circular No. 155 dated 23.01.2012 issued by the Maharashtra State Electricity Distribution Company Limited providing for tariff terms and conditions without the approval of the Honorable Commission
18 of 2012
Completed
5436 Mon 01/10/2012 12:30:00 PM
Hearing
Petition of M/s. Arvind Costsyn (India) Ltd for breach of Commission's Order dated 27.04.2012 in Case Nos. 8, 18, 20 & 33 of 2012.Case No.103 of 2012
103 of 2012
Completed
5437 Mon 01/10/2012 12:30:00 PM
Hearing
Petition of Bajaj Finserv Ltd. for revoking supply contract of OA consumers of Bajaj Finserv and ignoring the Commission's Stay Order dated 27th April, 2012. - Case No. 86 of 2012
86 of 2012
Completed
5438 Mon 01/10/2012 12:30:00 PM
Hearing
Petition of Bajaj Auto Ltd. for unilaterally revoking supply contract and reducing contract demand of the Petitioner by ignoring the Stay Order dated 27th April, 2012 of the Commission in Case No. 8, 18, 20 and 33 of 2012
85 of 2012
Completed
5439 Mon 01/10/2012 11:00:00 AM
Hearing
Petition of Shri Ganesh Khankar for review of Order dated 15.06.2012 in Case No. 180 of 2011
82 of 2012
Completed
5440 Thu 20/09/2012 15:00:00 PM
Admissibility Hearing
Petition of M/s. Urjankur Shree Datta Power Company Ltd. for dispute between a generating company and a distribution licensee under section 86 (1)(f) of Electricity Act, 2003 .
89 of 2012
Completed
5441 Tue 11/09/2012 11:00:00 AM
Admissibility Hearing
Petition of Nashik Ispat Pvt. Ltd. for Non implementation of the CGRF order dated 22.05.2012 of Nashik Zone by MSEDCL for change of tariff category from Continuous HT-I C to Non continuous HT-1 NC.
74 of 2012
0
5442 Tue 11/09/2012 11:00:00 AM
Admissibility Hearing
Petition for not providing permission by MSEDCL for availing open access through power exchange (IEX) although there is provision of non-discriminatory open access under sub section(47) of Section 2 with sub-section (2), (3) & (4) of Section 42 of the EA,2003 & Regulation specified there under
61 of 2012
Completed
5443 Tue 11/09/2012 11:00:00 AM
Admissibility Hearing
Petition of Cogeneration Association of India for review of the tariff rate and tariff structure for Non Fossil Fuel based Co-gen Power Plants in the State of Maharashtra.
66 of 2012
Completed
5444 Tue 11/09/2012 11:00:00 AM
Admissibility Hearing
Petition of Maharashtra Rajaya Sahkari Sakhar Karkhana SanghLtd. Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on Determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
49 of 2012
Completed
5445 Fri 07/09/2012 11:00:00 AM
Admissibility Hearing
Petition of Maharashtra Co-gen Green Power Producers Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.. [Case No. 46 of 2012
46 of 2012
Completed
5446 Fri 07/09/2012 11:00:00 AM
Admissibility Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.
53 of 2012
Completed
5447 Thu 06/09/2012 15:00:00 PM
Hearing
Petition of Shri. Tarak Oza for Review of Order dated 15.06.2012 passed in Case No.180 of 2011
81 of 2012
Completed
5448 Wed 05/09/2012 11:00:00 AM
Admissibility Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5449 Wed 05/09/2012 11:00:00 AM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5450 Thu 30/08/2012 16:00:00 PM
Hearing
Petition filed by Shri Haribhau D. Khapre in the matter of violation of the directions given by the Commission in its Order dated 5th January, 2012 in Case No. 148 of 2011.
74 of 2012
Completed
5451 Thu 23/08/2012 12:30:00 PM
Public Hearing
158 of 2012
Completed
5452 Wed 22/08/2012 23:00:00 PM
Hearing
Petition of Adani Power Maharashtra Ltd. for adjudication of dispute u/s 86 of the Electricity Act, 2003 and for Return of performance guarantee pursuant to the termination dated 16.02.2011.
68 of 2012
Completed
5453 Wed 22/08/2012 16:00:00 PM
Hearing
Petition of Smt. Kasturben Lalji Gudhka for non refund of the deposit approved by CGRF Bhandup in Case No. 402 dated 18.10.2011. [Case No. 72 of 2012]
72 of 2012
Completed
5454 Wed 22/08/2012 16:00:00 PM
Hearing
Petition of Smt. Kasturben Lalji Gudhka for non refund of the deposit approved by CGRF Bhandup in Case No. 388 dated 20.10.2011. [Case No. 71 of 2012]
71 of 2012
Completed
5455 Wed 22/08/2012 15:00:00 PM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of change in Unit Configuration of IBPL plant at Amravati. [Case No. 64 of 2012]
64 of 2012
Completed
5456 Fri 17/08/2012 17:00:00 PM
Hearing
Petition filed by Shri Ajit Vithal Dake for Non compliance of the Order dated 30.08.2011 passed by CGRF Kolhapur
of
Completed
5457 Fri 17/08/2012 16:30:00 PM
Hearing
Petition filed by Shri Haribhau D. Khapre in the matter of Petition under Regulation 25 of the MERC (CGRF & EO) Regulations, 2006 against the Order dated 28.03.2012 passed by the CGRF Kolhapur [Case No. 69 of 2012]
69 of 2012
Completed
5458 Fri 17/08/2012 15:00:00 PM
Hearing
Petition of Tata Power Company Limited (Distribution) for adjudication of dispute under Section 86(1) of the EA,2003 arising out of breach by the Respondent of the order dated 15.10.2009 passed by the Honorable Commission in Case No. 50 of 2009 and contravention by the Respondent of the provisions of the EA,2003.
60 of 2012
Completed
5459 Fri 17/08/2012 15:00:00 PM
Hearing
Petition against willful contempt of the order dated 15.10.2009 passed by the Commission in Case No. 50 of 2009.
37 of 2012
Completed
5460 Fri 17/08/2012 14:30:00 PM
Hearing
Petition of Mr. Namdev T. Malore in the matter of refusal by Tata Power Company Ltd. to accept application forms for supply of electricity and for violating / curtailing the fundamental right of Petitioner to avail electricity supply and to take appropriate action against TPC Ltd. for contravention of the provision of Section 43 of EA 2003.
67 of 2012
Completed
5461 Fri 17/08/2012 12:30:00 PM
Hearing
Petition of Maharashtra Airport Development Company Ltd, for adoption of Tariff and approval for modification in the Concession Agreement dated 7.11.2007 between MADC and AMNEPL.
of
Completed
5462 Fri 17/08/2012 11:00:00 AM
Hearing
Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order in Case No. 42 of 2006.
56 of 2012
Completed
5463 Mon 13/08/2012 12:30:00 PM
Hearing
Petition for not providing permission by MSEDCL for availing open access through power exchange (IEX) although there is provision of non-discriminatory open access under sub section(47) of Section 2 with sub-section (2), (3) & (4) of Section 42 of the EA,2003 & Regulation specified there under
61 of 2012
Completed
5464 Mon 13/08/2012 11:00:00 AM
Hearing
Petition of Shri. Shivaji Vitthal Saste under Section 67(4) of EA, 2003 challenging the alleged unlawful acts of the MSETCL for laying down and placing extra-high voltage double circuit 400 KV electric power lines and erecting Tower No. 32 on the Petitioner�s land, without issuing notice to the Petitioner and paying any compensation to him
58 of 2012
Completed
5465 Thu 09/08/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission�s Order dated 27.01.2011 and Mula Pravara�s Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5466 Thu 09/08/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission�s Order dated 27.01.2011.
85 of 2010
Completed
5467 Thu 09/08/2012 16:00:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5468 Thu 09/08/2012 11:00:00 AM
Public Hearing
Objections / suggestions on Reliance Infrastructure Limited � Transmission Business (RInfra-T) Petition for approval of Business Plan for the period FY 2011-12 to FY 2015-16
of
Completed
5469 Thu 09/08/2012 11:00:00 AM
Public Hearing
Objections / suggestions on Reliance Infrastructure Ltd.-Generation Business (RInfra-G) Petition for approval of Multi-Year Tariff (MYT) Business Plan for the Second Control Period from FY 2011-12 to FY 2015-16
156 of 2012
Completed
5470 Wed 08/08/2012 16:00:00 PM
Hearing
Determination of tariff for Procurement of Power by Distribution Company/ Licenses from Biomass based power Generating Company in the state of Maharashtra using the Gasification route (Otto Cycle) and Exemption from the zoning/overlapping policy for Power Plants of upto 2- MWe size. [Case No. 104 of 2010]
104 of 2010
Completed
5471 Wed 08/08/2012 15:00:00 PM
Hearing
Implementation of Judgement dated 22nd March,2012 given by ATE in Appeal No. 8 of 2011 filed by BEST Undertaking challenging the Commission�s Order dated 12th September 2010 in Case No. 95 of 2009. [Case No.62 of 2012]
62 of 2012
Completed
5472 Wed 08/08/2012 12:30:00 PM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Completed
5473 Wed 08/08/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010 .
39 of 2012
Completed
5474 Wed 08/08/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010 [Case No. 38 of 2012]
38 of 2012
Completed
5475 Fri 03/08/2012 16:00:00 PM
Hearing
The Petition filed by Shri. Haribhau D. Khapre, in the matter of Violation of the directions given by the Commission in its Order dated 05 January, 2012 in Case No. 148 of 2011.
of
Completed
5476 Fri 03/08/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability.
151 of 2011
Completed
5477 Fri 03/08/2012 11:00:00 AM
Hearing
Petition of Cogenaration Association of India for Review of the Tariff Rate and Tariff Structure for non Fossil Fuel based Cogen Power Plants in the State of Maharashtra
66 of 2012
0
5478 Fri 03/08/2012 11:00:00 AM
Hearing
Petition of Maharashtra Rajya Sahakari Sakhar Karkhana Sangh Ltd. seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
49 of 2012
Completed
5479 Fri 03/08/2012 11:00:00 AM
Hearing
Maharashtra Co-Gen Green Power Producers Association filed a Review Petition of MERC's Suo Moto order dated March 30, 2012 in Case No. 10 of 2012, on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
49 of 2012
Completed
5480 Thu 02/08/2012 11:00:00 AM
Hearing
Petition of Shri. Shivaji Vitthal Saste under Section 67(4) of EA, 2003 challenging the alleged unlawful acts of the MSETCL for laying down and placing extra-high voltage double circuit 400 KV electric power lines and erecting Tower No. 32 on the Petitioner's land, without issuing notice to the Petitioner and paying any compensation to him
58 of 2012
Completed
5481 Thu 02/08/2012 11:00:00 AM
Hearing
Petition of M/s Hitech Carbon (Unit of Aditya Birla Nuvo Ltd) for determination of Tariff for supply of electricity from industrial waste heat recovery cogeneration power plant of 23 MW capacity at Village Lohop / Talvali, Patalganga, District Raigad to Distribution Licensee in Maharashtra and fixation of Purchase Obligation for electricity produced from waste heat recovery based co-generation plants.
175 of 2011
Reschedule
5482 Thu 02/08/2012 11:00:00 AM
Hearing
Petition for not providing permission by MSEDCL for availing open access through power exchange (IEX) although there is provision of non-discriminatory open access under sub section(47) of Section 2 with sub-section (2), (3) & (4) of Section 42 of the EA,2003 & Regulation specified there under
of
0
5483 Thu 02/08/2012 11:00:00 AM
Hearing
Application of Indian Wind Power Association Maharashtra State Council directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 02.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010. [Misc. Application No. 1 of 2012 in Case No. 8 of 2012]
8 of 2012
Completed
5484 Thu 02/08/2012 11:00:00 AM
Hearing
Petition of M/s MSEDCL for seeking review of a Daily Order dated 27th April 2012 (Case No. 8, 18, 20, 33 of 2012) of the Commission in the matter of open access transactions regarding Non-Conventional Energy i.e. wind
59 of 2012
Completed
5485 Mon 30/07/2012 16:00:00 PM
Public Hearing
SUO-MOTU ORDER ON STIPULATION OF REVISED CEILING FOR LEVY OF FUEL ADJUSTMENT COST (FAC) BY DISTRIBUTION LICENSEES UNDER REGULATION 82 OF MERC (TERMS AND CONDITIONS OF TARIFF) REGULATIONS, 2005
63 of 2012
Completed
5486 Mon 30/07/2012 12:30:00 PM
Hearing
Petition of M/s NESCO Ltd. against willful contempt of the order dated 15.10.2009 passed by the Commission in Case No. 50 of 2009.
37 of 2012
Completed
5487 Mon 30/07/2012 12:30:00 PM
Hearing
Petition of Tata Power Company Limited (Distribution) for adjudication of dispute under Section 86(1) of the EA,2003 arising out of breach by the Respondent of the order dated 15.10.2009 passed by the Honorable Commission in Case No. 50 of 2009 and contravention by the Respondent of the provisions of the EA,2003
60 of 2012
Completed
5488 Mon 30/07/2012 11:00:00 AM
Public Hearing
Petition filed by Maharashtra State Power Generation Co. Ltd. and Government of Maharashtra, Water Resources Department for approval of Lease Rent for Ghatghar Pumped Storage Hydro Station. (MERC Case No. 2 of 2012)
2 of 2012
Completed
5489 Fri 27/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5490 Wed 25/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5491 Mon 23/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5492 Thu 19/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5493 Fri 13/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5494 Wed 11/07/2012 10:00:00 AM
Public Hearing
19 of 2012
Completed
5495 Mon 09/07/2012 17:00:00 PM
Hearing
Application of MSEDCL for interim relief in the matter of Petition for approval of Final True Up for FY 2010-11, ARR for FY 2011-12 & FY 2012-13 and Determination of Tariff for FY 2012-13 [Misc. Application No. 2 of 2012 in Case No. 19 of 2012]
of
Completed
5496 Mon 09/07/2012 16:30:00 PM
Hearing
Suo Motu hearing in the matter of Load Shedding Circulars No. 43 and 44 (with corrigendum) issued by Maharashtra State Electricity Distribution Co. Ltd.
41 of 2012
Completed
5497 Mon 09/07/2012 15:00:00 PM
Hearing
Petition of MSLDC for removal of difficulties sought in the matter of operation and implementation of the Intra State ABT Order
56 of 2012
Completed
5498 Mon 09/07/2012 12:30:00 PM
Hearing
Petition of Maharashtra Airport Development Company Ltd, in the matter of taking on Record the Distribution Licensee status of Maharashtra Airport Development Company Ltd for Multi Product Special Economic Zone at Mihan, Nagpur.
16 of 2011
Completed
5499 Mon 09/07/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Ltd. for approval of PPA for additional quantum between Indiabulls Realtech Ltd. (Nashik) and Adani Power Maharashtra Ltd. based on Competitive Bidding Process.
53 of 2012
Completed
5500 Fri 06/07/2012 16:00:00 PM
Hearing
Petition of Shri Babanrao Kale, Shetkari Sanghatna for action in respect of non-replacement of Failed Transformers and to set aside the MSEDCL�s Circular No 136 dated 04.11.2011 and letter No. 33329 dated 08.11.2011.
14 of 2012
Completed
5501 Fri 06/07/2012 15:00:00 PM
Hearing
Petition of Shri Ramakant R. Suryavanshi for Non-implementation of the Order dated 12.03.2010 passed by CGRF at Nashik.
52 of 2012
Completed
5502 Thu 05/07/2012 15:00:00 PM
Hearing
Petition filed by Shri Haribhau D. Khapre in the matter of violation of the directions given by the Commission in its Order dated 5 January 2012 in Case No. 148 of 2011.
of
Completed
5503 Thu 05/07/2012 11:00:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Completed
5504 Wed 04/07/2012 17:00:00 PM
Hearing
Petition filed by JSW Energy Ltd, for seeking clarification in Case No. 67 of 2011
32 of 2012
Completed
5505 Wed 04/07/2012 16:00:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount.
182 of 2011
Completed
5506 Wed 04/07/2012 15:00:00 PM
Hearing
Petition of M/s Geeta Pumps Pvt Ltd for non-compliance of the directions of the CGRF Forum, Kolhapur Zone, for refund of excess ASC Charges through future bills, in spite of the rejection of interim stay by Honorable High Court Mumbai in Respondent' Writ Petition No. 7873 of 2010 by the Order dated 25/07/2011
16 of 2012
Completed
5507 Wed 04/07/2012 12:30:00 PM
Hearing
Petition of Shri Ramchandra P. Farande & Ors. challenging the Judgment and Order dated 30.11.2011 and 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 12 and 13 of 2011.
28 of 2012
Completed
5508 Wed 04/07/2012 12:30:00 PM
Hearing
Petition of Shri Ganpat Khanderao Farande and Shri Subhash Khanderao Farande challenging the Judgment and Order dated 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 13 of 2011.
25 of 2012
Completed
5509 Wed 04/07/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010
38 of 2012
Completed
5510 Wed 04/07/2012 11:00:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010 .
39 of 2012
Completed
5511 Thu 28/06/2012 23:00:00 PM
Admissibility Hearing
Petition of Maharashtra Biomass Energy Developers Association seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
45 of 2012
Completed
5512 Wed 27/06/2012 23:00:00 PM
Hearing
Petition against willful contempt of the order dated 15.10.2009 passed by the Commission in Case No. 50 of 2009.
37 of 2012
Completed
5513 Wed 27/06/2012 23:00:00 PM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability.
151 of 2011
Completed
5514 Wed 27/06/2012 12:30:00 PM
Hearing
Petition of M/s Ixora Constructions Pvt Ltd for approval of deviations taken in Bidding Document issued by the MoP for medium term procurement of power through tariff based Competitive Bidding Process (Case-I).
35 of 2012
Completed
5515 Wed 27/06/2012 12:30:00 PM
Hearing
Petition of M/s Ixora Constructions Pvt Ltd for issuing Specific Conditions of License.
33 of 2011
Completed
5516 Fri 22/06/2012 23:00:00 PM
Hearing
Suo Motu hearing in the matter of Load Shedding Circulars No. 43 and 44 (with corrigendum) issued by Maharashtra State Electricity Distribution Co. Ltd
41 of 2012
Completed
5517 Fri 22/06/2012 15:00:00 PM
Hearing
Determination of tariff for Procurement of Power by Distribution Company/ Licenses from Biomass based power Generating Company in the state of Maharashtra using the Gasification route (Otto Cycle) and Exemption from the zoning/overlapping policy for Power Plants of upto 2- MWe size.
104 of 2010
Completed
5518 Fri 22/06/2012 12:30:00 PM
Hearing
Petition of Maharashtra Rajya Sahakari Sakhar Karkhana Sangh Ltd. seeking review of Suo moto Order dated March 30, 2012 in Case No. 10 of 2012 on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
49 of 2012
Completed
5519 Fri 22/06/2012 12:30:00 PM
Hearing
Maharashtra Co-Gen Green Power Producers Association filed a Review Petition of MERC's Suo Moto order dated March 30, 2012 in Case No. 10 of 2012, on determination of Generic Tariff for the third year of the first Control Period under Regulation 8 of the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2010.
46 of 2012
Completed
5520 Fri 15/06/2012 16:30:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission�s Order dated 27.01.2011 and Mula Pravara�s Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5521 Fri 15/06/2012 16:30:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission�s Order dated 27.01.2011.
85 of 2010
Completed
5522 Fri 15/06/2012 16:30:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5523 Fri 15/06/2012 15:00:00 PM
Hearing
Petition of Tata Power Company Limited for approval of additional norm for Unit 6 Heat Rate and Auxiliary consumption for the Second MYT Control Period from FY 2011-12 to FY 2015-16.
40 of 2012
Completed
5524 Fri 15/06/2012 12:30:00 PM
Hearing
Petition of Adani Power Maharahstra Ltd.for rectifications/ clarifications of the Commission�s order dated March 27, 2012 in Case No. 60 of 2011 filed for approval of MYT Business plan of Adani Power Maharahstra Ltd.
42 of 2012
Completed
5525 Wed 06/06/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability.
37 of 2012
Reschedule
5526 Wed 06/06/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability.
151 of 2011
Reschedule
5527 Mon 21/05/2012 15:00:00 PM
Hearing
Petition of MSEDCL for Review of the decisions, directions and order of the Commission in respect of the order dt 30th April, 2012 in Case No. 12 of 2012.
43 of 2012
Completed
5528 Mon 21/05/2012 12:30:00 PM
Hearing
Petition of M/s Ixora Constructions Pvt Ltd for issuing Specific Conditions of License.
33 of 2011
Completed
5529 Mon 21/05/2012 11:00:00 AM
Hearing
Petition of M/s Ixora Constructions Pvt Ltd for approval of deviations taken in Bidding Document issued by the MoP for medium term procurement of power through tariff based Competitive Bidding Process (Case-I).
35 of 2011
Completed
5530 Fri 18/05/2012 15:00:00 PM
Hearing
Shri. Vijay Yadavrao Wawu, in the matter of violation of the order dated 3rd May 2007 passed by the electricity Inspector, Mumbai
34 of 2012
Completed
5531 Fri 18/05/2012 11:00:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003.
161 of 2011
Reschedule
5532 Thu 17/05/2012 17:00:00 PM
Hearing
Implementation of the Judgment dated 17th February, 2012 given by the ATE in Appeal No. 106 of 2011 filed by the Vidharbha Industries Power Ltd. (VIPL) challenging the Commission�s Order dated 31.05.2011 passed in Case No. 12 of 2011.
23 of 2012
Completed
5533 Thu 17/05/2012 16:00:00 PM
Hearing
Petition of MSETCL for review of Order dated December 29, 2011 in Case No. 102 of 2011 in the matter of Petition of MSETCL for Truing up of FY 2009-10 and approval of Annual Performance Review for FY 2010-11 under provisions of MERC (Terms and Conditions of Tariff) Regulations, 2005.
17 of 2012
Completed
5534 Thu 17/05/2012 15:00:00 PM
Hearing
Petition of Vidyut Dar Vad Virodhi Sangharsh Samiti, Amravati regarding farmers' difficulties arising due to MSEDCL's Load Shedding policy in the State, specially in Amravati Zone, and seeking 8 hours electricity in a day for the crops of Cotton & Orange within the territorial jurisdiction of suicidal area of Western Vidarbha
144 of 2011
Completed
5535 Thu 17/05/2012 12:30:00 PM
Hearing
Implementation of Judgement dated 22nd March,2012 given by ATE in Appeal No. 8 of 2011 filed by BEST Undertaking challenging the Commission�s Order dated 12th September 2010 in Case No. 95 of 2009.
95 of 2009
Completed
5536 Thu 17/05/2012 11:00:00 AM
Hearing
Petition filed by JSW Energy Ltd, for seeking clarification in Case No. 67 of 2011
32 of 2012
Completed
5537 Wed 16/05/2012 16:00:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5538 Wed 16/05/2012 15:00:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1)(f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments, on account of the Change in law as per the terms of Power Purchase Agreement dated 04.06.2010 .
39 of 2012
Completed
5539 Wed 16/05/2012 15:00:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (a) (b) and 86 (1) (f) of the Electricity Act, 2003 in the matter of dispute between a Generating Company and the Distribution Licensee as a result of deliberate and willful failure of the distribution licensee to make payments in terms of Power Purchase Agreement dated 04.06.2010
38 of 2012
Completed
5540 Wed 16/05/2012 11:00:00 AM
Suo Motu Hearing
Suo Motu hearing in the matter of Load Shedding Circulars No. 43 and 44 (with corrigendum) issued by Maharashtra State Electricity Distribution Co. Ltd
41 of 2012
Completed
5541 Thu 03/05/2012 15:00:00 PM
Hearing
Shri Vijay Omkarrao Malokar, Akola for initiating the legal action under Sections 142, 146 and 149 of the EA 2003 against the Managing Director and Chairman of Maharashtra State Electricity Board Holding Company (MSEBHC) for violation of various MERC's Orders, and set aside the MSEDCL's Circular No. 35 of dated 05.10.2011 and seeking electricity power supply to Farmers in day hours.
154 of 2011
Completed
5542 Thu 03/05/2012 15:00:00 PM
Hearing
Petition of Shri Babanrao Kale, Shetkari Sanghatna for action in respect of non-replacement of Failed Transformers and to set aside the MSEDCL's Circular No 136 dated 04.11.2011 and letter No. 33329 dated 08.11.2011.
14 of 2012
Completed
5543 Thu 03/05/2012 12:30:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5544 Thu 03/05/2012 11:00:00 AM
Hearing
Petition of Shri Anjaya Rajam Anparthi challenging the power distribution franchisee agreement signed between Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) and M/s. Spanco Ltd. on 23rd February, 2011.
120 of 2011
Completed
5545 Thu 03/05/2012 11:00:00 AM
Hearing
Petition of Maharashtra Veej Grahak Sanghatna seeking investigation of the contracts for appointment of Distribution Franchisees at various places by MSEDCL and setting standards and rules as per law.
121 of 2011
Completed
5546 Wed 02/05/2012 17:00:00 PM
Hearing
Petition of M/s Geeta Pumps Pvt Ltd for non-compliance of the directions of the CGRF Forum, Kolhapur Zone, for refund of excess ASC Charges through future bills, in spite of the rejection of interim stay by Honorable High Court Mumbai in Respondent's Writ Petition No. 7873 of 2010 by the Order dated 25/07/2011
16 of 2012
Completed
5547 Wed 02/05/2012 16:00:00 PM
Hearing
Petition of Shri Ramchandra P. Farande & Ors. challenging the Judgment and Order dated 30.11.2011 and 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 12 and 13 of 2011.
28 of 2012
Completed
5548 Wed 02/05/2012 16:00:00 PM
Hearing
Petition of Shri Ganpat Khanderao Farande and Shri Subhash Khanderao Farande challenging the Judgment and Order dated 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 13 of 2011.
25 of 2012
Completed
5549 Wed 02/05/2012 15:00:00 PM
Hearing
Petition of M/s Birla Perucchini Ltd. for non-compliance of order dated 18th February 2011 passed by CGRF Aurangabad.
31 of 2012
Completed
5550 Wed 02/05/2012 11:00:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003
161 of 2011
Reschedule
5551 Fri 27/04/2012 23:00:00 PM
Hearing
Petition seeking setting aside/ quashing of limited portion of Commercial Circular No. 155 issued by the Maharashtra State Electricity Distribution Company Limited purporting to provide for additional tariff terms and conditions for granting Open Access without the approval of the Honorable Commission.
33 of 2012
Completed
5552 Fri 27/04/2012 23:00:00 PM
Hearing
Petition of Tata Motors Ltd to set aside Commercial Circular No. 155 dated 23.01.2012 issued by the Maharashtra State Electricity Distribution Company Limited providing for tariff terms and conditions without the approval of the Honorable Commission
18 of 2012
Completed
5553 Fri 27/04/2012 23:00:00 PM
Hearing
Petition of Enercon (India) Ltd for quashing Circular No 155 dated 23 .01.2012 by the Maharashtra State Electricity Distribution Company Limited purporting to provide for additional tariff terms and conditions for granting Open Access without the approval of the Honorable Commission.
20 of 2012
Completed
5554 Fri 27/04/2012 23:00:00 PM
Hearing
Petition of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 2.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010
8 of 2012
Completed
5555 Fri 27/04/2012 17:00:00 PM
Hearing
Application of Steel Authority of India Ltd. to grant exemption from Purchase of Renewable Energy Certificates in respect of 6% of its consumption from applicant's power generation plant towards its fulfillment of Renewable Energy Purchase Obligation.
27 of 2012
Completed
5556 Fri 27/04/2012 16:00:00 PM
Hearing
Petition of M/s Co-generation Association of India for review of the tariff order and tariff structure for non-qualifying/ incidental type bagasse based grid connected Co-generation Projects in Maharashtra.
42 of 2010
Completed
5557 Thu 26/04/2012 14:30:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011.
24 of 2012
Completed
5558 Thu 26/04/2012 14:30:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011 and Mula Pravara�s Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5559 Thu 26/04/2012 14:30:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
5560 Wed 25/04/2012 16:00:00 PM
Hearing
Petition of M/s Aaudh Tools, Aurangabad for non-compliance of order dated 23.01.2012 passed by the Electricity Ombudsman Nagpur in Representation No. 17 of 2011.
30 of 2012
Completed
5561 Fri 13/04/2012 15:00:00 PM
Hearing
Shri Vijay Omkarrao Malokar, Akola for initiating the legal action under Sections 142, 146 and 149 of the EA 2003 against the Managing Director and Chairman of Maharashtra State Electricity Board Holding Company (MSEBHC) for violation of various MERC's Orders, and set aside the MSEDCL's Circular No. 35 of dated 05.10.2011 and seeking electricity power supply to Farmers in day hours.
154 of 2011
Reschedule
5562 Fri 13/04/2012 15:00:00 PM
Hearing
Petition of Shri Babanrao Kale, Shetkari Sanghatna for action in respect of non-replacement of Failed Transformers and to set aside the MSEDCL�s Circular No 136 dated 04.11.2011 and letter No. 33329 dated 08.11.2011.
14 of 2012
Completed
5563 Fri 13/04/2012 15:00:00 PM
Hearing
Shri.Vijay Omkarrao Malokar, Akola for initiating the legal action under sections 142,146 and 149 of the EA 2003 against the Managing Director and Chairman of Maharashtra State Electricity Board Holding Company(MSEBHC) for voilation of various MERC's orders ans set aside MSEDCL's circular No. of Dated 05/10/2011 and seeking electricity supply to farmers in day hours.
154 of 2011
Reschedule
5564 Fri 13/04/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability.
151 of 2011
Completed
5565 Thu 12/04/2012 12:30:00 PM
Hearing
Petition for seeking review of the decisions, directions and order of the Honorable Commission in respect of the Order dated 30th December, 2011in Case No. 100 of 2011- Petition of Maharashtra State Electricity Distribution Company Ltd., for final Truing Up for the year FY 2009-10, Provisional Truing Up and Annual Performance Review for the year FY 2010-11 - Case No. 21 of 2012
of
Reschedule
5566 Wed 11/04/2012 16:30:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount.
182 of 2011
Completed
5567 Wed 11/04/2012 16:30:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount.
182 of 2011
Completed
5568 Wed 11/04/2012 14:00:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount. - Case No. 182 of 2011
182 of 2011
Reschedule
5569 Wed 11/04/2012 12:30:00 PM
Public Hearing
Petition of M/s Tata Power Co Ltd (Distribution) for approval to levy an additional FAC for nine months in FY 2012-13.
29 of 2012
Completed
5570 Wed 04/04/2012 23:00:00 PM
Public Hearing
Petition of M/s Jaigad Power Transco Ltd for approval of true up of Annual Revenue Requirement for 2010-11 and approval of Annual Revenue Requirement for FY 2011-12.
170 of 2011
Completed
5571 Wed 04/04/2012 17:00:00 PM
Hearing
Application of Steel Authority of India Ltd. to grant exemption from Purchase of Renewable Energy Certificates in respect of 6% of its consumption from applicant�s power generation plant towards its fulfillment of Renewable Energy Purchase Obligation.
27 of 2012
Reschedule
5572 Wed 04/04/2012 16:00:00 PM
Hearing
Petition of M/s Co-generation Association of India for review of the tariff order and tariff structure for non-qualifying/ incidental type bagasse based grid connected Co-generation Projects in Maharashtra.
42 of 2010
Reschedule
5573 Wed 04/04/2012 12:00:00 PM
Public Hearing
Petition of Maharashtra State Electricity Transmission Co Ltd for Truing Up for FY 2010-11 approval of Aggregate Revenue Requirement for FY 2011-12 and FY 2012-13 and determination of Tariff for FY 2012-13 under provisions of Maharashtra Electricity Regulatory Commission (Multi Year Tariff Regulations, 2011 and Maharashtra Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2011.
169 of 2011
Completed
5574 Wed 04/04/2012 12:00:00 PM
Public Hearing
Suggestions and objections on Maharashtra State Electricity Transmission Company Limited' (MSETCL) Truing Up for FY 2010-11, approval of Aggregate Revenue Requirement for FY 2011-12 and FY 2012-13 and determination of Tariff for FY 2012-13 (Case No. 169 of 2011)
169 of 2011
Reschedule
5575 Wed 04/04/2012 11:00:00 AM
Public Hearing
Suggestions/ Objections on Jaigad PowerTransco Limited (JPTL) Petition for Truing up for FY 2010-11 and approval of Aggregate Revenue Requirement (ARR) for FY 2011-12 (Case No. 170 of 2011)
170 of 2011
Reschedule
5576 Tue 03/04/2012 23:00:00 PM
Hearing
Petition seeking consideration on the expected variation in the performance parameter for MSPGCL power stations on account of backing down instructions from State Load Dispatch Centre.
109 of 2011
Completed
5577 Tue 03/04/2012 15:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011, and Mula Pravara�s Application for grant of Distribution Licence for MPECS area of supply.
87 of 2010
Completed
5578 Tue 03/04/2012 15:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission's Order dated 27.01.2011.
85 of 2010
Completed
5579 Mon 02/04/2012 16:00:00 PM
Hearing
Petition of Shri Ramchandra P. Farande & Ors. challenging the Judgment and Order dated 30.11.2011 and 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 12 and 13 of 2011.
28 of 2012
Completed
5580 Mon 02/04/2012 16:00:00 PM
Hearing
Petition of Shri Ganpat Khanderao Farande and Shri Subhash Khanderao Farande challenging the Judgment and Order dated 31.12.2011 passed by the Ld. Divisional Magistrate, Wai in Misc. Application No. 13 of 2011.
25 of 2012
Completed
5581 Mon 02/04/2012 15:00:00 PM
Hearing
Petition of Sau. Dipali S. Ahir for non compliance of order dated 26th August, 2011 passed by CGRF Kolhapur in Complaint No. 98 of 2011-12.
26 of 2012
Completed
5582 Mon 02/04/2012 11:00:00 AM
Hearing
Petition of M/s. Dodson Lindblom Hydro Power Pvt Ltd for Clarification and Directions on the Calculation of the Capacity index for the Generating station of the Petitioner for supply of Electricity to the Respondent.
142 of 2011
Completed
5583 Thu 29/03/2012 16:00:00 PM
Hearing
Petition of M/s Poultry Breeders Welfare Association for proper Tariff Categorization of the Hatchery Units, which are the integral part of the Poultry Units in LT/HT Agricultural Category, in order to stop improper Commercial Tariff Application by MSEDCL, and with reference to the Tariff Philosophy of the Honorable Commission and concerned Orders of the Honorable High Court, Mumbai. - Case No. 22 of 2012.
22 of 2012
Completed
5584 Thu 29/03/2012 12:30:00 PM
Hearing
173 of 2011
Completed
5585 Thu 29/03/2012 11:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd seeking grant of connectivity of 500 kWp Rooftop Solar Power Plant in Tata Motors premises in Pimpri unit to the electrical system within the premises of Tata Motors - Case No. 173 of 2011
173 of 2011
Reschedule
5586 Wed 28/03/2012 15:00:00 PM
Hearing
Petition of Enercon (India) Ltd for quashing Circular No 155 dated 23 .01.2012 by the Maharashtra State Electricity Distribution Company Limited purporting to provide for additional tariff terms and conditions for granting Open Access without the approval of the Honorable Commission. - Case No. 20 of 2012
20 of 2012
Completed
5587 Wed 28/03/2012 15:00:00 PM
Hearing
Petition of Tata Motors Ltd to set aside Commercial Circular No. 155 dated 23.01.2012 issued by the Maharashtra State Electricity Distribution Company Limited providing for tariff terms and conditions without the approval of the Honorable Commission - Case No. 18 of 2012
18 of 2012
Completed
5588 Wed 28/03/2012 15:00:00 PM
Hearing
Petition of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 2.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010 - Case No. 8 of 2012.
8 of 2012
Completed
5589 Wed 28/03/2012 12:30:00 PM
Hearing
Petition of Enercon (India) Ltd for quashing Circular No 155 dated 23 .01.2012 by the Maharashtra State Electricity Distribution Company Limited purporting to provide for additional tariff terms and conditions for granting Open Access without the approval of the Honorable Commission. - Case No. 20 of 2012
20 of 2012
Reschedule
5590 Wed 28/03/2012 12:30:00 PM
Hearing
Petition of Tata Motors Ltd to set aside Commercial Circular No. 155 dated 23.01.2012 issued by the Maharashtra State Electricity Distribution Company Limited providing for tariff terms and conditions without the approval of the Honorable Commission - Case No. 18 of 2012
18 of 2012
Reschedule
5591 Wed 28/03/2012 12:30:00 PM
Hearing
Petition of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 2.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010 - Case No. 8 of 2012.
8 of 2012
Reschedule
5592 Tue 27/03/2012 10:00:00 AM
Public Hearing
Suggestions and Objections on RInfra-Distribution Business (RInfra-D) petition for determination of ARR and tariff for FY 2011-12 (Case No. 180 of 2011)
180 of 2011
Completed
5593 Mon 26/03/2012 16:00:00 PM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability - Case No. 151 of 2011
151 of 2011
Completed
5594 Mon 26/03/2012 11:00:00 AM
Public Hearing
ISSUES ON OPEN ACCESS
171 of 2011
Completed
5595 Mon 26/03/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability - Case No. 151 of 2011
151 of 2011
Reschedule
5596 Thu 22/03/2012 16:00:00 PM
Hearing
Determination of compensation/ charges payable pursuant to Honorable APTEL Order and Judgment dated 16.12.2011 in Case No. 39 of 2011. - Case No. 24 of 2012
24 of 2012
Completed
5597 Thu 22/03/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011, and Mula Pravara' Application for grant of Distribution Licence for MPECS area of supply - Case Nos. 87 of 2010
87 of 2010
Completed
5598 Thu 22/03/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011. - Case No. 85 of 2010.
85 of 2010
Completed
5599 Thu 22/03/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011, and Mula Pravara' Application for grant of Distribution Licence for MPECS area of supply - Case Nos. 87 of 2010
87 of 2010
Reschedule
5600 Thu 22/03/2012 16:00:00 PM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011. - Case No. 85 of 2010.
85 of 2010
Reschedule
5601 Thu 22/03/2012 11:00:00 AM
Public Hearing
167 of 2011
Completed
5602 Thu 22/03/2012 11:00:00 AM
Public Hearing
Objections / Suggestions on Reliance Infrastructure Ltd.-Generation Business (RInfra-G) Petition for Approval of Annual Revenue Requirement (ARR) for FY 2011-12 (Case No. 163 of 2011)
163 of 2011
Completed
5603 Wed 21/03/2012 16:00:00 PM
Hearing
Petition of MSEDCL for increasing the existing ceiling of 10% (of the variable component of tariff) on levy & recovery of Fuel Adjustment Charges (FAC) and Recovery of unrecovered FAC accumulated during the period April 2011 to October 2011 beyond the 10% ceiling amounting to Rs.753.71 crs. - Case No. 12 of 2012.
12 of 2012
Completed
5604 Wed 21/03/2012 16:00:00 PM
Hearing
Petition of MSEDCL for approval of Short Term Power Procurement for the period April 2011 to March 2012 under the removal of difficulties. - Case No. 13 of 2012.
13 of 2012
Completed
5605 Wed 21/03/2012 15:00:00 PM
Hearing
Petition for determination of Lease Rent for Ghatghar Pumped Storage Hydro Power Station as per MERC (Terms and Conditions of Tariff) Regulations, 2005. - Case No. 2 of 2012
2 of 2012
Completed
5606 Wed 21/03/2012 12:30:00 PM
Hearing
Implementation of the Judgment dated 18th July, 2011 given by the ATE, in Appeal No. 144 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 15.06.2009 passed in RInfra' Tariff Petition for FY 2009-10. - Case 101 of 2011
101 of 2011
Completed
5607 Wed 21/03/2012 12:30:00 PM
Hearing
Implementation of the Judgment dated 31st May, 2011 given by the ATE, in Appeal No. 195 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 24.11.2009. - Case 82 of 2011
82 of 2011
Completed
5608 Wed 21/03/2012 11:00:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003. - Case No. 161 of 2011
161 of 2011
Completed
5609 Wed 21/03/2012 11:00:00 AM
Hearing
Petition of MSEDCL for increasing the existing ceiling of 10% (of the variable component of tariff) on levy & recovery of Fuel Adjustment Charges (FAC) and Recovery of unrecovered FAC accumulated during the period April 2011 to October 2011 beyond the 10% ceiling amounting to Rs.753.71 crs. - Case No. 12 of 2012.
12 of 2012
Reschedule
5610 Wed 21/03/2012 11:00:00 AM
Hearing
Petition of MSEDCL for approval of Short Term Power Procurement for the period April 2011 to March 2012 under the removal of difficulties. - Case No. 13 of 2012.
13 of 2012
0
5611 Fri 16/03/2012 11:00:00 AM
Hearing
Petition of Chamber of Marathwada Industries & Agriculture for issuing directions to Maharashtra Electricity Distribution Company Ltd. to withdraw their commercial amount along with interest to the consumers Case No. 183 of 2011
183 of 2011
Completed
5612 Wed 14/03/2012 16:00:00 PM
Hearing
Petition of MSETCL for review of Order dated December 29, 2011 in Case No. 102 of 2011 in the matter of Petition of MSETCL for Truing up of FY 2009-10 and approval of Annual Performance Review for FY 2010-11 under provisions of MERC (Terms and Conditions of Tariff) Regulations, 2005. - Case No. 17 of 2012
of
Completed
5613 Tue 13/03/2012 15:00:00 PM
Hearing
Petition of Water Resources Department, (GoM) for approval of completion of first Stage of Bidding Process undertaken by the Petitioner for Private Sector Participation for Development of Kodali Pumped Storage Scheme for electricity generation of Build , operate and Transfer (BOT) basis and procurement of power for long term basis, and initiation of second Stage of Bidding Process under Case-1 bidding procedure through Tariff based competitive bidding process (as per bidding guidelines, issued by the Ministry of Power , Govt of India vide notification No. 23 /11 2004/R&R (Vol II) ) dated 19.01.2005 - Case No. 15 of 2012
of
0
5614 Mon 12/03/2012 16:00:00 PM
Hearing
Petition of M/s Geeta Pumps Pvt Ltd for non-compliance of the directions of the CGRF Forum, Kolhapur Zone, for refund of excess ASC Charges through future bills, in spite of the rejection of interim stay by Honorable High Court Mumbai in Respondent' Writ Petition No. 7873 of 2010 by the Order dated 25/07/2011 - Case No. 16 of 2012
16 of 2012
Completed
5615 Mon 12/03/2012 15:00:00 PM
Hearing
Petition of M/s Hitech Carbon (Unit of Aditya Birla Nuvo Ltd) for determination of Tariff for supply of electricity from industrial waste heat recovery cogeneration power plant of 23 MW capacity at Village Lohop / Talvali, Patalganga, District Raigad to Distribution Licensee in Maharashtra and fixation of Purchase Obligation for electricity produced from waste heat recovery based co-generation plants. - Case No. 175 of 2011
175 of 2011
Completed
5616 Wed 07/03/2012 16:00:00 PM
Public Hearing
Objections / suggestions on Maharashtra State Load Despatch Centre' (MSLDC) Petition for approval of Budget for FY 2012-13 (Case No. 181 of 2011)
181 of 2011
0
5617 Wed 07/03/2012 15:00:00 PM
Hearing
Petition of M/s Co-generation Association of India for review of the tariff order and tariff structure for non-qualifying/ incidental type bagasse based grid connected Co-generation Projects in Maharashtra. - Case No. 42 of 2010
42 of 2010
Completed
5618 Wed 07/03/2012 11:00:00 AM
Public Hearing
HEARING ON SUO- MOTU DRAFT ORDER ON RENEWABLE ENERGY TARIFF FOR FY 2012-13
10 of 2012
Completed
5619 Fri 02/03/2012 16:30:00 PM
Hearing
Petition seeking consideration on the expected variation in the performance parameter for MSPGCL power stations on account of backing down instructions from State Load Dispatch Centre. - Case No. 109 of 2011.
109 of 2011
Completed
5620 Fri 02/03/2012 15:00:00 PM
Public Hearing
Objections / suggestions on Adani Power Maharashtra Limited (APML) Transmission Business' Aggregate Revenue Requirement (ARR) for FY 2011-12 in Case No. 174 of 2011
174 of 2011
Completed
5621 Fri 02/03/2012 12:30:00 PM
Hearing
Infrastructure and other Development activities in the erstwhile Mula Pravara Area. - Case No. 9 of 2012
9 of 2012
Completed
5622 Fri 02/03/2012 11:00:00 AM
Public Hearing
Suggestions and Objections on the Petition of Sinnar Power Transmission Company Limited (SPTCL) for approval of Business Plan for Second Control Period from FY 2011-12 to FY 2015-16 (Case No. 136 of 2011)
136 of 2011
Completed
5623 Fri 02/03/2012 11:00:00 AM
Public Hearing
Suggestions and Objections on the Petition of Amravati Power Transmission Company Limited (APTCL) for approval of Business Plan for Second Control Period from FY 2011-12 to FY 2015-16 (Case No. 135 of 2011)
135 of 2011
Completed
5624 Thu 01/03/2012 12:30:00 PM
Hearing
Petition of Enercon (India) Ltd for quashing Circular No 155 dated 23 .01.2012 by the Maharashtra State Electricity Distribution Company Limited purporting to provide for additional tariff terms and conditions for granting Open Access without the approval of the Honorable Commission. - Case No. 20 of 2012
20 of 2012
Completed
5625 Thu 01/03/2012 12:30:00 PM
Hearing
Petition of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 2.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010 Case No. 8 of 2012.
8 of 2012
Completed
5626 Thu 01/03/2012 12:30:00 PM
Hearing
Petition of Tata Motors Ltd to set aside Commercial Circular No. 155 dated 23.01.2012 issued by the Maharashtra State Electricity Distribution Company Limited providing for tariff terms and conditions without the approval of the Honorable Commission Case No. 18 of 2012
18 of 2012
Completed
5627 Thu 01/03/2012 11:00:00 AM
Hearing
Petition of MSEDCL for Extension of deadline of 5.1.2011 for Procurement of Power through MoU Route. - Case No 64 of 2011
64 of 2011
Completed
5628 Tue 28/02/2012 11:00:00 AM
Hearing
Petition of Sou. Arunabai w/o Shivsing Pardeshi for non-compliance of regulation while laying down transmission line and non payment of compensation for the same. - Case No. 11 of 2012
11 of 2012
Completed
5629 Tue 28/02/2012 11:00:00 AM
Hearing
Smt. Meena Kishinchand Tuny's Petition under Section 142 of the EA, 2003, against MSEDCL for non-compliance of the CGRF order dated 19.12.2008, passed by the CGRF, Kalyan - Case No. 27 of 2009
27 of 2009
Completed
5630 Mon 27/02/2012 11:00:00 AM
Hearing
Petition of M/s. Dodson Lindblom Hydro Power Pvt Ltd for Clarification and Directions on the Calculation of the Capacity index for the Generating station of the Petitioner for supply of Electricity to the Respondent - Case No. 142 of 2011 In
142 of 2011
Completed
5631 Fri 24/02/2012 11:00:00 AM
Hearing
Infrastructure and other Development activities in the erstwhile Mula Pravara Area. - Case No. 9 of 2012
9 of 2012
Completed
5632 Fri 24/02/2012 11:00:00 AM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011. - Case Nos. 85 and 87 of 2010
87 of 2010
Completed
5633 Fri 24/02/2012 11:00:00 AM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011. - Case Nos. 85 and 87 of 2010
85 of 2010
Completed
5634 Fri 24/02/2012 10:30:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003. - Case No. 161 of 2011
of
Completed
5635 Thu 23/02/2012 12:30:00 PM
Hearing
Petition of Indian Wind Power Association for directing MSEDCL to issue open access approval in accordance with the MERC (Distribution Open Access) Regulations, 2005, as amended and modified, for RE from time to time, Directives of MERC during the hearing held on 02.12.2010 and Order dated 20.10.2011 in Case No. 41 of 2010. - Case No. 8 of 2012
8 of 2012
Completed
5636 Thu 23/02/2012 12:30:00 PM
Hearing
Petition of M/s. Serene Properties Private Limited for taking on record the Distribution Licensee status of the Petitioner for IT & ITES SEZ at Plot No. 3 Airoli, Kalwa TTC Industrial Area, MIDC, District Thane and for issuing the Specific Condition of Distribution Licence applicable to the Petitioner - Case No. 157 of 2011
157 of 2011
Reschedule
5637 Thu 23/02/2012 11:00:00 AM
Hearing
Petition of M/s. Serene Properties Private Limited for taking on record the Distribution Licensee status of the Petitioner for IT & ITES SEZ at Plot No. 3 Airoli, Kalwa TTC Industrial Area, MIDC, District Thane and for issuing the Specific Condition of Distribution Licence applicable to the Petitioner - Case No. 157 of 2011
157 of 2011
Completed
5638 Wed 15/02/2012 15:00:00 PM
Hearing
Petition of M/s Ladam Finance Ltd for non-compliance of the Electricity Ombudsman Order dated 4.11.2011 in Representation No.121 of 2011. - Case No. 176 of 2011
176 of 2011
Completed
5639 Wed 15/02/2012 12:30:00 PM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003. - Case No. 161 of 2011
of
Completed
5640 Wed 15/02/2012 11:00:00 AM
Hearing
Petition seeking consideration on the expected variation in the performance parameter for MSPGCL power stations on account of backing down instructions from State Load Dispatch Centre. - Case No. 109 of 2011.
109 of 2011
Completed
5641 Mon 13/02/2012 16:00:00 PM
Hearing
Petition of the Govt of Maharashtra, Water Resources Department as regards to review of calculations in respect of arithmetical errors noticed in the Order dated 27th Oct 2008 for Hydro Power Station Lease Rent in Case No. 17 of 2007 - Case No. 5 of 2012
5 of 2012
Completed
5642 Mon 13/02/2012 15:00:00 PM
Hearing
Petition for determination of Lease Rent for Ghatghar Pumped Storage Hydro Power Station as per MERC (Terms and Conditions of Tariff) Regulations, 2005. - Case No. 2 of 2012
2 of 2012
Completed
5643 Mon 13/02/2012 12:30:00 PM
Hearing
Petition of M/s Maharashtra Eastern Grid Power Transmission Co Limited for the assignment of Transmission License No. 1 of 2010, granted to Maharashtra Eastern Grid Power Transmission Co Limited, to the lenders by way of security in respect of its 765 kV Intra-State Transmission system. - Case No. 4 of 2012
4 of 2012
Completed
5644 Mon 13/02/2012 12:30:00 PM
Hearing
Petition of M/s Adani Power Maharashtra Limited for the assignment of Transmission License No. 2 of 2009, granted to Adani Power Maharashtra Limited, to the lenders by way of security in respect of its 400kV Transmission system. - Case No. 3 of 2012
3 of 2012
Completed
5645 Mon 13/02/2012 11:00:00 AM
Hearing
Petition of MSEDCL for Extension of deadline of 5.1.2011 for Procurement of Power through MoU Route. - Case No 64 of 2011
64 of 2011
Completed
5646 Fri 10/02/2012 10:30:00 AM
Hearing
Implementation of the Judgment dated 18th July, 2011 given by the ATE, in Appeal No. 144 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 15.06.2009 passed in RInfra' Tariff Petition for FY 2009-10. - Case 101 of 2011
101 of 2011
Completed
5647 Fri 10/02/2012 10:30:00 AM
Hearing
Implementation of the Judgment dated 31st May, 2011 given by the ATE, in Appeal No. 195 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 24.11.2009. - Case 82 of 2011
82 of 2011
Completed
5648 Thu 09/02/2012 15:00:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount. - Case No. 182 of 2011
182 of 2011
Completed
5649 Thu 09/02/2012 11:00:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability - Case No. 151 of 2011
151 of 2011
Completed
5650 Wed 08/02/2012 15:00:00 PM
Hearing
Petition of Chamber of Marathwada Industries & Agriculture for issuing directions to Maharashtra Electricity Distribution Company Ltd. to withdraw their commercial amount along with interest to the consumers Case No. 183 of 2011
183 of 2011
Completed
5651 Wed 08/02/2012 12:30:00 PM
Admissibility Hearing
Petition of M/s Hindustan Antibiotics Ltd for providing electricity at concessional rates to the Petitioner and such other consumers manufacturing bulk life saving drugs, and giving advice to the Government of Maharashtra to provide subsidy to the Petitioner. - Case No. 164 of 2011
164 of 2011
Completed
5652 Wed 08/02/2012 11:00:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd seeking grant of connectivity of 500 kWp Rooftop Solar Power Plant in Tata Motors premises in Pimpri unit to the electrical system within the premises of Tata Motors - Case No. 173 of 2011
173 of 2011
Completed
5653 Tue 31/01/2012 11:00:00 AM
Hearing
Implementation of APTEL Order dated 16.12.2011 in Case No. 39 of 2011 with regards to granting of License to MSEDCL - Case No. 9 of 2012
9 of 2012
Completed
5654 Tue 31/01/2012 11:00:00 AM
Hearing
Implementation of the Judgment dated 16th December, 2011 given by the Honorable Appellate Tribunal for Electricity, in Appeal No. 39 of 2011, filed by Mula Pravara Electric Co-op Society Ltd. challenging the Commission' Order dated 27.01.2011.
87 of 2010
Completed
5655 Mon 30/01/2012 15:00:00 PM
Hearing
Petition of M/s Co-generation Association of India for review of the tariff order and tariff structure for non-qualifying/ incidental type bagasse based grid connected Co-generation Projects in Maharashtra. - Case No. 42 of 2010
42 of 2010
Completed
5656 Mon 30/01/2012 11:00:00 AM
Hearing
Petition of M/s. Dodson Lindblom Hydro Power Pvt Ltd for Clarification and Directions on the Calculation of the Capacity index for the Generating station of the Petitioner for supply of Electricity to the Respondent - Case No. 142 of 2011
142 of 2011
0
5657 Fri 27/01/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for recovery of expenditure to be incurred for such shifting of poles & conversion of low tension / high tension overhead distribution network to underground from consumers situated within the geographical limits of Nagpur Municipal Corporation - Case No. 172 of 2011
172 of 2011
Completed
5658 Wed 25/01/2012 16:30:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount. - Case No. 182 of 2011
182 of 2011
Completed
5659 Wed 25/01/2012 15:00:00 PM
Hearing
Implementation of the Honorable Appellate Tribunal for Electricity (APTEL) Judgment dated 16th September, 2011 in Appeal No. 197 of 2010 (Solapur Bioenergy Systems Pvt Ltd v/s Others). - Case No. 132 of 2011
of
Completed
5660 Wed 25/01/2012 12:30:00 PM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003. - Case No. 161 of 2011
of
Completed
5661 Wed 25/01/2012 12:00:00 PM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1) (f) of the Electricity Act, 2003 (read with Section 63 and 86 (1) (b)) seeking recovery of unpaid dues/ tariff for supply of electricity in terms of Power Purchase Agreement dated 13.05.2009. -- Case No. 14 of 2011
14 of 2011
Completed
5662 Wed 25/01/2012 11:00:00 AM
Admissibility Hearing
Petition seeking consideration on the expected variation in the performance parameter for MSPGCL power stations on account of backing down instructions from State Load Dispatch Centre. - Case No. 109 of 2011.
109 of 2011
Completed
5663 Wed 25/01/2012 10:30:00 AM
Hearing
Petition of Shalivahana Green Energy Ltd seeking termination of Biomass Energy Purchase Agreement dated June 7, 2006 executed by and entered into between Shalivahana Green Energy Ltd (formerly Shalivahana Projects Ltd.) in respect of power generated at 10 MW plant at Village Chanaka, Taluka Wani, District Yavatmal and claim of Deemed Generation Charges in accordance with Article 12.5 of the BEPA dated June 7, 2006. Case No. 19 of 2010
of
Completed
5664 Thu 19/01/2012 12:30:00 PM
Admissibility Hearing
Petition of Shopping Center Association of India for Single Point Supply to Commercial Building / Industrial Complexes for mixed load, (ii) the Order dated 3rd October 2011 passed by the MERC pursuant to the Suo motu hearing on 5th September, 2011, (iii) Commercial Circular No 143 issued by the Chief Engineer (Commercial), MSEDCL dated 16th Sept 2011. - Case No. 160 of 2011
160 of 2011
Completed
5665 Wed 18/01/2012 13:00:00 PM
Hearing
Implementation of the Judgment dated 31st May, 2011 given by the ATE, in Appeal No. 195 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 24.11.2009. - Case 82 of 2011
82 of 2011
Reschedule
5666 Wed 18/01/2012 13:00:00 PM
Hearing
Implementation of the Judgment dated 18th July, 2011 given by the ATE, in Appeal No. 144 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 15.06.2009 passed in RInfra' Tariff Petition for FY 2009-10. - Case 101 of 2011
101 of 2011
Reschedule
5667 Wed 18/01/2012 12:30:00 PM
Hearing
Implementation of the Judgment dated 18th July, 2011 given by the ATE, in Appeal No. 144 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 15.06.2009 passed in RInfra' Tariff Petition for FY 2009-10. - Case 101 of 2011
101 of 2011
Completed
5668 Wed 18/01/2012 12:30:00 PM
Hearing
Implementation of the Judgment dated 31st May, 2011 given by the ATE, in Appeal No. 195 of 2009, filed by the Mumbai International Airport Pvt. Ltd. (MIAL) challenging the Commission' Order dated 24.11.2009. - Case 82 of 2011
82 of 2011
Completed
5669 Wed 18/01/2012 10:30:00 AM
Hearing
Petition of Wardha Power Company Limited under Section 86 (1) (f) of the Electricity Act, 2003 (read with Section 63 and 86 (1) (b)) seeking recovery of unpaid dues/ tariff for supply of electricity in terms of Power Purchase Agreement dated 13.05.2009. -- Case No. 14 of 2011
14 of 2011
Completed
5670 Tue 17/01/2012 10:30:00 AM
Hearing
Petition of Reliance Infrastructure Ltd (Distribution) seeking relief on account of certain critical issues affecting Reliance Infrastructure Limited (Distribution) and its financial viability - Case No. 151 of 2011
151 of 2011
Completed
5671 Mon 16/01/2012 16:00:00 PM
Public Hearing
DIRECTIVES OF THE APPELLATE TRIBUNAL FOR ELECTRICITY, VIDE ORDER DATED 6TH SEPT. 2011 IN APPEAL NO. 50 OF 2011 IN RESPECT OF REFUND OF REGULATORY LIABILITY CHARGES WITH INTEREST TO ALL HT CONSUMERS MERC Case No. 138 of 2011
138 of 2011
Completed
5672 Mon 16/01/2012 15:00:00 PM
Hearing
Petition of BEST Undertaking to permit the BEST to recover the FAC for the period from April, 2011 to October, 2011 incurred by BEST in excess of the 10% cap imposed by the Honorable Commission and allow to recover FAC levied by TPC. - Case No. 162 of 2011
162 of 2011
Completed
5673 Mon 16/01/2012 10:00:00 AM
Public Hearing
Objections / suggestions on BEST' Petition for Truing Up for FY 2009-10 and Annual Performance Review (APR) for FY 2010-11 (Case No. 125 of 2011)
125 of 2011
Completed
5674 Thu 12/01/2012 16:30:00 PM
Hearing
Petition of M/s Areeb Rolling Mills Pvt Ltd for non-compliance of the CGRF, Kalyan Zone of MSEDCL for refund of unpaid RLC and ASC amount. - Case No. 182 of 2011
182 of 2011
Completed
5675 Thu 12/01/2012 12:30:00 PM
Hearing
Petition of Shopping Center Association of India for Single Point Supply to Commercial Building / Industrial Complexes for mixed load, (ii) the Order dated 3rd October 2011 passed by the MERC pursuant to the Suo motu hearing on 5th September, 2011, (iii) Commercial Circular No 143 issued by the Chief Engineer (Commercial), MSEDCL dated 16th Sept 2011. - Case No. 160 of 2011
160 of 2011
Completed
5676 Thu 12/01/2012 11:00:00 AM
Hearing
Petition of MSEDCL for Extension of deadline of 5.1.2011 for Procurement of Power through MoU Route. - Case No 64 of 2011
64 of 2011
Completed
5677 Fri 06/01/2012 16:00:00 PM
Admissibility Hearing
Petition filed by Shri Haribhau D. Khapre in the matter of violation of the directions given by the Commission in its Order dated 5th January, 2012 in Case No. 148 of 2011.
of
Completed
5678 Fri 06/01/2012 12:30:00 PM
Hearing
Petition of Chamber of Marathwada Industries & Agriculture for issuing directions to Maharashtra Electricity Distribution Company Ltd. to withdraw their commercial amount along with interest to the consumers Case No. 183 of 2011
183 of 2011
Completed
5679 Fri 06/01/2012 10:30:00 AM
Hearing
Petition of M/s Wardha Power Co Ltd against failure to grant open access under the provisions of the Electricity Act,2003 read with Regulation 3 of the MERC (Transmission open access ) Regulations,2005 Regulation 3 of MERC (Distribution open access ) Regulation,2004 and against abuse of the dominant position under the provisions of the Electricity Act 2003. - Case No. 161 of 2011
183 of 2011
Completed
5680 Thu 05/01/2012 12:30:00 PM
Hearing
Smt. Meena Kishinchand Tunya' Petition under Section 142 of the EA, 2003, against MSEDCL for non-compliance of the CGRF order dated 19.12.2008, passed by the CGRF, Kalyan - Case No. 27 of 2009
27 of 2009
Completed
5681 Thu 05/01/2012 11:00:00 AM
Hearing
Petition of Maharashtra State Electricity Distribution Company Limited for recovery of expenditure to be incurred for such shifting of poles & conversion of low tension / high tension overhead distribution network to underground from consumers situated within the geographical limits of Nagpur Municipal Corporation - Case No. 172 of 2011
172 of 2011
Completed
5682 Mon 02/01/2012 14:30:00 PM
Hearing
Petition of M/s Ladam Finance Ltd for non-compliance of the Electricity Ombudsman Order dated 4.11.2011 in Representation No.121 of 2011. - Case No. 176 of 2011
176 of 2011
Completed
5683 Mon 02/01/2012 12:30:00 PM
Hearing
Petition of M/s Hindustan Antibiotics Ltd for providing electricity at concessional rates to the Petitioner and such other consumers manufacturing bulk life saving drugs, and giving advice to the Government of Maharashtra to provide subsidy to the Petitioner. - Case No. 164 of 2011
164 of 2011
Completed
5684 Mon 02/01/2012 10:30:00 AM
Hearing
Petition of Tata Power Renewable Energy Ltd seeking grant of connectivity of 500 kWp Rooftop Solar Power Plant in Tata Motors premises in Pimpri unit to the electrical system within the premises of Tata Motors - Case No. 173 of 2011
173 of 2011
Completed